Causes of Delays in Construction Projects: A Case Study for Petrochemical Industry of Iran
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 32807
Causes of Delays in Construction Projects: A Case Study for Petrochemical Industry of Iran

Authors: S. Bagher Daryaii

Abstract:

Delays in construction projects are one of the most common risky problems and regardless of the causes, the delays can occur in all projects and all industries. The impact of delays has a wide range from neglectable ones to losing the project's importance or its economic justification. In this paper, by doing research and interview with managers, executors, consultants and supervisors of construction projects in the petrochemical industry, their opinions about reasons of delays in projects have been gathered.

Keywords: Analysis of delays, causes of delays, delays in petrochemical projects, project delays.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 363

References:


[1] S. A. Assaf, S. Al-Hejji ,“Causes of delay in large construction projects”, international journal of project manajment, 24, 2006, p.p 349-357.
[2] S. M. Ahmed, S. Azhar, M. Castillo, P. Kappagantula, “construction delays in florida: an empirical study”, in Department of Community Affairs, Final Report, florida: florida international university, 2002, pp. 1-44.
[3] R. Singh, “Delays and Cost Overruns in Infrastructure Projects: An Enquiry into Extents, Causes and Remedies”, Dehli, India: Department of Economics Delhi School of Economics University of Delhi, 2009.
[4] T. Pourrostam, I. Amiruddin, “Significant Factors Causing and Effects of Delay in Iranian Construction Projects”, Australian Journal of Basic and Applied Sciences, 5, 2011, p.p 450-456.
[5] L. Le-Hoai, Y. Dai Lee, J. Yong Lee, “Delay and Cost Overruns in Vietnam Large Construction Projects: A Comparison with Other Selected Countries”, KSCE Journal of Civil Engineering, 12, 2008, p.p 367–377.
[6] S. Dayi, “Schedule Delay Analysis in Construction Projects: A Case Study Using Time Impact Analysis Method”, Graduate School of Natural and Applied Sciences of Middle East Technical University, 2010.