	  title     = {Causes of Construction Delays in Qatar Construction Projects},
	  author    = {Murat Gunduz and  Mohanad H. A. AbuHassan},
	  country	= {},
	  institution	= {},
	  abstract     = {Construction industry mainly focuses on the superstructure, infrastructure, and oil and gas industry. The development of infrastructure projects in developing countries attracted a lot of foreign construction contractors, consultants, suppliers and diversified workforce to interfere and to be evolved in such huge investment. Reducing worksite delays in such projects require knowledge and attention. Therefore, it is important to identify the influencing delay attributes affecting construction projects. The significant project factors affecting construction delays were investigated. Data collection was carried out through an online web survey system to capture significant factors. Significant factors were determined with importance index and relevant recommendations are made. The output of the data analysis would lead the industry experts better assess the impact of construction delays on construction projects.
},
	    journal   = {International Journal of Civil and Environmental Engineering},
	  volume    = {10},
	  number    = {4},
	  year      = {2016},
	  pages     = {531 - 536},
	  ee        = {https://publications.waset.org/pdf/10004362},
	  url   	= {https://publications.waset.org/vol/112},
	  bibsource = {https://publications.waset.org/},
	  issn  	= {eISSN: 1307-6892},
	  publisher = {World Academy of Science, Engineering and Technology},
	  index 	= {Open Science Index 112, 2016},
	}