Search results for: Capacity planning
2190 A Design of Supply Chain Management System with Flexible Planning Capability
Authors: Chia-Hui Huang, Han-Ying Kao
Abstract:
In production planning (PP) periods with excess capacity and growing demand, the manufacturers have two options to use the excess capacity. First, it could do more changeovers and thus reduce lot sizes, inventories, and inventory costs. Second, it could produce in excess of demand in the period and build additional inventory that can be used to satisfy future demand increments, thus delaying the purchase of the next machine that is required to meet the growth in demand. In this study we propose an enhanced supply chain planning model with flexible planning capability. In addition, a 3D supply chain planning system is illustrated.Keywords: Supply chain, capacity expansion, inventory management, planning system.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 15652189 Optimal Resource Configuration and Allocation Planning Problem for Bottleneck Machines and Auxiliary Tools
Authors: Yin-Yann Chen, Tzu-Ling Chen
Abstract:
This study presents the case of an actual Taiwanese semiconductor assembly and testing manufacturer. Three major bottleneck manufacturing processes, namely, die bond, wire bond, and molding, are analyzed to determine how to use finite resources to achieve the optimal capacity allocation. A medium-term capacity allocation planning model is developed by considering the optimal total profit to satisfy the promised volume demanded by customers and to obtain the best migration decision among production lines for machines and tools. Finally, sensitivity analysis based on the actual case is provided to explore the effect of various parameter levels.Keywords: Capacity planning, capacity allocation, machine migration, resource configuration.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 10082188 Operating Room Capacity Planning Decisions
Authors: Abdulrahim Shamayleh, John Fowler, Muhong Zhang
Abstract:
Operating rooms are important assets for hospitals as they generate the largest revenue and, at the same time, produce the largest cost for hospitals. The model presented in this paper helps make capacity planning decisions on the combination of open operating rooms (ORs) and estimated overtime to satisfy the allocated OR time to each specialty. The model combines both decisions on determining the amount of OR time to open and to allocate to different surgical specialties. The decisions made are based on OR costs, overutilization and underutilization costs, and contribution margins from allocating OR time. The results show the importance of having a good estimate of specialty usage of OR time to determine the amount of needed capacity and highlighted the tradeoff that the OR manager faces between opening more ORs versus extending the working time of the ORs already in use.Keywords: capacity planning, contribution margins, operating room, overutilization
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 27242187 A Mathematical Framework for Expanding a Railway’s Theoretical Capacity
Authors: Robert L. Burdett, Bayan Bevrani
Abstract:
Analytical techniques for measuring and planning railway capacity expansion activities have been considered in this article. A preliminary mathematical framework involving track duplication and section sub divisions is proposed for this task. In railways, these features have a great effect on network performance and for this reason they have been considered. Additional motivations have also arisen from the limitations of prior models that have not included them.Keywords: Capacity analysis, capacity expansion, railways.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 22512186 Modeling and Optimization of Aggregate Production Planning - A Genetic Algorithm Approach
Authors: B. Fahimnia, L.H.S. Luong, R. M. Marian
Abstract:
The Aggregate Production Plan (APP) is a schedule of the organization-s overall operations over a planning horizon to satisfy demand while minimizing costs. It is the baseline for any further planning and formulating the master production scheduling, resources, capacity and raw material planning. This paper presents a methodology to model the Aggregate Production Planning problem, which is combinatorial in nature, when optimized with Genetic Algorithms. This is done considering a multitude of constraints of contradictory nature and the optimization criterion – overall cost, made up of costs with production, work force, inventory, and subcontracting. A case study of substantial size, used to develop the model, is presented, along with the genetic operators.Keywords: Aggregate Production Planning, Costs, and Optimization.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 25862185 A Development of a Simulation Tool for Production Planning with Capacity-Booking at Specialty Store Retailer of Private Label Apparel Firms
Authors: Erika Yamaguchi, Sirawadee Arunyanrt, Shunichi Ohmori, Kazuho Yoshimoto
Abstract:
In this paper, we suggest a simulation tool to make a decision of monthly production planning for maximizing a profit of Specialty store retailer of Private label Apparel (SPA) firms. Most of SPA firms are fabless and make outsourcing deals for productions with factories of their subcontractors. Every month, SPA firms make a booking for production lines and manpower in the factories. The booking is conducted a few months in advance based on a demand prediction and a monthly production planning at that time. However, the demand prediction is updated month by month, and the monthly production planning would change to meet the latest demand prediction. Then, SPA firms have to change the capacities initially booked within a certain range to suit to the monthly production planning. The booking system is called “capacity-booking”. These days, though it is an issue for SPA firms to make precise monthly production planning, many firms are still conducting the production planning by empirical rules. In addition, it is also a challenge for SPA firms to match their products and factories with considering their demand predictabilities and regulation abilities. In this paper, we suggest a model for considering these two issues. An objective is to maximize a total profit of certain periods, which is sales minus costs of production, inventory, and capacity-booking penalty. To make a better monthly production planning at SPA firms, these points should be considered: demand predictabilities by random trends, previous and next month’s production planning of the target month, and regulation abilities of the capacity-booking. To decide matching products and factories for outsourcing, it is important to consider seasonality, volume, and predictability of each product, production possibility, size, and regulation ability of each factory. SPA firms have to consider these constructions and decide orders with several factories per one product. We modeled these issues as a linear programming. To validate the model, an example of several computational experiments with a SPA firm is presented. We suppose four typical product groups: basic, seasonal (Spring / Summer), seasonal (Fall / Winter), and spot product. As a result of the experiments, a monthly production planning was provided. In the planning, demand predictabilities from random trend are reduced by producing products which are different product types. Moreover, priorities to produce are given to high-margin products. In conclusion, we developed a simulation tool to make a decision of monthly production planning which is useful when the production planning is set every month. We considered the features of capacity-booking, and matching of products and factories which have different features and conditions.
Keywords: Capacity-booking, SPA, monthly production planning, linear programming.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 13322184 Loading Methodology for a Capacity Constrained Job-Shop
Authors: Viraj Tyagi, Ajai Jain, P. K. Jain, Aarushi Jain
Abstract:
This paper presents a genetic algorithm based loading methodology for a capacity constrained job-shop with the consideration of alternative process plans for each part to be produced. Performance analysis of the proposed methodology is carried out for two case studies by considering two different manufacturing scenarios. Results obtained indicate that the methodology is quite effective in improving the shop load balance, and hence, it can be included in the frameworks of manufacturing planning systems of job-shop oriented industries.Keywords: Manufacturing planning, loading, genetic algorithm, Job-Shop
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 14952183 Multi-Criteria Nautical Ports Capacity and Services Planning
Authors: N. Perko, N. Kavran, M. Bukljaš, I. Berbić
Abstract:
This paper is a result of implemented research on proposed introduced methodology for nautical ports capacity planning by introducing a multi-criteria approach of defined criteria in the Adriatic Sea region. The purpose was analyzing the determinants - characteristics of infrastructure and services of nautical ports capacity allocated, especially nowadays due to COVID-19 pandemic, as crucial for successful operation of nautical ports. Giving the importance of the defined priorities for short-term and long-term planning is essential not only in terms of the development of nautical tourism, but also in terms of developing the maritime system, but unfortunately this is not always carried out. Evaluation of the use of resources should follow from a detailed analysis of all aspects of resources bearing in mind that nautical tourism used resources in a sustainable manner and generates effects in the tourism and maritime sectors. Consequently, identified multiplier effect of nautical tourism, which should be defined and quantified in detail, should be one of the major competitive products on the Croatian Adriatic and the Mediterranean. Research of nautical tourism is necessary to quantify the effects and required planning system development. In the future, the greatest threat to long-term sustainable development of nautical tourism can be its further uncontrolled or unlimited and undirected development, especially under pressure markedly higher demand than supply for new moorings in the Mediterranean. Results of this implemented research are applicable to nautical ports management and decision makers of maritime transport system development. This paper will present implemented research and obtained result - developed methodology for nautical port capacity planning - Port Capacity Planning Multi-criteria decision-making. A proposed methodological approach of multi-criteria capacity planning includes four criteria (spatial - transport, cost - infrastructure, ecological and organizational criteria, and additional services). The importance of the criteria and sub-criteria is evaluated and carried out the basis for a sensitivity analysis of the importance of the criteria and sub-criteria. Based on the analysis of the identified and quantified importance of certain criteria and sub-criteria as well as sensitivity analysis and analysis of changes of the quantified importance scientific and applicable results will be presented. These obtained results have practical applicability by management of nautical ports in the planning of increasing capacity and further development and for the adaptation of existing nautical ports. The obtained research is applicable and replicable in other seas and results are especially important and useful in this COVID-19 pandemic challenging maritime development framework.
Keywords: Adriatic Sea, capacity, infrastructures, maritime system, methodology, nautical ports, nautical tourism, service.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 4482182 Information Fusion as a Means of Forecasting Expenditures for Regenerating Complex Investment Goods
Authors: Steffen C. Eickemeyer, Tim Borcherding, Peter Nyhuis, Hannover
Abstract:
Planning capacities when regenerating complex investment goods involves particular challenges in that the planning is subject to a large degree of uncertainty regarding load information. Using information fusion – by applying Bayesian Networks – a method is being developed for forecasting the anticipated expenditures (human labor, tool and machinery utilization, time etc.) for regenerating a good. The generated forecasts then later serve as a tool for planning capacities and ensure a greater stability in the planning processes.
Keywords: Bayesian networks, capacity planning, complex investment goods, damages library, forecasting, information fusion, regeneration.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 16322181 Renewable Energy Supply Options in Kuwait
Authors: Osamah A. Alsayegh, Fatma A. Fairouz
Abstract:
This paper compares planning results of the electricity and water generation inventory up to year 2030 in the State of Kuwait. Currently, the generation inventory consists of oil and gas fired technologies only. The planning study considers two main cases. The first case, Reference case, examines a generation inventory based on oil and gas fired generation technologies only. The second case examines the inclusion of renewables as part of the generation inventory under two scenarios. In the first scenario, Ref-RE, renewable build-out is based on optimum economic performance of overall generation system. Result shows that the optimum installed renewable capacity with electric energy generation of 11% . In the second scenario, Ref-RE20, the renewable capacity build-out is forced to provide 20% of electric energy by 2030. The respective energy systems costs of Reference, Ref-RE and Ref-RE20 case scenarios reach US dollar 24, 10 and 14 billion annually in 2030.Keywords: Generation inventory, solar, planning, TIMES, wind.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 26362180 Using Model to Plan of Strategic Objectives
Authors: Terezie Bartusková, Jitka Baňařová, Zuzana Kusněřová
Abstract:
Importance of strategic planning is unquestionable. However, the practical implementation of a strategic plan faces too many obstacles. The aim of the article is explained the importance of strategic planning and to find how companies in Moravian-Silesian Region deal with strategic planning, and to introduce the model, which helps to set strategic goals in financial indicators area. This model should be part of the whole process of strategic planning and can be use to predict the future values of financial indicators of the company with regard to the factor, which influence these indicators.
Keywords: Planning of Potentials, Planning of Strategic Objectives, Portfolio Planning, Significant Factors, Strategic Planning.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 12432179 The Capacity of Government to Deliver Sustainable and Integrated Transport: The Case of Transit Oriented Development in Perth, Australia
Authors: Carey Curtis
Abstract:
There is a renewed interest in land use transport integration as a means of achieving sustainable accessibility. Such accessibility requires designing more than simply the transport network; it also requires attention to place (built form). Transitoriented development would appear to capture many of the criteria deemed important in land use transport integration. In Perth, Australia, there have been planning policies for the past 20 years requiring transit-oriented development around railway stations throughout the metropolitan area. While the policy intent, particularly at the State level, is clear the implementation of policy has been fairly ineffective. The first part of this paper provides an examination of state and local government planning and transport policies, evaluating them using a set of land use transport integration criteria considered all encompassing. This provides some insight into the extent of state and local government capacity to deliver land use transport integration. The second part of this paper examines the extent of implementation by examining existing and proposed land use around station precincts throughout metropolitan Perth. The findings of this research suggest that the capacity of state and local government to deliver land use transport integration is reasonable in a planning policy sense. Implementation, despite long policy lead times, has been lacking. It appears to be more effective where local planning controls have been suspended with new redevelopment authorities given powers to develop land around railway stations.
Keywords: Transit-oriented development, sustainable transport, transport policy.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 13262178 Role of GIS in Distribution Power Systems
Authors: N. Rezaee, M Nayeripour, A. Roosta, T. Niknam
Abstract:
With the prevalence of computer and development of information technology, Geographic Information Systems (GIS) have long used for a variety of applications in electrical engineering. GIS are designed to support the analysis, management, manipulation and mapping of spatial data. This paper presents several usages of GIS in power utilities such as automated route selection for the construction of new power lines which uses a dynamic programming model for route optimization, load forecasting and optimizing planning of substation-s location and capacity with comprehensive algorithm which involves an accurate small-area electric load forecasting procedure and simulates the different cost functions of substations.
Keywords: Geographic information systems (GIS), optimallocation and capacity, power distribution planning, route selection, spatial load forecasting.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 55072177 An Algorithm of Finite Capacity Material Requirement Planning System for Multi-stage Assembly Flow Shop
Authors: T. Wuttipornpun, U. Wangrakdiskul, W. Songserm
Abstract:
This paper aims to develop an algorithm of finite capacity material requirement planning (FCMRP) system for a multistage assembly flow shop. The developed FCMRP system has two main stages. The first stage is to allocate operations to the first and second priority work centers and also determine the sequence of the operations on each work center. The second stage is to determine the optimal start time of each operation by using a linear programming model. Real data from a factory is used to analyze and evaluate the effectiveness of the proposed FCMRP system and also to guarantee a practical solution to the user. There are five performance measures, namely, the total tardiness, the number of tardy orders, the total earliness, the number of early orders, and the average flow-time. The proposed FCMRP system offers an adjustable solution which is a compromised solution among the conflicting performance measures. The user can adjust the weight of each performance measure to obtain the desired performance. The result shows that the combination of FCMRP NP3 and EDD outperforms other combinations in term of overall performance index. The calculation time for the proposed FCMRP system is about 10 minutes which is practical for the planners of the factory.Keywords: Material requirement planning, Finite capacity, Linear programming, Permutation, Application in industry.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 23032176 A Genetic Algorithm Based Permutation and Non-Permutation Scheduling Heuristics for Finite Capacity Material Requirement Planning Problem
Authors: Watchara Songserm, Teeradej Wuttipornpun
Abstract:
This paper presents a genetic algorithm based permutation and non-permutation scheduling heuristics (GAPNP) to solve a multi-stage finite capacity material requirement planning (FCMRP) problem in automotive assembly flow shop with unrelated parallel machines. In the algorithm, the sequences of orders are iteratively improved by the GA characteristics, whereas the required operations are scheduled based on the presented permutation and non-permutation heuristics. Finally, a linear programming is applied to minimize the total cost. The presented GAPNP algorithm is evaluated by using real datasets from automotive companies. The required parameters for GAPNP are intently tuned to obtain a common parameter setting for all case studies. The results show that GAPNP significantly outperforms the benchmark algorithm about 30% on average.
Keywords: Finite capacity MRP, genetic algorithm, linear programming, flow shop, unrelated parallel machines, application in industries.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 11112175 Determination of the Economic Planning Depth for Assembly Process Planning
Authors: A. Kampker, P. Burggräf, Y. Bäumers
Abstract:
In order to be competitive, companies have to reduce their production costs while meeting increasing quality requirements. Therefore, companies try to plan their assembly processes as detailed as possible. However, increasing product individualization leading to a higher number of variants, smaller batch sizes and shorter product life cycles raise the question to what extent the effort of detailed planning is still justified. An important approach in this field of research is the concept of determining the economic planning depth for assembly process planning based on production specific influencing factors. In this paper first solution hypotheses as well as a first draft of the resulting method will be presented.Keywords: Assembly process planning, economic planning depth, planning benefit, planning effort.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 21232174 Native Framework of Economic Activities Development to Achieve The 1404 Iranian View Statement's Goals
Authors: H. Fallah, Z. Naddaf Baghdadabadi
Abstract:
Planning of economic activities development has various dimensions one of which determines adequate capacity of economic activities in provinces regarding the government-s goals. Paralleling planning goals of economic activities development including subjects being focused on the view statement is effective to better realize the statement's goals. Current paper presents a native framework for economic activities development in provincial level. Triple steps within the framework are concordant with the view statement-s goals achievement. At first step of the proposed framework, economic activities are being prioritized in terms of employment indices, and secondly economic activities regarding to the province's relative advantages are being recognized. In the third step, desirable capacity of economic activities is determined with regards to the government's goals and effective constraints in economic activities development. Development of economic activities related to the provinces- relative advantages, contributes on regional balance and on equal development of economic activities. Furthermore, results of the framework enable more confident investment, affect employment development and remove unemployment concern as the main goals of the view statement.
Keywords: Development, economic activity, regional planning, view statement.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 12982173 Analysis on the Development and Evolution of China's Territorial Spatial Planning
Authors: He YuanYan
Abstract:
In recent years, China has implemented the reform of land and space planning. As an important public policy, land and space planning plays a vital role in the construction and development of cities. Land and space planning throughout the country is in full swing, but there are still many disputes from all walks of life. The content, scope, and specific implementation process of land and space planning are also ambiguous, leading to the integration of multiple regulation problems such as unclear authority, unclear responsibilities, and poor planning results during the implementation of land and space planning. Therefore, it is necessary to sort out the development and evolution of domestic and foreign land space planning, clarify the problems and cruxes from the current situation of China's land space planning, and sort out the obstacles and countermeasures to the implementation of this policy, so as to deepen the understanding of the connotation of land space planning. It is of great practical significance for all planners to correctly understand and clarify the specific contents and methods of land space planning and to smoothly promote the implementation of land space planning at all levels.
Keywords: Territorial spatial planning, public policy, land space, overall planning.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2382172 Genetic Algorithm Based Wavelength Division Multiplexing Networks Planning
Authors: S.Baskar, P.S.Ramkumar, R.Kesavan
Abstract:
This paper presents a new heuristic algorithm useful for long-term planning of survivable WDM networks. A multi-period model is formulated that combines network topology design and capacity expansion. The ability to determine network expansion schedules of this type becomes increasingly important to the telecommunications industry and to its customers. The solution technique consists of a Genetic Algorithm that allows generating several network alternatives for each time period simultaneously and shortest-path techniques to deduce from these alternatives a least-cost network expansion plan over all time periods. The multi-period planning approach is illustrated on a realistic network example. Extensive simulations on a wide range of problem instances are carried out to assess the cost savings that can be expected by choosing a multi-period planning approach instead of an iterative network expansion design method.Keywords: Wavelength Division Multiplexing, Genetic Algorithm, Network topology, Multi-period reliable network planning
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 14382171 Improving Production Capacity through Efficient PPC System: Lesson from Leather Manufacturing
Authors: Mengist Hailemariam, Silma Yoseph
Abstract:
A well designed and executed Production Planning and Control (PPC) system is one of the key levers for superior performance in the current manufacturing set-up. Hence, measuring the PPC system performance has become a necessity for long term success. The present study examined PPC related issues which impact the production capacity and productivity of leather companies with special focus on Kombolcha Tannery Share Company (KTSC), Ethiopia. Physical observation, interview, and questionnaire were used to generate necessary information from the respondents and reach valid conclusions. Company annual reports were referred and analyzed to triangulate primary data. Consequently, the study revealed that KTSC runs below its capacity due to its inefficient PPC system being in use for which the root causes were identified. The study thereby conceptualizes a PPC system improvement framework comprising three pillars viz., management culture, internal capability and performance measurement together with key considerations in each case. The study findings enable the company to recognize the importance of efficient PPC system as a source of competitive advantage. It also aid managers in evaluating various PPC execution schemes to enhance productivity.
Keywords: Ethiopia, Leather manufacturing, Production planning and control, PPC improvement framework.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 37342170 A Control Model for the Dismantling of Industrial Plants
Authors: Florian Mach, Eric Hund, Malte Stonis
Abstract:
The dismantling of disused industrial facilities such as nuclear power plants or refineries is an enormous challenge for the planning and control of the logistic processes. Existing control models do not meet the requirements for a proper dismantling of industrial plants. Therefore, the paper presents an approach for the control of dismantling and post-processing processes (e.g. decontamination) in plant decommissioning. In contrast to existing approaches, the dismantling sequence and depth are selected depending on the capacity utilization of required post-processing processes by also considering individual characteristics of respective dismantling tasks (e.g. decontamination success rate, uncertainties regarding the process times). The results can be used in the dismantling of industrial plants (e.g. nuclear power plants) to reduce dismantling time and costs by avoiding bottlenecks such as capacity constraints.
Keywords: Dismantling management, logistics planning and control models, nuclear power plant dismantling, reverse logistics.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 14542169 Implementation-Oriented Discussion for Historical and Cultural Villages’ Conservation Planning
Authors: Xing Zhang
Abstract:
Since the State Council of China issued the Regulations on the Conservation of Historical Cultural Towns and Villages in 2008, formulation of conservation planning has been carried out in national, provincial and municipal historical and cultural villages for protection needs, which provides a legal basis for inheritance of historical culture and protection of historical resources. Although the quantity and content of the conservation planning are continually increasing, the implementation and application are still ambiguous. To solve the aforementioned problems, this paper explores methods to enhance the implementation of conservation planning from the perspective of planning formulation. Specifically, the technical framework of "overall objectives planning - sub-objectives planning - zoning guidelines - implementation by stages" is proposed to implement the planning objectives in different classifications and stages. Then combined with details of the Qiqiao historical and cultural village conservation planning project in Ningbo, five sub-objectives are set, which are implemented through the village zoning guidelines. At the same time, the key points and specific projects in the near-term, medium-term and long-term work are clarified, and the spatial planning is transformed into the action plan with time scale. The proposed framework and method provide a reference for the implementation and management of the conservation planning of historical and cultural villages in the future.Keywords: Conservation planning, planning by stages, planning implementation, zoning guidelines.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 7822168 Conventional Four Steps Travel Demand Modeling for Kabul New City
Authors: Ahmad Mansoor Stanikzai, Yoshitaka Kajita
Abstract:
This research is a very essential towards transportation planning of Kabul New City. In this research, the travel demand of Kabul metropolitan area (Existing and Kabul New City) are evaluated for three different target years (2015, current, 2025, mid-term, 2040, long-term). The outcome of this study indicates that, though currently the vehicle volume is less the capacity of existing road networks, Kabul city is suffering from daily traffic congestions. This is mainly due to lack of transportation management, the absence of proper policies, improper public transportation system and violation of traffic rules and regulations by inhabitants. On the other hand, the observed result indicates that the current vehicle to capacity ratio (VCR) which is the most used index to judge traffic status in the city is around 0.79. This indicates the inappropriate traffic condition of the city. Moreover, by the growth of population in mid-term (2025) and long-term (2040) and in the case of no development in the road network and transportation system, the VCR value will dramatically increase to 1.40 (2025) and 2.5 (2040). This can be a critical situation for an urban area from an urban transportation perspective. Thus, by introducing high-capacity public transportation system and the development of road network in Kabul New City and integrating these links with the existing city road network, significant improvements were observed in the value of VCR.
Keywords: Afghanistan, Kabul New City, planning, policy, urban transportation.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 11992167 Good Urban Planning and Management: New Aspects and Methodologies
Authors: Fattaneh Daneshmand Malayeri
Abstract:
In this paper, in addition to introducing good urban planning and its effects on globalization, some new methodologies in urban management and another urban aspects has been presented. Some new concerns in increasing of urban population , metropolitans and its relations on big problems has been focused in this paper. It is very important matter that future urban planning with based on globalization will be with full of basically changes in its management and perspectives.
Keywords: Urban planning, urban management, good governance, globalization, metropolitan, strategic planning
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 29132166 The Relationship between Spatial Planning and Transportation Planning in Southern Africa and its Consequences for Human Settlement
Authors: David Dewar
Abstract:
The paper reviews the relationship between spatial and transportation planning in the Southern African Development Community (SADC) region of Sub-Saharan Africa. It argues that most urbanisation in the region has largely occurred subsequent to the 1950s and, accordingly, urban development has been profoundly and negatively affected by the (misguided) spatial and institutional tenets of modernism. It demonstrates how a considerable amount of the poor performance of these settlements can be directly attributed to this. Two factors in particular about the planning systems are emphasized: the way in which programmatic land-use planning lies at the heart of both spatial and transportation planning; and the way on which transportation and spatial planning have been separated into independent processes. In the final section, the paper identifies ways of improving the planning system. Firstly, it identifies the performance qualities which Southern African settlements should be seeking to achieve. Secondly, it focuses on two necessary arenas of change: the need to replace programmatic land-use planning practices with structuralspatial approaches; and it makes a case for making urban corridors a spatial focus of integrated planning, as a way of beginning the restructuring and intensification of settlements which are currently characterised by sprawl, fragmentation and separationKeywords: Corridors, modernism, programmatic planning, structural-spatial planning
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 23632165 On the Differentiation of Strategic Spatial Planning Making Mechanisms in New Era: Between Melbourne and Tianjin
Abstract:
Strategic spatial planning, which is taken as an effective and competitive way for the governors of the city to improve the development and management level of a city, has been blooming in recent years all over the world. In the context of globalization and informatization, strategic spatial planning must transfer its focus on three different levels: global, regional and urban. Internal and external changes in environmental conditions lead to new advances in strategic planning both theoretically and practically. However, such advances or changes respond differently to cities on account of different dynamic mechanisms. This article aims at two cities of Tianjin in China and Melbourne in Australia, through a comparative study on strategic planning, to explore the differentiation of mechanisms in urban planning making. By comparison and exploration, the purpose of this article is to exhibit two different planning worlds between western and Chinese in a new way nowadays.
Keywords: Differentiation, Tianjin China, Melbourne Australia, strategic planning.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 22622164 Human Capacity Building in Manufacturing Sector: A Factor to Industrial Growth in Nigeria
Authors: Williams S. Ebhota, Ckikaodili Virginia Ugwu
Abstract:
Human ability is a major source of constraint to manufacturing industries in Nigeria. This paper therefore, discusses the importance of human influences on manufacturing and consequently to industrialization and National development. In this paper, the development of manufacturing was anchored on two main factors; Infrastructural Capacity Development (ICD) and Human Capacity Development (HCD). However, a wider view was given to the HCD and the various contemporary human capacity issues militating against manufacturing in Nigeria. It went further to discuss various ways of acquiring and upgrading workers’ skills and finally, suggestions were made on how to tackle the onerous human capacity issues in manufacturing.
Keywords: Manufacturing, Human, Capacity, Development, Innovation.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 34962163 Modeling User Behaviour by Planning
Authors: Alfredo Milani, Silvia Suriani
Abstract:
A model of user behaviour based automated planning is introduced in this work. The behaviour of users of web interactive systems can be described in term of a planning domain encapsulating the timed actions patterns representing the intended user profile. The user behaviour recognition is then posed as a planning problem where the goal is to parse a given sequence of user logs of the observed activities while reaching a final state. A general technique for transforming a timed finite state automata description of the behaviour into a numerical parameter planning model is introduced. Experimental results show that the performance of a planning based behaviour model is effective and scalable for real world applications. A major advantage of the planning based approach is to represent in a single automated reasoning framework problems of plan recognitions, plan synthesis and plan optimisation.Keywords: User behaviour, Timed Transition Automata, Automated Planning.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 13472162 The Capacity Building in the Natural Disaster Management of Thailand
Authors: Eakarat Boonreang
Abstract:
The past two decades, Thailand faced the natural disasters, for instance, Gay typhoon in 1989, tsunami in 2004, and huge flood in 2011. The disaster management in Thailand was improved both structure and mechanism for cope with the natural disaster since 2007. However, the natural disaster management in Thailand has various problems, for examples, cooperation between related an organizations have not unity, inadequate resources, the natural disaster management of public sectors not proactive, people has not awareness the risk of the natural disaster, and communities did not participate in the natural disaster management. Objective of this study is to find the methods for capacity building in the natural disaster management of Thailand. The concept and information about the capacity building and the natural disaster management of Thailand were reviewed and analyzed by classifying and organizing data. The result found that the methods for capacity building in the natural disaster management of Thailand should be consist of 1) link operation and information in the natural disaster management between nation, province, local and community levels, 2) enhance competency and resources of public sectors which relate to the natural disaster management, 3) establish proactive natural disaster management both planning and implementation, 4) decentralize the natural disaster management to local government organizations, 5) construct public awareness in the natural disaster management to community, 6) support Community Based Disaster Risk Management (CBDRM) seriously, and 7) emphasis on participation in the natural disaster management of all stakeholders.
Keywords: Capacity Building, Community Based Disaster Risk Management, Natural Disaster Management, Thailand.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 32482161 Knowledge Acquisition, Absorptive Capacity, and Innovation Capability: An Empirical Study of Taiwan's Knowledge-Intensive Industries
Authors: Shu-Hsien. Liao, Chi-Chuan. Wu, Da-Chian. Hu, Guang An. Tsuei
Abstract:
This study investigates the roles of knowledge acquisition, absorptive capacity, and innovation capability in finance and manufacturing industries. With 362 valid questionnaires from manufactures and financial industries in Taiwan, we examine the relationships between absorptive capacity, knowledge acquisition and innovation capability using a structural equation model. The results indicate that absorptive capacity is the mediator between knowledge acquisition and innovation capability, and that knowledge acquisition has a positive effect on absorptive capacity.Keywords: Absorptive capacity, knowledge acquisition, innovation capability.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2540