WASET
    A. Kampker and  P. Burggräf and  Y. Bäumers,  Determination of the Economic Planning Depth for Assembly Process Planning.   journal   = {International Journal of Industrial and Manufacturing Engineering}, [online]. World Academy of Science, Engineering and Technology.
    October 2015, vol. 107(11). 3858 - 3863
    [viewed 26 April 2024]. Available from: https://publications.waset.org/pdf/10002903.