WASET
	%0 Journal Article
	%A Mengist Hailemariam and  Silma Yoseph
	%D 2015
	%J International Journal of Industrial and Manufacturing Engineering
	%B World Academy of Science, Engineering and Technology
	%I Open Science Index 98, 2015
	%T Improving Production Capacity through Efficient PPC System: Lesson from Leather Manufacturing
	%U https://publications.waset.org/pdf/10000929
	%V 98
	%X A well designed and executed Production Planning
and Control (PPC) system is one of the key levers for superior
performance in the current manufacturing set-up. Hence, measuring
the PPC system performance has become a necessity for long term
success. The present study examined PPC related issues which
impact the production capacity and productivity of leather companies
with special focus on Kombolcha Tannery Share Company (KTSC),
Ethiopia. Physical observation, interview, and questionnaire were
used to generate necessary information from the respondents and
reach valid conclusions. Company annual reports were referred and
analyzed to triangulate primary data. Consequently, the study
revealed that KTSC runs below its capacity due to its inefficient PPC
system being in use for which the root causes were identified. The
study thereby conceptualizes a PPC system improvement framework
comprising three pillars viz., management culture, internal capability
and performance measurement together with key considerations in
each case. The study findings enable the company to recognize the
importance of efficient PPC system as a source of competitive
advantage. It also aid managers in evaluating various PPC execution
schemes to enhance productivity.

	%P 354 - 359