2743 The Establishment of Cause-System of Poor Construction Site Safety and Priority Analysis from Different Perspectives

Authors: Shirong Li, Xueping Xiang

Abstract:

Construction site safety in China has aroused comprehensive concern all over the world. It is imperative to investigate the main causes of poor construction site safety. This paper divides all the causes into four aspects, namely the factors of workers, object, environment and management and sets up the accident causes element system based on Delphi Method. This is followed by the application of structural equation modeling to examine the importance of each aspect of causes from the standpoints of different roles related to the construction respectively. The results indicate that all the four aspects of factors are in need of improvement, and different roles have different ideas considering the priority of those factors. The paper has instructive significance for the practitioners to take measures to improve construction site safety in China accordingly.

Keywords: construction site safety, Delphi Method, structuralequation modeling, different perspective.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1897
2742 Impacts of Project-Overload on Innovation inside Organizations: Agent-Based Modeling

Authors: Farnaz Motamediyan Dehkordi, Anthony Thompson, Tobias Larsson

Abstract:

Market competition and a desire to gain advantages on globalized market, drives companies towards innovation efforts. Project overload is an unpleasant phenomenon, which is happening for employees inside those organizations trying to make the most efficient use of their resources to be innovative. But what are the impacts of project overload on organization-s innovation capabilities? Advanced engineering teams (AE) inside a major heavy equipment manufacturer are suffering from project overload in their quest for innovation. In this paper, Agent-based modeling (ABM) is used to examine the current reality of the company context, and of the AE team, where the opportunities and challenges for reducing the risk of project overload and moving towards innovation were identified. Project overload is more likely to stifle innovation and creativity inside teams. On the other hand, motivations on proper challenging goals are more likely to help individual to alleviate the negative aspects of low level of project overload.

Keywords: Innovation, Creativity, Project overload, Agentbased modelling.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1802
2741 Application of Data Mining Tools to Predicate Completion Time of a Project

Authors: Seyed Hossein Iranmanesh, Zahra Mokhtari

Abstract:

Estimation time and cost of work completion in a project and follow up them during execution are contributors to success or fail of a project, and is very important for project management team. Delivering on time and within budgeted cost needs to well managing and controlling the projects. To dealing with complex task of controlling and modifying the baseline project schedule during execution, earned value management systems have been set up and widely used to measure and communicate the real physical progress of a project. But it often fails to predict the total duration of the project. In this paper data mining techniques is used predicting the total project duration in term of Time Estimate At Completion-EAC (t). For this purpose, we have used a project with 90 activities, it has updated day by day. Then, it is used regular indexes in literature and applied Earned Duration Method to calculate time estimate at completion and set these as input data for prediction and specifying the major parameters among them using Clem software. By using data mining, the effective parameters on EAC and the relationship between them could be extracted and it is very useful to manage a project with minimum delay risks. As we state, this could be a simple, safe and applicable method in prediction the completion time of a project during execution.

Keywords: Data Mining Techniques, Earned Duration Method, Earned Value, Estimate At Completion.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1771
2740 A Logic Based Framework for Planning for Mobile Agents

Authors: Rajdeep Niyogi

Abstract:

The objective of the paper is twofold. First, to develop a formal framework for planning for mobile agents. A logical language based on a temporal logic is proposed that can express a type of tasks which often arise in network management. Second, to design a planning algorithm for such tasks. The aim of this paper is to study the importance of finding plans for mobile agents. Although there has been a lot of research in mobile agents, not much work has been done to incorporate planning ideas for such agents. This paper makes an attempt in this direction. A theoretical study of finding plans for mobile agents is undertaken. A planning algorithm (based on the paradigm of mobile computing) is proposed and its space, time, and communication complexity is analyzed. The algorithm is illustrated by working out an example in detail.

Keywords: Acting, computer network, mobile agent, mobile computing, planning, temporal logic.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1373
2739 An Analytical Framework for Multi-Site Supply Chain Planning Problems

Authors: Yin-Yann Chen

Abstract:

As the gradual increase of the enterprise scale, the firms may possess many manufacturing plants located in different places geographically. This change will result in the multi-site production planning problems under the environment of multiple plants or production resources. Our research proposes the structural framework to analyze the multi-site planning problems. The analytical framework is composed of six elements: multi-site conceptual model, product structure (bill of manufacturing), production strategy, manufacturing capability and characteristics, production planning constraints, and key performance indicators. As well as the discussion of these six ingredients, we also review related literatures in this paper to match our analytical framework. Finally we take a real-world practical example of a TFT-LCD manufacturer in Taiwan to explain our proposed analytical framework for the multi-site production planning problems.

Keywords: Multi-Site, Production Planning, Supply Chain, TFT-LCD.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1845
2738 Role of GIS in Distribution Power Systems

Authors: N. Rezaee, M Nayeripour, A. Roosta, T. Niknam

Abstract:

With the prevalence of computer and development of information technology, Geographic Information Systems (GIS) have long used for a variety of applications in electrical engineering. GIS are designed to support the analysis, management, manipulation and mapping of spatial data. This paper presents several usages of GIS in power utilities such as automated route selection for the construction of new power lines which uses a dynamic programming model for route optimization, load forecasting and optimizing planning of substation-s location and capacity with comprehensive algorithm which involves an accurate small-area electric load forecasting procedure and simulates the different cost functions of substations.

Keywords: Geographic information systems (GIS), optimallocation and capacity, power distribution planning, route selection, spatial load forecasting.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 5456
2737 Research on the Development and Space Optimization of Rental-Type Public Housing in Hangzhou

Authors: Xuran Zhang, Huiru Chen

Abstract:

In recent years, China has made great efforts to cultivate and develop the housing rental market, especially the rental-type public housing, which has been paid attention to by all sectors of the society. This paper takes Hangzhou rental-type public housing as the research object, and divides it into three development stages according to the different supply modes of rental-type public housing. Through data collection and field research, the paper summarizes the spatial characteristics of rental-type public housing from the five perspectives of spatial planning, spatial layout, spatial integration, spatial organization and spatial configuration. On this basis, the paper proposes the optimization of the spatial layout. The study concludes that the spatial layout of rental-type public housing should be coordinated with the development of urban planning. When planning and constructing, it is necessary to select more mixed construction modes, to be properly centralized, and to improve the surrounding transportation service facilities.  It is hoped that the recommendations in this paper will provide a reference for the further development of rental-type public housing in Hangzhou.

Keywords: Hangzhou, rental-type public housing, spatial distribution, spatial optimization.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 753
2736 Lean Thinking and E-Commerce as New Opportunities to Improve Partnership in Supply Chain of Construction Industries

Authors: Kaustav Kundu, Alberto Portioli Staudacher

Abstract:

Construction industry plays a vital role in the economy of the world. However, due to high uncertainty and variability in the industry, its performance is not as efficient in terms of quality, lead times, productivity and costs as of other industries. Moreover, there are continuous conflicts among the different actors in the construction supply chains in terms of profit sharing. Previous studies suggested partnership as an important approach to promote cooperation among the different actors in the construction supply chains and thereby it improves the overall performance. Construction practitioners tried to focus on partnership which can enhance the performance of construction supply chains but they are not fully aware of different approaches and techniques for improving partnership. In this research, a systematic review on partnership in relation to construction supply chains is carried out to understand different elements influencing the partnership. The research development of this domain is analyzed by reviewing selected articles published from 1996 to 2015. Based on the papers, three major elements influencing partnership in construction supply chains are identified: ‘Lean approach’, ‘Relationship building’ and ‘E-commerce applications’. This study analyses the contributions in the areas within each element and provides suggestions for future developments of partnership in construction supply chains.

Keywords: Partnership, construction, lean, SCM, supply chain management.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2381
2735 The Study of the Correlation of Proactive Coping and Retirement Planning: An Example of Senior Civil Servants in Taiwan

Authors: Ya-Hui Lee, Chien-Hung Hsieh, Ching-Yi Lu

Abstract:

Demographic aging is the major problem that Taiwanese society is facing, and retirement life adaptation is the most concerning issue. In recent years, studies have suggested that in order to have successful aging and retirement planning, a view for the future is necessary. In Taiwan, civil servants receive better pensions and retirement benefits than do other industries. Therefore, their retirement preparation is considerably more significant than other senior groups in Taiwan. The purpose of this study is to understand the correlation of proactive coping and retirement planning of senior civil servants in Taiwan. The method is conducted by questionnaire surveys, with 342 valid questionnaires collected. The results of this study are: 1. The background variables of the interviewees, including age, perceived economic statuses, and retirement statuses, are all significantly related to their proactive coping and retirement planning. 2. Regarding age, the interviewees with ages 55 and above have better proactive coping and retirement planning than those with ages 45 and below. 3. In the aspect of perceived economic statuses, the participants who feel “very good” economic statuses have better proactive coping ability and retirement readiness than those who feel “bad” and “very bad”. 4. Retirees have better proactive coping and retirement planning than those who are still working. 5. Monthly income is significant in retirement planning only. The participants’ retirement planning would be better if they have higher incomes. Furthermore, the participants’ retirement planning would be better if their revenue were €1453~€1937, than if their revenue were below €968. 6. There are positive correlations between proactive coping and retirement planning. 7. Proactive coping can predict retirement planning. The result of this study will be provided as references to the Taiwan government for educational retirement planning policies.

Keywords: Civil servants, proactive coping, retirement planning.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1727
2734 Sustainability: An Ethical Approach Towards Project Business Success

Authors: G. S. Dangayach

Abstract:

For any country the project management has been a vital part for its development. The highly competitive business world has created tremendous pressure on the project managers to achieve success. The pressure is derived from survival and profit building in business organizations which compels the project managers to pursue unethical practices. As a result unethical activities in business projects can be found easily where situations or issues arise due to dubious business practice, high corruption, or absolute violation of the law. The recent spur on Commonwealth games to be organized in New Delhi indicates towards the same. It has been seen that the project managers mainly focus on cost, time, and quality rather than social impact and long term effects of the project. Surprisingly the literature as well as the practitioner-s perspective also does not identify the role of ethics in project success. This paper identifies ethics as the fourth most important dimension in the project based organizations. The paper predicts that the approach of considering ethics will result in sustainability of the project. It will increase satisfaction and loyalty of the customers as well as create harmony, trust, brotherhood, values and morality among the team members. This paper is conceptual in nature as inadequate literature exists linking the project success with an ethical approach.

Keywords: Ethics, Loyalty, Morality, Project success

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2733
2733 The Impact of the Type of Diversification of Listed Construction Enterprises in China on Corporation Performance

Authors: Yi-Hsin Lin, Ying-Ying Li

Abstract:

The construction industry is the pillar industry in China, accounting for about 6% of the gross domestic product. Along with changes in the external environment of the construction industry in China, the construction firm faces fierce competition. The paper aims to investigate the relationship between diversified types of construction firm and its performance in China. Based on generalist and specialist strategy in organizational ecology, we think a generalist organization can be applied to an enterprise with diversified developments, while specialist groups are extended to professional enterprises .This study takes advantage of annual financial data of listed construction firm to empirically verify the relationship between diversification and corporation performance establishing a regression equation to econometric analysis. We find that: 1) Specialization can significantly improve the level of profitability of listed construction firms, and there is a significant positive relationship with corporate performance; 2) The level of operating performance of listed construction enterprises which engage in unrelated diversification is higher than those with related diversification; 3) The relationship between state-owned construction firms and corporate performance is negative. The more the year of foundation is, the higher performance will be; however, the more the year of being listed, the lower performance will be.

Keywords: Diversification, Specialization, Construction Firm, Performance.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1711
2732 Operations Research Applications in Audit Planning and Scheduling

Authors: Abdel-Aziz M. Mohamed

Abstract:

This paper presents a state-of-the-art survey of the operations research models developed for internal audit planning. Two alternative approaches have been followed in the literature for audit planning: (1) identifying the optimal audit frequency; and (2) determining the optimal audit resource allocation. The first approach identifies the elapsed time between two successive audits, which can be presented as the optimal number of audits in a given planning horizon, or the optimal number of transactions after which an audit should be performed. It also includes the optimal audit schedule. The second approach determines the optimal allocation of audit frequency among all auditable units in the firm. In our review, we discuss both the deterministic and probabilistic models developed for audit planning. In addition, game theory models are reviewed to find the optimal auditing strategy based on the interactions between the auditors and the clients.

Keywords: Operations research applications, audit frequency, audit planning, audit-staff scheduling.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2877
2731 A Study of Factors Affecting the Elapsed Time of Housing Renewal Project Implementation in Seoul

Authors: In Su Na, Gunwon Lee, Seiyong Kim

Abstract:

This study analyzed the effect of area variables and economic variables on the length of each period of the project in order to analyze the effect of agreement rate on project implementation in housing renewal projects. In conclusion, as can be seen from these results, a low agreement rate may not translate into project promotion, and a higher agreement rate may not translate into project delay. The expectation of the policy is that the lower the agreement rate, the more projects would be promoted, but that is not the actual effect. From a policy consistency viewpoint, changing the agreement rate frequently, depending on the decision of the public, is not reasonable. The policy of using agreement rate as a necessary condition for project implementation should be reconsidered.

Keywords: Area and Economic Variables, Elapsed time, Housing Renewal Project.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1588
2730 Critical Factors to Company Success in the Construction Industry

Authors: G. Arslan, S. Kivrak

Abstract:

Achieving success is a highly critical issue for the companies to survive in a competitive business environment. The construction industry is also an area where there is strong competition due to a large number of construction contractors. There have been many factors such as qualified employees, quality workmanship and financial management that can lead to company success in the construction industry. The aim of this study was to investigate the critical factors leading to construction company success. Within this context, a survey was carried out among 40 Turkish construction companies which are located in the Northwest region of Turkey. In this survey, top-level managers and owners of the companies were interviewed. The interviews took place over a five month period between January and May 2007. Finally, the ranking of the critical success factors has been determined by using the Simple Multi Attribute Rating Technique (SMART). Based on the results, business management, financial conditions and owner/manager characteristics were determined as the most important factors to company success.

Keywords: Company success, construction, organization, success factors.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 9769
2729 Recycling Construction Waste Materials to Reduce the Environmental Pollutants

Authors: Mehrdad Abkenari, Alireza Rezaei, Naghmeh Pournayeb

Abstract:

There have recently been many studies and investments in developed and developing countries regarding the possibility of recycling construction waste, which are still ongoing. Since the term 'construction waste' covers a vast spectrum of materials in constructing buildings, roads and etc., many investigations are required to measure their technical performance in use as well as their time and place of use. Concrete is among the major and fundamental materials used in current construction industry. Along with the rise of population in developing countries, it is desperately required to meet the people's primary need in construction industry and on the other hand, dispose existing wastes for reducing the amount of environmental pollutants. Restrictions of natural resources and environmental pollution are the most important problems encountered by civil engineers. Reusing construction waste is an important and economic approach that not only assists the preservation of environment but also, provides us with primary raw materials. In line with consistent municipal development in disposal and reuse of construction waste, several approaches including, management of construction waste and materials, materials recycling and innovation and new inventions in materials have been predicted. This article has accordingly attempted to study the activities related to recycling of construction wastes and then, stated the economic, quantitative, qualitative and environmental results obtained.

Keywords: Civil engineering, environment, recycling, construction waste.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2845
2728 Measuring Relative Efficiency of Korean Construction Company using DEA/Window

Authors: Jung-Lo Park, Sung-Sik Kim, Sun-Young Choi, Ju-Hyung Kim, Jae-Jun Kim

Abstract:

Sub-prime mortgage crisis which began in the US is regarded as the most economic crisis since the Great Depression in the early 20th century. Especially, hidden problems on efficient operation of a business were disclosed at a time and many financial institutions went bankrupt and filed for court receivership. The collapses of physical market lead to bankruptcy of manufacturing and construction businesses. This study is to analyze dynamic efficiency of construction businesses during the five years at the turn of the global financial crisis. By discovering the trend and stability of efficiency of a construction business, this study-s objective is to improve management efficiency of a construction business in the ever-changing construction market. Variables were selected by analyzing corporate information on top 20 construction businesses in Korea and analyzed for static efficiency in 2008 and dynamic efficiency between 2006 and 2010. Unlike other studies, this study succeeded in deducing efficiency trend and stability of a construction business for five years by using the DEA/Window model. Using the analysis result, efficient and inefficient companies could be figured out. In addition, relative efficiency among DMU was measured by comparing the relationship between input and output variables of construction businesses. This study can be used as a literature to improve management efficiency for companies with low efficiency based on efficiency analysis of construction businesses.

Keywords: Construction Company, DEA, DEA/Window, Efficiency Analysis

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1941
2727 Evaluation of Traditional Methods in Construction and Their Effects on Reinforced-Concrete Buildings Behavior

Authors: E. H. N. Gashti, M. Zarrini, M. Irannezhad, J. R. Langroudi

Abstract:

Using ETABS software, this study analyzed 23 buildings to evaluate effects of mistakes during construction phase on buildings structural behavior. For modelling, two different loadings were assumed: 1) design loading and 2) loading due to the effects of mistakes in construction phase. Research results determined that considering traditional construction methods for buildings resulted in a significant increase in dead loads and consequently intensified the displacements and base-shears of buildings under seismic loads.

Keywords: Reinforced-concrete buildings, Construction mistakes, Base-shear, displacements, Failure.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2624
2726 Adaptive Motion Planning for 6-DOF Robots Based on Trigonometric Functions

Authors: Jincan Li, Mingyu Gao, Zhiwei He, Yuxiang Yang, Zhongfei Yu, Yuanyuan Liu

Abstract:

Building an appropriate motion model is crucial for trajectory planning of robots and determines the operational quality directly. An adaptive acceleration and deceleration motion planning based on trigonometric functions for the end-effector of 6-DOF robots in Cartesian coordinate system is proposed in this paper. This method not only achieves the smooth translation motion and rotation motion by constructing a continuous jerk model, but also automatically adjusts the parameters of trigonometric functions according to the variable inputs and the kinematic constraints. The results of computer simulation show that this method is correct and effective to achieve the adaptive motion planning for linear trajectories.

Keywords: 6-DOF robots, motion planning, trigonometric function, kinematic constraints

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 873
2725 Intelligent Path Planning for Rescue Robot

Authors: Sohrab Khanmohammadi, Raana Soltani Zarrin

Abstract:

In this paper, a heuristic method for simultaneous rescue robot path-planning and mission scheduling is introduced based on project management techniques, multi criteria decision making and artificial potential fields path-planning. Groups of injured people are trapped in a disastrous situation. These people are categorized into several groups based on the severity of their situation. A rescue robot, whose ultimate objective is reaching injured groups and providing preliminary aid for them through a path with minimum risk, has to perform certain tasks on its way towards targets before the arrival of rescue team. A decision value is assigned to each target based on the whole degree of satisfaction of the criteria and duties of the robot toward the target and the importance of rescuing each target based on their category and the number of injured people. The resulted decision value defines the strength of the attractive potential field of each target. Dangerous environmental parameters are defined as obstacles whose risk determines the strength of the repulsive potential field of each obstacle. Moreover, negative and positive energies are assigned to the targets and obstacles, which are variable with respects to the factors involved. The simulation results show that the generated path for two cases studies with certain differences in environmental conditions and other risk factors differ considerably.

Keywords: Artificial potential field, GERT, path planning

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1811
2724 Concentrated Animal Feeding Operations and Planning in the United States: Evidences from North Carolina

Authors: Asmaa Benbaba

Abstract:

This paper aims to reconsider relationships between animal feeding operations (CAFOs) and planning. It stresses the idea of the necessity for a methodological revolution in order to increase the chances for dialogue between different actors and various planning agencies and create possibilities to manage conflicts. The explored case of North Carolina shows limitations in environmental agencies’ actions and methods. It also calls for a more integrated approach among agencies including the local agencies.

Keywords: (CAFOs), North Carolina, Planning, United States.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1974
2723 Sustainable Construction in Malaysia – Developers- Awareness

Authors: Nazirah Zainul Abidin

Abstract:

The creation of a sustainable future depends on the knowledge and involvement of the people, as well as an understanding of the consequences of individual actions. Construction industry has long been associated with the detrimental effects to our mother earth. In Malaysia, the government, professional bodies and private companies are beginning to take heed in the necessity to reduce this environmental problem without restraining the need for development. This paper focuses on the actions undertaken by the Malaysian government, non-government organizations and construction players in promoting sustainability in construction. To ensure that those concerted efforts are not only skin deep in its impact, a survey was conducted to investigate the awareness of the developers regarding this issue and whether those developers has absorb the concept of sustainable construction in their current practices. The survey revealed that although the developers are aware of the rising issues on sustainability, little efforts are generated from them in implementing it. More effort is necessary to boost this application and further stimulate actions and strategies towards a sustainable built environment.

Keywords: Environmental sustainability, Malaysian construction industry, Malaysian developers, Sustainable construction.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 4543
2722 Information Fusion as a Means of Forecasting Expenditures for Regenerating Complex Investment Goods

Authors: Steffen C. Eickemeyer, Tim Borcherding, Peter Nyhuis, Hannover

Abstract:

Planning capacities when regenerating complex investment goods involves particular challenges in that the planning is subject to a large degree of uncertainty regarding load information. Using information fusion – by applying Bayesian Networks – a method is being developed for forecasting the anticipated expenditures (human labor, tool and machinery utilization, time etc.) for regenerating a good. The generated forecasts then later serve as a tool for planning capacities and ensure a greater stability in the planning processes.

Keywords: Bayesian networks, capacity planning, complex investment goods, damages library, forecasting, information fusion, regeneration.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1597
2721 Production Planning and Measuring Method for Non Patterned Production System Using Stock Cutting Model

Authors: S. Homrossukon, D. Aromstain

Abstract:

The simple methods used to plan and measure non patterned production system are developed from the basic definition of working efficiency. Processing time is assigned as the variable and used to write the equation of production efficiency. Consequently, such equation is extensively used to develop the planning method for production of interest using one-dimensional stock cutting problem. The application of the developed method shows that production efficiency and production planning can be determined effectively.

Keywords: Production Planning, Parallel Machine, Production Measurement, Cutting and Packing.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1161
2720 Construction Procedures Evaluation of Three Adjacent Tunnels and Excavation Step Effects

Authors: M. Mahdi, N. Shariatmadari

Abstract:

Since, both the relative position of tunnels and the construction procedure affect the soil movement and internal forces in the lining, it is of major concern to study the influence of these factors on the tunnel design. Construction procedures of tunnels have considerable effects on the magnitude of surface movements and lining stresses. This paper describes numerical analysis of construction procedure of a three adjacent shallow tunnels at high groundwater levels using the commercial finite difference software (FLAC-3D). The aim of this study is to determinate the most suitable construction procedure for the three tunnels and the optimum excavation step in Tehran Metro tunnels in order to optimize the surface settlements and lining stresses.

Keywords: Shallow tunnel, multiple tunnels, construction procedure, surface movement, numerical modeling.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2388
2719 A Construction Management Tool: Determining a Project Schedule Typical Behaviors Using Cluster Analysis

Authors: Natalia Rudeli, Elisabeth Viles, Adrian Santilli

Abstract:

Delays in the construction industry are a global phenomenon. Many construction projects experience extensive delays exceeding the initially estimated completion time. The main purpose of this study is to identify construction projects typical behaviors in order to develop a prognosis and management tool. Being able to know a construction projects schedule tendency will enable evidence-based decision-making to allow resolutions to be made before delays occur. This study presents an innovative approach that uses Cluster Analysis Method to support predictions during Earned Value Analyses. A clustering analysis was used to predict future scheduling, Earned Value Management (EVM), and Earned Schedule (ES) principal Indexes behaviors in construction projects. The analysis was made using a database with 90 different construction projects. It was validated with additional data extracted from literature and with another 15 contrasting projects. For all projects, planned and executed schedules were collected and the EVM and ES principal indexes were calculated. A complete linkage classification method was used. In this way, the cluster analysis made considers that the distance (or similarity) between two clusters must be measured by its most disparate elements, i.e. that the distance is given by the maximum span among its components. Finally, through the use of EVM and ES Indexes and Tukey and Fisher Pairwise Comparisons, the statistical dissimilarity was verified and four clusters were obtained. It can be said that construction projects show an average delay of 35% of its planned completion time. Furthermore, four typical behaviors were found and for each of the obtained clusters, the interim milestones and the necessary rhythms of construction were identified. In general, detected typical behaviors are: (1) Projects that perform a 5% of work advance in the first two tenths and maintain a constant rhythm until completion (greater than 10% for each remaining tenth), being able to finish on the initially estimated time. (2) Projects that start with an adequate construction rate but suffer minor delays culminating with a total delay of almost 27% of the planned time. (3) Projects which start with a performance below the planned rate and end up with an average delay of 64%, and (4) projects that begin with a poor performance, suffer great delays and end up with an average delay of a 120% of the planned completion time. The obtained clusters compose a tool to identify the behavior of new construction projects by comparing their current work performance to the validated database, thus allowing the correction of initial estimations towards more accurate completion schedules.

Keywords: Cluster analysis, construction management, earned value, schedule.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1147
2718 An Evaluation of the Effectiveness of Health and Safety Induction Practices in the Zambian Construction Industry

Authors: Josephine Mutwale-Ziko, Nonde Lushinga, Inonge Akakandelwa

Abstract:

The study discusses the effectiveness of health and safety induction practices on construction sites against the background of the Zambian construction industry experience. The research design included the literature review of relevant literature. Questionnaires and interviews were administered to regulatory bodies, health, and safety personnel. Observation was also employed on construction sites to assess the health and safety practices being used. Health and safety in the construction industry are not something to be ignored or overlooked. The construction industry needs to take heed of the serious consequences of inadequate health and safety induction practices. The implications of inadequate health and safety induction procedures included among others threats to profitability, corporate social responsibility and increased turnover of the workforce leading to poor productivity. Adequate health and safety practices can improve the health and wellbeing of employees, reduce financial implications on firms and encourage productivity on construction sites. Despite this, accidents are still prevalent on construction sites in Zambia. The overall result of this research denotes that the implementation of health and safety induction practices is inadequate, as indicated by the negligent and non-adherent attitude to health and safety induction aspects on the sites by most stakeholders on construction sites. Therefore, health and safety induction practices are ineffective as preventive measures for reduction of accidents on construction sites in Zambia.

Keywords: Accidents, employees, health and safety, inadequate induction.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1792
2717 Optimum Design of Launching Nose during Incremental Launching Construction of Same-Span Continuous Bridge

Authors: Weifeng Wang, Hengbin Zheng, Xianwei Zeng

Abstract:

The launching nose plays an important role in the incremental launching construction. The parameters of the launching nose essentially affect the internal forces of the girder during the construction. The appropriate parameters can decrease the internal forces in the girder and save the material and reduce the cost. The simplified structural model, which is made with displacement method according to the characteristic of incremental launching construction and the variation rule of the internal forces, calculates and analyzes the effect of the length, the rigidity and weight of launch nose on the internal forces of girder during the incremental launching construction. The method, which can calculate the launching nose parameters for the optimum incremental launching construction, is achieved. This method is simple, reliable and easy for practical use.

Keywords: incremental launching, launching nose, optimumanalysis, displacement method

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 3576
2716 Bridging the Green-Value-Gap: A South African Approach

Authors: E.J. Cilliers

Abstract:

Green- spaces might be very attractive, but where are the economic benefits? What value do nature and landscape have for us? What difference will it make to jobs, health and the economic strength of areas struggling with deprivation and social problems? [1].There is a need to consider green spaces from a different perspective. Green planning is not just about flora and fauna, but also about planning for economic benefits [2]. It is worth trying to quantify the value of green spaces since nature and landscape are crucially important to our quality of life and sustainable development. The reality, however, is that urban development often takes place at the expense of green spaces. Urbanization is an ongoing process throughout the world; however, hyper-urbanization without environmental planning is destructive, not constructive [3]. Urban spaces are believed to be more valuable than other land uses, particular green areas, simply because of the market value connected to urban spaces. However, attractive landscapes can help raise the quality and value of the urban market even more. In order to reach these objectives of integrated planning, the Green-Value-Gap needs to be bridged. Economists have to understand the concept of Green-Planning and the spinoffs, and Environmentalists have to understand the importance of urban economic development and the benefits thereof to green planning. An interface between Environmental Management, Economic Development and sustainable Spatial Planning are needed to bridge the Green-Value-Gap.

Keywords: Spatial Planning, Environmental Management, Green-Value-Gap, Compensation, Participation.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2601
2715 Effective Leadership in the Engineering, Technology, and Construction Industry

Authors: David W. Farler, Perry Haan

Abstract:

This paper explores what effective leadership is being employed in the engineering, technology, and construction (ETC) industry. Organizations need to understand what character traits are being used and what leadership styles work to promote sustainability and improve the triple bottom line. This paper looks at multiple publications on leadership and character traits effective for managers and leaders in the ETC industry. The ETC industry is a trillion-dollar industry, and understanding ways to improve leadership is vital for organizations' successful outcomes. With improvements to the managerial and leadership, there could be ways for organizations to profit more and cut down on cost costs. Finding ways to improve motivation can help organizations improve safety, improve culture, and increase employee motivation. From the research, this paper has found that situational leadership, transformational, and transactional are the most effective leadership styles that individuals can use in the ETC industry for leadership. Character traits that are the most effective have been identified in this research paper. This research has contributed to the ways individuals who start in the engineering and technology industry can improve upon their leadership skills as they are promoted into managerial and leadership roles. The need for managerial positions in the ETC industry, such as project and construction managers, to improve is vital for successful outcomes and creating a high-level performance. The study helps provide a gap in the limited research available to improve ETC leadership for all organizations' present and future.

Keywords: Construction, effective leadership, engineering, technology.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 902
2714 Optimal Planning of Ground Grid Based on Particle Swam Algorithm

Authors: Chun-Yao Lee, Yi-Xing Shen

Abstract:

This paper presents an application of particle swarm optimization (PSO) to the grounding grid planning which compares to the application of genetic algorithm (GA). Firstly, based on IEEE Std.80, the cost function of the grounding grid and the constraints of ground potential rise, step voltage and touch voltage are constructed for formulating the optimization problem of grounding grid planning. Secondly, GA and PSO algorithms for obtaining optimal solution of grounding grid are developed. Finally, a case of grounding grid planning is shown the superiority and availability of the PSO algorithm and proposal planning results of grounding grid in cost and computational time.

Keywords: Genetic algorithm, particle swarm optimization, grounding grid.