Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 33093
The Establishment of Cause-System of Poor Construction Site Safety and Priority Analysis from Different Perspectives
Authors: Shirong Li, Xueping Xiang
Abstract:
Construction site safety in China has aroused comprehensive concern all over the world. It is imperative to investigate the main causes of poor construction site safety. This paper divides all the causes into four aspects, namely the factors of workers, object, environment and management and sets up the accident causes element system based on Delphi Method. This is followed by the application of structural equation modeling to examine the importance of each aspect of causes from the standpoints of different roles related to the construction respectively. The results indicate that all the four aspects of factors are in need of improvement, and different roles have different ideas considering the priority of those factors. The paper has instructive significance for the practitioners to take measures to improve construction site safety in China accordingly.Keywords: construction site safety, Delphi Method, structuralequation modeling, different perspective.
Digital Object Identifier (DOI): doi.org/10.5281/zenodo.1332520
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1941References:
[1] O. A. Jannadi, and M. S. Bu-Khamsin, "Safety factors considered by industrial contractors in Saudi Arabia," Building and Environment, vol. 37, no. 5, pp. 539-547. 2002.
[2] Ministry of Housing and Urban-Rural Development, "The report of national safe production in housing and municipal engineering,". P. R. China. 2009-2010.
[3] M. D. M. Aires, M. C. R. Game, and A. Gibb, "Prevention through design: The effect of European Directives on construction workplace accidents," Safety Science, vol. 48, no. 2, pp. 248-258. 2010.
[4] C. M. Tam, S. X. Zeng, and Z. M. Deng, "Identifying elements of poor construction safety management in China," Safety Science, vol. 42, pp. 569-586 .2004.
[5] S. L. Zhang, W. Zhou, and W. Zheng, "An empirical analysis of the factors affecting the safety of construction," Construction Economy, vol. 6, pp. 85-88. 2008.
[6] J. H. Lu, "The assessment of safety management for construction enterprises based on information entropy," Developing, vol. 9 no. 227, pp. 122-123. 2009.
[7] L. Lu, L. D. Wang, L. P. Bian, and S. Qin, "Safety fuzzy evaluation of building sites," Industrial Engineering Journal, vol. 6, no. 6, pp. 49-53. 2003.
[8] A. Shapira, G. Lucko, and C. J. Schexnayder, "Cranes for building construction projects," Construction Engineering and Management, vol. 133 no. 9, pp. 690-700. 2007.
[9] Y. Sun, and X. D. Li, " Research on application of structural equation modeling in construction," Proceedings of 2010 International Conference on Construction and Real Estate Management, vol. 1, pp. 111-115. 2010.
[10] ]K. G. Joreskog, D. Sorbom, LISREL 7: Users reference guide. Scientific Software, Inc., 1369 Neitzel Road Mooresvile, IN 16158, USA .1989.
[11] F. G. Thomas, "Structural equation modeling for travel behavior research," Transportation Research, vol. 37, pp. 1-25. 2003.
[12] S. Dong-Chul, "An explicative model of unsafe work behavior," Safety Science vol. 43, pp. 187-211 .2005.