Search results for: zero installation cost
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 6242

Search results for: zero installation cost

6002 DG Allocation to Reduce Production Cost by Reducing Losses in Radial Distribution Systems Using Fuzzy

Authors: G. V. Siva Krishna Rao, B. Srinivasa Rao

Abstract:

Electrical energy is vital in every aspect of day-to-day life. Keen interest is taken on all possible sources of energy from which it can be generated and this led to the encouragement of generating electrical power using renewable energy resources such as solar, tidal waves and wind energy. Due to the increasing interest on renewable sources in recent times, the studies on integration of distributed generation to the power grid have rapidly increased. Distributed Generation (DG) is a promising solution to many power system problems such as voltage regulation, power loss and reduction in operational cost, etc. To reduce production cost, it is important to minimize the losses by determining the location and size of local generators to be placed in the radial distribution systems. In this paper, reduction of production cost by optimal size of DG unit operated at optimal power factor is dealt. The optimal size of the DG unit is calculated analytically using approximate reasoning suitable nodes and DG placement to minimize production cost with minimum loss is determined by fuzzy technique. Total Cost of Power generation is compared with and without DG unit for 1 year duration. The suggested method is programmed under MATLAB software and is tested on IEEE 33 bus system and the results are presented.

Keywords: distributed generation, operational cost, exact loss formula, optimum size, optimum location

Procedia PDF Downloads 455
6001 Mooring Analysis of Duct-Type Tidal Current Power System in Shallow Water

Authors: Chul H. Jo, Do Y. Kim, Bong K. Cho, Myeong J. Kim

Abstract:

The exhaustion of oil and the environmental pollution from the use of fossil fuel are increasing. Tidal current power (TCP) has been proposed as an alternative energy source because of its predictability and reliability. By applying a duct and single point mooring (SPM) system, a TCP device can amplify the generating power and keep its position properly. Because the generating power is proportional to cube of the current stream velocity, amplifying the current speed by applying a duct to a TCP system is an effective way to improve the efficiency of the power device. An SPM system can be applied at any water depth and is highly cost effective. Simple installation and maintenance procedures are also merits of an SPM system. In this study, we designed an SPM system for a duct-type TCP device for use in shallow water. Motions of the duct are investigated to obtain the response amplitude operator (RAO) as the magnitude of the transfer function. Parameters affecting the stability of the SPM system such as the fairlead departure angle, current velocity, and the number of clamp weights are analyzed and/or optimized. Wadam and OrcaFlex commercial software is used to design the mooring line.

Keywords: mooring design, parametric analysis, RAO (Response Amplitude Operator), SPM (Single Point Mooring)

Procedia PDF Downloads 258
6000 A Cost-Evaluation Study on the Use of Negative Pressure Wound Therapy with Instillation for Salvage of Infected Implant-Based Breast Reconstructions

Authors: S. Haque, M. Kanapathy, E. Bollen, I. Younis, A. Mosahebi

Abstract:

Background: Implant loss due to infection is the most devastating complication of implant-based breast reconstruction. The use of negative pressure wound therapy with instillation (NPWTi) for salvage of infected implant-based breast reconstructions has shown promising results to allow early reinsertion of a new implant as an alternative to current management of delayed reinsertion. This study compares the cost implication of NPWTi against current management of delayed reinsertion of infected breast implants. Methods: 20 cases of an infected breast implant treated with NPWTi (V.A.C. VERAFLO™ Therapy) followed by early re-insertion of a new implant were compared with 20 cases who had delayed reinsertion (non-NPWTi). Average cost per person was calculated using total operative expenses, cost of inpatient stay, cost of investigations, cost of antibiotics, and cost of outpatient visits. Results: Treatment with NPWTi allowed for earlier re-insertion of a new implant (NPWTi: 9.04 ± 2.92 days vs. non-NPWTi: 236.25 ± 123.89 days). The average cost per patient for NPWTi and non-NPWTi was £14,343.13 ± £2,786.70 and £8,920.31 ± £3,005.73 respectively. All patients treated with NPWTi had one admission and spent 11.9 ± 4.1days as an inpatient while non-NPWTi patients had 2.1 ± 0.3 admissions with total length of inpatient stay of 7.1 ± 5.8days. Patients treated with NPWTi had more surgeries (NPWTi: 3.35 ± 0.81 vs. non-NPWTi: 2.2 ± 0.41), however 3 non-NPWTi cases required flap reconstruction. Patients treated with NPWTi had fewer total outpatient visits (NPWTi: 12 ± 6 vs. non-NPWTi: 14.2 ± 6.3). Conclusion: Patients treated with NPWTi incurred higher average cost per patient, longer inpatient stay, and more procedures; however, had early re-insertion of new implants and fewer admissions and outpatient visits. A further study on patient-reported outcome is essential to compare cost against patient benefit.

Keywords: breast reconstruction, cost evaluation, infection, negative pressure wound therapy

Procedia PDF Downloads 89
5999 Investigating the Influence of the Ferro Alloys Consumption on the Slab Product Standard Cost with Different Grades Using Regression Analysis (A Case Study of Iran's Iron and Steel Industry)

Authors: Iman Fakhrian, Ali Salehi Manzari

Abstract:

Consistent Profitability is one of the most important priorities in manufacturing companies. One of the fundamental factors for increasing the companies profitability is cost management. Isfahan's mobarakeh steel company is one of the largest producers of the slab product grades in the middle east. Raw material cost constitutes about 70% of the company's expenditures. The costs of the ferro alloys have a remarkable contribution of the raw material costs. This research aims to determine the ferro alloys which have significant effect on the variability of the standard cost of the slab product grades. Used data in this study were collected from standard costing system of isfahan's mobarakeh steel company in 2022. The results of conducting the regression analysis model show that expense items: 03020, 03045, 03125, 03130 and 03150 have dominant role in variability of the standard cost of the slab product grades. In other words, the mentioned ferro alloys have noticeable and significant role in variability of the standard cost of the slab product grades.

Keywords: consistent profitability, ferro alloys, slab product grades, regression analysis

Procedia PDF Downloads 33
5998 A Translog Analysis of Insurance Economies in Nigeria

Authors: Prince Ayodeji Yusuph

Abstract:

Recapitalization process that has recently become an imperative process in the Nigerian Financial industry has implications for the survival of insurance sector, especially on their service delivery efficiency. This study therefore seeks to investigate the problem of inefficiency in the Nigerian Insurance market from the perspective of their cost structures. The study takes advantage of secondary data of financial reports of thirty randomly selected insurance firms which span over a period of ten years and applied transcendental logarithm model to evaluate their performance from the cost structures strategy. The results indicate that only large scale firms enjoy cost saving advantages. Twenty percent firms sampled belong to this category. The result suggests that premium income would contribute to insurance firm’s performance, only when a sound investment decisions are made.

Keywords: transcedental logarithm, cost structures, insurance firms and efficiency, Nigeria

Procedia PDF Downloads 220
5997 Cartel Formation with Differentiated Products, Asymmetric Cost, and Quantity Competition: The Case of Three Firms

Authors: Burkhard Hehenkamp, Tahmina Faizi

Abstract:

In this paper, we analyze the formation of cartels along with the stability of the cartel for the case of three firms that produce differentiated products and differ in their cost of production. Both cost and demand are linear, and firms compete in quantities once a cartel has been formed (or not). It turns out that the degree of product differentiation has a direct effect on the incentive to form a cartel. Firstly, when goods are complements or close substitutes, firms form a grand coalition. Secondly, for weak and medium substitutes, the firm with the lowest cost prefers to remain independent, while both other firms form a coalition. We also find that the producer profit of the stable coalition structure is nonmonotonic in the degree of product differentiation.

Keywords: collusion, cartel formation, cartel stability, differentiated market, quantity competition, oligopolies

Procedia PDF Downloads 72
5996 The Cost-Effectiveness of Pancreatic Surgical Cancer Care in the US vs. the European Union: Results of a Review of the Peer-Reviewed Scientific Literature

Authors: Shannon Hearney, Jeffrey Hoch

Abstract:

While all cancers are costly to treat, pancreatic cancer is a notoriously costly and deadly form of cancer. Across the world there are a variety of treatment centers ranging from small clinics to large, high-volume hospitals as well as differing structures of payment and access. It has been noted that centers that treat a high volume of pancreatic cancer patients have higher quality of care, it is unclear if that care is cost-effective. In the US there is no clear consensus on the cost-effectiveness of high-volume centers for the surgical care of pancreatic cancer. Other European countries, like Finland and Italy have shown that high-volume centers have lower mortality rates and can have lower costs, there however, is still a gap in knowledge about these centers cost-effectiveness globally. This paper seeks to review the current literature in Europe and the US to gain a better understanding of the state of high-volume pancreatic surgical centers cost-effectiveness while considering the contextual differences in health system structure. A review of major reference databases such as Medline, Embase and PubMed will be conducted for cost-effectiveness studies on the surgical treatment of pancreatic cancer at high-volume centers. Possible MeSH terms to be included, but not limited to, are: “pancreatic cancer”, “cost analysis”, “cost-effectiveness”, “economic evaluation”, “pancreatic neoplasms”, “surgical”, “Europe” “socialized medicine”, “privatized medicine”, “for-profit”, and “high-volume”. Studies must also have been available in the English language. This review will encompass European scientific literature, as well as those in the US. Based on our preliminary findings, we anticipate high-volume hospitals to provide better care at greater costs. We anticipate that high-volume hospitals may be cost-effective in different contexts depending on the national structure of a healthcare system. Countries with more centralized and socialized healthcare may yield results that are more cost-effective. High-volume centers may differ in their cost-effectiveness of the surgical care of pancreatic cancer internationally especially when comparing those in the United States to others throughout Europe.

Keywords: cost-effectiveness analysis, economic evaluation, pancreatic cancer, scientific literature review

Procedia PDF Downloads 62
5995 The Relation of Water Intake with Level of Knowledge Related to Water Intake in Workers of Food Production Unit, Nutrition Installation at Puspa Hospital, Jakarta

Authors: Siti Rahmah Fitrianti, Mela Milani

Abstract:

Inadequate of water intake has negative effects on the health of the body, which can cause kidney failure and death. One of the factors that can affect someone intake of water is level of knowledge about the importance of water intake itself. A good knowledge of the daily water intake can increase the awareness of daily needed of water intake. Therefore, researchers initiated a study on the relationship of water intake to the level of knowledge related with water intake in food workers, at “Puspa” Hospital. Type of this research is quantitative research with cross-sectional approach. The research data was collected by measuring the independent and dependent variable at a time. This study took place in the food production unit of Nutrition Installation in "Puspa" Hospital, Jakarta in October 2016. The population target in this study were workers in food production unit aged 30-64 years. The instrument was a questionnaire question regarding water intake and 24 hours food recall. The result is 78.6% of respondents have less knowledge about the importance of water intake. Meanwhile, as many as 85.7% of respondents have adequate water intake. Tested by Chi-Square test, showed that no significant relationship between water intake with the level of knowledge related to water intake in workers of food production unit. Adequate intake of water in food workers commonly may be not caused by the level of knowledge related to water intake, but it may be cause of work environment factor which has a high temperature.

Keywords: food production unit, food workers, level of knowledge, water intake

Procedia PDF Downloads 321
5994 Reducing Weight and Fuel Consumption of Civil Aircraft by EML

Authors: Luca Bertola, Tom Cox, Pat Wheeler, Seamus Garvey, Herve Morvan

Abstract:

Electromagnetic launch systems have been proposed for military applications to accelerate jet planes on aircraft carriers. This paper proposes the implementation of similar technology to aid civil aircraft take-off, which can provide significant economic, environmental and technical benefits. Assisted launch has the potential of reducing ground noise and emissions near airports and improving overall aircraft efficiency through reducing engine thrust requirements. This paper presents a take-off performance analysis for an Airbus A320-200 taking off with and without the assistance of the electromagnetic catapult. Assisted take-off allows for a significant reduction in take-off field length, giving more capacity with existing airport footprints and reducing the necessary footprint of new airports, which will both reduce costs and increase the number of suitable sites. The electromagnetic catapult may allow the installation of smaller engines with lower rated thrust. The consequent fuel consumption and operational cost reduction are estimated. The potential of reducing the aircraft operational costs and the runway length required making electromagnetic launch system an attractive solution to the air traffic growth in busy airports.

Keywords: electromagnetic launch, fuel consumption, take-off analysis, weight reduction

Procedia PDF Downloads 298
5993 Green Hydrogen: Exploring Economic Viability and Alluring Business Scenarios

Authors: S. Sakthivel

Abstract:

Currently, the global economy is based on the hydrocarbon economy, which is referencing the global hydrocarbon industry. Problems of using these fossil fuels (like oil, NG, coal) are emitting greenhouse gases (GHGs) and price fluctuation, supply/distribution, etc. These challenges can be overcome by using clean energy as hydrogen. The hydrogen economy is the use of hydrogen as a low carbon fuel, particularly for hydrogen vehicles, alternative industrial feedstock, power generation, and energy storage, etc. Engineering consulting firms have a significant role in this ambition and green hydrogen value chain (i.e., integration of renewables, production, storage, and distribution to end-users). Typically, the cost of green hydrogen is a function of the price of electricity needed, the cost of the electrolyser, and the operating cost to run the system. This article focuses on economic viability and explores the alluring business scenarios globally. Break-even analysis was carried out for green hydrogen production and in order to evaluate and compare the impact of the electricity price on the production costs of green hydrogen and relate it to fossil fuel-based brown/grey/blue hydrogen costs. It indicates that the cost of green hydrogen production will fall drastically due to the declining costs of renewable electricity prices and along with the improvement and scaling up of electrolyser manufacturing. For instance, in a scenario where electricity prices are below US$ 40/MWh, green hydrogen cost is expected to reach cost competitiveness.

Keywords: green hydrogen, cost analysis, break-even analysis, renewables, electrolyzer

Procedia PDF Downloads 106
5992 A General Iterative Nonlinear Programming Method to Synthesize Heat Exchanger Network

Authors: Rupu Yang, Cong Toan Tran, Assaad Zoughaib

Abstract:

The work provides an iterative nonlinear programming method to synthesize a heat exchanger network by manipulating the trade-offs between the heat load of process heat exchangers (HEs) and utilities. We consider for the synthesis problem two cases, the first one without fixed cost for HEs, and the second one with fixed cost. For the no fixed cost problem, the nonlinear programming (NLP) model with all the potential HEs is optimized to obtain the global optimum. For the case with fixed cost, the NLP model is iterated through adding/removing HEs. The method was applied in five case studies and illustrated quite well effectiveness. Among which, the approach reaches the lowest TAC (2,904,026$/year) compared with the best record for the famous Aromatic plants problem. It also locates a slightly better design than records in literature for a 10 streams case without fixed cost with only 1/9 computational time. Moreover, compared to the traditional mixed-integer nonlinear programming approach, the iterative NLP method opens a possibility to consider constraints (such as controllability or dynamic performances) that require knowing the structure of the network to be calculated.

Keywords: heat exchanger network, synthesis, NLP, optimization

Procedia PDF Downloads 132
5991 Prefabricated Integral Design of Building Services

Authors: Mina Mortazavi

Abstract:

The common approach in the construction industry for restraint requirements in existing structures or new constructions is to have Non-Structural Components (NSCs) assembled and installed on-site by different MEP subcontractors. This leads to a lack of coordination and higher costs, construction time, and complications due to inaccurate building information modelling (BIM) systems. Introducing NSCs to a consistent BIM system from the beginning of the design process and considering their seismic loads in the analysis and design process can improve coordination and reduce costs and time. One solution is to use prefabricated mounts with attached MEPs delivered as an integral module. This eliminates the majority of coordination complications and reduces design and installation costs and time. An advanced approach is to have as many NSCs as possible installed in the same prefabricated module, which gives the structural engineer the opportunity to consider the involved component weights and locations in the analysis and design of the prefabricated support. This efficient approach eliminates coordination and access issues, leading to enhanced quality control. This research will focus on the existing literature on modular sub-assemblies that are integrated with architectural and structural components. Modular MEP systems take advantage of the precision provided by BIM tools to meet exact requirements and achieve a buildable design every time. Modular installations that include MEP systems provide efficient solutions for the installation of MEP services or components.

Keywords: building services, modularisation, prefabrication, integral building design

Procedia PDF Downloads 45
5990 Shoring System Selection for Deep Excavation

Authors: Faouzi Ahtchi-Ali, Marcus Vitiello

Abstract:

A study was conducted in the east region of the Middle East to assess the constructability of a shoring system for a 12-meter deep excavation. Several shoring systems were considered in this study including secant concrete piling, contiguous concrete piling, and sheet-piling. The excavation was carried out in a very dense sand with the groundwater level located at 3 meters below ground surface. The study included conducting a pilot test for each shoring system listed above. The secant concrete piling included overlapping concrete piles to a depth of 16 meters. Drilling method with full steel casing was utilized to install the concrete piles. The verticality of the piles was a concern for the overlap. The contiguous concrete piling required the installation of micro-piles to seal the gap between the concrete piles. This method revealed that the gap between the piles was not fully sealed as observed by the groundwater penetration to the excavation. The sheet-piling method required pre-drilling due to the high blow count of the penetrated layer of saturated sand. This study concluded that the sheet-piling method with pre-drilling was the most cost effective and recommended a method for the shoring system.

Keywords: excavation, shoring system, middle east, Drilling method

Procedia PDF Downloads 426
5989 Investigation on Cost Reflective Network Pricing and Modified Cost Reflective Network Pricing Methods for Transmission Service Charges

Authors: K. Iskandar, N. H. Radzi, R. Aziz, M. S. Kamaruddin, M. N. Abdullah, S. A. Jumaat

Abstract:

Nowadays many developing countries have been undergoing a restructuring process in the power electricity industry. This process has involved disaggregating former state-owned monopoly utilities both vertically and horizontally and introduced competition. The restructuring process has been implemented by the Australian National Electricity Market (NEM) started from 13 December 1998, began operating as a wholesale market for supply of electricity to retailers and end-users in Queensland, New South Wales, the Australian Capital Territory, Victoria and South Australia. In this deregulated market, one of the important issues is the transmission pricing. Transmission pricing is a service that recovers existing and new cost of the transmission system. The regulation of the transmission pricing is important in determining whether the transmission service system is economically beneficial to both side of the users and utilities. Therefore, an efficient transmission pricing methodology plays an important role in the Australian NEM. In this paper, the transmission pricing methodologies that have been implemented by the Australian NEM which are the Cost Reflective Network Pricing (CRNP) and Modified Cost Reflective Network Pricing (MCRNP) methods are investigated for allocating the transmission service charges to the transmission users. A case study using 6-bus system is used in order to identify the best method that reflects a fair and equitable transmission service charge.

Keywords: cost-reflective network pricing method, modified cost-reflective network pricing method, restructuring process, transmission pricing

Procedia PDF Downloads 423
5988 Capacitated Multiple Allocation P-Hub Median Problem on a Cluster Based Network under Congestion

Authors: Çağrı Özgün Kibiroğlu, Zeynep Turgut

Abstract:

This paper considers a hub location problem where the network service area partitioned into predetermined zones (represented by node clusters is given) and potential hub nodes capacity levels are determined a priori as a selection criteria of hub to investigate congestion effect on network. The objective is to design hub network by determining all required hub locations in the node clusters and also allocate non-hub nodes to hubs such that the total cost including transportation cost, opening cost of hubs and penalty cost for exceed of capacity level at hubs is minimized. A mixed integer linear programming model is developed introducing additional constraints to the traditional model of capacitated multiple allocation hub location problem and empirically tested.

Keywords: hub location problem, p-hub median problem, clustering, congestion

Procedia PDF Downloads 453
5987 Performance Evaluation and Cost Analysis of Standby Systems

Authors: Mohammed A. Hajeeh

Abstract:

Pumping systems are an integral part of water desalination plants, their effective functioning is vital for the operation of a plant. In this research work, the reliability and availability of pressurized pumps in a reverse osmosis desalination plant are studied with the objective of finding configurations that provides optimal performance. Six configurations of a series system with different number of warm and cold standby components were examined. Closed form expressions for the mean time to failure (MTTF) and the long run availability are derived and compared under the assumption that the time between failures and repair times of the primary and standby components are exponentially distributed. Moreover, a cost/ benefit analysis is conducted in order to identify a configuration with the best performance and least cost. It is concluded that configurations with cold standby components are preferable especially when the pumps are of the size.

Keywords: availability, cost/benefit, mean time to failure, pumps

Procedia PDF Downloads 254
5986 The Transfer of Low-Cost Housing in South Africa: Problems and Impediments

Authors: Gert Van Schalkwyk, Chris Cloete

Abstract:

South Africa is experiencing a massive housing backlog in urban low-cost housing. A backlog in the transfer of low-cost housing units is exacerbated by various impediments and delays that exist in the current legal framework. Structured interviews were conducted with forty-five practicing conveyancers and fifteen deeds office examiners at the Deeds Office in Pretoria, South Africa. One of the largest, the Deeds Office in Pretoria implements a uniform registration process and can be regarded as representative of other deeds offices in South Africa. It was established that a low percentage of low-cost properties are freely transferable. The main economic impediments are the absence of financing and the affordability or payment of rates and taxes to local government. Encroachment of buildings on neighboring stands caused by the enlargement of existing small units on small stands also causes long-term unresolved legal disputes. In addition, as the transfer of properties is dependent on the proper functioning of administrative functions of various government departments, the adverse service delivery of government departments hampers transfer. Addressing the identified problems will contribute to a more sustainable process for the transfer of low-cost housing units in South Africa.

Keywords: conveyancing, low-cost housing, South Africa, tenure, titling, transfer

Procedia PDF Downloads 97
5985 Evidence on Scale Economies in National Bank of Pakistan

Authors: Sohail Zafar, Sardar Javaid Iqbal Khan

Abstract:

We use a parametric approach within a translog cost function framework to estimate the economies of scale in National Bank of Pakistan from 1997 to 2013. The results indicate significant economies of scale throughout the sample at aggregates and disaggregates taking in account size subject to stipulation ownership. The factor markets often produce scale inefficiencies in the banking of developing countries like Pakistan such inefficiencies are common due to distortion in factor markets leading to the use of inappropriate factor proportions. The findings suggest that National Bank of Pakistan diversify their asset portfolios that it has cost advantage, therefore, expansion in size should be encouraged under current technology because it appears to be cost effective. In addition, our findings support the implementation of universal banking model in Pakistan.

Keywords: scale economies, cost function, disaggregates, aggregates

Procedia PDF Downloads 295
5984 Software Engineering Inspired Cost Estimation for Process Modelling

Authors: Felix Baumann, Aleksandar Milutinovic, Dieter Roller

Abstract:

Up to this point business process management projects in general and business process modelling projects in particular could not rely on a practical and scientifically validated method to estimate cost and effort. Especially the model development phase is not covered by a cost estimation method or model. Further phases of business process modelling starting with implementation are covered by initial solutions which are discussed in the literature. This article proposes a method of filling this gap by deriving a cost estimation method from available methods in similar domains namely software development or software engineering. Software development is regarded as closely similar to process modelling as we show. After the proposition of this method different ideas for further analysis and validation of the method are proposed. We derive this method from COCOMO II and Function Point which are established methods of effort estimation in the domain of software development. For this we lay out similarities of the software development rocess and the process of process modelling which is a phase of the Business Process Management life-cycle.

Keywords: COCOMO II, busines process modeling, cost estimation method, BPM COCOMO

Procedia PDF Downloads 401
5983 Benefit-Cost Analysis of Flood Management: a Case Study of Jammu and Kashmir

Authors: Kowser Ali Jan, R. Balaji

Abstract:

A disaster hurts those affected. It also spares many in the affected areas, yet those spared may be indirectly affected. The analytical framework of prevention and coping has proved useful in many circumstances. Historically and currently, there has been limited quantitative information available on flood management in Jammu and Kashmir. This study focuses on the Cost-benefit Analysis (CBA) of flood management by District Disaster Management Kulgam, and the assessment is based on secondary pooled data collected from government offices, NGOs, published Journals, and local and national newspapers. It also described the scenario, the approach adopted, and the sources of flood damage cost information. The estimated total benefits account for 78686.18 lakh of rupees, and that of total costs account for 2218.75lakh of rupees. The Benefit-Cost ratio greater than one (>1) shows that Flood Management in District Kulgam was economically feasible and successfully managed. The State of Jammu and Kashmir takes essential prevention and management measures to bring down the damages due to floods to significant status.

Keywords: cost-benefit analysis, nature, flood management, disaster

Procedia PDF Downloads 118
5982 Supply Chain Decarbonisation – A Cost-Based Decision Support Model in Slow Steaming Maritime Operations

Authors: Eugene Y. C. Wong, Henry Y. K. Lau, Mardjuki Raman

Abstract:

CO2 emissions from maritime transport operations represent a substantial part of the total greenhouse gas emission. Vessels are designed with better energy efficiency. Minimizing CO2 emission in maritime operations plays an important role in supply chain decarbonisation. This paper reviews the initiatives on slow steaming operations towards the reduction of carbon emission. It investigates the relationship and impact among slow steaming cost reduction, carbon emission reduction, and shipment delay. A scenario-based cost-driven decision support model is developed to facilitate the selection of the optimal slow steaming options, considering the cost on bunker fuel consumption, available speed, carbon emission, and shipment delay. The incorporation of the social cost of cargo is reviewed and suggested. Additional measures on the effect of vessels sizes, routing, and type of fuels towards decarbonisation are discussed.

Keywords: slow steaming, carbon emission, maritime logistics, sustainability, green supply chain

Procedia PDF Downloads 430
5981 Impact Logistic Management to Reduce Costs

Authors: Waleerak Sittisom

Abstract:

The objectives of this research were to analyze transportation route management, to identify potential cost reductions in logistic operation. In-depth interview techniques and small group discussions were utilized with 25 participants from various backgrounds in the areas of logistics. The findings of this research revealed that there were four areas that companies are able to effectively manage a logistic cost reduction: managing the space within the transportation vehicles, managing transportation personnel, managing transportation cost, and managing control of transportation. On the other hand, there were four areas that companies were unable to effectively manage a logistic cost reduction: the working process of transportation, the route planning of transportation, the service point management, and technology management. There are five areas that cost reduction is feasible: personnel management, process of working, map planning, service point planning, and technology implementation. To be able to reduce costs, the transportation companies should suggest that customers use a file system to save truck space. Also, the transportation companies need to adopt new technology to manage their information system so that packages can be reached easy, safe, and fast. Staff needs to be trained regularly to increase knowledge and skills. Teamwork is required to effectively reduce the costs.

Keywords: cost reduction, management, logistics, transportation

Procedia PDF Downloads 468
5980 Opportunity Cost of Producing Sugarcane, Sweet Orange and Soybean in Sri Lankan Context: An Economic Analysis

Authors: Tharsinithevy Kirupananthan

Abstract:

This study analyzed the decision on growing three different crops which suit dry zone of Sri Lanka using the opportunity cost concept in economics. The variable cost of production of sugar cane, sweet orange, and soybean was 112,418.76, 13,463 and 10,928.08 Sri Lankan Rs. (LKR) per acre in the dry zone of Sri Lanka. The yield of the sugar cane, sweet orange, and soybean were 49.33 tons, 25,595 fruits, and 1032 kg per acre. The market price of the sugar cane, sweet orange, and soybean were 4200 LKR/ton, LKR 14.66 per fruit and LKR 89.69 per kg. The market value or the total income of the sugar cane, sweet orange, and soybean were LKR 207194.4, 283090.74, and 92560.08. The accounting profit of the sugar cane, sweet orange, and soybean was 94,775.64, 269,627.74, and 81,632 LKR per acre. Therefore, the opportunity cost of sugarcane per acre in terms of accounting profit was LKR. 269,627.74 from sweet orange and LKR 81,632 from soybean. The highest opportunity cost per acre in terms of accounting profit was found when soybean is produced instead of sweet orange. The opportunity cost which compared among the crops in terms of market value for sugar cane per acre was LKR 283090.74 of sweet orange and LKR 92560.08 of soybean. The highest opportunity cost both in terms of accounting profit and market value was found when growing soybean instead of sweet orange by using the resource per acre of land. The economic profit of sugar cane production in place of sweet orange was LKR -188315.1 per acre. The highest economic profit LKR 177067.66 was found when sweet orange is produced in place of soybean. A positive value of economic profit was found in all combination of sweet orange production without considering the first harvest duration of the crop.

Keywords: agricultural economics, crop, opportunity cost, Sri Lanka

Procedia PDF Downloads 311
5979 Determination of Failure Modes of Screwed Connections in Cold-Formed Steel Structures

Authors: Mahyar Maali, Merve Sagiroglu

Abstract:

Steel, which is one of the base materials we prefer in the building construction, is the material with the highest ratio to weight of carrying capacity. Due to the carrying capacity, lighter and better quality steel in smaller sections and sizes has recently been used as a frame system in cold-formed steel structures. While light steel elements used as secondary frame elements during the past, they have nowadays started to be preferred as the main frame in low/middle story buildings and detached houses with advantages such as quick and easy installation, time-saving, and small amount of scrap. It is also economically ideal because the weight of structure is lighter than other steel profiles. Structural performances and failure modes of cold-formed structures are different from conventional ones due to their thin-walled structures. One of the most important elements of light steel structures to ensure stability is the connection. The screwed connections, which have self-drilling properties with special drilling tools, are widely used in the installation of cold-formed profiles. The length of the screw is selected according to the total thickness of the elements after the screw thickness is determined according to the elements of connections. The thickness of the material depends on the length of the drilling portion at the end of the screw. The shear tests of plates connected with self-drilling screws are carried out depending on the screw length, and their failure modes were evaluated in this study.

Keywords: cold-formed steel, screwed connection, connection, screw length

Procedia PDF Downloads 151
5978 A Systematic Review on Development of a Cost Estimation Framework: A Case Study of Nigeria

Authors: Babatunde Dosumu, Obuks Ejohwomu, Akilu Yunusa-Kaltungo

Abstract:

Cost estimation in construction is often difficult, particularly when dealing with risks and uncertainties, which are inevitable and peculiar to developing countries like Nigeria. Direct consequences of these are major deviations in cost, duration, and quality. The fundamental aim of this study is to develop a framework for assessing the impacts of risk on cost estimation, which in turn causes variabilities between contract sum and final account. This is very important, as initial estimates given to clients should reflect the certain magnitude of consistency and accuracy, which the client builds other planning-related activities upon, and also enhance the capabilities of construction industry professionals by enabling better prediction of the final account from the contract sum. In achieving this, a systematic literature review was conducted with cost variability and construction projects as search string within three databases: Scopus, Web of science, and Ebsco (Business source premium), which are further analyzed and gap(s) in knowledge or research discovered. From the extensive review, it was found that factors causing deviation between final accounts and contract sum ranged between 1 and 45. Besides, it was discovered that a cost estimation framework similar to Building Cost Information Services (BCIS) is unavailable in Nigeria, which is a major reason why initial estimates are very often inconsistent, leading to project delay, abandonment, or determination at the expense of the huge sum of money invested. It was concluded that the development of a cost estimation framework that is adjudged an important tool in risk shedding rather than risk-sharing in project risk management would be a panacea to cost estimation problems, leading to cost variability in the Nigerian construction industry by the time this ongoing Ph.D. research is completed. It was recommended that practitioners in the construction industry should always take into account risk in order to facilitate the rapid development of the construction industry in Nigeria, which should give stakeholders a more in-depth understanding of the estimation effectiveness and efficiency to be adopted by stakeholders in both the private and public sectors.

Keywords: cost variability, construction projects, future studies, Nigeria

Procedia PDF Downloads 162
5977 Neural Network Models for Actual Cost and Actual Duration Estimation in Construction Projects: Findings from Greece

Authors: Panagiotis Karadimos, Leonidas Anthopoulos

Abstract:

Predicting the actual cost and duration in construction projects concern a continuous and existing problem for the construction sector. This paper addresses this problem with modern methods and data available from past public construction projects. 39 bridge projects, constructed in Greece, with a similar type of available data were examined. Considering each project’s attributes with the actual cost and the actual duration, correlation analysis is performed and the most appropriate predictive project variables are defined. Additionally, the most efficient subgroup of variables is selected with the use of the WEKA application, through its attribute selection function. The selected variables are used as input neurons for neural network models through correlation analysis. For constructing neural network models, the application FANN Tool is used. The optimum neural network model, for predicting the actual cost, produced a mean squared error with a value of 3.84886e-05 and it was based on the budgeted cost and the quantity of deck concrete. The optimum neural network model, for predicting the actual duration, produced a mean squared error with a value of 5.89463e-05 and it also was based on the budgeted cost and the amount of deck concrete.

Keywords: actual cost and duration, attribute selection, bridge construction, neural networks, predicting models, FANN TOOL, WEKA

Procedia PDF Downloads 106
5976 Assembly Solution for Modular Buildings: Development of a Plug-In Self-Locking Device Designed for Light-Framed Structures

Authors: Laurence Picard, André Bégin-Drolet, Pierre Blanchet

Abstract:

The prefabricated construction industry has been operating in North America for several years now and differs from traditional construction by its much shorter project timelines, lower costs, and increased build quality. Faced with the global housing crisis, prefabrication should be the first choice for erecting buildings quickly and at a low cost. However, the reality is quite different; manufacturers focus their operations mainly on single-home construction. This is explained by the lack of a suitable and efficient assembly solution for erecting large-scale buildings. Indeed, it is difficult to maintain the coveted advantages of prefabrication with a laborious on-site assembly and a colossal load of additional operations such as the installation of fasteners and the internal finishing. In the desire to maximize the benefits of prefabrication and make it a smart choice even for large buildings, an automated connection solution is developed. The plug-in self-locking device was developed accordingly to the product design phases: on-site observations, the definition of the problem and product requirements, solution generation, prototyping, fabricating and testing.

Keywords: assembly solution, automation, construction productivity, modular connection, modular buildings, plug-in device, self-lock mechanism

Procedia PDF Downloads 132
5975 Production Line Layout Planning Based on Complexity Measurement

Authors: Guoliang Fan, Aiping Li, Nan Xie, Liyun Xu, Xuemei Liu

Abstract:

Mass customization production increases the difficulty of the production line layout planning. The material distribution process for variety of parts is very complex, which greatly increases the cost of material handling and logistics. In response to this problem, this paper presents an approach of production line layout planning based on complexity measurement. Firstly, by analyzing the influencing factors of equipment layout, the complexity model of production line is established by using information entropy theory. Then, the cost of the part logistics is derived considering different variety of parts. Furthermore, the function of optimization including two objectives of the lowest cost, and the least configuration complexity is built. Finally, the validity of the function is verified in a case study. The results show that the proposed approach may find the layout scheme with the lowest logistics cost and the least complexity. Optimized production line layout planning can effectively improve production efficiency and equipment utilization with lowest cost and complexity.

Keywords: production line, layout planning, complexity measurement, optimization, mass customization

Procedia PDF Downloads 345
5974 Expected Present Value of Losses in the Computation of Optimum Seismic Design Parameters

Authors: J. García-Pérez

Abstract:

An approach to compute optimum seismic design parameters is presented. It is based on the optimization of the expected present value of the total cost, which includes the initial cost of structures as well as the cost due to earthquakes. Different types of seismicity models are considered, including one for characteristic earthquakes. Uncertainties are included in some variables to observe the influence on optimum values. Optimum seismic design coefficients are computed for three different structural types representing high, medium and low rise buildings, located near and far from the seismic sources. Ordinary and important structures are considered in the analysis. The results of optimum values show an important influence of seismicity models as well as of uncertainties on the variables.

Keywords: importance factors, optimum parameters, seismic losses, seismic risk, total cost

Procedia PDF Downloads 260
5973 Multibody Constrained Dynamics of Y-Method Installation System for a Large Scale Subsea Equipment

Authors: Naeem Ullah, Menglan Duan, Mac Darlington Uche Onuoha

Abstract:

The lowering of subsea equipment into the deep waters is a challenging job due to the harsh offshore environment. Many researchers have introduced various installation systems to deploy the payload safely into the deep oceans. In general practice, dual floating vessels are not employed owing to the prevalent safety risks and hazards caused by ever-increasing dynamical effects sourced by mutual interaction between the bodies. However, while keeping in the view of the optimal grounds, such as economical one, the Y-method, the two conventional tugboats supporting the equipment by the two independent strands connected to a tri-plate above the equipment, has been employed to study multibody dynamics of the dual barge lifting operations. In this study, the two tugboats and the suspended payload (Y-method) are deployed for the lowering of subsea equipment into the deep waters as a multibody dynamic system. The two-wire ropes are used for the lifting and installation operation by this Y-method installation system. 6-dof (degree of freedom) for each body are considered to establish coupled 18-dof multibody model by embedding technique or velocity transformation technique. The fundamental and prompt advantage of this technique is that the constraint forces can be eliminated directly, and no extra computational effort is required for the elimination of the constraint forces. The inertial frame of reference is taken at the surface of the water as the time-independent frame of reference, and the floating frames of reference are introduced in each body as the time-dependent frames of reference in order to formulate the velocity transformation matrix. The local transformation of the generalized coordinates to the inertial frame of reference is executed by applying the Euler Angle approach. The spherical joints are articulated amongst the multibody as the kinematic joints. The hydrodynamic force, the two-strand forces, the hydrostatic force, and the mooring forces are taken into consideration as the external forces. The radiation force of the hydrodynamic force is obtained by employing the Cummins equation. The wave exciting part of the hydrodynamic force is obtained by using force response amplitude operators (RAOs) that are obtained by the commercial solver ‘OpenFOAM’. The strand force is obtained by considering the wire rope as an elastic spring. The nonlinear hydrostatic force is obtained by the pressure integration technique at each time step of the wave movement. The mooring forces are evaluated by using Faltinsen analytical approach. ‘The Runge Kutta Method’ of Fourth-Order is employed to evaluate the coupled equations of motion obtained for 18-dof multibody model. The results are correlated with the simulated Orcaflex Model. Moreover, the results from Orcaflex Model are compared with the MOSES Model from previous studies. The MBDS of single barge lifting operation from the former studies are compared with the MBDS of the established dual barge lifting operation. The dynamics of the dual barge lifting operation are found larger in magnitude as compared to the single barge lifting operation. It is noticed that the traction at the top connection point of the cable decreases with the increase in the length, and it becomes almost constant after passing through the splash zone.

Keywords: dual barge lifting operation, Y-method, multibody dynamics, shipbuilding, installation of subsea equipment, shipbuilding

Procedia PDF Downloads 171