Search results for: times%20series%20analysis
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 3482

Search results for: times%20series%20analysis

3482 The Parental Involvement as Predictor of Happiness in School-Aged Children

Authors: Giedre Sirvinskiene, Kastytis Smigelskas

Abstract:

Quality of family relations is an important factor of child development, however, the role of joint family activities on adolescent happiness still needs investigation. The aim of this study is to analyze associations between happiness of school-aged children and parental involvement. The analysis involves Lithuanian data from the cross-sectional Health Behaviour in School Aged Children (HBSC) study. The sample comprised 5730 children aged 11–15 years. Results: The odds of happiness was 2.38 times higher if children were living together with mother (95% CI: 1.81–3.13) and 1.81 times – with father (95% CI: 1.53–2.15). However, the likelihood of happiness was 7.21 times lower if adolescent had difficulties to talk with mother (95% CI: 5.42–9.61) and 6.40 times – with father (95% CI: 4.80–8.56). The joint daily adolescents-parents activities also predict the odds for happiness: joint TV watching by 5.96 times (95% CI: 4.21–8.43), having meals together by 7.02 times (95% CI: 4.77–10.32), going for a walk together 4.30 times (95% CI: 2.96–6.26), visiting places by 6.85 times (95% CI: 4.74–9.90), visiting friends and relatives by 7.13 times (95% CI: 4.87–10.43), sporting by 2.76 (95% CI: 1.83–4.18) as well as discussing various things by 7.35 times (95% CI: 5.50–9.82). Conclusions: Joint parents-adolescents activities and communication are related with greater happiness of adolescent. Though adolescence is a period when the relationships with peers get more importance, the communication and joint activities with parents remain a significant factor of adolescent happiness.

Keywords: adolescent, family, happiness, school-age

Procedia PDF Downloads 221
3481 Flow Characteristics around Rectangular Obstacles with the Varying Direction of Obstacles

Authors: Hee-Chang Lim

Abstract:

The study aims to understand the surface pressure distribution around the bodies such as the suction pressure in the leading edge on the top and side-face when the aspect ratio of bodies and the wind direction are changed, respectively. We carried out the wind tunnel measurement and numerical simulation around a series of rectangular bodies (40d×80w×80h, 80d×80w×80h, 160d×80w×80h, 80d×40w×80h and 80d×160w×80h in mm3) placed in a deep turbulent boundary layer. Based on a modern numerical platform, the Navier-Stokes equation with the typical 2-equation (k-ε model) and the DES (Detached Eddy Simulation) turbulence model has been calculated, and they are both compared with the measurement data. Regarding the turbulence model, the DES model makes a better prediction comparing with the k-ε model, especially when calculating the separated turbulent flow around a bluff body with sharp edged corner. In order to observe the effect of wind direction on the pressure variation around the cube (e.g., 80d×80w×80h in mm), it rotates at 0º, 10º, 20º, 30º, and 45º, which stands for the salient wind directions in the tunnel. The result shows that the surface pressure variation is highly dependent upon the approaching wind direction, especially on the top and the side-face of the cube. In addition, the transverse width has a substantial effect on the variation of surface pressure around the bodies, while the longitudinal length has little or no influence.

Keywords: rectangular bodies, wind direction, aspect ratio, surface pressure distribution, wind-tunnel measurement, k-ε model, DES model, CFD

Procedia PDF Downloads 202
3480 Air Pollution from Volatile Metals and Acid Gases

Authors: F. Ait Ahsene-Aissat, Y. Kerchiche, Y. Moussaoui, M. Hachemi

Abstract:

Environmental pollution is at the heart of the debate today, the pollutants released into the atmosphere must be measured and reduced to the norms of international releases. The industries pollution is caused by emissions of SO₂, CO and heavy metals in volatile form that must be quantified and monitored. This study presents a qualitative and quantitative analysis However, the collection of volatile heavy metals were performed by active sampling using an isokinetic. SO₂ gas for the maximum is reached for a value of 343 mg / m³, the SO₂ concentration far exceeds the standard releases SO₂ followed by incineration industries in Algeria. the concentration of Cr exceeds 8 times the standard, the Pb concentration in the excess of 6 times, the concentration of Fe has reached very high values exceeding the standard 30 times, the Zn concentration in the excess of 5 times, and the Ni the excess of 4 times and finally that of Cu is almost double of the standard.

Keywords: SO₂, CO, volatiles metals, active sampling isokinetic

Procedia PDF Downloads 267
3479 General Network with Four Nodes and Four Activities with Triangular Fuzzy Number as Activity Times

Authors: Rashmi Tamhankar, Madhav Bapat

Abstract:

In many projects, we have to use human judgment for determining the duration of the activities which may vary from person to person. Hence, there is vagueness about the time duration for activities in network planning. Fuzzy sets can handle such vague or imprecise concepts and has an application to such network. The vague activity times can be represented by triangular fuzzy numbers. In this paper, a general network with fuzzy activity times is considered and conditions for the critical path are obtained also we compute total float time of each activity. Several numerical examples are discussed.

Keywords: PERT, CPM, triangular fuzzy numbers, fuzzy activity times

Procedia PDF Downloads 431
3478 Minimizing Total Completion Time in No-Wait Flowshops with Setup Times

Authors: Ali Allahverdi

Abstract:

The m-machine no-wait flowshop scheduling problem is addressed in this paper. The objective is to minimize total completion time subject to the constraint that the makespan value is not greater than a certain value. Setup times are treated as separate from processing times. Several recent algorithms are adapted and proposed for the problem. An extensive computational analysis has been conducted for the evaluation of the proposed algorithms. The computational analysis indicates that the best proposed algorithm performs significantly better than the earlier existing best algorithm.

Keywords: scheduling, no-wait flowshop, algorithm, setup times, total completion time, makespan

Procedia PDF Downloads 320
3477 A Prediction Method for Large-Size Event Occurrences in the Sandpile Model

Authors: S. Channgam, A. Sae-Tang, T. Termsaithong

Abstract:

In this research, the occurrences of large size events in various system sizes of the Bak-Tang-Wiesenfeld sandpile model are considered. The system sizes (square lattice) of model considered here are 25×25, 50×50, 75×75 and 100×100. The cross-correlation between the ratio of sites containing 3 grain time series and the large size event time series for these 4 system sizes are also analyzed. Moreover, a prediction method of the large-size event for the 50×50 system size is also introduced. Lastly, it can be shown that this prediction method provides a slightly higher efficiency than random predictions.

Keywords: Bak-Tang-Wiesenfeld sandpile model, cross-correlation, avalanches, prediction method

Procedia PDF Downloads 352
3476 Analysis of Temporal Factors Influencing Minimum Dwell Time Distributions

Authors: T. Pedersen, A. Lindfeldt

Abstract:

The minimum dwell time is an important part of railway timetable planning. Due to its stochastic behaviour, the minimum dwell time should be considered to create resilient timetables. While there has been significant focus on how to determine and estimate dwell times, to our knowledge, little research has been carried out regarding temporal and running direction variations of these. In this paper, we examine how the minimum dwell time varies depending on temporal factors such as the time of day, day of the week and time of the year. We also examine how it is affected by running direction and station type. The minimum dwell time is estimated by means of track occupation data. A method is proposed to ensure that only minimum dwell times and not planned dwell times are acquired from the track occupation data. The results show that on an aggregated level, the average minimum dwell times in both running directions at a station are similar. However, when temporal factors are considered, there are significant variations. The minimum dwell time varies throughout the day with peak hours having the longest dwell times. It is also found that the minimum dwell times are influenced by weekday, and in particular, weekends are found to have lower minimum dwell times than most other days. The findings show that there is a potential to significantly improve timetable planning by taking minimum dwell time variations into account.

Keywords: minimum dwell time, operations quality, timetable planning, track occupation data

Procedia PDF Downloads 167
3475 The Effect on Lead Times When Normalizing a Supply Chain Process

Authors: Bassam Istanbouli

Abstract:

Organizations are living in a very competitive and dynamic environment which is constantly changing. In order to achieve a high level of service, the products and processes of these organizations need to be flexible and evolvable. If the supply chains are not modular and well designed, changes can bring combinatorial effects to most areas of a company from its management, financial, documentation, logistics and its information structure. Applying the normalized system’s concept to segments of the supply chain may help in reducing those ripple effects, but it may also increase lead times. Lead times are important and can become a decisive element in gaining customers. Industries are always under the pressure in providing good quality products, at competitive prices, when and how the customer wants them. Most of the time, the customers want their orders now, if not yesterday. The above concept will be proven by examining lead times in a manufacturing example before and after applying normalized systems concept to that segment of the chain. We will then show that although we can minimize the combinatorial effects when changes occur, the lead times will be increased.

Keywords: supply chain, lead time, normalization, modular

Procedia PDF Downloads 98
3474 Information System for Early Diabetic Retinopathy Diagnostics Based on Multiscale Texture Gradient Method

Authors: L. S. Godlevsky, N. V. Kresyun, V. P. Martsenyuk, K. S. Shakun, T. V. Tatarchuk, K. O. Prybolovets, L. F. Kalinichenko, M. Karpinski, T. Gancarczyk

Abstract:

Structures of eye bottom were extracted using multiscale texture gradient method and color characteristics of macular zone and vessels were verified in CIELAB scale. The difference of average values of L*, a* and b* coordinates of CIE (International Commision of Illumination) scale in patients with diabetes and healthy volunteers was compared. The average value of L* in diabetic patients exceeded such one in the group of practically healthy persons by 2.71 times (P < 0.05), while the value of a* index was reduced by 3.8 times when compared with control one (P < 0.05). b* index exceeded such one in the control group by 12.4 times (P < 0.05). The integrated index on color difference (ΔE) exceeded control value by 2.87 times (P < 0.05). More pronounced differences with ΔE were followed by a shorter period of MA appearance with a correlation level at -0.56 (P < 0.05). The specificity of diagnostics raised by 2.17 times (P < 0.05) and negative prognostic index exceeded such one determined with the expert method by 2.26 times (P < 0.05).

Keywords: diabetic retinopathy, multiscale texture gradient, color spectrum analysis, medical diagnostics

Procedia PDF Downloads 93
3473 Investigation of the Drying Times of Blood under Different Environmental Conditions and on Different Fabrics and the Transfer of Blood at Different Times of the Drying Process

Authors: Peter Parkinson

Abstract:

The research investigates the effects of temperature, humidity, wind speed, and fabric composition on the drying times of blood and assesses the degree of blood transfer that can occur during the drying process. An assortment of fabrics, of different composition and thicknesses, were collected and stained using two blood volumes and exposed to varying environmental conditions. The conclusion reached was that temperature, humidity, wind speed, and fabric thickness do have an effect on drying times. An increase in temperature and wind speed results in a decrease in drying times while an increase in fabric thickness and humidity extended the drying times of blood under similar conditions. Transfer experimentation utilized three donor fabrics, 100% white cotton, 100% acrylic, and 100% cotton denim, which were bloodstained using two blood volumes. The fabrics were subjected to both full and low/light force contact from the donor fabrics onto the recipient fabric, under different environmental conditions. Transfer times onto the 100% white cotton (recipient fabric) from all donor fabrics were shorter than the drying times observed. The intensities of the bloodstains decreased from high to low with time during the drying process. The degree of transfer at high, medium, and low intensities varied significantly between different materials and is dependent on the environmental conditions, fabric compositions, blood volumes, the type of contact (full or light force), and the drying times observed for the respective donor fabrics. These factors should be considered collectively and conservatively when assessing the time frame of secondary transfer in casework.

Keywords: blood, drying time, blood stain transfer, different environmental conditions, fabrics

Procedia PDF Downloads 126
3472 A Two Stage Stochastic Mathematical Model for the Tramp Ship Routing with Time Windows Problem

Authors: Amin Jamili

Abstract:

Nowadays, the majority of international trade in goods is carried by sea, and especially by ships deployed in the industrial and tramp segments. This paper addresses routing the tramp ships and determining the schedules including the arrival times to the ports, berthing times at the ports, and the departure times in an operational planning level. In the operational planning level, the weather can be almost exactly forecasted, however in some routes some uncertainties may remain. In this paper, the voyaging times between some of the ports are considered to be uncertain. To that end, a two-stage stochastic mathematical model is proposed. Moreover, a case study is tested with the presented model. The computational results show that this mathematical model is promising and can represent acceptable solutions.

Keywords: routing, scheduling, tram ships, two stage stochastic model, uncertainty

Procedia PDF Downloads 414
3471 Waiting Time Reduction in a Government Hospital Emergency Department: A Case Study on AlAdan Hospital, Kuwait

Authors: Bashayer AlRobayaan, Munira Saad, Alaa AlBawab, Fatma AlHamad, Sara AlAwadhi, Sherif Fahmy

Abstract:

This paper addresses the problem of long waiting times in government hospitals emergency departments (ED). It aims at finding feasible and simple ways of reducing waiting times that do not require a lot of resources and/or expenses. AlAdan Hospital in Kuwait was chosen to be understudy to further understand and capture the problem.

Keywords: healthcare, hospital, Kuwait, waiting times, emergency department

Procedia PDF Downloads 444
3470 Healthcare Utilization and Costs of Specific Obesity Related Health Conditions in Alberta, Canada

Authors: Sonia Butalia, Huong Luu, Alexis Guigue, Karen J. B. Martins, Khanh Vu, Scott W. Klarenbach

Abstract:

Obesity-related health conditions impose a substantial economic burden on payers due to increased healthcare use. Estimates of healthcare resource use and costs associated with obesity-related comorbidities are needed to inform policies and interventions targeting these conditions. Methods: Adults living with obesity were identified (a procedure-related body mass index code for class 2/3 obesity between 2012 and 2019 in Alberta, Canada; excluding those with bariatric surgery), and outcomes were compared over 1-year (2019/2020) between those who had and did not have specific obesity-related comorbidities. The probability of using a healthcare service (based on the odds ratio of a zero [OR-zero] cost) was compared; 95% confidence intervals (CI) were reported. Logistic regression and a generalized linear model with log link and gamma distribution were used for total healthcare cost comparisons ($CDN); cost ratios and estimated cost differences (95% CI) were reported. Potential socio-demographic and clinical confounders were adjusted for, and incremental cost differences were representative of a referent case. Results: A total of 220,190 adults living with obesity were included; 44% had hypertension, 25% had osteoarthritis, 24% had type-2 diabetes, 17% had cardiovascular disease, 12% had insulin resistance, 9% had chronic back pain, and 4% of females had polycystic ovarian syndrome (PCOS). The probability of hospitalization, ED visit, and ambulatory care was higher in those with a following obesity-related comorbidity versus those without: chronic back pain (hospitalization: 1.8-times [OR-zero: 0.57 [0.55/0.59]] / ED visit: 1.9-times [OR-zero: 0.54 [0.53/0.56]] / ambulatory care visit: 2.4-times [OR-zero: 0.41 [0.40/0.43]]), cardiovascular disease (2.7-times [OR-zero: 0.37 [0.36/0.38]] / 1.9-times [OR-zero: 0.52 [0.51/0.53]] / 2.8-times [OR-zero: 0.36 [0.35/0.36]]), osteoarthritis (2.0-times [OR-zero: 0.51 [0.50/0.53]] / 1.4-times [OR-zero: 0.74 [0.73/0.76]] / 2.5-times [OR-zero: 0.40 [0.40/0.41]]), type-2 diabetes (1.9-times [OR-zero: 0.54 [0.52/0.55]] / 1.4-times [OR-zero: 0.72 [0.70/0.73]] / 2.1-times [OR-zero: 0.47 [0.46/0.47]]), hypertension (1.8-times [OR-zero: 0.56 [0.54/0.57]] / 1.3-times [OR-zero: 0.79 [0.77/0.80]] / 2.2-times [OR-zero: 0.46 [0.45/0.47]]), PCOS (not significant / 1.2-times [OR-zero: 0.83 [0.79/0.88]] / not significant), and insulin resistance (1.1-times [OR-zero: 0.88 [0.84/0.91]] / 1.1-times [OR-zero: 0.92 [0.89/0.94]] / 1.8-times [OR-zero: 0.56 [0.54/0.57]]). After fully adjusting for potential confounders, the total healthcare cost ratio was higher in those with a following obesity-related comorbidity versus those without: chronic back pain (1.54-times [1.51/1.56]), cardiovascular disease (1.45-times [1.43/1.47]), osteoarthritis (1.36-times [1.35/1.38]), type-2 diabetes (1.30-times [1.28/1.31]), hypertension (1.27-times [1.26/1.28]), PCOS (1.08-times [1.05/1.11]), and insulin resistance (1.03-times [1.01/1.04]). Conclusions: Adults with obesity who have specific disease-related health conditions have a higher probability of healthcare use and incur greater costs than those without specific comorbidities; incremental costs are larger when other obesity-related health conditions are not adjusted for. In a specific referent case, hypertension was costliest (44% had this condition with an additional annual cost of $715 [$678/$753]). If these findings hold for the Canadian population, hypertension in persons with obesity represents an estimated additional annual healthcare cost of $2.5 billion among adults living with obesity (based on an adult obesity rate of 26%). Results of this study can inform decision making on investment in interventions that are effective in treating obesity and its complications.

Keywords: administrative data, healthcare cost, obesity-related comorbidities, real world evidence

Procedia PDF Downloads 120
3469 Study of Parameters Influencing Dwell Times for Trains

Authors: Guillaume Craveur

Abstract:

The work presented here shows a study on several parameters identified as influencing dwell times for trains. Three kinds of rolling stocks are studied for this project and the parameters presented are the number of passengers, the allocation of passengers, their priorities, the platform station height, the door width and the train design. In order to make this study, a lot of records have been done in several stations in Paris (France). Then, in order to study these parameters, numerical simulations are completed. The goal is to quantify the impact of each parameter on the dwelling times. For example, this study highlights the impact of platform height and the presence of steps between the platform and the train. Three types of station platforms are concerned by this study : ‘optimum’ station platform which is 920 mm high, standard station platform which is 550 mm high, and high station platform which is 1150 mm high and different kinds of steps exist in order to fill these gaps. To conclude, this study shows the impact of these parameters on dwell times and their impact in function of the size of population.

Keywords: dwell times, numerical tools, rolling stock, platforms

Procedia PDF Downloads 312
3468 The Popularity and the Fantasy in Tiny Times

Authors: Shu Hui

Abstract:

From 2013 to 2015, Tiny Times series gained huge commercial success. However, compared with the successful box office, these films received severe public criticism. Some scholars refer to these films as trash (lan pian) because of the fragment narrative, the non-professional photographing, and advocating money warship. Differing from other popular films, the popularity of Tiny Times series is actually generated from the fantasy that presented on screen instead of good stories or photographs. The fantasy is desired by the public and then formulates its popularity. Based on Jacques Lacan’s fantasy theory, the paper aims to explain what kind of fantast the films present. Then, according to hegemony theory, the paper will illustrate why the public desires such a fantasy and how the fantasy causes the criticism as well. The dominant ideology (patriarchy) conspires with or manipulates consumerism, which brings about the female's fantasy in Tiny Times. Because consumerism interrogates Confucianism, the film received public criticism for highlighting the former.

Keywords: fantasy, desire, ideology, popularity

Procedia PDF Downloads 119
3467 Issues on Determination of Accurate Fajr and Dhuha Prayer Times According to Fiqh and Astronomical Perspectives in Malaysia: A Bibliography Study

Authors: Raihana Abdul Wahab, Norihan Kadir, Muhamad Hazwan Mustafa

Abstract:

The determination of accurate times for Fajr and Dhuha prayers in Malaysia is faced with issues of differing views in the fixation of the parameters of the sun’s altitude used in the calculation of astronomy, especially in Malaysia. Therefore, this study aims to identify issues and problems in the methods used in determining the accurate times for both these prayers through a literature review of previous research studies. The results show the need to review the parameters of sun altitude used in calculating prayer times for both these prayers through observations in changes in the brightness of the early morning light for distinguish of true dawn and false dawn for the Fajr prayers and the length of the shadow for Dhuha payer by collecting data from all the states throughout Malaysia.

Keywords: fajr, Dhuha, sky brightness, length of shadows, astronomy, Islamic jurisprudence

Procedia PDF Downloads 230
3466 M-Machine Assembly Scheduling Problem to Minimize Total Tardiness with Non-Zero Setup Times

Authors: Harun Aydilek, Asiye Aydilek, Ali Allahverdi

Abstract:

Our objective is to minimize the total tardiness in an m-machine two-stage assembly flowshop scheduling problem. The objective is an important performance measure because of the fact that the fulfillment of due dates of customers has to be taken into account while making scheduling decisions. In the literature, the problem is considered with zero setup times which may not be realistic and appropriate for some scheduling environments. Considering separate setup times from processing times increases machine utilization by decreasing the idle time and reduces total tardiness. We propose two new algorithms and adapt four existing algorithms in the literature which are different versions of simulated annealing and genetic algorithms. Moreover, a dominance relation is developed based on the mathematical formulation of the problem. The developed dominance relation is incorporated in our proposed algorithms. Computational experiments are conducted to investigate the performance of the newly proposed algorithms. We find that one of the proposed algorithms performs significantly better than the others, i.e., the error of the best algorithm is less than those of the other algorithms by minimum 50%. The newly proposed algorithm is also efficient for the case of zero setup times and performs better than the best existing algorithm in the literature.

Keywords: algorithm, assembly flowshop, scheduling, simulation, total tardiness

Procedia PDF Downloads 297
3465 Solution Approaches for Some Scheduling Problems with Learning Effect and Job Dependent Delivery Times

Authors: M. Duran Toksari, Berrin Ucarkus

Abstract:

In this paper, we propose two algorithms to optimally solve makespan and total completion time scheduling problems with learning effect and job dependent delivery times in a single machine environment. The delivery time is the extra time to eliminate adverse effect between the main processing and delivery to the customer. In this paper, we introduce the job dependent delivery times for some single machine scheduling problems with position dependent learning effect, which are makespan are total completion. The results with respect to two algorithms proposed for solving of the each problem are compared with LINGO solutions for 50-jobs, 100-jobs and 150-jobs problems. The proposed algorithms can find the same results in shorter time.

Keywords: delivery Times, learning effect, makespan, scheduling, total completion time

Procedia PDF Downloads 446
3464 Two Stage Assembly Flowshop Scheduling Problem Minimizing Total Tardiness

Authors: Ali Allahverdi, Harun Aydilek, Asiye Aydilek

Abstract:

The two stage assembly flowshop scheduling problem has lots of application in real life. To the best of our knowledge, the two stage assembly flowshop scheduling problem with total tardiness performance measure and separate setup times has not been addressed so far, and hence, it is addressed in this paper. Different dominance relations are developed and several algorithms are proposed. Extensive computational experiments are conducted to evaluate the proposed algorithms. The computational experiments have shown that one of the algorithms performs much better than the others. Moreover, the experiments have shown that the best performing algorithm performs much better than the best existing algorithm for the case of zero setup times in the literature. Therefore, the proposed best performing algorithm not only can be used for problems with separate setup times but also for the case of zero setup times.

Keywords: scheduling, assembly flowshop, total tardiness, algorithm

Procedia PDF Downloads 317
3463 Transparency Phenomenon in Kuew Teow

Authors: Muhammad Heikal Ismail, Law Chung Lim, Hii Ching Lik

Abstract:

In maintaining food quality and shelf life, drying is employed in food industry as the most reliable perseverance technique. In this way, heat pump drying and hot air drying of fresh rice noodles was deduced to freeze drying in achieving quality attributes of oil content Scanning Electron Microscope (SEM) images, texture, and colour. Soxthlet analysis shows freeze dried noodles contain more than 10 times oil content, distinct pores of SEM images, higher hardness by more than three times, and wider colour changes by average more than two times to both methods to explain the less transparency physical outlook of freeze dried samples.

Keywords: freeze drying, heat pump drying, noodles, Soxthlet

Procedia PDF Downloads 459
3462 Feasibilities for Recovering of Precious Metals from Printed Circuit Board Waste

Authors: Simona Ziukaite, Remigijus Ivanauskas, Gintaras Denafas

Abstract:

Market development of electrical and electronic equipment and a short life cycle is driven by the increasing waste streams. Gold Au, copper Cu, silver Ag and palladium Pd can be found on printed circuit board. These metals make up the largest value of printed circuit board. Therefore, the printed circuit boards scrap is valuable as potential raw material for precious metals recovery. A comparison of Cu, Au, Ag, Pd recovery from waste printed circuit techniques was selected metals leaching of chemical reagents. The study was conducted using the selected multistage technique for Au, Cu, Ag, Pd recovery of printed circuit board. In the first and second metals leaching stages, as the elution reagent, 2M H2SO4 and H2O2 (35%) was used. In the third stage, leaching of precious metals used solution of 20 g/l of thiourea and 6 g/l of Fe2 (SO4)3. Verify the efficiency of the method was carried out the metals leaching test with aqua regia. Based on the experimental study, the leaching efficiency, using the preferred methodology, 60 % of Au and 85,5 % of Cu dissolution was achieved. Metals leaching efficiency after waste mechanical crushing and thermal treatment have been increased by 1,7 times (40 %) for copper, 1,6 times (37 %) for gold and 1,8 times (44 %) for silver. It was noticed that, the Au amount in old (> 20 years) waste is 17 times more, Cu amount - 4 times more, and Ag - 2 times more than in the new (< 1 years) waste. Palladium in the new printed circuit board waste has not been found, however, it was established that from 1 t of old printed circuit board waste can be recovered 1,064 g of Pd (leaching with aqua regia). It was found that from 1 t of old printed circuit board waste can be recovered 1,064 g of Ag. Precious metals recovery in Lithuania was estimated in this study. Given the amounts of generated printed circuit board waste, the limits for recovery of precious metals were identified.

Keywords: leaching efficiency, limits for recovery, precious metals recovery, printed circuit board waste

Procedia PDF Downloads 363
3461 Dynamic Ambulance Deployment to Reduce Ambulance Response Times Using Geographic Information Systems

Authors: Masoud Swalehe, Semra Günay

Abstract:

Developed countries are losing many lives to non-communicable diseases as compared to their developing counterparts. The effects of these diseases are mostly sudden and manifest at a very short time prior to death or a dangerous attack and this has consolidated the significance of emergency medical system (EMS) as one of the vital areas of healthcare service delivery. The primary objective of this research is to reduce ambulance response times (RT) of Eskişehir province EMS since a number of studies have established a relationship between ambulance response times and survival chances of patients especially out of hospital cardiac arrest (OHCA) victims. It has been found out that patients who receive out of hospital medical attention in few (4) minutes after cardiac arrest because of low ambulance response times stand higher chances of survival than their counterparts who take longer times (more than 12 minutes) to receive out of hospital medical care because of higher ambulance response times. The study will make use of geographic information systems (GIS) technology to dynamically reallocate ambulance resources according to demand and time so as to reduce ambulance response times. Geospatial-time distribution of ambulance calls (demand) will be used as a basis for optimal ambulance deployment using system status management (SSM) strategy to achieve much demand coverage with the same number of ambulance resources to cause response time reduction. Drive-time polygons will be used to come up with time specific facility coverage areas and suggesting additional facility candidate sites where ambulance resources can be moved to serve higher demands making use of network analysis techniques. Emergency Ambulance calls’ data from 1st January 2014 to 31st December 2014 obtained from Eskişehir province health directorate will be used in this study. This study will focus on the reduction of ambulance response times which is a key Emergency Medical Services performance indicator.

Keywords: emergency medical services, system status management, ambulance response times, geographic information system, geospatial-time distribution, out of hospital cardiac arrest

Procedia PDF Downloads 279
3460 Correlation between Fetal Umbilical Cord pH and the Day, the Time and the Team Hand over Times: An Analysis of 6929 Deliveries of the Ulm University Hospital

Authors: Sabine Pau, Sophia Volz, Emanuel Bauer, Amelie De Gregorio, Frank Reister, Wolfgang Janni, Florian Ebner

Abstract:

Purpose: The umbilical cord pH is a well evaluated contributor for prediction of neonatal outcome. This study correlates nenonatal umbilical cord pH with the weekday of delivery, the time of birth as well as the staff hand over times (midwifes and doctors). Material and Methods: This retrospective study included all deliveries of a 20 year period (1994-2014) at our primary obstetric center. All deliveries with a newborn cord pH under 7,20 were included in this analysis (6929 of 48974 deliveries (14,4%)). Further subgroups were formed according to the pH (< 7,05; 7,05 – 7,09; 7,10 – 7,14; 7,15 – 7,19). The data were then separated in day- and night time (8am-8pm/8pm-8am) for a first analysis. Finally, handover times were defined at 6 am – 6.30 am, 2 pm -2.30 pm, 10 pm- 10.30 pm (midwives) and for the doctors 8-8.30 am, 4 – 4.30 pm (Monday- Thursday); 2 pm -2.30 pm (Friday) and 9 am – 9.30 am (weekend). Routinely a shift consists of at least three doctors as well as three midwives. Results: During the last 20 years, 6929 neonates were born with an umbilical cord ph < 7,20 ( < 7,05 : 7,1%; 7,05 – 7,09 : 10,9%; 7,10 – 7,14 : 30,2%; 7,15 – 7,19:51,8%). There was no significant difference between either night/day delivery (p = 0.408), delivery on different weekdays (p = 0.253), delivery between Monday to Thursday, Friday and the weekend (p = 0.496 ) or delivery during the handover times of the doctors as well as the midwives (p = 0.221). Even the standard deviation showed no differences between the groups. Conclusion: Despite an increased workload over the last 20 years, the standard of care remains high even during the handover times and night shifts. This applies for midwives and doctors. As the neonatal outcome depends on various factors, further studies are necessary to take more factors influencing the fetal outcome into consideration. In order to maintain this high standard of care, an adaption of work-load and changing conditions is necessary.

Keywords: delivery, fetal umbilical cord pH, day time, hand over times

Procedia PDF Downloads 278
3459 Scheduling Jobs with Stochastic Processing Times or Due Dates on a Server to Minimize the Number of Tardy Jobs

Authors: H. M. Soroush

Abstract:

The problem of scheduling products and services for on-time deliveries is of paramount importance in today’s competitive environments. It arises in many manufacturing and service organizations where it is desirable to complete jobs (products or services) with different weights (penalties) on or before their due dates. In such environments, schedules should frequently decide whether to schedule a job based on its processing time, due-date, and the penalty for tardy delivery to improve the system performance. For example, it is common to measure the weighted number of late jobs or the percentage of on-time shipments to evaluate the performance of a semiconductor production facility or an automobile assembly line. In this paper, we address the problem of scheduling a set of jobs on a server where processing times or due-dates of jobs are random variables and fixed weights (penalties) are imposed on the jobs’ late deliveries. The goal is to find the schedule that minimizes the expected weighted number of tardy jobs. The problem is NP-hard to solve; however, we explore three scenarios of the problem wherein: (i) both processing times and due-dates are stochastic; (ii) processing times are stochastic and due-dates are deterministic; and (iii) processing times are deterministic and due-dates are stochastic. We prove that special cases of these scenarios are solvable optimally in polynomial time, and introduce efficient heuristic methods for the general cases. Our computational results show that the heuristics perform well in yielding either optimal or near optimal sequences. The results also demonstrate that the stochasticity of processing times or due-dates can affect scheduling decisions. Moreover, the proposed problem is general in the sense that its special cases reduce to some new and some classical stochastic single machine models.

Keywords: number of late jobs, scheduling, single server, stochastic

Procedia PDF Downloads 460
3458 Using Discrete Event Simulation Approach to Reduce Waiting Times in Computed Tomography Radiology Department

Authors: Mwafak Shakoor

Abstract:

The purpose of this study was to reduce patient waiting times, improve system throughput and improve resources utilization in radiology department. A discrete event simulation model was developed using Arena simulation software to investigate different alternatives to improve the overall system delivery based on adding resource scenarios due to the linkage between patient waiting times and resource availability. The study revealed that there is no addition investment need to procure additional scanner but hospital management deploy managerial tactics to enhance machine utilization and reduce the long waiting time in the department.

Keywords: discrete event simulation, radiology department, arena, waiting time, healthcare modeling, computed tomography

Procedia PDF Downloads 558
3457 Impact of Varying Malting and Fermentation Durations on Specific Chemical, Functional Properties, and Microstructural Behaviour of Pearl Millet and Sorghum Flour Using Response Surface Methodology

Authors: G. Olamiti; TK. Takalani; D. Beswa, AIO Jideani

Abstract:

The study investigated the effects of malting and fermentation times on some chemical, functional properties and microstructural behaviour of Agrigreen, Babala pearl millet cultivars and sorghum flours using response surface methodology (RSM). Central Composite Rotatable Design (CCRD) was performed on two independent variables: malting and fermentation times (h), at intervals of 24, 48, and 72, respectively. The results of dependent parameters such as pH, titratable acidity (TTA), Water absorption capacity (WAC), Oil absorption capacity (OAC), bulk density (BD), dispersibility and microstructural behaviour of the flours studied showed a significant difference in p < 0.05 upon malting and fermentation time. Babala flour exhibited a higher pH value at 4.78 at 48 h malted and 81.9 fermentation times. Agrigreen flour showed a higher TTA value at 0.159% at 81.94 h malted and 48 h fermentation times. WAC content was also higher in malted and fermented Babala flour at 2.37 ml g-1 for 81.94 h malted and 48 h fermentation time. Sorghum flour exhibited the least OAC content at 1.67 ml g-1 at 14 h malted and 48 h fermentation times. Agrigreen flour recorded the least bulk density, at 0.53 g ml-1 for 72 h malted and 24 h fermentation time. Sorghum flour exhibited a higher content of dispersibility, at 56.34%, after 24 h malted and 72 h fermented time. The response surface plots showed that increased malting and fermentation time influenced the dependent parameters. The microstructure behaviour of malting and fermentation times of pearl millet varieties and sorghum flours showed isolated, oval, spherical, or polygonal to smooth surfaces. The optimal processing conditions, such as malting and fermentation time for Agrigreen, were 32.24 h and 63.32 h; 35.18 h and 34.58 h for Babala; and 36.75 h and 47.88 h for sorghum with high desirability of 1.00. The validation of the optimum processing malting and fermentation times (h) on the dependent improved the experimented values. Food processing companies can use the study's findings to improve food processing and quality.

Keywords: Pearl millet, malting, fermentation, microstructural behaviour

Procedia PDF Downloads 41
3456 On a Single Server Queue with Arrivals in Batches of Variable Size, Generalized Coxian-2 Service and Compulsory Server Vacations

Authors: Kailash C. Madan

Abstract:

We study the steady state behaviour of a batch arrival single server queue in which the first service with general service times is compulsory and the second service with general service times is optional. We term such a two phase service as generalized Coxian-2 service. Just after completion of a service the server must take a vacation of random length of time with general vacation times. We obtain steady state probability generating functions for the queue size as well as the steady state mean queue size at a random epoch of time in explicit and closed forms. Some particular cases of interest including some known results have been derived.

Keywords: batch arrivals, compound Poisson process, generalized Coxian-2 service, steady state

Procedia PDF Downloads 427
3455 Effects of Feeding Time on Survival Rates, Growth Performance and Feeding Behavior of Juvenile Catfish

Authors: Abdullahi Ibrahim

Abstract:

The culture of Clarias gariepinus for fish production is becoming increasingly essential as the fish is contributing to the food abundance and nutritional benefit to family health, income generation, and employment opportunities. The effect of feeding frequency was investigated over a period of ten (10) weeks; the experiment was conducted to monitor survival rates, growth performance, and feeding behavior of juvenile catfish. The experimental fish were randomly assigned to five treatment groups; (i.e., with different feeding frequency intervals) of 100 fish each. Each treatment was replicated twice with 50 fish per replicate. All the groups were fed with floating fish feed (blue crown®). The five treatments (feeding frequency) were T1- once a day feeding of night hours only, T2- twice a day feeding time of morning and night hours, T3- trice a day feeding time of morning, evening and night hours, T-4 four times a day feeding of morning, afternoon, evening, and night hours, T-5 five times a day feeding at four hours interval. There were significant differences (p > 0.05) among treatments. Feed intake and weight gain improved significantly (p < 0.05) in T-4 and T-3. The best of the feeding time on weight gain, survival rate, and feed conversion ratio were obtained at three times a day feeding (T-3) compared to other treatments, especially those fed once and five times feeding a regiment. This might be attributed to the high level of dissolve oxygen and less stress. Feeding fish three times a day is therefore recommended for efficient catfish production to maximize profits as the feed represents more than 50% of aquaculture inputs, particularly in intensive farming systems.

Keywords: catfish, floating fish feed, dissolve oxygen, juvenile

Procedia PDF Downloads 118
3454 Algorithms Minimizing Total Tardiness

Authors: Harun Aydilek, Asiye Aydilek, Ali Allahverdi

Abstract:

The total tardiness is a widely used performance measure in the scheduling literature. This performance measure is particularly important in situations where there is a cost to complete a job beyond its due date. The cost of scheduling increases as the gap between a job's due date and its completion time increases. Such costs may also be penalty costs in contracts, loss of goodwill. This performance measure is important as the fulfillment of due dates of customers has to be taken into account while making scheduling decisions. The problem is addressed in the literature, however, it has been assumed zero setup times. Even though this assumption may be valid for some environments, it is not valid for some other scheduling environments. When setup times are treated as separate from processing times, it is possible to increase machine utilization and to reduce total tardiness. Therefore, non-zero setup times need to be considered as separate. A dominance relation is developed and several algorithms are proposed. The developed dominance relation is utilized in the proposed algorithms. Extensive computational experiments are conducted for the evaluation of the algorithms. The experiments indicated that the developed algorithms perform much better than the existing algorithms in the literature. More specifically, one of the newly proposed algorithms reduces the error of the best existing algorithm in the literature by 40 percent.

Keywords: algorithm, assembly flowshop, dominance relation, total tardiness

Procedia PDF Downloads 326
3453 The Trumping of Science: Exploratory Study into Discrepancy between Politician and Scientist Sources in American Covid-19 News Coverage

Authors: Wafa Unus

Abstract:

Science journalism has been vanishing from America’s national newspapers for decades. Reportage on scientific topics is limited to only a handful of newspapers and of those, few employ dedicated science journalists to cover stories that require this specialized expertise. News organizations' lack of readiness to convey complex scientific concepts to a mass populace becomes particularly problematic when events like the Covid-19 pandemic occur. The lack of coverage of Covid-19 prior to its onset in the United States, suggests something more troubling - that the deprioritization of reporting on hard science as an educational tool in favor of political frames of coverage, places dangerous blinders on the American public. This research looks at the disparity between voices of health and science experts in news articles and the voices of political figures, in order to better understand the approach of American newspapers in conveying expert opinion on Covid-19. A content analysis of 300 articles on Covid-19 by major newspapers in the United States between January 1st, 2020 and April 30th, 2020 illuminates this investigation. The Boston Globe, the New York Times, and the Los Angeles Times are included in the content analysis. Initial findings reveal a significant disparity in the number of articles that mention Anthony Fauci, the director of the National Institute Allergy and Infectious Disease, and the number that make reference to political figures. Covid-related articles in the New York Times that focused on health topics (as opposed to economic or social issues) contained the voices of 54 different politicians who were mentioned a total of 608 times. Only five members of the scientific community were mentioned a total of 24 times (out of 674 articles). In the Boston Globe, 36 different politicians were mentioned a total of 147 times, and only two members of the scientific community, one being Anthony Fauci, were mentioned a total of nine times (out of 423 articles). In the Los Angeles Times, 52 different politicians were mentioned a total of 600 times, and only six members of the scientific community were included and were mentioned a total of 82 times with Fauci being mentioned 48 times (out of 851 articles). Results provide a better understanding of the frames in which American journalists in Covid hotspots conveyed information of expert analysis on Covid-19 during one of the most pressing news events of the century. Ultimately, the objective of this study is to utilize the exploratory data to evaluate the nature, extent and impact of Covid-19 reporting in the context of trustworthiness and scientific expertise. Secondarily, this data will illuminate the degree to which Covid-19 reporting focused on politics over science.

Keywords: science reporting, science journalism, covid, misinformation, news

Procedia PDF Downloads 181