Search results for: safety risk assessment
13180 Development of Risk Assessment and Occupational Safety Management Model for Building Construction Projects
Authors: Preeda Sansakorn, Min An
Abstract:
In order to be capable of dealing with uncertainties, subjectivities, including vagueness arising in building construction projects, the application of fuzzy reasoning technique based on fuzzy set theory is proposed. This study contributes significantly to the development of a fuzzy reasoning safety risk assessment model for building construction projects that could be employed to assess the risk magnitude of each hazardous event identified during construction, and a third parameter of probability of consequence is incorporated in the model. By using the proposed safety risk analysis methodology, more reliable and less ambiguities, which provide the safety risk management project team for decision-making purposes.Keywords: safety risk assessment, building construction safety, fuzzy reasoning, construction risk assessment model, building construction projects
Procedia PDF Downloads 49013179 Design for Safety: Safety Consideration in Planning and Design of Airport Airsides
Authors: Maithem Al-Saadi, Min An
Abstract:
During airport planning and design stages, the major issues of capacity and safety in construction and operation of an airport need to be taken into consideration. The airside of an airport is a major and critical infrastructure that usually consists of runway(s), taxiway system, and apron(s) etc., which have to be designed according to the international standards and recommendations, and local limitations to accommodate the forecasted demands. However, in many cases, airport airsides are suffering from unexpected risks that occurred during airport operations. Therefore, safety risk assessment should be applied in the planning and design of airsides to cope with the probability of risks and their consequences, and to make decisions to reduce the risks to as low as reasonably practicable (ALARP) based on safety risk assessment. This paper presents a combination approach of Failure Modes, Effect, and Criticality Analysis (FMECA), Fuzzy Reasoning Approach (FRA), and Fuzzy Analytic Hierarchy Process (FAHP) to develop a risk analysis model for safety risk assessment. An illustrated example is used to the demonstrate risk assessment process on how the design of an airside in an airport can be analysed by using the proposed safety design risk assessment model.Keywords: airport airside planning and design, design for safety, fuzzy reasoning approach, fuzzy AHP, risk assessment
Procedia PDF Downloads 36413178 Combined Safety and Cybersecurity Risk Assessment for Intelligent Distributed Grids
Authors: Anders Thorsén, Behrooz Sangchoolie, Peter Folkesson, Ted Strandberg
Abstract:
As more parts of the power grid become connected to the internet, the risk of cyberattacks increases. To identify the cybersecurity threats and subsequently reduce vulnerabilities, the common practice is to carry out a cybersecurity risk assessment. For safety classified systems and products, there is also a need for safety risk assessments in addition to the cybersecurity risk assessment in order to identify and reduce safety risks. These two risk assessments are usually done separately, but since cybersecurity and functional safety are often related, a more comprehensive method covering both aspects is needed. Some work addressing this has been done for specific domains like the automotive domain, but more general methods suitable for, e.g., intelligent distributed grids, are still missing. One such method from the automotive domain is the Security-Aware Hazard Analysis and Risk Assessment (SAHARA) method that combines safety and cybersecurity risk assessments. This paper presents an approach where the SAHARA method has been modified in order to be more suitable for larger distributed systems. The adapted SAHARA method has a more general risk assessment approach than the original SAHARA. The proposed method has been successfully applied on two use cases of an intelligent distributed grid.Keywords: intelligent distribution grids, threat analysis, risk assessment, safety, cybersecurity
Procedia PDF Downloads 15213177 Holistic Risk Assessment Based on Continuous Data from the User’s Behavior and Environment
Authors: Cinzia Carrodano, Dimitri Konstantas
Abstract:
Risk is part of our lives. In today’s society risk is connected to our safety and safety has become a major priority in our life. Each person lives his/her life based on the evaluation of the risk he/she is ready to accept and sustain, and the level of safety he/she wishes to reach, based on highly personal criteria. The assessment of risk a person takes in a complex environment and the impact of actions of other people’actions and events on our perception of risk are alements to be considered. The concept of Holistic Risk Assessment (HRA) aims in developing a methodology and a model that will allow us to take into account elements outside the direct influence of the individual, and provide a personalized risk assessment. The concept is based on the fact that in the near future, we will be able to gather and process extremely large amounts of data about an individual and his/her environment in real time. The interaction and correlation of these data is the key element of the holistic risk assessment. In this paper, we present the HRA concept and describe the most important elements and considerations.Keywords: continuous data, dynamic risk, holistic risk assessment, risk concept
Procedia PDF Downloads 12513176 Environmental Safety and Occupational Health Risk Assessment for Rocket Static Test
Authors: Phontip Kanlahasuth
Abstract:
This paper presents the environmental safety and occupational health risk assessment of rocket static test by assessing risk level from probability and severity and then appropriately applying the risk control measures. Before the environmental safety and occupational health measures are applied, the serious hazards level is 31%, medium level is 24% and low level is 45%. Once risk control measures are practically implemented, the serious hazard level can be diminished, medium level is 38%, low level is 45% and eliminated level is 17%. It is clearly shown that the environmental safety and occupational health measures can significantly reduce the risk level.Keywords: rocket static test, hazard, risk, risk assessment, risk analysis, environment, safety, occupational health, acceptable risk, probability, severity, risk level
Procedia PDF Downloads 58613175 Railway Accidents: Using the Global Railway Accident Database and Evaluation for Risk Analysis
Authors: Mathias Linden, André Schneider, Harald F. O. von Korflesch
Abstract:
The risk of train accidents is an ongoing concern for railway organizations, governments, insurance companies and other depended sectors. Safety technologies are installed to reduce and to prevent potential damages of train accidents. Since the budgetary for the safety of railway organizations is limited, it is necessary not only to achieve a high availability and high safety standard but also to be cost effective. Therefore, an economic assessment of safety technologies is fundamental to create an accurate risk analysis. In order to conduct an economical assessment of a railway safety technology and a quantification of the costs of the accident causes, the Global Railway Accident Database & Evaluation (GRADE) has been developed. The aim of this paper is to describe the structure of this accident database and to show how it can be used for risk analyses. A number of risk analysis methods, such as the probabilistic safety assessment method (PSA), was used to demonstrate this accident database’s different possibilities of risk analysis. In conclusion, it can be noted that these analyses would not be as accurate without GRADE. The information gathered in the accident database was not available in this way before. Our findings are relevant for railway operators, safety technology suppliers, assurances, governments and other concerned railway organizations.Keywords: accident causes, accident costs, accident database, global railway accident database & evaluation, GRADE, probabilistic safety assessment, PSA, railway accidents, risk analysis
Procedia PDF Downloads 35813174 Incorporation of Safety into Design by Safety Cube
Authors: Mohammad Rajabalinejad
Abstract:
Safety is often seen as a requirement or a performance indicator through the design process, and this does not always result in optimally safe products or systems. This paper suggests integrating the best safety practices with the design process to enrich the exploration experience for designers and add extra values for customers. For this purpose, the commonly practiced safety standards and design methods have been reviewed and their common blocks have been merged forming Safety Cube. Safety Cube combines common blocks for design, hazard identification, risk assessment and risk reduction through an integral approach. An example application presents the use of Safety Cube for design of machinery.Keywords: safety, safety cube, product, system, machinery, design
Procedia PDF Downloads 24513173 A Development of a Conceptual Framework for Safety Culture and Safety Risk Assessment: The Case of Chinese International Construction Projects under the “New Belt and Road” Initiative in Africa
Authors: Bouba Oumarou Aboubakar, HongXia Li, Sardar Annes Farooq
Abstract:
The Belt and Road Initiative’s success strongly depends on the safety of all the million workers on construction projects sites. As the new BRI is directed toward Africa and meets a completely different culture from the Chinese project managers, maintaining low risk for workers risks shall be closely related to cultural sharing and mutual understanding. This is why this work introduces a cultural-wise safety management framework for Chinese Construction projects in Africa. The theoretical contribution of this paper is an improved risk assessment framework that integrates language, culture and difficulty of controlling risk factors into one approach. Practically, this study provides not only a useful tool for project safety management practitioners but the full understanding of all risks that may arise in the BRI projects in Africa.Keywords: cultural-wise, safety culture, risk assessment, Chinese construction, BRI projects, Africa
Procedia PDF Downloads 10413172 Weighted Risk Scores Method Proposal for Occupational Safety Risk Assessment
Authors: Ulas Cinar, Omer Faruk Ugurlu, Selcuk Cebi
Abstract:
Occupational safety risk management is the most important element of a safe working environment. Effective risk management can only be possible with accurate analysis and evaluations. Scoring-based risk assessment methods offer considerable ease of application as they convert linguistic expressions into numerical results. It can also be easily adapted to any field. Contrary to all these advantages, important problems in scoring-based methods are frequently discussed. Effective measurability is one of the most critical problems. Existing methods allow experts to choose a score equivalent to each parameter. Therefore, experts prefer the score of the most likely outcome for risk. However, all other possible consequences are neglected. Assessments of the existing methods express the most probable level of risk, not the real risk of the enterprises. In this study, it is aimed to develop a method that will present a more comprehensive evaluation compared to the existing methods by evaluating the probability and severity scores, all sub-parameters, and potential results, and a new scoring-based method is proposed in the literature.Keywords: occupational health and safety, risk assessment, scoring based risk assessment method, underground mining, weighted risk scores
Procedia PDF Downloads 13413171 Safety of Ports, Harbours, Marine Terminals: Application of Quantitative Risk Assessment
Authors: Dipak Sonawane, Sudarshan Daga, Somesh Gupta
Abstract:
Quantitative risk assessment (QRA) is a very precise and consistent approach to defining the likelihood, consequence and severity of a major incident/accident. A variety of hazardous cargoes in bulk, such as hydrocarbons and flammable/toxic chemicals, are handled at various ports. It is well known that most of the operations are hazardous, having the potential of damaging property, causing injury/loss of life and, in some cases, the threat of environmental damage. In order to ensure adequate safety towards life, environment and property, the application of scientific methods such as QRA is inevitable. By means of these methods, comprehensive hazard identification, risk assessment and appropriate implementation of Risk Control measures can be carried out. In this paper, the authors, based on their extensive experience in Risk Analysis for ports and harbors, have exhibited how QRA can be used in practice to minimize and contain risk to tolerable levels. A specific case involving the operation for unloading of hydrocarbon at a port is presented. The exercise provides confidence that the method of QRA, as proposed by the authors, can be used appropriately for the identification of hazards and risk assessment of Ports and Terminals.Keywords: quantitative risk assessment, hazard assessment, consequence analysis, individual risk, societal risk
Procedia PDF Downloads 8013170 Research Progress on Patient Perception Assessment Tools for Patient Safety
Authors: Yirui Wang
Abstract:
In the past few decades, patient safety has been the focus of much attention in the global medical and health field. As medical standards continue to improve and develop, the demand for patient safety is also growing. As one of the important dimensions in assessing patient safety, the Patient Perception Patient Safety Assessment Tool provides unique and valuable information from the patient's own perspective and plays an important role in promoting patient safety. This article aims to summarize and analyze the assessment content, assessment methods and applications of currently commonly used patient-perceived patient safety assessment tools at home and abroad, with a view to providing a reference for medical staff to select appropriate patient-perceived patient safety assessment tools.Keywords: patients, patient safety, perception, assessment tools, review
Procedia PDF Downloads 8613169 Investigation of Occupational Health and Safety of Bakeries in Izmir, Turkey
Authors: Pinar Ercan, Bulut Mert
Abstract:
The baking industry is prone to occupational health challenges like other industries. Workers in bakeries face many hazards in their work environment; hazards have the potential for causing injury, illness or work accidents. Most of these hazards are preventable and arise from the neglect of occupational safety measures. Some bakeries in Izmır Turkey was evaluated according to occupational health and safety. First of all, the production process was evaluated. The survey was administered to a total of 50 employees. The survey consisted of two sections. The first one comprised only demographic questions and items related to job characteristics. The remaining section was assessing the satisfaction and confidence about occupational health and safety in terms of employees consist of a 10-item questionnaire by using HSE (2010) survey with some modifications. Also, hazards, risks and control measures in the bakeries were determined. Risk assessment has been done by the use of '5x5 Risk Assessment Table' for this purpose.Keywords: bakeries, occupational health and safety, hazards, risks, risk assessment
Procedia PDF Downloads 36613168 Workplace Risk Assessment in a Paint Factory
Authors: Rula D. Alshareef, Safa S. Alqathmi, Ghadah K. Alkhouldi, Reem O. Bagabas, Farheen B. Hasan
Abstract:
Safety engineering is among the most crucial considerations in any work environment. Providing mentally, physically, and environmentally safe work conditions must be the top priority of any successful organization. Company X is a local paint production company in Saudi Arabia; in a month, the factory experienced two significant accidents, which indicates that workers’ safety is overlooked. The aim of the research is to examine the risks, assess the root causes and recommend control measures that will eventually contribute to providing a safe workplace. The methodology used is sectioned into three phases, risk identification, assessment, and finally, mitigation. In the identification phase, the team used Rapid Entire Body Assessment (REBA) and National Institute for Occupational Safety and Health Lifting Index (NIOSH LI) tools to holistically establish knowledge about the current risk posed to the factory. The physical hazards in the factory were assessed in two different operations, which are mixing and filling/packaging. For the risk assessment phase, the hazards were deeply analyzed through their severity and impact. Additionally, through risk mitigation, the Rapid Entire Body Assessment (REBA) score decreased from 11 to 7, and the National Institute for Occupational Safety and Health Lifting Index (NIOSH LI) has been reduced from 5.27 to 1.85.Keywords: ergonomics, safety, workplace risks, hazards, awkward posture, fatigue, work environment
Procedia PDF Downloads 7913167 A Study on Exploring and Prioritizing Critical Risks in Construction Project Assessment
Authors: A. Swetha
Abstract:
This study aims to prioritize and explore critical risks in construction project assessment, employing the Weighted Average Index method and Principal Component Analysis (PCA). Through extensive literature review and expert interviews, project assessment risk factors were identified across Budget and Cost Management Risk, Schedule and Time Management Risk, Scope and Planning Risk, Safety and Regulatory Compliance Risk, Resource Management Risk, Communication and Stakeholder Management Risk, and Environmental and Sustainability Risk domains. A questionnaire was distributed to stakeholders involved in construction activities in Hyderabad, India, with 180 completed responses analyzed using the Weighted Average Index method to prioritize risk factors. Subsequently, PCA was used to understand relationships between these factors and uncover underlying patterns. Results highlighted dependencies on critical resources, inadequate risk assessment, cash flow constraints, and safety concerns as top priorities, while factors like currency exchange rate fluctuations and delayed information dissemination ranked lower but remained significant. These insights offer valuable guidance for stakeholders to mitigate risks effectively and enhance project outcomes. By adopting systematic risk assessment and management approaches, construction projects in Hyderabad and beyond can navigate challenges more efficiently, ensuring long-term viability and resilience.Keywords: construction project assessment risk factor, risk prioritization, weighted average index, principal component analysis, project risk factors
Procedia PDF Downloads 3913166 A Fuzzy TOPSIS Based Model for Safety Risk Assessment of Operational Flight Data
Authors: N. Borjalilu, P. Rabiei, A. Enjoo
Abstract:
Flight Data Monitoring (FDM) program assists an operator in aviation industries to identify, quantify, assess and address operational safety risks, in order to improve safety of flight operations. FDM is a powerful tool for an aircraft operator integrated into the operator’s Safety Management System (SMS), allowing to detect, confirm, and assess safety issues and to check the effectiveness of corrective actions, associated with human errors. This article proposes a model for safety risk assessment level of flight data in a different aspect of event focus based on fuzzy set values. It permits to evaluate the operational safety level from the point of view of flight activities. The main advantages of this method are proposed qualitative safety analysis of flight data. This research applies the opinions of the aviation experts through a number of questionnaires Related to flight data in four categories of occurrence that can take place during an accident or an incident such as: Runway Excursions (RE), Controlled Flight Into Terrain (CFIT), Mid-Air Collision (MAC), Loss of Control in Flight (LOC-I). By weighting each one (by F-TOPSIS) and applying it to the number of risks of the event, the safety risk of each related events can be obtained.Keywords: F-topsis, fuzzy set, flight data monitoring (FDM), flight safety
Procedia PDF Downloads 16713165 Toward a Risk Assessment Model Based on Multi-Agent System for Cloud Consumer
Authors: Saadia Drissi
Abstract:
The cloud computing is an innovative paradigm that introduces several changes in technology that have resulted a new ways for cloud providers to deliver their services to cloud consumers mainly in term of security risk assessment, thus, adapting a current risk assessment tools to cloud computing is a very difficult task due to its several characteristics that challenge the effectiveness of risk assessment approaches. As consequence, there is a need of risk assessment model adapted to cloud computing. This paper requires a new risk assessment model based on multi-agent system and AHP model as fundamental steps towards the development of flexible risk assessment approach regarding cloud consumers.Keywords: cloud computing, risk assessment model, multi-agent system, AHP model, cloud consumer
Procedia PDF Downloads 54413164 Traffic Safety and Risk Assessment Model by Analysis of Questionnaire Survey: A Case Study of S. G. Highway, Ahmedabad, India
Authors: Abhijitsinh Gohil, Kaushal Wadhvaniya, Kuldipsinh Jadeja
Abstract:
Road Safety is a multi-sectoral and multi-dimensional issue. An effective model can assess the risk associated with highway safety. A questionnaire survey is very essential to identify the events or activities which are causing unsafe condition for traffic on an urban highway. A questionnaire of standard questions including vehicular, human and infrastructure characteristics can be made. Responses from the age wise group of road users can be taken on field. Each question or an event holds a specific risk weightage, which contributes in creating an inappropriate and unsafe flow of traffic. The probability of occurrence of an event can be calculated from the data collected from the road users. Finally, the risk score can be calculated by considering the risk factor and the probability of occurrence of individual event and addition of all risk score for the individual event will give the total risk score of a particular road. Standards for risk score can be made and total risk score can be compared with the standards. Thus road can be categorized based on risk associated and traffic safety on it. With this model, one can assess the need for traffic safety improvement on a given road, and qualitative data can be analysed.Keywords: probability of occurrence, questionnaire, risk factor, risk score
Procedia PDF Downloads 33713163 Integrating Deterministic and Probabilistic Safety Assessment to Decrease Risk & Energy Consumption in a Typical PWR
Authors: Ebrahim Ghanbari, Mohammad Reza Nematollahi
Abstract:
Integrating deterministic and probabilistic safety assessment (IDPSA) is one of the most commonly used issues in the field of safety analysis of power plant accident. It has also been recognized today that the role of human error in creating these accidents is not less than systemic errors, so the human interference and system errors in fault and event sequences are necessary. The integration of these analytical topics will be reflected in the frequency of core damage and also the study of the use of water resources in an accident such as the loss of all electrical power of the plant. In this regard, the SBO accident was simulated for the pressurized water reactor in the deterministic analysis issue, and by analyzing the operator's behavior in controlling the accident, the results of the combination of deterministic and probabilistic assessment were identified. The results showed that the best performance of the plant operator would reduce the risk of an accident by 10%, as well as a decrease of 6.82 liters/second of the water sources of the plant.Keywords: IDPSA, human error, SBO, risk
Procedia PDF Downloads 12813162 Managing Uncertainty in Unmanned Aircraft System Safety Performance Requirements Compliance Process
Authors: Achim Washington, Reece Clothier, Jose Silva
Abstract:
System Safety Regulations (SSR) are a central component to the airworthiness certification of Unmanned Aircraft Systems (UAS). There is significant debate on the setting of appropriate SSR for UAS. Putting this debate aside, the challenge lies in how to apply the system safety process to UAS, which lacks the data and operational heritage of conventionally piloted aircraft. The limited knowledge and lack of operational data result in uncertainty in the system safety assessment of UAS. This uncertainty can lead to incorrect compliance findings and the potential certification and operation of UAS that do not meet minimum safety performance requirements. The existing system safety assessment and compliance processes, as used for conventional piloted aviation, do not adequately account for the uncertainty, limiting the suitability of its application to UAS. This paper discusses the challenges of undertaking system safety assessments for UAS and presents current and envisaged research towards addressing these challenges. It aims to highlight the main advantages associated with adopting a risk based framework to the System Safety Performance Requirement (SSPR) compliance process that is capable of taking the uncertainty associated with each of the outputs of the system safety assessment process into consideration. Based on this study, it is made clear that developing a framework tailored to UAS, would allow for a more rational, transparent and systematic approach to decision making. This would reduce the need for conservative assumptions and take the risk posed by each UAS into consideration while determining its state of compliance to the SSR.Keywords: Part 1309 regulations, risk models, uncertainty, unmanned aircraft systems
Procedia PDF Downloads 18513161 Storage Tank Overfill Protection in Compliance with Functional Safety Standard: IEC 61511
Authors: Hassan Alsada
Abstract:
Tank overfill accidents are major concerns for industries handling large volumes of hydrocarbons. Buncefield, Jaipur, Puerto Rico, and West Virginia are just a few accidents with catastrophic consequences. Thus, it is very important for any industry to take the right safety measures for overfill prevention. Moreover, one of the main causative factors in the overfill accidents was inadequate risk analysis and, subsequently, inadequate design. This study aims to provide a full assessment in accordance with the Functional safety standard: “IEC 615 11 – Safety instrumented systems for the process industry” to the tank overfill scenario according to the standard’s Safety Life Cycle (SLC), which includes: the analysis phase, the implementation phase, and the operation phase. The paper discusses in depth the tank overfills Independent Protection Layers (IPLs) with systematic analysis to avoid the safety risks of under-design and the financial risk of facility overdesign. The result shows a clear and systematic assessment in compliance with the standards that can help to assist existing tank overfilling setup or a guide to support designing new storage facilities overfill protection.Keywords: IEC 61511, PHA, LOPA, process safety, safety, health, environment, safety instrumented systems, safety instrumented function, functional safety, safety life cycle
Procedia PDF Downloads 8913160 Application of Italian Guidelines for Existing Bridge Management
Authors: Giovanni Menichini, Salvatore Giacomo Morano, Gloria Terenzi, Luca Salvatori, Maurizio Orlando
Abstract:
The “Guidelines for Risk Classification, Safety Assessment, and Structural Health Monitoring of Existing Bridges” were recently approved by the Italian Government to define technical standards for managing the national network of existing bridges. These guidelines provide a framework for risk mitigation and safety assessment of bridges, which are essential elements of the built environment and form the basis for the operation of transport systems. Within the guideline framework, a workflow based on three main points was proposed: (1) risk-based, i.e., based on typical parameters of hazard, vulnerability, and exposure; (2) multi-level, i.e., including six assessment levels of increasing complexity; and (3) multirisk, i.e., assessing structural/foundational, seismic, hydrological, and landslide risks. The paper focuses on applying the Italian Guidelines to specific case studies, aiming to identify the parameters that predominantly influence the determination of the “class of attention”. The significance of each parameter is determined via sensitivity analysis. Additionally, recommendations for enhancing the process of assigning the class of attention are proposed.Keywords: bridge safety assessment, Italian guidelines implementation, risk classification, structural health monitoring
Procedia PDF Downloads 5413159 Comprehensive Risk Assessment Model in Agile Construction Environment
Authors: Jolanta Tamošaitienė
Abstract:
The article focuses on a developed comprehensive model to be used in an agile environment for the risk assessment and selection based on multi-attribute methods. The model is based on a multi-attribute evaluation of risk in construction, and the determination of their optimality criterion values are calculated using complex Multiple Criteria Decision-Making methods. The model may be further applied to risk assessment in an agile construction environment. The attributes of risk in a construction project are selected by applying the risk assessment condition to the construction sector, and the construction process efficiency in the construction industry accounts for the agile environment. The paper presents the comprehensive risk assessment model in an agile construction environment. It provides a background and a description of the proposed model and the developed analysis of the comprehensive risk assessment model in an agile construction environment with the criteria.Keywords: assessment, environment, agile, model, risk
Procedia PDF Downloads 25413158 Integration of FMEA and Human Factor in the Food Chain Risk Assessment
Authors: Mohsen Shirani, Micaela Demichela
Abstract:
During the last decades, a number of food crises such as Bovine Spongiform Encephalopathy (BSE), Mad-Cow disease, Dioxin in chicken food, Food-and-Mouth Disease (FMD), have certainly inflicted the reliability of the food industry. Consequently, the trend in applying different scientific methods of risk assessment in food safety has obtained more attentions in the academic and practice. However, lack of practical approach considering entire food supply chain is tangible in the academic literature. In this regard, this paper aims to apply risk assessment tool (FMEA) with integration of Human Factor along the entire supply chain of food production and test the method in a case study of Diary production, and analyze its results.Keywords: FMEA, food supply chain, risk assessment, human factor
Procedia PDF Downloads 44513157 Calibrating Risk Factors for Road Safety in Low Income Countries
Authors: Atheer Al-Nuaimi, Harry Evdorides
Abstract:
Daily, many individuals die or get harmed on streets around the globe, which requires more particular solutions for transport safety issues. International road assessment program (iRAP) is one of the models that are considering many variables which influence road user’s safety. In iRAP, roads have been partitioned into five-star ratings from 1 star (the most reduced level) to 5 star (the most noteworthy level). These levels are calculated from risk factors which represent the effect of the geometric and traffic conditions on rod safety. The result of iRAP philosophy are the countermeasures that can be utilized to enhance safety levels and lessen fatalities numbers. These countermeasures can be utilized independently as a single treatment or in combination with other countermeasures for a section or an entire road. There is a general understanding that the efficiency of a countermeasure is liable to reduction when it is used in combination with various countermeasures. That is, crash diminishment estimations of single countermeasures cannot be summed easily. In the iRAP model, the fatalities estimations are calculated using a specific methodology. However, this methodology suffers overestimations. Therefore, this study has developed a calibration method to estimate fatalities numbers more accurately.Keywords: crash risk factors, international road assessment program, low-income countries, road safety
Procedia PDF Downloads 14513156 Screening Methodology for Seismic Risk Assessment of Aging Structures in Oil and Gas Plants
Authors: Mohammad Nazri Mustafa, Pedram Hatami Abdullah, M. Fakhrur Razi Ahmad Faizul
Abstract:
With the issuance of Malaysian National Annex 2017 as a part of MS EN 1998-1:2015, the seismic mapping of Malaysian Peninsular including Sabah and Sarawak has undergone some changes in terms of the Peak Ground Acceleration (PGA) value. The revision to the PGA has raised a concern on the safety of oil and gas onshore structures as these structures were not designed to accommodate the new PGA values which are much higher than the previous values used in the original design. In view of the high numbers of structures and buildings to be re-assessed, a risk assessment methodology has been developed to prioritize and rank the assets in terms of their criticality against the new seismic loading. To-date such risk assessment method for oil and gas onshore structures is lacking, and it is the main intention of this technical paper to share the risk assessment methodology and risk elements scoring finalized via Delphi Method. The finalized methodology and the values used to rank the risk elements have been established based on years of relevant experience on the subject matter and based on a series of rigorous discussions with professionals in the industry. The risk scoring is mapped against the risk matrix (i.e., the LOF versus COF) and hence, the overall risk for the assets can be obtained. The overall risk can be used to prioritize and optimize integrity assessment, repair and strengthening work against the new seismic mapping of the country.Keywords: methodology, PGA, risk, seismic
Procedia PDF Downloads 15013155 Probabilistic Safety Assessment of Koeberg Spent Fuel Pool
Authors: Sibongiseni Thabethe, Ian Korir
Abstract:
The effective management of spent fuel pool (SFP) safety has been raised as one of the emerging issues to further enhance nuclear installation safety after the Fukushima accident on March 11, 2011. Before then, SFP safety-related issues have been mainly focused on (a) controlling the configuration of the fuel assemblies in the pool with no loss of pool coolants and (b) ensuring adequate pool storage space to prevent fuel criticality owing to chain reactions of the fission products and the ability for neutron absorption to keep the fuel cool. A probabilistic safety (PSA) assessment was performed using the systems analysis program for hands-on integrated reliability evaluations (SAPHIRE) computer code. Event and fault tree analysis was done to develop a PSA model for the Koeberg SFP. We present preliminary PSA results of events that lead to boiling and cause fuel uncovering, resulting in possible fuel damage in the Koeberg SFP.Keywords: computer code, fuel assemblies, probabilistic risk assessment, spent fuel pool
Procedia PDF Downloads 16713154 An Integrated Approach for Risk Management of Transportation of HAZMAT: Use of Quality Function Deployment and Risk Assessment
Authors: Guldana Zhigerbayeva, Ming Yang
Abstract:
Transportation of hazardous materials (HAZMAT) is inevitable in the process industries. The statistics show a significant number of accidents has occurred during the transportation of HAZMAT. This makes risk management of HAZMAT transportation an important topic. The tree-based methods including fault-trees, event-trees and cause-consequence analysis, and Bayesian network, have been applied to risk management of HAZMAT transportation. However, there is limited work on the development of a systematic approach. The existing approaches fail to build up the linkages between the regulatory requirements and the safety measures development. The analysis of historical data from the past accidents’ report databases would limit our focus on the specific incidents and their specific causes. Thus, we may overlook some essential elements in risk management, including regulatory compliance, field expert opinions, and suggestions. A systematic approach is needed to translate the regulatory requirements of HAZMAT transportation into specified safety measures (both technical and administrative) to support the risk management process. This study aims to first adapt the House of Quality (HoQ) to House of Safety (HoS) and proposes a new approach- Safety Function Deployment (SFD). The results of SFD will be used in a multi-criteria decision-support system to develop find an optimal route for HazMats transportation. The proposed approach will be demonstrated through a hypothetical transportation case in Kazakhstan.Keywords: hazardous materials, risk assessment, risk management, quality function deployment
Procedia PDF Downloads 14013153 Model of MSD Risk Assessment at Workplace
Authors: K. Sekulová, M. Šimon
Abstract:
This article focuses on upper-extremity musculoskeletal disorders risk assessment model at workplace. In this model are used risk factors that are responsible for musculoskeletal system damage. Based on statistic calculations the model is able to define what risk of MSD threatens workers who are under risk factors. The model is also able to say how MSD risk would decrease if these risk factors are eliminated.Keywords: ergonomics, musculoskeletal disorders, occupational diseases, risk factors
Procedia PDF Downloads 54913152 Comprehensive Risk Analysis of Decommissioning Activities with Multifaceted Hazard Factors
Authors: Hyeon-Kyo Lim, Hyunjung Kim, Kune-Woo Lee
Abstract:
Decommissioning process of nuclear facilities can be said to consist of a sequence of problem solving activities, partly because there may exist working environments contaminated by radiological exposure, and partly because there may also exist industrial hazards such as fire, explosions, toxic materials, and electrical and physical hazards. As for an individual hazard factor, risk assessment techniques are getting known to industrial workers with advance of safety technology, but the way how to integrate those results is not. Furthermore, there are few workers who experienced decommissioning operations a lot in the past. Therefore, not a few countries in the world have been trying to develop appropriate counter techniques in order to guarantee safety and efficiency of the process. In spite of that, there still exists neither domestic nor international standard since nuclear facilities are too diverse and unique. In the consequence, it is quite inevitable to imagine and assess the whole risk in the situation anticipated one by one. This paper aimed to find out an appropriate technique to integrate individual risk assessment results from the viewpoint of experts. Thus, on one hand the whole risk assessment activity for decommissioning operations was modeled as a sequence of individual risk assessment steps, and on the other, a hierarchical risk structure was developed. Then, risk assessment procedure that can elicit individual hazard factors one by one were introduced with reference to the standard operation procedure (SOP) and hierarchical task analysis (HTA). With an assumption of quantification and normalization of individual risks, a technique to estimate relative weight factors was tried by using the conventional Analytic Hierarchical Process (AHP) and its result was reviewed with reference to judgment of experts. Besides, taking the ambiguity of human judgment into consideration, debates based upon fuzzy inference was added with a mathematical case study.Keywords: decommissioning, risk assessment, analytic hierarchical process (AHP), fuzzy inference
Procedia PDF Downloads 42313151 Safety Climate Assessment and Its Impact on the Productivity of Construction Enterprises
Authors: Krzysztof J. Czarnocki, F. Silveira, E. Czarnocka, K. Szaniawska
Abstract:
Research background: Problems related to the occupational health and decreasing level of safety occur commonly in the construction industry. Important factor in the occupational safety in construction industry is scaffold use. All scaffolds used in construction, renovation, and demolition shall be erected, dismantled and maintained in accordance with safety procedure. Increasing demand for new construction projects unfortunately still is linked to high level of occupational accidents. Therefore, it is crucial to implement concrete actions while dealing with scaffolds and risk assessment in construction industry, the way on doing assessment and liability of assessment is critical for both construction workers and regulatory framework. Unfortunately, professionals, who tend to rely heavily on their own experience and knowledge when taking decisions regarding risk assessment, may show lack of reliability in checking the results of decisions taken. Purpose of the article: The aim was to indicate crucial parameters that could be modeling with Risk Assessment Model (RAM) use for improving both building enterprise productivity and/or developing potential and safety climate. The developed RAM could be a benefit for predicting high-risk construction activities and thus preventing accidents occurred based on a set of historical accident data. Methodology/Methods: A RAM has been developed for assessing risk levels as various construction process stages with various work trades impacting different spheres of enterprise activity. This project includes research carried out by teams of researchers on over 60 construction sites in Poland and Portugal, under which over 450 individual research cycles were carried out. The conducted research trials included variable conditions of employee exposure to harmful physical and chemical factors, variable levels of stress of employees and differences in behaviors and habits of staff. Genetic modeling tool has been used for developing the RAM. Findings and value added: Common types of trades, accidents, and accident causes have been explored, in addition to suitable risk assessment methods and criteria. We have found that the initial worker stress level is more direct predictor for developing the unsafe chain leading to the accident rather than the workload, or concentration of harmful factors at the workplace or even training frequency and management involvement.Keywords: safety climate, occupational health, civil engineering, productivity
Procedia PDF Downloads 318