14743 Development of Risk-Based Dam Safety Framework in Climate Change Condition for Batu Dam, Malaysia

Authors: Wan Noorul Hafilah Binti Wan Ariffin

Abstract:

Dam safety management is the crucial infrastructure as dam failure has a catastrophic effect on the community. Dam safety management is the effective framework of key actions and activities for the dam owner to manage the safety of the dam for its entire life cycle. However, maintaining dam safety is a challenging task as there are changes in current dam states. These changes introduce new risks to the dam's safety, which had not been considered when the dam was designed. A new framework has to be developed to adapt to the changes in the dam risk and make the dams resilient. This study proposes a risk-based decision-making adaptation framework for dam safety management. The research focuses on climate change's impact on hydrological situations as it causes floods and damages the dam structure. The risk analysis framework is adopted to improve the dam management strategies. The proposed study encompasses four phases. To start with, measuring the effect by assessing the impact of climate change on embankment dam, the second phase is to analyze the potential embankment dam failures. The third is analyzing the different components of risks related to the dam and, finally, developing a robust decision-making framework.

Keywords: climate change, embankment dam, failure, risk-informed decision making

Procedia PDF Downloads 112
14742 Frailty Models for Modeling Heterogeneity: Simulation Study and Application to Quebec Pension Plan

Authors: Souad Romdhane, Lotfi Belkacem

Abstract:

When referring to actuarial analysis of lifetime, only models accounting for observable risk factors have been developed. Within this context, Cox proportional hazards model (CPH model) is commonly used to assess the effects of observable covariates as gender, age, smoking habits, on the hazard rates. These covariates may fail to fully account for the true lifetime interval. This may be due to the existence of another random variable (frailty) that is still being ignored. The aim of this paper is to examine the shared frailty issue in the Cox proportional hazard model by including two different parametric forms of frailty into the hazard function. Four estimated methods are used to fit them. The performance of the parameter estimates is assessed and compared between the classical Cox model and these frailty models through a real-life data set from the Quebec Pension Plan and then using a more general simulation study. This performance is investigated in terms of the bias of point estimates and their empirical standard errors in both fixed and random effect parts. Both the simulation and the real dataset studies showed differences between classical Cox model and shared frailty model.

Keywords: life insurance-pension plan, survival analysis, risk factors, cox proportional hazards model, multivariate failure-time data, shared frailty, simulations study

Procedia PDF Downloads 330
14741 Utilization of Online Risk Mapping Techniques versus Desktop Geospatial Tools in Making Multi-Hazard Risk Maps for Italy

Authors: Seyed Vahid Kamal Alavi

Abstract:

Italy has experienced a notable quantity and impact of disasters due to natural hazards and technological accidents caused by diverse risk sources on its physical, technological, and human/sociological infrastructures during past decade. This study discusses the frequency and impacts of the most three physical devastating natural hazards in Italy for the period 2000–2013. The approach examines the reliability of a range of open source WebGIS techniques versus a proposed multi-hazard risk management methodology. Spatial and attribute data which include USGS publically available hazard data and thirteen years Munich RE recorded data for Italy with different severities have been processed, visualized in a GIS (Geographic Information System) framework. Comparison of results from the study showed that the multi-hazard risk maps generated using open source techniques do not provide a reliable system to analyze the infrastructures losses in respect to national risk sources while they can be adopted for general international risk management purposes. Additionally, this study establishes the possibility to critically examine and calibrate different integrated techniques in evaluating what better protection measures can be taken in an area.

Keywords: multi-hazard risk mapping, risk management, GIS, Italy

Procedia PDF Downloads 336
14740 Development of Risk Management System for Urban Railroad Underground Structures and Surrounding Ground

Authors: Y. K. Park, B. K. Kim, J. W. Lee, S. J. Lee

Abstract:

To assess the risk of the underground structures and surrounding ground, we collect basic data by the engineering method of measurement, exploration and surveys and, derive the risk through proper analysis and each assessment for urban railroad underground structures and surrounding ground including station inflow. Basic data are obtained by the fiber-optic sensors, MEMS sensors, water quantity/quality sensors, tunnel scanner, ground penetrating radar, light weight deflectometer, and are evaluated if they are more than the proper value or not. Based on these data, we analyze the risk level of urban railroad underground structures and surrounding ground. And we develop the risk management system to manage efficiently these data and to support a convenient interface environment at input/output of data.

Keywords: urban railroad, underground structures, ground subsidence, station inflow, risk

Procedia PDF Downloads 309
14739 Risk Management of Water Derivatives: A New Commodity in The Market

Authors: Daniel Mokatsanyane, Johnny Jansen Van Rensburg

Abstract:

This paper is a concise introduction of the risk management on the water derivatives market. Water, a new commodity in the market, is one of the most important commodity on earth. As important to life and planet as crops, metals, and energy, none of them matters without water. This paper presents a brief overview of water as a tradable commodity via a new first of its kind futures contract on the Nasdaq Veles California Water Index (NQH2O) derivative instrument, TheGeneralised Autoregressive Conditional Heteroscedasticity (GARCH) statistical model will be the used to measure the water price volatility of the instrument and its performance since it’s been traded. describe the main products and illustrate their usage in risk management and also discuss key challenges with modeling and valuation of water as a traded commodity and finally discuss how water derivatives may be taken as an alternative asset investment class.

Keywords: water derivatives, commodity market, nasdaq veles california water Index (NQH2O, water price, risk management

Procedia PDF Downloads 96
14738 Uncertainty in Risk Modeling

Authors: Mueller Jann, Hoffmann Christian Hugo

Abstract:

Conventional quantitative risk management in banking is a risk factor of its own, because it rests on assumptions such as independence and availability of data which do not hold when rare events of extreme consequences are involved. There is a growing recognition of the need for alternative risk measures that do not make these assumptions. We propose a novel method for modeling the risk associated with investment products, in particular derivatives, by using a formal language for specifying financial contracts. Expressions in this language are interpreted in the category of values annotated with (a formal representation of) uncertainty. The choice of uncertainty formalism thus becomes a parameter of the model, so it can be adapted to the particular application and it is not constrained to classical probabilities. We demonstrate our approach using a simple logic-based uncertainty model and a case study in which we assess the risk of counter party default in a portfolio of collateralized loans.

Keywords: risk model, uncertainty monad, derivatives, contract algebra

Procedia PDF Downloads 545
14737 Adoption of Noise and Vibration Management Tools for Major Infrastructure Projects in Sydney, Australia

Authors: Adrian Morris, Rodney Phillips, Mattia Tabacchi

Abstract:

Minimizing construction noise and vibration impacts is a key challenge for major infrastructure projects in urban environments. Before commencing construction works, Construction Noise and Vibration Management Plan (CNVMP) and Construction Noise and Vibration Impact Statements (CNVIS) are required to be prepared and submitted to the relevant government authorities for review and approval. However, the assessment of potential impacts from work activities at pre-approval stage may be inaccurate as works methodology and scheduling are yet to be determined. In response, noise and vibration management tools have been developed to refine and supplement the CNVIS as works progress. These tools have been successfully implemented in major infrastructure projects allowing contractors to plan and assess construction works in a cost effective and timely manner. As a result, noise and vibration management tools have been incorporated into management plans and are increasingly required by regulators.

Keywords: noise management, environmental noise, infrastructure projects, construction, vibration, cost effective

Procedia PDF Downloads 95
14736 Supply Chain Risk Management: A Meta-Study of Empirical Research

Authors: Shoufeng Cao, Kim Bryceson, Damian Hine

Abstract:

The existing supply chain risk management (SCRM) research is currently chaotic and somewhat disorganized, and the topic has been addressed conceptually more often than empirically. This paper, using both qualitative and quantitative data, employs a modified Meta-study method to investigate the SCRM empirical research published in quality journals over the period of 12 years (2004-2015). The purpose is to outline the extent research trends and the employed research methodologies (i.e., research method, data collection and data analysis) across the sub-field that will guide future research. The synthesized findings indicate that empirical study on risk ripple effect along an entire supply chain, industry-specific supply chain risk management and global/export supply chain risk management has not yet given much attention than it deserves in the SCRM field. Besides, it is suggested that future empirical research should employ multiple and/or mixed methods and multi-source data collection techniques to reduce common method bias and single-source bias, thus improving research validity and reliability. In conclusion, this paper helps to stimulate more quality empirical research in the SCRM field via identifying promising research directions and providing some methodology guidelines.

Keywords: empirical research, meta-study, methodology guideline, research direction, supply chain risk management

Procedia PDF Downloads 287
14735 Features of Formation and Development of Possessory Risk Management Systems of Organization in the Russian Economy

Authors: Mikhail V. Khachaturyan, Inga A. Koryagina, Maria Nikishova

Abstract:

The study investigates the impact of the ongoing financial crisis, started in the 2nd half of 2014, on marketing budgets spent by Fast-moving consumer goods companies. In these conditions, special importance is given to efficient possessory risk management systems. The main objective for establishing and developing possessory risk management systems for FMCG companies in a crisis is to analyze the data relating to the external environment and consumer behavior in a crisis. Another important objective for possessory risk management systems of FMCG companies is to develop measures and mechanisms to maintain and stimulate sales. In this regard, analysis of risks and threats which consumers define as the main reasons affecting their level of consumption become important. It is obvious that in crisis conditions the effective risk management systems responsible for development and implementation of strategies for consumer demand stimulation, as well as the identification, analysis, assessment and management of other types of risks of economic security will be the key to sustainability of a company. In terms of financial and economic crisis, the problem of forming and developing possessory risk management systems becomes critical not only in the context of management models of FMCG companies, but for all the companies operating in other sectors of the Russian economy. This study attempts to analyze the specifics of formation and development of company possessory risk management systems. In the modern economy, special importance among all the types of owner’s risks has the risk of reduction in consumer activity. This type of risk is common not only for the consumer goods trade. Study of consumer activity decline is especially important for Russia due to domestic market of consumer goods being still in the development stage, despite its significant growth. In this regard, it is especially important to form and develop possessory risk management systems for FMCG companies. The authors offer their own interpretation of the process of forming and developing possessory risk management systems within owner’s management models of FMCG companies as well as in Russian economy in general. Proposed methods and mechanisms of problem analysis of formation and development of possessory risk management systems in FMCG companies and the results received can be helpful for researchers interested in problems of consumer goods market development in Russia and overseas.

Keywords: FMCG companies, marketing budget, risk management, owner, Russian economy, organization, formation, development, system

Procedia PDF Downloads 350
14734 Banking Risk Management between the Prudential and the Operational Approaches

Authors: Mustapha Achibane, Imane Allam

Abstract:

Since the nineties, all Moroccan banking institutions have to respect an arsenal of prudential ratios. The respect of these prudential measures aims to ensure the financial system stability. In order to do so, regulatory authorities tried to reduce the financial and operational risks incurred by the banking entities. Meanwhile, regulatory authorities demanded a balance sheet management work from banks. They also asked them to establish a management control system to manage operational risk, as well as an effort in terms of incurred risk-based commitments. Therefore, the prudential approach has a macroeconomic nature and it is presented as a determinant of the operational, microeconomic approach. This operational approach takes the form of a strategy that each banking entity must develop to manage the different banking risks. This study seeks to analyze the problem of risk management between the prudential and the operational approaches. It was processed through a literature review followed by an analysis of the Moroccan banking sector’s performance. At first, we will reconcile the inductive logic and then, the analytical one. The first approach consists of analyzing the phenomenon from a normative and conceptual perspective, while the second one will consist of considering the Moroccan banking system and analyzing the behavior of Moroccan banking entities in terms of risk management and performance. The results identified a favorable growth in terms of performance, despite the huge provisioning effort made to meet the international standards and the harmonization of the regulations.

Keywords: banking performance, financial intermediation, operational approach, prudential standards, risk management

Procedia PDF Downloads 118
14733 The Significance of a Well-Defined Systematic Approach in Risk Management for Construction Projects within Oil Industry

Authors: Batool Ismaeel, Umair Farooq, Saad Mushtaq

Abstract:

Construction projects in the oil industry can be very complex, having unknown outcomes and uncertainties that cannot be easily predicted. Each project has its unique risks generated by a number of factors which, if not controlled, will impact the successful completion of the project mainly in terms of schedule, cost, quality, and safety. This paper highlights the historic risks associated with projects in the south and east region of Kuwait Oil Company (KOC) collated from the company’s lessons learned database. Starting from Contract Award through to handover of the project to the Asset owner, the gaps in project execution in terms of managing risk will be brought to discussion and where a well-defined systematic approach in project risk management reflecting many claims, change of scope, exceeding budget, delays in engineering phase as well as in the procurement and fabrication of long lead items should be adopted. This study focuses on a proposed feasible approach in risk management for engineering, procurement and construction (EPC) level projects including the various stakeholders involved in executing the works from International to local contractors and vendors in KOC. The proposed approach covers the areas categorized into organizational, design, procurement, construction, pre-commissioning, commissioning and project management in which the risks are identified and require management and mitigation. With the effective deployment and implementation of the proposed risk management system and the consideration of it as a vital key in achieving the project’s target, the outcomes will be more predictable in the future, and the risk triggers will be managed and controlled. The correct resources can be allocated on a timely basis for the company for avoiding any unpredictable outcomes during the execution of the project. It is recommended in this paper to apply this risk management approach as an integral part of project management and investigate further in the future, the effectiveness of this proposed system for newly awarded projects and compare the same with those projects of similar budget/complexity that have not applied this approach to risk management.

Keywords: construction, project completion, risk management, uncertainties

Procedia PDF Downloads 125
14732 Developing a Multiagent-Based Decision Support System for Realtime Multi-Risk Disaster Management

Authors: D. Moser, D. Pinto, A. Cipriano

Abstract:

A Disaster Management System (DMS) for countries with different disasters is very important. In the world different disasters like earthquakes, tsunamis, volcanic eruption, fire or other natural or man-made disasters occurs and have an effect on the population. It is also possible that two or more disasters arisen at the same time, this means to handle multi-risk situations. To handle such a situation a Decision Support System (DSS) based on multiagents is a suitable architecture. The most known DMSs deal with one (in the case of an earthquake-tsunami combination with two) disaster and often with one particular disaster. Nevertheless, a DSS helps for a better realtime response. Analyze the existing systems in the literature and expand them for multi-risk disasters to construct a well-organized system is the proposal of our work. The here shown work is an approach of a multi-risk system, which needs an architecture, and well-defined aims. In this moment our study is a kind of case study to analyze the way we have to follow to create our proposed system in the future.

Keywords: decision support system, disaster management system, multi-risk, multiagent system

Procedia PDF Downloads 389
14731 Historic Urban Landscape Approach, a Methodology to Elaborate Sustainable Development Plans through Culture and Heritage: The Case Study of Valverde de Burguillos (Spain)

Authors: Julia Rey Perez, Victoria Dominguez Ruiz

Abstract:

The phenomenon of depopulation puts the authorities at risk of abandoning a number of rural-urban areas of significant cultural value, affecting their architecture and intangible cultural heritage. The purpose of this research is to present a methodology created according to the UNESCO Recommendation on the Historic Urban Landscape (HUL), which through the identification of cultural values and attributes, leads to ´Strategic Plans´ build upon the culture and heritage. This methodology is based on the analysis of the town from three perspectives: 1) from the public administration, 2) from the discipline of architecture, and 3) from citizen perception. In order to be able to work on the development of a diagnosis from three very different approaches, collaborative cartographies have been used as working tools. The methodology discussed was applied in Valverde de Burguillos, in Spain, leading to the construction of an inclusive ‘Strategic Plan’ that integrates the management of the town within the overall territorial development plan. The importance of incorporating culture and heritage as a conductor for sustainable urban development through the HUL approach has allowed the local authorities to assume these new tools for heritage conservation, acknowledging community participation as the main element for the ´Strategic Plan” elaboration.

Keywords: rural heritage, citizen participation, inclusiveness, urban governance, UNESCO

Procedia PDF Downloads 108
14730 Breakthrough Innovation Thinking Technology of a Conglomerate for Next Generation Plan

Authors: Dongkyu Lee, Doan-Quoc Hoan, Soomi Shin

Abstract:

The purpose of this study is to suggest the Value Innovation type Breakthrough Innovation which is a Big Thinking Process that realizes a creative idea for the next generation innovation Master Plan of a company. The BI based on the PVI methodology is believed to contribute to the launching of a new business, the acquisition of new markets, and the development of an innovative management process.

Keywords: value, innovation, breakthrough innovation, Korean firm

Procedia PDF Downloads 561
14729 Islamic Credit Risk Management in Murabahah Financing: The Study of Islamic Banking in Malaysia

Authors: Siti Nor Amira Bt. Mohamad, Mohamad Yazis B. Ali Basah, Muhammad Ridhwan B. Ab. Aziz, Khairil Faizal B. Khairi, Mazlynda Bt. Md. Yusuf, Hisham B. Sabri

Abstract:

The understanding of risk and the concept of it occurs associated in Islamic financing was well-known in the financial industry by the using of Profit-and-Loss Sharing (PLS). It was presently in any Islamic financial transactions in order to comply with shariah rules. However, the existence of risk in Murabahah contract of financing is an ability that the counterparty is unable to complete its obligations within the agreed terms. Therefore, it is called as credit or default risk. Credit risk occurs when the client fails to make timely payment after the bank makes complete delivery of assets. Thus, it affects the growth of the bank as the banking business is in no position to have appropriate measures to cover the risk. Therefore, the bank may impose penalty on the outstanding balance. This paper aims to highlight the credit risk determinant and issues surrounding in Islamic bank in Malaysia in terms of Murabahah financing and how to manage it by using the proper techniques. Finally, it explores the credit risk management concept that might solve the problems arise. The study found that the credit risk can be managed properly by improving the use of comprehensive reference checklist of business partners on their character and past performance as well as their comprehensive database. Besides that, prevention of credit risk can be done by using collateral as security against the risk and we also argue on the Shariah guidelines and procedures should be implement coherently by the banking business because so that the risk would be control by having an effective instrument for Islamic modes of financing.

Keywords: Islamic banking, credit risk, Murabahah financing, risk mitigation

Procedia PDF Downloads 422
14728 Risk Based on Computer Auditing and Measures of ‎Prevention

Authors: Mohammad Hadi Khorashadi Zadeh, Amin Karkon, Seyd Mohammad Reza Mashhoori

Abstract:

The technology of computer audit played a major role in the progress and prospects of a proper application to improve the quality and efficiency of audit work. But due to the technical complexity and the specific risks of computer audit, it should be shown effective in audit and preventive action. Mainly through research in this paper, we propose the causes of audit risk in a computer environment and the risk of further proposals for measures to control, to some extent reduce the risk of computer audit and improve the audit quality.

Keywords: computer auditing, risk, measures to prevent, information management

Procedia PDF Downloads 484
14727 Quality Assurance as an Educational Development Tool: Case from the European Higher Education

Authors: Maha Mourad

Abstract:

Higher education in any competitive European economy should serve the new information society by increasing the supply of good quality education services and by creating good international brands in the international higher education market. Hence, continuous risk management techniques through higher educational reforms programs became one of the top priorities within the European Union to control the quality of higher education. Risk is higher education is studies by several researchers who agreed that the risk in higher education has a direct influence on continuity of quality education and research contribution. The focus of this research is to highlights the Internal Quality Assurance (IQA) activities in the Polish higher education system as a risk management tool used to control the quality of education. This paper presents a qualitative empirical analysis in 5 different universities in Poland. In addition, it aims to help in finding global practical and create benchmark for policy makers concerning the risk management techniques based on the Polish experience.

Keywords: education development, quality assurance, sustainability, european higher education

Procedia PDF Downloads 433
14726 Some Discrepancies between Experimentally-Based Theory of Toxic Metals Combined Action and Actual Approaches to Occupational and Environmental Health Risk Assessment and Management

Authors: Ilzira A. Minigalieva

Abstract:

Assessment of cumulative health risks associated with the widely observed combined exposures to two or more metals and their compounds on the organism in industrial or general environment, as well as respective regulatory and technical risk management decision-making have presumably the theoretical and experimental toxicology of mixtures as their reliable scientific basis. Analysis of relevant literature and our own experience proves, however, that there is no full match between these different practices. Moreover, some of the contradictions between them are of a fundamental nature. This unsatisfactory state of things may be explained not only by unavoidable simplifications characteristic of the methodologies of risk assessment and permissible exposure standards setting but also by the extreme intrinsic complexity of the combined toxicity theory, the most essential issues of which are considered and briefly discussed in this paper.

Keywords: toxic metals, nanoparticles, typology of combined toxicity, mathematical modeling, health risk assessment and management

Procedia PDF Downloads 299
14725 A Probability Analysis of Construction Project Schedule Using Risk Management Tool

Authors: A. L. Agarwal, D. A. Mahajan

Abstract:

Construction industry tumbled along with other industry/sectors during recent economic crash. Construction business could not regain thereafter and still pass through slowdown phase, resulted many real estate as well as infrastructure projects not completed on schedule and within budget. There are many theories, tools, techniques with software packages available in the market to analyze construction schedule. This study focuses on the construction project schedule and uncertainties associated with construction activities. The infrastructure construction project has been considered for the analysis of uncertainty on project activities affecting project duration and analysis is done using @RISK software. Different simulation results arising from three probability distribution functions are compiled to benefit construction project managers to plan more realistic schedule of various construction activities as well as project completion to document in the contract and avoid compensations or claims arising out of missing the planned schedule.

Keywords: construction project, distributions, project schedule, uncertainty

Procedia PDF Downloads 308
14724 A Case Study of Brownfield Revitalization in Taiwan

Authors: Jen Wang, Wei-Chia Hsu, Zih-Sin Wang, Ching-Ping Chu, Bo-Shiou Guo

Abstract:

In the late 19th century, the Jinguashi ore deposit in northern Taiwan was discovered, and accompanied with flourishing mining activities. However, tons of contaminants including heavy metals, sulfur dioxide, and total petroleum hydrocarbons (TPH) were released to surroundings and caused environmental problems. Site T was one of copper smelter located on the coastal hill near Jinguashi ore deposit. In over ten years of operation, variety contaminants were emitted that it polluted the surrounding soil and groundwater quality. In order to exhaust fumes produced from smelting process, three stacks were built along the hill behind the factory. The sediment inside the stacks contains high concentration of heavy metals such as arsenic, lead, copper, etc. Moreover, soil around the discarded stacks suffered a serious contamination when deposition leached from the ruptures of stacks. Consequently, Site T (including the factory and its surroundings) was declared as a pollution remediation site that visiting the site and land-use activities on it are forbidden. However, the natural landscape and cultural attractions of Site T are spectacular that it attracts a lot of visitors annually. Moreover, land resources are extremely precious in Taiwan. In addition, Taiwan Environmental Protection Administration (EPA) is actively promoting the contaminated land revitalization policy. Therefore, this study took Site T as case study for brownfield revitalization planning to the limits of activate and remediate the natural resources. Land-use suitability analysis and risk mapping were applied in this study to make appropriate risk management measures and redevelopment plan for the site. In land-use suitability analysis, surrounding factors into consideration such as environmentally sensitive areas, biological resources, land use, contamination, culture, and landscapes were collected to assess the development of each area; health risk mapping was introduced to show the image of risk assessments results based on the site contamination investigation. According to land-use suitability analysis, the site was divided into four zones: priority area (for high-efficiency development), secondary area (for co-development with priority area), conditional area (for reusing existing building) and limited area (for Eco-tourism and education). According to the investigation, polychlorinated biphenyls (PCB), heavy metals and TPH were considered as target contaminants while oral, inhalation and dermal would be the major exposure pathways in health risk assessment. In accordance with health risk map, the highest risk was found in the southwest and eastern side. Based on the results, the development plan focused on zoning and land use. Site T was recommended be divides to public facility zone, public architectonic art zone, viewing zone, existing building preservation zone, historic building zone, and cultural landscape zone for various purpose. In addition, risk management measures including sustained remediation, extinguish exposure and administration management are applied to ensure particular places are suitable for visiting and protect the visitors’ health. The consolidated results are corroborated available by analyzing aspects of law, land acquired method, maintenance and management and public participation. Therefore, this study has a certain reference value to promote the contaminated land revitalization policy in Taiwan.

Keywords: brownfield revitalization, land-use suitability analysis, health risk map, risk management

Procedia PDF Downloads 143
14723 The Development of the Quality Management Processes for the Building and Environment of the Basic Education Schools

Authors: Suppara Charoenpoom

Abstract:

The objectives of this research was to design and develop a quality management of the school buildings and environment. A quantitative and qualitative mixed research methodology was used. The population sample included 14 directors of primary schools. Two research tools were used. The first research tool included an in-depth interview and questionnaire. The second research tool included the Quality Business Process and Quality Work Procedure, and a Key Performance Indicator of each activity. The statistics included mean and standard deviation. The findings for the development of a quality management process of buildings and environment administration of the basic schools consisted of one quality business process (QBP) and seven quality work processes (QWP). The result from the experts’ evaluation revealed that the process and implementation of quality management of the school buildings and environment has passed the inspection process with consensus. This implies that the process of quality management of the school buildings and environment is suitable for implementation. Moreover, the level of agreement in the feasibility of the implementation of this plan had the mean in the range of 0.64-1.00 which suggests the design of the new plan is acceptable.

Keywords: process, building, environment, management

Procedia PDF Downloads 207
14722 Spatial Analysis for Wind Risk Index Assessment

Authors: Ljiljana Seric, Vladimir Divic, Marin Bugaric

Abstract:

This paper presents methodology for spatial analysis of GIS data that is used for assessing the microlocation risk index from potential damages of high winds. The analysis is performed on freely available GIS data comprising information about wind load, terrain cover and topography of the area. The methodology utilizes the legislation of Eurocode norms for determination of wind load of buildings and constructions. The core of the methodology is adoption of the wind load parameters related to location on geographical spatial grid. Presented work is a part of the Wind Risk Project, supported by the European Commission under the Civil Protection Financial Instrument of the European Union (ECHO). The partners involved in Wind Risk project performed Wind Risk assessment and proposed action plan for three European countries – Slovenia, Croatia and Germany. The proposed method is implemented in GRASS GIS open source GIS software and demonstrated for Case study area of wider area of Split, Croatia. Obtained Wind Risk Index is visualized and correlated with critical infrastructures like buildings, roads and power lines. The results show good correlation between high Wind Risk Index with recent incidents related to wind.

Keywords: Eurocode norms, GIS, spatial analysis, wind distribution, wind risk

Procedia PDF Downloads 291
14721 Rethinking Urban Floodplain Management: The Case of Colombo, Sri Lanka

Authors: Malani Herath, Sohan Wijesekera, Jagath Munasingha

Abstract:

The impact of recent floods become significant, and the extraordinary flood events cause considerable damage to lives, properties, environment and negatively affect the whole development of Colombo urban region. Even though the Colombo urban region experiences recurrent flood impacts, several spatial planning interventions have been taken from time to time since early 20th century. All past plans have adopted a traditional approach to flood management, using infrastructural measures to reduce the chance of flooding together with rigid planning regulations. The existing flood risk management practices do not operate to be acceptable by the local community particular the urban poor. Researchers have constantly reported the differences in estimations of flood risk, priorities, concerns of experts and the local community. Risk-based decision making in flood management is not only a matter of technical facts; it has a significant bearing on how flood risk is viewed by local community and individuals. Moreover, sustainable flood management is an integrated approach, which highlights joint actions of experts and community. This indicates the necessity of further societal discussion on the acceptable level of flood risk indicators to prioritize and identify the appropriate flood management measures in Colombo. The understanding and evaluation of flood risk by local people are important to integrate in the decision-making process. This research questioned about the gap between the acceptable level of flood risk to spatial planners and to the local communities in Colombo. A comprehensive literature review was conducted to prepare a framework to analyze the public perception in Colombo. This research work identifies the factors that affect the variation of flood risk and acceptable levels to both local community and planning authorities.

Keywords: Colombo basin, public perception, urban flood risk, multi-criteria analysis

Procedia PDF Downloads 282
14720 Risk Analysis in Off-Site Construction Manufacturing in Small to Medium-Sized Projects

Authors: Atousa Khodadadyan, Ali Rostami

Abstract:

The objective of off-site construction manufacturing is to utilise the workforce and machinery in a controlled environment without external interference for higher productivity and quality. The usage of prefabricated components can save up to 14% of the total energy consumption in comparison with the equivalent number of cast-in-place ones. Despite the benefits of prefabrication construction, its current project practices encompass technical and managerial issues. Building design, precast components’ production, logistics, and prefabrication installation processes are still mostly discontinued and fragmented. Furthermore, collaboration among prefabrication manufacturers, transportation parties, and on-site assemblers rely on real-time information such as the status of precast components, delivery progress, and the location of components. From the technical point of view, in this industry, geometric variability is still prevalent, which can be caused during the transportation or production of components. These issues indicate that there are still many aspects of prefabricated construction that can be developed using disruptive technologies. Practical real-time risk analysis can be used to address these issues as well as the management of safety, quality, and construction environment issues. On the other hand, the lack of research about risk assessment and the absence of standards and tools hinder risk management modeling in prefabricated construction. It is essential to note that no risk management standard has been established explicitly for prefabricated construction projects, and most software packages do not provide tailor-made functions for this type of projects.

Keywords: project risk management, risk analysis, risk modelling, prefabricated construction projects

Procedia PDF Downloads 147
14719 The Integrated Methodological Development of Reliability, Risk and Condition-Based Maintenance in the Improvement of the Thermal Power Plant Availability

Authors: Henry Pariaman, Iwa Garniwa, Isti Surjandari, Bambang Sugiarto

Abstract:

Availability of a complex system of thermal power plant is strongly influenced by the reliability of spare parts and maintenance management policies. A reliability-centered maintenance (RCM) technique is an established method of analysis and is the main reference for maintenance planning. This method considers the consequences of failure in its implementation, but does not deal with further risk of down time that associated with failures, loss of production or high maintenance costs. Risk-based maintenance (RBM) technique provides support strategies to minimize the risks posed by the failure to obtain maintenance task considering cost effectiveness. Meanwhile, condition-based maintenance (CBM) focuses on monitoring the application of the conditions that allow the planning and scheduling of maintenance or other action should be taken to avoid the risk of failure prior to the time-based maintenance. Implementation of RCM, RBM, CBM alone or combined RCM and RBM or RCM and CBM is a maintenance technique used in thermal power plants. Implementation of these three techniques in an integrated maintenance will increase the availability of thermal power plants compared to the use of maintenance techniques individually or in combination of two techniques. This study uses the reliability, risks and conditions-based maintenance in an integrated manner to increase the availability of thermal power plants. The method generates MPI (Priority Maintenance Index) is RPN (Risk Priority Number) are multiplied by RI (Risk Index) and FDT (Failure Defense Task) which can generate the task of monitoring and assessment of conditions other than maintenance tasks. Both MPI and FDT obtained from development of functional tree, failure mode effects analysis, fault-tree analysis, and risk analysis (risk assessment and risk evaluation) were then used to develop and implement a plan and schedule maintenance, monitoring and assessment of the condition and ultimately perform availability analysis. The results of this study indicate that the reliability, risks and conditions-based maintenance methods, in an integrated manner can increase the availability of thermal power plants.

Keywords: integrated maintenance techniques, availability, thermal power plant, MPI, FDT

Procedia PDF Downloads 764
14718 Climate Related Financial Risk on Automobile Industry and the Impact to the Financial Institutions

Authors: Mahalakshmi Vivekanandan S.

Abstract:

As per the recent changes happening in the global policies, climate-related changes and the impact it causes across every sector are viewed as green swan events – in essence, climate-related changes can often happen and lead to risk and a lot of uncertainty, but needs to be mitigated instead of considering them as black swan events. This brings about a question on how this risk can be computed so that the financial institutions can plan to mitigate it. Climate-related changes impact all risk types – credit risk, market risk, operational risk, liquidity risk, reputational risk and other risk types. And the models required to compute this has to consider the different industrial needs of the counterparty, as well as the factors that are contributing to this – be it in the form of different risk drivers, or the different transmission channels or the different approaches and the granular form of data availability. This brings out the suggestion that the climate-related changes, though it affects Pillar I risks, will be a Pillar II risk. This has to be modeled specifically based on the financial institution’s actual exposure to different industries instead of generalizing the risk charge. And this will have to be considered as the additional capital to be met by the financial institution in addition to their Pillar I risks, as well as the existing Pillar II risks. In this paper, the author presents a risk assessment framework to model and assess climate change risks - for both credit and market risks. This framework helps in assessing the different scenarios and how the different transition risks affect the risk associated with the different parties. This research paper delves into the topic of the increase in the concentration of greenhouse gases that in turn cause global warming. It then considers the various scenarios of having the different risk drivers impacting the Credit and market risk of an institution by understanding the transmission channels and also considering the transition risk. The paper then focuses on the industry that’s fast seeing a disruption: the automobile industry. The paper uses the framework to show how the climate changes and the change to the relevant policies have impacted the entire financial institution. Appropriate statistical models for forecasting, anomaly detection and scenario modeling are built to demonstrate how the framework can be used by the relevant agencies to understand their financial risks. The paper also focuses on the climate risk calculation for the Pillar II Capital calculations and how it will make sense for the bank to maintain this in addition to their regular Pillar I and Pillar II capital.

Keywords: capital calculation, climate risk, credit risk, pillar ii risk, scenario modeling

Procedia PDF Downloads 100
14717 Mathematical Model of Corporate Bond Portfolio and Effective Border Preview

Authors: Sergey Podluzhnyy

Abstract:

One of the most important tasks of investment and pension fund management is building decision support system which helps to make right decision on corporate bond portfolio formation. Today there are several basic methods of bond portfolio management. They are duration management, immunization and convexity management. Identified methods have serious disadvantage: they do not take into account credit risk or insolvency risk of issuer. So, identified methods can be applied only for management and evaluation of high-quality sovereign bonds. Applying article proposes mathematical model for building an optimal in case of risk and yield corporate bond portfolio. Proposed model takes into account the default probability in formula of assessment of bonds which results to more correct evaluation of bonds prices. Moreover, applied model provides tools for visualization of the efficient frontier of corporate bonds portfolio taking into account the exposure to credit risk, which will increase the quality of the investment decisions of portfolio managers.

Keywords: corporate bond portfolio, default probability, effective boundary, portfolio optimization task

Procedia PDF Downloads 294
14716 Applying Resilience Engineering to improve Safety Management in a Construction Site: Design and Validation of a Questionnaire

Authors: M. C. Pardo-Ferreira, J. C. Rubio-Romero, M. Martínez-Rojas

Abstract:

Resilience Engineering is a new paradigm of safety management that proposes to change the way of managing the safety to focus on the things that go well instead of the things that go wrong. Many complex and high-risk sectors such as air traffic control, health care, nuclear power plants, railways or emergencies, have applied this new vision of safety and have obtained very positive results. In the construction sector, safety management continues to be a problem as indicated by the statistics of occupational injuries worldwide. Therefore, it is important to improve safety management in this sector. For this reason, it is proposed to apply Resilience Engineering to the construction sector. The Construction Phase Health and Safety Plan emerges as a key element for the planning of safety management. One of the key tools of Resilience Engineering is the Resilience Assessment Grid that allows measuring the four essential abilities (respond, monitor, learn and anticipate) for resilient performance. The purpose of this paper is to develop a questionnaire based on the Resilience Assessment Grid, specifically on the ability to learn, to assess whether a Construction Phase Health and Safety Plans helps companies in a construction site to implement this ability. The research process was divided into four stages: (i) initial design of a questionnaire, (ii) validation of the content of the questionnaire, (iii) redesign of the questionnaire and (iii) application of the Delphi method. The questionnaire obtained could be used as a tool to help construction companies to evolve from Safety-I to Safety-II. In this way, companies could begin to develop the ability to learn, which will serve as a basis for the development of the other abilities necessary for resilient performance. The following steps in this research are intended to develop other questions that allow evaluating the rest of abilities for resilient performance such as monitoring, learning and anticipating.

Keywords: resilience engineering, construction sector, resilience assessment grid, construction phase health and safety plan

Procedia PDF Downloads 111
14715 Revisiting the Donning and Doffing Procedure: Ensuring a Coordinated Practice

Authors: Deanna Ruano-Meas, Laura Shenkman

Abstract:

Variances are seen in the way healthcare personnel (HCP) don and doff PPE risking contamination to self and others. By standardizing practice, variances in technique decrease, and so does the risk of contamination. To implement this change, the Model for Improvement will be used. A system change will be developed that will outline the role of the organizational leader’s support of HCP in the proper donning and doffing of PPE. Interventions will include environmental surveys to assess the safety and work situation ensuring a permissible environment, plan audits to confirm consistency, and the assessment of PPE wear for standardization. The change will also include an educational plan that will involve instruction of the current guidelines recommended by the Centers for Disease Control and Prevention (CDC) to all pertinent HCP, and the incorporation of PPE education in yearly educational training. The goal is a standardized practice and a reduced risk of contamination through education and organizational support. Personal protective equipment has had recent attention with the coming of the SARS-CoV-2. The realization that proper technique is important to decreasing contamination of pathogens has led to the revising of current processes.

Keywords: donning and doffing, HAI, infection control, PPE

Procedia PDF Downloads 168
14714 Operation and Management System of New Ahmadi Hospital Facility

Authors: Abdulrahman H. Alrashidi

Abstract:

Kuwait Oil Company provides health care services through Ahmadi hospital for oil sector employee and their families. Due to increasing number of entitled patients in Ahmadi hospital, the company starts health insurance option in 2010. In addition, a new Ahmadi hospital decided to build to accumulate all entitled patients. Operation and management of new Ahmadi hospital investigated in this research. In order to maintain the high quality of medical services and satisfaction rate among oil sector community and reducing the operation cost. Six operation and management options evaluated in order to implement in new Ahmadi hospital. Qualitative Risk assessment method used to investigate proposed options for operation and management of new Ahmadi hospital. Evaluation criteria consist of quality of medical services, operation cost and satisfaction rate among oil sector community. Results show that using the same operation and management system in existing Ahmadi hospital with new Ahmadi hospital will bring cost higher. This approach brings risk to KOC. Results from risk assessment show that partially operated new Ahmadi hospital is the best opportunity to meet the objectives of KOC’s medical group.

Keywords: Kuwait Oil Company, new Ahmadi hospital, operation and management, risk assessment