Search results for: quantitative risk management
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 16281

Search results for: quantitative risk management

16251 Quantitative Risk Analysis for Major Subsystems and Project Success of a Highthrouput Satellite

Authors: Ibrahim Isa Ali (Pantami), Abdu Jaafaru Bambale, Abimbola Alale, Danjuma Ibrahim Ndihgihdah, Muhammad Alkali, Adamu Idris Umar, Babadoko Dantala Mohammed, Moshood Kareem Olawole

Abstract:

This paper dwells on the risk management required for High throughput Satellite (HTS) project, and major subsystems that pertains to the improved performance and reliability of the spacecraft. The paper gives a clear picture of high‐throughput satellites (HTS) and the associated technologies with performances as they align and differ with the traditional geostationary orbit or Geosynchronous Equatorial Orbit (GEO) Communication Satellites. The paper also highlights critical subsystems and processes in project conceptualization and execution. The paper discusses the configuration of the payload. The need for optimization of resources for the HTS project and successful integration of critical subsystems for spacecraft requires implementation of risk analysis and mitigation from the preliminary design stage; Assembly, Integration and Test (AIT); Launch and in-orbit- Management stage.

Keywords: AIT, HTS, in-orbit management, optimization

Procedia PDF Downloads 58
16250 Risk Management through Controlling in Industrial Enterprises Operating in Slovakia

Authors: Mária Hudáková, Mária Lusková

Abstract:

This report is focused on widening the theoretical knowledge as well as controlling practical application from the risk management point of view, regarding to dynamic business changes that have occurred in Slovakia which recently has been considered to be an environment full of risk and uncertainty. The idea of the report is the proposal of the controlling operation model in the course of risk management process in an enterprise operating in Slovakia, by which the controller is able to identify early risk factors in suggested major areas of the business management upon appropriate business information integration, consecutive control and prognoses and to prepare in time full-value documents in order to suggest measures for reduction thereof. Dealing with risk factors, that can quickly limit the growth potential of the enterprise, is an essential part of managerial activities on each level. This is the reason why mutual unofficial, ergo collegial cooperation of individual departments is necessary for controlling application from the business risk management point of view. An important part of the report is elaborated survey of the most important risk factors existing in major management areas of enterprises operating in Slovakia. The outcome of the performed survey is a catalogue of the most important enterprise risk factors. The catalogue serves for better understanding risk factors affecting the Slovak enterprises, their importance and evaluation.

Keywords: controlling, information, risks, risk factor, crisis

Procedia PDF Downloads 359
16249 Effect of Enterprise Risk Management Commitee on the Financial Performance of Listed Banks in Nigeria

Authors: Joseph Uche Azubike, Evelyn Ngozi Agbasi, Mi Ogbonna

Abstract:

The audit committee of the board of directors could no longer handle the enterprise's risks. Therefore, a risk management committee was created to control them. Thus, this study examined how enterprise risk management committee characteristics affected Nigerian exchange-listed banks' financial performance from 2013 to 2022. The study's hypotheses and three objectives were to determine how enterprise risk management committee size, composition, and gender diversity affect Nigerian banks' performance. An ex-post facto study design collected secondary data from bank annual reports. We used descriptive statistics, correlation analysis, and Ordinary least square regression to analyze panel data. Enterprise risk management committee size and composition had both negative and no significant effect on bank financial performance in Nigeria, whereas enterprise risk committee gender diversity has a 10% favorable effect. The report advises that adding more women with relevant knowledge to the risk committee to boost performance and allowing women to be at the lead of such risk management could improve bank performance in Nigeria since they are noted to be thorough in their tasks.

Keywords: enterprise, risks, committee, management, banks

Procedia PDF Downloads 10
16248 The Role of Tax Management Components in Creating Value or Increasing Risk of Tehran Stock Exchange Firms

Authors: Fereshteh Darash

Abstract:

Reflective tax management corresponds to the Agency Theory since it determines the motivation of managers for tax management actions and short-term and long-term consequences. Therefore, selection of tax strategy contributes to the tax and financial position of the firm in the future. The aim of the present research is to evaluate the effect of tax management components on risk-taking of firms listed in Tehran stock exchange by using regression analysis method. Results show that tax effective rate, tax risk and tax planning have no significant effect on the firm's future risk. Results suggest that stakeholders assess the effective tax rate and delay in tax payment in line with their benefits. They tend to accept the higher risk cost for reduction of tax payments and benefits of higher liquidity in current period. Hence, effective tax rate and tax risk have no significant effect on future risk of the firm. Moreover, tax planning yields no information regarding the predictability of the future profits and as a result, it has no significant effect on the future risk of the firm since specific goals of financial reporting are in priority for the stakeholders and regardless of the firm’s data analysis, they take investment decisions and they less intend to purchase the stocks in a rational manner.

Keywords: tax management, tax effective rate, tax risk, tax planning, firm risk

Procedia PDF Downloads 98
16247 The Impact of Shariah Non-Compliance Risk on Islamic Financial Institutions

Authors: Ibtissam Mharzi Alaoui, Camélia Sehaqui

Abstract:

The success of a bank depends upon its effective risk management. With the growing complexity and diversity of financial products and services, as well as the accelerating pace of globalization over the past decade, risk management is becoming increasingly difficult. thus, all measurement and monitoring functions must be much more vigorous, relevant and adequate. The Shariah non-compliance risk is specific aspect of Islamic finance which ipso facto, deserves particular attention. It affects the validity of all Islamic financial contracts and it turns out to be likely to result in considerable losses on the overall Islamic financial institutions (IFIs). The purpose of this paper is to review the theoretical literature on Shariah non-compliance risk in order to give a clearer understanding of its sources, causes and consequences. Our intention through this work is to bring added value to the Islamic finance industry all over the world. The findings provide a useful reference work for the Islamic banks in structuring (or restructuring) of their own system of shariah risk management and internal control.

Keywords: Shariah non-compliance, risk management, financial products, Islamic finance.

Procedia PDF Downloads 50
16246 Relationship between Growth of Non-Performing Assets and Credit Risk Management Practices in Indian Banks

Authors: Sirus Sharifi, Arunima Haldar, S. V. D. Nageswara Rao

Abstract:

The study attempts to analyze the impact of credit risk management practices of Indian scheduled commercial banks on their non-performing assets (NPAs). The data on credit risk practices was collected by administering a questionnaire to risk managers/executives at different banks. The data on NPAs (from 2012 to 2016) is sourced from Prowess, a database compiled by the Centre for Monitoring Indian Economy (CMIE). The model was estimated using cross-sectional regression method. As expected, the findings suggest that there is a negative relationship between credit risk management and NPA growth in Indian banks. The study has implications for Indian banks given the high level of losses, and the implementation of Basel III norms by the central bank, i.e. Reserve Bank of India (RBI). Evidence on credit risk management in Indian banks, and their relationship with non-performing assets held by them.

Keywords: credit risk, identification, Indian Banks, NPAs, ownership

Procedia PDF Downloads 355
16245 A Review on Disaster Risk Reduction and Sustainable Development in Nigeria

Authors: Kudu Dangana

Abstract:

The occurrences of disaster often call for the support of both government and non-government organization. Consequently, disaster relief remains extremely important in disaster management. However, this approach alone does not proactively address the need to adduce the human and environment impacts of future disasters. Recent thinking in the area of disaster management is indicative of the need for a new paradigm that focuses on reducing the risk of disasters with the involvement and participation of communities. This paper reviews the need for communities to place more emphasis on a holistic approach to disaster risk reduction. This approach involves risk assessment, risk reduction, early warning and disaster preparedness in order to effectively address the reduction of social, economic, and environmental costs of disasters nationally and at the global level.

Keywords: disaster, early, management, warning, relief, risk vulnerability

Procedia PDF Downloads 606
16244 Risk Management Practices In The Construction Industry In Malawi

Authors: Taonga Temwani Chibaka

Abstract:

This qualitative research study was conducted to identify the common risk factors that affect the construction industry in Malawi in the building and infrastructure (civil works) projects. The study then evaluates the possible risk responses that are done to mitigate the various risk factors that were identified. I addition the research also established the barriers to risk management implementation with lastly mapping out as where the identified risk factors fall on which stage of the project and then also map out the knowledge areas that need to be worked on the cases on Malawian construction industry in order to mitigate most of the identified risk factors. The study involved the interviewing the professionals from the construction industry in Malawi where insights and ideas were collected, analysed and interpreted. The key study findings show that risks related to clients group are perceived as most critical followed by the contractor related, consultant related and then external group related factors respectively where preventive measures are the most applied risk response technique where the aim to avoid most of the risk factors from happening. Most of the risk factors identified were internal risks and in managerial category which suggested that risk planning was to be emphasized at pre-contract stage to minimize these risks since a bigger percentage of the risk factors were mapped out at implementation stage. Furthermore, barriers to risk management were identified and the key barriers were lack of awareness; lack of knowledge; lack of formal policies in place; regarded as costly and limited time which resulted in proposing that regulating authorities to purposefully introduce intense training on risk management to make known of this new knowledge area. The study then recommends that organisation should formally implement risk management where policies should be introduced to enforce all parties to undertake this. Risk planning was regarded as paramount and this to be done from pre-contract phase so as to mitigate 80% of the risk factors. Finally, training should be done on all project management knowledge areas.

Keywords: risk management, risk factors, risks, malawi

Procedia PDF Downloads 254
16243 A Risk Management Framework for Selling a Mega Power Plant Project in a New Market

Authors: Negar Ganjouhaghighi, Amirali Dolatshahi

Abstract:

The origin of most risks of a mega project usually takes place in the phases before closing the contract. As a practical point of view, using project risk management techniques for preparing a proposal is not a total solution for managing the risks of a contract. The objective of this paper is to cover all those activities associated with risk management of a mega project sale’s processes; from entrance to a new market to awarding activities and the review of contract performance. In this study, the risk management happens in six consecutive steps that are divided into three distinct but interdependent phases upstream of the award of the contract: pre-tendering, tendering and closing. In the first step, by preparing standard market risk report, risks of the new market are identified. The next step is the bid or no bid decision making based on the previous gathered data. During the next three steps in tendering phase, project risk management techniques are applied for determining how much contingency reserve must be added or reduced to the estimated cost in order to put the residual risk to an acceptable level. Finally, the last step which happens in closing phase would be an overview of the project risks and final clarification of residual risks. The sales experience of more than 20,000 MW turn-key power plant projects alongside this framework, are used to develop a software that assists the sales team to have a better project risk management.

Keywords: project marketing, risk management, tendering, project management, turn-key projects

Procedia PDF Downloads 301
16242 Implementation of Risk Management System to Improve the Quality of Higher Education Institutes

Authors: Muhammad Wasif, Asif Ahmed Shaikh, Sarosh Hashmat Lodi, Muhammad Aslam Bhutto, Riazuddin

Abstract:

Risk Management System is quite popular in profit- based organizations, health and safety and project management fields since the last few decades. But due to rapidly changing environment and requirement of ISO 9001:2015 standards, public-sector institution, especially higher education institutes are also performing risk assessment to monitor the performance of the institution and aligning it with the latest benchmark. In this context, NED University of Engineering and Technology performed research and developed a Standard Operating Procedure (SOP) for the risk assessment, its monitoring and control. In this research, risks are broken into the four sources, namely; Internal Academics Risks, External Academics Risks, Internal Non-academic Risks, External Non-academic Risks. Risks are identified by the management at all levels. Severity and likelihood of the risks are assigned based on the previous audit results and the customer complains. Risk Ratings are calculated to orderly arrange the risk according to the Risk Rating, and controls for the risks are designed, which are assigned to the responsible person. At the end of the article, result and analysis on the different sources of risk are discussed in details and the conclusion is drawn. Discussion on few sample risks are presented in this article. Hence it is presented in the research that the Risk Management System can be applied in a Higher Education Institute to effectively control the risks which might affect the scope and Quality Management System of an organization.

Keywords: higher education, quality management system, risk assessment, risk management

Procedia PDF Downloads 270
16241 Evaluating the Feasibility of Chemical Dermal Exposure Assessment Model

Authors: P. S. Hsi, Y. F. Wang, Y. F. Ho, P. C. Hung

Abstract:

The aim of the present study was to explore the dermal exposure assessment model of chemicals that have been developed abroad and to evaluate the feasibility of chemical dermal exposure assessment model for manufacturing industry in Taiwan. We conducted and analyzed six semi-quantitative risk management tools, including UK - Control of substances hazardous to health ( COSHH ) Europe – Risk assessment of occupational dermal exposure ( RISKOFDERM ), Netherlands - Dose related effect assessment model ( DREAM ), Netherlands – Stoffenmanager ( STOFFEN ), Nicaragua-Dermal exposure ranking method ( DERM ) and USA / Canada - Public Health Engineering Department ( PHED ). Five types of manufacturing industry were selected to evaluate. The Monte Carlo simulation was used to analyze the sensitivity of each factor, and the correlation between the assessment results of each semi-quantitative model and the exposure factors used in the model was analyzed to understand the important evaluation indicators of the dermal exposure assessment model. To assess the effectiveness of the semi-quantitative assessment models, this study also conduct quantitative dermal exposure results using prediction model and verify the correlation via Pearson's test. Results show that COSHH was unable to determine the strength of its decision factor because the results evaluated at all industries belong to the same risk level. In the DERM model, it can be found that the transmission process, the exposed area, and the clothing protection factor are all positively correlated. In the STOFFEN model, the fugitive, operation, near-field concentrations, the far-field concentration, and the operating time and frequency have a positive correlation. There is a positive correlation between skin exposure, work relative time, and working environment in the DREAM model. In the RISKOFDERM model, the actual exposure situation and exposure time have a positive correlation. We also found high correlation with the DERM and RISKOFDERM models, with coefficient coefficients of 0.92 and 0.93 (p<0.05), respectively. The STOFFEN and DREAM models have poor correlation, the coefficients are 0.24 and 0.29 (p>0.05), respectively. According to the results, both the DERM and RISKOFDERM models are suitable for performance in these selected manufacturing industries. However, considering the small sample size evaluated in this study, more categories of industries should be evaluated to reduce its uncertainty and enhance its applicability in the future.

Keywords: dermal exposure, risk management, quantitative estimation, feasibility evaluation

Procedia PDF Downloads 141
16240 Circular Economy: Development of Quantitative Material Wastage Management Plan for Effective Waste Reduction in Building Construction Industry

Authors: Kwok Tak Kit

Abstract:

Combating climate change is becoming a hot topic in various sectors. Building construction and infrastructure sectors contributed a significant proportion of waste and GHGs emissions in the economy of different countries and cities. Many types of research had conducted and discussed the topic of waste management and waste management being a macro-level control is well developed in the building and construction industry. However, there is little research and studies on the micro-level of waste management, “building construction material wastage management,” and fewer reviews about regulatory control in the building construction sector. In this paper, we will focus on the potentialities and importance of material wastage management and review the deficiencies of the current standard to take into account the reduction of material wastage in a systematic and quantitative approach.

Keywords: quantitative measurement, material wastage management plan, waste management, uncalculated waste, circular economy

Procedia PDF Downloads 117
16239 Critical Psychosocial Risk Treatment for Engineers and Technicians

Authors: R. Berglund, T. Backström, M. Bellgran

Abstract:

This study explores how management addresses psychosocial risks in seven teams of engineers and technicians in the midst of the fourth industrial revolution. The sample is from an ongoing quasi-experiment about psychosocial risk management in a manufacturing company in Sweden. Each of the seven teams belongs to one of two clusters: a positive cluster or a negative cluster. The positive cluster reports a significantly positive change in psychosocial risk levels between two time-points and the negative cluster reports a significantly negative change. The data are collected using semi-structured interviews. The results of the computer aided thematic analysis show that there are more differences than similarities when comparing the risk treatment actions taken between the two clusters. Findings show that the managers in the positive cluster use more enabling actions that foster and support formal and informal relationship building. In contrast, managers that use less enabling actions hinder the development of positive group processes and contribute negative changes in psychosocial risk levels. This exploratory study sheds some light on how management can influence significant positive and negative changes in psychosocial risk levels during a risk management process.

Keywords: group process model, risk treatment, risk management, psychosocial

Procedia PDF Downloads 126
16238 Analysis of Farm Management Skills in Broiler Poultry Producers in Botswana

Authors: Som Pal Baliyan

Abstract:

The purpose of this quantitative study was to analyze farm management skills in broiler poultryproducers in Botswana. The study adopted a descriptive and correlation research design. The population of the study was the poultry farm operators who had been in broiler poultry farming at least for two years. Based on the information from literature, a questionnaire was constructed for data collection on seven areas of farm management skills namely; planning skills, accounting and financial management skills, production management skills, product procurement and marketing skills, decision making skills, risk management skills, and specific technical skills. The validity and reliability of the questionnaire were accomplished by a panel of experts and by calculating the Cronbach’s alpha coefficient, respectively. Data were collected through a survey of 60 randomly sampled poultry farm operators in Botswana. Data were analyzed through descriptive statistical tools whereby the level of farm management skills were determined by calculating means and standard deviations of the management skills among the broiler producers. The level of farm management skills in broilers producers was discussed. All the seven farm management skills were ranked based on their calculated means. The specific technical skills and risk management skills were the highest and the lowest ranked farm management skills, respectively.Findings revealed that the broiler producers had skills above the average level only in specific technical skills whereas the skill levels in the remaining six farm management skills under study were found below the average level. This prevailing low level of farm management skills can be justified asthe cause of failure or poor performance of the broiler poultry farms in Botswana. Therefore, in order to improve the efficiency and productivityin broiler production in the country, it was recommended that the broiler poultry producers should be adequately trained in areas of planning skills, financial management skills, production management skills, product procurement and marketing skills, decision making skills and risk management skills.

Keywords: poultry production, broiler production, management skills, levels of skills

Procedia PDF Downloads 375
16237 Evaluation of Disease Risk Variables in the Control of Bovine Tuberculosis

Authors: Berrin Şentürk

Abstract:

In this study, due to the recurrence of bovine tuberculosis, in the same areas, the risk factors for the disease were determined and evaluated at the local level. This study was carried out in 32 farms where the disease was detected in the district and center of Samsun province in 2014. Predetermined risk factors, such as farm, environmental and economic risks, were investigated with the survey method. It was predetermined that risks in the three groups are similar to the risk variables of the disease on the global scale. These risk factors that increase the susceptibility of the infection must be understood by the herd owners. The risk-based contagious disease management system approach should be applied for bovine tuberculosis by farmers, animal health professionals and public and private sector decision makers.

Keywords: bovine tuberculosis, disease management, control, outbreak, risk analysis

Procedia PDF Downloads 370
16236 Safety Management on Construction Sites

Authors: Jonathan Doku

Abstract:

The study's goal was to evaluate construction site safety management in Ghana. The construction sector has long been seen as a high-risk business. It entails a variety of hazardous and challenging labor duties, such as lifting and working at a height, among others. The accident rate is a standard indicator for comparing the safety performance of construction projects. Because of its high-risk and fast-changing work environment, the construction business is regarded as one of the industries with the highest accident rates in the world. Many mishaps and work-related diseases have occurred there, and construction workers are particularly vulnerable to catastrophic calamities such as falls, collapses, and burial. The study's main goals were to discover characteristics that have a substantial impact on construction site safety, to evaluate the safety management methods utilized on construction sites, and to assess the obstacles associated with construction site safety management. The study was conducted using a quantitative research method and a purposive sampling strategy. Google forms were used to distribute self-administered surveys to 85 responders. 72 of the 85 questionnaires were completed and submitted for analysis, accounting for 84.7 percent of the total. The variables were analyzed using descriptive statistics, mean score ranking, and Cronbach's Alpha Coefficient to ensure the scale's reliability. The formal safety organization structure and the Safety checklist were identified as the key practices of safety management on site as part of the study goals. In addition, it was discovered that the most serious problem with safety management is ineffective supervision. To guarantee efficient monitoring and proper implementation of health and safety rules on building sites, management must be on the ball.

Keywords: construction, safety, risk, management

Procedia PDF Downloads 46
16235 Risk Management in an Islamic Framework

Authors: Magid Maatallah

Abstract:

The problem is, investment management in modern conditions boils down to risk management which is very underdeveloped in Islamic financial theory and practice. Add to this the fact that, in Islamic perception, this is one of the areas of conventional finance in need of drastic reforms. This need was recently underlined by the story of Long Term Capital Management (LTCM ), ( told by Roger Lowenstein in his book, When Genius Failed, Random House, 2000 ). So we face a double challenge, to develop Islamic techniques of risk management and to see that these new techniques are free from the ills with which conventional methods are suffering. This is different from the challenge faced in the middle of twentieth century, to develop a method of financial intermediation free of interest.Risk was always there, especially in business. But industrialization brought risks unknown in trade and agriculture. Industrial production often involves long periods of time .The longer the period of production the more the uncertainty. The scope of the market has expanded to cover the whole world, introducing new kinds of risk. More than a thousand years ago, when Islamic laws were being written, the nature and scope of risk and uncertainty was different. However, something can still be learnt which, in combination with the modern experience, should enable us to realize the Shariah objectives of justice, fairness and efficiency.

Keywords: financial markets, Islamic framework, risk management, investment

Procedia PDF Downloads 519
16234 Diversification and Risk Management in Non-Profit Organisations: A Case Study

Authors: Manzurul Alam, John Griffiths, David Holloway, Megan Paull, Anne Clear

Abstract:

Background: This paper investigates the nature of risk management practices in non-profit organizations. It is argued here that the risk exposure of these organizations has increased as a result of their entrepreneurial activities. This study explores how a particular non-profit organization formulates its risk strategies in the face funding restrictions. Design/Method/Approach: The study adopts a case study approach to report the results on how a non-profit organization diversifies its activities, tackles risks arising from such activities and improves performance. Results: The findings show that the organization made structural adjustments and leadership changes which helped to adjust their risk strategies. It also reports the organizational processes to deal with risks arising from both related and unrelated diversification strategies. Implications: Any generalization from this case example needs to be taken with caution as there are significant differences between non-profit organizations operating in different sectors. Originality: The paper makes a significant contribution to the non-profit literature by highlighting the diversification strategies along with risk performance.

Keywords: risk management, performance management, non-profit organizations, financial management

Procedia PDF Downloads 490
16233 Schedule Risk Management for Complex Projects: The Royal Research Ship: Sir David Attenborough Case Study

Authors: Chatelier Charlene, Oyegoke Adekunle, Ajayi Saheed, Jeffries Andrew

Abstract:

This study seeks to understand Schedule Risk Assessments as a priori for better performance whilst exploring the strategies employed to deliver complex projects like the New Polar research ship. This high-profile vessel was offered to Natural Environment Research Council and British Antarctic Survey (BAS) by Cammell Laird Shipbuilders. The Research Ship was designed to support science in extreme environments, with the expectancy to provide a wide range of specialist scientific facilities, instruments, and laboratories to conduct research over multiple disciplines. Aim: The focus is to understand the allocation and management of schedule risk on such a Major Project. Hypothesising that "effective management of schedule risk management" could be the most critical factor in determining whether the intended benefits mentioned are delivered within time and cost constraints. Objective 1: Firstly, the study seeks to understand the allocation and management of schedule risk in Major Projects. Objective 2: Secondly, it explores "effective management of schedule risk management" as the most critical factor determining the delivery of intended benefits. Methodology: This study takes a retrospective review of schedule risk management and how it influences project performance using a case study approach for the RRS (Royal Research Ship) Sir David Attenborough. Research Contribution: The outcomes of this study will contribute to a better understanding of project performance whilst building on its under-researched relationship to schedule risk management for complex projects. The outcomes of this paper will guide further research on project performance and enable the understanding of how risk-based estimates over time impact the overall risk management of the project.

Keywords: complexity, major projects, performance management, schedule risk management, uncertainty

Procedia PDF Downloads 67
16232 Infection Risk of Fecal Coliform Contamination in Drinking Water Sources of Urban Slum Dwellers: Application of Quantitative Microbiological Risk Assessment

Authors: Sri Yusnita Irda Sari, Deni Kurniadi Sunjaya, Ardini Saptaningsih Raksanagara

Abstract:

Water is one of the fundamental basic needs for human life, particularly drinking water sources. Although water quality is getting better, fecal-contamination of water is still found around the world, especially in the slum area of mid-low income countries. Drinking water source contamination in urban slum dwellers increases the risk of water borne diseases. Low level of sanitation and poor drinking water supply known as risk factors for diarrhea, moreover bacteria-contaminated drinking water source is the main cause of diarrhea in developing countries. This study aimed to assess risk infection due to Fecal Coliform contamination in various drinking water sources in urban area by applying Quantitative Microbiological Risk Assessment (QMRA). A Cross-sectional survey was conducted in a period of August to October 2015. Water samples were taken by simple random sampling from households in Cikapundung river basin which was one of urban slum area in the center of Bandung city, Indonesia. About 379 water samples from 199 households and 15 common wells were tested. Half of the households used treated drinking water from water gallon mostly refill water gallon which was produced in drinking water refill station. Others used raw water sources which need treatment before consume as drinking water such as tap water, borehole, dug well and spring water source. Annual risk to get infection due to Fecal Coliform contamination from highest to lowest risk was dug well (1127.9 x 10-5), spring water (49.7 x 10-5), borehole (1.383 x 10-5) and tap water (1.121 x 10-5). Annual risk infection of refill drinking water was 1.577 x 10-5 which is comparable to borehole and tap water. Household water treatment and storage to make raw water sources drinkable is essential to prevent risk of water borne diseases. Strong regulation and intense monitoring of refill water gallon quality should be prioritized by the government; moreover, distribution of tap water should be more accessible and affordable especially in urban slum area.

Keywords: drinking water, quantitative microbiological risk assessment, slum, urban

Procedia PDF Downloads 251
16231 Non-Performing Assets and Credit Risk Performance: An Evidence of Commercial Banks in India

Authors: Sirus Sharifi, Arunima Haldar, S. V. D. Nageswara Rao

Abstract:

This research analyzes the effect of credit risk management practices of commercial banks in India and the relationship with their non-performing assets (NPAs). Required data on credit risk performance was collected through a survey questionnaire from top risk officers of 38 Indian banks. NPA data (period from 2012 to 2016) was collected from Prowess database compiled by the Centre for Monitoring Indian Economy (CMIE). The model was assessed utilizing cross sectional regression method. As expected, the results indicate a negative significant relationship between credit risk management in India banks and their NPA growth. The research has implications for banks given the high level of losses in India and other economies as well, and the implementation of Basel III standards by the central banks. This research would be an evidence on credit risk performance and its relationship with the level of non-performing assets (NPAs) in Indian banks.

Keywords: risk management, risk identification, banks, Non-Performing Assets (NPAs)

Procedia PDF Downloads 230
16230 Risk Management in Construction Projects

Authors: Mustafa Dogru, Ruveyda Komurlu

Abstract:

Companies and professionals in the construction sector face various risks in every project depending on the characteristics, size, complexity, the location of the projects and the techniques used. Some risks’ effects may increase as the project progresses whereas new risks may emerge. Because of the ever-changing nature of the risks, risk management is a cyclical process that needs to be repeated throughout the project. Since the risks threaten the success of the project, risk management is an important part of the entire project management process. The aims of this study are to emphasize the importance of risk management in construction projects, summarize the risk identification process, and introduce a number of methods for preventing risks such as alternative design, checklists, prototyping and test-analysis-correction technique etc. Following the literature review conducted to list the techniques for preventing risks, case studies has been performed to compare and evaluate the success of the techniques in a number of completed projects with the same typology, performed domestic and international. Findings of the study suggest that controlling and minimizing the level of the risks in construction projects, taking optimal precautions for different risks, and mitigating or eliminating the effects of risks are important in order to prevent additional costs for the project. Additionally, focusing on the risks that have highest impact is the most rational way to minimize the effects of the risks on projects.

Keywords: construction projects, construction management, project management, risk management

Procedia PDF Downloads 280
16229 Turkey Disaster Risk Management System Project (TAFRISK)

Authors: Ahmet Parlak, Celalettin Bilgen

Abstract:

In order to create an effective early warning system, Identification of the risks, preparation and carrying out risk modeling of risk scenarios, taking into account the shortcomings of the old disaster scenarios should be used to improve the system. In the light of this, the importance of risk modeling in creating an effective early warning system is understood. In the scope of TAFRISK project risk modeling trend analysis report on risk modeling developed and a demonstration was conducted for Risk Modeling for flood and mass movements. For risk modeling R&D, studies have been conducted to determine the information, and source of the information, to be gathered, to develop algorithms and to adapt the current algorithms to Turkey’s conditions for determining the risk score in the high disaster risk areas. For each type of the disaster; Disaster Deficit Index (DDI), Local Disaster Index (LDI), Prevalent Vulnerability Index (PVI), Risk Management Index (RMI) have been developed as disaster indices taking danger, sensitivity, fragility, and vulnerability, the physical and economic damage into account in the appropriate scale of the respective type.

Keywords: disaster, hazard, risk modeling, sensor

Procedia PDF Downloads 395
16228 Influence of Non-Carcinogenic Risk on Public Health

Authors: Gulmira Umarova

Abstract:

The data on the assessment of the influence of environmental risk to the health of the population of Uralsk in the West region of Kazakhstan were presented. Calculation of non-carcinogenic risks was performed for such air pollutants as sulfur dioxide, nitrogen oxides, hydrogen sulfide, carbon monoxide. Here with the critical organs and systems, which are affected by the above-mentioned substances were taken into account. As well as indicators of primary and general morbidity by classes of diseases among the population were considered. The quantitative risk of the influence of substances on organs and systems is established by results of the calculation.

Keywords: environment, health, morbidity, non-carcinogenic risk

Procedia PDF Downloads 89
16227 Risk Management in Islamic Banks: A Case Study of the Faisal Islamic Bank of Egypt

Authors: Mohamed Saad Ahmed Hussien

Abstract:

This paper discusses the risk management in Islamic banks and aims to determine the difference in the practices and methods of risk management in those banks compared to the conventional banks, and to make a case study of the biggest Islamic bank in Egypt (Faisal Islamic Bank of Egypt) to identify the most important financial risks faced and how to manage those risks. It was found that Islamic banks face two types of risks. The first type is similar to the risks in conventional banks; the second type is the additional risks which facing the Islamic banks only as a result of some Islamic modes of financing. With regard to the risk management, Islamic banks such as conventional banks applied the regulatory rules issued by the Central Banks and the Basel Committee; Islamic banks also applied the instructions and procedures issued by the Islamic Financial Services Board (IFSB). Also, Islamic banks are similar to the conventional banks in the practices and methods which they use to manage the risks. And there are some factors that may affect the risk management in Islamic banks, such as the size of the bank and the efficiency of the administration and the staff of the bank.

Keywords: conventional banks, Faisal Islamic Bank of Egypt, Islamic banks, risk management

Procedia PDF Downloads 429
16226 Development of Risk Assessment and Occupational Safety Management Model for Building Construction Projects

Authors: Preeda Sansakorn, Min An

Abstract:

In order to be capable of dealing with uncertainties, subjectivities, including vagueness arising in building construction projects, the application of fuzzy reasoning technique based on fuzzy set theory is proposed. This study contributes significantly to the development of a fuzzy reasoning safety risk assessment model for building construction projects that could be employed to assess the risk magnitude of each hazardous event identified during construction, and a third parameter of probability of consequence is incorporated in the model. By using the proposed safety risk analysis methodology, more reliable and less ambiguities, which provide the safety risk management project team for decision-making purposes.

Keywords: safety risk assessment, building construction safety, fuzzy reasoning, construction risk assessment model, building construction projects

Procedia PDF Downloads 455
16225 Public Participation for an Effective Flood Risk Management: Building Social Capacities in Ribera Alta Del Ebro, Spain

Authors: Alba Ballester Ciuró, Marc Pares Franzi

Abstract:

While coming decades are likely to see a higher flood risk in Europe and greater socio-economic damages, traditional flood risk management has become inefficient. In response to that, new approaches such as capacity building and public participation have recently been incorporated in natural hazards mitigation policy (i.e. Sendai Framework for Action, Intergovernmental Panel on Climate Change reports and EU Floods Directive). By integrating capacity building and public participation, we present a research concerning the promotion of participatory social capacity building actions for flood risk mitigation at the local level. Social capacities have been defined as the resources and abilities available at individual and collective level that can be used to anticipate, respond to, cope with, recover from and adapt to external stressors. Social capacity building is understood as a process of identifying communities’ social capacities and of applying collaborative strategies to improve them. This paper presents a proposal of systematization of participatory social capacity building process for flood risk mitigation, and its implementation in a high risk of flooding area in the Ebro river basin: Ribera Alta del Ebro. To develop this process, we designed and tested a tool that allows measuring and building five types of social capacities: knowledge, motivation, networks, participation and finance. The tool implementation has allowed us to assess social capacities in the area. Upon the results of the assessment we have developed a co-decision process with stakeholders and flood risk management authorities on which participatory activities could be employed to improve social capacities for flood risk mitigation. Based on the results of this process, and focused on the weaker social capacities, we developed a set of participatory actions in the area oriented to general public and stakeholders: informative sessions on flood risk management plan and flood insurances, interpretative river descents on flood risk management (with journalists, teachers, and general public), interpretative visit to the floodplain, workshop on agricultural insurance, deliberative workshop on project funding, deliberative workshops in schools on flood risk management (playing with a flood risk model). The combination of obtaining data through a mixed-methods approach of qualitative inquiry and quantitative surveys, as well as action research through co-decision processes and pilot participatory activities, show us the significant impact of public participation on social capacity building for flood risk mitigation and contributes to the understanding of which main factors intervene in this process.

Keywords: flood risk management, public participation, risk reduction, social capacities, vulnerability assessment

Procedia PDF Downloads 180
16224 Management Strategies for Risk Events in Construction Industries during Economic Situation and COVID-19 Pandemic in Nigeria

Authors: Ezeabasili Chibuike Patrick

Abstract:

The complex situation of construction industries in Nigeria and the risk of failures involved includes cost overrun, time overrun, Corruption, Government influence, Subcontractor challenges, Political influence and Instability, Cultural differences, Human resources deficiencies, cash flow Challenges, foreign exchange issues, inadequate design, Safety, low productivity, late payment, Quality control issues, project management issues, Environmental issues, Force majeure Competition amongst others has made the industry prone to risk and failures. Good project management remains effective in improving decision-making, which minimizes these risk events. This study was done to address these project risks and good decision-making to avert them. A mixed-method approach to research was used to do this study. Data collected by questionnaires and interviews on thirty-two (32) construction professionals was used in analyses to aid the knowledge and management of risks that were identified. The study revealed that there is no good risk management expertise in Nigeria. Also, that the economic/political situation and the recent COVID-19 pandemic has added to the risk and poor management strategies. The contingency theory and cost has therefore surfaced to be the most strategic management method used to reduce these risk issues and they seem to be very effective.

Keywords: strategies, risk management, contingency theory, Nigeria

Procedia PDF Downloads 96
16223 Environmental Governance and Opportunities for Disaster Risk Reduction in Nigeria

Authors: Willie Eselebor

Abstract:

Environmental governance is not new, but may consist of a series of actions taken to establish sanity and ensure sustainable environment. While there is a growing accord linking disaster risk reduction with the management of environment and natural resources, little is known about failure to act which constitute vulnerability and how improved governance reduces risk globally. The paper reviews emerging trends in the field of application of governance tools and approaches for reducing disaster risk. The Hyogo Framework for Action (HFA) enjoin all stakeholders to stimulate the sustainable use and management of ecosystems, which promote the implementation of integrated environmental and natural resource planning that incorporate disaster risk reduction, including structural and non-structural measures, such as integrated management of fragile ecosystems. The methodology adopted is a case study of disaster-prone sites, prompting guided analysis on which hazards are traceable to environmental degradation, why a degraded environment reduces community resilience; how healthy ecosystems provide natural defense, and which opportunities exist to address gaps in reduction of disasters in Nigeria. The paper further analyses the interaction between disaster risk and environmental change. It is established that environmental governance remains a challenge; which implies that there is the need for a shift in traditional approaches to disaster risk management; exploring new initiatives and allowing environmental managers to be docketed as disaster risk managers in context, potentially opening up a window of dialogue on disaster risk management.

Keywords: disaster, ecosystem, environment, risk

Procedia PDF Downloads 322
16222 Co-integration for Soft Commodities with Non-Constant Volatility

Authors: E. Channol, O. Collet, N. Kostyuchyk, T. Mesbah, Quoc Hoang Long Nguyen

Abstract:

In this paper, a pricing model is proposed for co-integrated commodities extending Larsson model. The futures formulae have been derived and tests have been performed with non-constant volatility. The model has been applied to energy commodities (gas, CO2, energy) and soft commodities (corn, wheat). Results show that non-constant volatility leads to more accurate short term prices, which provides better evaluation of value-at-risk and more generally improve the risk management.

Keywords: co-integration, soft commodities, risk management, value-at-risk

Procedia PDF Downloads 524