9353 Interface Problems in Construction Projects

Authors: Puti F. Marzuki, Adrianto Oktavianus, Almerinda Regina

Abstract:

Interface problems among interacting parties in Indonesian construction projects have most often led to low productivity and completion delay. In the midst of this country’s needs to accelerate construction of public infrastructure providing connectivity among regions and supporting economic growth as well as better living quality, project delays have to be seriously addressed. This paper identifies potential causes factors of interface problems experienced by construction projects in Indonesia. Data are collected through a survey involving the main actors of six important public infrastructure construction projects including railway, LRT, sports stadiums, apartment, and education building construction projects. Five of these projects adopt the design-build project delivery method and one applies the design-bid-build scheme. Interface problems’ potential causes are categorized into contract, management, technical experience, coordination, financial, and environmental factors. Research results reveal that, especially in railway and LRT projects, potential causes of interface problems are mainly technical and managerial in nature. These relate to complex construction execution in highly congested areas. Meanwhile, coordination cause factors are mainly found in the education building construction project with loan from a foreign donor. All of the six projects have to resolve interface problems caused by incomplete or low-quality contract documents. This research also shows that the design-bid-build delivery method involving more parties in construction projects tends to induce more interface problem cause factors than the design-build scheme.

Keywords: cause factors, construction delays, project delivery method, contract documents

Procedia PDF Downloads 225
9352 Contractors Perspective on Causes of Delays in Power Transmission Projects

Authors: Goutom K. Pall

Abstract:

At the very heart of the power system, power transmission (PT) acts as an essential link between power generation and distribution. Timely completion of PT infrastructures is therefore crucial to support the development of power system as a whole. Yet despite the importance, studies on PT infrastructure development projects are embryonic and, hence, PT projects undergoing widespread delays worldwide. These delay factors are idiosyncratic and identifying the critical delay factors is essential if the PT industry professionals are to complete their projects efficiently and within the expected timeframes. This study identifies and categorizes 46 causes of PT project delay under ten major groups using six sector expert’s recommendations studied by a preliminary questionnaire survey. Based on the experts’ strong recommendations, two new groups are introduced in the final questionnaire survey: sector specific factors (SSF) and general factors (GF). SSF pertain to delay factors applicable only to the PT projects, while GF represents less biased samples with shared responsibilities of all project parties involved in a project. The study then uses 112 data samples from the contractors to rank the delay factors using relative importance index (RII). The results reveal that SSF, GF and external factors are the most critical groups, while the highest ranked delay factors include the right of way (RoW) problems of transmission lines (TL), delay in payments, frequent changes in TL routes, poor communication and coordination among the project parties and accessibility to TL tower locations. Finally, recommendations are made to minimize the identified delay. The findings are expected to be of substantial benefit to professionals in minimizing time overrun in PT projects implementation, as well as power generation, power distribution, and non-power linear construction projects worldwide.

Keywords: delay, project delay, power transmission projects, time-overruns

Procedia PDF Downloads 146
9351 Infrastructure Investment Law Formulation to Ensure Low Transaction Cost at Policy Level: Case Study of Public Private Partnership Project at the Ministry of Public Works and Housing of the Republic of Indonesia

Authors: Yolanda Indah Permatasari, Sudarsono Hardjosoekarto

Abstract:

Public private partnership (PPP) scheme was considered as an alternative source of funding for infrastructure provision. However, the performance of PPP scheme and interest of private sector to participate in the provision of infrastructure was still practically low. This phenomenon motivates the research to reconstruct the form of collaborative governance at the policy level from the perspective of transaction cost of the PPP scheme. Soft-system methodology (SSM)-based action research was used as this research methodology. The result of this study concludes that the emergence of transaction cost sources at the policy level is caused by the absence of a law that governs infrastructure investment, especially the implementation of PPP scheme. This absence is causing the imbalance in risk allocation and risk mitigation between the public and private sector. Thus, this research recommended the formulation of infrastructure investment law that aims to minimize asymmetry information, to anticipate the principal-principal problems, and to provide legal basis that ensures risk certainty and guarantee fair risk allocation between public and private sector.

Keywords: public governance, public private partnership, soft system methodology, transaction cost

Procedia PDF Downloads 109
9350 Employee Perception of Corporate Social Responsibility and Its Impact on Organizational Performance: Evidence from the UAE

Authors: Sherine Farouk, Fauzia Jabeen

Abstract:

The purpose of this study is to examine the role played by ethical climate and CSR on organizational performance in public sector organizations. In particular, the research will shed light on the link between formalized ethical procedures and employee responses including corporate social responsibility, and organizational performance among public sector employees. Data was collected from 425 employees working in public sector organizations in Abu Dhabi, the capital of United Arab Emirates. Structural Equation Modeling will be used to test the proposed hypotheses. The paper contributes to the literature by being one of the first to study CSR and ethical climate within a Middle Eastern context, and will offer important implications for theory and practice.

Keywords: corporate social responsibility, ethical climate, organizational performance, United Arab Emirates

Procedia PDF Downloads 301
9349 Linking Sustainable Public Procurement and the Sustainable Development Goals Targets in Zambia: A Preliminary Investigation

Authors: Charles P. Mukumba, Kahilu K. Shakantu

Abstract:

Achieving the Sustainable Development Goals [SDGs] is a key to achieving transformational results that support Zambia’s development. Public procurement is an integral to the government’s mission to deliver goods and services, in a timely and economic manner beyond the value of money spent. This study explores the link between sustainable public procurement and the SDG targets in Zambia. And to validate the established links with the public sector procurement in Zambia. The study employed qualitative research using semi-structured interviews with 18 public procurement officials. The collected data was analysed using thematic analysis. The findings indicate that public procurement plays a fundamental role in achieving the sustainable development goals [SDGs] by helping to deliver core public services that support SDGs and also by systematising and co-delivering added value along the way. The study further established the importance of sustainable public procurement within the context of development. The interviews were limited to mainstream public sector procurement entities in Lusaka, Zambia. Sustainable public procurement actions have the potential to impact SDG goals. Promoting sustainable public procurement will enhance sustainable development and significantly improve supply chain that would benefit the economy, society and environment. Findings will inform policy-makers how to strategically design sustainable public procurement policy by attuning it to procuring entities objectives and priorities in order to contribute to the attainment of SDGs.

Keywords: sustainable public procurement, sustainable development goals, target, Zambia

Procedia PDF Downloads 90
9348 Tender Systems and Processes within the Mauritian Construction Industry: Investigating the Predominance of International Firms and the Lack of Absorptive Capacity in Local Firms

Authors: K. Appasamy, P. Paul

Abstract:

Mauritius, a developing small-island-state, is facing a recession which is having a considerable economic impact particularly on its construction sector. Further, the presence of foreign entities, both as companies and workers, within this sector is creating a very competitive environment for local firms. This study investigates the key drivers that allow foreign firms to participate in this sector, in particular looking at the international and local tender processes, and the capacity of local industry to participate. This study also looks at how the current set up may hinder the latter’s involvement. The methodology used included qualitative semi-structured interviews conducted with established foreign companies, local companies, and public bodies. Study findings indicate: there is an adequate availability of professional skills and expertise within the Mauritian construction industry but a lack of skilled labour especially at the operative level; projects awarded to foreign firms are either due to their uniqueness and hence lack of local knowledge, or due to foreign firms having lower tender bids; tendering systems and processes are weak, including monitoring and enforcement, which encourages corruption and favouritism; a high level of ignorance of this sector’s characteristics and opportunities exists amongst the local population; local entities are very profit oriented and have short term strategies that discourage long term investment in workforce training and development; but most importantly, stakeholders do not grasp the importance of encouraging youngsters to join this sector, they have no long term vision, and there is a lack of mutual involvement and collaboration between them. Although local industry is highly competent, qualified and experienced, the tendering and procurement systems in Mauritius are not conducive enough to allow for effective strategic planning and an equitable allocation of projects during an economic downturn so that the broadest spread of stakeholders’ benefit. It is of utmost importance that all sector and government entities collaborate to formulate strategies and reforms on tender processes and capacity building to ensure fairness and continuous growth of this sector in Mauritius.

Keywords: construction industry, tender process, international firms, local capacity, Mauritius

Procedia PDF Downloads 295
9347 Hybrid Risk Assessment Model for Construction Based on Multicriteria Decision Making Methods

Authors: J. Tamosaitiene

Abstract:

The article focuses on the identification and classification of key risk management criteria that represent the most important sustainability aspects of the construction industry. The construction sector is one of the most important sectors in Lithuania. Nowadays, the assessment of the risk level of a construction project is especially important for the quality of construction projects, the growth of enterprises and the sector. To establish the most important criteria for successful growth of the sector, a questionnaire for experts was developed. The analytic hierarchy process (AHP), the expert judgement method and other multicriteria decision making (MCDM) methods were used to develop the hybrid model. The results were used to develop an integrated knowledge system for the measurement of a risk level particular to construction projects. The article presents a practical case that details the developed system, sustainable aspects, and risk assessment.

Keywords: risk, system, model, construction

Procedia PDF Downloads 134
9346 Diplomatic Public Relations Techniques for Official Recognition of Palestine State in Europe

Authors: Bilgehan Gultekin, Tuba Gultekin

Abstract:

Diplomatic public relations gives an ideal concept for recognition of palestine state in all over the europe. The first step of official recognition is approval of palestine state in international political organisations such as United Nations and Nato. So, diplomatic public relations provides a recognition process in communication scale. One of the aims of the study titled “Diplomatic Public Relations Techniques for Recognition of Palestine State in Europe” is to present some communication projects on diplomatic way. The study also aims at showing communication process at diplomatic level. The most important level of such kind of diplomacy is society based diplomacy. Moreover,The study provides a wider perspective that gives some creative diplomatic communication strategies for attracting society. To persuade the public for official recognition also is key element of this process. The study also finds new communication routes including persuasion techniques for society. All creative projects are supporting parts in original persuasive process of official recognition of Palestine.

Keywords: diplomatic public relations, diplomatic communication strategies, diplomatic communication, public relations

Procedia PDF Downloads 412
9345 A Conceptual Stakeholder Engagement Model for Change Management in the South African Public Sector

Authors: Mokgata Matjie, Sibo Mayime

Abstract:

The 4IR brought with it an inevitable need for change in all organisations, regardless of sector. As a member of the global community, South African organisations are bound to experience the 4IR pressure, and the need to digitize becomes unavoidable. The South African government sector has various departments, of which one of them is the land administration solely responsible for the registration, management, and maintenance of the property registry of South Africa. For the past many years, the registration of deeds was done manually, ranging from 7-10 days, with lots and loads of paperwork handled manually by conveyancers and Registry Clerks. Some information might get lost during the registration period, thus delaying the whole process. This conceptual paper proposes ways to digitalize the land administration office by consulting all relevant literature and ultimately developing a theoretical change management framework for all public sector organisations in South Africa. Change is inevitable, but careful consideration is necessary in terms of consulting all relevant stakeholders for their buy-in and successful implementation of digitalization. The developed framework will serve as a theoretical basis for the empirical research envisaged as a PhD study.

Keywords: stakeholders, engagement, change management, land administration, digitalisation, South African public sector

Procedia PDF Downloads 72
9344 Empirical Analysis of Forensic Accounting Practices for Tackling Persistent Fraud and Financial Irregularities in the Nigerian Public Sector

Authors: Sani AbdulRahman Bala

Abstract:

This empirical study delves into the realm of forensic accounting practices within the Nigerian Public Sector, seeking to quantitatively analyze their efficacy in addressing the persistent challenges of fraud and financial irregularities. With a focus on empirical data, this research employs a robust methodology to assess the current state of fraud in the Nigerian Public Sector and evaluate the performance of existing forensic accounting measures. Through quantitative analyses, including statistical models and data-driven insights, the study aims to identify patterns, trends, and correlations associated with fraudulent activities. The research objectives include scrutinizing documented fraud cases, examining the effectiveness of established forensic accounting practices, and proposing data-driven strategies for enhancing fraud detection and prevention. Leveraging quantitative methodologies, the study seeks to measure the impact of technological advancements on forensic accounting accuracy and efficiency. Additionally, the research explores collaborative mechanisms among government agencies, regulatory bodies, and the private sector by quantifying the effects of information sharing on fraud prevention. The empirical findings from this study are expected to provide a nuanced understanding of the challenges and opportunities in combating fraud within the Nigerian Public Sector. The quantitative insights derived from real-world data will contribute to the refinement of forensic accounting strategies, ensuring their effectiveness in addressing the unique complexities of financial irregularities in the public sector. The study's outcomes aim to inform policymakers, practitioners, and stakeholders, fostering evidence-based decision-making and proactive measures for a more resilient and fraud-resistant financial governance system in Nigeria.

Keywords: fraud, financial irregularities, nigerian public sector, quantitative investigation

Procedia PDF Downloads 20
9343 Implementation of Total Quality Management in Public Sector: Case of Tunisia

Authors: Rafla Hchaichi

Abstract:

The public administration is currently experiencing in the field of quality unprecedented effervescence. However, in a globalized world more and more competitive, public services are confronted with the need to improve their performances which push public companies to implement quality approaches. Quality approaches have taken diverse forms such as service commitment, labels, certifications and the Common Assessment Framework. This paper provides an overview on the strategy for administrative development in Tunisia since the Carthaginian civilization until today. It outlines the evolution of quality management in the Tunisian public context while focusing on the National Referential of Quality of Administrative Services.

Keywords: quality approach, the common assessment framework, service commitment, label, certification, quality of public service, performance of public service, Tunisian Public Service

Procedia PDF Downloads 516
9342 Knowledge Management in Public Sector Employees: A Case Study of Training Participants at National Institute of Management, Pakistan

Authors: Muhammad Arif Khan, Haroon Idrees, Imran Aziz, Sidra Mushtaq

Abstract:

The purpose of this study is to investigate the current level of knowledge mapping skills of the public sector employees in Pakistan. National Institute of Management is one of the premiere public sector training organization for mid-career public sector employees in Pakistan. This study is conducted on participants of fourteen weeks long training course called Mid-Career Management Course (MCMC) which is mandatory for public sector employees in order to ascertain how to enhance their knowledge mapping skills. Methodology: Researcher used both qualitative and quantitative approach to conduct this study. Primary data about current level of participants’ understanding of knowledge mapping was collected through structured questionnaire. Later on, Participant Observation method was used where researchers acted as part of the group to gathered data from the trainees during their performance in training activities and tasks. Findings: Respondents of the study were examined for skills and abilities to organizing ideas, helping groups to develop conceptual framework, identifying critical knowledge areas of an organization, study large networks and identifying the knowledge flow using nodes and vertices, visualizing information, represent organizational structure etc. Overall, the responses varied in different skills depending on the performance and presentations. However, generally all participants have demonstrated average level of using both the IT and Non-IT K-mapping tools and techniques during simulation exercises, analysis paper de-briefing, case study reports, post visit presentation, course review, current issue presentation, syndicate meetings, and daily synopsis. Research Limitations: This study is conducted on a small-scale population of 67 public sector employees nominated by federal government to undergo 14 weeks extensive training program called MCMC (Mid-Career Management Course) at National Institute of Management, Peshawar, Pakistan. Results, however, reflects only a specific class of public sector employees i.e. working in grade 18 and having more than 5 years of work. Practical Implications: Research findings are useful for trainers, training agencies, government functionaries, and organizations working for capacity building of public sector employees.

Keywords: knowledge management, km in public sector, knowledge management and professional development, knowledge management in training, knowledge mapping

Procedia PDF Downloads 228
9341 Framework for Government ICT Projects

Authors: Manal Rayes

Abstract:

In its efforts to utilize the information and communication technology to enhance the quality of public service delivery, national and local governments around the world are competing to introduce more ICT applications as tools to automate processes related to law enforcement or policy execution, increase citizen orientation, trust, and satisfaction, and create one-stop-shops for public services. In its implementation, e-Government ICTs need to maintain transparency, participation, and collaboration. Due to this diverse of mixed goals and requirements, e-Government systems need to be designed based on special design considerations in order to eliminate the risks of failure to compliance to government regulations, citizen dissatisfaction, or market repulsion. In this article we suggest a framework with guidelines for designing government information systems that takes into consideration the special requirements of the public sector. Then we introduce two case studies and show how applying those guidelines would result in a more solid system design.

Keywords: e-government, framework, guidelines, system design

Procedia PDF Downloads 327
9340 An Investigation of E-Government by Using GIS and Establishing E-Government in Developing Countries Case Study: Iraq

Authors: Ahmed M. Jamel

Abstract:

Electronic government initiatives and public participation to them are among the indicators of today's development criteria of the countries. After consequent two wars, Iraq's current position in, for example, UN's e-government ranking is quite concerning and did not improve in recent years, either. In the preparation of this work, we are motivated with the fact that handling geographic data of the public facilities and resources are needed in most of the e-government projects. Geographical information systems (GIS) provide most common tools not only to manage spatial data but also to integrate such type of data with nonspatial attributes of the features. With this background, this paper proposes that establishing a working GIS in the health sector of Iraq would improve e-government applications. As the case study, investigating hospital locations in Erbil is chosen.

Keywords: e-government, GIS, Iraq, Erbil

Procedia PDF Downloads 355
9339 The Role of Urban Design in Creating Cohesive and People’s Public Spaces

Authors: Hazem Abuorf

Abstract:

From the perspective of viewing urban design as the architecture of public spaces, the latter has many advantages; for example, in achieving attractive and vibrant public spaces, ensuring safety and amenity, supporting a strong sense of place and local character. Besides all advantages, such spaces nevertheless trigger numerous dilemmas, how to design urban spaces preserving the quality of life in the long term while equally achieving cohesion between new urban developments and the already existing urban structure without causing a split in history through the cause of functional and aesthetic degradation. Analysis of this article seeks to propose a methodology deemed essential for assessing and stimulating design criteria of the public spaces when rehabilitating urban sites. The method’s utility is shown by analyzing rehabilitation projects in Gaza Strip, whose design of the public spaces has mainly focused on the physical aspect ignoring the place’s local identity, users’ needs, and history. The proposed methodology serves as a guide for municipal authorities and technical teams to deal with interventions that would rework the role of urban design towards making sense of place.

Keywords: urban design, public realm, rehabilitation projects, quality of life

Procedia PDF Downloads 127
9338 Pawn or Potentates: Corporate Governance Structure in Indian Central Public Sector Enterprises

Authors: Ritika Jain, Rajnish Kumar

Abstract:

The Department of Public Enterprises had made submissions of Self Evaluation Reports, for the purpose of corporate governance, mandatory for all central government owned enterprises. Despite this, an alarming 40% of the enterprises did not do so. This study examines the impact of external policy tools and internal firm-specific factors on corporate governance of central public sector enterprises (CPSEs). We use a dataset of all manufacturing and non-financial services owned by the central government of India for the year 2010-11. Using probit, ordered logit and Heckman’s sample selection models, the study finds that the probability and quality of corporate governance is positively influenced by the CPSE getting into a Memorandum of Understanding (MoU) with the central government of India, and hence, enjoying more autonomy in terms of day to day operations. Besides these, internal factors, including bigger size and lower debt size contribute significantly to better corporate governance.

Keywords: corporate governance, central public sector enterprises (CPSEs), sample selection, Memorandum of Understanding (MoU), ordered logit, disinvestment

Procedia PDF Downloads 229
9337 Co-Creating Value between Public Financial Management Institutions: An Integrated Approach towards Financial Sustainability

Authors: Pascal Horni, Sandro Fuchs

Abstract:

In presence of increasing deficits and public debt among OECD countries, the debate on fiscal disciple and mechanisms to constrain public spending policy heated up and gave rise to the institutionalization of fiscal rules. Considering the notions from political economy literature and the therein advocated axiom of maximization of votes, introduction of institutional mechanisms and rules to govern public spending is likely to be coined by electoral motives. While there exists a series of research concerned with the rise of creative accounting in the presence fiscal rules, implementation of accrual government accounting and its impact on the biting of fiscal rules has to authors’ best knowledge never been explored. This paper serves the illumination of the connection between debt break mechanisms and the adoption of accrual public sector accounting standards such as the IPSAS in the interface of political economy in the Swiss context. By explicitly considering the technical accounting dimension, this paper develops an integrated conceptual view on well-established Public Financial Management (PFM) institutions and elaborates how their interdependencies can co-create value with regard to the contemporary challenge of fiscal sustainability. Derivation of this integrated view follows an explorative approach, taking into account expert interviews with director level staff from cantonal finance administrations and policy documents, as well as literature from both research areas – public sector accounting and political economy.

Keywords: accounting, fiscal rules, International Public Sector Accounting Standards (IPSAS), public financial management

Procedia PDF Downloads 134
9336 Urban Gamification: Analyzing the Effects of UFLab’s Tangible Gamified Tools in Four Hungarian Urban Public Participation Processes

Authors: Olivia Kurucz

Abstract:

Gamification is one of the outstanding new methodological possibilities of urban public participation processes to make the most informed decision possible for the future steps of urban development. This paper examines four Hungarian experimental projects in which gamified tools were applied during the public participation progresses by the Urban Future Laboratory (UFLab) research workshop of Budapest University of Technology and Economics (BUTE). The recently implemented future planning projects (in the cities of Pécel, Kistarcsa, Budapest, and Salgótarján) were initiated by various motives, but the multi-stakeholder dialogues were facilitated through physical gamified tools in all cases. Based on the urban gamification hypothesis, the use of gamified tools supported certain steps of participatory processes in several aspects: it helped to increase the attractiveness of public events, to create a more informal atmosphere, to ensure equal conditions for actors, to recall a design mindset, to bridge contrasting social or cultural differences, to fix opinions and to assist dialogue between city actors, designers, and residents. This statement is confirmed by assessing the applied tools, analyzing the case studies, and comparing them to perceive their effects and interrelations.

Keywords: experimental projects, future planning, gamification, gamified tools, Hungary, public participation, UFLab, urban gamification

Procedia PDF Downloads 109
9335 Reconceptualizing “Best Practices” in Public Sector

Authors: Eftychia Kessopoulou, Styliani Xanthopoulou, Ypatia Theodorakioglou, George Tsiotras, Katerina Gotzamani

Abstract:

Public sector managers frequently herald that implementing best practices as a set of standards, may lead to superior organizational performance. However, recent research questions the objectification of best practices, highlighting: a) the inability of public sector organizations to develop innovative administrative practices, as well as b) the adoption of stereotypical renowned practices inculcated in the public sector by international governance bodies. The process through which organizations construe what a best practice is, still remains a black box that is yet to be investigated, given the trend of continuous changes in public sector performance, as well as the burgeoning interest of sharing popular administrative practices put forward by international bodies. This study aims to describe and understand how organizational best practices are constructed by public sector performance management teams, like benchmarkers, during the benchmarking-mediated performance improvement process and what mechanisms enable this construction. A critical realist action research methodology is employed, starting from a description of various approaches on best practice nature when a benchmarking-mediated performance improvement initiative, such as the Common Assessment Framework, is applied. Firstly, we observed the benchmarker’s management process of best practices in a public organization, so as to map their theories-in-use. As a second step we contextualized best administrative practices by reflecting the different perspectives emerged from the previous stage on the design and implementation of an interview protocol. We used this protocol to conduct 30 semi-structured interviews with “best practice” process owners, in order to examine their experiences and performance needs. Previous research on best practices has shown that needs and intentions of benchmarkers cannot be detached from the causal mechanisms of the various contexts in which they work. Such causal mechanisms can be found in: a) process owner capabilities, b) the structural context of the organization, and c) state regulations. Therefore, we developed an interview protocol theoretically informed in the first part to spot causal mechanisms suggested by previous research studies and supplemented it with questions regarding the provision of best practice support from the government. Findings of this work include: a) a causal account of the nature of best administrative practices in the Greek public sector that shed light on explaining their management, b) a description of the various contexts affecting best practice conceptualization, and c) a description of how their interplay changed the organization’s best practice management.

Keywords: benchmarking, action research, critical realism, best practices, public sector

Procedia PDF Downloads 102
9334 Template Design Packages for Repetitive Construction Projects

Authors: Ali Youniss Aidbaiss, G. Unnikrishnan, Anoob Hakim

Abstract:

Scope changes, scope creeps, cost and time overruns have become common in projects in the oil and gas sector. Even in repetitive projects, failure to implement lessons learnt and correct past mistakes have resulted in various setbacks. This paper describes the concept of reusing successfully implemented design packages as templates for repetitive projects, and thereby lowering the instances of project failures. Units or systems successfully installed in projects can be identified and taken up for preparing template design packages. Standardization of units and systems helps to develop templates from successful designs which can be repeatedly used with confidence. These packages can be used with minimum modifications for developing FEED packages faster, saving cost and other valuable resources. Lessons learnt from the completed project incorporated in the templates avoid repeating past mistakes during detailed design, procurement and execution. With template packages, consistent quality can be maintained for similar projects, avoiding scope creep and scope changes which will ultimately result in cost and time savings.

Keywords: engineering work package, repetitive construction, template design package, time saving in projects

Procedia PDF Downloads 285
9333 Performance Management in Public Administration on Chile and Portugal

Authors: Lilian Bambirra De Assis, Patricia Albuquerque Gomes, Kamila Pagel De Oliveira, Deborah Oliveira Santos, Marcelo Esteves Chaves Campos

Abstract:

This paper aimed to analyze how performance management occurs in the context of the modernization of the federal public sector in Chile and Portugal. To do so, the study was based on a theoretical framework that covers the modernization of public administration to performance management, passing on people management. The work consisted of qualitative-descriptive research in which 16 semi-structured interviews were applied in the countries of study and documents and legislation were used referring to the subject. Performance management, as well as other people management subsystems, is criticized for using private sector management tools, based on a results-driven logic. From this point of view, it is understood that certain practices of the private sector, regarding the measurement of performance, can not be simply inserted in the scenario of the public administration. Beyond this criticism, performance management can contribute to the achievement of the strategic objectives of the countries and its focus is upward, a trend that can be verified through the manuals produced; by the interest of consultants and professional organizations, both public and private; and OECD (Organization for Economic Cooperation and Development) evaluations. In Portugal, public administration reform was implemented during the Constitutional Government (2005-2009) and had as its objective the restructuring of human resources management, with an emphasis on its integration with budget management, which is an inclination of the OECD, while in Chile HRM (Human Resource Management) practices are directed to ministries to a lesser extent than the OECD average. The central human resources management sector, for the most part, coordinates policy but is also responsible for other issues, including payment and classification systems. Chile makes less use of strategic Human Resource Management practices than the average of OECD countries, and its prominence lies in the decentralization of public bodies, which may grant autonomy, but fragments the implementation of policies and practices in that country since they are not adopted by all organs. Through the analysis, it was possible to identify that Chile and Portugal have practices and personnel management policies that make reference to performance management, which is similar to other OECD countries. The study countries also have limitations to implement performance management and the results indicate that there are still processes to be perfected, such as performance appraisal and compensation.

Keywords: management of people in the public sector, modernization of public administration, performance management in the public sector, HRM, OECD

Procedia PDF Downloads 122
9332 Developing a Web-Based Tender Evaluation System Based on Fuzzy Multi-Attributes Group Decision Making for Nigerian Public Sector Tendering

Authors: Bello Abdullahi, Yahaya M. Ibrahim, Ahmed D. Ibrahim, Kabir Bala

Abstract:

Public sector tendering has traditionally been conducted using manual paper-based processes which are known to be inefficient, less transparent and more prone to manipulations and errors. The advent of the Internet and the World Wide Web has led to the development of numerous e-Tendering systems that addressed some of the problems associated with the manual paper-based tendering system. However, most of these systems rarely support the evaluation of tenders and where they do it is mostly based on the single decision maker which is not suitable in public sector tendering, where for the sake of objectivity, transparency, and fairness, it is required that the evaluation is conducted through a tender evaluation committee. Currently, in Nigeria, the public tendering process in general and the evaluation of tenders, in particular, are largely conducted using manual paper-based processes. Automating these manual-based processes to digital-based processes can help in enhancing the proficiency of public sector tendering in Nigeria. This paper is part of a larger study to develop an electronic tendering system that supports the whole tendering lifecycle based on Nigerian procurement law. Specifically, this paper presents the design and implementation of part of the system that supports group evaluation of tenders based on a technique called fuzzy multi-attributes group decision making. The system was developed using Object-Oriented methodologies and Unified Modelling Language and hypothetically applied in the evaluation of technical and financial proposals submitted by bidders. The system was validated by professionals with extensive experiences in public sector procurement. The results of the validation showed that the system called NPS-eTender has an average rating of 74% with respect to correct and accurate modelling of the existing manual tendering domain and an average rating of 67.6% with respect to its potential to enhance the proficiency of public sector tendering in Nigeria. Thus, based on the results of the validation, the automation of the evaluation process to support tender evaluation committee is achievable and can lead to a more proficient public sector tendering system.

Keywords: e-Tendering, e-Procurement, group decision making, tender evaluation, tender evaluation committee, UML, object-oriented methodologies, system development

Procedia PDF Downloads 235
9331 The Iraqi Fibre-to-the-Home Networks, Problems, Challenges, and Solutions along with Less Expense

Authors: Hasanein Hasan, Mohammed Al-Taie, Basil Shanshool, Khalaf Abd-Ali

Abstract:

This approach aims to deal with establishing and operating Iraqi Fibre-To-The-Home (FTTH) projects. The problems they suffer from are organized sabotage, vandalism, accidental damage and poor planning. It provides practical solutions that deal with the aforementioned problems. These solutions consist of both technical and financial clarifications that ensure the achievement of the FTTH network’s stability for the purpose of equipping citizens, private sector companies, and governmental institutions with services, data transmission, the Internet, and other services. They aim to solve problems and obstacles accompanying the operation and maintenance of FTTH projects implemented by the Informatics and Telecommunications Public Company (ITPC)/ Iraqi Ministry of Communications (MoC). This approach takes the FTTH network of AlMaalif-AlMuaslat districts/ Baghdad-Iraq as a case study.

Keywords: CCTV, FTTH, ITPC, MoC, NVR, PTZ

Procedia PDF Downloads 25
9330 Risk Management in Construction Projects

Authors: Mustafa Dogru, Ruveyda Komurlu

Abstract:

Companies and professionals in the construction sector face various risks in every project depending on the characteristics, size, complexity, the location of the projects and the techniques used. Some risks’ effects may increase as the project progresses whereas new risks may emerge. Because of the ever-changing nature of the risks, risk management is a cyclical process that needs to be repeated throughout the project. Since the risks threaten the success of the project, risk management is an important part of the entire project management process. The aims of this study are to emphasize the importance of risk management in construction projects, summarize the risk identification process, and introduce a number of methods for preventing risks such as alternative design, checklists, prototyping and test-analysis-correction technique etc. Following the literature review conducted to list the techniques for preventing risks, case studies has been performed to compare and evaluate the success of the techniques in a number of completed projects with the same typology, performed domestic and international. Findings of the study suggest that controlling and minimizing the level of the risks in construction projects, taking optimal precautions for different risks, and mitigating or eliminating the effects of risks are important in order to prevent additional costs for the project. Additionally, focusing on the risks that have highest impact is the most rational way to minimize the effects of the risks on projects.

Keywords: construction projects, construction management, project management, risk management

Procedia PDF Downloads 280
9329 Critical Success Factors of Information Technology Projects

Authors: Athar Imtiaz, Abduljalil S. Al-Mudhary, Taha Mirhashemi, Roslina Ibrahim

Abstract:

Information Technology (IT) is being used by almost all organizations throughout the world. However, its success at supporting and improving business is debatable. There is always the risk of IT project failure and studies have proven that a large number of IT projects indeed do fail. There are many components that further the success of IT projects; these have been studied in previous studies. Studies have found the most necessary components for success in software development projects, executive information systems etc. In this study, previous literature that has looked into these success promoting factors have been critically reviewed and analyzed. Fifteen critical Success Factors (CSF) of IT projects were enlisted and examined. These factors can be applied to all IT projects and is not specific to a particular type of IT/IS project. A hypothesis was also generated after the evaluation of the factors.

Keywords: critical success factors, CSF, IT projects, IS projects, software development projects

Procedia PDF Downloads 356
9328 The Urbanistic Initiative of Architecture Students to Intensify the Socio-Economic and Spatial Development of Small Settlements in Tatarstan

Authors: Karina Rashidovna Nabiullina

Abstract:

In 2016, the ‘Beautiful Country’ innovative project was implemented in the Republic of Tatarstan (Russia). This project started at the initiative of architecture students majoring in city planning during their summer internship. As a part of the internship, the students had to study the layout and the lifestyle of Tatarstan towns. All the projects were presented to the Ministry of Construction of Tatarstan, which allowed the settlement authorities to receive the government funding for their implementation. This initiative, from the public discussion of the projects to their implementation, was welcomed by the local communities, evoked local patriotism, created new jobs as a part of the projects' implementation, and improved the architectural environment of the settlements. The projects initiated by the students became the ‘Big Projects’ for these small settlements.

Keywords: adapted graphic language, complex territorial development, identity of local resources, overcoming stagnation, participation

Procedia PDF Downloads 303
9327 Evaluating the Implementation of Public Procurement Principles at Tendering Stage: SME Contractors' Perspective

Authors: Charles Poleni Mukumba, Kahilu Kajimo-Shakantu

Abstract:

Purpose: Principles of public procurement are the foundation of good public procurement, representing best practices in delivering public services by the government and its organs. They provide guidance in the public procurement cycle to achieve the best value for public resources. Tendering stage in the procurement cycle is the most critical, as tendering information is made available to bidders. The paper evaluates the implementation of public procurement principles at the tendering stage. Design/Methodology/Approach: The research was conducted by using qualitative methods with 18 SME contractors in Lusaka as the sample. The samples are business owners and managers of purposively selected SME contractors. The collected data was analysed using thematic and content analysis. Findings: The findings indicate inconsistency in accessing information critical for tendering success by bidders. Further, the findings suggest that adjustments to technical specifications are made to suit certain preferred bidders by procuring officials. Research Limitations/Implications: The interviews were limited to SME contractors registered with the national council for construction and involved in public sector construction works in Lusaka, Zambia. Practical Implications: Implementing principles of public procurement at the tendering stage creates equal, open, and fair competition for the bidders in cost terms to deliver standardised and quality works to the public sector. Original/Value: The findings reveal how principles of public procurement play a critical role in enhancing the efficient performance of the procurement cycle at the tendering stage.

Keywords: evaluating, implementation, public procurement principles, tendering stage, SME contractors

Procedia PDF Downloads 51
9326 Private and Public Health Sector Difference on Client Satisfaction: Results from Secondary Data Analysis in Sindh, Pakistan

Authors: Wajiha Javed, Arsalan Jabbar, Nelofer Mehboob, Muhammad Tafseer, Zahid Memon

Abstract:

Introduction: Researchers globally have strived to explore diverse factors that augment the continuation and uptake of family planning methods. Clients’ satisfaction is one of the core determinants facilitating continuation of family planning methods. There is a major debate yet scanty evidence to contrast public and private sectors with respect to client satisfaction. The objective of this study is to compare quality-of-care provided by public and private sectors of Pakistan through a client satisfaction lens. Methods: We used Pakistan Demographic Heath Survey 2012-13 dataset (Sindh province) on a total of 3133 Married Women of Reproductive Age (MWRA) aged 15-49 years. Source of family planning (public/private sector) was the main exposure variable. Outcome variable was client satisfaction judged by ten different dimensions of client satisfaction. Means and standard deviations were calculated for continuous variable while for categorical variable frequencies and percentages were computed. For univariate analysis, Chi-square/Fisher Exact test was used to find an association between clients’ satisfaction in public and private sectors. Ten different multivariate models were made. Variables were checked for multi-collinearity, confounding, and interaction, and then advanced logistic regression was used to explore the relationship between client satisfaction and dependent outcome after adjusting for all known confounding factors and results are presented as OR and AOR (95% CI). Results: Multivariate analyses showed that clients were less satisfied in contraceptive provision from private sector as compared to public sector (AOR 0.92,95% CI 0.63-1.68) even though the result was not statistically significant. Clients were more satisfied from private sector as compared to the public sector with respect to other determinants of quality-of-care (follow-up care (AOR 3.29, 95% CI 1.95-5.55), infection prevention (AOR 2.41, 95% CI 1.60-3.62), counseling services (AOR 2.01, 95% CI 1.27-3.18, timely treatment (AOR 3.37, 95% CI 2.20-5.15), attitude of staff (AOR 2.23, 95% CI 1.50-3.33), punctuality of staff (AOR 2.28, 95% CI 1.92-4.13), timely referring (AOR 2.34, 95% CI 1.63-3.35), staff cooperation (AOR 1.75, 95% CI 1.22-2.51) and complications handling (AOR 2.27, 95% CI 1.56-3.29).

Keywords: client satisfaction, family planning, public private partnership, quality of care

Procedia PDF Downloads 385
9325 Corporate Social Responsibility: A Comparative Study of Two Largest Banks in India

Authors: Navdeep Kaur

Abstract:

Corporate Social Responsibility is the process through which the organizations execute their philanthropic visions for social welfare. This paper considers the data of one Public Sector Bank–State Bank of India (SBI) and one Private Sector Bank-Industrial Credit and Investment Corporation of India (ICICI) from the year 2008 to 2016. The study is based on descriptive research design, and secondary data collected from the annual report of respective bank from website and different literature are reviewed. Least Square Method is used for estimating CSR spending for the financial year 2017-18. The analysis shows that these banks are making efforts for the implementation of CSR, but are not spending their 2% share of profits on CSR. There is a need for better CSR activities by the banks, which is possible by concentrating more on the prevailing social issues. The finding reveals that the percentage of profit after tax spends for CSR by SBI is more compare to ICICI. The estimated Spending for CSR for 2017-18 is also more in SBI as compared to ICICI.

Keywords: banking sector, corporate social responsibility in India, financial institution, public sector banks, SBI, ICICI

Procedia PDF Downloads 161
9324 Planning Urban Sprawl in Mining Areas in Africa: How to Ensure Coherent Development

Authors: Pascal Rey, Anaïs Weber

Abstract:

Many mining projects are being developed in Africa the last decades. Due to the economic opportunities they offer, these projects result in a massive and rapid influx of migrants to the surrounding area. In areas where central government representation is low and local administration lack financial resources, urban development is often anarchical, beyond all public control. It leads to socio-spatial segregation, insecurity and the risk of social conflicts rising. Aware that their economic development is very correlated with local situation, mining companies get more and more involved in regional planning in setting up tools and Strategic Directions document. One of the commonly used tools in this regard is the “Influx Management Plan”. It consists in looking at the region’s absorption capacities in order to ensure its coherent development and by developing several urban centers than one macrocephalic city. It includes many other measures such as urban governance support, skills transfer, creation of strategic guidelines, financial support (local taxes, mining taxes, development funds etc.) local development projects. Through various examples of mining projects in Guinea, A country that is host to many large mining projects, we will look at the implications of regional and urban planning of which mining companies are key playor as well as public authorities. While their investment capacity offers advantages and accelerates development, their actions raise questions of the unilaterality of interests and local governance. By interfering in public affairs are mining companies not increasing the risk of central and local government shirking their responsibilities in terms of regional development, or even calling their legitimacy into question? Is such public-private collaboration really sustainable for the region as a whole and for all stakeholders?

Keywords: Africa, guinea, mine, urban planning

Procedia PDF Downloads 465