7503 Hybrid Project Management Model Based on Lean and Agile Approach

Authors: Fatima-Zahra Eddoug, Jamal Benhra, Rajaa Benabbou

Abstract:

Several project management models exist in the literature and the most used ones are the hybrids for their multiple advantages. Our objective in this paper is to analyze the existing models, which are based on the Lean and Agile approaches and to propose a novel framework with the convenient tools that will allow efficient management of a general project. To create the desired framework, we were based essentially on 7 existing models. Only the Scrum tool among the agile tools was identified by several authors to be appropriate for project management. In contrast, multiple lean tools were proposed in different phases of the project.

Keywords: agility, hybrid project management, lean, scrum

Procedia PDF Downloads 106
7502 Integration of Building Information Modeling Framework for 4D Constructability Review and Clash Detection Management of a Sewage Treatment Plant

Authors: Malla Vijayeta, Y. Vijaya Kumar, N. Ramakrishna Raju, K. Satyanarayana

Abstract:

Global AEC (architecture, engineering, and construction) industry has been coined as one of the most resistive domains in embracing technology. Although this digital era has been inundated with software tools like CAD, STADD, CANDY, Microsoft Project, Primavera etc. the key stakeholders have been working in siloes and processes remain fragmented. Unlike the yesteryears’ simpler project delivery methods, the current projects are of fast-track, complex, risky, multidisciplinary, stakeholder’s influential, statutorily regulative etc. pose extensive bottlenecks in preventing timely completion of projects. At this juncture, a paradigm shift surfaced in construction industry, and Building Information Modeling, aka BIM, has been a panacea to bolster the multidisciplinary teams’ cooperative and collaborative work leading to productive, sustainable and leaner project outcome. Building information modeling has been integrative, stakeholder engaging and centralized approach in providing a common platform of communication. A common misconception that BIM can be used for building/high rise projects in Indian Construction Industry, while this paper discusses of the implementation of BIM processes/methodologies in water and waste water industry. It elucidates about BIM 4D planning and constructability reviews of a Sewage Treatment Plant in India. Conventional construction planning and logistics management involves a blend of experience coupled with imagination. Even though the excerpts or judgments or lessons learnt gained from veterans might be predictive and helpful, but the uncertainty factor persists. This paper shall delve about the case study of real time implementation of BIM 4D planning protocols for one of the Sewage Treatment Plant of Dravyavati River Rejuvenation Project in India and develops a Time Liner to identify logistics planning and clash detection. With this BIM processes, we shall find that there will be significant reduction of duplication of tasks and reworks. Also another benefit achieved will be better visualization and workarounds during conception stage and enables for early involvement of the stakeholders in the Project Life cycle of Sewage Treatment Plant construction. Moreover, we have also taken an opinion poll of the benefits accrued utilizing BIM processes versus traditional paper based communication like 2D and 3D CAD tools. Thus this paper concludes with BIM framework for Sewage Treatment Plant construction which will achieve optimal construction co-ordination advantages like 4D construction sequencing, interference checking, clash detection checking and resolutions by primary engagement of all key stakeholders thereby identifying potential risks and subsequent creation of risk response strategies. However, certain hiccups like hesitancy in adoption of BIM technology by naïve users and availability of proficient BIM trainers in India poses a phenomenal impediment. Hence the nurture of BIM processes from conception, construction and till commissioning, operation and maintenance along with deconstruction of a project’s life cycle is highly essential for Indian Construction Industry in this digital era.

Keywords: integrated BIM workflow, 4D planning with BIM, building information modeling, clash detection and visualization, constructability reviews, project life cycle

Procedia PDF Downloads 93
7501 Optimising Urban Climate at Mesoscale: The Case of Floor-Area-Ratio Modelling and Energy Planning Integration

Authors: Ali Cheshmehzangi, Ayotunde Dawodu

Abstract:

In urban planning, Floor Area Ratio (FAR) of the site plays a major role in the multiplicity of performances, from humane living environments to energy performance. When one considers the astounding volume of new housing that is going to be constructed across the globe during the next few decades due to growing urbanisation (e.g. particularly in developing world), it is imperative that we have an empirically grounded grasp of which building configurations are more energy efficient. As a common planning metric, it would be helpful to know exactly how managing FAR connects with energy efficiency. Hence, this study puts together a set of modelling of various FARs for a typical residential compound and address the considerations of energy planning integration in the practice of building configuration and urban planning. Such decision makings at the planning and design stage enable us to provide pathways of optimising urban climate at mesoscale of the built environment, i.e. the neighbourhood or community level. In this study, a comparative study is conducted using Eco-Tect Software, using a case study in the City of Ningbo, China. Findings of the study contribute to identifying scenarios of various FAR use and energy planning at mesoscale. The final results contribute to studies in urban climate, from the perspectives of urban planning, energy planning, and urban modelling.

Keywords: China, energy planning, FAR, floor-area-ratio, mesoscale, urban climate, urban modelling

Procedia PDF Downloads 135
7500 Empirical Study for the Project and the Project Management Dimensions Comparison between SMEs and Large Companies

Authors: Amina Oukennou, Zitouni Beidouri, Otmane Bouksour

Abstract:

Small to Medium-sized enterprises are a very important component of the economy. They are present in the whole industries all over the world. They are considered as the engine for future growth in the economy. Project management is an economical international factor impacting all types of enterprises including the SMEs. This paper has the aim of measuring the weight of using projects and project management in Moroccan SMEs in comparison with the large companies. The study is based on interviews with experts: project managers, managers, directors, and consultants. They were asked questions measuring the weight of using projects, the level of using project management, and the resources employed. Eighteen Moroccan companies from a range of industries and sizes were consulted. All the companies consider projects as a key element in their strategy. Most of them affirm the great usefulness of the approach 'project', especially for the external activities. The main differences lie in the duration and the size of used projects. Despite the commonly shared idea about the importance of the project management, the interviewed persons believe that the project management knowledge has the same importance or less than the technical knowledge. All the companies affirm the need for a simpler version of project management. The content varies from one company to another.

Keywords: project dimension, project management, small to medium-sized entreprise, Morocco

Procedia PDF Downloads 283
7499 Project Management Agile Model Based on Project Management Body of Knowledge Guideline

Authors: Mehrzad Abdi Khalife, Iraj Mahdavi

Abstract:

This paper presents the agile model for project management process. For project management process, the Project Management Body of Knowledge (PMBOK) guideline has been selected as platform. Combination of computational science and artificial intelligent methodology has been added to the guideline to transfer the standard to agile project management process. The model is the combination of practical standard, computational science and artificial intelligent. In this model, we present communication model and protocols to keep process agile. Here, we illustrate the collaboration man and machine in project management area with artificial intelligent approach.

Keywords: artificial intelligent, conceptual model, man-machine collaboration, project management, standard

Procedia PDF Downloads 312
7498 The Secret Ingredient of Student Involvement: Applied Science Case Studies to Enhance Sustainability

Authors: Elizelle Juanee Cilliers

Abstract:

Recent planning thinking has laid the foundations for a general sense of best practice that aims to enhance the quality of life, suggesting an open and participatory process. It is accepted that integration of top-down and bottom-up approaches may lead to efficient action in environments and sustainable planning and development, although it is also accepted that such an integrated approach has various challenges of implementation. A flexible framework in which the strengths of both the top-down and bottom-up approaches were explored in this research, based on the EU Interreg VALUE Added project and five case studies where student education and student involvement played a crucial role within the participation process of the redesign of the urban environment. It was found that international student workshops were an effective tool to integrate bottom-up and top-down structures, as it acted as catalyst for communication, interaction, creative design, quick transformation from planning to implementation, building social cohesion, finding mutual ground between stakeholders and thus enhancing overall quality of life and quality of environments. It offered a good alternative to traditional participation modes and created a platform for an integrative planning approach. The role and importance of education and integration within the urban environment were emphasized.

Keywords: top-down, bottom-up, flexible, student involvement

Procedia PDF Downloads 188
7497 Applications Using Geographic Information System for Planning and Development of Energy Efficient and Sustainable Living for Smart-Cities

Authors: Javed Mohammed

Abstract:

As urbanization process has been and will be happening in an unprecedented scale worldwide, strong requirements from academic research and practical fields for smart management and intelligent planning of cities are pressing to handle increasing demands of infrastructure and potential risks of inhabitants agglomeration in disaster management. Geo-spatial data and Geographic Information System (GIS) are essential components for building smart cities in a basic way that maps the physical world into virtual environment as a referencing framework. On higher level, GIS has been becoming very important in smart cities on different sectors. In the digital city era, digital maps and geospatial databases have long been integrated in workflows in land management, urban planning and transportation in government. People have anticipated GIS to be more powerful not only as an archival and data management tool but also as spatial models for supporting decision-making in intelligent cities. The purpose of this project is to offer observations and analysis based on a detailed discussion of Geographic Information Systems( GIS) driven Framework towards the development of Smart and Sustainable Cities through high penetration of Renewable Energy Technologies.

Keywords: digital maps, geo-spatial, geographic information system, smart cities, renewable energy, urban planning

Procedia PDF Downloads 501
7496 Overview of Standard Unit System of Shenzhen Land Spatial Planning and Case Analysis

Authors: Ziwei Huang

Abstract:

The standard unit of Shenzhen land spatial planning has the characteristics of vertical conduction, horizontal evaluation, internal balance and supervision of implementation. It mainly assumes the role of geospatial unit, assists in promoting the complex development of the business in Shenzhen and undertakes the management and transmission of upper and lower levels of planning as well as the Urban management functions such as gap analysis of public facilities, planning evaluation and dynamic monitoring of planning information. Combining with the application examples of the analysis of gaps in public facilities in Longgang District, it can be found that the standard unit of land spatial planning in Shenzhen as a small-scale geographic basic unit, has a stronger urban spatial coupling effect. However, the universality of the application of the system is still lacking and it is necessary to propose more scientific and powerful standard unit delineation standards and planning function evaluation indicators to guide the implementation of the system's popularization and application.

Keywords: Shenzhen city, land spatial planning, standard unit system, urban delicacy management

Procedia PDF Downloads 95
7495 Four-dimensional (4D) Decoding Information Presented in Reports of Project Progress in Developing Countries

Authors: Vahid Khadjeh Anvary, Hamideh Karimi Yazdi

Abstract:

Generally, the tool of comparison between performance of each stage in the life of a project, is the number of project progress during that period, which in most cases is only determined as one-dimensional with referring to one of three factors (physical, time, and financial). In many projects in developing countries there are controversies on accuracy and the way of analyzing progress report of projects that hinders getting definitive and engineering conclusions on the status of project.Identifying weakness points of this kind of one-dimensional look on project and determining a reliable and engineering approach for multi-dimensional decoding information receivable from project is of great importance in project management.This can be a tool to help identification of hidden diseases of project before appearing irreversible symptoms that are usually delays or increased costs of execution. The method used in this paper is defining and evaluating a hypothetical project as an example analyzing different scenarios and numerical comparison of them along with related graphs and tables. Finally, by analyzing different possible scenarios in the project, possibility or impossibility of predicting their occurrence is examine through the evidence.

Keywords: physical progress, time progress, financial progress, delays, critical path

Procedia PDF Downloads 347
7494 A Refinement Strategy Coupling Event-B and Planning Domain Definition Language (PDDL) for Planning Problems

Authors: Sabrine Ammar, Mohamed Tahar Bhiri

Abstract:

Automatic planning has a de facto standard language called Planning Domain Definition Language (PDDL) for describing planning problems. It aims to formalize the planning problems described by the concept of state space. PDDL-related dynamic analysis tools, namely planners and validators, are insufficient for verifying and validating PDDL descriptions. Indeed, these tools made it possible to detect errors a posteriori by means of test activity. In this paper, we recommend a formal approach coupling the two languages Event-B and PDDL, for automatic planning. Event-B is used for formal modeling by stepwise refinement with mathematical proofs of planning problems. Thus, this paper proposes a refinement strategy allowing to obtain reliable PDDL descriptions from an ultimate Event-B model correct by construction. The ultimate Event-B model, correct by construction which is supposed to be translatable into PDDL, is automatically translated into PDDL using our MDE Event-B2PDDL tool.

Keywords: code generation, event-b, PDDL, refinement strategy, translation rules

Procedia PDF Downloads 161
7493 Planning for a Smart Sustainable Cities: A Case Study

Authors: Ajaykumar Kambekar, Nikita Kalantri

Abstract:

Due to faster urbanization; developing nations will have to look forward towards establishing new planned cities those are environmentally friendly. Due to growth in Information and Communication Technology (ICT), it is evident that the rise of smart cities is witnessed as a promising trend for future growth; however, technology alone cannot make a city as a smart city. Cities must use smart systems to enhance the quality of life of its citizens and to achieve sustainable growth. Recent trends in technology may offer some indication towards harnessing our cities potential as the new engines of sustainable growth. To overcome the problems of mega-urbanization, new concept of smart cities has been introduced. The current research aims to reduce the knowledge gap in urban planning by exploring the concept of smart cities considering sustainability as a major focus. The aim of this paper is to plan for an entire smart city. The paper analyses sustainable development and identifies the key factors for the creation of future smart cities. The study also emphasizes the use of advanced planning and scheduling software such as Microsoft Project (MSP).

Keywords: urbanization, planned cities, information and communication technology, sustainable growth

Procedia PDF Downloads 279
7492 The Successful in Construction Project via Effectiveness of Project Team

Authors: Zarabizan Zakaria, Hayati Zainal

Abstract:

The construction industry is one of the most important sectors that contribute to the nation’s economy and catalyze towards the growth of other industries. However, some construction projects have not been completed on its stipulated time and duration, scope and budget due to several factors. This problem arises due to the weaknesses of human factors, especially from ineffective leadership quality practiced by project managers and contractors in managing project teams. Therefore, a construction project should impose the element of Project Team. The project team is formed in the implementation of the project which includes the project brief, project scope, customer requirements and provided designs. Many organizations in the construction sector use teams to meet today's global competition and customer expectations, however, team effectiveness evaluation is required. In insuring the construction team is successful and effectiveness, the construction department must encourage, measure, set up, and evaluate or review the effectiveness of project team that was formed. In order to produce a better outcome for a high-end project, an effective and efficient project team is required which also help in increasing overall productivity. The purpose of this study is to determine the role of team effectiveness in the construction project team based on the overall construction project performance. It examines several different factors which related to team effectiveness. It also examines the relationship between team effectiveness factor and project performance aspect. Team Effect Review and Project Performance Review are developed to be used for data collection. Data collected were analyzed using several statistical tests. Results obtained from data analysis are validated using semi-structured interviews. Besides that, a comprehensive survey were developed to assess the way construction project teams in order to maintain its effectiveness throughout the project phase. In order to determine a project successful it has been found that Project Team Leadership is the most important factor. In addition, the definition of team effectiveness in the construction project team is developed based on the perspective of project clients and project team members. The results of this study are expected to provide an idea on the factors that are needed to be focused on improving the team's effectiveness towards project performance aspects. At the same time, the definition of team effectiveness from team members and owner views has been developed in order to provide a better understanding of the word team's effectiveness in construction projects.

Keywords: project team, leadership, construction project, project successful

Procedia PDF Downloads 146
7491 The Advancement of Environmental Impact Assessment for 5th Transmission Natural Gas Pipeline Project in Thailand

Authors: Penrug Pengsombut, Worawut Hamarn, Teerawuth Suwannasri, Kittiphong Songrukkiat, Kanatip Ratanachoo

Abstract:

PTT Public Company Limited or simply PTT has played an important role in strengthening national energy security of the Kingdom of Thailand by transporting natural gas to customers in power, industrial and commercial sectors since 1981. PTT has been constructing and operating natural gas pipeline system of over 4,500-km network length both onshore and offshore laid through different area classifications i.e., marine, forest, agriculture, rural, urban, and city areas. During project development phase, an Environmental Impact Assessment (EIA) is conducted and submitted to the Office of Natural Resources and Environmental Policy and Planning (ONEP) for approval before project construction commencement. Knowledge and experiences gained and revealed from EIA in the past projects definitely are developed to further advance EIA study process for newly 5th Transmission Natural Gas Pipeline Project (5TP) with approximately 415 kilometers length. The preferred pipeline route is selected and justified by SMARTi map, an advance digital one-map platform with consists of multiple layers geographic and environmental information. Sensitive area impact focus (SAIF) is a practicable impact assessment methodology which appropriate for a particular long distance infrastructure project such as 5TP. An environmental modeling simulation is adopted into SAIF methodology for impact quantified in all sensitive areas whereas other area along pipeline right-of-ways is typically assessed as an impact representative. Resulting time and cost deduction is beneficial to project for early start.

Keywords: environmental impact assessment, EIA, natural gas pipeline, sensitive area impact focus, SAIF

Procedia PDF Downloads 369
7490 Genetic Algorithms Multi-Objective Model for Project Scheduling

Authors: Elsheikh Asser

Abstract:

Time and cost are the main goals of the construction project management. The first schedule developed may not be a suitable schedule for beginning or completing the project to achieve the target completion time at a minimum total cost. In general, there are trade-offs between time and cost (TCT) to complete the activities of a project. This research presents genetic algorithms (GAs) multi-objective model for project scheduling considering different scenarios such as least cost, least time, and target time.

Keywords: genetic algorithms, time-cost trade-off, multi-objective model, project scheduling

Procedia PDF Downloads 394
7489 Effective Financial Planning: A Study of Comprehensive Retirement Planning for Financial Independence

Authors: Stanley Yap, Chong Wei Ying, Leow Hon Wei

Abstract:

Purpose: In Malaysia, an effective financial planning is vital to accumulate wealth and financial independence. However, retirees are required to resume working due to insufficient pension fund. This study examines how the financial decision in retirement planning is being made based on the net worth from the household. Design/methodology/approach: This study uses financial data from a married working couple with children to evaluate their composition of financial position. Numerous financial methods are made pertaining to net worth analysis, insurance needs analysis, investment portfolio rebalancing, estate planning, education planning and retirement planning to enhance the financial decision. Findings: Our results show, firstly, financial planning is essential to achieve financial independence; secondly, insurance needs, education and retirement funding are the most significant for household. Thirdly, current resources are critical to maintain family lifestyle after retirement, emergency funds for critical illness, and the long term children education funding. Practical implications: Refer to the findings, sufficient net worth is priority in financial planning. Different suggestions for household include reduction of unnecessary expenses, re-allocate of cash flow, adequate insurance coverage and re-balancing of investment portfolios to accumulate wealth. It is a challenge to obtain financial independence, hence, there is a need to increase the literature on financial planning. Originality/value: To the best of our knowledge, this is the important paper that uses financial information from household to provide solutions to enhance the efficiency of financial planning industry.

Keywords: net worth, financial planning, wealth and financial independence, retirement planning

Procedia PDF Downloads 472
7488 An Assessment of Existing Material Management Process in Building Construction Projects in Nepal

Authors: Uttam Neupane, Narendra Budha, Subash Kumar Bhattarai

Abstract:

Material management is an essential part in construction project management. There are a number of material management problems in the Nepalese construction industry, which contribute to an inefficient material management system. Ineffective material management can cause waste of time and money thus increasing the problem of time and cost overrun. An assessment of material management system with gap and solution was carried out on 20 construction projects implemented by the Federal Level Project Implementation Unit (FPIU); Kaski district of Nepal. To improve the material management process, the respondents have provided possible solutions to overcome the gaps seen in the current material management process. The possible solutions are preparation of material schedule in line with the construction schedule for material requirement planning, verifications of material and locating of source, purchasing of the required material in advance before commencement of work, classifying the materials, and managing the inventory based on their usage value and eliminating and reduction in wastages during the overall material management process.

Keywords: material management, construction site, inventory, construction project

Procedia PDF Downloads 30
7487 Developing Integrated Model for Building Design and Evacuation Planning

Authors: Hao-Hsi Tseng, Hsin-Yun Lee

Abstract:

In the process of building design, the designers have to complete the spatial design and consider the evacuation performance at the same time. It is usually difficult to combine the two planning processes and it results in the gap between spatial design and evacuation performance. Then the designers cannot complete an integrated optimal design solution. In addition, the evacuation routing models proposed by previous researchers is different from the practical evacuation decisions in the real field. On the other hand, more and more building design projects are executed by Building Information Modeling (BIM) in which the design content is formed by the object-oriented framework. Thus, the integration of BIM and evacuation simulation can make a significant contribution for designers. Therefore, this research plan will establish a model that integrates spatial design and evacuation planning. The proposed model will provide the support for the spatial design modifications and optimize the evacuation planning. The designers can complete the integrated design solution in BIM. Besides, this research plan improves the evacuation routing method to make the simulation results more practical. The proposed model will be applied in a building design project for evaluation and validation when it will provide the near-optimal design suggestion. By applying the proposed model, the integration and efficiency of the design process are improved and the evacuation plan is more useful. The quality of building spatial design will be better.

Keywords: building information modeling, evacuation, design, floor plan

Procedia PDF Downloads 420
7486 Identifying Project Delay Factors in the Australian Construction Industry

Authors: Syed Sohaib Bin Hasib, Hiyam Al-Kilidar

Abstract:

Meeting project deadlines is a major challenge for most construction projects. In this study, perceptions of contractors, clients, and consultants are compared relative to a list of factors derived from the review of the extant literature on project delay. 59 causes (categorized into 8 groups) of project delays were identified from the literature. A survey was devised to get insights and ranking of these factors from clients, consultants & contractors in the Australian construction industry. Findings showed that project delays in the Australian construction industry are mainly the result of skill shortages, interference in execution, and poor coordination and communication between the project stakeholders.

Keywords: construction, delay factors, time delay, australian construction industry

Procedia PDF Downloads 141
7485 Post Occupancy Evaluation in Higher Education

Authors: Balogun Azeez Olawale, Azeez S. A.

Abstract:

Post occupancy evaluation (POE) is a process of assessing building performance for its users and intended function during the occupation. User satisfaction impacts the performance of educational environments and their users: students, faculty, and staff. In addition, buildings are maintained and managed by teams that spend a large amount of time and capital on their long-term sustenance. By evaluating the feedback from users of higher education facilities, university planning departments are more prepared to understand the inputs for programming and future project planning. In addition, university buildings will be closer to meeting user and maintenance needs. This paper reports on a research team made up of academics, facility personnel, and users that have developed a plan to improve the quality of campus facilities through a POE exercise on a recently built project. This study utilized a process of focus group interviews representing the different users and subsequent surveys. The paper demonstrates both the theory and practice of POE in higher education and learning environment through the case example of four universities in Nigeria's POE exercise.

Keywords: post occupancy evaluation, building performance, building analysis, building evaluation, quality control, building assessment, facility management, design quality

Procedia PDF Downloads 85
7484 An Integrated Approach to Child Care Earthquake Preparedness through “Telemachus” Project

Authors: A. Kourou, S. Kyriakopoulos, N. Anyfanti

Abstract:

A lot of children under the age of five spend their daytime hours away from their home, in a kindergarten. Caring for children is a serious subject, and their safety in case of earthquake is the first priority. Being aware of earthquakes helps to prioritize the needs and take the appropriate actions to limit the effects. Earthquakes occurring anywhere at any time require emergency planning. Earthquake planning is a cooperative effort and childcare providers have unique roles and responsibilities. Greece has high seismicity and Ionian Islands Region has the highest seismic activity of the country. The last five years Earthquake Planning and Protection Organization (EPPO), which is a national organization, has analyzed the needs and requirements of kindergartens on earthquake protection issues. In this framework it has been noticed that although the State requires child care centers to hold drills, the standards for emergency preparedness in these centers are varied, and a lot of them had not written plans for emergencies. For these reasons, EPPO supports the development of emergency planning guidance and familiarizes the day care centers’ staff being prepared for earthquakes. Furthermore, the Handbook on Day Care Earthquake Planning that has been developed by EPPO helps the providers to understand that emergency planning is essential to risk reduction. Preparedness and training should be ongoing processes, thus EPPO implements every year dozens of specific seminars on children’s disaster related needs. This research presents the results of a survey that detects the level of earthquake preparedness of kindergartens in all over the country and Ionian Islands too. A closed-form questionnaire of 20 main questions was developed for the survey in order to detect the aspects of participants concerning the earthquake preparedness actions at individual, family and day care environment level. 2668 questionnaires were gathered from March 2014 to May 2019, and analyzed by EPPO’s Department of Education. Moreover, this paper presents the EPPO’s educational activities targeted to the Ionian Islands Region that implemented in the framework of “Telemachus” Project. To provide safe environment for children to learn, and staff to work is the foremost goal of any State, community and kindergarten. This project is funded under the Priority Axis "Environmental Protection and Sustainable Development" of Operational Plan "Ionian Islands 2014-2020". It is increasingly accepted that emergency preparedness should be thought of as an ongoing process rather than a one-time activity. Creating an earthquake safe daycare environment that facilitates learning is a challenging task. Training, drills, and update of emergency plan should take place throughout the year at kindergartens to identify any gaps and to ensure the emergency procedures. EPPO will continue to work closely with regional and local authorities to actively address the needs of children and kindergartens before, during and after earthquakes.

Keywords: child care centers, education on earthquake, emergency planning, kindergartens, Ionian Islands Region of Greece

Procedia PDF Downloads 87
7483 Knowledge and Practice of Family Planning among Rural Women in Ogun State, South West Nigeria

Authors: Tope Olubodun

Abstract:

Background: Family planning practices help individuals and couples avoid unwanted pregnancies, regulate intervals between pregnancies, and determine the number of children in the family. Family planning is an effective intervention for promoting maternal health, but its acceptability and utilization are impeded by many factors in Southwest Nigeria. Aim: This study was conducted to assess women’s knowledge and practice of family planning in two rural communities in Ogun State, Southwest Nigeria, and to determine factors associated with the utilization of family planning among these women. Methods: This was a cross-sectional study conducted among 561 women of reproductive age selected by multistage sampling. The data collection was done using interviewer-administered questionnaires. Data obtained were analyzed using IBM SPSS Statistics version 20. Frequencies were generated, and chi-square test was used to explore associations. The level of significance was set at 0.05. Result: The majority of the respondents were aware of family planning 410 (73.1%). The method most commonly known was male condom 348 (62.0%), then pills 276 (49.2%) and injectables 231(41.3%). The commonest sources of information on family planning were health workers 158 (26.8%), outreaches 162 (27.5%) and TV/radio 136 (23.1%). Respondents that had used family planning, however, only constituted forty–five percent. The methods commonly used were injectables 104 (39.2%) and pills 85 (32.1%). Reasons for choosing not to use family planning include the desire for more children 78 (26.3%), because spouse does not support family planning 56 (18.9%), fear of unbearable side effects 44 (14.9%), and poor knowledge of the methods of family planning as well as where the services can be obtained 39 (13.2%). There is a statistically significant association between age, ethnicity, education, occupation, average monthly income, and use of family planning. Conclusion: Campaigns that promote male involvement in family planning, use of family planning for child spacing, and dispelling of fears is recommended to improve the practice of family planning among such a group of women.

Keywords: family planning, rural, knowledge, practice

Procedia PDF Downloads 116
7482 Assessing Project Performance through Work Sampling and Earned Value Analysis

Authors: Shobha Ramalingam

Abstract:

The majority of the infrastructure projects are affected by time overrun, resulting in project delays and subsequently cost overruns. Time overrun may vary from a few months to as high as five or more years, placing the project viability at risk. One of the probable reasons noted in the literature for this outcome in projects is due to poor productivity. Researchers contend that productivity in construction has only marginally increased over the years. While studies in the literature have extensively focused on time and cost parameters in projects, there are limited studies that integrate time and cost with productivity to assess project performance. To this end, a study was conducted to understand the project delay factors concerning cost, time and productivity. A case-study approach was adopted to collect rich data from a nuclear power plant project site for two months through observation, interviews and document review. The data were analyzed using three different approaches for a comprehensive understanding. Foremost, a root-cause analysis was performed on the data using Ishikawa’s fish-bone diagram technique to identify the various factors impacting the delay concerning time. Based on it, a questionnaire was designed and circulated to concerned executives, including project engineers and contractors to determine the frequency of occurrence of the delay, which was then compiled and presented to the management for a possible solution to mitigate. Second, a productivity analysis was performed on select activities, including rebar bending and concreting through a time-motion study to analyze product performance. Third, data on cost of construction for three years allowed analyzing the cost performance using earned value management technique. All three techniques allowed to systematically and comprehensively identify the key factors that deter project performance and productivity loss in the construction of the nuclear power plant project. The findings showed that improper planning and coordination between multiple trades, concurrent operations, improper workforce and material management, fatigue due to overtime were some of the key factors that led to delays and poor productivity. The findings are expected to act as a stepping stone for further research and have implications for practitioners.

Keywords: earned value analysis, time performance, project costs, project delays, construction productivity

Procedia PDF Downloads 70
7481 The Impact of Social Media on Urban E-planning: A Review of the Literature

Authors: Farnoosh Faal

Abstract:

The rapid growth of social media has brought significant changes to the field of urban e-planning. This study aims to review the existing literature on the impact of social media on urban e-planning processes. The study begins with a discussion of the evolution of social media and its role in urban e-planning. The review covers research on the use of social media for public engagement, citizen participation, stakeholder communication, decision-making, and monitoring and evaluation of urban e-planning initiatives. The findings suggest that social media has the potential to enhance public participation and improve decision-making in urban e-planning processes. Social media platforms such as Facebook, Twitter, and Instagram can provide a platform for citizens to engage with planners and policymakers, express their opinions, and provide feedback on planning proposals. Social media can also facilitate the collection and analysis of data, including real-time data, to inform urban e-planning decision-making. However, the literature also highlights some challenges associated with the use of social media in urban e-planning. These challenges include issues related to the representativeness of social media users, the quality of information obtained from social media, the potential for bias and manipulation of social media content, and the need for effective data management and analysis. The study concludes with recommendations for future research on the use of social media in urban e-planning. The recommendations include the need for further research on the impact of social media on equity and social justice in planning processes, the need for more research on effective strategies for engaging underrepresented groups, and the development of guidelines for the use of social media in urban e-planning processes. Overall, the study suggests that social media has the potential to transform urban e-planning processes but that careful consideration of the opportunities and challenges associated with its use is essential for effective and ethical planning practice.

Keywords: social media, Urban e-planning, public participation, citizen engagement

Procedia PDF Downloads 195
7480 A Correlation Between Perceived Usage of Project Management Methodologies and Project Success in Horizon 2020 Projects

Authors: Aurelio Palacardo, Giulio Mangano, Alberto De Marco

Abstract:

Nowadays, the global economic framework is extremely competitive, and it consequently requires an efficient deployment of the resources provided by EU. In this context, Project management practices are intended to be one of the levers for increasing such an efficiency. The objective of this work is to explore the usage of Project Management methodologies and good practices in the European-wide research program “Horizon2020” and establish whether their maturity might impact the project's success. This allows to identify strengths in terms of application of PM methodologies and good practices and, in turn, to provide feedback and opportunities for improvements to be implemented in future programs. In order to achieve this objective, the present research makes use of a survey-based data retrieval and correlation analysis to investigate the level of perceived PM maturity in H2020 projects and the correlation of maturity with project success. The results show the Project Managers involved in H2020 to hold a high level of PM maturity, confirming PM standards, which are imposed by the EU commission as a binding process, are effectively enforced.

Keywords: project management, project management maturity, maturity models, project success

Procedia PDF Downloads 129
7479 Operations Research Applications in Audit Planning and Scheduling

Authors: Abdel-Aziz M. Mohamed

Abstract:

This paper presents a state-of-the-art survey of the operations research models developed for internal audit planning. Two alternative approaches have been followed in the literature for audit planning: (1) identifying the optimal audit frequency; and (2) determining the optimal audit resource allocation. The first approach identifies the elapsed time between two successive audits, which can be presented as the optimal number of audits in a given planning horizon, or the optimal number of transactions after which an audit should be performed. It also includes the optimal audit schedule. The second approach determines the optimal allocation of audit frequency among all auditable units in the firm. In our review, we discuss both the deterministic and probabilistic models developed for audit planning. In addition, game theory models are reviewed to find the optimal auditing strategy based on the interactions between the auditors and the clients.

Keywords: operations research applications, audit frequency, audit-staff scheduling, audit planning

Procedia PDF Downloads 788
7478 A Study of Factors Affecting the Elapsed Time of Housing Renewal Project Implementation in Seoul

Authors: In Su Na, Gunwon Lee, Seiyong Kim

Abstract:

This study analyzed the effect of area variables and economic variables on the length of each period of the project in order to analyze the effect of agreement rate on project implementation in housing renewal projects. In conclusion, as can be seen from these results, a low agreement rate may not translate into project promotion, and a higher agreement rate may not translate into project delay. The expectation of the policy is that the lower the agreement rate, the more projects would be promoted, but that is not the actual effect. From a policy consistency viewpoint, changing the agreement rate frequently, depending on the decision of the public, is not reasonable. The policy of using agreement rate as a necessary condition for project implementation should be reconsidered.

Keywords: Area and Economic Variables, Elapsed time, Housing Renewal Project

Procedia PDF Downloads 431
7477 Public Participation as a Social Inclusion Tool in the Urban Planning Process: A Case Study of Abuja, Nigeria

Authors: Nwachi Prosper Louis, Cynthia Ogonna Ikesee

Abstract:

The urban planning system of cities varies by country, but in general, it is an instrument for establishing long-term sustainable frameworks and plans for social, institutional and economic development. There is limited knowledge, development, and implementation of effective and sustainable urban planning structures and plans that encourage social inclusion in most communities. This has led to social, economic and environmental deficiencies resulting in community isolation and segregation in class, ethnicity, and race. Encouraging public participation in the urban planning process is one of the instruments that cities can utilise to achieve better social inclusion outcomes. This paper explores how public participation can be used as a social inclusion tool in the urban planning process to achieve better outcomes in Abuja urban planning system. The purpose of this study is to investigate the effectiveness of this approach. Also, a conceptual model was developed which evaluates the relationship between public participation and social inclusion outcomes in the urban planning process. It was seen that every community has its peculiar way of life and challenges, and an understanding of these social societal needs is paramount in the urban planning process. Therefore, the involvement of the public in identifying their needs, selecting priorities and identifying strategies offer better chances for developing solutions that are sustainable, feasible and implementable.

Keywords: public participation, social inclusion, urban planning, urban planning process

Procedia PDF Downloads 154
7476 Urban Planning Compilation Problems in China and the Corresponding Optimization Ideas under the Vision of the Hyper-Cycle Theory

Authors: Hong Dongchen, Chen Qiuxiao, Wu Shuang

Abstract:

Systematic science reveals the complex nonlinear mechanisms of behaviour in urban system. However, in China, when the current city planners face with the system, most of them are still taking simple linear thinking to consider the open complex giant system. This paper introduces the hyper-cycle theory, which is one of the basis theories of systematic science, based on the analysis of the reasons why the current urban planning failed, and proposals for optimization ideas that urban planning compilation should change, from controlling quantitative to the changes of relationship, from blueprint planning to progressive planning based on the nonlinear characteristics and from management control to dynamically monitor feedback.

Keywords: systematic science, hyper-cycle theory, urban planning, urban management

Procedia PDF Downloads 367
7475 The Effect of Critical Activity on Critical Path and Project Duration in Precedence Diagram Method

Authors: J. Nisar, S. Halim

Abstract:

The additional relationships i.e., start-to-start, finish-to-finish, and start-to-finish, between activity in Precedence Diagram Method (PDM) provides a more flexible schedule than traditional Critical Path Method (CPM). But, changing the duration of critical activities in the PDM network will have an anomalous effect on the critical path and the project completion date. In this study, we classified the critical activities in two groups i.e., 1. activity on single critical path and 2. activity on multi-critical paths, and six classes i.e., normal, reverse, neutral, perverse, decrease-reverse and increase-normal, based on their effects on project duration in PDM. Furthermore, we determined the maximum float of time by which the duration each type of critical activities can be changed without effecting the project duration. This study would help the project manager to clearly understand the behavior of each critical activity on critical path, and he/she would be able to change the project duration by shortening or lengthening activities based on project budget and project deadline.

Keywords: construction management, critical path method, project scheduling network, precedence diagram method

Procedia PDF Downloads 184
7474 Project Management Framework and Influencing Factors

Authors: Mehrnoosh Askarizadeh

Abstract:

The increasing variations of the business world correspond with a high diversity of theoretical perspectives used in project management research. This diversity is reflected by a variety of influencing factors, which have been the subject of empirical studies. This article aims to systemize the different streams of research on the basis of a literature review and at developing a research framework influencing factors. We will identify fundamental elements of a project management theory. The framework consists of three dimensions: design, context, and goal. Its purpose is to support the combination of different perspectives and the development of strategies for further research.

Keywords: project, goal, project management, influencing factors

Procedia PDF Downloads 513