15272 Empirical Study of Correlation between the Cost Performance Index Stability and the Project Cost Forecast Accuracy in Construction Projects

Authors: Amin AminiKhafri, James M. Dawson-Edwards, Ryan M. Simpson, Simaan M. AbouRizk

Abstract:

Earned value management (EVM) has been introduced as an integrated method to combine schedule, budget, and work breakdown structure (WBS). EVM provides various indices to demonstrate project performance including the cost performance index (CPI). CPI is also used to forecast final project cost at completion based on the cost performance during the project execution. Knowing the final project cost during execution can initiate corrective actions, which can enhance project outputs. CPI, however, is not constant during the project, and calculating the final project cost using a variable index is an inaccurate and challenging task for practitioners. Since CPI is based on the cumulative progress values and because of the learning curve effect, CPI variation dampens and stabilizes as project progress. Although various definitions for the CPI stability have been proposed in literature, many scholars have agreed upon the definition that considers a project as stable if the CPI at 20% completion varies less than 0.1 from the final CPI. While 20% completion point is recognized as the stability point for military development projects, construction projects stability have not been studied. In the current study, an empirical study was first conducted using construction project data to determine the stability point for construction projects. Early findings have demonstrated that a majority of construction projects stabilize towards completion (i.e., after 70% completion point). To investigate the effect of CPI stability on cost forecast accuracy, the correlation between CPI stability and project cost at completion forecast accuracy was also investigated. It was determined that as projects progress closer towards completion, variation of the CPI decreases and final project cost forecast accuracy increases. Most projects were found to have 90% accuracy in the final cost forecast at 70% completion point, which is inlined with findings from the CPI stability findings. It can be concluded that early stabilization of the project CPI results in more accurate cost at completion forecasts.

Keywords: cost performance index, earned value management, empirical study, final project cost

Procedia PDF Downloads 130
15271 Assessment of Human Factors Analysis and Classification System in Construction Accident Prevention

Authors: Zakari Mustapha, Clinton Aigbavboa, Wellington Didi Thwala

Abstract:

Majority of the incidents and accidents in complex high-risk systems that exist in the construction industry and other sectors have been attributed to unsafe acts of workers. The purpose of this paper was to asses Human Factors Analysis and Classification System (HFACS) in construction accident prevention. The study was conducted through the use of secondary data from journals, books and internet to achieve the objective of the study. The review of literature looked into details of different views from different scholars about HFACS framework in accidents investigations. It further highlighted on various sections or disciplines of accident occurrences in human performance within the construction. The findings from literature review showed that unsafe acts of a worker and unsafe working conditions are the two major causes of accident in the construction industry.Most significant factor in the cause of site accident in the construction industry is unsafe acts of a worker. The findings also show how the application of HFACS framework in the investigation of accident will lead to the identification of common trends. Further findings show that provision for the prevention of accident will be made based on past accident records to identify and prioritize where intervention is needed within the construction industry.

Keywords: accident, construction, HFACS, unsafe acts

Procedia PDF Downloads 295
15270 Causes of Construction Delays in Qatar Construction Projects

Authors: Murat Gunduz, Mohanad H. A. AbuHassan

Abstract:

Construction industry mainly focuses on the superstructure, infrastructure, and oil and gas industry. The development of infrastructure projects in developing countries attracted a lot of foreign construction contractors, consultants, suppliers and diversified workforce to interfere and to be evolved in such huge investment. Reducing worksite delays in such projects require knowledge and attention. Therefore, it is important to identify the influencing delay attributes affecting construction projects. The significant project factors affecting construction delays were investigated. Data collection was carried out through an online web survey system to capture significant factors. Significant factors were determined with importance index and relevant recommendations are made. The output of the data analysis would lead the industry experts better assess the impact of construction delays on construction projects.

Keywords: construction industry, delays, importance index, frequency index

Procedia PDF Downloads 313
15269 Application of the Critical Decision Method for Monitoring and Improving Safety in the Construction Industry

Authors: Juan Carlos Rubio Romero, Francico Salguero Caparros, Virginia Herrera-Pérez

Abstract:

No one is in the slightest doubt about the high levels of risk involved in work in the construction industry. They are even higher in structural construction work. The Critical Decision Method (CDM) is a semi-structured interview technique that uses cognitive tests to identify the different disturbances that workers have to deal with in their work activity. At present, the vision of safety focused on daily performance and things that go well for safety and health management is facing the new paradigm known as Resilience Engineering. The aim of this study has been to describe the variability in formwork labour on concrete structures in the construction industry and, from there, to find out the resilient attitude of workers to unexpected events that they have experienced during their working lives. For this purpose, a series of semi-structured interviews were carried out with construction employees with extensive experience in formwork labour in Spain by applying the Critical Decision Method. This work has been the first application of the Critical Decision Method in the field of construction and, more specifically, in the execution of structures. The results obtained show that situations categorised as unthought-of are identified to a greater extent than potentially unexpected situations. The identification during these interviews of both expected and unexpected events provides insight into the critical decisions made and actions taken to improve resilience in daily practice in this construction work. From this study, it is clear that it is essential to gain more knowledge about the nature of the human cognitive process in work situations within complex socio-technical systems such as construction sites. This could lead to a more effective design of workplaces in the search for improved human performance.

Keywords: resilience engineering, construction industry, unthought-of situations, critical decision method

Procedia PDF Downloads 125
15268 Production and Recycling of Construction and Demolition Waste

Authors: Vladimira Vytlacilova

Abstract:

Recycling of construction and demolition waste (C&DW) and their new reuse in structures is one of the solutions of environmental problems. Construction and demolition waste creates a major portion of total solid waste production in the world and most of it is used in landfills all the time. The paper deals with the situation of the recycling of the building and demolition waste in the Czech Republic during the recent years. The paper is dealing with questions of C&D waste recycling, it also characterizes construction and demolition waste in general, furthermore it analyses production of construction waste and subsequent production of recycled materials.

Keywords: Recycling, Construction and demolition waste, Recycled rubble, Waste management

Procedia PDF Downloads 271
15267 Experimental Investigation on High Performance Concrete with Silica Fume and Ceramic Waste

Authors: P. Vinayagam, A. Madhanagopal

Abstract:

This experimental investigation focuses on the study of the strength of concrete with ceramic waste as coarse aggregate. It is not a new concept of using alternate materials for aggregates. Pottery and ceramics have been an important part of human culture for thousands of years. The ceramic waste from ceramic and construction industries is a major contribution to construction demolition waste (CDW), representing a serious environmental, technical, and economical problem of today’s society. The major sources of ceramic waste are ceramic industry, building construction and building demolition. In ceramic industries, a significant part of the losses in the manufacturing of ceramic elements is not returned to the production process. In building construction, ceramic waste is produced during transportation to the building site, on the execution of several construction elements and on subsequent works. This waste is regionally deposited in dumping grounds, without any separation or reuse. In this study an attempt has been made to find the suitability of the ceramic industrial wastes as a possible replacement for conventional crushed stone coarse aggregate in high performance concrete. In this study, glazed stoneware pipe waste was used as coarse aggregates. In this investigation, physical properties of ceramic waste coarse aggregates were studied. Experiments were carried out to determine the strength of high performance concrete with silica fume and ceramic stoneware pipe waste coarse aggregate of 10%, 20%, 30%, 40% and 50% different replacement ratios in comparison with those of corresponding conventional concrete mixes.

Keywords: ceramic waste, coarse aggregate replacement, glazed stoneware pipe waste, silica fume

Procedia PDF Downloads 259
15266 Maturity Level of Knowledge Management in Whole Life Costing in the UK Construction Industry: An Empirical Study

Authors: Ndibarefinia Tobin

Abstract:

The UK construction industry has been under pressure for many years to produce economical buildings which offer value for money, not only during the construction phase, but more importantly, during the full life of the building. Whole life costing is considered as an economic analysis tool that takes into account the total investment cost in and ownership, operation and subsequent disposal of a product or system to which the whole life costing method is being applied. In spite of its importance, the practice is still crippled by the lack of tangible evidence, ‘know-how’ skills and knowledge of the practice i.e. the lack of professionals with the knowledge and training on the use of the practice in construction project, this situation is compounded by the absence of available data on whole life costing from relevant projects, lack of data collection mechanisms and so on. The aforementioned problems has forced many construction organisations to adopt project enhancement initiatives to boost their performance on the use of whole life costing techniques so as to produce economical buildings which offer value for money during the construction stage also the whole life of the building/asset. The management of knowledge in whole life costing is considered as one of the many project enhancement initiative and it is becoming imperative in the performance and sustainability of an organisation. Procuring building projects using whole life costing technique is heavily reliant on the knowledge, experience, ideas and skills of workers, which comes from many sources including other individuals, electronic media and documents. Due to the diversity of knowledge, capabilities and skills of employees that vary across an organisation, it is significant that they are directed and coordinated efficiently so as to capture, retrieve and share knowledge in order to improve the performance of the organisation. The implementation of knowledge management concept has different levels in each organisation. Measuring the maturity level of knowledge management in whole life costing practice will paint a comprehensible picture of how knowledge is managed in construction organisations. Purpose: The purpose of this study is to identify knowledge management maturity in UK construction organisations adopting whole life costing in construction project. Design/methodology/approach: This study adopted a survey method and conducted by distributing questionnaires to large construction companies that implement knowledge management activities in whole life costing practice in construction project. Four level of knowledge management maturity was proposed on this study. Findings: From the results obtained in the study shows that 34 contractors at the practiced level, 26 contractors at managed level and 12 contractors at continuously improved level.

Keywords: knowledge management, whole life costing, construction industry, knowledge

Procedia PDF Downloads 216
15265 Text2Time: Transformer-Based Article Time Period Prediction

Authors: Karthick Prasad Gunasekaran, B. Chase Babrich, Saurabh Shirodkar, Hee Hwang

Abstract:

Construction preparation is crucial for the success of a construction project. By involving project participants early in the construction phase, project managers can plan ahead and resolve issues early, resulting in project success and satisfaction. This study uses quantitative data from construction management projects to determine the relationship between the pre-construction phase, construction schedule, and customer satisfaction. This study examined a total of 65 construction projects and 93 clients per job to (a) identify the relationship between the pre-construction phase and program reduction and (b) the pre-construction phase and customer retention. Based on a quantitative analysis, this study found a negative correlation between pre-construction status and project schedule in 65 construction projects. This finding means that the more preparatory work done on a particular project, the shorter the total construction time. The Net Promoter Score of 93 clients from 65 projects was then used to determine the relationship between construction preparation and client satisfaction. The pre-construction status and the projects were further analyzed, and a positive correlation between them was found. This shows that customers are happier with projects with a higher ready-to-build ratio than projects with less ready-to-build.

Keywords: NLP, BERT, LLM, deep learning, classification

Procedia PDF Downloads 62
15264 Establishment of a Test Bed for Integrated Map of Underground Space and Verification of GPR Exploration Equipment

Authors: Jisong Ryu, Woosik Lee, Yonggu Jang

Abstract:

The paper discusses the process of establishing a reliable test bed for verifying the usability of Ground Penetrating Radar (GPR) exploration equipment based on an integrated underground spatial map in Korea. The aim of this study is to construct a test bed consisting of metal and non-metal pipelines to verify the performance of GPR equipment and improve the accuracy of the underground spatial integrated map. The study involved the design and construction of a test bed for metal and non-metal pipe detecting tests. The test bed was built in the SOC Demonstration Research Center (Yeoncheon) of the Korea Institute of Civil Engineering and Building Technology, burying metal and non-metal pipelines up to a depth of 5m. The test bed was designed in both vehicle-type and cart-type GPR-mounted equipment. The study collected data through the construction of the test bed and conducting metal and non-metal pipe detecting tests. The study analyzed the reliability of GPR detecting results by comparing them with the basic drawings, such as the underground space integrated map. The study contributes to the improvement of GPR equipment performance evaluation and the accuracy of the underground spatial integrated map, which is essential for urban planning and construction. The study addressed the question of how to verify the usability of GPR exploration equipment based on an integrated underground spatial map and improve its performance. The study found that the test bed is reliable for verifying the performance of GPR exploration equipment and accurately detecting metal and non-metal pipelines using an integrated underground spatial map. The study concludes that the establishment of a test bed for verifying the usability of GPR exploration equipment based on an integrated underground spatial map is essential. The proposed Korean-style test bed can be used for the evaluation of GPR equipment performance and support the construction of a national non-metal pipeline exploration equipment performance evaluation center in Korea.

Keywords: Korea-style GPR testbed, GPR, metal pipe detecting, non-metal pipe detecting

Procedia PDF Downloads 66
15263 Safety Management on Construction Sites

Authors: Jonathan Doku

Abstract:

The study's goal was to evaluate construction site safety management in Ghana. The construction sector has long been seen as a high-risk business. It entails a variety of hazardous and challenging labor duties, such as lifting and working at a height, among others. The accident rate is a standard indicator for comparing the safety performance of construction projects. Because of its high-risk and fast-changing work environment, the construction business is regarded as one of the industries with the highest accident rates in the world. Many mishaps and work-related diseases have occurred there, and construction workers are particularly vulnerable to catastrophic calamities such as falls, collapses, and burial. The study's main goals were to discover characteristics that have a substantial impact on construction site safety, to evaluate the safety management methods utilized on construction sites, and to assess the obstacles associated with construction site safety management. The study was conducted using a quantitative research method and a purposive sampling strategy. Google forms were used to distribute self-administered surveys to 85 responders. 72 of the 85 questionnaires were completed and submitted for analysis, accounting for 84.7 percent of the total. The variables were analyzed using descriptive statistics, mean score ranking, and Cronbach's Alpha Coefficient to ensure the scale's reliability. The formal safety organization structure and the Safety checklist were identified as the key practices of safety management on site as part of the study goals. In addition, it was discovered that the most serious problem with safety management is ineffective supervision. To guarantee efficient monitoring and proper implementation of health and safety rules on building sites, management must be on the ball.

Keywords: construction, safety, risk, management

Procedia PDF Downloads 46
15262 Stabilized Earth Roads Construction and Its Challenges

Authors: Mokhtar Nikgoo

Abstract:

Road definition and road construction: in engineering literature, a road is defined as a means of communication between two different places by air, land, and sea. In this way, all sea, land, and air routes are considered as roads. Road construction is an operation to create a road on the ground between 2 points with a specified width, which includes works such as subgrade, paving, placing tables, and traffic signs on the road. In this article, the stages of road construction are explained from the beginning to the end. Road construction is generally done in the construction of rural, urban, and inter-city roads, and according to the special conditions of this area, the precision of engineers in its design and calculations is very important. For example, if the design of a road does not pay enough attention to the way the road curves, there will undoubtedly be countless accidents. Also, adjusting the road surface and its durability and uniformity are among the things that engineers solve according to the upcoming obstacles.

Keywords: road construction, surveying, freeway, pavement, excavator

Procedia PDF Downloads 45
15261 Modern Work Modules in Construction Practice

Authors: Robin Becker, Nane Roetmann, Manfred Helmus

Abstract:

Construction companies lack junior staff for construction management. According to a nationwide survey of students, however, the profession lacks attractiveness. The conflict between the traditional job profile and the current desires of junior staff for contemporary and flexible working models must be resolved. Increasing flexibility is essential for the future viability of small and medium-sized enterprises. The implementation of modern work modules can help here. The following report will present the validation results of the developed work modules in construction practice.

Keywords: modern construction management, construction industry, work modules, shortage of junior staff, sustainable personnel management, making construction management more attractive, working time model

Procedia PDF Downloads 52
15260 Comprehensive Risk Assessment Model in Agile Construction Environment

Authors: Jolanta Tamošaitienė

Abstract:

The article focuses on a developed comprehensive model to be used in an agile environment for the risk assessment and selection based on multi-attribute methods. The model is based on a multi-attribute evaluation of risk in construction, and the determination of their optimality criterion values are calculated using complex Multiple Criteria Decision-Making methods. The model may be further applied to risk assessment in an agile construction environment. The attributes of risk in a construction project are selected by applying the risk assessment condition to the construction sector, and the construction process efficiency in the construction industry accounts for the agile environment. The paper presents the comprehensive risk assessment model in an agile construction environment. It provides a background and a description of the proposed model and the developed analysis of the comprehensive risk assessment model in an agile construction environment with the criteria.

Keywords: assessment, environment, agile, model, risk

Procedia PDF Downloads 224
15259 Causes of Cost Overrun in Building Construction Projects: Case Study from Al Madinah, Saudi Arabia

Authors: Z. Hamed, K. Sa'deya, E. Abdelrasheed, I. Mahamid

Abstract:

The construction industry is one of the main sectors that play basic role in the urban and rural development of a society. It provides important ingredients for the development of an economy. However, many construction projects experience extensive cost overrun. This study was conducted to identify the causes of cost overrun in building construction contracts in Al Madinah, Saudi Arabia and test the importance of these causes from contractors' perspective. To achieve the study objectives, a questionnaire survey was conducted to identify and rank cost overrun causes from the perspective of contractors. The findings found that the top five cost overrun causes are: lack of experience in the line of work, lack of labor productivity, delay in payments, rework and material waste. It is hoped that the findings will guide efforts to improve the performance of construction industry in Saudi Arabia and other developing countries.

Keywords: building, contractor, cost increase, cost overrun

Procedia PDF Downloads 123
15258 Construction Contractor Pre-Qualification Using Multi-Attribute Utility Theory: A Multiplicative Approach

Authors: B. Vikram, Y. Anu Leena, Y. Anu Neena, M. V. Krishna Rao, V. S. S. Kumar

Abstract:

The industry is often criticized for inefficiencies in outcomes such as time and cost overruns, low productivity, poor quality and inadequate customer satisfaction. To enhance the chances for construction projects to be successful, selecting an able contractor is one of the fundamental decisions to be made by clients. The selection of the most appropriate contractor is a multi-criteria decision making (MCDM) process. In this paper, multi-attribute utility theory (MAUT) is employed utilizing the multiplicative form of utility function for ranking the prequalified contractors. Performance assessment criteria covering contracting company attributes, experience record, past performance, performance potential, financial stability and project specific criteria are considered for contractor evaluation. A case study of multistoried building for which four contractors submitted bids is considered to illustrate the applicability of multiplicative approach of MAUT to rank the prequalified contractors. The proposed MAUT decision making methodology can also be employed to other decision making situations.

Keywords: multi-attribute utility theory, construction industry, prequalification, contractor

Procedia PDF Downloads 410
15257 A Construction Management Tool: Determining a Project Schedule Typical Behaviors Using Cluster Analysis

Authors: Natalia Rudeli, Elisabeth Viles, Adrian Santilli

Abstract:

Delays in the construction industry are a global phenomenon. Many construction projects experience extensive delays exceeding the initially estimated completion time. The main purpose of this study is to identify construction projects typical behaviors in order to develop a prognosis and management tool. Being able to know a construction projects schedule tendency will enable evidence-based decision-making to allow resolutions to be made before delays occur. This study presents an innovative approach that uses Cluster Analysis Method to support predictions during Earned Value Analyses. A clustering analysis was used to predict future scheduling, Earned Value Management (EVM), and Earned Schedule (ES) principal Indexes behaviors in construction projects. The analysis was made using a database with 90 different construction projects. It was validated with additional data extracted from literature and with another 15 contrasting projects. For all projects, planned and executed schedules were collected and the EVM and ES principal indexes were calculated. A complete linkage classification method was used. In this way, the cluster analysis made considers that the distance (or similarity) between two clusters must be measured by its most disparate elements, i.e. that the distance is given by the maximum span among its components. Finally, through the use of EVM and ES Indexes and Tukey and Fisher Pairwise Comparisons, the statistical dissimilarity was verified and four clusters were obtained. It can be said that construction projects show an average delay of 35% of its planned completion time. Furthermore, four typical behaviors were found and for each of the obtained clusters, the interim milestones and the necessary rhythms of construction were identified. In general, detected typical behaviors are: (1) Projects that perform a 5% of work advance in the first two tenths and maintain a constant rhythm until completion (greater than 10% for each remaining tenth), being able to finish on the initially estimated time. (2) Projects that start with an adequate construction rate but suffer minor delays culminating with a total delay of almost 27% of the planned time. (3) Projects which start with a performance below the planned rate and end up with an average delay of 64%, and (4) projects that begin with a poor performance, suffer great delays and end up with an average delay of a 120% of the planned completion time. The obtained clusters compose a tool to identify the behavior of new construction projects by comparing their current work performance to the validated database, thus allowing the correction of initial estimations towards more accurate completion schedules.

Keywords: cluster analysis, construction management, earned value, schedule

Procedia PDF Downloads 233
15256 Delivery of Sustainable Construction in South Africa – Assessing the Roles of Organisational Leadership

Authors: Ayodeji Emmanuel Oke, Mathew O. Ikuabe, Clinton O. Aigbavboa, Douglas O. Aghimien

Abstract:

The call for sustainable construction has received significant drive in recent time considering the overwhelming impacts of its adoption. However, not much has been deliberated on this subject with regards to the roles of organisational leadership in delivering sustainable construction. To this end, the study empirically scrutinised the roles of organisational leadership in delivering sustainable construction. The study adopted a quantitative approach while construction professionals formed the population of the study. A well-articulated questionnaire was used in eliciting responses from the respondents, while appropriate methods of data analysis were used. Findings from the study depicted that the major role of organisational leadership in the delivery of sustainable construction is acting as sustainability integrators. Equally revealed are the internal and external factors affecting organisational leadership in delivering sustainable construction. The study concluded by emphasizing the core roles for delivering sustainable construction by organisational leadership and further recommended that sustainable construction should serve as a prominent and focal organisation goal by organisational leadership when steering the organisation towards meeting its objectives

Keywords: organisational leadership, project delivery, roles, sustainable construction

Procedia PDF Downloads 86
15255 Critical Factors Influencing Effective Communication Among Stakeholders on Construction Project Delivery in Jigawa State, Nigeria

Authors: Shazali Abdulahi

Abstract:

Project planning is the first phase in project life cycle which relates to the use of schedules such as Gantt charts to plan and subsequently report the project progress within the project environment. Likewise, project execution is the third phase in project lifecycle, is the phase where the work of the project must get done correctly and it’s the longest phase in the project lifecycle therefore, they must be effectively communicated, now today Communication has become the crucial element of every organization. During construction project delivery, information needs to be accurately and timely communicating among project stakeholders in order to realize the project objective. Effective communication among stakeholders during construction project delivery is one of the major factors that impact construction project delivery. Therefore, the aim of the research work is to examine the critical factors influencing effective communication among stakeholders on construction project delivery from the perspective of construction professionals (Architects, Builders, Quantity surveyors, and Civil engineers). A quantitative approach was adopted. This entailed the used of structured questionnaire to one (108) construction professionals in public and private organization within dutse metropolis. Frequency, mean, ranking and multiple linear regression using SPSS vision 25 software were used to analyses the data. The results show that Leadership, Trust, Communication tools, Communication skills, Stakeholders involvement, Cultural differences, and Communication technology were the most critical factors influencing effective communication among stakeholders on construction project delivery. The hypothesis revealed that, effective communication among stakeholders has significant effects on construction project delivery. This research work will profit the construction stakeholders in construction industry, by providing adequate knowledge regarding the factors influencing effective communication among stakeholders, so that necessary steps to be taken to improve project performance. Also, it will provide knowledge about the appropriate strategies to employ in order to improve communication among stakeholders.

Keywords: effetive communication, ineffective communication, stakeholders, project delivery

Procedia PDF Downloads 12
15254 The Utilization of Recycled Construction and Demolition Waste Aggregate in Asphaltic Concrete

Authors: Inas Kamel, Noor Z. Habib

Abstract:

Utilizing construction and demolition wastes in hotmix asphalt (HMA) pavement construction can reduce the adverse environmental effect of its inadequate disposal and reduce the pressure of extracting and processing mineral aggregates (MA). This study aims to examine the viability of replacing MA by recycled construction and demolition waste aggregates (RCDWA) in the wearing course of asphaltic concrete (AC) pavements without compromising its loadbearing capacity. The Marshall Method was used to evaluate the performance of AC wearing course specimens by replacing MA by 10%, 20% and 30% RCDWA. Grade 60/70 bitumen was used in the range 3.0-5.5%, with 05% increments, to generate the optimum bitumen content (OBC). From the volumetric analysis and test property curves, the mixture containing 20% RCDWA was chosen as the preferred mix at 5.1% OBC. It possessed a 10% increase in Marshall Stability compared to the reference specimen, containing 100% MA, and a 6% increase in Marshall flow.

Keywords: aggregate, asphaltic concrete, Marshall method, optimum bitumen content, recycled construction and demolition waste

Procedia PDF Downloads 117
15253 Weaknesses and Performance Defects of Steel Structures According to the Executive Criteria

Authors: Ehsan Sadie

Abstract:

Despite the experience of heavy losses and damages of recent earthquakes such as 8 km E of Pāhala, Hawaii, 11 km W of Salvaleón de Higüey, Dominican Republic and 49 km SSE of Punta Cana, Dominican Republic earthquakes, the possibility of large earthquakes in most populated areas of any country and the serious need for quality control in the design and implementation of buildings, not enough attention has been paid to the proper construction. Steel structures constitute a significant part of construction in any metropolitan area. This article gives a brief overview of the implementation status of these buildings in urban areas and considers the weaknesses of performance that typically occur due to negligence or insufficient mastery of the building supervisor in the principles of operation of earthquake-resistant buildings, and provide appropriate and possible solutions to improve the construction.

Keywords: bracing member, concentrated load, diaphragm system, earthquake engineering, load-bearing system, shear force, seismic retrofitting, steel building, strip foundation, supervising engineer, vulnerability of building

Procedia PDF Downloads 123
15252 Effects of the Quality Construction of Public Construction in Taiwan to Implementation Three Levels Quality Management Institution

Authors: Hsin-Hung Lai, Wei Lo

Abstract:

Whether it is in virtue or vice for a construction quality of public construction project, it is one of the important indicators for national economic development and overall construction, the impact on the quality of national life is very deep. In recent years, a number of scandal of public construction project occurred, the requirements of the government agencies and the public require the quality of construction of public construction project are getting stricter than ever, the three-level public construction project construction quality of quality control system implemented by the government has a profound impact. This study mainly aggregated the evolution of ISO 9000 quality control system, the difference between the practice of implementing management of construction quality by many countries and three-level quality control of our country, so we explored and found that almost all projects of enhancing construction quality are dominated by civil organizations in foreign countries, whereas, it is induced by the national power in our country and develop our three-level quality control system and audit mechanism based on IOS system and implement the works by legislation, we also explored its enhancement and relevance with construction quality of public construction project that are intervened by such system and national power, and it really presents the effectiveness of construction quality been enhanced by the audited result. The three-level quality control system of our country to promote the policy of public construction project is almost same with the quality control system of many developed countries; however our country mainly implements such system on public construction project only, we promote the three-level quality control system is for enhancing the quality of public construction project, for establishing effective quality management system, so as to urge, correct and prevent the defects of quality management by manufacturers, whereas, those developed countries is comprehensively promoting (both public construction project and civil construction) such system. Therefore, this study is to explore the scope for public construction project only; the most important is the quality recognition by the executor, either good quality or deterioration is not a single event, there is a certain procedure extends from the demand and feasibility analysis, design, tendering, contracting, construction performance, inspection, continuous improvement, completion and acceptance, transferring and meeting the needs of the users, all of mentioned above have a causal relationship and it is a systemic problems. So the best construction quality would be manufactured and managed by reasonable cost if it is by extensive thinking and be preventive. We aggregated the implemented results in the past 10 years (2005 to 2015), the audited results of both in central units and local ones were slightly increased in A-grade while those listed in B-grade were decreased, although the levels were not evidently upgraded, yet, such result presents that the construction quality of concept of manufacturers are improving, and the construction quality has been established in the design stage, thus it is relatively beneficial to the enhancement of construction quality of overall public construction project.

Keywords: ISO 9000, three-level quality control system, audit and review mechanism for construction implementation, quality of construction implementation

Procedia PDF Downloads 311
15251 Application of Flexi-Wall in Noise Barriers Renewal

Authors: B. Daee, H. M. El Naggar

Abstract:

This paper presents an experimental study on structural performance of an innovative noise barrier consisting of poly-block, light polyurethane foam (LPF) and polyurea. This wall system (flexi-wall) is intended to be employed as a vertical extension to existing sound barriers in an accelerated construction method. To aid in the wall design, several mechanical tests were conducted on LPF specimens and two full-scale walls were then fabricated employing the same LPF material. The full-scale walls were subjected to lateral loading in order to establish their lateral resistance. A cyclic fatigue test was also performed on a full-scale flexi-wall in order to evaluate the performance of the wall under a repetitive loading condition. The result of the experiments indicated the suitability of flexi-wall in accelerated construction and confirmed that the structural performance of the wall system under lateral loading is satisfactory for the sound barrier application. The experimental results were discussed and a preliminary design procedure for application of flexi-wall in sound barrier applications was also developed.

Keywords: noise barrier, polyurethane foam, accelerated construction, full-scale experiment

Procedia PDF Downloads 260
15250 Identifying Reforms Required in Construction Contracts from Resolved Disputed Cases

Authors: K. C. Iyer, Yogita Manan Bindal, Sumit Kumar Bakshi

Abstract:

The construction industry is plagued with disputes and litigation in India with many stalled projects seeking dispute resolution. This has an adverse effect on the performance and overall project delivery and impacts future investments within the industry. While construction industry is the major driver of growth, there has not been major reforms in the government construction contracts. The study is aimed at identifying the proactive means of dispute avoidance, focusing on reforms required within the construction contracts, by studying 49 arbitration awards of construction disputes. The claims presented in the awards are aggregated to study the causes linked to the contract document and are referred against the prospective recommendation and practices as surveyed from literature review of research papers. Within contract administration, record keeping has been a major concern as they are required by the parties to substantiate the claims or the counterclaims and therefore are essential in any dispute redressal process. The study also observes that the right judgment is inhibited when the record keeping is improper and due to lack of coherence between documents, the dispute resolution period is also prolonged. The finding of the research will be relevant to industry practitioners in contract drafting with a view to avoid disputes.

Keywords: construction contract, contract administration, contract management, dispute avoidance

Procedia PDF Downloads 235
15249 Time Overrun in Pre-Construction Planning Phase of Construction Projects

Authors: Hafiz Usama Imad, Muhammad Akram Akhund, Tauha Hussain Ali, Ali Raza Khoso, Fida Hussain Siddiqui

Abstract:

Construction industry plays a significant role in fulfilling the major requirements of the human being. It is one of the major constituents of every developed country. Although the construction industry of both the developing and developed countries encompasses a major part of the economy, and millions of rupees are utilized every year on various kinds of construction projects. But, this industry is facing numerous hurdles in terms of its budget and timely completion. Construction projects generally consist of several phases like planning, designing, execution, and finishing. This research study aims to determine the significant factors of time overrun in pre-construction planning (PCP) phase of construction projects in Pakistan. Questionnaires were distributed by various means and responses of respondents were compiled and collected data were then analyzed through a statistical technique using SPSS version 24. Major causes of time overrun in pre-construction planning phase; which is an extremely important phase of construction projects, were revealed. The research conclusion will provide a pathway for stakeholders to pay attention to the mentioned causes to overcome the major issue of time overrun.

Keywords: construction industry, Pakistan, pre-construction planning phase, time overrun

Procedia PDF Downloads 222
15248 CO2 Emission and Cost Optimization of Reinforced Concrete Frame Designed by Performance Based Design Approach

Authors: Jin Woo Hwang, Byung Kwan Oh, Yousok Kim, Hyo Seon Park

Abstract:

As greenhouse effect has been recognized as serious environmental problem of the world, interests in carbon dioxide (CO2) emission which comprises major part of greenhouse gas (GHG) emissions have been increased recently. Since construction industry takes a relatively large portion of total CO2 emissions of the world, extensive studies about reducing CO2 emissions in construction and operation of building have been carried out after the 2000s. Also, performance based design (PBD) methodology based on nonlinear analysis has been robustly developed after Northridge Earthquake in 1994 to assure and assess seismic performance of building more exactly because structural engineers recognized that prescriptive code based design approach cannot address inelastic earthquake responses directly and assure performance of building exactly. Although CO2 emissions and PBD approach are recent rising issues on construction industry and structural engineering, there were few or no researches considering these two issues simultaneously. Thus, the objective of this study is to minimize the CO2 emissions and cost of building designed by PBD approach in structural design stage considering structural materials. 4 story and 4 span reinforced concrete building optimally designed to minimize CO2 emissions and cost of building and to satisfy specific seismic performance (collapse prevention in maximum considered earthquake) of building satisfying prescriptive code regulations using non-dominated sorting genetic algorithm-II (NSGA-II). Optimized design result showed that minimized CO2 emissions and cost of building were acquired satisfying specific seismic performance. Therefore, the methodology proposed in this paper can be used to reduce both CO2 emissions and cost of building designed by PBD approach.

Keywords: CO2 emissions, performance based design, optimization, sustainable design

Procedia PDF Downloads 376
15247 A Prediction of Electrical Cost for High-Rise Building Construction

Authors: Picha Sriprachan

Abstract:

The increase in electricity prices affects the cost of high-rise building construction. The objectives of this research are to study the electrical cost, trend of electrical cost and to forecast electrical cost of high-rise building construction. The methods of this research are: 1) to study electrical payment formats, cost data collection methods, and the factors affecting electrical cost of high-rise building construction, 2) to study the quantity and trend of cumulative percentage of the electrical cost, and 3) to forecast the electrical cost for different types of high-rise buildings. The results of this research show that the average proportion between electrical cost and the value of the construction project is 0.87 percent. The proportion of electrical cost for residential, office and commercial, and hotel buildings are closely proportional. If construction project value increases, the proportion of electrical cost and the value of the construction project will decrease. However, there is a relationship between the amount of electrical cost and the value of the construction project. During the structural construction phase, the amount of electrical cost will increase and during structural and architectural construction phase, electrical cost will be maximum. The cumulative percentage of the electrical cost is related to the cumulative percentage of the high-rise building construction cost in the same direction. The amount of service space of the building, number of floors and the duration of the construction affect the electrical cost of construction. The electrical cost of construction forecasted by using linear regression equation is close to the electrical cost forecasted by using the proportion of electrical cost and value of the project.

Keywords: high-rise building construction, electrical cost, construction phase, architectural phase

Procedia PDF Downloads 357
15246 Descriptive Assessment of Health and Safety Regulations and Its Current Situation in the Construction Industry of Pakistan

Authors: Khawaja A. Wahaj Wani, Aykut Erkal

Abstract:

Pakistan's construction industry, a key player in economic development, has experienced remarkable growth. However, the surge in activities has been accompanied by dangerous working conditions, attributed to legislative gaps and flaws. Unhealthy construction practices, uncertain site conditions, and hazardous environments contribute to a concerning rate of injuries and fatalities. The principal aim of this research study is to undertake a thorough evaluation based on the assessment of the current situation of Health & Safety policies and the surveys performed by stakeholders of Pakistan with the aim of providing solution-centric methodologies for the enforcement of health and safety regulations within construction companies operating on project sites. Recognizing the pivotal role that the construction industry plays in bolstering a nation's economy, it is imperative to address the pressing need for heightened awareness among site engineers and laborers. The study adopts a robust approach, utilizing questionnaire surveys and interviews. As an exclusive investigative study, it encompasses all stakeholders: clients, consultants, contractors, and subcontractors. Targeting PEC-registered companies. Safety performance was assessed through the examination of sixty safety procedures using SPSS-18. A high Cronbach's alpha value of 0.958 ensures data reliability, and non-parametric tests were employed due to the non-normal distribution of data. The safety performance evaluation revealed significant insights. "Using Hoists and Cranes" and "Precautionary Measures (Shoring and Excavation)" exhibited commendable safety levels. Conversely, "Trainings on Safety" displayed a lower safety performance, alongside areas such as "Safety in Contract Documentation," "Meetings for Safety," and "Worker Participation," indicating room for improvement. These findings provide stakeholders with a detailed understanding of current safety measures within Pakistan's construction industry.

Keywords: construction industry, health and safety regulations, Pakistan, risk management

Procedia PDF Downloads 24
15245 An Empirical Study of Barriers to Total Quality Management Implementation in Construction Industries

Authors: Dhafer Alqahtani

Abstract:

Total quality management (TQM) has become a widely accepted approach in the modern industry over recent years. There is a general consensus that by adopting TQM, the overall effectiveness and performance of an industry can be improved. It is also proved that as long as TQM is adopted fully and practiced effectively in the industry, potential benefits of TQM will be delivered. But despite the benefits of TQM as articulated by many quality gurus and academicians, these benefits are not achieved in practice. Many service industries have found it difficult to implement TQM successfully. This paper, therefore, explores the barriers to TQM’s successful implementation in construction firms. The aim is to identify and rank the barriers to successful TQM implementation in order to make them know and get a better understanding by the managers and practitioners of the Construction Industries. The research methodology adopted in this study was an extensive literature review on barriers to TQM implementation followed by a survey of selected construction firms using the self-administered instrument. The results also showed that only lack of effective communication and lack of top management support were not significantly associated with the level of implementation of TQM.

Keywords: total quality management, construction firms, barriers, successful implementation

Procedia PDF Downloads 62
15244 Assessing the Influence of Using Traditional Methods of Construction on Cost and Quality of Building Construction

Authors: Musoke Ivan, Birungi Racheal

Abstract:

The construction trend is characterized by increased use of modern methods yet traditional methods are cheaper in terms of costs, in addition to the benefits it offers to the construction sector, like providing more jobs that could have been worked with the intensive machines. The purpose of this research was to assess the influence of using Traditional methods of construction (TMC) on the costs and quality of building structures and determine the different ways. Traditional methods of construction (TMC) can be applicable and integrated into the construction trend, and propose ways how this can be a success. The study adopted a quantitative method approach targeting various construction professionals like Architects, Quantity surveyors, Engineers, and Construction Managers. Questionnaires and analyses of literature were used to obtain research data and findings. Simple random sampling was used to select 40 construction professionals to which questionnaires were administered. The data was then analyzed using Microsoft Excel. The findings of the research indicate that Traditional methods of construction (TMCs) in Uganda are cheaper in terms of costs, but the quality is still low. This is attributed to a lack of skilled labour and efficient supervision while undertaking tasks leading to low quality. The study identifies strategies that would improve Traditional methods of construction (TMC), which include the employment of skilled manpower and effective supervision. It also identifies the need by stakeholders like the government, clients, and professionals to appreciate Traditional methods of construction (TMCs) and allow for a levelled ground for Traditional Methods of Construction and Modern methods of construction (MMCs).

Keywords: traditional methods of construction, integration, cost, quality

Procedia PDF Downloads 28
15243 Implementation of Social Network Analysis to Analyze the Dependency between Construction Bid Packages

Authors: Kawalpreet Kaur, Panagiotis Mitropoulos

Abstract:

The division of the project scope into work packages is the most important step in the preconstruction phase of construction projects. The work division determines the scope and complexity of each bid package, resulting in dependencies between project participants performing these work packages. The coordination between project participants is necessary because of these dependencies. Excessive dependencies between the bid packages create coordination difficulties, leading to delays, added costs, and contractual friction among project participants. However, the literature on construction provides limited knowledge regarding work structuring approaches, issues, and challenges. Manufacturing industry literature provides a systematic approach to defining the project scope into work packages, and the implementation of social network analysis (SNA) in manufacturing is an effective approach to defining and analyzing the divided scope of work at the dependencies level. This paper presents a case study of implementing a similar approach using SNA in construction bid packages. The study uses SNA to analyze the scope of bid packages and determine the dependency between scope elements. The method successfully identifies the bid package with the maximum interaction with other trade contractors and the scope elements that are crucial for project performance. The analysis provided graphical and quantitative information on bid package dependencies. The study can be helpful in performing an analysis to determine the dependencies between bid packages and their scope elements and how these scope elements are critical for project performance. The study illustrates the potential use of SNA as a systematic approach to analyzing bid package dependencies in construction projects, which can guide the division of crucial scope elements to minimize negative impacts on project performance.

Keywords: work structuring, bid packages, work breakdown, project participants