Search results for: constraint satisfaction problem (CSP)
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 9013

Search results for: constraint satisfaction problem (CSP)

9013 Exhaustive Study of Essential Constraint Satisfaction Problem Techniques Based on N-Queens Problem

Authors: Md. Ahsan Ayub, Kazi A. Kalpoma, Humaira Tasnim Proma, Syed Mehrab Kabir, Rakib Ibna Hamid Chowdhury

Abstract:

Constraint Satisfaction Problem (CSP) is observed in various applications, i.e., scheduling problems, timetabling problems, assignment problems, etc. Researchers adopt a CSP technique to tackle a certain problem; however, each technique follows different approaches and ways to solve a problem network. In our exhaustive study, it has been possible to visualize the processes of essential CSP algorithms from a very concrete constraint satisfaction example, NQueens Problem, in order to possess a deep understanding about how a particular constraint satisfaction problem will be dealt with by our studied and implemented techniques. Besides, benchmark results - time vs. value of N in N-Queens - have been generated from our implemented approaches, which help understand at what factor each algorithm produces solutions; especially, in N-Queens puzzle. Thus, extended decisions can be made to instantiate a real life problem within CSP’s framework.

Keywords: arc consistency (AC), backjumping algorithm (BJ), backtracking algorithm (BT), constraint satisfaction problem (CSP), forward checking (FC), least constrained values (LCV), maintaining arc consistency (MAC), minimum remaining values (MRV), N-Queens problem

Procedia PDF Downloads 365
9012 A Survey on Constraint Solving Approaches Using Parallel Architectures

Authors: Nebras Gharbi, Itebeddine Ghorbel

Abstract:

In the latest years and with the advancements of the multicore computing world, the constraint programming community tried to benefit from the capacity of new machines and make the best use of them through several parallel schemes for constraint solving. In this paper, we propose a survey of the different proposed approaches to solve Constraint Satisfaction Problems using parallel architectures. These approaches use in a different way a parallel architecture: the problem itself could be solved differently by several solvers or could be split over solvers.

Keywords: constraint programming, parallel programming, constraint satisfaction problem, speed-up

Procedia PDF Downloads 320
9011 A Genetic Algorithm Approach for Multi Constraint Team Orienteering Problem with Time Windows

Authors: Uyanga Sukhbaatar, Ahmed Lbath, Mendamar Majig

Abstract:

The Orienteering Problem is the most known example to start modeling tourist trip design problem. In order to meet tourist’s interest and constraint the OP is becoming more and more complicate to solve. The Multi Constraint Team Orienteering Problem with Time Windows is the last extension of the OP which differentiates from other extensions by including more extra associated constraints. The goal of the MCTOPTW is maximizing tourist’s satisfaction score in same time not to violate any of these constraints. This paper presents a genetic algorithmic approach to tackle the MCTOPTW. The benchmark data from literature is tested by our algorithm and the performance results are compared.

Keywords: multi constraint team orienteering problem with time windows, genetic algorithm, tour planning system

Procedia PDF Downloads 627
9010 Problem of Services Selection in Ubiquitous Systems

Authors: Malika Yaici, Assia Arab, Betitra Yakouben, Samia Zermani

Abstract:

Ubiquitous computing is nowadays a reality through the networking of a growing number of computing devices. It allows providing users with context aware information and services in a heterogeneous environment, anywhere and anytime. Selection of the best context-aware service, between many available services and providers, is a tedious problem. In this paper, a service selection method based on Constraint Satisfaction Problem (CSP) formalism is proposed. The services are considered as variables and domains; and the user context, preferences and providers characteristics are considered as constraints. The Backtrack algorithm is used to solve the problem to find the best service and provider which matches the user requirements. Even though this algorithm has an exponential complexity, but its use guarantees that the service, that best matches the user requirements, will be found. A comparison of the proposed method with the existing solutions finishes the paper.

Keywords: ubiquitous computing, services selection, constraint satisfaction problem, backtrack algorithm

Procedia PDF Downloads 245
9009 Rating and Generating Sudoku Puzzles Based on Constraint Satisfaction Problems

Authors: Bahare Fatemi, Seyed Mehran Kazemi, Nazanin Mehrasa

Abstract:

Sudoku is a logic-based combinatorial puzzle game which people in different ages enjoy playing it. The challenging and addictive nature of this game has made it a ubiquitous game. Most magazines, newspapers, puzzle books, etc. publish lots of Sudoku puzzles every day. These puzzles often come in different levels of difficulty so that all people, from beginner to expert, can play the game and enjoy it. Generating puzzles with different levels of difficulty is a major concern of Sudoku designers. There are several works in the literature which propose ways of generating puzzles having a desirable level of difficulty. In this paper, we propose a method based on constraint satisfaction problems to evaluate the difficulty of the Sudoku puzzles. Then, we propose a hill climbing method to generate puzzles with different levels of difficulty. Whereas other methods are usually capable of generating puzzles with only few number of difficulty levels, our method can be used to generate puzzles with arbitrary number of different difficulty levels. We test our method by generating puzzles with different levels of difficulty and having a group of 15 people solve all the puzzles and recording the time they spend for each puzzle.

Keywords: constraint satisfaction problem, generating Sudoku puzzles, hill climbing

Procedia PDF Downloads 402
9008 Three-Stage Multivariate Stratified Sample Surveys with Probabilistic Cost Constraint and Random Variance

Authors: Sanam Haseen, Abdul Bari

Abstract:

In this paper a three stage multivariate programming problem with random survey cost and variances as random variables has been formulated as a non-linear stochastic programming problem. The problem has been converted into an equivalent deterministic form using chance constraint programming and modified E-modeling. An empirical study of the problem has been done at the end of the paper using R-simulation.

Keywords: chance constraint programming, modified E-model, stochastic programming, stratified sample surveys, three stage sample surveys

Procedia PDF Downloads 458
9007 Reconstruction of Binary Matrices Satisfying Neighborhood Constraints by Simulated Annealing

Authors: Divyesh Patel, Tanuja Srivastava

Abstract:

This paper considers the NP-hard problem of reconstructing binary matrices satisfying exactly-1-4-adjacency constraint from its row and column projections. This problem is formulated into a maximization problem. The objective function gives a measure of adjacency constraint for the binary matrices. The maximization problem is solved by the simulated annealing algorithm and experimental results are presented.

Keywords: discrete tomography, exactly-1-4-adjacency, simulated annealing, binary matrices

Procedia PDF Downloads 407
9006 Bi-Directional Evolutionary Topology Optimization Based on Critical Fatigue Constraint

Authors: Khodamorad Nabaki, Jianhu Shen, Xiaodong Huang

Abstract:

This paper develops a method for considering the critical fatigue stress as a constraint in the Bi-directional Evolutionary Structural Optimization (BESO) method. Our aim is to reach an optimal design in which high cycle fatigue failure does not occur for a specific life time. The critical fatigue stress is calculated based on modified Goodman criteria and used as a stress constraint in our topology optimization problem. Since fatigue generally does not occur for compressive stresses, we use the p-norm approach of the stress measurement that considers the highest tensile principal stress in each point as stress measure to calculate the sensitivity numbers. The BESO method has been extended to minimize volume an object subjected to the critical fatigue stress constraint. The optimization results are compared with the results from the compliance minimization problem which shows clearly the merits of our newly developed approach.

Keywords: topology optimization, BESO method, p-norm, fatigue constraint

Procedia PDF Downloads 295
9005 An Improved Genetic Algorithm for Traveling Salesman Problem with Precedence Constraint

Authors: M. F. F. Ab Rashid, A. N. Mohd Rose, N. M. Z. Nik Mohamed, W. S. Wan Harun, S. A. Che Ghani

Abstract:

Traveling salesman problem with precedence constraint (TSPPC) is one of the most complex problems in combinatorial optimization. The existing algorithms to solve TSPPC cost large computational time to find the optimal solution. The purpose of this paper is to present an efficient genetic algorithm that guarantees optimal solution with less number of generations and iterations time. Unlike the existing algorithm that generates priority factor as chromosome, the proposed algorithm directly generates sequence of solution as chromosome. As a result, the proposed algorithm is capable of generating optimal solution with smaller number of generations and iteration time compare to existing algorithm.

Keywords: traveling salesman problem, sequencing, genetic algorithm, precedence constraint

Procedia PDF Downloads 561
9004 Happiness, Life Satisfaction, Self-Efficacy, Coping Strategies and Perceived Stress among High School Students

Authors: Mustafa Jahanara, Mohsen Shahbakhti

Abstract:

The current study examined the relationship between happiness, life satisfaction, self-efficacy, coping strategies and perceived stress among high school students, Eshtehard city, Alboez province, Iran. One hundred and sixty-seven high school students were asked to complete the Subjective Happiness scale (SHS), The Satisfaction with Life Scale (SWLS), General Self-efficacy (GSE), the Brief COPE, and Perceived Stress Scale (PSS). Results revealed a positive correlation between happiness with life satisfaction, self-efficacy, problem-focused coping, adopted coping and it was a negative correlation with stress. Self-efficacy is a significant positive correlated with life satisfaction, problem-focused coping and it is negative correlated with stress. However, the findings suggest that self-efficacy and problem-focused coping could influence on happiness and life satisfaction.

Keywords: happiness, life satisfaction, self-efficacy, perceived stress and coping strategies

Procedia PDF Downloads 537
9003 Constraint-Directed Techniques for Transport Scheduling with Capacity Restrictions of Automotive Manufacturing Components

Authors: Martha Ndeley, John Ikome

Abstract:

In this paper, we expand the scope of constraint-directed techniques to deal with the case of transportation schedule with capacity restrictions where the scheduling problem includes alternative activities. That is, not only does the scheduling problem consist of determining when an activity is to be executed, but also determining which set of alternative activities is to be executed at all level of transportation from input to output. Such problems encompass both alternative resource problems and alternative process plan problems. We formulate a constraint-based representation of alternative activities to model problems containing such choices. We then extend existing constraint-directed scheduling heuristic commitment techniques and propagators to reason directly about the fact that an activity does not necessarily have to exist in a final transportation schedule without being completed. Tentative results show that an algorithm using a novel texture-based heuristic commitment technique propagators achieves the best overall performance of the techniques tested.

Keywords: production, transportation, scheduling, integrated

Procedia PDF Downloads 362
9002 Finite Element and Split Bregman Methods for Solving a Family of Optimal Control Problem with Partial Differential Equation Constraint

Authors: Mahmoud Lot

Abstract:

In this article, we will discuss the solution of elliptic optimal control problem. First, by using the nite element method, we obtain the discrete form of the problem. The obtained discrete problem is actually a large scale constrained optimization problem. Solving this optimization problem with traditional methods is difficult and requires a lot of CPU time and memory. But split Bergman method converts the constrained problem to an unconstrained, and hence it saves time and memory requirement. Then we use the split Bregman method for solving this problem, and examples show the speed and accuracy of split Bregman methods for solving these types of problems. We also use the SQP method for solving the examples and compare with the split Bregman method.

Keywords: Split Bregman Method, optimal control with elliptic partial differential equation constraint, finite element method

Procedia PDF Downloads 152
9001 A Survey on Compression Methods for Table Constraints

Authors: N. Gharbi

Abstract:

Constraint Satisfaction problems are mathematical problems that are often used to model many real-world problems for which we look if there exists a solution satisfying all its constraints. Table constraints are important for modeling parts of many problems since they list all combinations of allowed or forbidden values. However, they admit practical limitations because they are sometimes too large to be represented in a direct way. In this paper, we present a survey of the different categories of the proposed approaches to compress table constraints in order to reduce both space and time complexities.

Keywords: constraint programming, compression, data mining, table constraints

Procedia PDF Downloads 326
9000 A Heuristic Based Decomposition Approach for a Hierarchical Production Planning Problem

Authors: Nusrat T. Chowdhury, M. F. Baki, A. Azab

Abstract:

The production planning problem is concerned with specifying the optimal quantities to produce in order to meet the demand for a prespecified planning horizon with the least possible expenditure. Making the right decisions in production planning will affect directly the performance and productivity of a manufacturing firm, which is important for its ability to compete in the market. Therefore, developing and improving solution procedures for production planning problems is very significant. In this paper, we develop a Dantzig-Wolfe decomposition of a multi-item hierarchical production planning problem with capacity constraint and present a column generation approach to solve the problem. The original Mixed Integer Linear Programming model of the problem is decomposed item by item into a master problem and a number of subproblems. The capacity constraint is considered as the linking constraint between the master problem and the subproblems. The subproblems are solved using the dynamic programming approach. We also propose a multi-step iterative capacity allocation heuristic procedure to handle any kind of infeasibility that arises while solving the problem. We compare the computational performance of the developed solution approach against the state-of-the-art heuristic procedure available in the literature. The results show that the proposed heuristic-based decomposition approach improves the solution quality by 20% as compared to the literature.

Keywords: inventory, multi-level capacitated lot-sizing, emission control, setup carryover

Procedia PDF Downloads 139
8999 Implementation of Problem-Based Learning (PBL) in the Classroom

Authors: Jarmon Sirigunna

Abstract:

The objective of this study were to investigate the success of the implementation of problem-based learning in classroom and to evaluate the level of satisfaction of Suan Sunandra Rajabhat University’s students who participated in the study. This paper aimed to study and focus on a university students survey conducted in Suan Sunandha Rajabhat University during January to March of 2014. The quota sampling was utilized to obtain the sample which included 60 students, 50 percent male and 50 percent female students. The pretest and posttest method was utilized. The findings revealed that the majority of respondents had gained higher knowledge after the posttest significantly. The respondents’ knowledge increased about 40 percent after the experiment. Also, the findings revealed the top three highest level of satisfaction as follows: 1) the proper roles of teacher and students, 2) the knowledge gained from the method of the problem-based learning, 3) the activities of the problem-based learning, 4) the interaction of students from the problem-based learning, and 5) the problem-based learning model. Also, the mean score of all categories was 4.22 with a standard deviation of 0.7435 which indicated that the level of satisfaction was high.

Keywords: implement, problem-based learning, satisfaction, university students

Procedia PDF Downloads 370
8998 A Bi-Objective Model to Address Simultaneous Formulation of Project Scheduling and Material Ordering

Authors: Babak H. Tabrizi, Seyed Farid Ghaderi

Abstract:

Concurrent planning of project scheduling and material ordering has been increasingly addressed within last decades as an approach to improve the project execution costs. Therefore, we have taken the problem into consideration in this paper, aiming to maximize schedules quality robustness, in addition to minimize the relevant costs. In this regard, a bi-objective mathematical model is developed to formulate the problem. Moreover, it is possible to utilize the all-unit discount for materials purchasing. The problem is then solved by the constraint method, and the Pareto front is obtained for a variety of robustness values. The applicability and efficiency of the proposed model is tested by different numerical instances, finally.

Keywords: e-constraint method, material ordering, project management, project scheduling

Procedia PDF Downloads 295
8997 A Hybrid Model of Goal, Integer and Constraint Programming for Single Machine Scheduling Problem with Sequence Dependent Setup Times: A Case Study in Aerospace Industry

Authors: Didem Can

Abstract:

Scheduling problems are one of the most fundamental issues of production systems. Many different approaches and models have been developed according to the production processes of the parts and the main purpose of the problem. In this study, one of the bottleneck stations of a company serving in the aerospace industry is analyzed and considered as a single machine scheduling problem with sequence-dependent setup times. The objective of the problem is assigning a large number of similar parts to the same shift -to reduce chemical waste- while minimizing the number of tardy jobs. The goal programming method will be used to achieve two different objectives simultaneously. The assignment of parts to the shift will be expressed using the integer programming method. Finally, the constraint programming method will be used as it provides a way to find a result in a short time by avoiding worse resulting feasible solutions with the defined variables set. The model to be established will be tested and evaluated with real data in the application part.

Keywords: constraint programming, goal programming, integer programming, sequence-dependent setup, single machine scheduling

Procedia PDF Downloads 238
8996 Job Satisfaction and Commitment among Academic Staff of Selected Colleges of Education in Kano and Kaduna States of Nigeria

Authors: Mary Okonkwo Ekwy

Abstract:

The problem of the growing disillusionment of College of Education teachers with academic life vis-à-vis their job satisfaction and commitment was investigated in this study with a view to finding out if both their job satisfaction and commitment have suffered, and to find out if there was a relationship between job satisfaction and commitment among these College of Education teachers. Due consideration was also given in the study to the possible effects of demographic variables on attitudes to their job. To carry out a study of job satisfaction and commitment among the College of Education teachers and to explore the relationship between them, research instruments were used for measuring the levels of job satisfaction and commitment among them. A sample of 200 Colleges of Education teachers, comprising 15 Professors, 9 Principal Lecturers, 70 Senior Lecturer and 106 Lecturers was used for the study. Five major hypothesis were tested with regard to the relationship between job satisfaction and commitment among the teachers. The Pearson correlation, the F-ratio, and regression analysis were used for data analysis and hypothesis testing. The result of this investigation suggests that, perhaps the best way to secure the commitment of teachers is to ensure their job satisfaction. Future investigations will further enrich our knowledge about these very important themes.

Keywords: job satisfaction, commitment, academic staff, college of education

Procedia PDF Downloads 552
8995 Satisfaction of International Tourists during Their Visit to Bangkok, Thailand

Authors: Bovornluck Kuosuwan, Kevin Wongleedee

Abstract:

The purposes of this research was to study the level of satisfaction of international tourists in five important areas: satisfaction on visiting tourist destinations, satisfaction on tourist images, satisfaction on value for money, satisfaction on service quality, and satisfaction when compared with their expectation. A probability random sampling of 200 inbound tourists was utilized. A questionnaire was used to collect the data and small in-depth interviews were also used to get their opinions about their positive and negative evaluations of their experience travelling in Thailand. The findings revealed that the majority of respondents had a medium level of satisfaction. When examined in detail, the level of satisfaction can be ranked from highest to lowest according to the mean average as follows: visiting tourist destinations, expectations, service quality, tourist image, and value for money.

Keywords: inbound tourists, satisfaction, Thailand, international tourists

Procedia PDF Downloads 323
8994 Fuzzy Approach for the Evaluation of Feasibility Levels of Vehicle Movement on the Disaster-Streaking Zone’s Roads

Authors: Gia Sirbiladze

Abstract:

Route planning problems are among the activities that have the highest impact on logistical planning, transportation, and distribution because of their effects on efficiency in resource management, service levels, and client satisfaction. In extreme conditions, the difficulty of vehicle movement between different customers causes the imprecision of time of movement and the uncertainty of the feasibility of movement. A feasibility level of vehicle movement on the closed route of the disaster-streaking zone is defined for the construction of an objective function. Experts’ evaluations of the uncertain parameters in q-rung ortho-pair fuzzy numbers (q-ROFNs) are presented. A fuzzy bi-objective combinatorial optimization problem of fuzzy vehicle routine problem (FVRP) is constructed based on the technique of possibility theory. The FVRP is reduced to the bi-criteria partitioning problem for the so-called “promising” routes which were selected from the all-admissible closed routes. The convenient selection of the “promising” routes allows us to solve the reduced problem in real-time computing. For the numerical solution of the bi-criteria partitioning problem, the -constraint approach is used. The main results' support software is designed. The constructed model is illustrated with a numerical example.

Keywords: q-rung ortho-pair fuzzy sets, facility location selection problem, multi-objective combinatorial optimization problem, partitioning problem

Procedia PDF Downloads 136
8993 The Relationship of Employee’s Job Satisfaction and Job Performance in Service Sector in Bangkok

Authors: Vithaya Intaraphimol

Abstract:

This study investigates the relationship between employee’s job satisfaction and job performance of hotel’s employees in five-star hotels in Bangkok. This study used self-administration data collection from a sample of 400 employees of five-star hotels in Bangkok. The results indicated that there was a relationship between job satisfaction and job performance. In addition, dysfunctional conflict was related negatively to job satisfaction; meanwhile, functional conflict was related positively to job satisfaction. Moreover, there was a positive relationship between integrating, obliging, avoiding and compromising style and job satisfaction; however; dominating style had a negative relationship with job satisfaction and proved that job satisfaction tend to increase the positive emotion on job satisfaction in the service setting, consequently, employee has ability to deal with problems with more effectively and predictor of job satisfaction due to employee who satisfied with the job seems to remain in the organization and appearing to gain rewarding beneficial.

Keywords: conflict management, job satisfaction, job performance, service sector

Procedia PDF Downloads 275
8992 The Role of Sexual Satisfaction Sexual Satisfaction in Marital Satisfaction Married Men

Authors: Maghsoud Nader Pilehroud, Mohmmad Alizadeh, Soheila Golipour, Sedigeh Tajabadipour

Abstract:

Aim: in terms of importance, sexual issues are of the highest priority in married life issues and sexual compatibility is of the most important reasons of success in married life and consequently marital satisfaction.the present research was conducted with the aim of The role of sexual satisfaction sexual satisfaction in marital satisfaction married men. Study Design: this research is descriptive and is of correlation type.Method: The statistical population includes all the married men of Ardebil city out of which, 60 men were chosen using random sampling as the research samples. The research instruments were ENRICH couple scale and Hudson sexual satisfaction scale. The findings were analyzed using descriptive statistics method (mean and standard deviation) and inferential statistics (Pearson's correlation and regression) and SPSS-16 software. Results: the results showed that sexual satisfaction has a positive and significant relationship with marital satisfaction and all of its components, and that sexual satisfaction can predict marital satisfaction. The results also showed that sexual and marital satisfaction, are not significantly related to any of the variables of education level, duration of marriage and number of children. conclusion: according to the results, it can be claimed that sexual skills training for couples can be influential at increasing their martial satisfaction, and that also, sexual satisfaction has an important role in marital satisfaction.

Keywords: sexual satisfaction, marital satisfaction, married men, Iran

Procedia PDF Downloads 157
8991 Quality-Of-Service-Aware Green Bandwidth Allocation in Ethernet Passive Optical Network

Authors: Tzu-Yang Lin, Chuan-Ching Sue

Abstract:

Sleep mechanisms are commonly used to ensure the energy efficiency of each optical network unit (ONU) that concerns a single class delay constraint in the Ethernet Passive Optical Network (EPON). How long the ONUs can sleep without violating the delay constraint has become a research problem. Particularly, we can derive an analytical model to determine the optimal sleep time of ONUs in every cycle without violating the maximum class delay constraint. The bandwidth allocation considering such optimal sleep time is called Green Bandwidth Allocation (GBA). Although the GBA mechanism guarantees that the different class delay constraints do not violate the maximum class delay constraint, packets with a more relaxed delay constraint will be treated as those with the most stringent delay constraint and may be sent early. This means that the ONU will waste energy in active mode to send packets in advance which did not need to be sent at the current time. Accordingly, we proposed a QoS-aware GBA using a novel intra-ONU scheduling to control the packets to be sent according to their respective delay constraints, thereby enhancing energy efficiency without deteriorating delay performance. If packets are not explicitly classified but with different packet delay constraints, we can modify the intra-ONU scheduling to classify packets according to their packet delay constraints rather than their classes. Moreover, we propose the switchable ONU architecture in which the ONU can switch the architecture according to the sleep time length, thus improving energy efficiency in the QoS-aware GBA. The simulation results show that the QoS-aware GBA ensures that packets in different classes or with different delay constraints do not violate their respective delay constraints and consume less power than the original GBA.

Keywords: Passive Optical Networks, PONs, Optical Network Unit, ONU, energy efficiency, delay constraint

Procedia PDF Downloads 285
8990 Supplier Selection by Bi-Objectives Mixed Integer Program Approach

Authors: K.-H. Yang

Abstract:

In the past, there was a lot of excellent research studies conducted on topics related to supplier selection. Because the considered factors of supplier selection are complicated and difficult to be quantified, most researchers deal supplier selection issues by qualitative approaches. Compared to qualitative approaches, quantitative approaches are less applicable in the real world. This study tried to apply the quantitative approach to study a supplier selection problem with considering operation cost and delivery reliability. By those factors, this study applies Normalized Normal Constraint Method to solve the dual objectives mixed integer program of the supplier selection problem.

Keywords: bi-objectives MIP, normalized normal constraint method, supplier selection, quantitative approach

Procedia PDF Downloads 417
8989 The Level of Job Satisfaction among English as a Foreign Language Instructors

Authors: Hashem A. Alsamadani

Abstract:

Identifying the level of job satisfaction has many positive benefits for both the worker and employer. The purpose of the study was to examine the overall level of job satisfaction among English as a Foreign Language (EFL) instructors. During the past years, multiple methods were utilized to collect data to determine the level of job satisfaction among teachers. This study was conducted using survey research method. A questionnaire was coded and analyzed using the SPSS. The findings revealed that the overall level of job satisfaction among EFL instructors is high. The study recommended improving conditions of instructors working at public universities so as to gain a high level of job satisfaction and improve outcomes of the teaching-learning process.

Keywords: job satisfaction, EFL teachers, Saudi Arabia, instruction

Procedia PDF Downloads 408
8988 Interval Bilevel Linear Fractional Programming

Authors: F. Hamidi, N. Amiri, H. Mishmast Nehi

Abstract:

The Bilevel Programming (BP) model has been presented for a decision making process that consists of two decision makers in a hierarchical structure. In fact, BP is a model for a static two person game (the leader player in the upper level and the follower player in the lower level) wherein each player tries to optimize his/her personal objective function under dependent constraints; this game is sequential and non-cooperative. The decision making variables are divided between the two players and one’s choice affects the other’s benefit and choices. In other words, BP consists of two nested optimization problems with two objective functions (upper and lower) where the constraint region of the upper level problem is implicitly determined by the lower level problem. In real cases, the coefficients of an optimization problem may not be precise, i.e. they may be interval. In this paper we develop an algorithm for solving interval bilevel linear fractional programming problems. That is to say, bilevel problems in which both objective functions are linear fractional, the coefficients are interval and the common constraint region is a polyhedron. From the original problem, the best and the worst bilevel linear fractional problems have been derived and then, using the extended Charnes and Cooper transformation, each fractional problem can be reduced to a linear problem. Then we can find the best and the worst optimal values of the leader objective function by two algorithms.

Keywords: best and worst optimal solutions, bilevel programming, fractional, interval coefficients

Procedia PDF Downloads 447
8987 Measurements of Service Quality vs Customer Satisfaction in Government Owned Retail Store at Kochi

Authors: N. S. Ajisha

Abstract:

In today’s competitive world the quality of the service you deliver is one of the important factor that determine customer satisfaction. Service quality is considered to be one important determinant to evaluate customer satisfaction and the relationship between service quality and customer satisfaction is considered as the foundation in researches on customer satisfaction. This research examines to do a gap analysis between the perception and expectation of the services delivered and find relation between the service quality and customer satisfaction. Service quality is found out here using the SERVQUAL model. And it finds out the dimension of service quality which is more important to measure customer satisfaction. The dimensions which we measure using SERVQUAL include the tangibles, reliability, responsiveness, assurance, and empathy. This study involves primary data collection like market survey.

Keywords: customer satisfaction, service quality, retail service quality, Kochi

Procedia PDF Downloads 556
8986 Resource Constrained Time-Cost Trade-Off Analysis in Construction Project Planning and Control

Authors: Sangwon Han, Chengquan Jin

Abstract:

Time-cost trade-off (TCTO) is one of the most significant part of construction project management. Despite the significance, current TCTO analysis, based on the Critical Path Method, does not consider resource constraint, and accordingly sometimes generates an impractical and/or infeasible schedule planning in terms of resource availability. Therefore, resource constraint needs to be considered when doing TCTO analysis. In this research, genetic algorithms (GA) based optimization model is created in order to find the optimal schedule. This model is utilized to compare four distinct scenarios (i.e., 1) initial CPM, 2) TCTO without considering resource constraint, 3) resource allocation after TCTO, and 4) TCTO with considering resource constraint) in terms of duration, cost, and resource utilization. The comparison results identify that ‘TCTO with considering resource constraint’ generates the optimal schedule with the respect of duration, cost, and resource. This verifies the need for consideration of resource constraint when doing TCTO analysis. It is expected that the proposed model will produce more feasible and optimal schedule.

Keywords: time-cost trade-off, genetic algorithms, critical path, resource availability

Procedia PDF Downloads 188
8985 Well-Being Inequality Using Superimposing Satisfaction Waves: Heisenberg Uncertainty in Behavioral Economics and Econometrics

Authors: Okay Gunes

Abstract:

In this article, for the first time in the literature for this subject we propose a new method for the measuring of well-being inequality through a model composed of superimposing satisfaction waves. The displacement of households’ satisfactory state (i.e. satisfaction) is defined in a satisfaction string. The duration of the satisfactory state for a given period of time is measured in order to determine the relationship between utility and total satisfactory time, itself dependent on the density and tension of each satisfaction string. Thus, individual cardinal total satisfaction values are computed by way of a one-dimensional form for scalar sinusoidal (harmonic) moving wave function, using satisfaction waves with varying amplitudes and frequencies which allow us to measure well-being inequality. One advantage to using satisfaction waves is the ability to show that individual utility and consumption amounts would probably not commute; hence it is impossible to measure or to know simultaneously the values of these observables from the dataset. Thus, we crystallize the problem by using a Heisenberg-type uncertainty resolution for self-adjoint economic operators. We propose to eliminate any estimation bias by correlating the standard deviations of selected economic operators; this is achieved by replacing the aforementioned observed uncertainties with households’ perceived uncertainties (i.e. corrected standard deviations) obtained through the logarithmic psychophysical law proposed by Weber and Fechner.

Keywords: Heisenberg uncertainty principle, superimposing satisfaction waves, Weber–Fechner law, well-being inequality

Procedia PDF Downloads 441
8984 A Mixed Method Design to Studying the Effects of Lean Production on Job Satisfaction and Health Work in a French Context

Authors: Gregor Bouville, Celine Schmidt

Abstract:

This article presents a French case study on lean production drawing on a mixed method design which has received little attention in French management research-especially in French human resources research. The purpose is to show that using a mixed method approach in this particular case overstep the limitations of previous studies in lean production studies. The authors use the embedded design as a special articulation of mixed method to analyse and understand the effects of three organizational practices on job satisfaction and workers’ health. Results show that low scheduled autonomy, quality management, time constraint have deleterious effects on job satisfaction. Furthermore, these three practices have ambivalent effects on health work. Interest in the subjects of mixed method has been growing up among French health researchers and practioners, also recently among French management researchers. This study reinforces and refines how mixed methods may offer interesting perspectives in an integrated framework included human resources, management, and health fields. Finally, potentials benefits and limits for those interdisciplinary researches programs are discussed.

Keywords: lean production, mixed method, work organization practices, job satisfaction

Procedia PDF Downloads 360