Search results for: assembly process planning
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 17600

Search results for: assembly process planning

17540 Collaboration During Planning and Reviewing in Writing: Effects on L2 Writing

Authors: Amal Sellami, Ahlem Ammar

Abstract:

Writing is acknowledged to be a cognitively demanding and complex task. Indeed, the writing process is composed of three iterative sub-processes, namely planning, translating (writing), and reviewing. Not only do second or foreign language learners need to write according to this process, but they also need to respect the norms and rules of language and writing in the text to-be-produced. Accordingly, researchers have suggested to approach writing as a collaborative task in order to al leviate its complexity. Consequently, collaboration has been implemented during the whole writing process or only during planning orreviewing. Researchers report that implementing collaboration during the whole process might be demanding in terms of time in comparison to individual writing tasks. Consequently, because of time constraints, teachers may avoid it. For this reason, it might be pedagogically more realistic to limit collaboration to one of the writing sub-processes(i.e., planning or reviewing). However, previous research implementing collaboration in planning or reviewing is limited and fails to explore the effects of the seconditionson the written text. Consequently, the present study examines the effects of collaboration in planning and collaboration in reviewing on the written text. To reach this objective, quantitative as well as qualitative methods are deployed to examine the written texts holistically and in terms of fluency, complexity, and accuracy. Participants of the study include 4 pairs in each group (n=8). They participated in two experimental conditions, which are: (1) collaborative planning followed by individual writing and individual reviewing and (2) individual planning followed by individual writing and collaborative reviewing. The comparative research findings indicate that while collaborative planning resulted in better overall text quality (precisely better content and organization ratings), better fluency, better complexity, and fewer lexical errors, collaborative reviewing produces better accuracy and less syntactical and mechanical errors. The discussion of the findings suggests the need to conduct more comparative research in order to further explore the effects of collaboration in planning or in reviewing. Pedagogical implications of the current study include advising teachers to choose between implementing collaboration in planning or in reviewing depending on their students’ need and what they need to improve.

Keywords: collaboration, writing, collaborative planning, collaborative reviewing

Procedia PDF Downloads 63
17539 The Role of Information Technology in Supply Chain Management

Authors: V. Jagadeesh, K. Venkata Subbaiah, P. Govinda Rao

Abstract:

This paper explaining about the significance of information technology tools and software packages in supply chain management (SCM) in order to manage the entire supply chain. Managing materials flow and financial flow and information flow effectively and efficiently with the aid of information technology tools and packages in order to deliver right quantity with right quality of goods at right time by using right methods and technology. Information technology plays a vital role in streamlining the sales forecasting and demand planning and Inventory control and transportation in supply networks and finally deals with production planning and scheduling. It achieves the objectives by streamlining the business process and integrates within the enterprise and its extended enterprise. SCM starts with customer and it involves sequence of activities from customer, retailer, distributor, manufacturer and supplier within the supply chain framework. It is the process of integrating demand planning and supply network planning and production planning and control. Forecasting indicates the direction for planning raw materials in order to meet the production planning requirements. Inventory control and transportation planning allocate the optimal or economic order quantity by utilizing shortest possible routes to deliver the goods to the customer. Production planning and control utilize the optimal resources mix in order to meet the capacity requirement planning. The above operations can be achieved by using appropriate information technology tools and software packages for the supply chain management.

Keywords: supply chain management, information technology, business process, extended enterprise

Procedia PDF Downloads 343
17538 The Impact of Business Process Reengineering to the Company Performance through TQM and Enterprise Resource Planning Implementation on Manufacturing Companies in East Java, Indonesia

Authors: Widjojo Suprapto, Zeplin Jiwa Husada Tarigan, Sautma Ronni Basana

Abstract:

Business process reengineering can be conducted by some procedure rationalization for all related departments in a company so that all data and business processes are connected. The changing of any business process is used to set up the working standard so that it gives an impact to the implementation of ERP and the company performance. After collecting and processing the data from 77 manufacturing companies, it is obtained that BPR (Business Process Reengineering) has no direct impact on the implementation of ERP (Enterprise Resource Planning) in the companies and manufacturing performance; however, it influences the implementation of TQM. The implementation of TQM influences directly the implementation of ERP, but it does not influence directly the company performance. The implementation of ERP gives a significant increase in the work performance of the manufacturing companies in East Java.

Keywords: enterprise resources planning, business process reengineering, TQM, company performance

Procedia PDF Downloads 177
17537 Integrating Process Planning, WMS Dispatching, and WPPW Weighted Due Date Assignment Using a Genetic Algorithm

Authors: Halil Ibrahim Demir, Tarık Cakar, Ibrahim Cil, Muharrem Dugenci, Caner Erden

Abstract:

Conventionally, process planning, scheduling, and due-date assignment functions are performed separately and sequentially. The interdependence of these functions requires integration. Although integrated process planning and scheduling, and scheduling with due date assignment problems are popular research topics, only a few works address the integration of these three functions. This work focuses on the integration of process planning, WMS scheduling, and WPPW due date assignment. Another novelty of this work is the use of a weighted due date assignment. In the literature, due dates are generally assigned without considering the importance of customers. However, in this study, more important customers get closer due dates. Typically, only tardiness is punished, but the JIT philosophy punishes both earliness and tardiness. In this study, all weighted earliness, tardiness, and due date related costs are penalized. As no customer desires distant due dates, such distant due dates should be penalized. In this study, various levels of integration of these three functions are tested and genetic search and random search are compared both with each other and with ordinary solutions. Higher integration levels are superior, while search is always useful. Genetic searches outperformed random searches.

Keywords: process planning, weighted scheduling, weighted due-date assignment, genetic algorithm, random search

Procedia PDF Downloads 353
17536 Employing Deep Learning for Defect Detection in Antenna Assembly

Authors: Theodoros Tziolas, Konstantinos Papageorgiou, Theodosios Theodosiou, Sebastian Pantoja, Nikos Dimitriou Dimosthenis, Elpiniki Papageorgiou

Abstract:

Assembly processes involve disparate materials that possess dissimilar resiliencies and, therefore, are prone to generating defective products. Manually performed quality inspection of such products is a time-consuming and susceptible to error process. The emerging computer vision techniques in smart manufacturing can alleviate the need for thorough, manually performed quality control. Object detection techniques provide crucial localization abilities, thus helping the operators further validate the identified defect with ease. In this work, several state-of-the-art object detection models are assessed in a real industrial imagery dataset and with the use of transfer learning. EfficientDet D2 is proposed for the identification and localization of antenna defects that are generated during the assembly process. To further enhance the dataset, heavy on-the-fly data augmentation was employed, along with synthetic samples generated with the use of image processing software. The proposed approach utilizing EfficientDet D2 can increase the Average Precision from 0.90 (at IoU 0.5) to 0.97 (at IoU 0.3). The overall performance is further evaluated by applying the F1-Score at each confidence score. For conducting the experiments, the TensorFlow object detection API is employed.

Keywords: defect detection, EfficientDet, deep learning, smart manufacturing, classification

Procedia PDF Downloads 23
17535 Multi-Actors’ Scenario for Measuring Metropolitan Governance and Spatial Planning: A Case Study of Bangalore, India

Authors: H. S. Kumara

Abstract:

The rapid process of urbanization and the growing number of the metropolitan cities and its region call for better governance in India. This article attempts to argue that spatial planning really matters for measuring the governance at metropolitan scale. These study explore to metropolitan governance and spatial planning and its interrelationship issues, concepts and evolution of spatial planning in India and critically examines the multi actors’ scenario for measuring metropolitan governance by means of spatial planning in context with reviewing various master plans, concept of multi-actors viewpoint on role of spatial planning related to zoning regulations, master plan implementations and effective service delivery issues. This paper argues and concludes that the spatial planning of Bangalore directly impact on measuring metropolitan governance.

Keywords: metropolitan governance, spatial planning, service delivery, multi-actors’, opinion survey, master plan

Procedia PDF Downloads 565
17534 Solving Weighted Number of Operation Plus Processing Time Due-Date Assignment, Weighted Scheduling and Process Planning Integration Problem Using Genetic and Simulated Annealing Search Methods

Authors: Halil Ibrahim Demir, Caner Erden, Mumtaz Ipek, Ozer Uygun

Abstract:

Traditionally, the three important manufacturing functions, which are process planning, scheduling and due-date assignment, are performed separately and sequentially. For couple of decades, hundreds of studies are done on integrated process planning and scheduling problems and numerous researches are performed on scheduling with due date assignment problem, but unfortunately the integration of these three important functions are not adequately addressed. Here, the integration of these three important functions is studied by using genetic, random-genetic hybrid, simulated annealing, random-simulated annealing hybrid and random search techniques. As well, the importance of the integration of these three functions and the power of meta-heuristics and of hybrid heuristics are studied.

Keywords: process planning, weighted scheduling, weighted due-date assignment, genetic search, simulated annealing, hybrid meta-heuristics

Procedia PDF Downloads 451
17533 Template-less Self-Assembled Morphologically Cubic BiFeO₃ for Improved Electrical Properties

Authors: Jenna Metera, Olivia Graeve

Abstract:

Ceramic capacitor technologies using lead based materials is being phased out for its environmental and handling hazards. Bismuth ferrite (BiFeO₃) is the next best replacement for those lead-based technologies. Unfortunately, the electrical properties in bismuth systems are not as robust as the lead alternatives. The improvement of electrical properties such as charge density, charge anisotropy, relative permittivity, and dielectric loss are the parameters that will make BiFeO₃ a competitive alternative to lead-based ceramic materials. In order to maximize the utility of these properties, we propose the ordering and an evaporation-induced self-assembly of a cubic morphology powder. Evaporation-induced self-assembly is a template-less, bottom-up, self-assembly option. The capillary forces move the particles closer together when the solvent evaporates, promoting organized agglomeration at the particle faces. The assembly of particles into organized structures can lead to enhanced properties compared to unorganized structures or single particles themselves. The interactions between the particles can be controlled based on the long-range order in the organized structure. The cubic particle morphology is produced through a hydrothermal synthesis with changes in the concentration of potassium hydroxide, which changes the morphology of the powder. Once the assembly materializes, the powder is fabricated into workable substrates for electrical testing after consolidation.

Keywords: evaporation, lead-free, morphology, self-assembly

Procedia PDF Downloads 95
17532 Analysis of the Level of Production Failures by Implementing New Assembly Line

Authors: Joanna Kochanska, Dagmara Gornicka, Anna Burduk

Abstract:

The article examines the process of implementing a new assembly line in a manufacturing enterprise of the household appliances industry area. At the initial stages of the project, a decision was made that one of its foundations should be the concept of lean management. Because of that, eliminating as many errors as possible in the first phases of its functioning was emphasized. During the start-up of the line, there were identified and documented all production losses (from serious machine failures, through any unplanned downtime, to micro-stops and quality defects). During 6 weeks (line start-up period), all errors resulting from problems in various areas were analyzed. These areas were, among the others, production, logistics, quality, and organization. The aim of the work was to analyze the occurrence of production failures during the initial phase of starting up the line and to propose a method for determining their critical level during its full functionality. There was examined the repeatability of the production losses in various areas and at different levels at such an early stage of implementation, by using the methods of statistical process control. Based on the Pareto analysis, there were identified the weakest points in order to focus improvement actions on them. The next step was to examine the effectiveness of the actions undertaken to reduce the level of recorded losses. Based on the obtained results, there was proposed a method for determining the critical failures level in the studied areas. The developed coefficient can be used as an alarm in case of imbalance of the production, which is caused by the increased failures level in production and production support processes in the period of the standardized functioning of the line.

Keywords: production failures, level of production losses, new production line implementation, assembly line, statistical process control

Procedia PDF Downloads 106
17531 Adaption of the Design Thinking Method for Production Planning in the Meat Industry Using Machine Learning Algorithms

Authors: Alica Höpken, Hergen Pargmann

Abstract:

The resource-efficient planning of the complex production planning processes in the meat industry and the reduction of food waste is a permanent challenge. The complexity of the production planning process occurs in every part of the supply chain, from agriculture to the end consumer. It arises from long and uncertain planning phases. Uncertainties such as stochastic yields, fluctuations in demand, and resource variability are part of this process. In the meat industry, waste mainly relates to incorrect storage, technical causes in production, or overproduction. The high amount of food waste along the complex supply chain in the meat industry could not be reduced by simple solutions until now. Therefore, resource-efficient production planning by conventional methods is currently only partially feasible. The realization of intelligent, automated production planning is basically possible through the application of machine learning algorithms, such as those of reinforcement learning. By applying the adapted design thinking method, machine learning methods (especially reinforcement learning algorithms) are used for the complex production planning process in the meat industry. This method represents a concretization to the application area. A resource-efficient production planning process is made available by adapting the design thinking method. In addition, the complex processes can be planned efficiently by using this method, since this standardized approach offers new possibilities in order to challenge the complexity and the high time consumption. It represents a tool to support the efficient production planning in the meat industry. This paper shows an elegant adaption of the design thinking method to apply the reinforcement learning method for a resource-efficient production planning process in the meat industry. Following, the steps that are necessary to introduce machine learning algorithms into the production planning of the food industry are determined. This is achieved based on a case study which is part of the research project ”REIF - Resource Efficient, Economic and Intelligent Food Chain” supported by the German Federal Ministry for Economic Affairs and Climate Action of Germany and the German Aerospace Center. Through this structured approach, significantly better planning results are achieved, which would be too complex or very time consuming using conventional methods.

Keywords: change management, design thinking method, machine learning, meat industry, reinforcement learning, resource-efficient production planning

Procedia PDF Downloads 103
17530 Solving Process Planning, Weighted Earliest Due Date Scheduling and Weighted Due Date Assignment Using Simulated Annealing and Evolutionary Strategies

Authors: Halil Ibrahim Demir, Abdullah Hulusi Kokcam, Fuat Simsir, Özer Uygun

Abstract:

Traditionally, three important manufacturing functions which are process planning, scheduling and due-date assignment are performed sequentially and separately. Although there are numerous works on the integration of process planning and scheduling and plenty of works focusing on scheduling with due date assignment, there are only a few works on integrated process planning, scheduling and due-date assignment. Although due-dates are determined without taking into account of weights of the customers in the literature, here weighted due-date assignment is employed to get better performance. Jobs are scheduled according to weighted earliest due date dispatching rule and due dates are determined according to some popular due date assignment methods by taking into account of the weights of each job. Simulated Annealing, Evolutionary Strategies, Random Search, hybrid of Random Search and Simulated Annealing, and hybrid of Random Search and Evolutionary Strategies, are applied as solution techniques. Three important manufacturing functions are integrated step-by-step and higher integration levels are found better. Search meta-heuristics are found to be very useful while improving performance measure.

Keywords: process planning, weighted scheduling, weighted due-date assignment, simulated annealing, evolutionary strategies, hybrid searches

Procedia PDF Downloads 432
17529 Prioritization in a Maintenance, Repair and Overhaul (MRO) System Based on Fuzzy Logic at Iran Khodro (IKCO)

Authors: Izadi Banafsheh, Sedaghat Reza

Abstract:

Maintenance, Repair, and Overhaul (MRO) of machinery are a key recent issue concerning the automotive industry. It has always been a debated question what order or priority should be adopted for the MRO of machinery. This study attempts to examine several criteria including process sensitivity, average time between machine failures, average duration of repair, availability of parts, availability of maintenance personnel and workload through a literature review and experts survey so as to determine the condition of the machine. According to the mentioned criteria, the machinery were ranked in four modes below: A) Need for inspection, B) Need for minor repair, C) Need for part replacement, and D) Need for major repair. The Fuzzy AHP was employed to determine the weighting of criteria. At the end, the obtained weights were ranked through the AHP for each criterion, three groups were specified: shaving machines, assembly and painting in four modes. The statistical population comprises the elite in the Iranian automotive industry at IKCO covering operation managers, CEOs and maintenance professionals who are highly specialized in MRO and perfectly knowledgeable in how the machinery function. The information required for this study were collected from both desk research and field review, which eventually led to construction of a questionnaire handed out to the sample respondents in order to collect information on the subject matter. The results of the AHP for weighting the criteria revealed that the availability of maintenance personnel was the top priority at coefficient of 0.206, while the process sensitivity took the last priority at coefficient of 0.066. Furthermore, the results of TOPSIS for prioritizing the IKCO machinery suggested that at the mode where there is need for inspection, the assembly machines took the top priority while paining machines took the third priority. As for the mode where there is need for minor repairs, the assembly machines took the top priority while the third priority belonged to the shaving machines. As for the mode where there is need for parts replacement, the assembly machines took the top priority while the third belonged to the paining machinery. Finally, as for the mode where there is need for major repair, the assembly machines took the top priority while the third belonged to the paining machinery.

Keywords: maintenance, repair, overhaul, MRO, prioritization of machinery, fuzzy logic, AHP, TOPSIS

Procedia PDF Downloads 261
17528 An Industrial Steady State Sequence Disorder Model for Flow Controlled Multi-Input Single-Output Queues in Manufacturing Systems

Authors: Anthony John Walker, Glen Bright

Abstract:

The challenge faced by manufactures, when producing custom products, is that each product needs exact components. This can cause work-in-process instability due to component matching constraints imposed on assembly cells. Clearing type flow control policies have been used extensively in mediating server access between multiple arrival processes. Although the stability and performance of clearing policies has been well formulated and studied in the literature, the growth in arrival to departure sequence disorder for each arriving job, across a serving resource, is still an area for further analysis. In this paper, a closed form industrial model has been formulated that characterizes arrival-to-departure sequence disorder through stable manufacturing systems under clearing type flow control policy. Specifically addressed are the effects of sequence disorder imposed on a downstream assembly cell in terms of work-in-process instability induced through component matching constraints. Results from a simulated manufacturing system show that steady state average sequence disorder in parallel upstream processing cells can be balanced in order to decrease downstream assembly system instability. Simulation results also show that the closed form model accurately describes the growth and limiting behavior of average sequence disorder between parts arriving and departing from a manufacturing system flow controlled via clearing policy.

Keywords: assembly system constraint, custom products, discrete sequence disorder, flow control

Procedia PDF Downloads 150
17527 Tourism and Urban Planning for Intermediate Cities: An Empirical Approach toward Cultural Heritage Conservation in Damavand, Iran

Authors: M. Elham Ghabouli

Abstract:

Intermediate cities which also called medium size cities have an important role in the process of globalization. It is argued that, in some cases this type of cities may be depopulated or in otherwise may be transformed as the periphery of metropolitans so that the personal identity of the city and its local cultural heritage could suffer from its neighbor metropolitan. Over the last decades, the role of tourism in development process and the cultural heritage is increased. The effect of tourism in socio-economic growth makes motivation for study on tourism development in regional and urban planning process. Tourism potentially has a specific role in promoting sustainable development especially by its economic and socio-cultural effects. The positive role of tourism in local development and in cultural heritage should be empowered by urban and regional planning. Damavand is an intermediate city located in Tehran province, Iran. Considering its local specific characteristic like social structure, antiquities and natural monuments made a suitable case study for studying on urban tourism planning method. Focusing on recognition of historical and cultural heritage of Damavand, this paper tried to peruse cultural-historical heritage protecting issue through “base plan methodology” which is introduced as a first step of urban planning for intermediate cities.

Keywords: urban planning, tourism, cultural heritage, intermediate cities

Procedia PDF Downloads 486
17526 Overview of Time, Resource and Cost Planning Techniques in Construction Management Research

Authors: R. Gupta, P. Jain, S. Das

Abstract:

One way to approach construction scheduling optimization problem is to focus on the individual aspects of planning, which can be broadly classified as time scheduling, crew and resource management, and cost control. During the last four decades, construction planning has seen a lot of research, but to date, no paper had attempted to summarize the literature available under important heads. This paper addresses each of aspects separately, and presents the findings of an in-depth literature of the various planning techniques. For techniques dealing with time scheduling, the authors have adopted a rough chronological documentation. For crew and resource management, classification has been done on the basis of the different steps involved in the resource planning process. For cost control, techniques dealing with both estimation of costs and the subsequent optimization of costs have been dealt with separately.

Keywords: construction planning techniques, time scheduling, resource planning, cost control

Procedia PDF Downloads 454
17525 Electoral Politics and Voting Behaviour in 2011 Assembly Election in West Bengal, India: A Case Study in Electoral Geography

Authors: Md Motibur Rahman

Abstract:

The present paper attempts to study the electoral politics and voting behavior of 2011 assembly election of West Bengal state in India. Electoral geography is considered as the study of geographical aspects of the organization, conduct, and result of elections. It deals with the spatial voting patterns/behaviour or the study of the spatial distribution of political phenomena of voting. Voting behavior is a form of political psychology which played a great role in political decision-making process. The voting behavior of the electorates is largely influenced by their perception that existing during the time of election. The main focus of the study will be to analyze the electoral politics of the party organizations and political profile of the electorates. The principle objectives of the present work are i) to study the spatial patterns of voting behavior in 2011 assembly election in West Bengal, ii) to analysis the result and finding of 2011 assembly election. The whole study based on the secondary source of data. The electoral data have taken from Election Commission of India, New Delhi and Centre for the study of Developing Societies (CSDS) in New Delhi. In the battle of 2011 Assembly election in West Bengal, the two major parties were Left Front and Trinamool Congress. This election witnessed the remarkable successes of Trinamool Congress and decline of 34 years longest ruler party that is Left Front. Trinamool Congress won a majority of seats that 227 out of 294 but Left Front won only 62 seats out of 294 seats. The significance of the present study is that it helps in understanding the voting pattern, voting behaviour, trends of voting and also helps for further study of electoral geography in West Bengal. The study would be highly significant and helpful to the planners, politicians, and administrators who are involved in the formulation of development plans and programmes for the people of the state.

Keywords: assembly election, electoral geography, electoral politics, voting behaviour

Procedia PDF Downloads 198
17524 Application of the Building Information Modeling Planning Approach to the Factory Planning

Authors: Peggy Näser

Abstract:

Factory planning is a systematic, objective-oriented process for planning a factory, structured into a sequence of phases, each of which is dependent on the preceding phase and makes use of particular methods and tools, and extending from the setting of objectives to the start of production. The digital factory, on the other hand, is the generic term for a comprehensive network of digital models, methods, and tools – including simulation and 3D visualisation – integrated by a continuous data management system. Its aim is the holistic planning, evaluation and ongoing improvement of all the main structures, processes and resources of the real factory in conjunction with the product. Digital factory planning has already become established in factory planning. The application of Building Information Modeling has not yet been established in factory planning but has been used predominantly in the planning of public buildings. Furthermore, this concept is limited to the planning of the buildings and does not include the planning of equipment of the factory (machines, technical equipment) and their interfaces to the building. BIM is a cooperative method of working, in which the information and data relevant to its lifecycle are consistently recorded, managed and exchanged in a transparent communication between the involved parties on the basis of digital models of a building. Both approaches, the planning approach of Building Information Modeling and the methodical approach of the Digital Factory, are based on the use of a comprehensive data model. Therefore it is necessary to examine how the approach of Building Information Modeling can be extended in the context of factory planning in such a way that an integration of the equipment planning, as well as the building planning, can take place in a common digital model. For this, a number of different perspectives have to be investigated: the equipment perspective including the tools used to implement a comprehensive digital planning process, the communication perspective between the planners of different fields, the legal perspective, that the legal certainty in each country and the quality perspective, on which the quality criteria are defined and the planning will be evaluated. The individual perspectives are examined and illustrated in the article. An approach model for the integration of factory planning into the BIM approach, in particular for the integrated planning of equipment and buildings and the continuous digital planning is developed. For this purpose, the individual factory planning phases are detailed in the sense of the integration of the BIM approach. A comprehensive software concept is shown on the tool. In addition, the prerequisites required for this integrated planning are presented. With the help of the newly developed approach, a better coordination between equipment and buildings is to be achieved, the continuity of the digital factory planning is improved, the data quality is improved and expensive implementation errors are avoided in the implementation.

Keywords: building information modeling, digital factory, digital planning, factory planning

Procedia PDF Downloads 237
17523 Review of the Effect of Strategic Planning on Fulfillment of State Road Management and Transportation Organization Objectives

Authors: Elahe Memari, Ahmad Aslizadeh, Ahmad Memari

Abstract:

To compile and execute a strategy for State Road Management and Transportation Organization, we need to identify and include them in the process of planning. Therefore, present research work tries to rely on experiences by managers and experts from State Road Management and Transportation Organization and other sources like books, magazines and new papers, such factors have to be identified and be applied in this important and vital process before proceeding to strategic planning. Trying to present a conceptual model from factors effective on strategic planning success in fulfillment of State Road Management and Transportation Organization, the present research figures on indicating the role of organizational factors in efficiency of the process to managers. In this research connection between six main factors studied in fulfillment of State Road Management and Transportation Organization objectives. The factors are improvement of strategic thinking in senior managers, improvement of organization business, rationalizing resource allocation in different sections of the organization, conformity of strategic planning with organization needs, conformity of organization activities with environmental changes, stabilization of organizational culture, all approved through implemented tests.

Keywords: improvement of organization business, rationalization of resource allocation in different sections of the organization, stability of organizational culture, strategic planning

Procedia PDF Downloads 313
17522 A Hybrid Genetic Algorithm for Assembly Line Balancing In Automotive Sector

Authors: Qazi Salman Khalid, Muhammad Khalid, Shahid Maqsood

Abstract:

This paper presents a solution for optimizing the cycle time in an assembly line with human-robot collaboration and diverse operators. A genetic algorithm with tailored parameters is used to address the assembly line balancing problem in the automobile sector. A mathematical model is developed, depicting the problem. Currently, the firm runs on the largest candidate rule; however, it causes a lag in orders, which ultimately gets penalized. The results of the study show that the proposed GA is effective in providing efficient solutions and that the cycle time has significantly impacted productivity.

Keywords: line balancing, cycle time, genetic algorithm, productivity

Procedia PDF Downloads 97
17521 Multi-Objective Optimization of Assembly Manufacturing Factory Setups

Authors: Andreas Lind, Aitor Iriondo Pascual, Dan Hogberg, Lars Hanson

Abstract:

Factory setup lifecycles are most often described and prepared in CAD environments; the preparation is based on experience and inputs from several cross-disciplinary processes. Early in the factory setup preparation, a so-called block layout is created. The intention is to describe a high-level view of the intended factory setup and to claim area reservations and allocations. Factory areas are then blocked, i.e., targeted to be used for specific intended resources and processes, later redefined with detailed factory setup layouts. Each detailed layout is based on the block layout and inputs from cross-disciplinary preparation processes, such as manufacturing sequence, productivity, workers’ workplace requirements, and resource setup preparation. However, this activity is often not carried out with all variables considered simultaneously, which might entail a risk of sub-optimizing the detailed layout based on manual decisions. Therefore, this work aims to realize a digital method for assembly manufacturing layout planning where productivity, area utilization, and ergonomics can be considered simultaneously in a cross-disciplinary manner. The purpose of the digital method is to support engineers in finding optimized designs of detailed layouts for assembly manufacturing factories, thereby facilitating better decisions regarding setups of future factories. Input datasets are company-specific descriptions of required dimensions for specific area reservations, such as defined dimensions of a worker’s workplace, material façades, aisles, and the sequence to realize the product assembly manufacturing process. To test and iteratively develop the digital method, a demonstrator has been developed with an adaptation of existing software that simulates and proposes optimized designs of detailed layouts. Since the method is to consider productivity, ergonomics, area utilization, and constraints from the automatically generated block layout, a multi-objective optimization approach is utilized. In the demonstrator, the input data are sent to the simulation software industrial path solutions (IPS). Based on the input and Lua scripts, the IPS software generates a block layout in compliance with the company’s defined dimensions of area reservations. Communication is then established between the IPS and the software EPP (Ergonomics in Productivity Platform), including intended resource descriptions, assembly manufacturing process, and manikin (digital human) resources. Using multi-objective optimization approaches, the EPP software then calculates layout proposals that are sent iteratively and simulated and rendered in IPS, following the rules and regulations defined in the block layout as well as productivity and ergonomics constraints and objectives. The software demonstrator is promising. The software can handle several parameters to optimize the detailed layout simultaneously and can put forward several proposals. It can optimize multiple parameters or weight the parameters to fine-tune the optimal result of the detailed layout. The intention of the demonstrator is to make the preparation between cross-disciplinary silos transparent and achieve a common preparation of the assembly manufacturing factory setup, thereby facilitating better decisions.

Keywords: factory setup, multi-objective, optimization, simulation

Procedia PDF Downloads 120
17520 Machine Learning Approach to Project Control Threshold Reliability Evaluation

Authors: Y. Kim, H. Lee, M. Park, B. Lee

Abstract:

Planning is understood as the determination of what has to be performed, how, in which sequence, when, what resources are needed, and their cost within the organization before execution. In most construction project, it is evident that the inherent nature of planning is dynamic, and initial planning is subject to be changed due to various uncertain conditions of construction project. Planners take a continuous revision process during the course of a project and until the very end of project. However, current practice lacks reliable, systematic tool for setting variance thresholds to determine when and what corrective actions to be taken. Rather it is heavily dependent on the level of experience and knowledge of the planner. Thus, this paper introduces a machine learning approach to evaluate project control threshold reliability incorporating project-specific data and presents a method to automate the process. The results have shown that the model improves the efficiency and accuracy of the monitoring process as an early warning.

Keywords: machine learning, project control, project progress monitoring, schedule

Procedia PDF Downloads 222
17519 Strategic Planning in South African Higher Education

Authors: Noxolo Mafu

Abstract:

This study presents an overview of strategic planning in South African higher education institutions by tracing its trends and mystique in order to identify its impact. Over the democratic decades, strategic planning has become integral to institutional survival. It has been used as a potent tool by several institutions to catch up and surpass counterparts. While planning has always been part of higher education, strategic planning should be considered different. Strategic planning is primarily about development and maintenance of a strategic fitting between an institution and its dynamic opportunities. This presupposes existence of sets of stages that institutions pursue of which, can be regarded for assessment of the impact of strategic planning in an institution. The network theory serves guides the study in demystifying apparent organisational networks in strategic planning processes.

Keywords: network theory, strategy, planning, strategic planning, assessment, impact

Procedia PDF Downloads 522
17518 Material Supply Mechanisms for Contemporary Assembly Systems

Authors: Rajiv Kumar Srivastava

Abstract:

Manufacturing of complex products such as automobiles and computers requires a very large number of parts and sub-assemblies. The design of mechanisms for delivery of these materials to the point of assembly is an important manufacturing system and supply chain challenge. Different approaches to this problem have been evolved for assembly lines designed to make large volumes of standardized products. However, contemporary assembly systems are required to concurrently produce a variety of products using approaches such as mixed model production, and at times even mass customization. In this paper we examine the material supply approaches for variety production in moderate to large volumes. The conventional approach for material delivery to high volume assembly lines is to supply and stock materials line-side. However for certain materials, especially when the same or similar items are used along the line, it is more convenient to supply materials in kits. Kitting becomes more preferable when lines concurrently produce multiple products in mixed model mode, since space requirements could increase as product/ part variety increases. At times such kits may travel along with the product, while in some situations it may be better to have delivery and station-specific kits rather than product-based kits. Further, in some mass customization situations it may even be better to have a single delivery and assembly station, to which an entire kit is delivered for fitment, rather than a normal assembly line. Finally, in low-moderate volume assembly such as in engineered machinery, it may be logistically more economical to gather materials in an order-specific kit prior to launching final assembly. We have studied material supply mechanisms to support assembly systems as observed in case studies of firms with different combinations of volume and variety/ customization. It is found that the appropriate approach tends to be a hybrid between direct line supply and different kitting modes, with the best mix being a function of the manufacturing and supply chain environment, as well as space and handling considerations. In our continuing work we are studying these scenarios further, through the use of descriptive models and progressing towards prescriptive models to help achieve the optimal approach, capturing the trade-offs between inventory, material handling, space, and efficient line supply.

Keywords: assembly systems, kitting, material supply, variety production

Procedia PDF Downloads 194
17517 Ranking Effective Factors on Strategic Planning to Achieve Organization Objectives in Fuzzy Multivariate Decision-Making Technique

Authors: Elahe Memari, Ahmad Aslizadeh, Ahmad Memari

Abstract:

Today strategic planning is counted as the most important duties of senior directors in each organization. Strategic planning allows the organizations to implement compiled strategies and reach higher competitive benefits than their competitors. The present research work tries to prepare and rank the strategies form effective factors on strategic planning in fulfillment of the State Road Management and Transportation Organization in order to indicate the role of organizational factors in efficiency of the process to organization managers. Connection between six main factors in fulfillment of State Road Management and Transportation Organization were studied here, including Improvement of Strategic Thinking in senior managers, improvement of the organization business process, rationalization of resources allocation in different parts of the organization, coordination and conformity of strategic plan with organization needs, adjustment of organization activities with environmental changes, reinforcement of organizational culture. All said factors approved by implemented tests and then ranked using fuzzy multivariate decision-making technique.

Keywords: Fuzzy TOPSIS, improvement of organization business process, multivariate decision-making, strategic planning

Procedia PDF Downloads 376
17516 Cyber Operational Design and Military Decision Making Process

Authors: M. Karaman, H. Catalkaya

Abstract:

Due to the complex nature of cyber attacks and their effects ranging from personal to governmental level, it becomes one of the priority tasks for operation planners to take into account the risks, influences and effects of cyber attacks. However it can also be embedded or integrated technically with electronic warfare planning, cyber operation planning is needed to have a sole and broadened perspective. This perspective embodies itself firstly in operational design and then military decision making process. In order to find out the ill-structured problems, understand or visualize the operational environment and frame the problem, operational design can help support cyber operation planners and commanders. After having a broadened and conceptual startup with cyber operational design, military decision making process will follow the principles of design into more concrete elements like reaching results after risk management and center of gravity analysis of our and the enemy. In this paper we tried to emphasize the importance of cyber operational design, cyber operation planning and its integration to military decision making problem. In this foggy, uncertain and unaccountable cyber security environment, it is inevitable to stay away from cyber attacks. Therefore, a cyber operational design should be formed with line of operations, decisive points and end states in cyber then a tactical military decision making process should be followed with cyber security focus in order to support the whole operation.

Keywords: cyber operational design, military decision making process (MDMP), operation planning, end state

Procedia PDF Downloads 558
17515 Two Stage Assembly Flowshop Scheduling Problem Minimizing Total Tardiness

Authors: Ali Allahverdi, Harun Aydilek, Asiye Aydilek

Abstract:

The two stage assembly flowshop scheduling problem has lots of application in real life. To the best of our knowledge, the two stage assembly flowshop scheduling problem with total tardiness performance measure and separate setup times has not been addressed so far, and hence, it is addressed in this paper. Different dominance relations are developed and several algorithms are proposed. Extensive computational experiments are conducted to evaluate the proposed algorithms. The computational experiments have shown that one of the algorithms performs much better than the others. Moreover, the experiments have shown that the best performing algorithm performs much better than the best existing algorithm for the case of zero setup times in the literature. Therefore, the proposed best performing algorithm not only can be used for problems with separate setup times but also for the case of zero setup times.

Keywords: scheduling, assembly flowshop, total tardiness, algorithm

Procedia PDF Downloads 317
17514 Laser Welding Technique Effect for Proton Exchange Membrane Fuel Cell Application

Authors: Chih-Chia Lin, Ching-Ying Huang, Cheng-Hong Liu, Wen-Lin Wang

Abstract:

A complete fuel cell stack comprises several single cells with end plates, bipolar plates, gaskets and membrane electrode assembly (MEA) components. Electrons generated from cells are conducted through bipolar plates. The amount of cells' components increases as the stack voltage increases, complicating the fuel cell assembly process and mass production. Stack assembly error influence cell performance. PEM fuel cell stack importing laser welding technique could eliminate transverse deformation between bipolar plates to promote stress uniformity of cell components as bipolar plates and MEA. Simultaneously, bipolar plates were melted together using laser welding to decrease interface resistance. A series of experiments as through-plan and in-plan resistance measurement test was conducted to observe the laser welding effect. The result showed that the through-plane resistance with laser welding was a drop of 97.5-97.6% when the contact pressure was about 1MPa to 3 MPa, and the in-plane resistance was not significantly different for laser welding.

Keywords: PEM fuel cell, laser welding, through-plan, in-plan, resistance

Procedia PDF Downloads 475
17513 On the Differentiation of Strategic Spatial Planning Mechanisms in New Era: Between Melbourne and Tianjin

Authors: Zhao Liu, Kang Cao

Abstract:

Strategic spatial planning, which is taken as an effective and competitive way for the governors of the city to improve the development and management level of a city, has been blooming in recent years all over the world. In the context of globalization and informatization, strategic spatial planning must transfer its focus on three different levels: global, regional and urban. Internal and external changes in environmental conditions lead to new advances in strategic planning both theoretically and practically. However, such advances or changes respond differently to cities on account of different dynamic mechanisms. This article aims at two cities of Tianjin in China and Melbourne in Australia, through a comparative study on strategic planning, to explore the differentiation of mechanisms in urban planning. By comparison and exploration, the purpose of this article is to exhibit two different planning worlds, western and Chinese, in a new way. The article can be divided into four parts. The first part outlines strategic planning transformations in the new era on three levels, generally analysing the internal and external environmental factors of today. The second part indicates the concepts of strategic planning theoretically, demonstrating briefly its development background and process in western and China, respectively. The third part takes Tianjin and Melbourne urban strategic spatial planning as examples to mainly carry on the contrast research from the aspects of strategic planning mode, competitive mechanism, contents, strategy implementation and management. It is expected to summarize the differences and similarities of the two plans, meanwhile, to explore the inherent factors or mechanisms probably spatial, material, political and etc., which affect cities in the course of urban planning. The final part is a summary of general mechanisms of planning from the perspective of strategic spatial planning.

Keywords: differentiation, strategic planning, Melbourne, Australia, Tianjin, China

Procedia PDF Downloads 493
17512 Literature Review and Approach for the Use of Digital Factory Models in an Augmented Reality Application for Decision Making in Restructuring Processes

Authors: Rene Hellmuth, Jorg Frohnmayer

Abstract:

The requirements of the factory planning and the building concerned have changed in the last years. Factory planning has the task of designing products, plants, processes, organization, areas, and the building of a factory. Regular restructuring gains more importance in order to maintain the competitiveness of a factory. Even today, the methods and process models used in factory planning are predominantly based on the classical planning principles of Schmigalla, Aggteleky and Kettner, which, however, are not specifically designed for reorganization. In addition, they are designed for a largely static environmental situation and a manageable planning complexity as well as for medium to long-term planning cycles with a low variability of the factory. Existing approaches already regard factory planning as a continuous process that makes it possible to react quickly to adaptation requirements. However, digital factory models are not yet used as a source of information for building data. Approaches which consider building information modeling (BIM) or digital factory models in general either do not refer to factory conversions or do not yet go beyond a concept. This deficit can be further substantiated. A method for factory conversion planning using a current digital building model is lacking. A corresponding approach must take into account both the existing approaches to factory planning and the use of digital factory models in practice. A literature review will be conducted first. In it, approaches to classic factory planning and approaches to conversion planning are examined. In addition, it will be investigated which approaches already contain digital factory models. In the second step, an approach is presented how digital factory models based on building information modeling can be used as a basis for augmented reality tablet applications. This application is suitable for construction sites and provides information on the costs and time required for conversion variants. Thus a fast decision making is supported. In summary, the paper provides an overview of existing factory planning approaches and critically examines the use of digital tools. Based on this preliminary work, an approach is presented, which suggests the sensible use of digital factory models for decision support in the case of conversion variants of the factory building. The augmented reality application is designed to summarize the most important information for decision-makers during a reconstruction process.

Keywords: augmented reality, digital factory model, factory planning, restructuring

Procedia PDF Downloads 113
17511 BIM Model and Virtual Prototyping in Construction Management

Authors: Samar Alkindy

Abstract:

Purpose: The BIM model has been used to support the planning of different construction projects in the industry by showing the different stages of the construction process. The model has been instrumental in identifying some of the common errors in the construction process through the spatial arrangement. The continuous use of the BIM model in the construction industry has resulted in various radical changes such as virtual prototyping. Construction virtual prototyping is a highly advanced technology that incorporates a BIM model with realistic graphical simulations, and facilitates the simulation of the project before a product is built in the factory. The paper presents virtual prototyping in the construction industry by examining its application, challenges and benefits to a construction project. Methodology approach: A case study was conducted for this study in four major construction projects, which incorporate virtual construction prototyping in several stages of the construction project. Furthermore, there was the administration of interviews with the project manager and engineer and the planning manager. Findings: Data collected from the methodological approach shows a positive response for virtual construction prototyping in construction, especially concerning communication and visualization. Furthermore, the use of virtual prototyping has increased collaboration and efficiency between construction experts handling a project. During the planning stage, virtual prototyping has increased accuracy, reduced planning time, and reduced the amount of rework during the implementation stage. Irrespective of virtual prototyping being a new concept in the construction industry, the findings outline that the approach will benefit the management of construction projects.

Keywords: construction operations, construction planning, process simulation, virtual prototyping

Procedia PDF Downloads 197