Search results for: KPIs for sustainable maintenance
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 5680

Search results for: KPIs for sustainable maintenance

5620 Feature of Employment Injuries and Maintenance Works of Construction Machinery

Authors: Naoko Kanazawa, Tran Thi Bich Nguyet, Yoshiyuki Higuchi, Hideki Hamada

Abstract:

Construction machines’ condition is maintained with the regularly inspections, preventive maintenance and repairs by skillful and qualified engineers. If an accident occurs, there will be enormous influence such as human injuries, delays in the term of construction. In this paper, we revealed the characteristics such as inspection, maintenance and repair works for construction machines, and we also clarified the trends of employment injuries based on actual data by simple and cross tabulation methods, and investigated the relation with their works, injured body parts and accident types.

Keywords: construction machines, employment injuries, maintenance and repair, safety and health

Procedia PDF Downloads 269
5619 Assessing Renewal Needs of Urban Water Infrastructure Systems: Case Study of Linköping in Sweden

Authors: Eman Hegazy, Stefan Anderberg, Joakim Krook

Abstract:

Urban water infrastructure systems are central to functioning cities. For securing a continuous and efficient supply of the systems services, continuous investment, maintenance, and renewal are needed. Neglecting maintenance and renewal can lead to recurrent breakdown problems as systems age, which makes it more and more difficult to secure efficient long-term supply. Globally, many cities struggle with aging water infrastructure, often due to competing funding priorities. Investment in maintenance and renewal is not prioritized. The problem primarily stems from the challenge of reaping the benefits of investments promptly. The long-term benefits gained from investing in the renewal of water infrastructure may be achievable in the long run, resulting in the oversight of such investments. This leads to a build-up of "renewal debt" for future generations to inherit. Addressing this issue is difficult due to various contributing factors and the complex nature of the systems. The study aims to contribute to an increased understanding of the long-term management challenges of urban water infrastructure, the development of improved maintenance and renewal strategies through the examination of water infrastructure management, and the assessment of the adequacy of the maintenance and renewal in a case study, the city of Linköping, Sweden. Employing a multi-methods approach, this study utilized both qualitative and quantitative methods, including interviews, workshops, and data analysis. The findings of the study provided insights into the current status of the water and sewerage networks in Linkoping, highlighting the risks to ensuring reliable and sustainable water supply and discussing strategies for improving maintenance and renewal.

Keywords: case study, infrastructure management, renewal needs, Sweden, urban water infrastructure

Procedia PDF Downloads 37
5618 Mobile Application Tool for Individual Maintenance Users on High-Rise Residential Buildings in South Korea

Authors: H. Cha, J. Kim, D. Kim, J. Shin, K. Lee

Abstract:

Since 1980's, the rapid economic growth resulted in so many aged apartment buildings in South Korea. Nevertheless, there is insufficient maintenance practice of buildings. In this study, to facilitate the building maintenance the authors classified the building defects into three levels according to their level of performance and developed a mobile application tool based on each level's appropriate feedback. The feedback structure consisted of 'Maintenance manual phase', 'Online feedback phase', 'Repair work phase of the specialty contractors'. In order to implement each phase the authors devised the necessary database for each phase and created a prototype system that can develop on its own. The authors expect that the building users can easily maintain their buildings by using this application.

Keywords: building defect, maintenance practice, mobile application, system algorithm

Procedia PDF Downloads 170
5617 A Quality Improvement Approach for Reducing Stigma and Discrimination against Young Key Populations in the Delivery of Sexual Reproductive Health and Rights Services

Authors: Atucungwiire Rwebiita

Abstract:

Introduction: In Uganda, provision of adolescent sexual reproductive health and rights (SRHR) services for key population is still hindered by negative attitudes, stigma and discrimination (S&D) at both the community and facility levels. To address this barrier, Integrated Community Based Initiatives (ICOBI) with support from SIDA is currently implementing a quality improvement (QI) innovative approach for strengthening the capacity of key population (KP) peer leaders and health workers to deliver friendly SRHR services without S&D. Methods: Our innovative approach involves continuous mentorship and coaching of 8 QI teams at 8 health facilities and their catchment areas. Each of the 8 teams (comprised of 5 health workers and 5 KP peer leaders) are facilitated twice a month by two QI Mentors in a 2-hour mentorship session over a period of 4 months. The QI mentors were provided a 2-weeks training on QI approaches for reducing S&D against young key populations in the delivery of SRHR Services. The mentorship sessions are guided by a manual where teams base to analyse root causes of S&D and develop key performance indicators (KPIs) in the 1st and 2nd second sessions respectively. The teams then develop action plans in the 3rd session and review implementation progress on KPIs at the end of subsequent sessions. The KPIs capture information on the attitude of health workers and peer leaders and the general service delivery setting as well as clients’ experience. A dashboard is developed to routinely track the KPIs for S&D across all the supported health facilities and catchment areas. After 4 months, QI teams share documented QI best practices and tested change packages on S&D in a learning and exchange session involving all the teams. Findings: The implementation of this approach is showing positive results. So far, QI teams have already identified the root causes of S&D against key populations including: poor information among health workers, fear of a perceived risk of infection, perceived links between HIV and disreputable behaviour. Others are perceptions that HIV & STIs are divine punishment, sex work and homosexuality are against religion and cultural values. They have also noted the perception that MSM are mentally sick and a danger to everyone. Eight QI teams have developed action plans to address the root causes of S&D. Conclusion: This approach is promising, offers a novel and scalable means to implement stigma-reduction interventions in facility and community settings.

Keywords: key populations, sexual reproductive health and rights, stigma and discrimination , quality improvement approach

Procedia PDF Downloads 123
5616 Work demand and Prevalence of Work-Related Musculoskeletal Disorders: A Case Study of Pakistan Aviation Maintenance Workers

Authors: Muzamil Mahmood, Afshan Naseem, Muhammad Zeeshan Mirza, Yasir Ahmad, Masood Raza

Abstract:

The purpose of this research is to analyze how aviation maintenance workers’ characteristics and work demand affect their development of work-related musculoskeletal disorders (WMSDs). Guided by literature on task characteristics, work demand, and WMSDs, data is collected from 128 aviation maintenance workers of private and public airlines. Data is then analyzed through descriptive and inferential statistics. It is found that task characteristics have a significant positive effect on WMSDs and an increase in tasks performed by aviation maintenance workers leads to increase in WMSDs. Work demand did not have a significant effect on WMSDs. The task characteristics of aviation maintenance workers moderates the relationship between their work demand and WMSDs. This reveals that task characteristics of aviation maintenance workers enhance the effect of work demand on WMSDs. The task characteristics of aviation maintenance workers are challenging and unpredictable. Subsequently, WMSDs are prevalent among aviation maintenance workers. The work demand of aviation maintenance workers does not influence their development of WMSDs. Pakistan Civil Aviation Authority should minimize the intensity of tasks assigned to aviation maintenance workers by introducing work dynamisms such as task sharing, job rotation, and probably teleworking to enhance flexibility. Human Resource and Recruitment Department need to consider the ability and fitness levels of potential aviation maintenance workers during recruitment. In addition, regular physical activities and ergonomic policies should be put in place by the management of the Pakistan Civil Aviation Authority to reduce the incidences of WMSDs.

Keywords: work related musculoskeletal disorders, ergonomics, occupational health and safety, human factors

Procedia PDF Downloads 112
5615 An Appraisal of Maintenance Management Practices in Federal University Dutse and Jigawa State Polytechnic Dutse, Nigeria

Authors: Aminu Mubarak Sadis

Abstract:

This study appraised the maintenance management practice in Federal University Dutse and Jigawa State Polytechnic Dutse, in Nigeria. The Physical Planning, Works and Maintenance Departments of the two Higher Institutions (Federal University Dutse and Jigawa State Polytechnic) are responsible for production and maintenance management of their physical assets. Over–enrollment problem has been a common feature in the higher institutions in Nigeria, Data were collected by the administered questionnaires and subsequent oral interview to authenticate the completed questionnaires. Random sampling techniques was used in selecting 150 respondents across the various institutions (Federal University Dutse and Jigawa State Polytechnic Dutse). Data collected was analyzed using Statistical Package for Social Science (SPSS) and t-test statistical techniques The conclusion was that maintenance management activities are yet to be given their appropriate attention on functions of the university and polytechnic which are crucial to improving teaching, learning and research. The unit responsible for maintenance and managing facilities should focus on their stated functions and effect changes were possible.

Keywords: appraisal, maintenance management, university, Polytechnic, practices

Procedia PDF Downloads 218
5614 Developing Medium Term Maintenance Plan For Road Networks

Authors: Helen S. Ghali, Haidy S. Ghali, Salma Ibrahim, Ossama Hosny, Hatem S. Elbehairy

Abstract:

Infrastructure systems are essential assets in any community; accordingly, authorities aim to maximize its life span while minimizing the life cycle cost. This requires studying the asset conditions throughout its operation and forming a cost-efficient maintenance strategy plan. The objective of this study is to develop a highway management system that provides medium-term maintenance plans with the minimum life cycle cost subject to budget constraints. The model is applied to data collected for the highway network in India with the aim to output a 5-year maintenance plan strategy from 2019 till 2023. The main element considered is the surface coarse, either rigid or flexible pavement. The model outputs a 5-year maintenance plan for each segment given the budget constraint while maximizing the new pavement condition rating and minimizing its life cycle cost.

Keywords: infrastructure, asset management, optimization, maintenance plan

Procedia PDF Downloads 185
5613 Analyzing the Performance of Different Cost-Based Methods for the Corrective Maintenance of a System in Thermal Power Plants

Authors: Demet Ozgur-Unluakin, Busenur Turkali, S. Caglar Aksezer

Abstract:

Since the age of industrialization, maintenance has always been a very crucial element for all kinds of factories and plants. With today’s increasingly developing technology, the system structure of such facilities has become more complicated, and even a small operational disruption may return huge losses in profits for the companies. In order to reduce these costs, effective maintenance planning is crucial, but at the same time, it is a difficult task because of the complexity of systems. The most important aspect of correct maintenance planning is to understand the structure of the system, not to ignore the dependencies among the components and as a result, to model the system correctly. In this way, it will be better to understand which component improves the system more when it is maintained. Undoubtedly, proactive maintenance at a scheduled time reduces costs because the scheduled maintenance prohibits high losses in profits. But the necessity of corrective maintenance, which directly affects the situation of the system and provides direct intervention when the system fails, should not be ignored. When a fault occurs in the system, if the problem is not solved immediately and proactive maintenance time is awaited, this may result in increased costs. This study proposes various maintenance methods with different efficiency measures under corrective maintenance strategy on a subsystem of a thermal power plant. To model the dependencies between the components, dynamic Bayesian Network approach is employed. The proposed maintenance methods aim to minimize the total maintenance cost in a planning horizon, as well as to find the most appropriate component to be attacked on, which improves the system reliability utmost. Performances of the methods are compared under corrective maintenance strategy. Furthermore, sensitivity analysis is also applied under different cost values. Results show that all fault effect methods perform better than the replacement effect methods and this conclusion is also valid under different downtime cost values.

Keywords: dynamic Bayesian networks, maintenance, multi-component systems, reliability

Procedia PDF Downloads 100
5612 Sustainable Building Law - The Legal Issues Abound

Authors: Richard J. Sobelsohn

Abstract:

Green Building and Sustainable Development help fight climate change, and protects the ozone, animal habitats, air quality, and ground water. The myriad of reasons to go Green has multiplied to the point that a developer that is building a ground-up or renovating/retrofitting a property has a plethora of choices to get to the green goal post. Sustainability not affects the bottom line but satisfies corporate mandates (ESG), consumer demand, market requirements, and the many laws dictating green building practices. The good news is that there are many paths a property owner can take to become green. The bad news is that there are many paths a property owner can take to become green, and they need to choose which direction to take. Certification of a building used to be the highest achievement in the Green building world. Now there are so many variables and laws with which a property owner must comply, and the legal analysis has mushroomed. Operation and Maintenance have also become one of the most important functions for a prudent Green Building owner. So adding to the “development/retrofit” parties involved in the sustainable building legal world, we now need to include all those people who keep the building green, and there are a lot of them!

Keywords: green building, sustainable development, legal issues, greenwashing, green cleaning, compliance, ESQ

Procedia PDF Downloads 93
5611 Road Maintenance Management Decision System Using Multi-Criteria and Geographical Information System for Takoradi Roads, Ghana

Authors: Eric Mensah, Carlos Mensah

Abstract:

The road maintenance backlogs created as a result of deferred maintenance especially in developing countries has caused considerable deterioration of many road assets. This is usually due to difficulties encountered in selecting and prioritising maintainable roads based on objective criteria rather than some political or other less important criteria. In order to ensure judicious use of limited resources for road maintenance, five factors were identified as the most important criteria for road management within the study area. This was based on the judgements of 40 experts. The results were further used to develop weightings using the Multi-Criteria Decision Process (MCDP) to analyse and select road alternatives according to maintenance goal. Using Geographical Information Systems (GIS), maintainable roads were grouped using the Jenk’s natural breaks to allow for further prioritised in order of importance for display on a dashboard of maps, charts, and tables. This reduces the problems of subjective maintenance and road selections, thereby reducing wastage of resources and easing the maintenance process through an object organised spatial decision support system.

Keywords: decision support, geographical information systems, multi-criteria decision process, weighted sum

Procedia PDF Downloads 340
5610 Environmental Aspects in the Job Performed by Supervisors Working in Industries

Authors: Mahesh Chandra Paliwal, Ajay Kumar Jain

Abstract:

Supervisors working in the industries must have the knowledge and skills for performing their job for environmental protection and sustainable development. A survey of thirty industries was conducted to know the roles of supervisors related to environmental protection and sustainable development. A questionnaire was prepared based on the discussion with the environmental experts. The findings of the study show that supervisors must be aware of practices followed for good housekeeping, water management, waste management, maintenance of effluent treatment plants, monitoring pollution control level to perform their job to save the environment. These aspects must be incorporated in diploma curriculum so that the diploma pass outs may use this knowledge and skills in the industries.

Keywords: environmental protection, sustainable development, water management, waste management, curriculum

Procedia PDF Downloads 294
5609 Framework to Quantify Customer Experience

Authors: Anant Sharma, Ashwin Rajan

Abstract:

Customer experience is measured today based on defining a set of metrics and KPIs, setting up thresholds and defining triggers across those thresholds. While this is an effective way of measuring against a Key Performance Indicator ( referred to as KPI in the rest of the paper ), this approach cannot capture the various nuances that make up the overall customer experience. Customers consume a product or service at various levels, which is not reflected in metrics like Customer Satisfaction or Net Promoter Score, but also across other measurements like recurring revenue, frequency of service usage, e-learning and depth of usage. Here we explore an alternative method of measuring customer experience by flipping the traditional views. Rather than rolling customers up to a metric, we roll up metrics to hierarchies and then measure customer experience. This method allows any team to quantify customer experience across multiple touchpoints in a customer’s journey. We make use of various data sources which contain information for metrics like CXSAT, NPS, Renewals, and depths of service usage collected across a customer lifecycle. This data can be mined systematically to get linkages between different data points like geographies, business groups, products and time. Additional views can be generated by blending synthetic contexts into the data to show trends and top/bottom types of reports. We have created a framework that allows us to measure customer experience using the above logic.

Keywords: analytics, customers experience, BI, business operations, KPIs, metrics

Procedia PDF Downloads 40
5608 Comparison of Two Maintenance Policies for a Two-Unit Series System Considering General Repair

Authors: Seyedvahid Najafi, Viliam Makis

Abstract:

In recent years, maintenance optimization has attracted special attention due to the growth of industrial systems complexity. Maintenance costs are high for many systems, and preventive maintenance is effective when it increases operations' reliability and safety at a reduced cost. The novelty of this research is to consider general repair in the modeling of multi-unit series systems and solve the maintenance problem for such systems using the semi-Markov decision process (SMDP) framework. We propose an opportunistic maintenance policy for a series system composed of two main units. Unit 1, which is more expensive than unit 2, is subjected to condition monitoring, and its deterioration is modeled using a gamma process. Unit 1 hazard rate is estimated by the proportional hazards model (PHM), and two hazard rate control limits are considered as the thresholds of maintenance interventions for unit 1. Maintenance is performed on unit 2, considering an age control limit. The objective is to find the optimal control limits and minimize the long-run expected average cost per unit time. The proposed algorithm is applied to a numerical example to compare the effectiveness of the proposed policy (policy Ⅰ) with policy Ⅱ, which is similar to policy Ⅰ, but instead of general repair, replacement is performed. Results show that policy Ⅰ leads to lower average cost compared with policy Ⅱ. 

Keywords: condition-based maintenance, proportional hazards model, semi-Markov decision process, two-unit series systems

Procedia PDF Downloads 94
5607 Modeling Sustainable Truck Rental Operations Using Closed-Loop Supply Chain Network

Authors: Khaled S. Abdallah, Abdel-Aziz M. Mohamed

Abstract:

Moving industries consume numerous resources and dispose masses of used packaging materials. Proper sorting, recycling and disposing the packaging materials is necessary to avoid a sever pollution disaster. This research paper presents a conceptual model to propose sustainable truck rental operations instead of the regular one. An optimization model was developed to select the locations of truck rental centers, collection sites, maintenance and repair sites, and identify the rental fees to be charged for all routes that maximize the total closed supply chain profits. Fixed costs of vehicle purchasing, costs of constructing collection centers and repair centers, as well as the fixed costs paid to use disposal and recycling centers are considered. Operating costs include the truck maintenance, repair costs as well as the cost of recycling and disposing the packing materials, and the costs of relocating the truck are presented in the model. A mixed integer model is developed followed by a simulation model to examine the factors affecting the operation of the model.

Keywords: modeling, truck rental, supply chains management.

Procedia PDF Downloads 201
5606 An Assessment of Airport Collaborative Decision-Making System Using Predictive Maintenance

Authors: Faruk Aras, Melih Inal, Tansel Cinar

Abstract:

The coordination of airport staff especially in the operations and maintenance departments is important for the airport operation. As a result, this coordination will increase the efficiency in all operation. Therefore, a Collaborative Decision-Making (CDM) system targets on improving the overall productivity of all operations by optimizing the use of resources and improving the predictability of actions. Enlarged productivity can be of major benefit for all airport operations. It also increases cost-efficiency. This study explains how predictive maintenance using IoT (Internet of Things), predictive operations and the statistical data such as Mean Time To Failure (MTTF) improves airport terminal operations and utilize airport terminal equipment in collaboration with collaborative decision making system/Airport Operation Control Center (AOCC). Data generated by the predictive maintenance methods is retrieved and analyzed by maintenance managers to predict when a problem is about to occur. With that information, maintenance can be scheduled when needed. As an example, AOCC operator would have chance to assign a new gate that towards to this gate all the equipment such as travellator, elevator, escalator etc. are operational if the maintenance team is in collaboration with AOCC since maintenance team is aware of the health of the equipment because of predictive maintenance methods. Applying predictive maintenance methods based on analyzing the health of airport terminal equipment dramatically reduces the risk of downtime by on time repairs. We can classify the categories as high priority calls for urgent repair action, as medium priority requires repair at the earliest opportunity, and low priority allows maintenance to be scheduled when convenient. In all cases, identifying potential problems early resulted in better allocation airport terminal resources by AOCC.

Keywords: airport, predictive maintenance, collaborative decision-making system, Airport Operation Control Center (AOCC)

Procedia PDF Downloads 326
5605 Reliability-Based Maintenance Management Methodology to Minimise Life Cycle Cost of Water Supply Networks

Authors: Mojtaba Mahmoodian, Joshua Phelan, Mehdi Shahparvari

Abstract:

With a large percentage of countries’ total infrastructure expenditure attributed to water network maintenance, it is essential to optimise maintenance strategies to rehabilitate or replace underground pipes before failure occurs. The aim of this paper is to provide water utility managers with a maintenance management approach for underground water pipes, subject to external loading and material corrosion, to give the lowest life cycle cost over a predetermined time period. This reliability-based maintenance management methodology details the optimal years for intervention, the ideal number of maintenance activities to perform before replacement and specifies feasible renewal options and intervention prioritisation to minimise the life cycle cost. The study was then extended to include feasible renewal methods by determining the structural condition index and potential for soil loss, then obtaining the failure impact rating to assist in prioritising pipe replacement. A case study on optimisation of maintenance plans for the Melbourne water pipe network is considered in this paper to evaluate the practicality of the proposed methodology. The results confirm that the suggested methodology can provide water utility managers with a reliable systematic approach to determining optimum maintenance plans for pipe networks.

Keywords: water pipe networks, maintenance management, reliability analysis, optimum maintenance plan

Procedia PDF Downloads 121
5604 Optimal Opportunistic Maintenance Policy for a Two-Unit System

Authors: Nooshin Salari, Viliam Makis, Jane Doe

Abstract:

This paper presents a maintenance policy for a system consisting of two units. Unit 1 is gradually deteriorating and is subject to soft failure. Unit 2 has a general lifetime distribution and is subject to hard failure. Condition of unit 1 of the system is monitored periodically and it is considered as failed when its deterioration level reaches or exceeds a critical level N. At the failure time of unit 2 system is considered as failed, and unit 2 will be correctively replaced by the next inspection epoch. Unit 1 or 2 are preventively replaced when deterioration level of unit 1 or age of unit 2 exceeds the related preventive maintenance (PM) levels. At the time of corrective or preventive replacement of unit 2, there is an opportunity to replace unit 1 if its deterioration level reaches the opportunistic maintenance (OM) level. If unit 2 fails in an inspection interval, system stops operating although unit 1 has not failed. A mathematical model is derived to find the preventive and opportunistic replacement levels for unit 1 and preventive replacement age for unit 2, that minimize the long run expected average cost per unit time. The problem is formulated and solved in the semi-Markov decision process (SMDP) framework. Numerical example is provided to illustrate the performance of the proposed model and the comparison of the proposed model with an optimal policy without opportunistic maintenance level for unit 1 is carried out.

Keywords: condition-based maintenance, opportunistic maintenance, preventive maintenance, two-unit system

Procedia PDF Downloads 170
5603 Sustainable Enterprise Theory: A Starting Point for Reporting Sustainable Business Values

Authors: Arne Fagerstrom, Gary Cunningham, Fredrik Hartwig

Abstract:

In this paper, a theory of sustainable enterprises, sustainable enterprise theory (SET), is developed. The sustainable enterprise theory can only be a valid theory if knowledge about life and nature is complete. Knowledge limitations should not stop enterprises from doing business with a goal of better long-term life on earth. Life demands stewardship of the resources used during one’s lifetime. This paper develops a model influenced by (the classical) enterprise theory and resource theory that includes more than money in the business activities of an enterprise. The sustainable enterprise theory is then used in an analysis of accountability and in discussions about sustainable businesses.

Keywords: sustainable business, sustainability reporting, sustainable values, theory of the firm

Procedia PDF Downloads 541
5602 A Genetic Algorithm to Schedule the Flow Shop Problem under Preventive Maintenance Activities

Authors: J. Kaabi, Y. Harrath

Abstract:

This paper studied the flow shop scheduling problem under machine availability constraints. The machines are subject to flexible preventive maintenance activities. The nonresumable scenario for the jobs was considered. That is, when a job is interrupted by an unavailability period of a machine it should be restarted from the beginning. The objective is to minimize the total tardiness time for the jobs and the advance/tardiness for the maintenance activities. To solve the problem, a genetic algorithm was developed and successfully tested and validated on many problem instances. The computational results showed that the new genetic algorithm outperforms another earlier proposed algorithm.

Keywords: flow shop scheduling, genetic algorithm, maintenance, priority rules

Procedia PDF Downloads 447
5601 Overview on Sustainable Coastal Protection Structures

Authors: Suresh Reddi, Mathew Leslie, Vishnu S. Das

Abstract:

Sustainable design is a prominent concept across all sectors of engineering and its importance is widely recognized within the Arabian Gulf region. Despite that sustainable or soft engineering options are not widely deployed in coastal engineering projects and a preference for utilizing ‘hard engineering’ solutions remain. The concept of soft engineering lies in “working together” with the nature to manage the coastline. This approach allows hard engineering options, such as breakwaters or sea walls, to be minimized or even eliminated altogether. Hard structures provide a firm barrier to wave energy or flooding, but in doing so they often have a significant impact on the natural processes of the coastline. This may affect the area locally or impact on neighboring zones. In addition, they often have a negative environmental impact and may create a sense of disconnect between the marine environment and local users. Soft engineering options, seek to protect the coastline by working in harmony with the natural process of sediment transport/budget. They often consider new habitat creation and creating usable spaces that will increase the sense of connection with nature. Often soft engineering options, where appropriately deployed can provide a low-maintenance, aesthetically valued, natural line of coastal protection. This paper deals with an overview of the following: The widely accepted soft engineering practices across the world; How this approach has been considered by Ramboll in some recent projects in Middle East and Asia; Challenges and barriers to use in using soft engineering options in the region; Way forward towards more widespread adoption.

Keywords: coastline, hard engineering, low maintenance, soft engineering options

Procedia PDF Downloads 110
5600 The Application of Maintenance Strategy in Energy Power Plant: A Case Study

Authors: Steven Vusmuzi Mashego, Opeyeolu Timothy Laseinde

Abstract:

This paper presents a case study on applying maintenance strategies observed in a turbo-generator at a coal power plant. Turbo generators are one of the primary and critical components in energy generation. It is essential to apply correct maintenance strategies and apply operational procedures accordingly. The maintenance strategies are implemented to ensure the high reliability of the equipment. The study was carried out at a coal power station which will transit to a cleaner energy source in the nearest future. The study is relevant as lessons learned in this system will support plans and operational models implemented when cleaner energy sources replace coal-powered turbines. This paper first outlines different maintenance strategies executed on the turbo-generator modules. Secondly, the impacts of human factors on a coal power station are discussed, and the findings prompted recommendations for future actions.

Keywords: maintenance strategies, turbo generator, operational error, human factor, electricity generation

Procedia PDF Downloads 81
5599 Preliminary Study of the Cost-Effectiveness of Green Walls: Analyzing Cases from the Perspective of Life Cycle

Authors: Jyun-Huei Huang, Ting-I Lee

Abstract:

Urban heat island effect is derived from the reduction of vegetative cover by urban development. Because plants can improve air quality and microclimate, green walls have been applied as a sustainable design approach to cool building temperature. By using plants to green vertical surfaces, they decrease room temperature and, as a result, decrease the energy use for air conditioning. Based on their structures, green walls can be divided into two categories, green façades and living walls. A green façade uses the climbing ability of a plant itself, while a living wall assembles planter modules. The latter one is widely adopted in public space, as it is time-effective and less limited. Although a living wall saves energy spent on cooling, it is not necessarily cost-effective from the perspective of a lifecycle analysis. The Italian study shows that the overall benefit of a living wall is only greater than its costs after 47 years of its establishment. In Taiwan, urban greening policies encourage establishment of green walls by referring to their benefits of energy saving while neglecting their low performance on cost-effectiveness. Thus, this research aims at understanding the perception of appliers and consumers on the cost-effectiveness of their living wall products from the lifecycle viewpoint. It adopts semi-structured interviews and field observations on the maintenance of the products. By comparing the two results, it generates insights for sustainable urban greening policies. The preliminary finding shows that stakeholders do not have a holistic sense of lifecycle or cost-effectiveness. Most importantly, a living wall well maintained is often with high input due to the availability of its maintenance budget, and thus less sustainable. In conclusion, without a comprehensive sense of cost-effectiveness throughout a product’s lifecycle, it is very difficult for suppliers and consumers to maintain a living wall system while achieve sustainability.

Keywords: case study, maintenance, post-occupancy evaluation, vertical greening

Procedia PDF Downloads 239
5598 Intelligent Platform for Photovoltaic Park Operation and Maintenance

Authors: Andreas Livera, Spyros Theocharides, Michalis Florides, Charalambos Anastassiou

Abstract:

A main challenge in the quest for ensuring the quality of operation, especially for photovoltaic (PV) systems, is to safeguard the reliability and optimal performance by detecting and diagnosing potential failures and performance losses at early stages or before occurrence through real-time monitoring, supervision, fault detection and predictive maintenance. The purpose of this work is to present the functionalities and results related to the development and validation of a software platform for PV assets diagnosis and maintenance. The platform brings together proprietary hardware sensors and software algorithms to enable the early detection and prediction of the most common and critical faults in PV systems. It was validated using field measurements from operating PV systems. The results showed the effectiveness of the platform for detecting faults and losses (e.g., inverter failures, string disconnections and potential induced degradation) at early stages, forecasting the PV power production while also providing recommendations for maintenance actions. Increased PV energy yield production and revenue can be thus achieved while also minimizing operation and maintenance (O&M) costs.

Keywords: failure detection and prediction, operation and maintenance, performance monitoring, photovoltaic, platform, recommendations, predictive maintenance

Procedia PDF Downloads 0
5597 Presentation of the Model of Reliability of the Signaling System with Emphasis on Determining Best Time Schedule for Repairments and Preventive Maintenance in the Iranian Railway

Authors: Maziar Yazdani, Ahmad Khodaee, Fatemeh Hajizadeh

Abstract:

The purpose of this research was analysis of the reliability of the signaling system in the railway and planning repair and maintenance of its subsystems. For this purpose, it will be endeavored to introduce practical strategies for activities control and appropriate planning for repair and preventive maintenance by statistical modeling of reliability. Therefore, modeling, evaluation, and promotion of reliability of the signaling system appear very critical. Among the key goals of the railway is provision of quality service for passengers and this purpose is gained by increasing reliability, availability, maintainability and safety of (RAMS). In this research, data were analyzed, and the reliability of the subsystems and entire system was calculated and with emphasis on preservation of performance of each of the subsystems with a reliability of 80%, a plan for repair and preventive maintenance of the subsystems of the signaling system was introduced.

Keywords: reliability, modeling reliability, plan for repair and preventive maintenance, signaling system

Procedia PDF Downloads 143
5596 Predictive Maintenance Based on Oil Analysis Applicable to Transportation Fleets

Authors: Israel Ibarra Solis, Juan Carlos Rodriguez Sierra, Ma. del Carmen Salazar Hernandez, Isis Rodriguez Sanchez, David Perez Guerrero

Abstract:

At the present paper we try to explain the analysis techniques use for the lubricating oil in a maintenance period of a city bus (Mercedes Benz Boxer 40), which is call ‘R-24 route’, line Coecillo Centro SA de CV in Leon Guanajuato, to estimate the optimal time for the oil change. Using devices such as the rotational viscometer and the atomic absorption spectrometer, they can detect the incipient form when the oil loses its lubricating properties and, therefore, cannot protect the mechanical components of diesel engines such these trucks. Timely detection of lost property in the oil, it allows us taking preventive plan maintenance for the fleet.

Keywords: atomic absorption spectrometry, maintenance, predictive velocity rate, lubricating oils

Procedia PDF Downloads 534
5595 GIS Pavement Maintenance Selection Strategy

Authors: Mekdelawit Teferi Alamirew

Abstract:

As a practical tool, the Geographical information system (GIS) was used for data integration, collection, management, analysis, and output presentation in pavement mangement systems . There are many GIS techniques to improve the maintenance activities like Dynamic segmentation and weighted overlay analysis which considers Multi Criteria Decision Making process. The results indicated that the developed MPI model works sufficiently and yields adequate output for providing accurate decisions. Hence considering multi criteria to prioritize the pavement sections for maintenance, as a result of the fact that GIS maps can express position, extent, and severity of pavement distress features more effectively than manual approaches, lastly the paper also offers digitized distress maps that can help agencies in their decision-making processes.

Keywords: pavement, flexible, maintenance, index

Procedia PDF Downloads 25
5594 Minimizing Unscheduled Maintenance from an Aircraft and Rolling Stock Maintenance Perspective: Preventive Maintenance Model

Authors: Adel A. Ghobbar, Varun Raman

Abstract:

The Corrective maintenance of components and systems is a problem plaguing almost every industry in the world today. Train operators’ and the maintenance repair and overhaul subsidiary of the Dutch railway company is also facing this problem. A considerable portion of the maintenance activities carried out by the company are unscheduled. This, in turn, severely stresses and stretches the workforce and resources available. One possible solution is to have a robust preventive maintenance plan. The other possible solution is to plan maintenance based on real-time data obtained from sensor-based ‘Health and Usage Monitoring Systems.’ The former has been investigated in this paper. The preventive maintenance model developed for train operator will subsequently be extended, to tackle the unscheduled maintenance problem also affecting the aerospace industry. The extension of the model to the aerospace sector will be dealt with in the second part of the research, and it would, in turn, validate the soundness of the model developed. Thus, there are distinct areas that will be addressed in this paper, including the mathematical modelling of preventive maintenance and optimization based on cost and system availability. The results of this research will help an organization to choose the right maintenance strategy, allowing it to save considerable sums of money as opposed to overspending under the guise of maintaining high asset availability. The concept of delay time modelling was used to address the practical problem of unscheduled maintenance in this paper. The delay time modelling can be used to help with support planning for a given asset. The model was run using MATLAB, and the results are shown that the ideal inspection intervals computed using the extended from a minimal cost perspective were 29 days, and from a minimum downtime, perspective was 14 days. Risk matrix integration was constructed to represent the risk in terms of the probability of a fault leading to breakdown maintenance and its consequences in terms of maintenance cost. Thus, the choice of an optimal inspection interval of 29 days, resulted in a cost of approximately 50 Euros and the corresponding value of b(T) was 0.011. These values ensure that the risk associated with component X being maintained at an inspection interval of 29 days is more than acceptable. Thus, a switch in maintenance frequency from 90 days to 29 days would be optimal from the point of view of cost, downtime and risk.

Keywords: delay time modelling, unscheduled maintenance, reliability, maintainability, availability

Procedia PDF Downloads 104
5593 Aspects on the Problems of Road Asset Management and Maintenance in Albania

Authors: Diana Bardhi

Abstract:

Road safety is an essential part of the economic and social development of any industrialized country. Decisions to maintain and improve the reliability, functionality of infrastructure structures can only be achieved through integrated road life cycle planning and management. There has always been a tendency to review road maintenance strategies, but there is still no serious and reliable administration due to not only insufficient funds but also problems in the proper reorganization of this system. The safety and performance of the road system depend on the ongoing activity of road maintenance management. For it to be effective, it is necessary to intervene before the degradation has caused irreparable damage or damage with a high economic cost of repairs. Investments in road infrastructure during 2006-2014 show that the life of these projects presents problems related to the maintenance and management of life cycle performance in a wide range of constituent elements. Maintenance planning includes various problems that depend on the degree of degradation of asphalt layers, the degree of damage to road structures (bridges, tunnels, culverts, and the economic planning of resources for their repair). The purpose of this study is first to provide a brief overview of the problems in the field of maintenance and life cycle management of road infrastructure investments, proposing ways to reorganize the sector of administration and maintenance of ongoing roads and secondly testing and evaluating the work and nature of standards of different types of road infrastructure projects, through a methodology consisting of a) development, b) data collection, and c) analysis.

Keywords: infrastructure, maintenance, depreciation, efficiency

Procedia PDF Downloads 126
5592 Requirements for a Shared Management of State-Owned Building in the Archaeological Park of Pompeii

Authors: Maria Giovanna Pacifico

Abstract:

Maintenance, in Italy, is not yet a consolidated practice despite the benefits that could come from. Among the main reasons, there are the lack of financial resources and personnel in the public administration and a general lack of knowledge about how to activate and to manage a prevented and programmed maintenance. The experimentation suggests that users and tourists could be involved in the maintenance process from the knowledge phase to the monitoring ones by using mobile devices. The goal is to increase the quality of Facility Management for cultural heritage, prioritizing usage needs, and limiting interference between the key stakeholders. The method simplifies the consolidated procedures for the Information Systems, avoiding a loss in terms of quality and amount of information by focusing on the users' requirements: management economy, user safety, accessibility, and by receiving feedback information to define a framework that will lead to predictive maintenance. This proposal was designed to be tested in the Archaeological Park of Pompeii on the state property asset.

Keywords: asset maintenance, key stakeholders, Pompeii, user requirement

Procedia PDF Downloads 93
5591 Study on the Pavement Structural Performance of Highways in the North China Region Based on Pavement Distress and Ground Penetrating Radar

Authors: Mingwei Yi, Liujie Guo, Zongjun Pan, Xiang Lin, Xiaoming Yi

Abstract:

With the rapid expansion of road construction mileage in China, the scale of road maintenance needs has concurrently escalated. As the service life of roads extends, the design of pavement repair and maintenance emerges as a crucial component in preserving the excellent performance of the pavement. The remaining service life of asphalt pavement structure is a vital parameter in the lifecycle maintenance design of asphalt pavements. Based on an analysis of pavement structural integrity, this study introduces a characterization and assessment of the remaining life of existing asphalt pavement structures. It proposes indicators such as the transverse crack spacing and the length of longitudinal cracks. The transverse crack spacing decreases with an increase in maintenance intervals and with the extended use of semi-rigid base layer structures, although this trend becomes less pronounced after maintenance intervals exceed 4 years. The length of longitudinal cracks increases with longer maintenance intervals, but this trend weakens after five years. This system can support the enhancement of standardization and scientific design in highway maintenance decision-making processes.

Keywords: structural integrity, highways, pavement evaluation, asphalt concrete pavement

Procedia PDF Downloads 28