Search results for: risk management failure
15868 Resistance and Sub-Resistances of RC Beams Subjected to Multiple Failure Modes
Authors: F. Sangiorgio, J. Silfwerbrand, G. Mancini
Abstract:
Geometric and mechanical properties all influence the resistance of RC structures and may, in certain combination of property values, increase the risk of a brittle failure of the whole system. This paper presents a statistical and probabilistic investigation on the resistance of RC beams designed according to Eurocodes 2 and 8, and subjected to multiple failure modes, under both the natural variation of material properties and the uncertainty associated with cross-section and transverse reinforcement geometry. A full probabilistic model based on JCSS Probabilistic Model Code is derived. Different beams are studied through material nonlinear analysis via Monte Carlo simulations. The resistance model is consistent with Eurocode 2. Both a multivariate statistical evaluation and the data clustering analysis of outcomes are then performed. Results show that the ultimate load behaviour of RC beams subjected to flexural and shear failure modes seems to be mainly influenced by the combination of the mechanical properties of both longitudinal reinforcement and stirrups, and the tensile strength of concrete, of which the latter appears to affect the overall response of the system in a nonlinear way. The model uncertainty of the resistance model used in the analysis plays undoubtedly an important role in interpreting results.Keywords: modelling, Monte Carlo simulations, probabilistic models, data clustering, reinforced concrete members, structural design
Procedia PDF Downloads 47215867 Integrated Clean Development Mechanism and Risk Management Approach for Infrastructure Transportation Project
Authors: Debasis Sarkar
Abstract:
Clean development mechanism (CDM) can act as an effective instrument for mitigating climate change. This mechanism can effectively reduce the emission of CO2 and other green house gases (GHG). Construction of a mega infrastructure project like underground corridor construction for metro rail operation involves in consumption of substantial quantity of concrete which consumes huge quantity of energy consuming materials like cement and steel. This paper is an attempt to develop an integrated clean development mechanism and risk management approach for sustainable development for an underground corridor metro rail project in India during its construction phase. It was observed that about 35% reduction in CO2 emission can be obtained by adding fly ash as a part replacement of cement. The reduced emission quantity of CO2 which is of the quantum of about 21,646.36 MT would result in cost savings of approximately INR 8.5 million (USD 1,29,878).But construction and operation of such infrastructure projects of the present era are subject to huge risks and uncertainties throughout all the phases of the project, thus reducing the probability of successful completion of the project within stipulated time and cost frame. Thus, an integrated approach of combining CDM with risk management would enable the metro rail authorities to develop a sustainable risk mitigation measure framework to ensure more cost and energy savings and lesser time and cost over-run.Keywords: clean development mechanism (CDM), infrastructure transportation, project risk management, underground metro rail
Procedia PDF Downloads 47415866 Proposal of a Model Supporting Decision-Making Based on Multi-Objective Optimization Analysis on Information Security Risk Treatment
Authors: Ritsuko Kawasaki (Aiba), Takeshi Hiromatsu
Abstract:
Management is required to understand all information security risks within an organization, and to make decisions on which information security risks should be treated in what level by allocating how much amount of cost. However, such decision-making is not usually easy, because various measures for risk treatment must be selected with the suitable application levels. In addition, some measures may have objectives conflicting with each other. It also makes the selection difficult. Moreover, risks generally have trends and it also should be considered in risk treatment. Therefore, this paper provides the extension of the model proposed in the previous study. The original model supports the selection of measures by applying a combination of weighted average method and goal programming method for multi-objective analysis to find an optimal solution. The extended model includes the notion of weights to the risks, and the larger weight means the priority of the risk.Keywords: information security risk treatment, selection of risk measures, risk acceptance, multi-objective optimization
Procedia PDF Downloads 46115865 Effect of Bank Specific and Macro Economic Factors on Credit Risk of Islamic Banks in Pakistan
Authors: Mati Ullah, Shams Ur Rahman
Abstract:
The purpose of this research study is to investigate the effect of macroeconomic and bank-specific factors on credit risk in Islamic banking in Pakistan. The future of financial institutions largely depends on how well they manage risks. Credit risk is an important type of risk affecting the banking sector. The current study has taken quarterly data for the period of 6 years, from 1st July 2014 to 30 Jun 2020. The data set consisted of secondary data. Data was extracted from the websites of the State Bank and World Bank and from the financial statements of the concerned banks. In this study, the Ordinary least square model was used for the analysis of the data. The results supported the hypothesis that macroeconomic factors and bank-specific factors have a significant effect on credit risk. Macroeconomic variables, Inflation and exchange rates have positive significant effects on credit risk. However, gross domestic product has a negative significant relationship with credit risk. Moreover, the corporate rate has no significant relation with credit risk. Internal variables, size, management efficiency, net profit share income and capital adequacy have been proven to influence positively and significantly the credit risk. However, loan to deposit-has a negative insignificance relationship with credit risk. The contribution of this article is that similar conclusions have been made regarding the influence of banking factors on credit risk.Keywords: credit risk, Islamic banks, macroeconomic variables, banks specific variable
Procedia PDF Downloads 1715864 Development of Database for Risk Assessment Appling to Ballast Water Managements
Authors: Eun-Chan Kim, Jeong-Hwan Oh, Seung-Guk Lee
Abstract:
Billions of tones of ballast water including various aquatic organisms are being carried around the world by ships. When the ballast water is discharged into new environments, some aquatic organisms discharged with ballast water may become invasive and severely disrupt the native ecology. Thus, International Maritime Organization (IMO) adopted the Ballast Water Management Convention in 2004. Regulation A-4 of the convention states that a government in waters under their jurisdiction may grant exemptions to any requirements to ballast water management, but only when they are granted to a ship or ships on a voyage or voyages between specified ports or locations, or to a ship which operates exclusively between specified ports or locations. In order to grant exemptions, risk assessment should be conducted based on the guidelines for risk assessment developed by the IMO. For the risk assessment, it is essential to collect the relevant information and establish a database system. This paper studies the database system for ballast water risk assessment. This database consists of the shipping database, ballast water database, port environment database and species database. The shipping database has been established based on the data collected from the port management information system of Korea Government. For the ballast water database, ballast water discharge has only been estimated by the loading/unloading of the cargoes as the convention has not come into effect yet. The port environment database and species database are being established based on the reference documents, and existing and newly collected monitoring data. This database system has been approved to be a useful system, capable of appropriately analyzing the risk assessment in the all ports of Korea.Keywords: ballast water, IMO, risk assessment, shipping, environment, species
Procedia PDF Downloads 52015863 Study of Contrast Induced Nephropathy in Patients Undergoing Cardiac Catheterization: Upper Egypt Experience
Authors: Ali Kassem, Sharf Eldeen-Shazly, Alshemaa Lotfy
Abstract:
Introduction: Contrast-induced nephropathy (CIN) has been the third leading cause of hospital-acquired renal failure. Patients with cardiac diseases are particularly at risk especially with repeated injections of contrast media. CIN is generally defined as an increase in serum creatinine concentration of > 0.5 mg/dL or 25% above baseline within 48 hours after contrast administration. Aim of work: To examine the frequency of CIN for patients undergoing cardiac catheterization at Sohag University Hospital (Upper Egypt) and to identify possible risk factors for CIN in these patients. Material and methods: The study included 104 patients with mean age 56.11 ±10.03, 64(61.5%) are males while 40(38.5%) are females. 44(42.3%) patients are diabetics, 43(41%) patients are hypertensive, 6(5.7%) patients have congestive heart failure, 69(66.3%) patients on statins, 74 (71.2 %) are on ACEIs or ARBs, 19(15.4%) are on metformin, 6 (5.8%) are on NSAIDs, 30(28.8%) are on diuretics. RESULTS: Patients were classified at the end of the study into two groups: Group A: Included 91 patients who did not develop CIN. Group B: Included 13 patients who developed CIN, of which serum creatinine raised > 0.5mg/dl in 6 patients and raised > 25% from the baseline after the procedure in 13 patients. The overall incidence of CIN was 12.5%. CIN increased with older age. There was an increase in the incidence of CIN in diabetic versus non-diabetic patients (20.5% and 6.7%) respectively. (p< 0.03). There was a highly significant increase in the incidence of CIN in patients with CHF versus those without CHF (100% and 71%) respectively, (P<0001). Patients on diuretics showed a significant increase in the incidence of CIN representing 61.5% of all patients who developed CIN. Conclusion: Older patients, diabetic patients, patients with CHF and patients on diuretics have higher risk of developing CIN during coronary catheterization and should receive reno-protective measures before contrast exposure.Keywords: cardiac diseases, contrast-induced nephropathy, coronary catheterization, CIN
Procedia PDF Downloads 31315862 New Stress Instability Workability Criteria for Internal Ductile Failure in Steel Cold Heading
Authors: Amar Sabih, James Nemes
Abstract:
The occurrence of internal ductile failure within the Adiabatic Shear Band (ASB) in cold-headed products presents a significant barrier in the fast-expanding cold-heading (CH) industry. The presence of internal ductile failure in cold-headed products may lead to catastrophic fracture under tensile loads despite the ductile nature of the material causing expensive industrial recalls. Therefore, this paper presents a new workability criterion that uses stress instability as an indicator to accurately reveal the locus of initiation of internal ductile failures. The concept of the instability criterion is to use the stress ratio at failure as a weighting function to indicate the initiation of ductile failure inside the ASBs. This paper presents a comprehensive experimental, metallurgical, and finite element simulation study to calculate the material constants used in this criterion.Keywords: adiabatic sher band, ductile failure, stress instability, workability criterion
Procedia PDF Downloads 9115861 Communication Barriers in Disaster Risk Management
Authors: Pooja Pandey
Abstract:
The role of communication plays an integral part in the management of any disaster, whether natural or human-induced, both require effective and strategic delivery of information. The way any information is conveyed carries the most weight while dealing with the disaster. Hence, integrating communication strategies in disaster risk management (DRM) are extensively acknowledged however, these integration and planning are missing from the practical books. Researchers are continuously exploring integrated DRM and have established substantial vents between research and implementation of the strategies (gaps between science and policy). For this reason, this paper reviews the communication barriers that obstruct effective management of the disaster. Communication between first responders (government agencies, police, medical services) and the public (people directly affected by the disaster) is most critical and lacks proper delivery during a disaster. And these challenges can only be resolved if the foundation of the problem is properly dealt with, which is resolving the issues within the organizations. Through this study, it was found that it is necessary to build the communication gap between the organizations themselves as most of the hindrances occur during the mitigation, preparedness, response and recovery phase of the disaster. The study is concluded with the main aim to review the communication barriers within and at the organizational, technological, and social levels that impact effective DRM. In the end, some suggestions are made to strengthen the knowledge for future improvement in communication between the responders and their organizations.Keywords: communication, organization, barriers, first responders, disaster risk management
Procedia PDF Downloads 30015860 Demographic Assessment and Evaluation of Degree of Lipid Control in High Risk Indian Dyslipidemia Patients
Authors: Abhijit Trailokya
Abstract:
Background: Cardiovascular diseases (CVD’s) are the major cause of morbidity and mortality in both developed and developing countries. Many clinical trials have demonstrated that low-density lipoprotein cholesterol (LDL-C) lowering, reduces the incidence of coronary and cerebrovascular events across a broad spectrum of patients at risk. Guidelines for the management of patients at risk have been established in Europe and North America. The guidelines have advocated progressively lower LDL-C targets and more aggressive use of statin therapy. In Indian patients, comprehensive data on dyslipidemia management and its treatment outcomes are inadequate. There is lack of information on existing treatment patterns, the patient’s profile being treated, and factors that determine treatment success or failure in achieving desired goals. Purpose: The present study was planned to determine the lipid control status in high-risk dyslipidemic patients treated with lipid-lowering therapy in India. Methods: This cross-sectional, non-interventional, single visit program was conducted across 483 sites in India where male and female patients with high-risk dyslipidemia aged 18 to 65 years who had visited for a routine health check-up to their respective physician at hospital or a healthcare center. Percentage of high-risk dyslipidemic patients achieving adequate LDL-C level (< 70 mg/dL) on lipid-lowering therapy and the association of lipid parameters with patient characteristics, comorbid conditions, and lipid lowering drugs were analysed. Results: 3089 patients were enrolled in the study; of which 64% were males. LDL-C data was available for 95.2% of the patients; only 7.7% of these patients achieved LDL-C levels < 70 mg/dL on lipid-lowering therapy, which may be due to inability to follow therapeutic plans, poor compliance, or inadequate counselling by physician. The physician’s lack of awareness about recent treatment guidelines also might contribute to patients’ poor adherence, not explaining adequately the benefit and risks of a medication, not giving consideration to the patient’s life style and the cost of medication. Statin was the most commonly used anti-dyslipidemic drug across population. The higher proportion of patients had the comorbid condition of CVD and diabetes mellitus across all dyslipidemic patients. Conclusion: As per the European Society of Cardiology guidelines the ideal LDL-C levels in high risk dyslipidemic patients should be less than 70%. In the present study, 7.7% of the patients achieved LDL-C levels < 70 mg/dL on lipid lowering therapy which is very less. Most of high risk dyslipidemic patients in India are on suboptimal dosage of statin. So more aggressive and high dosage statin therapy may be required to achieve target LDLC levels in high risk Indian dyslipidemic patients.Keywords: cardiovascular disease, diabetes mellitus, dyslipidemia, LDL-C, lipid lowering drug, statins
Procedia PDF Downloads 20115859 Flood Risk Assessment in the Niger River Basin in Support of the Conception of a Flood Risk Management Plan: Case Study of the District of Malanville, Benin
Authors: Freddy Houndekindo
Abstract:
A study was carried out to evaluate the flood risk in the district of Malanville located along the Niger River. The knowledge produce by this study is useful in the implementation of adaptation and/or mitigation measures to alleviate the impact of the flooding on the populations, the economy and the environment. Over the course of the study, the lack of data in the area of interest has been one of the main challenges encountered. Therefore, in the analysis of the flood hazard different sources of remotely sensed data were used. Moreover, the flood hazard was analysed by applying a 1D hydraulic model: HEC-RAS. After setting up the model for the study area, the different flood scenarios considered were simulated and mapped using ArcGIS and the HEC-GEORAS extension. The result of the simulation gave information about the inundated areas and the water depths at each location. From the analysis of the flood hazard, it was found that between 47% and 50% of the total area of the district of Malanville would be flooded in the different flood scenarios considered, and the water depth varies between 1 and 7 m. The townships of Malanville most at risk of flooding are Momkassa and Galiel, located in a high-risk and very high-risk zone, respectively. Furthermore, the assessment of the flood risk showed that the most vulnerable sector to the inundations is the agricultural sector. Indeed, the cultivated floodplains were the most affected areas by the floodwater in every flood scenarios. Knowing that a high proportion of the population of the district relies on their farmlands in these floodplains for their livelihood, the floods pose a challenge not only to the food security in the area but also to its development.Keywords: flood risk management, Niger, remote sensing, vulnerability
Procedia PDF Downloads 15215858 Risk Assessment for International Investment: A Standardized Approach to Identify Risk, Risk Appetite, Risk Rating, Risk Treatment and Mitigation Plans
Authors: Pui Yong Leo, Normy Maziah Mohd Said
Abstract:
Change of global economy landscape and business environment has led to companies’ decision to go global and enter international markets. As the companies go beyond the comfort zone (i.e. investing in the home country), it is important to ensure a comprehensive risk assessment is carried out. This paper describes a standardized approach for international investment, ensuring identification of risk, risk appetite, risk rating, risk treatment and mitigation plans for respective international investment proposal. The standardized approach is divided into three (3) stages as follows: Stage 1 – Preliminary Risk profiling; with the objective to gauge exposure to countries and high level risk factors as first level assessment. Stage 2 – Risk Parameters; with the objective to define risk appetite for the international investment from the perspective of likelihood and impact. Stage 3 – Detailed Risk Assessments; with the objectives to assess in detail any triggered elements from Stage 1, and project specific risks. The final output will include the mitigation plans for the identified risks for the total investment. Example will be given in this paper to show how comprehensive risk assessment is carried out for an international investment in power energy sector.Keywords: international investment, mitigation plans, risk appetite, risk assessment
Procedia PDF Downloads 38815857 Modeling the Impact of Controls on Information System Risks
Authors: M. Ndaw, G. Mendy, S. Ouya
Abstract:
Information system risk management helps to reduce or eliminate risk by implementing appropriate controls. In this paper, we propose a quantification model of controls impact on information system risks by automatizing the residual criticality estimation step of FMECA which is based on a inductive reasoning. For this, we defined three equations based on type and maturity of controls. For testing, the values obtained with the model were compared to estimated values given by interlocutors during different working sessions and the result is satisfactory. This model allows an optimal assessment of controls maturity and facilitates risk analysis of information system.Keywords: information system, risk, control, FMECA method
Procedia PDF Downloads 35515856 Typhoon Disaster Risk Assessment of Mountain Village: A Case Study of Shanlin District in Kaohsiung
Abstract:
Taiwan is mountainous country, 70% of land is covered with mountains. Because of extreme climate, the mountain villages with sensitive and fragile environment often get easily affected by inundation and debris flow from typhoon which brings huge rainfall. Due to inappropriate development, overuse and fewer access roads, occurrence of disaster becomes more frequent through downpour and rescue actions are postponed. However, risk map is generally established through administrative boundaries, the difference of urban and rural area is ignored. The neglect of mountain village characteristics eventually underestimates the importance of factors related to vulnerability and reduces the effectiveness. In disaster management, there are different strategies and actions at each stage. According to different tasks, there will be different risk indices and weights to analyze disaster risk for each stage and then it will contribute to confront threat and reduce impact appropriately on right time. Risk map is important in mitigation, but also in response stage because some factors such as road network will be changed by disaster. This study will use risk assessment to establish risk map of Shanlin District which is mountain village in Kaohsiung as a case study in mitigation and response stage through Analytic Hierarchy Process (AHP). AHP helps to recognize the composition and weights of risk factors in mountain village by experts’ opinions through survey design and is combined with present potential hazard map to produce risk map.Keywords: risk assessment, mountain village, risk map, analytic hierarchy process
Procedia PDF Downloads 39915855 Risk Management in Islamic Micro Finance Credit System for Poverty Alleviation from Qualitative Perspective
Authors: Liyu Adhi Kasari Sulung
Abstract:
Poverty has been a major problem in Indonesia. Islamic micro finance (IMF) named Baitul Maal Wat Tamwil (Bmt) plays a prominent role to eradicate this. Indonesia as the biggest muslim country has many successful applied products such as worldwide adopt group-based lending approach, flexible financing for farmers, and gold pawning. The Problems related to these models are operation risk management and internal control system (ICS). A proper ICS will help an organization in preventing the occurrence of bad financing through detecting error and irregularities in its operation. This study aims to seek a proper risk management scheme of credit system in Bmt and internal control system’s rank for every stage. Risk management variables are obtained at the first In-Depth Interview (IDI) and Focus Group Discussion (FGD) with Shariah supervisory boards, boards of directors, and operational managers. Survey was conducted covering nationwide data; West Java, South Sulawesi, and West Nusa Tenggara. Moreover, Content analysis is employed to build the relationship among these variables. Research Findings shows that risk management Characteristics in Indonesia involves ex ante, credit process, and ex post strategies to deal with risk in credit system. Ex-ante control consists of Shariah compliance, survey, group leader reference, and islamic forming orientation. Then, credit process involves saving, collateral, joint liability, loan repayment, and credit installment controlling. Finally, ex-post control includes shariah evaluation, credit evaluation, grace period and low installment provisions. In addition, internal control order sort three stages by its priority; Credit process as first rank, then ex-post control as second, and ex ante control as the last rank.Keywords: internal control system, islamic micro finance, poverty, risk management
Procedia PDF Downloads 40715854 Hybrid Risk Assessment Model for Construction Based on Multicriteria Decision Making Methods
Authors: J. Tamosaitiene
Abstract:
The article focuses on the identification and classification of key risk management criteria that represent the most important sustainability aspects of the construction industry. The construction sector is one of the most important sectors in Lithuania. Nowadays, the assessment of the risk level of a construction project is especially important for the quality of construction projects, the growth of enterprises and the sector. To establish the most important criteria for successful growth of the sector, a questionnaire for experts was developed. The analytic hierarchy process (AHP), the expert judgement method and other multicriteria decision making (MCDM) methods were used to develop the hybrid model. The results were used to develop an integrated knowledge system for the measurement of a risk level particular to construction projects. The article presents a practical case that details the developed system, sustainable aspects, and risk assessment.Keywords: risk, system, model, construction
Procedia PDF Downloads 16715853 Overcoming 4-to-1 Decryption Failure of the Rabin Cryptosystem
Authors: Muhammad Rezal Kamel Ariffin, Muhammad Asyraf Asbullah
Abstract:
The square root modulo problem is a known primitive in designing an asymmetric cryptosystem. It was first attempted by Rabin. Decryption failure of the Rabin cryptosystem caused by the 4-to-1 decryption output is overcome efficiently in this work. The proposed scheme to overcome the decryption failure issue (known as the AAβ-cryptosystem) is constructed using a simple mathematical structure, it has low computational requirements and would enable communication devices with low computing power to deploy secure communication procedures efficiently.Keywords: Rabin cryptosystem, 4-to-1 decryption failure, square root modulo problem, integer factorization problem
Procedia PDF Downloads 47515852 Nonlinear Analysis with Failure Using the Boundary Element Method
Authors: Ernesto Pineda Leon, Dante Tolentino Lopez, Janis Zapata Lopez
Abstract:
The current paper shows the application of the boundary element method for the analysis of plates under shear stress causing plasticity. In this case, the shear deformation of a plate is considered by means of the Reissner’s theory. The probability of failure of a Reissner’s plate due to a proposed index plastic behavior is calculated taken into account the uncertainty in mechanical and geometrical properties. The problem is developed in two dimensions. The classic plasticity’s theory is applied and a formulation for initial stresses that lead to the boundary integral equations due to plasticity is also used. For the plasticity calculation, the Von Misses criteria is used. To solve the non-linear equations an incremental method is employed. The results show a relatively small failure probability for the ranges of loads between 0.6 and 1.0. However, for values between 1.0 and 2.5, the probability of failure increases significantly. Consequently, for load bigger than 2.5 the plate failure is a safe event. The results are compared to those that were found in the literature and the agreement is good.Keywords: boundary element method, failure, plasticity, probability
Procedia PDF Downloads 31115851 Use of Bamboo Piles in Ground Improvement Design: Case Study
Authors: Thayalan Nall, Andreas Putra
Abstract:
A major offshore reclamation work is currently underway in Southeast Asia for a container terminal. The total extent of the reclamation extent is 2600m x 800m and the seabed level is around -5mRL below mean sea level. Subsoil profile below seabed comprises soft marine clays of thickness varying from 8m to 15m. To contain the dredging spoil within the reclamation area, perimeter bunds have been constructed to +2.5mRL. They include breakwaters of trapezoidal geometry, made of boulder size rock along the northern, eastern and western perimeters, with a sand bund along the southern perimeter. Breakwaters were constructed on a composite bamboo pile and raft foundation system. Bamboo clusters 8m long, with 7 individual Bamboos bundled together as one, have been installed within the footprint of the breakwater below seabed in soft marine clay. To facilitate drainage two prefabricated vertical drains (PVD) have been attached to each cluster. Once the cluster piles were installed, a bamboo raft was placed as a load transfer platform. Rafts were made up of 5 layers of bamboo mattress, and in each layer bamboos were spaced at 200mm centres. The rafts wouldn’t sink under their own weight, and hence, they were sunk by loading quarry run rock onto them. Bamboo is a building material available in abundance in Indonesia and obtained at a relatively low cost. They are commonly used as semi-rigid inclusions to improve compressibility and stability of soft soils. Although bamboo is widely used in soft soil engineering design, no local design guides are available and the designs are carried out based on local experience. In June 2015, when the 1st load of sand was pumped by a dredging vessel next to the breakwater, a 150m long section of the breakwater underwent failure and displaced the breakwater between 1.2m to 4.0m. The cause of the failure was investigated to implement remedial measures to reduce the risk of further failures. Analyses using both limit equilibrium approach and finite element modelling revealed two plausible modes of breakwater failure. This paper outlines: 1) Developed Geology and the ground model, 2) The techniques used for the installation of bamboo piles, 3) Details of the analyses including modes and mechanism of failure and 4) Design changes incorporated to reduce the risk of failure.Keywords: bamboo piles, ground improvement, reclamation, breakwater failure
Procedia PDF Downloads 41715850 Participatory Approach of Flood Disaster Risk Reduction
Authors: Laxman Budhathoki, Lal Bahadur Shrestha, K. C. Laxman
Abstract:
Hundreds of people are being lost their life by flood disaster in Nepal every year. Community-based disaster management committee has formed to formulate the disaster management plan including the component of EWS like EWS tower, rain gauge station, flood gauge station, culverts, boats, ropes, life jackets, a communication mechanism, emergency shelter, Spur, dykes, dam, evacuation route, emergency dry food management etc. Now EWS become a successful tool to decrease the human casualty from 13 to 0 every year in Rapti River of Chitwan District.Keywords: disaster risk reduction, early warning system, flood, participatory approach
Procedia PDF Downloads 35415849 A Novel Stress Instability Workability Criteria for Internal Ductile Failure in Steel Cold Heading Process
Authors: Amar Sabih, James Nemes
Abstract:
The occurrence of internal ductile failure within the Adiabatic Shear Band (ASB) in cold-headed products presents a significant barrier in the fast-expanding cold-heading (CH) industry. The presence of internal ductile failure in cold-headed products may lead to catastrophic fracture under tensile loads despite the ductile nature of the material causing expensive industrial recalls. Therefore, this paper presents a workability criterion that uses stress instability as an indicator to accurately reveal the locus of initiation of internal ductile failures. The concept of the instability criterion is to use the stress ratio at failure as a weighting function to indicate the initiation of ductile failure inside the ASBs. This paper presents a comprehensive experimental, metallurgical, and finite element simulation study to calculate the material constants used in this criterion.Keywords: adiabatic shear band, workability criterion, ductile failure, stress instability
Procedia PDF Downloads 8915848 Portfolio Risk Management Using Quantum Annealing
Authors: Thomas Doutre, Emmanuel De Meric De Bellefon
Abstract:
This paper describes the application of local-search metaheuristic quantum annealing to portfolio opti- mization. Heuristic technics are particularly handy when Markowitz’ classical Mean-Variance problem is enriched with additional realistic constraints. Once tailored to the problem, computational experiments on real collected data have shown the superiority of quantum annealing over simulated annealing for this constrained optimization problem, taking advantages of quantum effects such as tunnelling.Keywords: optimization, portfolio risk management, quantum annealing, metaheuristic
Procedia PDF Downloads 38315847 Utilising Indigenous Knowledge to Design Dykes in Malawi
Authors: Martin Kleynhans, Margot Soler, Gavin Quibell
Abstract:
Malawi is one of the world’s poorest nations and consequently, the design of flood risk management infrastructure comes with a different set of challenges. There is a lack of good quality hydromet data, both in spatial terms and in the quality thereof and the challenge in the design of flood risk management infrastructure is compounded by the fact that maintenance is almost completely non-existent and that solutions have to be simple to be effective. Solutions should not require any further resources to remain functional after completion, and they should be resilient. They also have to be cost effective. The Lower Shire Valley of Malawi suffers from frequent flood events. Various flood risk management interventions have been designed across the valley during the course of the Shire River Basin Management Project – Phase I, and due to the data poor environment, indigenous knowledge was relied upon to a great extent for hydrological and hydraulic model calibration and verification. However, indigenous knowledge comes with the caveat that it is ‘fuzzy’ and that it can be manipulated for political reasons. The experience in the Lower Shire valley suggests that indigenous knowledge is unlikely to invent a problem where none exists, but that flood depths and extents may be exaggerated to secure prioritization of the intervention. Indigenous knowledge relies on the memory of a community and cannot foresee events that exceed past experience, that could occur differently to those that have occurred in the past, or where flood management interventions change the flow regime. This complicates communication of planned interventions to local inhabitants. Indigenous knowledge is, for the most part, intuitive, but flooding can sometimes be counter intuitive, and the rural poor may have a lower trust of technology. Due to a near complete lack of maintenance of infrastructure, infrastructure has to be designed with no moving parts and no requirement for energy inputs. This precludes pumps, valves, flap gates and sophisticated warning systems. Designs of dykes during this project included ‘flood warning spillways’, that double up as pedestrian and animal crossing points, which provide warning of impending dangerous water levels behind dykes to residents before water levels that could cause a possible dyke failure are reached. Locally available materials and erosion protection using vegetation were used wherever possible to keep costs down.Keywords: design of dykes in low-income countries, flood warning spillways, indigenous knowledge, Malawi
Procedia PDF Downloads 27915846 The Impact of Enhanced Recovery after Surgery (ERAS) Protocols on Anesthesia Management in High-Risk Surgical Patients
Authors: Rebar Mohammed Hussein
Abstract:
Enhanced Recovery After Surgery (ERAS) protocols have transformed perioperative care, aiming to reduce surgical stress, optimize pain management, and accelerate recovery. This study evaluates the impact of ERAS on anesthesia management in high-risk surgical patients, focusing on opioid-sparing techniques and multimodal analgesia. A retrospective analysis was conducted on patients undergoing major surgeries within an ERAS program, comparing outcomes with a historical cohort receiving standard care. Key metrics included postoperative pain scores, opioid consumption, length of hospital stay, and complication rates. Results indicated that the implementation of ERAS protocols significantly reduced postoperative opioid use by 40% and improved pain management outcomes, with 70% of patients reporting satisfactory pain control on postoperative day one. Additionally, patients in the ERAS group experienced a 30% reduction in length of stay and a 20% decrease in complication rates. These findings underscore the importance of integrating ERAS principles into anesthesia practice, particularly for high-risk patients, to enhance recovery, improve patient satisfaction, and reduce healthcare costs. Future directions include prospective studies to further refine anesthesia techniques within ERAS frameworks and explore their applicability across various surgical specialties.Keywords: ERAS protocols, high-risk surgical patients, anesthesia management, recovery
Procedia PDF Downloads 1915845 Study of Chlorine Gas Leak Consequences in Direct Chlorination System Failure in Cooling Towers in the Petrochemical Industry
Authors: Mohammad H. Ruhipour, Mahdi Goharrokhi, Mahsa Ghasemi, Artadokht Ostadsarayi
Abstract:
In this paper, we are aiming to study the consequences of chlorine gas leak in direct chlorine gas injection compared to using bleach (sodium hypochlorite), studying the negative effects both on the environment and individuals. This study was performed in the cooling towers of a natural fractioning unit of Bandar-e-IMAM petrochemical plant. Considering that chlorine gas is highly toxic and based on the health regulation, its release into the surrounding environment can be very dangerous for people and even fatal for individuals. We studied performing quantitative studies in the worst cases of event incidence. In addition, studying alternative methods with a lower risk was also on the agenda to select the least likely possible option causing an accident. In this paper chlorine gas release consequences have been evaluated by using PHAST software. Reaching to 10 ppm of chlorine gas concentration was basis of hazardous area determination. The results show that the full chlorine gas line rupture scenario in Pasquill category F, were worst case, and many people could be harmed around cooling towers area because of chlorine gas inhalation.Keywords: chlorine gas, consequence modeling, cooling towers, direct chlorination, risk assessment, system failure
Procedia PDF Downloads 28515844 Solution of S3 Problem of Deformation Mechanics for a Definite Condition and Resulting Modifications of Important Failure Theories
Authors: Ranajay Bhowmick
Abstract:
Analysis of stresses for an infinitesimal tetrahedron leads to a situation where we obtain a cubic equation consisting of three stress invariants. This cubic equation, when solved for a definite condition, gives the principal stresses directly without requiring any cumbersome and time-consuming trial and error methods or iterative numerical procedures. Since the failure criterion of different materials are generally expressed as functions of principal stresses, an attempt has been made in this study to incorporate the solutions of the cubic equation in the form of principal stresses, obtained for a definite condition, into some of the established failure theories to determine their modified descriptions. It has been observed that the failure theories can be represented using the quadratic stress invariant and the orientation of the principal plane.Keywords: cubic equation, stress invariant, trigonometric, explicit solution, principal stress, failure criterion
Procedia PDF Downloads 13715843 Review of Capitalization of Construction Industry on Sustainable Risk Management in Nigeria
Authors: Nnadi Ezekiel Ejiofor
Abstract:
The construction industry plays a decisive role in the healthy development of any nation. Not only large but even small construction projects contribute to a country’s economic growth. There is a need for good management to ensure successful delivery and sustainability because of the plethora of risks that have resulted in low-profit margins for contractors, cost and schedule overruns, poor quality delivery, and abandoned projects. This research reviewed Capitalization on Sustainable Risk Management. Questionnaires and oral interviews conducted were utilized as means of data collection. One hundred and ninety-eight (198) large construction firms in Nigeria form the population of this study. 15 (fifteen) companies that emanated from merger and acquisition were used for the study. The instruments used for data collection were a researcher-developed structured questionnaire based on a five-point rating scale, interviews, focus group discussion, and secondary sources (bill of quantities and stock and exchange commission). The instrument was validated by two experts in the field. The reliability of the instrument was established by applying the split-half method. Kendall’s coefficient of concordance was used to test the data, and a degree of agreement was obtained. Data were subjected to descriptive statistics and analyzed using analysis of variance, t-test, and SPSS. The identified impacts of capitalization were an increase in turnover (24.5%), improvement in the image (24.5%), risk reduction (20%), business expansion (17.3%), and geographical spread (13.6%). The study strongly advocates the inclusion of risk management evaluation as part of the construction procurement process.Keywords: capitalization, project delivery, risks, risk management, sustainability
Procedia PDF Downloads 5915842 A Critical Review of Risk-Based Approach for Project Management Office Development
Authors: Alin Veronika, Yusuf Latief
Abstract:
This critical review meticulously delineates and elucidates the considerable deficiencies and voids that exist within the extant body of literature concerning the development strategies associated with risk-based Project Management Offices (PMOs). Although the advantages and positive outcomes linked to the establishment and functioning of PMOs are regularly articulated and acknowledged in various academic discourses, the empirical evidence that supports these claims frequently demonstrates a significant shortfall in methodological rigor and often encounters challenges when attempting to distinctly isolate and delineate the unique contributions and impacts of PMOs in contrast to other multifaceted organizational factors that may also play a role. This comprehensive review systematically scrutinizes and evaluates the current research landscape pertaining to the critical success factors that include, but are not limited to, strategic alignment, organizational structure, human capital, operational efficiency, technology, and the overarching influence of organizational culture, thereby identifying notable limitations within this research domain and proposing targeted areas for further scholarly investigation. Furthermore, the analysis accentuates the imperative need for the development and implementation of more sophisticated, nuanced risk assessment and mitigation frameworks that are specifically designed to cater to the unique operational characteristics of PMOs while simultaneously advocating for an elevated focus on the profound influence exerted by organizational culture and its various subcultures on the overall effectiveness and success of PMOs.Keywords: organizational culture, project management office, risk management, risk-based PMO development
Procedia PDF Downloads 1215841 Risk Allocation in Public-Private Partnership (PPP) Projects for Wastewater Treatment Plants
Authors: Samuel Capintero, Ole H. Petersen
Abstract:
This paper examines the utilization of public-private partnerships for the building and operation of wastewater treatment plants. Our research focuses on risk allocation in this kind of projects. Our analysis builds on more than hundred wastewater treatment plants built and operated through PPP projects in Aragon (Spain). The paper illustrates the consequences of an inadequate management of construction risk and an unsuitable transfer of demand risk in wastewater treatment plants. It also shows that the involvement of many public bodies at local, regional and national level further increases the complexity of this kind of projects and make time delays more likely.Keywords: wastewater, treatment plants, PPP, construction
Procedia PDF Downloads 64915840 Safety Management on Construction Sites
Authors: Jonathan Doku
Abstract:
The study's goal was to evaluate construction site safety management in Ghana. The construction sector has long been seen as a high-risk business. It entails a variety of hazardous and challenging labor duties, such as lifting and working at a height, among others. The accident rate is a standard indicator for comparing the safety performance of construction projects. Because of its high-risk and fast-changing work environment, the construction business is regarded as one of the industries with the highest accident rates in the world. Many mishaps and work-related diseases have occurred there, and construction workers are particularly vulnerable to catastrophic calamities such as falls, collapses, and burial. The study's main goals were to discover characteristics that have a substantial impact on construction site safety, to evaluate the safety management methods utilized on construction sites, and to assess the obstacles associated with construction site safety management. The study was conducted using a quantitative research method and a purposive sampling strategy. Google forms were used to distribute self-administered surveys to 85 responders. 72 of the 85 questionnaires were completed and submitted for analysis, accounting for 84.7 percent of the total. The variables were analyzed using descriptive statistics, mean score ranking, and Cronbach's Alpha Coefficient to ensure the scale's reliability. The formal safety organization structure and the Safety checklist were identified as the key practices of safety management on site as part of the study goals. In addition, it was discovered that the most serious problem with safety management is ineffective supervision. To guarantee efficient monitoring and proper implementation of health and safety rules on building sites, management must be on the ball.Keywords: construction, safety, risk, management
Procedia PDF Downloads 8115839 Analysis of Risk-Based Disaster Planning in Local Communities
Authors: R. A. Temah, L. A. Nkengla-Asi
Abstract:
Planning for future disasters sets the stage for a variety of activities that may trigger multiple recurring operations and expose the community to opportunities to minimize risks. Local communities are increasingly embracing the necessity for planning based on local risks, but are also significantly challenged to effectively plan and response to disasters. This research examines basic risk-based disaster planning model and compares it with advanced risk-based planning that introduces the identification and alignment of varieties of local capabilities within and out of the local community that can be pivotal to facilitate the management of local risks and cascading effects prior to a disaster. A critical review shows that the identification and alignment of capabilities can potentially enhance risk-based disaster planning. A tailored holistic approach to risk based disaster planning is pivotal to enhance collective action and a reduction in disaster collective cost.Keywords: capabilities, disaster planning, hazards, local community, risk-based
Procedia PDF Downloads 206