10215 Causes and Effects of Delays in Construction Projects in Akure, Ondo State, South-West Nigeria

Authors: K.T Alade, A.F Lawal, A.A Omonori

Abstract:

Construction is an everlasting activity across the globe. Likewise, the problem of delay in the construction industry is a global phenomenon. Although there are several reasons that may be responsible for delay during construction, this may vary from place to place and can be reduced to the minimum when identified. This study considered the major causes and effects of delay in the execution of construction projects in Akure, Ondo State, Nigeria. Using literatures, a total number of 30 causes of construction delays were identified. The convenient sampling technique was used to select sixty respondents for a survey. The respondents comprise twenty-two (22) clients, eighteen consultants (18) and twenty (20) contractors. The analyses of the primary data revealed that the three most important causes of delay in construction projects in Akure, Ondo State Nigeria are poor site management and supervision, inadequate contractors experience and client’s financial difficulties. Based on the findings of this study, recommendations were given on how the causes and effects of delay in construction can be mitigated.

Keywords: Akure, causes, construction projects, delay, effects

Procedia PDF Downloads 481
10214 Approach to Functional Safety-Compliant Design of Electric Power Steering Systems for Commercial Vehicles

Authors: Hyun Chul Koag, Hyun-Sik Ahn

Abstract:

In this paper, we propose a design approach for the safety mechanism of an actuator used in a commercial vehicle’s EPS system. As the number of electric/electronic system in a vehicle increases, the importance of the functional safety has been receiving much attention. EPS(Electric Power Steering) systems for commercial vehicles require large power than passenger vehicles, and hence, dual motor can be applied to get more torque. We show how to formulate the development process for the design of hardware and software of an EPS system using dual motors. A lot of safety mechanisms for the processor, sensors, and memory have been suggested, however, those for actuators have not been fully researched. It is shown by metric analyses that the target ASIL(Automotive Safety Integrated Level) is satisfied in the point of view of hardware of EPS controller.

Keywords: safety mechanism, functional safety, commercial vehicles, electric power steering

Procedia PDF Downloads 364
10213 Hybrid Concrete Construction (HCC) for Sustainable Infrastructure Development in Nigeria

Authors: Muhammad Bello Ibrahim, M. Auwal Zakari, Aliyu Usman

Abstract:

Hybrid concrete construction (HCC) combines all the benefits of pre-casting with the advantages of cast in-situ construction. Merging the two, as a hybrid structure, results in even greater construction speed, value, and the overall economy. Its variety of uses has gained popularity in the United States and in Europe due to its distinctive benefits. However, the increase of its application in some countries (including Nigeria) has been relatively slow. Several researches have shown that hybrid construction offers an ultra-high performance concrete that offers superior strength, durability and aesthetics with design flexibility and within sustainability credentials, based on the available and economically visible technologies. This paper examines and documents the criterion that will help inform the process of deciding whether or not to adopt hybrid concrete construction (HCC) technology rather than more traditional alternatives. It also the present situation of design, construction and research on hybrid structures.

Keywords: hybrid concrete construction, Nigeria, sustainable infrastructure development, design flexibility

Procedia PDF Downloads 528
10212 Major Causes of Delay in Construction Projects

Authors: Y. Gholipour, E. Rezazadeh

Abstract:

Delay is one of the most serious and common problems of construction project that can affect project delivery unfavorably. This research presents the most important causes of delay in large dam projects based on a survey on some executed dam construction in Iran. In this survey a randomly selected samples of owners, consultants and contractors have been involved. The outcome of this survey revealed that scheduled payments, site management, shop drawing review process, unforeseen ground conditions and contractor experience as the most important factors affecting on delay in dam construction projects.

Keywords: delay, dam construction, project management, Iran

Procedia PDF Downloads 418
10211 Design and Development of a Safety Equipment and Accessory for Bicycle Users

Authors: Francine Siy, Stephen Buñi

Abstract:

Safety plays a significant role in everyone’s life on a day-to-day basis. We wish ourselves and our loved ones their safety as we all venture out on our daily commute. The road is undeniably dangerous and unpredictable, with abundant traffic collisions and pedestrians experiencing various injuries. For bicycle users, the risk of accidents is even more exacerbated, and injuries may be severe. Even when cyclists try their best to be safe and protected, the possibility of encountering danger is always there. Despite being equipped with protective gear, safety is never guaranteed. Cyclists often settle for helmets and standard reflector vests to establish a presence on the road. There are different types of vests available, depending on the profession. However, traditional reflector vests, mostly seen on construction workers and traffic enforcers, were not designed for riders and their protection from injuries. With insufficient protection for riders, they need access to ergonomically designed equipment and accessories that suit the riders and cater to their needs. This research aimed to offer a protective vest with safety features for riders that is comfortable, effective, durable, and intuitive. This sheds light and addresses the safety of the biker population, which continuously grows through the years. The product was designed and developed by gathering data and using the cognitive mapping method to ensure that all qualitative and quantitative data were considered in this study to improve other existing products that do not have the proper design considerations. It is known that available equipment for cyclists is often sold separately or lacks the safety features for cyclists traversing open roads. Each safety feature like the headlights, reflectors, signal or rear lights, zipper pouch, body camera attachment, and wireless remote control all play a particular role in helping cyclists embark on their daily commute. These features aid in illumination, visibility, easy maneuvering, convenience, and security, allowing cyclists to go for a safer ride that is of use throughout the day. The product is designed and produced effectively and inexpensively without sacrificing the quality and purpose of its usage.

Keywords: bicycle accessory, protective gear, safety, transport, visibility

Procedia PDF Downloads 60
10210 Process Safety Management Digitalization via SHEQTool based on Occupational Safety and Health Administration and Center for Chemical Process Safety, a Case Study in Petrochemical Companies

Authors: Saeed Nazari, Masoom Nazari, Ali Hejazi, Siamak Sanoobari Ghazi Jahani, Mohammad Dehghani, Javad Vakili

Abstract:

More than ever, digitization is an imperative for businesses to keep their competitive advantages, foster innovation and reduce paperwork. To design and successfully implement digital transformation initiatives within process safety management system, employees need to be equipped with the right tool, frameworks, and best practices. we developed a unique full stack application so-called SHEQTool which is entirely dynamic based on our extensive expertise, experience, and client feedback to help business processes particularly operations safety management. We use our best knowledge and scientific methodologies published by CCPS and OSHA Guidelines to streamline operations and integrated them into task management within Petrochemical Companies. We digitalize their main process safety management system elements and their sub elements such as hazard identification and risk management, training and communication, inspection and audit, critical changes management, contractor management, permit to work, pre-start-up safety review, incident reporting and investigation, emergency response plan, personal protective equipment, occupational health, and action management in a fully customizable manner with no programming needs for users. We review the feedback from main actors within petrochemical plant which highlights improving their business performance and productivity as well as keep tracking their functions’ key performance indicators (KPIs) because it; 1) saves time, resources, and costs of all paperwork on our businesses (by Digitalization); 2) reduces errors and improve performance within management system by covering most of daily software needs of the organization and reduce complexity and associated costs of numerous tools and their required training (One Tool Approach); 3) focuses on management systems and integrate functions and put them into traceable task management (RASCI and Flowcharting); 4) helps the entire enterprise be resilient to any change of your processes, technologies, assets with minimum costs (through Organizational Resilience); 5) reduces significantly incidents and errors via world class safety management programs and elements (by Simplification); 6) gives the companies a systematic, traceable, risk based, process based, and science based integrated management system (via proper Methodologies); 7) helps business processes complies with ISO 9001, ISO 14001, ISO 45001, ISO 31000, best practices as well as legal regulations by PDCA approach (Compliance).

Keywords: process, safety, digitalization, management, risk, incident, SHEQTool, OSHA, CCPS

Procedia PDF Downloads 20
10209 Cooperation and Conflict in Child Rearing Practices among Parents in Indian Context

Authors: Jilly John

Abstract:

The paper reports one of the study conducted to explore the dimensions of child rearing practice and effects of power difference among parents on child rearing practices adopted in the families. The first objective investigated dimensions of child rearing practices (a) overprotection (b) disciplinarian, (c) esteem building, (d) normal, (e) harsh (f) ridicule, and (g) rejection. The second objective investigated difference among father and mother on child rearing practices. The results of the study revealed that dimensions of child rearing practices are crucial variables which resulted in form of major deviations in distribution of parents in the seven dimensions. Analysis of objective two revealed that harsh and ridicule dimensions of child rearing practices are significantly different among father and mother. The dimensions are also different when the parents are employed and according to the type of families. Thus the results of the study present the possibility of changed child rearing practices among Indian families in relation to prevalent sociodemographic changes and indicate the necessity to re-examine culture-based explanations on child rearing practices.

Keywords: child rearing practices, dimensions of child rearing, difference among parents, Indian families

Procedia PDF Downloads 377
10208 Heavy Liquid Metal Coolant – the Key Safety Element in the Complex of New Nuclear Energy Technologies

Authors: A. Orlov, V. Rachkov

Abstract:

The future of Nuclear Energetics is seen in fast reactors with inherent safety working in the closed nuclear fuel cycle. The concept of inherent safety, which lies in deterministic elimination of the most severe accidents due to inherent properties of the reactor rather than through building up engineered barriers, is a cornerstone of success in ensuring safety and economic efficiency of future Nuclear Energetics. The focus of this paper is one of the key elements of inherent safety - the lead coolant of a nuclear reactor. Advantages of lead coolant for reactor application, influence on safety are reviewed. BREST-OD-300 fast reactor, currently being developed in Russia withing the “Proryv” Project utilizes lead coolant and a special set of measures and devices, called technology of lead coolant that ensures safe operation in a wide range of temperatures. Here these technological elements are reviewed, and current progress in their development is discussed.

Keywords: BREST-OD-300. , fast reactor, inherent safety, lead coolant

Procedia PDF Downloads 126
10207 A Review of Digital Twins to Reduce Emission in the Construction Industry

Authors: Zichao Zhang, Yifan Zhao, Samuel Court

Abstract:

The carbon emission problem of the traditional construction industry has long been a pressing issue. With the growing emphasis on environmental protection and advancement of science and technology, the organic integration of digital technology and emission reduction has gradually become a mainstream solution. Among various sophisticated digital technologies, digital twins, which involve creating virtual replicas of physical systems or objects, have gained enormous attention in recent years as tools to improve productivity, optimize management and reduce carbon emissions. However, the relatively high implementation costs including finances, time, and manpower associated with digital twins have limited their widespread adoption. As a result, most of the current applications are primarily concentrated within a few industries. In addition, the creation of digital twins relies on a large amount of data and requires designers to possess exceptional skills in information collection, organization, and analysis. Unfortunately, these capabilities are often lacking in the traditional construction industry. Furthermore, as a relatively new concept, digital twins have different expressions and usage methods across different industries. This lack of standardized practices poses a challenge in creating a high-quality digital twin framework for construction. This paper firstly reviews the current academic studies and industrial practices focused on reducing greenhouse gas emissions in the construction industry using digital twins. Additionally, it identifies the challenges that may be encountered during the design and implementation of a digital twin framework specific to this industry and proposes potential directions for future research. This study shows that digital twins possess substantial potential and significance in enhancing the working environment within the traditional construction industry, particularly in their ability to support decision-making processes. It proves that digital twins can improve the work efficiency and energy utilization of related machinery while helping this industry save energy and reduce emissions. This work will help scholars in this field to better understand the relationship between digital twins and energy conservation and emission reduction, and it also serves as a conceptual reference for practitioners to implement related technologies.

Keywords: digital twins, emission reduction, construction industry, energy saving, life cycle, sustainability

Procedia PDF Downloads 55
10206 Tourism Development and Planning in Rwanda

Authors: Ntachobazi bosco

Abstract:

Tourism Development and Planning in Rwanda: Rwanda, a small landlocked country located in the heart of Africa, has experienced significant growth in its tourism industry in recent years. The country’s stunning natural beauty, rich cultural heritage, and warm hospitality have made it an attractive destination for travelers from around the world. However, to ensure sustainable tourism development and planning, the Rwandan government has implemented various strategies and policies to promote responsible tourism practices. Infrastructure Development: To support the growth of the tourism industry, the Rwandan government has invested heavily in infrastructure development. This includes the construction of new hotels, resorts, and lodges, as well as the upgrading of existing facilities. The government has also improved the country’s transportation network, including the construction of new airports and the upgrading of existing ones. Conservation Efforts: Rwanda is home to several national parks and reserves, including the famous Volcanoes National Park, which is known for its mountain gorilla populations. To protect these natural wonders, the Rwandan government has implemented conservation efforts, such as the establishment of protected areas and the development of sustainable tourism practices. Community-Based Tourism: Community-based tourism is a key component of Rwanda’s tourism development strategy. The government has established several community-based tourism programs, which aim to involve local communities in the tourism industry and provide them with economic benefits. These programs include homestays, village tours, and cultural performances. Sustainable Tourism Practices: To promote sustainable tourism practices, the Rwandan government has implemented several initiatives, such as the use of eco-friendly accommodations and the promotion of responsible wildlife viewing practices. The government has also established the Rwanda Tourism Board, which is responsible for promoting and regulating the tourism industry. Challenges and Opportunities: Despite the growth of the tourism industry in Rwanda, several challenges need to be addressed, such as the lack of skilled labor and the need for more infrastructure development. However, there are also several opportunities for the industry, such as the potential for ecotourism and the growth of the meetings, incentives, conventions, and exhibitions (MICE) market.

Keywords: tourism, in rwanda, developent, in africa

Procedia PDF Downloads 40
10205 Development of Construction Cost Optimization System Using Genetic Algorithm Method

Authors: Hyeon-Seung Kim, Young-Hwan Kim, Sang-Mi Park, Min-Seo Kim, Jong-Myeung Shin, Leen-Seok Kang

Abstract:

The project budget at the planned stage might be changed by the insufficient government budget or the design change. There are many cases more especially in the case of a project performed for a long period of time. If the actual construction budget is insufficient comparing with the planned budget, the construction schedule should also be changed to match the changed budget. In that case, most project managers change the planned construction schedule by a heuristic approach without a reasonable consideration on the work priority. This study suggests an optimized methodology to modify the construction schedule according to the changed budget. The genetic algorithm was used to optimize the modified construction schedule within the changed budget. And a simulation system of construction cost histogram in accordance with the construction schedule was developed in the BIM (Building Information Modeling) environment.

Keywords: 5D, BIM, GA, cost optimization

Procedia PDF Downloads 569
10204 The Human Resource Management Systems and Practices of Multinational Companies in Their Nigerian Subsidiaries

Authors: Suwaiba Sabiu Bako, Yaw Debrah

Abstract:

In spite of the extensive literature available on the human resource management (HRM) systems and practices of multinational companies (MNCs) from developed countries, there are gaps concerning emerging countries’ multinational companies’ (EMNCs) HRM systems and practices. This study examines the transfer of HRM practices in Nigerian subsidiaries of MNCs from South Africa. It reveals that South MNCs hybridise their recruitment and selection processes and localise their compensation and employee relations. It also proves that performance appraisal, talent management and code of conduct practices are largely transferred to subsidiaries with minimal adaptation.

Keywords: EMNCs, HRM practices, HRM systems, Nigeria, South Africa

Procedia PDF Downloads 76
10203 A Fuzzy TOPSIS Based Model for Safety Risk Assessment of Operational Flight Data

Authors: N. Borjalilu, P. Rabiei, A. Enjoo

Abstract:

Flight Data Monitoring (FDM) program assists an operator in aviation industries to identify, quantify, assess and address operational safety risks, in order to improve safety of flight operations. FDM is a powerful tool for an aircraft operator integrated into the operator’s Safety Management System (SMS), allowing to detect, confirm, and assess safety issues and to check the effectiveness of corrective actions, associated with human errors. This article proposes a model for safety risk assessment level of flight data in a different aspect of event focus based on fuzzy set values. It permits to evaluate the operational safety level from the point of view of flight activities. The main advantages of this method are proposed qualitative safety analysis of flight data. This research applies the opinions of the aviation experts through a number of questionnaires Related to flight data in four categories of occurrence that can take place during an accident or an incident such as: Runway Excursions (RE), Controlled Flight Into Terrain (CFIT), Mid-Air Collision (MAC), Loss of Control in Flight (LOC-I). By weighting each one (by F-TOPSIS) and applying it to the number of risks of the event, the safety risk of each related events can be obtained.

Keywords: F-topsis, fuzzy set, flight data monitoring (FDM), flight safety

Procedia PDF Downloads 143
10202 Decommissioning of Nuclear Power Plants: The Current Position and Requirements

Authors: A. Stifi, S. Gentes

Abstract:

Undoubtedly from construction's perspective, the use of explosives will remove a large facility such as a 40-storey building , that took almost 3 to 4 years for construction, in few minutes. Usually, the reconstruction or decommissioning, the last phase of life cycle of any facility, is considered to be the shortest. However, this is proved to be wrong in the case of nuclear power plant. Statistics says that in the last 30 years, the construction of a nuclear power plant took an average time of 6 years whereas it is estimated that decommissioning of such plants may take even a decade or more. This paper is all about the decommissioning phase of a nuclear power plant which needs to be given more attention and encouragement from the research institutes as well as the nuclear industry. Currently, there are 437 nuclear power reactors in operation and 70 reactors in construction. With around 139 nuclear facilities already been shut down and are in different decommissioning stages and approximately 347 nuclear reactors will be in decommissioning phase in the next 20 years (assuming the operation time of a reactor as 40 years), This fact raises the following two questions (1) How far is the nuclear and construction Industry ready to face the challenges of decommissioning project? (2) What is required for a safety and reliable decommissioning project delivery? The decommissioning of nuclear facilities across the global have severe time and budget overruns. Largely the decommissioning processes are being executed by the force of manual labour where the change in regulations is respectively observed. In term of research and development, some research projects and activities are being carried out in this area, but the requirement seems to be much more. The near future of decommissioning shall be better through a sustainable development strategy where all stakeholders agree to implement innovative technologies especially for dismantling and decontamination processes and to deliever a reliable and safety decommissioning. The scope of technology transfer from other industries shall be explored. For example, remotery operated robotic technologies used in automobile and production industry to reduce time and improve effecincy and saftey shall be tried here. However, the innovative technologies are highly requested but they are alone not enough, the implementation of creative and innovative management methodologies should be also investigated and applied. Lean Management with it main concept "elimination of waste within process", is a suitable example here. Thus, the cooperation between international organisations and related industries and the knowledge-sharing may serve as a key factor for the successful decommissioning projects.

Keywords: decommissioning of nuclear facilities, innovative technology, innovative management, sustainable development

Procedia PDF Downloads 446
10201 The Eco-Efficient Construction: A Review of Embodied Energy in Building Materials

Authors: Francesca Scalisi, Cesare Sposito

Abstract:

The building construction industry consumes a large amount of resources and energy, both during construction (embodied energy) and during the operational phase (operating energy). This paper presents a review of the literature on low carbon and low embodied energy materials in buildings. The embodied energy comprises the energy consumed during the extraction, processing, transportation, construction, and demolition of building materials. While designing a nearly zero energy building, it is necessary to choose and use materials, components, and technologies that allow to reduce the consumption of energy and also to reduce the emissions in the atmosphere during all the Life Cycle Assessment phases. The appropriate choice of building materials can contribute decisively to reduce the energy consumption of the building sector. The increasing worries for the environmental impact of construction materials are witnessed by a lot of studies. The mentioned worries have brought again the attention towards natural materials. The use of more sustainable construction materials and construction techniques represent a major contribution to the eco-efficiency of the construction industry and thus to a more sustainable development.

Keywords: embodied energy, embodied carbon, life cycle assessment, architecture, sustainability, material construction

Procedia PDF Downloads 310
10200 Water Quality, Safety and Drowning Prevention to Preschool Children in Sub-Saharan Africa

Authors: Amos King'ori Githu

Abstract:

Water safety is crucial for all ages, but particularly for children. In the past decade, preschool institutions in Sub-Saharan Africa have seen the inclusion of swimming as one of the co-curricular activities. However, these countries face challenges in adopting frameworks, staffing, and resources to heighten water safety, quality, and drowning prevention, hence the focus of this research. It is worth noting that drowning is a leading cause of injury-related deaths among children. Universally, the highest drowning rates occur among children aged 1-4 years and 5-9 years. Preschool children even stand a higher risk of drowning as they are active, eager, and curious to explore their environment. If not supervised closely around or in water, these children can drown quickly in just a few inches of water. Thus, this empirical review focuses on the identification, assessment, and analysis of water safety efforts to curb drowning among children and assess the quality of water to mitigate contamination that may eventually pose infection risks to the children. In addition, it outlines the use of behavioral theories and evaluation frameworks to guide the above. Notably, a search on ten databases was adopted for crucial peer-reviewed articles, and five were selected in the eventual review. This research relied extensively on secondary data to curb water infections and drowning-inflicted deaths among children. It suffices to say that interventions must be supported that adopt an array of strategies, are guided by planning and theory as well as evaluation frameworks, and are vast in intervention design, evaluation, and delivery methodology. Finally, this approach will offer solid evidence that can be shared to guide future practices and policies in preschools on child safety and drowning prevention.

Keywords: water quality and safety, drowning prevention, preschool children, sub-saharan Africa, supervision

Procedia PDF Downloads 35
10199 Evolution of Classroom Languaging over the Years: Prospects for Teaching Mathematics Differently

Authors: Jabulani Sibanda, Clemence Chikiwa

Abstract:

This paper traces diverse language practices representative of equally diverse conceptions of language. To be dynamic with languaging practices, one needs to appreciate nuanced languaging practices, their challenges, prospects, and opportunities. The paper presents what we envision as three major conceptions of language that give impetus to diverse language practices. It examines theoretical models of the bilingual mental lexicon and how they inform language practices. The paper explores classroom languaging practices that have been promulgated and experimented with. The paper advocates the deployment of multisensory semiotic systems to complement linguistic classroom communication and the acknowledgement of learners’ linguistic and semiotic resources as valid in the learning enterprise. It recommends the enactment of specific clauses on language in education policies and curriculum documents that empower classroom interactants to exercise discretion in languaging practices.

Keywords: languaging, monolingual, multilingual, semiotic and linguistic repertoire

Procedia PDF Downloads 43
10198 Methodology of Construction Equipment Optimization for Earthwork

Authors: Jaehyun Choi, Hyunjung Kim, Namho Kim

Abstract:

Earthwork is one of the critical civil construction operations that require large-quantities of resources due to its intensive dependency upon construction equipment. Therefore, efficient construction equipment management can highly contribute to productivity improvements and cost savings. Earthwork operation utilizes various combinations of construction equipment in order to meet project requirements such as time and cost. Identification of site condition and construction methods should be performed in advance in order to develop a proper execution plan. The factors to be considered include capacity of equipment assigned, the method of construction, the size of the site, and the surrounding condition. In addition, optimal combination of various construction equipment should be selected. However, in real world practice, equipment utilization plan is performed based on experience and intuition of management. The researchers evaluated the efficiency of various alternatives of construction equipment combinations by utilizing the process simulation model, validated the model from a case study project, and presented a methodology to find optimized plan among alternatives.

Keywords: earthwork operation, construction equipment, process simulation, optimization

Procedia PDF Downloads 403
10197 Gifted Disadvantage in Education Safety Net: A Reality Check: A Case Study From India

Authors: Jyoti Sharma

Abstract:

Although notion of giftedness is a reality, yet it swings along the pendulum of equality and excellence. At times, nurturance of gifted abilities becomes a struggle of better catchment of resources and facilities. Those from affluent setup are blessed with better support system whereas gifted children from disadvantaged group suffer from submissive upbringing. In developing countries like India, with diverse demographic profiles, socio-cultural diversity and economic disparity, the very concept of equality in education face severe challenge. The present paper presents the dichotomy of ideology of equality and excellence in education practices. It highlights the need of wider vision, better policy making and decentralized implementation services to allow gifted children to enjoy what they are; dream what they can be; and promote what they will be.

Keywords: gifted, disadvantaged, education safety net, India

Procedia PDF Downloads 506
10196 The Current Home Hemodialysis Practices and Patients’ Safety Related Factors: A Case Study from Germany

Authors: Ilyas Khan. Liliane Pintelon, Harry Martin, Michael Shömig

Abstract:

The increasing costs of healthcare on one hand, and the rise in aging population and associated chronic disease, on the other hand, are putting increasing burden on the current health care system in many Western countries. For instance, chronic kidney disease (CKD) is a common disease and in Europe, the cost of renal replacement therapy (RRT) is very significant to the total health care cost. However, the recent advancement in healthcare technology, provide the opportunity to treat patients at home in their own comfort. It is evident that home healthcare offers numerous advantages apparently, low costs and high patients’ quality of life. Despite these advantages, the intake of home hemodialysis (HHD) therapy is still low in particular in Germany. Many factors are accounted for the low number of HHD intake. However, this paper is focusing on patients’ safety-related factors of current HHD practices in Germany. The aim of this paper is to analyze the current HHD practices in Germany and to identify risks related factors if any exist. A case study has been conducted in a dialysis center which consists of four dialysis centers in the south of Germany. In total, these dialysis centers have 350 chronic dialysis patients, of which, four patients are on HHD. The centers have 126 staff which includes six nephrologists and 120 other staff i.e. nurses and administration. The results of the study revealed several risk-related factors. Most importantly, these centers do not offer allied health services at the pre-dialysis stage, the HHD training did not have an established curriculum; however, they have just recently developed the first version. Only a soft copy of the machine manual is offered to patients. Surprisingly, the management was not aware of any standard available for home assessment and installation. The home assessment is done by a third party (i.e. the machines and equipment provider) and they may not consider the hygienic quality of the patient’s home. The type of machine provided to patients at home is similar to the one in the center. The model may not be suitable at home because of its size and complexity. Even though portable hemodialysis machines, which are specially designed for home use, are available in the market such as the NxStage series. Besides the type of machine, no assistance is offered for space management at home in particular for placing the machine. Moreover, the centers do not offer remote assistance to patients and their carer at home. However, telephonic assistance is available. Furthermore, no alternative is offered if a carer is not available. In addition, the centers are lacking medical staff including nephrologists and renal nurses.

Keywords: home hemodialysis, home hemodialysis practices, patients’ related risks in the current home hemodialysis practices, patient safety in home hemodialysis

Procedia PDF Downloads 97
10195 Evolution of Classroom Languaging in Multilingual Contexts: Challenges and Prospects

Authors: Jabulani Sibanda, Clemence Chikiwa

Abstract:

This paper traces diverse language practices representative of equally diverse conceptions of language. To be dynamic with languaging practices, one needs to appreciate nuanced languaging practices, their challenges, prospects, and opportunities. The paper presents what we envision as three major conceptions of language that give impetus to diverse language practices. It examines theoretical models of the bilingual mental lexicon and how they inform language practices. The paper explores classroom languaging practices that have been promulgated and experimented with. The paper advocates the deployment of multisensory semiotic systems to complement linguistic classroom communication and the acknowledgement of learners’ linguistic and semiotic resources as valid in the learning enterprise. It recommends the enactment of specific clauses on language in education policies and curriculum documents that empower classroom interactants to exercise discretion in languaging practices.

Keywords: languaging, monolingual, multilingual, semiotic and linguistic repertoire

Procedia PDF Downloads 35
10194 Identifying Project Delay Factors in the Australian Construction Industry

Authors: Syed Sohaib Bin Hasib, Hiyam Al-Kilidar

Abstract:

Meeting project deadlines is a major challenge for most construction projects. In this study, perceptions of contractors, clients, and consultants are compared relative to a list of factors derived from the review of the extant literature on project delay. 59 causes (categorized into 8 groups) of project delays were identified from the literature. A survey was devised to get insights and ranking of these factors from clients, consultants & contractors in the Australian construction industry. Findings showed that project delays in the Australian construction industry are mainly the result of skill shortages, interference in execution, and poor coordination and communication between the project stakeholders.

Keywords: construction, delay factors, time delay, australian construction industry

Procedia PDF Downloads 146
10193 Food Safety Management in Riyadh’s Ministry of Health Hospitals

Authors: A. Alrasheed, I. Connerton

Abstract:

Providing patients with safe meals on a daily basis is one of the challenges in the healthcare sector. In Saudi Arabia matters related to food safety and hygiene have been the heart of the Ministry of Health (MOH) and Saudi Food and Drugs Authority (SFDA). The aim of this study is to examine the causes of inadequate implementation of food safety management systems such as HACCP in Riyadh’s MOH hospitals. By the law, food safety must be managed using a documented, HACCP based approach, and food handlers must be appropriately trained in food safety. Food handlers in Saudi Arabia are not required to provide a certificate or attend a food handling training course even in healthcare sectors. Since food safety and hygiene issues are of increasing importance for Saudi Arabian health decision makers, the SFDA has been established to apply food hygiene requirements in all food operations. It should be pointed out that the implications of food outbreaks on the whole society may potentially go beyond individual health impacts but also impact on the Nation’s health and bring about economic repercussions.

Keywords: food safety, patient, hospital, HACCP

Procedia PDF Downloads 846
10192 Abating the Barriers to the Deployment of RFID for Construction Project Delivery in South Africa

Authors: Matthew O. Ikuabe, Ayodeji E. Oke, Clinton O. Aigbavboa, Douglas O. Aghimien

Abstract:

The use of technological innovations have been touted to be beneficial in the delivery of construction projects. Particularly, Radio Frequency Identification (RFID) technology is widely regarded to be of immense advantage for the management of construction projects. This study focused on evaluating the barriers to the use of Radio Frequency Identification (RFID) technology for the delivery of construction projects. Using Gauteng Provincein South Africa as the study area, questionnaire was used in eliciting responses from construction professionals, which made up the population of the study. Retrieved data was analysed using Mean Item Score and One-Sample t-test. Findings from the study showed that the most significant barriers to the deployment of RFID for construction project delivery are high cost and lack of awareness. Conclusively, the study made recommendations that would aid in the abatement of the barriers to the use of RFID technology for construction project delivery.

Keywords: barriers, construction, project delivery, RFID

Procedia PDF Downloads 166
10191 Study and Construction on Signalling System during Reverse Motion Due to Obstacle

Authors: S. M. Yasir Arafat

Abstract:

Driving models are needed by many researchers to improve traffic safety and to advance autonomous vehicle design. To be most useful, a driving model must state specifically what information is needed and how it is processed. So we developed an “Obstacle Avoidance and Detection Autonomous Car” based on sensor application. The ever increasing technological demands of today call for very complex systems, which in turn require highly sophisticated controllers to ensure that high performance can be achieved and maintained under adverse conditions. Based on a developed model of brakes operation, the controller of braking system operation has been designed. It has a task to enable solution to the problem of the better controlling of braking system operation in a more accurate way then it was the case now a day.

Keywords: automobile, obstacle, safety, sensing

Procedia PDF Downloads 340
10190 Applications of Engineering Geology in Hydro Power Tunnel Projects in Himalayan Geological Regime

Authors: Rameh Chauhan

Abstract:

Tunnel construction in Himalayan rock is a challenging task due to fragile nature of the strata. Tunnel excavation carried out from lower Himalayas to high Himalayas in different metamorphic rock. Therefore application of engineering geology plays a vital role during various stage of the tunneling projects. Engineering geology is defined as application of geology to construction of civil structures through engineering practice. It is applied to the design, construction and performance aspects of engineering structure on the surface or sub-surface like dam, underground and surface power house, cut slopes, tunnels and underground storage cavern for nuclear material. But this paper emphasized mostly on underground structures like big caverns of Power house, desilting chambers, and tunnels of various sizes. Construction of these structures in the fragile rock conditions of Himalayan geology from Western Himalayas to Eastern Himalayas necessitated the application of the engineering geology on the micro-scale base for the stability, performance, and longevity of the civil structures. Number of hydropower projects have been constructed, some of them are under construction and under investigation stage. These projects are located in various parts of Himalayas under various seismic-tectonic zones. Tunneling works are involved in these projects. This paper represents the various engineering geological practices adopted in investigation and construction stage of various projects based on experiences gained during past construction histories in Himalayan geology of young mountains in very fragile geological conditions. Highlighting and sharing of use of these techniques on various platforms will definitely enhance the knowledge for carrying out the construction of various projects for the development of society. Construction of the tunnels, surface, and sub-surface caverns, dams, highway, metro, highway tunnels are all based on engineering geological parameters in combinations with other engineering considerations.

Keywords: cavern-power house, desilting chambers and tunnels, seismic-tectonic-zones, earthquake-prone zones based on intensities

Procedia PDF Downloads 198
10189 Heritage Spanish Speaker’s Bilingual Practices and Linguistic Varieties: Challenges and Opportunities

Authors: Ana C. Sanchez

Abstract:

This paper will discuss some of the bilingual practices of Heritage Spanish speakers caused by living within two cultures and two languages, Spanish, the heritage language, and English, the dominant language. When two languages remain in contact for long periods, such as the case of Spanish and English, it is common that both languages can be affected by bilingual practices such as Spanglish, code-switching, borrowing, anglicisms and calques. Examples of these translingual practices will be provided, as well as HS speaker’s linguistic dialects, and the challenges they encounter with the standard variety used in the Spanish classroom.

Keywords: heritage, practices, Spanish, speakers translingual

Procedia PDF Downloads 176
10188 An Assessment of the Factors Affecting Green Building Technology (GBT) Adoption

Authors: Nuruddeen Usman, Usman Mohammed Gidado

Abstract:

A construction and post construction activity in buildings contributes to environmental degradation, because of the generation of solid waste during construction to the production of carbon dioxide by the occupants during utilization. These problems were caused as a result of lack of adopting green building technology during and after construction. However, this study aims at conceptualizing the factors that are affecting the adoption of green building technology with a view to suggest better ways for its successful adoption in the construction industry through developing a green building technology model. Thus, the research findings show that: Economic, social, cultural, and technological progresses are the factors affecting Green Building Technology Adoption. Therefore, identifying these factors and developing the model might help in the successful adoption of green building technology.

Keywords: green building technology, construction, post construction, degradation

Procedia PDF Downloads 624
10187 Wind Comfort and Safety of People in the Vicinity of Tall Buildings

Authors: Mohan Kotamrazu

Abstract:

Tall buildings block and divert strong upper level winds to the ground. These high velocity winds many a time create adverse wind effects at ground level which can be uncomfortable and even compromise the safety of pedestrians and people who frequent the spaces in the vicinity of tall buildings. Discomfort can be experienced around the entrances and corners of tall buildings. Activities such as strolling or sitting in a park, waiting for a bus near a tall building can become highly unpleasant. For the elderly unpleasant conditions can also become dangerous leading to accidents and injuries. Today there is a growing concern among architects, planners and urban designers about the wind environment in the vicinity of tall building. Regulating authorities insist on wind tunnel testing of tall buildings in cities such as Wellington, Auckland, Boston, San Francisco, etc. prior to granting permission for their construction The present paper examines the different ways that tall buildings can induce strong winds at pedestrian level and their impact on people who frequent the spaces around tall buildings.

Keywords: tall buildings, wind effects, wind comfort, wind safety

Procedia PDF Downloads 349
10186 Critical Success Factors Influencing Construction Project Performance for Different Objectives: Procurement Phase

Authors: Samart Homthong, Wutthipong Moungnoi

Abstract:

Critical success factors (CSFs) and the criteria to measure project success have received much attention over the decades and are among the most widely researched topics in the context of project management. However, although there have been extensive studies on the subject by different researchers, to date, there has been little agreement on the CSFs. The aim of this study is to identify the CSFs that influence the performance of construction projects, and determine their relative importance for different objectives across five stages in the project life cycle. A considerable literature review was conducted that resulted in the identification of 179 individual factors. These factors were then grouped into nine major categories. A questionnaire survey was used to collect data from three groups of respondents: client representatives, consultants, and contractors. Out of 164 questionnaires distributed, 93 were returned, yielding a response rate of 56.7%. Using the mean score, relative importance index, and weighted average method, the top 10 critical factors for each category were identified. The agreement of survey respondents on those categorised factors were analysed using Spearman’s rank correlation. A one-way analysis of variance was then performed to determine whether the mean scores among the various groups of respondents were statistically significant. The findings indicate the most CSFs in each category in procurement phase are: proper procurement programming of materials (time), stability in the price of materials (cost), and determining quality in the construction (quality). They are then followed by safety equipment acquisition and maintenance (health and safety), budgeting allowed in a contractual arrangement for implementing environmental management activities (environment), completeness of drawing documents (productivity), accurate measurement and pricing of bill of quantities (risk management), adequate communication among the project team (human resource), and adequate cost control measures (client satisfaction). An understanding of CSFs would help all interested parties in the construction industry to improve project performance. Furthermore, the results of this study would help construction professionals and practitioners take proactive measures for effective project management.

Keywords: critical success factors, procurement phase, project life cycle, project performance

Procedia PDF Downloads 166