Search results for: design-build-finance-operate (DBFO) road projects
3185 Identification and Optimisation of South Africa's Basic Access Road Network
Authors: Diogo Prosdocimi, Don Ross, Matthew Townshend
Abstract:
Road authorities are mandated within limited budgets to both deliver improved access to basic services and facilitate economic growth. This responsibility is further complicated if maintenance backlogs and funding shortfalls exist, as evident in many countries including South Africa. These conditions require authorities to make difficult prioritisation decisions, with the effect that Road Asset Management Systems with a one-dimensional focus on traffic volumes may overlook the maintenance of low-volume roads that provide isolated communities with vital access to basic services. Given these challenges, this paper overlays the full South African road network with geo-referenced information for population, primary and secondary schools, and healthcare facilities to identify the network of connective roads between communities and basic service centres. This connective network is then rationalised according to the Gross Value Added and number of jobs per mesozone, administrative and functional road classifications, speed limit, and road length, location, and name to estimate the Basic Access Road Network. A two-step floating catchment area (2SFCA) method, capturing a weighted assessment of drive-time to service centres and the ratio of people within a catchment area to teachers and healthcare workers, is subsequently applied to generate a Multivariate Road Index. This Index is used to assign higher maintenance priority to roads within the Basic Access Road Network that provide more people with better access to services. The relatively limited incidence of Basic Access Roads indicates that authorities could maintain the entire estimated network without exhausting the available road budget before practical economic considerations get any purchase. Despite this fact, a final case study modelling exercise is performed for the Namakwa District Municipality to demonstrate the extent to which optimal relocation of schools and healthcare facilities could minimise the Basic Access Road Network and thereby release budget for investment in roads that best promote GDP growth.Keywords: basic access roads, multivariate road index, road prioritisation, two-step floating catchment area method
Procedia PDF Downloads 2313184 Traffic Safety and Risk Assessment Model by Analysis of Questionnaire Survey: A Case Study of S. G. Highway, Ahmedabad, India
Authors: Abhijitsinh Gohil, Kaushal Wadhvaniya, Kuldipsinh Jadeja
Abstract:
Road Safety is a multi-sectoral and multi-dimensional issue. An effective model can assess the risk associated with highway safety. A questionnaire survey is very essential to identify the events or activities which are causing unsafe condition for traffic on an urban highway. A questionnaire of standard questions including vehicular, human and infrastructure characteristics can be made. Responses from the age wise group of road users can be taken on field. Each question or an event holds a specific risk weightage, which contributes in creating an inappropriate and unsafe flow of traffic. The probability of occurrence of an event can be calculated from the data collected from the road users. Finally, the risk score can be calculated by considering the risk factor and the probability of occurrence of individual event and addition of all risk score for the individual event will give the total risk score of a particular road. Standards for risk score can be made and total risk score can be compared with the standards. Thus road can be categorized based on risk associated and traffic safety on it. With this model, one can assess the need for traffic safety improvement on a given road, and qualitative data can be analysed.Keywords: probability of occurrence, questionnaire, risk factor, risk score
Procedia PDF Downloads 3383183 Development of Solar Energy Resources for Land along the Transportation Infrastructure: Taking the Lan-Xin Railway in the Silk Road Economic Belt as an Example
Authors: Dan Han, Yukun Zhang, Jie Zheng, Rui Zhang
Abstract:
Making full use of space along transportation infrastructure to develop renewable energy sources, especially solar energy resources, has become a research focus in relevant fields. In recent years, relevant international researches can be classified into three stages of theoretical and technical exploration, exploratory practice as well as planning implementation. Compared with traditional solar energy development mode, the development of solar energy resources in places along the transportation infrastructure has special advantages, which can also bring forth new opportunities for the development of green transportation. 'Road Integrated Photovoltaic', a development model of combining transport and new energy, has been actively studied and applied in developed countries, but it was still in its infancy in China. 'New Silk Road Economic Belt' has great advantage to carry out the 'Road Integrated Photovoltaic' because of the rich solar energy resources in its path, the shortages of renewable energy, the constraints of agricultural land and other reasons. Especially the massive amount of construction of transportation infrastructure brought by Silk Road Economic Belt, large area of developable land along the transportation line will be generated. Abundant solar energy recourses along the Silk Road will provide extremely superb practical opportunities to the land development along transportation infrastructure. We take PVsyst, GIS and Google map software for simulation of its potential by taking Lan-Xin Railway as an example, so potential electrical energy generation can be quantified and further analyzed. Research of 'New Silk Road Economic Belt' combined with 'Road Integrated Photovoltaic' is a creative development for the along transport and energy infrastructure. It not only can make full use of solar radiation and land in its path, but also bring more long-term advantages and benefits.Keywords: land use, silk road economic belt, solar energy, transportation infrastructure
Procedia PDF Downloads 2413182 Mega Development Projects Problems and Challenges From a Social Science Perspective: A Critical Review
Authors: Shakir Ullah
Abstract:
This article reviews social science understanding to explore the challenges megaprojects face before and after implementation. It also sheds light on the problems directly and indirectly caused by mega development projects in the project implemented areas. By Using a qualitative approach such as thematic analysis, the article uses recent literature such as published articles, government reports, and books to cite examples of different mega projects worldwide. The study report that mega development projects are a necessary element of the modern-day infrastructural development process as they represent the perfect example of urban socioeconomic development. They are introduced and implemented by multinational companies with the support of state authorities to produce the common good. However, they are not devoid of their critical challenges and bring implicit and explicit problems to the targeted localities. The article takes insights from social science research for suggestions on how to reduce the challenges faced by project implementers and problems received by local people due to the fault lines of such projects.Keywords: development, mega-projects, challenges, problems
Procedia PDF Downloads 1033181 Assessment of Vehicular Accidents and Possible Mitigation Measures: A Case of Ahmedabad, Gujarat, India
Abstract:
Rapid urbanization is one of the consequences of rapid population explosion, which has also led to massive increase in number of motorized vehicles essential for carrying out all activities needed for sustaining urban livelihood. With this increased use of motorized vehicles over the time there has also been an increase in number of accidents. Study of road network and geometric features are essential to tackle problems of road accidents in any district or town. The increase in road accidents is one of the burning issues in the present society. Records show that there is one death at every 3.7 minutes because of road accident. It has been found from the research that, accidents occur due to, mistakes of the driver (86%) followed by bad street condition (5%), mistake of pedestrian (4%), as well as technical and maintenance defects (1%). Here, case study of Ahmedabad, Gujarat is taken up where first road safety level is assessed considering various parameters. The study confined to accident characteristics of all types of vehicles. For deeper analysis, road safety index for various stretches in Ahmedabad was found out. Crash rate for same stretches was found out. Based on various parameters priority was decided so that which stretch should be look out first to minimize road accidents on that stretch and which stretch should look out last. The major findings of the study are that accident severity of Ahmedabad has increased, but accident fatality risk has decreased; thus there is need to undertake some traffic engineering measures or make some traffic rules that are strictly followed by traffic. From the above study and literature studied it is found that Ahmedabad is suffering from similar problem of accidents and injuries and deaths caused by them, after properly investigating the issue short-term and long-term solutions to minimize road accidents have been presented in this paper.Keywords: accident severity index, accident fatality rate, accident fatality risk, accident risk, road safety index
Procedia PDF Downloads 1423180 Saudi Arabian Aviation Construction Projects: Risks and Their Assessments
Authors: Ahmad Baghdadi, Mohammed Kishk
Abstract:
Construction projects are unique and involve different level of complexity. Airports projects, among other construction projects, are considered to be very complex as they face a number of challenges which make them inevitably exposed to risks. However, in Saudi Arabia, the sector of aviation is considered an important sector owing to the fact that it is the first destination for Muslims on an annual basis. As a result the Saudi government has allocated a huge amount of their general budget to this sector through the General Authority of Civil Aviation (GACA). However, it has been found that the projects are still delivered with a significant number of time and cost overruns. These consequences are typically generated from the risks involved in the projects. Thus, there is a need to identify the number of risks thought to cause such overruns in project times and costs, as well as to assess their significances in terms of their likelihoods of occurrence and their impacts. Accordingly, this paper aims to identify risks associated with aviation construction projects in Saudi Arabia, as well as to assess their likelihoods of occurrence and impacts on such projects. In total, forty four risks have been identified through a critical literature review of common risks in similar projects, as well as thirteen semi-structured interviews with expert project managers involved in GACA’s projects. However, the assessment of the identified risks in term of their likelihoods of occurrence and impacts was obtained through the analysis of forty five questionnaires. Respondents of questionnaires include clients, contractors and consultants. The results show the risks of design changes by the client, labour issue, and setting a tight schedule by the client have the highest likelihoods of occurrence in GACA projects, while the risks of earthquakes, design constructability, and corruption have the greatest impacts.Keywords: aviation construction projects, GACA, risks, risk assessment, Saudi Arabia
Procedia PDF Downloads 5433179 Experimental Study of Application of Steel Slag as Aggregate in Road Construction
Authors: Meftah M. Elsaraiti, Samir Milad Elsariti
Abstract:
Steel slag is a by-product of the steel production and utilizing it potentially as new or substitute materials in road construction is advantageous regarding cost reduction and flattening improvement or properties pavement. Ease of use, low cost, and resource availability are some of few advantages of reuse and recycling of steel slag. This study assesses the use of Steel Slag Aggregates (SSA) as an alternative to natural road building aggregates. This paper discusses the basic characteristics of steel slag based on extensive laboratory tests, and to determine the possibilities of using steel slag in road construction. Samples were taken from the furnaces directly at different times and dates. Moreover, random samples were also taken from the slag field from various areas at different far distances from each other. A necessary analysis was performed through the use of (XRF). Three different percentages of SSA (0, 50 and 100%) were added as an alternative to natural aggregate in hot mix asphalt (HMA) production. The proposed design of the mix was made according to the Marshall mix design. The results of the experiments revealed that the percentages of iron oxide ranged from (9 to 26%) and that the addition of SSA has a significant improvement on HMA properties. It was observed that the Marshall stability obtained in the mix of 100% slag ranged from 600 to 800 N as a minimum, and the flow of Marshall obtained from 2.4 to 3.23 mm and the specification requires from 2 to 4 mm. The results may be showed possibilities to use steel slag as new or substitute materials in road construction in Libya.Keywords: by-product material, properties, road construction, steel slag
Procedia PDF Downloads 1853178 A Study on the Planning of Urban Road Traffic Signs Based on the Leisure Involvement of Self-Driving Tourists
Authors: Chun-Lin Zhang, Min Wan
Abstract:
With the upgrade development of the tourism industry from the simple sightseeing tour to the leisure and vacation, people's travel idea has undergone a fundamental change. More and more people begin to pursue liberal and personal tourism, so self-driving tourism has become the main form of current tourism activities. With the self-driving tourism representing the general trend, the importance of convenient tourism transportation and perfect road traffic signs have become more and more prominent. A clear urban road traffic signs can help visitors quickly identify the direction and distance to the tourism destination. The purpose of this article is analyzing the planning of urban road traffic signs which can bring positive impact on the participation in the recreation involved of self-driving tourists. The content of this article is divided into three parts. Based on the literature review and theoretical analysis, the first part constructs a structural variance model. The model is from three dimensions: the attention of the self-driving tourists to the urban traffic signs along the road, the perception of the self-driving tourists to the road traffic signs itself, the perceptions of the self-driving tourists to the tourism destination information on the traffic signs. Through this model, the paper aims to explore the influence of the urban road traffic signs to the leisure psychological involvement and leisure behavior involvement of the self-driving tourists. The second part aims to verify through the hypothesis model the questionnaire survey and come to preliminary conclusions. The preliminary conclusions are as follows: firstly, the color, shape, size, setting mode and occurrence frequency of urban road traffic sign have significant influence on the leisure psychological involvement and leisure behavior involvement of the self-driving tourists. Secondly, the influence on the leisure behavior involvement is obviously higher than the influence on the leisure psychological involvement. Thirdly, the information about the tourism destination marked on the urban road traffic signs has not obviously influence on the leisure psychological involvement, but it has distinct influence on the leisure behavior involvement of self-driving tourists. The third part puts forward that the planning of urban road traffic signs should focus on the angle of the impact of road traffic signs on people's psychology and behavior. On the basis of the above conclusions, the paper researches the color, shape, size, setting mode and information labeling of urban road traffic signs so that they can preferably satisfy the demand of the leisure involvement of self-driving tourists.Keywords: leisure involvement, self-driving tourism, structural equation, urban road traffic signs
Procedia PDF Downloads 2373177 Study on Impact of Road Loads on Full Vehicle Squeak and Rattle Performance
Authors: R. Praveen, B. R. Chandan Ravi, M. Harikrishna
Abstract:
Squeak and rattle noises are the most annoying transient vehicle noises produced due to different terrain conditions. Interpretation and prohibition of squeak and rattle noises are the dominant aspects of a vehicle refinement. This paper describes the computer-aided engineering (CAE) approach to evaluating the full vehicle squeak and rattle performance with the measured road surface profile as enforced excitation at the tire patch points. The E-Line methodology has been used to predict the relative displacement at the interface points and the risk areas were identified. Squeak and rattle performance has been evaluated at different speeds and at different road conditions to understand the vehicle characteristics. The competence of the process in predicting the risk and root cause of the problems showcased us a pleasing conformity between the physical testing and CAE simulation results.Keywords: e-line, enforced excitation, full vehicle, squeak and rattle, road excitation
Procedia PDF Downloads 1423176 An Electromechanical Device to Use in Road Pavements to Convert Vehicles Mechanical Energy into Electrical Energy
Authors: Francisco Duarte, Adelino Ferreira, Paulo Fael
Abstract:
With the growing need for alternative energy sources, research into energy harvesting technologies has increased considerably in recent years. The particular case of energy harvesting on road pavements is a very recent area of research, with different technologies having been developed in recent years. However, none of them have presented high conversion efficiencies nor technical or economic viability. This paper deals with the development of a mechanical system to implement on a road pavement energy harvesting electromechanical device, to transmit energy from the device surface to an electrical generator. The main goal is to quantify the energy harvesting, transmission and conversion efficiency of the proposed system and compare it with existing systems. Conclusions about the system’s efficiency are presented.Keywords: road pavement, energy harvesting, energy conversion, system modelling
Procedia PDF Downloads 3253175 Vision Zero for the Caribbean Using the Systemic Approach for Road Safety: A Case Study Analyzing Jamaican Road Crash Data (Ongoing)
Authors: Rachelle McFarlane
Abstract:
The Second Decade of Action Road Safety has begun with increased focus on countries who are disproportionately affected by road fatalities. Researchers highlight the low effectiveness of road safety campaigns in Latin America and the Caribbean (LAC) still reporting approximately 130,000 deaths and six million injuries annually. The regional fatality rate 19.2 per 100,000 with heightened concern for persons 15 to 44 years. In 2021, 483 Jamaicans died in 435 crashes, with 33% of these fatalities occurring during Covid-19 curfew hours. The study objective is to conduct a systemic safety review of Jamaican road crashes and provide a framework for its use in complementing traditional methods. The methodology involves the use of the FHWA Systemic Safety Project Selection Tool for analysis. This tool reviews systemwide data in order to identify risk factors across the network associated with severe and fatal crashes, rather that only hotspots. A total of 10,379 crashes with 745 fatalities and serious injuries were reviewed. Of the focus crash types listed, 50% of ‘Pedestrian Accidents’ resulted in fatalities and serious injuries, followed by 32% ‘Bicycle’, 24% ‘Single’ and 12% of ‘Head-on’. This study seeks to understand the associated risk factors with these priority crash types across the network and recommend cost-effective countermeasures across common sites. As we press towards Vision Zero, the inclusion of the systemic safety review method, complementing traditional methods, may create a wider impact in reducing road fatalities and serious injury by targeting issues across network with similarities; focus crash types and contributing factors.Keywords: systemic safety review, risk factors, road crashes, crash types
Procedia PDF Downloads 913174 Reducing Accidents Using Text Stops
Authors: Benish Chaudhry
Abstract:
Most of the accidents these days are occurring because of the ‘text-and-drive’ concept. If we look at the structure of cities in UAE, there are great distances, because of which it is impossible to drive without using or merely checking the cellphone. Moreover, if we look at the road structure, it is almost impossible to stop at a point and text. With the introduction of TEXT STOPs, drivers will be able to stop different stops for a maximum of 1 and a half-minute in order to reply or write a message. They can be introduced at a distance of 10 minutes of driving on the average speed of the road, so the drivers can look forward to a stop and can reply to a text when needed. A user survey indicates that drivers are willing to NOT text-and-drive if they have such a facility available.Keywords: transport, accidents, urban planning, road planning
Procedia PDF Downloads 3943173 Price Compensation Mechanism with Unmet Demand for Public-Private Partnership Projects
Abstract:
Public-private partnership (PPP), as an innovative way to provide infrastructures by the private sector, is being widely used throughout the world. Compared with the traditional mode, PPP emerges largely for merits of relieving public budget constraint and improving infrastructure supply efficiency by involving private funds. However, PPP projects are characterized by large scale, high investment, long payback period, and long concession period. These characteristics make PPP projects full of risks. One of the most important risks faced by the private sector is demand risk because many factors affect the real demand. If the real demand is far lower than the forecasting demand, the private sector will be got into big trouble because operating revenue is the main means for the private sector to recoup the investment and obtain profit. Therefore, it is important to study how the government compensates the private sector when the demand risk occurs in order to achieve Pareto-improvement. This research focuses on price compensation mechanism, an ex-post compensation mechanism, and analyzes, by mathematical modeling, the impact of price compensation mechanism on payoff of the private sector and consumer surplus for PPP toll road projects. This research first investigates whether or not price compensation mechanisms can obtain Pareto-improvement and, if so, then explores boundary conditions for this mechanism. The research results show that price compensation mechanism can realize Pareto-improvement under certain conditions. Especially, to make the price compensation mechanism accomplish Pareto-improvement, renegotiation costs of the government and the private sector should be lower than a certain threshold which is determined by marginal operating cost and distortionary cost of the tax. In addition, the compensation percentage should match with the price cut of the private investor when demand drops. This research aims to provide theoretical support for the government when determining compensation scope under the price compensation mechanism. Moreover, some policy implications can also be drawn from the analysis for better risk-sharing and sustainability of PPP projects.Keywords: infrastructure, price compensation mechanism, public-private partnership, renegotiation
Procedia PDF Downloads 1793172 Proposal of Commutation Protocol in Hybrid Sensors and Vehicular Networks for Intelligent Transport Systems
Authors: Taha Bensiradj, Samira Moussaoui
Abstract:
Hybrid Sensors and Vehicular Networks (HSVN), represent a hybrid network, which uses several generations of Ad-Hoc networks. It is used especially in Intelligent Transport Systems (ITS). The HSVN allows making collaboration between the Wireless Sensors Network (WSN) deployed on the border of the road and the Vehicular Network (VANET). This collaboration is defined by messages exchanged between the two networks for the purpose to inform the drivers about the state of the road, provide road safety information and more information about traffic on the road. Moreover, this collaboration created by HSVN, also allows the use of a network and the advantage of improving another network. For example, the dissemination of information between the sensors quickly decreases its energy, and therefore, we can use vehicles that do not have energy constraint to disseminate the information between sensors. On the other hand, to solve the disconnection problem in VANET, the sensors can be used as gateways that allow sending the messages received by one vehicle to another. However, because of the short communication range of the sensor and its low capacity of storage and processing of data, it is difficult to ensure the exchange of road messages between it and the vehicle, which can be moving at high speed at the time of exchange. This represents the time where the vehicle is in communication range with the sensor. This work is the proposition of a communication protocol between the sensors and the vehicle used in HSVN. The latter has as the purpose to ensure the exchange of road messages in the available time of exchange.Keywords: HSVN, ITS, VANET, WSN
Procedia PDF Downloads 3613171 Investigating the Effect of Refinancing on Financial Behaviour of Energy Efficiency Projects
Authors: Zohreh Soltani, Seyedmohammadhossein Hosseinian
Abstract:
Reduction of energy consumption in built infrastructure, through the installation of energy-efficient technologies, is a major approach to achieving sustainability. In practice, the viability of energy efficiency projects strongly depends on the cost reimbursement and profitability. These projects are subject to failure if the actual cost savings do not reimburse the project cost in a timely manner. In such cases, refinancing could be a solution to benefit from the long-term returns of the project if implemented wisely. However, very little is still known about the effect of refinancing options on financial performance of energy efficiency projects. To fill this gap, the present study investigates the financial behavior of energy efficiency projects with focus on refinancing options, such as Leveraged Loans. A System Dynamics (SD) model is introduced, and the model application is presented using an actual case-study data. The case study results indicate that while high-interest start-ups make using Leveraged Loan inevitable, refinancing can rescue the project and bring about profitability. This paper also presents some managerial implications of refinancing energy efficiency projects based on the case-study analysis. Results of this study help implementing financially viable energy efficiency projects, so the community could benefit from their environmental advantages widely.Keywords: energy efficiency projects, leveraged loan, refinancing, sustainability
Procedia PDF Downloads 3933170 Financial Feasibility of Clean Development Mechanism (CDM) Projects in India
Authors: Renuka H. Deshmukh, Snehal Nifadkar, Anil P. Dongre
Abstract:
The research study aims to analyze the financial performance of the companies associated with CDM projects implemented in India from 2001 to 2014 by calculating net profit with and without CDM revenue. Further the study also highlights the Year-wise and sector-wise lending to CDM projects in India as well as in the state of Maharashtra. The study further aims to examine the year-wise trend of Certified Emission Reductions (CER) issued by the CDM projects implemented in Maharashtra from 2001-2014. The study as well analyses the responses of selected corporate with respect to the challenges in implementing and obtaining finance from commercial banks.Keywords: adaptation costs, internal rate of return, mitigation, vulnerability, CER
Procedia PDF Downloads 3473169 Template Design Packages for Repetitive Construction Projects
Authors: Ali Youniss Aidbaiss, G. Unnikrishnan, Anoob Hakim
Abstract:
Scope changes, scope creeps, cost and time overruns have become common in projects in the oil and gas sector. Even in repetitive projects, failure to implement lessons learnt and correct past mistakes have resulted in various setbacks. This paper describes the concept of reusing successfully implemented design packages as templates for repetitive projects, and thereby lowering the instances of project failures. Units or systems successfully installed in projects can be identified and taken up for preparing template design packages. Standardization of units and systems helps to develop templates from successful designs which can be repeatedly used with confidence. These packages can be used with minimum modifications for developing FEED packages faster, saving cost and other valuable resources. Lessons learnt from the completed project incorporated in the templates avoid repeating past mistakes during detailed design, procurement and execution. With template packages, consistent quality can be maintained for similar projects, avoiding scope creep and scope changes which will ultimately result in cost and time savings.Keywords: engineering work package, repetitive construction, template design package, time saving in projects
Procedia PDF Downloads 3183168 A Framework for ERP Project Evaluation Based on BSC Model: A Study in Iran
Authors: Mohammad Reza Ostad Ali Naghi Kashani, Esfanji Elia
Abstract:
Nowadays, the amounts of companies which tend to have an Enterprise Resource Planning (ERP) application are increasing particularly in developing countries like Iran. ERP projects are expensive, time consuming, and complex, in addition the failure rate is high among these projects. It is important to know whether these projects could meet their goals or not. Furthermore, the area which should be improved should be identified. In this paper we made a framework to evaluate ERP projects success implementation. First, based on literature review we made a framework based on BSC model, financial, customer, processes, learning and knowledge, because of the importance of change management it was added to model. Then an organization was divided in three layers. We choose corporate, managerial, and operational levels. Then to find criteria to assess each aspect, we use Delphi method in two rounds. And for the second round we made a questionnaire and did some statistical tasks on them. Based on the statistical results some of them are accepted and others are rejected.Keywords: ERP, BSC, ERP project evaluation, IT projects
Procedia PDF Downloads 3223167 Comparison of Noise Emissions in the Interior of Passenger Cars
Authors: Martin Kendra, Tomas Skrucany, Jaroslav Masek
Abstract:
The noise is one of the negative elements influencing the human health. This article is due to the measurement of noise emitted by road vehicle and its parts during the operation. Measurement was done in the interior of common passenger cars with a digital sound meter. The results compare the noise value in different cars with different body shape, which influences the driver’s health. Transport has considerable ecological effects, many of them detrimental to environmental sustainability. Roads and traffic exert a variety of direct and mostly detrimental effects on nature.Keywords: driver, noise measurement, passenger road vehicle, road transport
Procedia PDF Downloads 4493166 Optimized Road Lane Detection Through a Combined Canny Edge Detection, Hough Transform, and Scaleable Region Masking Toward Autonomous Driving
Authors: Samane Sharifi Monfared, Lavdie Rada
Abstract:
Nowadays, autonomous vehicles are developing rapidly toward facilitating human car driving. One of the main issues is road lane detection for a suitable guidance direction and car accident prevention. This paper aims to improve and optimize road line detection based on a combination of camera calibration, the Hough transform, and Canny edge detection. The video processing is implemented using the Open CV library with the novelty of having a scale able region masking. The aim of the study is to introduce automatic road lane detection techniques with the user’s minimum manual intervention.Keywords: hough transform, canny edge detection, optimisation, scaleable masking, camera calibration, improving the quality of image, image processing, video processing
Procedia PDF Downloads 943165 The Urbanistic Initiative of Architecture Students to Intensify the Socio-Economic and Spatial Development of Small Settlements in Tatarstan
Authors: Karina Rashidovna Nabiullina
Abstract:
In 2016, the ‘Beautiful Country’ innovative project was implemented in the Republic of Tatarstan (Russia). This project started at the initiative of architecture students majoring in city planning during their summer internship. As a part of the internship, the students had to study the layout and the lifestyle of Tatarstan towns. All the projects were presented to the Ministry of Construction of Tatarstan, which allowed the settlement authorities to receive the government funding for their implementation. This initiative, from the public discussion of the projects to their implementation, was welcomed by the local communities, evoked local patriotism, created new jobs as a part of the projects' implementation, and improved the architectural environment of the settlements. The projects initiated by the students became the ‘Big Projects’ for these small settlements.Keywords: adapted graphic language, complex territorial development, identity of local resources, overcoming stagnation, participation
Procedia PDF Downloads 3333164 Earthquake Effect in Micro Hydro Sector: Case Study of Dulakha District, Nepal
Authors: Keshav Raj Dhakal, Jit Bahadur Rokaya Chhetri
Abstract:
The Micro Hydro (MH) is one of the successful technology in Rural Nepal. Out of 75 district, 59 districts have installed 1287 MH projects with a total capacity of 24 Mega Watt (MW). Now, the challenge is how to sustain them. Dolakha is a prominent district for sustainable endues of power to sustain the MH projects. A total of 37 MH projects have been constructed with producing 886 Kilo Watt (KW) of energy in the district. This study traces out the impact of earthquake in MH sector in Dolakha district. It shows that 59 % of projects have been affected by devastating earthquake in April and May, 2015 where 29 % are completely damaged. Most of the damages are in civil structures like Penstock, forebay, power house, Canal, Intake. Transmission and distribution line have been partially damaged. This paper analysis failure of the civil structural component of MH projects and its financial consequence to the community. This study recommends that a disaster impact assessment is essential before construction of MH projects.Keywords: micro hydro, earthquake, structural failure, financial consequence
Procedia PDF Downloads 2053163 Text2Time: Transformer-Based Article Time Period Prediction
Authors: Karthick Prasad Gunasekaran, B. Chase Babrich, Saurabh Shirodkar, Hee Hwang
Abstract:
Construction preparation is crucial for the success of a construction project. By involving project participants early in the construction phase, project managers can plan ahead and resolve issues early, resulting in project success and satisfaction. This study uses quantitative data from construction management projects to determine the relationship between the pre-construction phase, construction schedule, and customer satisfaction. This study examined a total of 65 construction projects and 93 clients per job to (a) identify the relationship between the pre-construction phase and program reduction and (b) the pre-construction phase and customer retention. Based on a quantitative analysis, this study found a negative correlation between pre-construction status and project schedule in 65 construction projects. This finding means that the more preparatory work done on a particular project, the shorter the total construction time. The Net Promoter Score of 93 clients from 65 projects was then used to determine the relationship between construction preparation and client satisfaction. The pre-construction status and the projects were further analyzed, and a positive correlation between them was found. This shows that customers are happier with projects with a higher ready-to-build ratio than projects with less ready-to-build.Keywords: NLP, BERT, LLM, deep learning, classification
Procedia PDF Downloads 1043162 Protection of Chinese Enterprises’ Overseas Investments Under Bilateral Investment Treaties Under the Belt and Road Initiative
Abstract:
Bilateral investment treaties have played a role in the construction of the Belt and Road, providing institutional protection for Chinese companies' overseas investments. However, such treaties between China and countries along the Belt and Road were signed in the 1980s and 1990s, and their provisions are outdated and insufficiently detailed to provide adequate legal protection for Chinese investors when they initiate investment arbitration against host countries. By studying cases involving China in international investment arbitration, this paper suggests that China should pay attention to further clarifying the identity of "investors", the scope of disputes that can be submitted to arbitration, and the concept of "indirect expropriation" when updating bilateral investment treaties in the future, in order to reduce the risk of losing cases for Chinese investors.Keywords: belt and road, bilateral investment agreement, investment arbitration, indirect expropriation
Procedia PDF Downloads 2563161 Risk Allocation in Public-Private Partnership (PPP) Projects for Wastewater Treatment Plants
Authors: Samuel Capintero, Ole H. Petersen
Abstract:
This paper examines the utilization of public-private partnerships for the building and operation of wastewater treatment plants. Our research focuses on risk allocation in this kind of projects. Our analysis builds on more than hundred wastewater treatment plants built and operated through PPP projects in Aragon (Spain). The paper illustrates the consequences of an inadequate management of construction risk and an unsuitable transfer of demand risk in wastewater treatment plants. It also shows that the involvement of many public bodies at local, regional and national level further increases the complexity of this kind of projects and make time delays more likely.Keywords: wastewater, treatment plants, PPP, construction
Procedia PDF Downloads 6493160 Effect of Pre-Construction on Construction Schedule and Client Loyalty
Authors: Jong Hoon Kim, Hyun-Soo Lee, Moonseo Park, Min Jeong, Inbeom Lee
Abstract:
Pre-construction is essential in achieving the success of a construction project. Due to the early involvement of project participants in the construction phase, project managers are able to plan ahead and solve issues well in advance leading to the success of the project and the satisfaction of the client. This research utilizes quantitative data derived from construction management projects in order to identify the relationship between pre-construction, construction schedule, and client satisfaction. A total of 65 construction projects and 93 clients were investigated for this research in an attempt to identify (a) the relationship between pre-construction and schedule reduction, and (b) pre-construction and client loyalty. Based on the quantitative analysis, this research was able to establish a negative correlation based on 65 construction projects between pre-construction and project schedule existed. This finding represents that the more pre-construction is performed for a certain project, the overall construction schedule decreased. Then, to determine the relationship between pre-construction and client satisfaction, Net Promoter Score (NPS) of 93 clients from the 65 projects was utilized. Pre-construction and NPS was further analyzed and a positive correlation was found between the two. This infers that clients tend to be more satisfied with projects with higher ratio of pre-construction than those projects with less pre-construction.Keywords: client loyalty, NPS, pre-construction, schedule reduction
Procedia PDF Downloads 3603159 Relation between Pavement Roughness and Distress Parameters for Highways
Authors: Suryapeta Harini
Abstract:
Road surface roughness is one of the essential aspects of the road's functional condition, indicating riding comfort in both the transverse and longitudinal directions. The government of India has made maintaining good surface evenness a prerequisite for all highway projects. Pavement distress data was collected with a Network Survey Vehicle (NSV) on a National Highway. It determines the smoothness and frictional qualities of the pavement surface, which are related to driving safety and ease. Based on the data obtained in the field, a regression equation was created with the IRI value and the visual distresses. The suggested system can use wireless acceleration sensors and GPS to gather vehicle status and location data, as well as calculate the international roughness index (IRI). Potholes, raveling, rut depth, cracked area, and repair work are all affected by pavement roughness, according to the current study. The study was carried out in one location. Data collected through using Bump integrator was used for the validation. The bump integrator (BI) obtained using deflection from the network survey vehicle was correlated with the distress parameter to establish an equation.Keywords: roughness index, network survey vehicle, regression, correlation
Procedia PDF Downloads 1763158 Technology Road Mapping in the Fourth Industrial Revolution: A Comprehensive Analysis and Strategic Framework
Authors: Abdul Rahman Hamdan
Abstract:
The Fourth Industrial Revolution (4IR) has brought unprecedented technological advancements that have disrupted many industries worldwide. In keeping up with the technological advances and rapid disruption by the introduction of many technological advancements brought forth by the 4IR, the use of technology road mapping has emerged as one of the critical tools for organizations to leverage. Technology road mapping can be used by many companies to guide them to become more adaptable and anticipate future transformation and innovation, and avoid being redundant or irrelevant due to the rapid changes in technological advancement. This research paper provides a comprehensive analysis of technology road mapping within the context of the 4IR. The objectives of the paper are to provide companies with practical insights and a strategic framework of technology road mapping for them to navigate the fast-changing nature of the 4IR. This study also contributes to the understanding and practice of technology road mapping in the 4IR and, at the same time, provides organizations with the necessary tools and critical insight to navigate the 4IR transformation by leveraging technology road mapping. Based on the literature review and case studies, the study analyses key principles, methodologies, and best practices in technology road mapping and integrates them with the unique characteristics and challenges of the 4IR. The research paper gives the background of the fourth industrial revolution. It explores the disruptive potential of technologies in the 4IR and the critical need for technology road mapping that consists of strategic planning and foresight to remain competitive and relevant in the 4IR era. It also highlights the importance of technology road mapping as an organisation’s proactive approach to align the organisation’s objectives and resources to their technology and product development in meeting the fast-evolving technological 4IR landscape. The paper also includes the theoretical foundations of technology road mapping and examines various methodological approaches, and identifies external stakeholders in the process, such as external experts, stakeholders, collaborative platforms, and cross-functional teams to ensure an integrated and robust technological roadmap for the organisation. Moreover, this study presents a comprehensive framework for technology road mapping in the 4IR by incorporating key elements and processes such as technology assessment, competitive intelligence, risk analysis, and resource allocation. It provides a framework for implementing technology road mapping from strategic planning, goal setting, and technology scanning to road mapping visualisation, implementation planning, monitoring, and evaluation. In addition, the study also addresses the challenges and limitations related to technology roadmapping in 4IR, including the gap analysis. In conclusion of the study, the study will propose a set of practical recommendations for organizations that intend to leverage technology road mapping as a strategic tool in the 4IR in driving innovation and becoming competitive in the current and future ecosystem.Keywords: technology management, technology road mapping, technology transfer, technology planning
Procedia PDF Downloads 683157 Strategic Investment in Infrastructure Development to Facilitate Economic Growth in the United States
Authors: Arkaprabha Bhattacharyya, Makarand Hastak
Abstract:
The COVID-19 pandemic is unprecedented in terms of its global reach and economic impacts. Historically, investment in infrastructure development projects has been touted to boost the economic growth of a nation. The State and Local governments responsible for delivering infrastructure assets work under tight budgets. Therefore, it is important to understand which infrastructure projects have the highest potential of boosting economic growth in the post-pandemic era. This paper presents relationships between infrastructure projects and economic growth. Statistical relationships between investment in different types of infrastructure projects (transit, water and wastewater, highways, power, manufacturing etc.) and indicators of economic growth are presented using historic data between 2002 and 2020 from the U.S. Census Bureau and U.S. Bureau of Economic Analysis (BEA). The outcome of the paper is the comparison of statistical correlations between investment in different types of infrastructure projects and indicators of economic growth. The comparison of the statistical correlations is useful in ranking the types of infrastructure projects based on their ability to influence economic prosperity. Therefore, investment in the infrastructures with the higher rank will have a better chance of boosting the economic growth. Once, the ranks are derived, they can be used by the decision-makers in infrastructure investment related decision-making process.Keywords: economic growth, infrastructure development, infrastructure projects, strategic investment
Procedia PDF Downloads 1713156 The Association of Slope Failure and Lineament Density along the Ranau-Tambunan Road, Sabah, Malaysia
Authors: Norbert Simon, Rodeano Roslee, Abdul Ghani Rafek, Goh Thian Lai, Azimah Hussein, Lee Khai Ern
Abstract:
The 54 km stretch of Ranau-Tambunan (RTM) road in Sabah is subjected to slope failures almost every year. This study is focusing on identifying section of roads that are susceptible to failure based on temporal landslide density and lineament density analyses. In addition to the analyses, the rock slopes in several sections of the road were assessed using the geological strength index (GSI) technique. The analysis involved 148 landslides that were obtained in 1978, 1994, 2009 and 2011. The landslides were digitized as points and the point density was calculated based on every 1km2 of the road. The lineaments of the area was interpreted from Landsat 7 15m panchromatic band. The lineament density was later calculated based on every 1km2 of the area using similar technique with the slope failure density calculation. The landslide and lineament densities were classified into three different classes that indicate the level of susceptibility (low, moderate, high). Subsequently, the two density maps were overlap to produce the final susceptibility map. The combination of both high susceptibility classes from these maps signifies the high potential of slope failure in those locations in the future. The final susceptibility map indicates that there are 22 sections of the road that are highly susceptible. Seven rock slopes were assessed along the RTM road using the GSI technique. It was found from the assessment that rock slopes along this road are highly fractured, weathered and can be classified into fair to poor categories. The poor condition of the rock slope can be attributed to the high lineament density that presence in the study area. Six of the rock slopes are located in the high susceptibility zones. A detailed investigation on the 22 high susceptibility sections of the RTM road should be conducted due to their higher susceptibility to failure, in order to prevent untoward incident to road users in the future.Keywords: GSI, landslide, landslide density, landslide susceptibility, lineament density
Procedia PDF Downloads 398