Search results for: risk approach
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 18101

Search results for: risk approach

18011 Evaluation of the Impact of Community Based Disaster Risk Management Applied In Landslide Prone Area; Reference to Badulla District

Authors: S. B. D. Samarasinghe, Malini Herath

Abstract:

Participatory planning is a very important process for decision making and choosing the best alternative options for community welfare, development of the society and its interactions among community and professionals. People’s involvement is considered as the key guidance in participatory planning. Presently, Participatory planning is being used in many fields. It's not only limited to planning but also to disaster management, poverty, housing, etc. In the past, Disaster management practice was a top-down approach, but it raised many issues as it was converted to a bottom-up approach. There are several approaches that can aid disaster management. Community-Based Disaster Risk Management (CBDRM) is a very successful participatory approach to risk management that is often successfully applied by other disaster-prone countries. In the local context, CBDRM has been applied to prevent Diseases as well as to prevent disasters such as landslides, tsunamis and floods. From three years before, Sri Lanka has initiated the CBDRM approach to minimize landslide vulnerability. Hence, this study mainly focuses on the impact of CBDRM approaches on landslide hazards. Also to identify their successes and failures from both implementing parties and community. This research is carried out based on a qualitative method combined with a descriptive research approach. A successful framework was prepared via a literature review. Case studies were selected considering landslide CBDRM programs which were implemented by Disaster Management Center and National Building Research Organization in Badulla. Their processes were evaluated. Data collection is done through interviews and informal discussions. Then their ideas were quantified by using the Relative Effectiveness index. The resulting numerical value was used to rank the program effectiveness and their success, failures and impacting factors. Results show that there are several failures among implementing parties and the community. Overcoming those factors can make way for better conduction of future CBDRM programs.

Keywords: community-based disaster risk management, disaster management, preparedness, landslide

Procedia PDF Downloads 119
18010 A Development of a Conceptual Framework for Safety Culture and Safety Risk Assessment: The Case of Chinese International Construction Projects under the “New Belt and Road” Initiative in Africa

Authors: Bouba Oumarou Aboubakar, HongXia Li, Sardar Annes Farooq

Abstract:

The Belt and Road Initiative’s success strongly depends on the safety of all the million workers on construction projects sites. As the new BRI is directed toward Africa and meets a completely different culture from the Chinese project managers, maintaining low risk for workers risks shall be closely related to cultural sharing and mutual understanding. This is why this work introduces a cultural-wise safety management framework for Chinese Construction projects in Africa. The theoretical contribution of this paper is an improved risk assessment framework that integrates language, culture and difficulty of controlling risk factors into one approach. Practically, this study provides not only a useful tool for project safety management practitioners but the full understanding of all risks that may arise in the BRI projects in Africa.

Keywords: cultural-wise, safety culture, risk assessment, Chinese construction, BRI projects, Africa

Procedia PDF Downloads 64
18009 Analysis of the Predictive Performance of Value at Risk Estimations in Times of Financial Crisis

Authors: Alexander Marx

Abstract:

Measuring and mitigating market risk is essential for the stability of enterprises, especially for major banking corporations and investment bank firms. To employ these risk measurement and mitigation processes, the Value at Risk (VaR) is the most commonly used risk metric by practitioners. In the past years, we have seen significant weaknesses in the predictive performance of the VaR in times of financial market crisis. To address this issue, the purpose of this study is to investigate the value-at-risk (VaR) estimation models and their predictive performance by applying a series of backtesting methods on the stock market indices of the G7 countries (Canada, France, Germany, Italy, Japan, UK, US, Europe). The study employs parametric, non-parametric, and semi-parametric VaR estimation models and is conducted during three different periods which cover the most recent financial market crisis: the overall period (2006–2022), the global financial crisis period (2008–2009), and COVID-19 period (2020–2022). Since the regulatory authorities have introduced and mandated the Conditional Value at Risk (Expected Shortfall) as an additional regulatory risk management metric, the study will analyze and compare both risk metrics on their predictive performance.

Keywords: value at risk, financial market risk, banking, quantitative risk management

Procedia PDF Downloads 71
18008 The Study of the Awareness of Sexual Risk Bahaviors and Sexual Risk Behaviors of Adolescents Students

Authors: Sumitta Sawangtook, Parichart Thano

Abstract:

The purposes of research were to study the relationship between the awareness of sexual risk behaviors and sexual risk behaviors of adolescent students, and to compare the sexual risk behaviors of adolescent students by gender, education level, sweetheart’s number, achievement, sexual value, and the influence of the friendship group. The research sample of 344 sevenths through twelfth grade students in secondary school for the academic year 2014, Dindang district Bangkok was selected by simple random sampling. The research instruments are: 1) demographic questionnaire 2) evaluation form of the awareness of sexual risk behaviors 3) questionnaire about sexual value 4) questionnaire about the influence of the friendship group and 5) evaluation form of sexual risk behaviors. They were used for data collections which are subsequently analyzed by percentage, mean, standard deviation, t-test, One-way Analysis of Variances. The results of this study were presented as follow: 1) The awareness of sexual risk behaviors was negatively correlated with sexual risk behaviors of adolescent students (r=-.27, p=.000). 2) There was significant difference at .05 level in sexual risk behaviors among adolescent students who had gender difference (t=5.90, p=.000). 3) There was no significant difference at .05 level in sexual risk behaviors among adolescent students who had the different level of education (t=1.41, p=.16). 4) There was significant difference at .05 level in sexual risk behaviors among adolescent students who had the different level of sweetheart’s number (F=13.03, p=.000). 5) There was significant difference at .05 level in sexual risk behaviors among adolescent students who had the different level of achievement (F=4.77, p=.009). 6) There were significant difference at .05 level in sexual risk behaviors among adolescent students who had different level of sexual value (F=50.91, p=.000) 7) There were significant difference at .05 level in sexual risk behaviors among adolescent students who had different level of the influence of the friendship group (F=98.41, p=.000).

Keywords: the awareness of sexual risk behaviors, sexual risk behaviors, adolescent students

Procedia PDF Downloads 433
18007 Early Warning Signals: Role and Status of Risk Management in Small and Medium Enterprises

Authors: Alexander Kelíšek, Denisa Janasová, Veronika Mitašová

Abstract:

Weak signals using is often associated with early warning. It is possible to find a link between early warning, respectively early problems detection and risk management. The idea of early warning is very important in the context of crisis management because of the risk prevention possibility. Weak signals are likened to risk symptoms. Nowadays, their usefulness as a tool of proactive problems solving is emphasized. Based on it, it is possible to use weak signals not only in strategic planning, project management, or early warning system, but also as a subsidiary element in risk management. The main question is how to effectively integrate weak signals into risk management. The main aim of the paper is to point out the possibilities of weak signals using in small and medium enterprises risk management.

Keywords: early warning system, weak signals, risk management, small and medium enterprises (SMEs)

Procedia PDF Downloads 400
18006 Management Strategies for Risk Events in Construction Industries during Economic Situation and COVID-19 Pandemic in Nigeria

Authors: Ezeabasili Chibuike Patrick

Abstract:

The complex situation of construction industries in Nigeria and the risk of failures involved includes cost overrun, time overrun, Corruption, Government influence, Subcontractor challenges, Political influence and Instability, Cultural differences, Human resources deficiencies, cash flow Challenges, foreign exchange issues, inadequate design, Safety, low productivity, late payment, Quality control issues, project management issues, Environmental issues, Force majeure Competition amongst others has made the industry prone to risk and failures. Good project management remains effective in improving decision-making, which minimizes these risk events. This study was done to address these project risks and good decision-making to avert them. A mixed-method approach to research was used to do this study. Data collected by questionnaires and interviews on thirty-two (32) construction professionals was used in analyses to aid the knowledge and management of risks that were identified. The study revealed that there is no good risk management expertise in Nigeria. Also, that the economic/political situation and the recent COVID-19 pandemic has added to the risk and poor management strategies. The contingency theory and cost has therefore surfaced to be the most strategic management method used to reduce these risk issues and they seem to be very effective.

Keywords: strategies, risk management, contingency theory, Nigeria

Procedia PDF Downloads 100
18005 Performance of the Strong Stability Method in the Univariate Classical Risk Model

Authors: Safia Hocine, Zina Benouaret, Djamil A¨ıssani

Abstract:

In this paper, we study the performance of the strong stability method of the univariate classical risk model. We interest to the stability bounds established using two approaches. The first based on the strong stability method developed for a general Markov chains. The second approach based on the regenerative processes theory . By adopting an algorithmic procedure, we study the performance of the stability method in the case of exponential distribution claim amounts. After presenting numerically and graphically the stability bounds, an interpretation and comparison of the results have been done.

Keywords: Marcov chain, regenerative process, risk model, ruin probability, strong stability

Procedia PDF Downloads 294
18004 From Intuitive to Constructive Audit Risk Assessment: A Complementary Approach to CAATTs Adoption

Authors: Alon Cohen, Jeffrey Kantor, Shalom Levy

Abstract:

The use of the audit risk model in auditing has faced limitations and difficulties, leading auditors to rely on a conceptual level of its application. The qualitative approach to assessing risks has resulted in different risk assessments, affecting the quality of audits and decision-making on the adoption of CAATTs. This study aims to investigate risk factors impacting the implementation of the audit risk model and propose a complementary risk-based instrument (KRIs) to form substance risk judgments and mitigate against heightened risk of material misstatement (RMM). The study addresses the question of how risk factors impact the implementation of the audit risk model, improve risk judgments, and aid in the adoption of CAATTs. The study uses a three-stage scale development procedure involving a pretest and subsequent study with two independent samples. The pretest involves an exploratory factor analysis, while the subsequent study employs confirmatory factor analysis for construct validation. Additionally, the authors test the ability of the KRIs to predict audit efforts needed to mitigate against heightened RMM. Data was collected through two independent samples involving 767 participants. The collected data was analyzed using exploratory factor analysis and confirmatory factor analysis to assess scale validity and construct validation. The suggested KRIs, comprising two risk components and seventeen risk items, are found to have high predictive power in determining audit efforts needed to reduce RMM. The study validates the suggested KRIs as an effective instrument for risk assessment and decision-making on the adoption of CAATTs. This study contributes to the existing literature by implementing a holistic approach to risk assessment and providing a quantitative expression of assessed risks. It bridges the gap between intuitive risk evaluation and the theoretical domain, clarifying the mechanism of risk assessments. It also helps improve the uniformity and quality of risk assessments, aiding audit standard-setters in issuing updated guidelines on CAATT adoption. A few limitations and recommendations for future research should be mentioned. First, the process of developing the scale was conducted in the Israeli auditing market, which follows the International Standards on Auditing (ISAs). Although ISAs are adopted in European countries, for greater generalization, future studies could focus on other countries that adopt additional or local auditing standards. Second, this study revealed risk factors that have a material impact on the assessed risk. However, there could be additional risk factors that influence the assessment of the RMM. Therefore, future research could investigate other risk segments, such as operational and financial risks, to bring a broader generalizability to our results. Third, although the sample size in this study fits acceptable scale development procedures and enables drawing conclusions from the body of research, future research may develop standardized measures based on larger samples to reduce the generation of equivocal results and suggest an extended risk model.

Keywords: audit risk model, audit efforts, CAATTs adoption, key risk indicators, sustainability

Procedia PDF Downloads 46
18003 Reliability Analysis of Partial Safety Factor Design Method for Slopes in Granular Soils

Authors: K. E. Daryani, H. Mohamad

Abstract:

Uncertainties in the geo-structure analysis and design have a significant impact on the safety of slopes. Traditionally, uncertainties in the geotechnical design are addressed by incorporating a conservative factor of safety in the analytical model. In this paper, a risk-based approach is adopted to assess the influence of the geotechnical variable uncertainties on the stability of infinite slopes in cohesionless soils using the “partial factor of safety on shear strength” approach as stated in Eurocode 7. Analyses conducted using Monte Carlo simulation show that the same partial factor can have very different levels of risk depending on the degree of uncertainty of the mean values of the soil friction angle and void ratio.

Keywords: Safety, Probability of Failure, Reliability, Infinite Slopes, Sand.

Procedia PDF Downloads 549
18002 Schedule Risk Management for Complex Projects: The Royal Research Ship: Sir David Attenborough Case Study

Authors: Chatelier Charlene, Oyegoke Adekunle, Ajayi Saheed, Jeffries Andrew

Abstract:

This study seeks to understand Schedule Risk Assessments as a priori for better performance whilst exploring the strategies employed to deliver complex projects like the New Polar research ship. This high-profile vessel was offered to Natural Environment Research Council and British Antarctic Survey (BAS) by Cammell Laird Shipbuilders. The Research Ship was designed to support science in extreme environments, with the expectancy to provide a wide range of specialist scientific facilities, instruments, and laboratories to conduct research over multiple disciplines. Aim: The focus is to understand the allocation and management of schedule risk on such a Major Project. Hypothesising that "effective management of schedule risk management" could be the most critical factor in determining whether the intended benefits mentioned are delivered within time and cost constraints. Objective 1: Firstly, the study seeks to understand the allocation and management of schedule risk in Major Projects. Objective 2: Secondly, it explores "effective management of schedule risk management" as the most critical factor determining the delivery of intended benefits. Methodology: This study takes a retrospective review of schedule risk management and how it influences project performance using a case study approach for the RRS (Royal Research Ship) Sir David Attenborough. Research Contribution: The outcomes of this study will contribute to a better understanding of project performance whilst building on its under-researched relationship to schedule risk management for complex projects. The outcomes of this paper will guide further research on project performance and enable the understanding of how risk-based estimates over time impact the overall risk management of the project.

Keywords: complexity, major projects, performance management, schedule risk management, uncertainty

Procedia PDF Downloads 73
18001 Assessing the Impact of Urbanization on Flood Risk: A Case Study

Authors: Talha Ahmed, Ishtiaq Hassan

Abstract:

Urban areas or metropolitan is portrayed by the very high density of population due to the result of these economic activities. Some critical elements, such as urban expansion and climate change, are driving changes in cities with exposure to the incidence and impacts of pluvial floods. Urban communities are recurrently developed by huge spaces by which water cannot enter impermeable surfaces, such as man-made permanent surfaces and structures, which do not cause the phenomena of infiltration and percolation. Urban sprawl can result in increased run-off volumes, flood stage and flood extents during heavy rainy seasons. The flood risks require a thorough examination of all aspects affecting to severe an event in order to accurately estimate their impacts and other risk factors associated with them. For risk evaluation and its impact due to urbanization, an integrated hydrological modeling approach is used on the study area in Islamabad (Pakistan), focusing on a natural water body that has been adopted in this research. The vulnerability of the physical elements at risk in the research region is analyzed using GIS and SOBEK. The supervised classification of land use containing the images from 1980 to 2020 is used. The modeling of DEM with selected return period is used for modeling a hydrodynamic model for flood event inundation. The selected return periods are 50,75 and 100 years which are used in flood modeling. The findings of this study provided useful information on high-risk places and at-risk properties.

Keywords: urbanization, flood, flood risk, GIS

Procedia PDF Downloads 148
18000 Accelerated Evaluation of Structural Reliability under Tsunami Loading

Authors: Sai Hung Cheung, Zhe Shao

Abstract:

It is of our great interest to quantify the risk to structural dynamic systems due to earthquake-induced tsunamis in view of recent earthquake-induced tsunamis in Padang, 2004 and Tohoku, 2011 which brought huge losses of lives and properties. Despite continuous advancement in computational simulation of the tsunami and wave-structure interaction modeling, it still remains computationally challenging to evaluate the reliability of a structural dynamic system when uncertainties related to the system and its modeling are taken into account. The failure of the structure in a tsunami-wave-structural system is defined as any response quantities of the system exceeding specified thresholds during the time when the structure is subjected to dynamic wave impact due to earthquake-induced tsunamis. In this paper, an approach based on a novel integration of a recently proposed moving least squares response surface approach for stochastic sampling and the Subset Simulation algorithm is proposed. The effectiveness of the proposed approach is discussed by comparing its results with those obtained from the Subset Simulation algorithm without using the response surface approach.

Keywords: response surface, stochastic simulation, structural reliability tsunami, risk

Procedia PDF Downloads 649
17999 Urban Flood Risk Mapping–a Review

Authors: Sherly M. A., Subhankar Karmakar, Terence Chan, Christian Rau

Abstract:

Floods are one of the most frequent natural disasters, causing widespread devastation, economic damage and threat to human lives. Hydrologic impacts of climate change and intensification of urbanization are two root causes of increased flood occurrences, and recent research trends are oriented towards understanding these aspects. Due to rapid urbanization, population of cities across the world has increased exponentially leading to improperly planned developments. Climate change due to natural and anthropogenic activities on our environment has resulted in spatiotemporal changes in rainfall patterns. The combined effect of both aggravates the vulnerability of urban populations to floods. In this context, an efficient and effective flood risk management with its core component as flood risk mapping is essential in prevention and mitigation of flood disasters. Urban flood risk mapping involves zoning of an urban region based on its flood risk, which depicts the spatiotemporal pattern of frequency and severity of hazards, exposure to hazards, and degree of vulnerability of the population in terms of socio-economic, environmental and infrastructural aspects. Although vulnerability is a key component of risk, its assessment and mapping is often less advanced than hazard mapping and quantification. A synergic effort from technical experts and social scientists is vital for the effectiveness of flood risk management programs. Despite an increasing volume of quality research conducted on urban flood risk, a comprehensive multidisciplinary approach towards flood risk mapping still remains neglected due to which many of the input parameters and definitions of flood risk concepts are imprecise. Thus, the objectives of this review are to introduce and precisely define the relevant input parameters, concepts and terms in urban flood risk mapping, along with its methodology, current status and limitations. The review also aims at providing thought-provoking insights to potential future researchers and flood management professionals.

Keywords: flood risk, flood hazard, flood vulnerability, flood modeling, urban flooding, urban flood risk mapping

Procedia PDF Downloads 558
17998 The Role of Education and Indigenous Knowledge in Disaster Preparedness

Authors: Sameen Masood, Muhammad Ali Jibran

Abstract:

The frequent flood history in Pakistan has pronounced the need for disaster risk management. Various policies are formulated and steps are being taken by the government in order to cope with the flood effects. However, a much promising pro-active approach that is globally acknowledged is educating the masses regarding living with risk and uncertainty. Unfortunately, majority of the flood victims in Pakistan are poor and illiterate which also transpires as a significant cause of their distress. An illiterate population is not risk averse or equipped intellectually regarding how to prepare and protect against natural disasters. The current research utilizes a cross-disciplinary approach where the role of education (both formal and informal) and indigenous knowledge is explored with reference to disaster preparedness. The data was collected from the flood prone rural areas of Punjab. In the absence of disaster curriculum taught in formal schools, informal education disseminated by NGOs and relief and rehabilitation agencies was the only education given to the flood victims. However the educational attainment of flood victims highly correlated with their awareness regarding flood management and disaster preparedness. Moreover, lessons learned from past flood experience generated indigenous knowledge on the basis of which flood victims prepared themselves for any uncertainty. If the future policy regarding disaster preparation integrates indigenous knowledge and then delivers education on the basis of that, it is anticipated that the flood devastations can be much reduced. Education can play a vital role in amplifying perception of risk and taking precautionary measures for disaster. The findings of the current research will provide practical strategies where disaster preparedness through education has not yet been applied.

Keywords: education, disaster preparedness, illiterate population, risk management

Procedia PDF Downloads 453
17997 The Promotion of a Risk Culture: a Descriptive Study of Ghanaian Banks

Authors: Gerhard Grebe, Johan Marx

Abstract:

The aim of the study is to assess the state of operational risk management and the adoption of an appropriate risk culture in Ghanaian banks. The Bank of Ghana (BoG) joined the Basel Consultative Group (BCG) of the Basel Committee on Bank Supervision (BCBS) in 2021 and is proceeding with the implementation of the Basel III international regulatory framework for banks. The BoG’s Directive about risk management encourages, inter alia, the creation of an appropriate risk culture by Ghanaian banks. However, it is not evident how the risk management staff of Ghanaian banks experience the risk culture and the implementation of operational risk management in the banks where they are employed. Ghana is a developing economy, and it is addressing challenges with its organisational culture. According to Transparency International, successive Ghanaian governments claim to be fighting corruption, but little success has been achieved so far. This points to a possible lack of accountability, transparency, and integrity in the environment in which Ghanaian banks operate and which could influence their risk culture negatively. Purposive sampling was used for the survey, and the questionnaire was completed byGhanaian bank personnel who specializesin operational risk management, risk governance, and compliance, bank supervision, risk analyses, as well as the implementation of the operational risk management requirements of the Basel regulatory frameworks. The respondents indicated that they are fostering a risk culture and implementing monitoring and reporting procedures; the three lines of defence (3LOD); compliance; internal auditing; disclosure of operational risk information; and receiving guidance from the bank supervisor in an attempt to improve their operational risk management practices. However, the respondents reported the following challenges with staff members who are not inside the risk management departments(in order of priority), namelydemonstrating a risk culture, training and development; communication; reporting and disclosure; roles and responsibilities; performance appraisal; and technological and environmental barriers. Recommendations to address these challenges are provided

Keywords: ghana, operational risk, risk culture, risk management

Procedia PDF Downloads 89
17996 A Knowledge-Based Development of Risk Management Approaches for Construction Projects

Authors: Masoud Ghahvechi Pour

Abstract:

Risk management is a systematic and regular process of identifying, analyzing and responding to risks throughout the project's life cycle in order to achieve the optimal level of elimination, reduction or control of risk. The purpose of project risk management is to increase the probability and effect of positive events and reduce the probability and effect of unpleasant events on the project. Risk management is one of the most fundamental parts of project management, so that unmanaged or untransmitted risks can be one of the primary factors of failure in a project. Effective risk management does not apply to risk regression, which is apparently the cheapest option of the activity. However, the main problem with this option is the economic sensitivity, because what is potentially profitable is by definition risky, and what does not pose a risk is economically interesting and does not bring tangible benefits. Therefore, in relation to the implemented project, effective risk management is finding a "middle ground" in its management, which includes, on the one hand, protection against risk from a negative direction by means of accurate identification and classification of risk, which leads to analysis And it becomes a comprehensive analysis. On the other hand, management using all mathematical and analytical tools should be based on checking the maximum benefits of these decisions. Detailed analysis, taking into account all aspects of the company, including stakeholder analysis, will allow us to add what will become tangible benefits for our project in the future to effective risk management. Identifying the risk of the project is based on the theory that which type of risk may affect the project, and also refers to specific parameters and estimating the probability of their occurrence in the project. These conditions can be divided into three groups: certainty, uncertainty, and risk, which in turn support three types of investment: risk preference, risk neutrality, specific risk deviation, and its measurement. The result of risk identification and project analysis is a list of events that indicate the cause and probability of an event, and a final assessment of its impact on the environment.

Keywords: risk, management, knowledge, risk management

Procedia PDF Downloads 35
17995 An Assessment of the Risk and Protective Factors Impacting Criminal Gang Involvement among At-Risk Boys Resident at a Juvenile Home in Trinidad and Tobago: The Peer/Individual Domain of the Risk Factor Prevention ParadIGM

Authors: Dianne Williams

Abstract:

This study examined the peer/individual domain of the Risk Factor Prevention Paradigm (RFPP) to assess the risk and protective factors that impact criminal gang involvement among at-risk males residing in a juvenile home in Trinidad and Tobago. The RFPP allows for the identification of both risk and protective factors in a single, holistic framework to identify the relationship between risk factors, protective factors, and criminal gang involvement among at-risk male adolescents. Findings showed that having anti-social peers was the most significant risk factor associated with criminal gang involvement, while the most significant protective factor was having a positive social attitude. Moreover, while 65% of the boys reported never having been in a gang, 70% reported having hit, struck or used a weapon against someone, while 52% reported being involved in other violent incidents on more than two occasions. This suggests that while involvement with criminal gangs may not be common among this population, predisposing behavioral patterns are present. Results are expected to assist in the development of targeted strategies to reduce the attractiveness of gang membership.

Keywords: risk factor prevention paradigm, risk factors, protective factors, peer/individual domain, gang involvement, at-risk youth, trinidad and tobago, juvenile home

Procedia PDF Downloads 575
17994 Extreme Value Modelling of Ghana Stock Exchange Indices

Authors: Kwabena Asare, Ezekiel N. N. Nortey, Felix O. Mettle

Abstract:

Modelling of extreme events has always been of interest in fields such as hydrology and meteorology. However, after the recent global financial crises, appropriate models for modelling of such rare events leading to these crises have become quite essential in the finance and risk management fields. This paper models the extreme values of the Ghana Stock Exchange All-Shares indices (2000-2010) by applying the Extreme Value Theory to fit a model to the tails of the daily stock returns data. A conditional approach of the EVT was preferred and hence an ARMA-GARCH model was fitted to the data to correct for the effects of autocorrelation and conditional heteroscedastic terms present in the returns series, before EVT method was applied. The Peak Over Threshold (POT) approach of the EVT, which fits a Generalized Pareto Distribution (GPD) model to excesses above a certain selected threshold, was employed. Maximum likelihood estimates of the model parameters were obtained and the model’s goodness of fit was assessed graphically using Q-Q, P-P and density plots. The findings indicate that the GPD provides an adequate fit to the data of excesses. The size of the extreme daily Ghanaian stock market movements were then computed using the Value at Risk (VaR) and Expected Shortfall (ES) risk measures at some high quantiles, based on the fitted GPD model.

Keywords: extreme value theory, expected shortfall, generalized pareto distribution, peak over threshold, value at risk

Procedia PDF Downloads 519
17993 Evaluating the Effects of Weather and Climate Change to Risks in Crop Production

Authors: Marcus Bellett-Travers

Abstract:

Different modelling approaches have been used to determine or predict yield of crops in different geographies. Central to the methodologies are the presumption that it is the absolute yield of the crop in a given location that is of the highest priority to those requiring information on crop productivity. Most individuals, companies and organisations within the agri-food sector need to be able to balance the supply of crops with the demand for them. Different modelling approaches have been used to determine and predict crop yield. The growing need to ensure certainty of supply and stability of prices requires an approach that describes the risk in producing a crop. A review of current methodologies to evaluate the risk to food production from changes in the weather and climate is presented.

Keywords: crop production, risk, climate, modelling

Procedia PDF Downloads 362
17992 Challenges in Environmental Governance: A Case Study of Risk Perceptions of Environmental Agencies Involved in Flood Management in the Hawkesbury-Nepean Region, Australia

Authors: S. Masud, J. Merson, D. F. Robinson

Abstract:

The management of environmental resources requires engagement of a range of stakeholders including public/private agencies and different community groups to implement sustainable conservation practices. The challenge which is often ignored is the analysis of agencies involved and their power relations. One of the barriers identified is the difference in risk perceptions among the agencies involved that leads to disjointed efforts of assessing and managing risks. Wood et al 2012, explains that it is important to have an integrated approach to risk management where decision makers address stakeholder perspectives. This is critical for an effective risk management policy. This abstract is part of a PhD research that looks into barriers to flood management under a changing climate and intends to identify bottlenecks that create maladaptation. Experiences are drawn from international practices in the UK and examined in the context of Australia through exploring the flood governance in a highly flood-prone region in Australia: the Hawkesbury Ne-pean catchment as a case study. In this research study several aspects of governance and management are explored: (i) the complexities created by the way different agencies are involved in assessing flood risks (ii) different perceptions on acceptable flood risk level; (iii) perceptions on community engagement in defining acceptable flood risk level; (iv) Views on a holistic flood risk management approach; and, (v) challenges of centralised information system. The study concludes that the complexity of managing a large catchment is exacerbated by the difference in the way professionals perceive the problem. This has led to: (a) different standards for acceptable risks; (b) inconsistent attempt to set-up a regional scale flood management plan beyond the jurisdictional boundaries: (c) absence of a regional scale agency with license to share and update information (d) Lack of forums for dialogue with insurance companies to ensure an integrated approach to flood management. The research takes the Hawkesbury-Nepean catchment as case example and draws from literary evidence from around the world. In addition, conclusions were extrapolated from eighteen semi-structured interviews from agencies involved in flood risk management in the Hawkesbury-Nepean catchment of NSW, Australia. The outcome of this research is to provide a better understanding of complexity in assessing risks against a rapidly changing climate and contribute towards developing effective risk communication strategies thus enabling better management of floods and achieving increased level of support from insurance companies, real-estate agencies, state and regional risk managers and the affected communities.

Keywords: adaptive governance, flood management, flood risk communication, stakeholder risk perceptions

Procedia PDF Downloads 260
17991 Weighted Risk Scores Method Proposal for Occupational Safety Risk Assessment

Authors: Ulas Cinar, Omer Faruk Ugurlu, Selcuk Cebi

Abstract:

Occupational safety risk management is the most important element of a safe working environment. Effective risk management can only be possible with accurate analysis and evaluations. Scoring-based risk assessment methods offer considerable ease of application as they convert linguistic expressions into numerical results. It can also be easily adapted to any field. Contrary to all these advantages, important problems in scoring-based methods are frequently discussed. Effective measurability is one of the most critical problems. Existing methods allow experts to choose a score equivalent to each parameter. Therefore, experts prefer the score of the most likely outcome for risk. However, all other possible consequences are neglected. Assessments of the existing methods express the most probable level of risk, not the real risk of the enterprises. In this study, it is aimed to develop a method that will present a more comprehensive evaluation compared to the existing methods by evaluating the probability and severity scores, all sub-parameters, and potential results, and a new scoring-based method is proposed in the literature.

Keywords: occupational health and safety, risk assessment, scoring based risk assessment method, underground mining, weighted risk scores

Procedia PDF Downloads 119
17990 Health Risk Assessment of Trihalogenmethanes in Drinking Water

Authors: Lenka Jesonkova, Frantisek Bozek

Abstract:

Trihalogenmethanes (THMs) are disinfection byproducts with non-carcinogenic and genotoxic effects. The contamination of 6 sites close to the water treatment plant has been monitored in second largest city of the Czech Republic. Health risk assessment including both non-carcinogenic and genotoxic risk for long term exposition was realized using the critical concentrations. Concentrations of trihalogenmethanes met national standards in all samples. Risk assessment proved that health risks from trihalogenmethanes are acceptable on each site.

Keywords: drinking water, health risk assessment, trihalogenmethanes, water pollution

Procedia PDF Downloads 497
17989 Credit Risk Prediction Based on Bayesian Estimation of Logistic Regression Model with Random Effects

Authors: Sami Mestiri, Abdeljelil Farhat

Abstract:

The aim of this current paper is to predict the credit risk of banks in Tunisia, over the period (2000-2005). For this purpose, two methods for the estimation of the logistic regression model with random effects: Penalized Quasi Likelihood (PQL) method and Gibbs Sampler algorithm are applied. By using the information on a sample of 528 Tunisian firms and 26 financial ratios, we show that Bayesian approach improves the quality of model predictions in terms of good classification as well as by the ROC curve result.

Keywords: forecasting, credit risk, Penalized Quasi Likelihood, Gibbs Sampler, logistic regression with random effects, curve ROC

Procedia PDF Downloads 515
17988 Development of Risk Assessment and Occupational Safety Management Model for Building Construction Projects

Authors: Preeda Sansakorn, Min An

Abstract:

In order to be capable of dealing with uncertainties, subjectivities, including vagueness arising in building construction projects, the application of fuzzy reasoning technique based on fuzzy set theory is proposed. This study contributes significantly to the development of a fuzzy reasoning safety risk assessment model for building construction projects that could be employed to assess the risk magnitude of each hazardous event identified during construction, and a third parameter of probability of consequence is incorporated in the model. By using the proposed safety risk analysis methodology, more reliable and less ambiguities, which provide the safety risk management project team for decision-making purposes.

Keywords: safety risk assessment, building construction safety, fuzzy reasoning, construction risk assessment model, building construction projects

Procedia PDF Downloads 460
17987 Risk Based on Computer Auditing and Measures of ‎Prevention

Authors: Mohammad Hadi Khorashadi Zadeh, Amin Karkon, Seyd Mohammad Reza Mashhoori

Abstract:

The technology of computer audit played a major role in the progress and prospects of a proper application to improve the quality and efficiency of audit work. But due to the technical complexity and the specific risks of computer audit, it should be shown effective in audit and preventive action. Mainly through research in this paper, we propose the causes of audit risk in a computer environment and the risk of further proposals for measures to control, to some extent reduce the risk of computer audit and improve the audit quality.

Keywords: computer auditing, risk, measures to prevent, information management

Procedia PDF Downloads 487
17986 Revised Risk Priority Number in Failure Mode and Effects Analysis Model from the Perspective of Healthcare System

Authors: Fatemeh Rezaei, Mohammad H. Yarmohammadian, Masoud Ferdosi, Abbas Haghshnas

Abstract:

Background: Failure Modes and Effect Analysis is now having known as the main methods of risk assessment and the accreditation requirements for many organizations. The Risk Priority Number (RPN) approach is generally preferred, especially for its easiness of use. Indeed it does not require statistical data, but it is based on subjective evaluations given by the experts about the Occurrence (O i), the Severity (Si) and the Detectability (D i) of each cause of failure. Methods: This study is a quantitative – qualitative research. In terms of qualitative dimension, method of focus groups with inductive approach is used. To evaluate the results of the qualitative study, quantitative assessment was conducted to calculate RPN score. Results; We have studied patient’s journey process in surgery ward and the most important phase of the process determined Transport of the patient from the holding area to the operating room. Failures of the phase with the highest priority determined by defining inclusion criteria included severity (clinical effect, claim consequence, waste of time and financial loss), occurrence (time- unit occurrence and degree of exposure to risk) and preventability (degree of preventability and defensive barriers) and quantifying risks priority criteria in the context of RPN index. Ability of improved RPN reassess by root cause (RCA) analysis showed some variations. Conclusions: Finally, It could be concluded that understandable criteria should have been developed according to personnel specialized language and communication field. Therefore, participation of both technical and clinical groups is necessary to modify and apply these models.

Keywords: failure mode, effects analysis, risk priority number(RPN), health system, risk assessment

Procedia PDF Downloads 289
17985 COVID-19 Teaches Probability Risk Assessment

Authors: Sean Sloan

Abstract:

Probability Risk Assessments (PRA) can be a difficult concept for students to grasp. So in searching for different ways to describe PRA to relate it to their lives; COVID-19 came up. The parallels are amazing. Soon students began analyzing acceptable risk with the virus. This helped them to quantify just how dangerous is dangerous. The original lesson was dismissed and for the remainder of the period, the probability of risk, and the lethality of risk became the topic. Spreading events such as a COVID carrier on an airline became analogous to single fault casualties such as a Tsunami. Odds of spreading became odds of backup-diesel-generator failure – like with Fukashima Daiichi. Fatalities of the disease became expected fatalities due to radiation spread. Quantification from this discussion took it from hyperbole and emotion into one where we could rationally base guidelines. It has been one of the most effective educational devices observed.

Keywords: COVID, education, probability, risk

Procedia PDF Downloads 135
17984 Scientometrics Analysis of Food Supply Chain Risk Assessment Literature: Based On Web of Science Record 1996-2014

Authors: Mohsen Shirani, Shadi Asadzandi, Micaela Demichela

Abstract:

This paper presents the results of a study to assess crucial aspects and the strength of the scientific basis of a typically interdisciplinary, applied field: food supply chain risk assessment research. Our approach is based on an advanced scientometrics analysis with novel elements to assess the influence and dissemination of research results and to measure interdisciplinary. This paper aims to describe the quantity and quality of the publication trends in food supply chain risk assessment. The population under study was composed of 266 articles from database web of science. The results were analyzed based on date of publication, type of document, language of the documents, source of publications, subject areas, authors and their affiliations, and the countries involved in developing the articles.

Keywords: food supply chain, risk assessment, scientometrics, web of science

Procedia PDF Downloads 468
17983 Role of Macro and Technical Indicators in Equity Risk Premium Prediction: A Principal Component Analysis Approach

Authors: Naveed Ul Hassan, Bilal Aziz, Maryam Mushtaq, Imran Ameen Khan

Abstract:

Equity risk premium (ERP) is the stock return in excess of risk free return. Even though it is an essential topic of finance but still there is no common consensus upon its forecasting. For forecasting ERP, apart from the macroeconomic variables attention is devoted to technical indicators as well. For this purpose, set of 14 technical and 14 macro-economic variables is selected and all forecasts are generated based on a standard predictive regression framework, where ERP is regressed on a constant and a lag of a macroeconomic variable or technical indicator. The comparative results showed that technical indicators provide better indications about ERP estimates as compared to macro-economic variables. The relative strength of ERP predictability is also investigated by using National Bureau of Economic Research (NBER) data of business cycle expansion and recessions and found that ERP predictability is more than twice for recessions as compared to expansions.

Keywords: equity risk premium, forecasting, macroeconomic indicators, technical indicators

Procedia PDF Downloads 280
17982 A BIM-Based Approach to Assess COVID-19 Risk Management Regarding Indoor Air Ventilation and Pedestrian Dynamics

Authors: T. Delval, C. Sauvage, Q. Jullien, R. Viano, T. Diallo, B. Collignan, G. Picinbono

Abstract:

In the context of the international spread of COVID-19, the Centre Scientifique et Technique du Bâtiment (CSTB) has led a joint research with the French government authorities Hauts-de-Seine department, to analyse the risk in school spaces according to their configuration, ventilation system and spatial segmentation strategy. This paper describes the main results of this joint research. A multidisciplinary team involving experts in indoor air quality/ventilation, pedestrian movements and IT domains was established to develop a COVID risk analysis tool based on Building Information Model. The work started with specific analysis on two pilot schools in order to provide for the local administration specifications to minimize the spread of the virus. Different recommendations were published to optimize/validate the use of ventilation systems and the strategy of student occupancy and student flow segmentation within the building. This COVID expertise has been digitized in order to manage a quick risk analysis on the entire building that could be used by the public administration through an easy user interface implemented in a free BIM Management software. One of the most interesting results is to enable a dynamic comparison of different ventilation system scenarios and space occupation strategy inside the BIM model. This concurrent engineering approach provides users with the optimal solution according to both ventilation and pedestrian flow expertise.

Keywords: BIM, knowledge management, system expert, risk management, indoor ventilation, pedestrian movement, integrated design

Procedia PDF Downloads 84