Search results for: risk priority number(RPN)
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 6448

Search results for: risk priority number(RPN)

6448 Revised Risk Priority Number in Failure Mode and Effects Analysis Model from the Perspective of Healthcare System

Authors: Fatemeh Rezaei, Mohammad H. Yarmohammadian, Masoud Ferdosi, Abbas Haghshnas

Abstract:

Background: Failure Modes and Effect Analysis is now having known as the main methods of risk assessment and the accreditation requirements for many organizations. The Risk Priority Number (RPN) approach is generally preferred, especially for its easiness of use. Indeed it does not require statistical data, but it is based on subjective evaluations given by the experts about the Occurrence (O i), the Severity (Si) and the Detectability (D i) of each cause of failure. Methods: This study is a quantitative – qualitative research. In terms of qualitative dimension, method of focus groups with inductive approach is used. To evaluate the results of the qualitative study, quantitative assessment was conducted to calculate RPN score. Results; We have studied patient’s journey process in surgery ward and the most important phase of the process determined Transport of the patient from the holding area to the operating room. Failures of the phase with the highest priority determined by defining inclusion criteria included severity (clinical effect, claim consequence, waste of time and financial loss), occurrence (time- unit occurrence and degree of exposure to risk) and preventability (degree of preventability and defensive barriers) and quantifying risks priority criteria in the context of RPN index. Ability of improved RPN reassess by root cause (RCA) analysis showed some variations. Conclusions: Finally, It could be concluded that understandable criteria should have been developed according to personnel specialized language and communication field. Therefore, participation of both technical and clinical groups is necessary to modify and apply these models.

Keywords: failure mode, effects analysis, risk priority number(RPN), health system, risk assessment

Procedia PDF Downloads 278
6447 Repair Workshop Queue System Modification Using Priority Scheme

Authors: C. Okonkwo Ugochukwu, E. Sinebe Jude, N. Odoh Blessing, E. Okafor Christian

Abstract:

In this paper, a modification on repair workshop queuing system using multi priority scheme was carried out. Chi square goodness of fit test was used to determine the random distribution of the inter arrival time and service time of crankshafts that come for maintenance in the workshop. The chi square values obtained for all the prioritized classes show that the distribution conforms to Poisson distribution. The mean waiting time in queue results of non-preemptive priority for 1st, 2nd and 3rd classes show 0.066, 0.09, and 0.224 day respectively, while preemptive priority show 0.007, 0.036 and 0.258 day. However, when non priority is used, which obviously has no class distinction it amounts to 0.17 days. From the results, one can observe that the preemptive priority system provides a very dramatic improvement over the non preemptive priority as it concerns arrivals that are of higher priority. However, the improvement has a detrimental effect on the low priority class. The trend of the results is similar to the mean waiting time in the system as a result of addition of the actual service time. Even though the mean waiting time for the queue and that of the system for no priority takes the least time when compared with the least priority, urgent and semi-urgent jobs will terribly suffer which will most likely result in reneging or balking of many urgent jobs. Hence, the adoption of priority scheme in this type of scenario will result in huge profit to the Company and more customer satisfaction.

Keywords: queue, priority class, preemptive, non-preemptive, mean waiting time

Procedia PDF Downloads 349
6446 Holistic Risk Assessment Based on Continuous Data from the User’s Behavior and Environment

Authors: Cinzia Carrodano, Dimitri Konstantas

Abstract:

Risk is part of our lives. In today’s society risk is connected to our safety and safety has become a major priority in our life. Each person lives his/her life based on the evaluation of the risk he/she is ready to accept and sustain, and the level of safety he/she wishes to reach, based on highly personal criteria. The assessment of risk a person takes in a complex environment and the impact of actions of other people’actions and events on our perception of risk are alements to be considered. The concept of Holistic Risk Assessment (HRA) aims in developing a methodology and a model that will allow us to take into account elements outside the direct influence of the individual, and provide a personalized risk assessment. The concept is based on the fact that in the near future, we will be able to gather and process extremely large amounts of data about an individual and his/her environment in real time. The interaction and correlation of these data is the key element of the holistic risk assessment. In this paper, we present the HRA concept and describe the most important elements and considerations.

Keywords: continuous data, dynamic risk, holistic risk assessment, risk concept

Procedia PDF Downloads 83
6445 A Process FMEA in Aero Fuel Pump Manufacturing and Conduct the Corrective Actions

Authors: Zohre Soleymani, Meisam Amirzadeh

Abstract:

Many products are safety critical, so proactive analysis techniques are vital for them because these techniques try to identify potential failures before the products are produced. Failure Mode and Effective Analysis (FMEA) is an effective tool in identifying probable problems of product or process and prioritizing them and planning for its elimination. The paper shows the implementation of FMEA process to identify and remove potential troubles of aero fuel pumps manufacturing process and improve the reliability of subsystems. So the different possible causes of failure and its effects along with the recommended actions are discussed. FMEA uses Risk Priority Number (RPN) to determine the risk level. RPN value is depending on Severity(S), Occurrence (O) and Detection (D) parameters, so these parameters need to be determined. After calculating the RPN for identified potential failure modes, the corrective actions are defined to reduce risk level according to assessment strategy and determined acceptable risk level. Then FMEA process is performed again and RPN revised is calculated. The represented results are applied in the format of a case study. These results show the improvement in manufacturing process and considerable reduction in aero fuel pump production risk level.

Keywords: FMEA, risk priority number, aero pump, corrective action

Procedia PDF Downloads 255
6444 Risk Assessment of Building Information Modelling Adoption in Construction Projects

Authors: Amirhossein Karamoozian, Desheng Wu, Behzad Abbasnejad

Abstract:

Building information modelling (BIM) is a new technology to enhance the efficiency of project management in the construction industry. In addition to the potential benefits of this useful technology, there are various risks and obstacles to applying it in construction projects. In this study, a decision making approach is presented for risk assessment in BIM adoption in construction projects. Various risk factors of exerting BIM during different phases of the project lifecycle are identified with the help of Delphi method, experts’ opinions and related literature. Afterward, Shannon’s entropy and Fuzzy TOPSIS (Technique for Order Preference by Similarity to Ideal Situation) are applied to derive priorities of the identified risk factors. Results indicated that lack of knowledge between professional engineers about workflows in BIM and conflict of opinions between different stakeholders are the risk factors with the highest priority.

Keywords: risk, BIM, fuzzy TOPSIS, construction projects

Procedia PDF Downloads 189
6443 Relaxing Convergence Constraints in Local Priority Hysteresis Switching Logic

Authors: Mubarak Alhajri

Abstract:

This paper addresses certain inherent limitations of local priority hysteresis switching logic. Our main result establishes that under persistent excitation assumption, it is possible to relax constraints requiring strict positivity of local priority and hysteresis switching constants. Relaxing these constraints allows the adaptive system to reach optimality which implies the performance improvement. The unconstrained local priority hysteresis switching logic is examined and conditions for global convergence are derived.

Keywords: adaptive control, convergence, hysteresis constant, hysteresis switching

Procedia PDF Downloads 358
6442 Proposal of a Model Supporting Decision-Making Based on Multi-Objective Optimization Analysis on Information Security Risk Treatment

Authors: Ritsuko Kawasaki (Aiba), Takeshi Hiromatsu

Abstract:

Management is required to understand all information security risks within an organization, and to make decisions on which information security risks should be treated in what level by allocating how much amount of cost. However, such decision-making is not usually easy, because various measures for risk treatment must be selected with the suitable application levels. In addition, some measures may have objectives conflicting with each other. It also makes the selection difficult. Moreover, risks generally have trends and it also should be considered in risk treatment. Therefore, this paper provides the extension of the model proposed in the previous study. The original model supports the selection of measures by applying a combination of weighted average method and goal programming method for multi-objective analysis to find an optimal solution. The extended model includes the notion of weights to the risks, and the larger weight means the priority of the risk.

Keywords: information security risk treatment, selection of risk measures, risk acceptance, multi-objective optimization

Procedia PDF Downloads 424
6441 The Role of Tax Management Components in Creating Value or Increasing Risk of Tehran Stock Exchange Firms

Authors: Fereshteh Darash

Abstract:

Reflective tax management corresponds to the Agency Theory since it determines the motivation of managers for tax management actions and short-term and long-term consequences. Therefore, selection of tax strategy contributes to the tax and financial position of the firm in the future. The aim of the present research is to evaluate the effect of tax management components on risk-taking of firms listed in Tehran stock exchange by using regression analysis method. Results show that tax effective rate, tax risk and tax planning have no significant effect on the firm's future risk. Results suggest that stakeholders assess the effective tax rate and delay in tax payment in line with their benefits. They tend to accept the higher risk cost for reduction of tax payments and benefits of higher liquidity in current period. Hence, effective tax rate and tax risk have no significant effect on future risk of the firm. Moreover, tax planning yields no information regarding the predictability of the future profits and as a result, it has no significant effect on the future risk of the firm since specific goals of financial reporting are in priority for the stakeholders and regardless of the firm’s data analysis, they take investment decisions and they less intend to purchase the stocks in a rational manner.

Keywords: tax management, tax effective rate, tax risk, tax planning, firm risk

Procedia PDF Downloads 95
6440 The Promotion of a Risk Culture: a Descriptive Study of Ghanaian Banks

Authors: Gerhard Grebe, Johan Marx

Abstract:

The aim of the study is to assess the state of operational risk management and the adoption of an appropriate risk culture in Ghanaian banks. The Bank of Ghana (BoG) joined the Basel Consultative Group (BCG) of the Basel Committee on Bank Supervision (BCBS) in 2021 and is proceeding with the implementation of the Basel III international regulatory framework for banks. The BoG’s Directive about risk management encourages, inter alia, the creation of an appropriate risk culture by Ghanaian banks. However, it is not evident how the risk management staff of Ghanaian banks experience the risk culture and the implementation of operational risk management in the banks where they are employed. Ghana is a developing economy, and it is addressing challenges with its organisational culture. According to Transparency International, successive Ghanaian governments claim to be fighting corruption, but little success has been achieved so far. This points to a possible lack of accountability, transparency, and integrity in the environment in which Ghanaian banks operate and which could influence their risk culture negatively. Purposive sampling was used for the survey, and the questionnaire was completed byGhanaian bank personnel who specializesin operational risk management, risk governance, and compliance, bank supervision, risk analyses, as well as the implementation of the operational risk management requirements of the Basel regulatory frameworks. The respondents indicated that they are fostering a risk culture and implementing monitoring and reporting procedures; the three lines of defence (3LOD); compliance; internal auditing; disclosure of operational risk information; and receiving guidance from the bank supervisor in an attempt to improve their operational risk management practices. However, the respondents reported the following challenges with staff members who are not inside the risk management departments(in order of priority), namelydemonstrating a risk culture, training and development; communication; reporting and disclosure; roles and responsibilities; performance appraisal; and technological and environmental barriers. Recommendations to address these challenges are provided

Keywords: ghana, operational risk, risk culture, risk management

Procedia PDF Downloads 80
6439 The Integrated Methodological Development of Reliability, Risk and Condition-Based Maintenance in the Improvement of the Thermal Power Plant Availability

Authors: Henry Pariaman, Iwa Garniwa, Isti Surjandari, Bambang Sugiarto

Abstract:

Availability of a complex system of thermal power plant is strongly influenced by the reliability of spare parts and maintenance management policies. A reliability-centered maintenance (RCM) technique is an established method of analysis and is the main reference for maintenance planning. This method considers the consequences of failure in its implementation, but does not deal with further risk of down time that associated with failures, loss of production or high maintenance costs. Risk-based maintenance (RBM) technique provides support strategies to minimize the risks posed by the failure to obtain maintenance task considering cost effectiveness. Meanwhile, condition-based maintenance (CBM) focuses on monitoring the application of the conditions that allow the planning and scheduling of maintenance or other action should be taken to avoid the risk of failure prior to the time-based maintenance. Implementation of RCM, RBM, CBM alone or combined RCM and RBM or RCM and CBM is a maintenance technique used in thermal power plants. Implementation of these three techniques in an integrated maintenance will increase the availability of thermal power plants compared to the use of maintenance techniques individually or in combination of two techniques. This study uses the reliability, risks and conditions-based maintenance in an integrated manner to increase the availability of thermal power plants. The method generates MPI (Priority Maintenance Index) is RPN (Risk Priority Number) are multiplied by RI (Risk Index) and FDT (Failure Defense Task) which can generate the task of monitoring and assessment of conditions other than maintenance tasks. Both MPI and FDT obtained from development of functional tree, failure mode effects analysis, fault-tree analysis, and risk analysis (risk assessment and risk evaluation) were then used to develop and implement a plan and schedule maintenance, monitoring and assessment of the condition and ultimately perform availability analysis. The results of this study indicate that the reliability, risks and conditions-based maintenance methods, in an integrated manner can increase the availability of thermal power plants.

Keywords: integrated maintenance techniques, availability, thermal power plant, MPI, FDT

Procedia PDF Downloads 760
6438 Contaminated Sites Prioritization Process Promoting and Redevelopment Planning

Authors: Che-An Lin, Wan-Ying Tsai, Ying-Shin Chen, Yu-Jen Chung

Abstract:

With the number and area of contaminated sites continued to increase in Taiwan, the Government have to make a priority list of screening contaminated sites under the limited funds and information. This study investigated the announcement of Taiwan EPA land 261 contaminated sites (except the agricultural lands), after preliminary screening 211 valid data to propose a screening system, removed contaminated sites were used to check the accuracy. This system including two dimensions which can create the sequence and use the XY axis to construct four quadrants. One dimension included environmental and social priority and the other related economic. All of the evaluated items included population density, land values, traffic hub, pollutant compound, pollutant concentrations, pollutant transport pathways, land usage sites, site areas, and water conductivity. The classification results of this screening are 1. Prioritization promoting sites (10%). 2. Environmental and social priority of the sites (17%), 3. Economic priority of the sites (30%), 4. Non-priority sites (43 %). Finally, this study used three of the removed contaminated sites to check screening system verification. As the surmise each of them are in line with the priority site and Economic priority of the site.

Keywords: contaminated sites, redevelopment, environmental, economics

Procedia PDF Downloads 443
6437 Risk Measure from Investment in Finance by Value at Risk

Authors: Mohammed El-Arbi Khalfallah, Mohamed Lakhdar Hadji

Abstract:

Managing and controlling risk is a topic research in the world of finance. Before a risky situation, the stakeholders need to do comparison according to the positions and actions, and financial institutions must take measures of a particular market risk and credit. In this work, we study a model of risk measure in finance: Value at Risk (VaR), which is a new tool for measuring an entity's exposure risk. We explain the concept of value at risk, your average, tail, and describe the three methods for computing: Parametric method, Historical method, and numerical method of Monte Carlo. Finally, we briefly describe advantages and disadvantages of the three methods for computing value at risk.

Keywords: average value at risk, conditional value at risk, tail value at risk, value at risk

Procedia PDF Downloads 405
6436 Evaluating the Effects of Weather and Climate Change to Risks in Crop Production

Authors: Marcus Bellett-Travers

Abstract:

Different modelling approaches have been used to determine or predict yield of crops in different geographies. Central to the methodologies are the presumption that it is the absolute yield of the crop in a given location that is of the highest priority to those requiring information on crop productivity. Most individuals, companies and organisations within the agri-food sector need to be able to balance the supply of crops with the demand for them. Different modelling approaches have been used to determine and predict crop yield. The growing need to ensure certainty of supply and stability of prices requires an approach that describes the risk in producing a crop. A review of current methodologies to evaluate the risk to food production from changes in the weather and climate is presented.

Keywords: crop production, risk, climate, modelling

Procedia PDF Downloads 353
6435 Analytic Hierarchy Process

Authors: Hadia Rafi

Abstract:

To make any decision in any work/task/project it involves many factors that needed to be looked. The analytic Hierarchy process (AHP) is based on the judgments of experts to derive the required results this technique measures the intangibles and then by the help of judgment and software analysis the comparisons are made which shows how much a certain element/unit leads another. AHP includes how an inconsistent judgment should be made consistent and how the judgment should be improved when possible. The Priority scales are obtained by multiplying them with the priority of their parent node and after that they are added.

Keywords: AHP, priority scales, parent node, software analysis

Procedia PDF Downloads 364
6434 An Online Priority-Configuration Algorithm for Obstacle Avoidance of the Unmanned Air Vehicles Swarm

Authors: Lihua Zhu, Jianfeng Du, Yu Wang, Zhiqiang Wu

Abstract:

Collision avoidance problems of a swarm of unmanned air vehicles (UAVs) flying in an obstacle-laden environment are investigated in this paper. Given that the UAV swarm needs to adapt to the obstacle distribution in dynamic operation, a priority configuration is designed to guide the UAVs to pass through the obstacles in turn. Based on the collision cone approach and the prediction of the collision time, a collision evaluation model is established to judge the urgency of the imminent collision of each UAV, and the evaluation result is used to assign the priority of each UAV to further instruct them going through the obstacles in descending order. At last, the simulation results provide the promising validation in terms of the efficiency and scalability of the proposed approach.

Keywords: UAV swarm, collision avoidance, complex environment, online priority design

Procedia PDF Downloads 184
6433 Comparison between Deterministic and Probabilistic Stability Analysis, Featuring Consequent Risk Assessment

Authors: Isabela Moreira Queiroz

Abstract:

Slope stability analyses are largely carried out by deterministic methods and evaluated through a single security factor. Although it is known that the geotechnical parameters can present great dispersal, such analyses are considered fixed and known. The probabilistic methods, in turn, incorporate the variability of input key parameters (random variables), resulting in a range of values of safety factors, thus enabling the determination of the probability of failure, which is an essential parameter in the calculation of the risk (probability multiplied by the consequence of the event). Among the probabilistic methods, there are three frequently used methods in geotechnical society: FOSM (First-Order, Second-Moment), Rosenblueth (Point Estimates) and Monte Carlo. This paper presents a comparison between the results from deterministic and probabilistic analyses (FOSM method, Monte Carlo and Rosenblueth) applied to a hypothetical slope. The end was held to evaluate the behavior of the slope and consequent risk analysis, which is used to calculate the risk and analyze their mitigation and control solutions. It can be observed that the results obtained by the three probabilistic methods were quite close. It should be noticed that the calculation of the risk makes it possible to list the priority to the implementation of mitigation measures. Therefore, it is recommended to do a good assessment of the geological-geotechnical model incorporating the uncertainty in viability, design, construction, operation and closure by means of risk management. 

Keywords: probabilistic methods, risk assessment, risk management, slope stability

Procedia PDF Downloads 344
6432 Model of MSD Risk Assessment at Workplace

Authors: K. Sekulová, M. Šimon

Abstract:

This article focuses on upper-extremity musculoskeletal disorders risk assessment model at workplace. In this model are used risk factors that are responsible for musculoskeletal system damage. Based on statistic calculations the model is able to define what risk of MSD threatens workers who are under risk factors. The model is also able to say how MSD risk would decrease if these risk factors are eliminated.

Keywords: ergonomics, musculoskeletal disorders, occupational diseases, risk factors

Procedia PDF Downloads 506
6431 Analysis of Performance Improvement Factors in Supply Chain Manufacturing Using Analytic Network Process and Kaizen

Authors: Juliza Hidayati, Yesie M. Sinuhaji, Sawarni Hasibuan

Abstract:

A company producing drinking water through many incompatibility issues that affect supply chain performance. The study was conducted to determine the factors that affect the performance of the supply chain and improve it. To obtain the dominant factors affecting the performance of the supply chain used Analytic Network Process, while to improve performance is done by using Kaizen. Factors affecting the performance of the supply chain to be a reference to identify the cause of the non-conformance. Results weighting using ANP indicates that the dominant factor affecting the level of performance is the precision of the number of shipments (15%), the ability of the fulfillment of the booking amount (12%), and the number of rejected products when signing (12%). Incompatibility of the factors that affect the performance of the supply chain are identified, so that found the root cause of the problem is most dominant. Based on the weight of Risk Priority Number (RPN) gained the most dominant root cause of the problem, namely the poorly maintained engine, the engine worked for three shifts, machine parts that are not contained in the plant. Improvements then performed using the Kaizen method of systematic and sustainable.

Keywords: analytic network process, booking amount, risk priority number, supply chain performance

Procedia PDF Downloads 264
6430 A Stochastic Volatility Model for Optimal Market-Making

Authors: Zubier Arfan, Paul Johnson

Abstract:

The electronification of financial markets and the rise of algorithmic trading has sparked a lot of interest from the mathematical community, for the market making-problem in particular. The research presented in this short paper solves the classic stochastic control problem in order to derive the strategy for a market-maker. It also shows how to calibrate and simulate the strategy with real limit order book data for back-testing. The ambiguity of limit-order priority in back-testing is dealt with by considering optimistic and pessimistic priority scenarios. The model, although it does outperform a naive strategy, assumes constant volatility, therefore, is not best suited to the LOB data. The Heston model is introduced to describe the price and variance process of the asset. The Trader's constant absolute risk aversion utility function is optimised by numerically solving a 3-dimensional Hamilton-Jacobi-Bellman partial differential equation to find the optimal limit order quotes. The results show that the stochastic volatility market-making model is more suitable for a risk-averse trader and is also less sensitive to calibration error than the constant volatility model.

Keywords: market-making, market-microsctrucure, stochastic volatility, quantitative trading

Procedia PDF Downloads 112
6429 Incorporating Priority Round-Robin Scheduler to Sustain Indefinite Blocking Issue and Prioritized Processes in Operating System

Authors: Heng Chia Ying, Charmaine Tan Chai Nie, Burra Venkata Durga Kumar

Abstract:

Process scheduling is the method of process management that determines which process the CPU will proceed with for the next task and how long it takes. Some issues were found in process management, particularly for Priority Scheduling (PS) and Round Robin Scheduling (RR). The proposed recommendations made for IPRRS are to combine the strengths of both into a combining algorithm while they draw on others to compensate for each weakness. A significant improvement on the combining technique of scheduler, Incorporating Priority Round-Robin Scheduler (IPRRS) address an algorithm for both high and low priority task to sustain the indefinite blocking issue faced in the priority scheduling algorithm and minimize the average turnaround time (ATT) and average waiting time (AWT) in RR scheduling algorithm. This paper will delve into the simple rules introduced by IPRRS and enhancements that both PS and RR bring to the execution of processes in the operating system. Furthermore, it incorporates the best aspects of each algorithm to build the optimum algorithm for a certain case in terms of prioritized processes, ATT, and AWT.

Keywords: round Robin scheduling, priority scheduling, indefinite blocking, process management, sustain, turnaround time

Procedia PDF Downloads 94
6428 An Algorithm for the Map Labeling Problem with Two Kinds of Priorities

Authors: Noboru Abe, Yoshinori Amai, Toshinori Nakatake, Sumio Masuda, Kazuaki Yamaguchi

Abstract:

We consider the problem of placing labels of the points on a plane. For each point, its position, the size of its label and a priority are given. Moreover, several candidates of its label positions are prespecified, and each of such label positions is assigned a priority. The objective of our problem is to maximize the total sum of priorities of placed labels and their points. By refining a labeling algorithm that can use these priorities, we propose a new heuristic algorithm which is more suitable for treating the assigned priorities.

Keywords: map labeling, greedy algorithm, heuristic algorithm, priority

Procedia PDF Downloads 400
6427 Defining Priority Areas for Biodiversity Conservation to Support for Zoning Protected Areas: A Case Study from Vietnam

Authors: Xuan Dinh Vu, Elmar Csaplovics

Abstract:

There has been an increasing need for methods to define priority areas for biodiversity conservation since the effectiveness of biodiversity conservation in protected areas largely depends on the availability of material resources. The identification of priority areas requires the integration of biodiversity data together with social data on human pressures and responses. However, the deficit of comprehensive data and reliable methods becomes a key challenge in zoning where the demand for conservation is most urgent and where the outcomes of conservation strategies can be maximized. In order to fill this gap, the study applied an environmental model Condition–Pressure–Response to suggest a set of criteria to identify priority areas for biodiversity conservation. Our empirical data has been compiled from 185 respondents, categorizing into three main groups: governmental administration, research institutions, and protected areas in Vietnam by using a well - designed questionnaire. Then, the Analytic Hierarchy Process (AHP) theory was used to identify the weight of all criteria. Our results have shown that priority level for biodiversity conservation could be identified by three main indicators: condition, pressure, and response with the value of the weight of 26%, 41%, and 33%, respectively. Based on the three indicators, 7 criteria and 15 sub-criteria were developed to support for defining priority areas for biodiversity conservation and zoning protected areas. In addition, our study also revealed that the groups of governmental administration and protected areas put a focus on the 'Pressure' indicator while the group of Research Institutions emphasized the importance of 'Response' indicator in the evaluation process. Our results provided recommendations to apply the developed criteria for identifying priority areas for biodiversity conservation in Vietnam.

Keywords: biodiversity conservation, condition–pressure–response model, criteria, priority areas, protected areas

Procedia PDF Downloads 128
6426 Decision Tree Based Scheduling for Flexible Job Shops with Multiple Process Plans

Authors: H.-H. Doh, J.-M. Yu, Y.-J. Kwon, J.-H. Shin, H.-W. Kim, S.-H. Nam, D.-H. Lee

Abstract:

This paper suggests a decision tree based approach for flexible job shop scheduling with multiple process plans, i. e. each job can be processed through alternative operations, each of which can be processed on alternative machines. The main decision variables are: (a) selecting operation/machine pair; and (b) sequencing the jobs assigned to each machine. As an extension of the priority scheduling approach that selects the best priority rule combination after many simulation runs, this study suggests a decision tree based approach in which a decision tree is used to select a priority rule combination adequate for a specific system state and hence the burdens required for developing simulation models and carrying out simulation runs can be eliminated. The decision tree based scheduling approach consists of construction and scheduling modules. In the construction module, a decision tree is constructed using a four-stage algorithm, and in the scheduling module, a priority rule combination is selected using the decision tree. To show the performance of the decision tree based approach suggested in this study, a case study was done on a flexible job shop with reconfigurable manufacturing cells and a conventional job shop, and the results are reported by comparing it with individual priority rule combinations for the objectives of minimizing total flow time and total tardiness.

Keywords: flexible job shop scheduling, decision tree, priority rules, case study

Procedia PDF Downloads 313
6425 UEMSD Risk Identification: Case Study

Authors: K. Sekulová, M. Šimon

Abstract:

The article demonstrates on a case study how it is possible to identify MSD risk. It is based on a dissertation risk identification model of occupational diseases formation in relation to the work activity that determines what risk can endanger workers who are exposed to the specific risk factors. It is evaluated based on statistical calculations. These risk factors are main cause of upper-extremities musculoskeletal disorders.

Keywords: case study, upper-extremity musculoskeletal disorders, ergonomics, risk identification

Procedia PDF Downloads 465
6424 A Holistic Analysis of the Emergency Call: From in Situ Negotiation to Policy Frameworks and Back

Authors: Jo Angouri, Charlotte Kennedy, Shawnea Ting, David Rawlinson, Matthew Booker, Nigel Rees

Abstract:

Ambulance services need to balance the large volume of emergency (999 in the UK) calls they receive (e.g., West Midlands Ambulance Service reports per day about 4,000 999 calls; about 679,000 calls per year are received in Wales), with dispatching limited resource for on-site intervention to the most critical cases. The process by which Emergency Medical Dispatch (EMD) decisions are made is related to risk assessment and involves the caller and call-taker as well as clinical teams negotiating risk levels on a case-by-case basis. Medical Priority Dispatch System (MPDS – also referred to as Advanced Medical Priority Dispatch System AMPDS) are used in the UK by NHS Trusts (e.,g WAST) to process and prioritise 999 calls. MPDS / AMPDS provide structured protocols for call prioritisation and call management. Protocols/policy frameworks have not been examined before in the way we propose in our project. In more detail, the risk factors that play a role in the EMD negotiation between the caller and call-taker have been analysed in both medical and social science research. Research has focused on the structural, morphological and phonological aspects that could improve, and train, human-to-human interaction or automate risk detection, as well as the medical factors that need to be captured from the caller to inform the dispatch decision. There are two significant gaps in our knowledge that we address in our work: 1. the role of backstage clinical teams in translating the caller/call-taker interaction in their internal risk negotiation and, 2. the role of policy frameworks, protocols and regulations in the framing of institutional priorities and resource allocation. We take a multi method approach and combine the analysis of 999 calls with the analysis of policy documents. We draw on interaction analysis, corpus methodologies and thematic analysis. In this paper, we report on our preliminary findings and focus in particular on the risk factors we have identified and the relationship with the regulations that create the frame within which teams operate. We close the paper with implications of our study for providing evidence-based policy intervention and recommendations for further research.

Keywords: emergency (999) call, interaction analysis, discourse analysis, ambulance dispatch, medical discourse

Procedia PDF Downloads 65
6423 Risk Assessment of Oil Spill Pollution by Integration of Gnome, Aloha and Gis in Bandar Abbas Coast, Iran

Authors: Mehrnaz Farzingohar, Mehran Yasemi, Ahmad Savari

Abstract:

The oil products are imported and exported via Rajaee’s tanker terminal. Within loading and discharging in several cases the oil is released into the berths and made oil spills. The spills are distributed within short time and seriously affected Rajaee port’s environment and even extended areas. The trajectory and fate of oil spills investigated by modeling and parted by three risk levels base on the modeling results. First GNOME (General NOAA Operational Modeling Environment) applied to trajectory the liquid oil. Second, ALOHA (Areal Location Of Hazardous Atmosphere) air quality model, is integrated to predict the oil evaporation path within the air. Base on the identified zones the high risk areas are signed by colored dots which their densities calculated and clarified on a map which displayed the harm places. Wind and water circulation moved the pollution to the East of Rajaee Port that accumulated about 12 km of coastline. Approximately 20 km of north east of Qeshm Island shore is covered by the three levels of risky areas. Since the main wind direction is SSW the pollution pushed to the east and the highest risk zones formed on the crests edges hence the low risk appeared on the concavities. This assessment help the management and emergency systems to monitor the exposure places base on the priority factors and find the best approaches to protect the environment.

Keywords: oil spill, modeling, pollution, risk assessment

Procedia PDF Downloads 351
6422 Geographic Information System Applications in Prioritizing Karlahi Forest Reserve Area for Conservation

Authors: Samuel Hyellamada Jerry

Abstract:

This study focused on assessing conservation priorities within the Karlahi Forest Reserve of Fufore Local Government in Adamawa State. The main objective was to identify specific areas within the forest reserve that require immediate conservation attention. The research employed remote sensing and GIS techniques to achieve this goal. By overlaying the IDRIS Silva module results, a spatial distribution map was generated, highlighting the cumulative priority areas within and outside the forest. Among the total vegetated area of 26.38 km² in the Karlahi Forest Reserve, the analysis revealed that 16.16 km² were classified as high-priority conservation zones. Additionally, 4.59 km² and 5.63 km² were identified as medium and low-priority areas, respectively. In light of these findings, it is recommended that conservation efforts incorporate detailed land cover information and regular assessments of species diversity. Furthermore, strict adherence to national and state policies regarding forest reserves and parks is crucial for effective conservation management.

Keywords: priority, Karlahi, forest, reserve, IDRISI Silva, species diversity

Procedia PDF Downloads 117
6421 Enterprise Risk Management: A Future Outlook

Authors: Ruchi Agarwal, Jake Ansell

Abstract:

Austerity impacts on all aspects of society. Companies into the future will have to be more capable of dealing with the risks they face. Enterprise Risk Management (ERM) has widely been accepted in recent years as an approach to manage risks within businesses. ERM attempts to tackle risk holistically with gains from opportunities in a managing risk and reduction in the risk of failure. The paper reviews merits and demerits of approaches to risk management in regard to antifragility. A qualitative study has investigated current practices and the problems with ERM implementation by interviewing over 25 chief risk officers and senior management. The findings indicate the gap in ERM description, understanding, and implementation. The paper suggests risk learning and expertise knowledge supports development of effective enterprise risk management by designing systems with inherent resilience.

Keywords: risk management, interviews, antifragility, failure

Procedia PDF Downloads 519
6420 Prioritization in a Maintenance, Repair and Overhaul (MRO) System Based on Fuzzy Logic at Iran Khodro (IKCO)

Authors: Izadi Banafsheh, Sedaghat Reza

Abstract:

Maintenance, Repair, and Overhaul (MRO) of machinery are a key recent issue concerning the automotive industry. It has always been a debated question what order or priority should be adopted for the MRO of machinery. This study attempts to examine several criteria including process sensitivity, average time between machine failures, average duration of repair, availability of parts, availability of maintenance personnel and workload through a literature review and experts survey so as to determine the condition of the machine. According to the mentioned criteria, the machinery were ranked in four modes below: A) Need for inspection, B) Need for minor repair, C) Need for part replacement, and D) Need for major repair. The Fuzzy AHP was employed to determine the weighting of criteria. At the end, the obtained weights were ranked through the AHP for each criterion, three groups were specified: shaving machines, assembly and painting in four modes. The statistical population comprises the elite in the Iranian automotive industry at IKCO covering operation managers, CEOs and maintenance professionals who are highly specialized in MRO and perfectly knowledgeable in how the machinery function. The information required for this study were collected from both desk research and field review, which eventually led to construction of a questionnaire handed out to the sample respondents in order to collect information on the subject matter. The results of the AHP for weighting the criteria revealed that the availability of maintenance personnel was the top priority at coefficient of 0.206, while the process sensitivity took the last priority at coefficient of 0.066. Furthermore, the results of TOPSIS for prioritizing the IKCO machinery suggested that at the mode where there is need for inspection, the assembly machines took the top priority while paining machines took the third priority. As for the mode where there is need for minor repairs, the assembly machines took the top priority while the third priority belonged to the shaving machines. As for the mode where there is need for parts replacement, the assembly machines took the top priority while the third belonged to the paining machinery. Finally, as for the mode where there is need for major repair, the assembly machines took the top priority while the third belonged to the paining machinery.

Keywords: maintenance, repair, overhaul, MRO, prioritization of machinery, fuzzy logic, AHP, TOPSIS

Procedia PDF Downloads 258
6419 The Challenge of Characterising Drought Risk in Data Scarce Regions: The Case of the South of Angola

Authors: Natalia Limones, Javier Marzo, Marcus Wijnen, Aleix Serrat-Capdevila

Abstract:

In this research we developed a structured approach for the detection of areas under the highest levels of drought risk that is suitable for data-scarce environments. The methodology is based on recent scientific outcomes and methods and can be easily adapted to different contexts in successive exercises. The research reviews the history of drought in the south of Angola and characterizes the experienced hazard in the episode from 2012, focusing on the meteorological and the hydrological drought types. Only global open data information coming from modeling or remote sensing was used for the description of the hydroclimatological variables since there is almost no ground data in this part of the country. Also, the study intends to portray the socioeconomic vulnerabilities and the exposure to the phenomenon in the region to fully understand the risk. As a result, a map of the areas under the highest risk in the south of the country is produced, which is one of the main outputs of this work. It was also possible to confirm that the set of indicators used revealed different drought vulnerability profiles in the South of Angola and, as a result, several varieties of priority areas prone to distinctive impacts were recognized. The results demonstrated that most of the region experienced a severe multi-year meteorological drought that triggered an unprecedent exhaustion of the surface water resources, and that the majority of their socioeconomic impacts started soon after the identified onset of these processes.

Keywords: drought risk, exposure, hazard, vulnerability

Procedia PDF Downloads 163