Search results for: construction project
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 8154

Search results for: construction project

8064 Effect of Institutional Structure on Project Managers Performance in Construction Projects: A Case Study in Nigeria

Authors: Ebuka Valentine Iroha, Tsunemi Watanabe, Satoshi Tsuchiya

Abstract:

Project management practices play an important role in construction project performance and are one of project managers' essential key performance indicators. Previous studies have explored the poor performance of the construction industry, with project delays and cost overruns identified to contribute largely to numerous abandoned projects. These challenges are attributed to insufficient project management practices and a lack of utilization of project managers. The actual causes of inadequate project management practices and underutilization of project managers have been rarely discussed. This study tends to bridge the gap by identifying and assessing the actual causes of insufficient project management practices and underutilization of project managers. This study differs from past studies investigating the causes of poor performance by using institutional analysis methods to identify and analyze the factors influencing project management practices and proper utilization of project managers. Based on a comprehensive literature review, this study identified some factors embedded in the construction industry that influence the institutional environment and weaken the laws and regulations. These factors were used as the basis for semi-structured interview questions to investigate their impacts on project management practices and project managers. The data collected were coded into a four-level framework for institutional analysis. This method was used to analyze the interrelationships between the identified embedded factors, institutional laws and regulations, and construction organizations to understand how these influences result in the underutilization of project managers. The study found that the underutilization of project managers consists of two subsystems, including underutilization and lowering commitment. The first subsystem, corruption, political influence, religious and tribal discrimination, and organizational culture, were found to affect the institutional structure. These embedded factors weaken the industry’s governance mechanism, forcing project managers to prioritize corrupt practices over project demands. The ineffectiveness of the existing laws and regulations worsens the situation, supporting unfair working conditions and contributing to the underperformance of project managers. This situation leads to the development of the second subsystem, which is characterized by a lack of opportunities for career development and minimal incentives within construction organizations. The findings provide significant potential for addressing systemic challenges in the construction industry, particularly the underutilization of project managers and enhancing organizational support measures to improve project management practices and mitigate the adverse effects of corruption.

Keywords: construction industry, project management, poor performance, embedded factors, project managers underutilization

Procedia PDF Downloads 41
8063 Environmental Issues in Construction Projects in India

Authors: Gurbir Singh Khaira, Anmoldeep Singh Kang

Abstract:

Exposures to environmental pollution remain a major source of health risk throughout the world, though risks are generally higher in developing countries, where poverty, lack of investment in modern technology and weak environmental legislation combine to cause high pollution levels. This paper will tell us about the environment is threatened severely by so many problems, some of which are caused by the activities of Construction Projects. The research reveals major environmental impacts of building construction projects to include environmental pollution, resource depletion and habitat destruction causing Destruction of ecosystem, Desertification, Soil Erosion and increasing Material Wastage. Construction is considered as one of the main sources of environmental pollution in the world, the level of knowledge and awareness of project participants, especially project managers, with regards to environmental impacts of construction processes needs to be enhanced. It was found that ‘Transportation Resource’, ‘Noise Pollution’, and ‘Dust Generation with Construction Machinery’ are the greatest environmental impacts in INDIA respectively. The results of this study are useful for construction managers and other participants in construction sites to become aware of construction processes impacts on the environment.

Keywords: construction projects, environmental impacts, material waste age, awareness

Procedia PDF Downloads 383
8062 Critical Factors Affecting the Implementation of Total Quality Management in the Construction Industry in U. A. E.

Authors: Firas Mohamad Al-Sabek

Abstract:

The Purpose of the paper is to examine the most critical and important factor which will affect the implementation of Total Quality Management (TQM) in the construction industry in the United Arab Emirates. It also examines the most effected Project outcome from implementing TQM. A framework was also proposed depending on the literature studies. The method used in this paper is a quantitative study. A survey with a sample of 60 respondents was created and distributed in a construction company in Abu Dhabi, which includes 15 questions to examine the most critical factor that will affect the implementation of TQM in addition to the most effected project outcome from implementing TQM. The survey showed that management commitment is the most important factor in implementing TQM in a construction company. Also it showed that Project cost is most effected outcome from the implementation of TQM. Management commitment is very important for implementing TQM in any company. If the management loose interest in quality then everyone in the organization will do so. The success of TQM will depend mostly on the top of the pyramid. Also cost is reduced and money is saved when the project team implement TQM. While if no quality measures are present within the team, the project will suffer a commercial failure. Based on literature, more factors can be examined and added to the model. In addition, more construction companies could be surveyed in order to obtain more accurate results. Also this study could be conducted outside the United Arab Emirates for further enchantment.

Keywords: construction project, total quality management, management commitment, cost, theoretical framework

Procedia PDF Downloads 426
8061 Differentiation of Customer Types by Stereotypical Characteristics for Modular and Conventional Construction Methods

Authors: Peter Schnell, Phillip Haag

Abstract:

In the course of the structural transformation of the construction industry, the integration of industrialization and digitization has led to the development of construction methods with an increased degree of prefabrication, such as system or modular construction. Compared to conventional construction, these innovative construction methods are characterized by modified structural and procedural properties and expand the range of construction services. Faced with the supply side, it is possible to identify construction-specific customer types with different characteristics and certain preferences as far as the choice of construction method is concerned. The basis for this finding was qualitative expert interviews. By evaluating the stereotypical customer needs, a corresponding segmentation of the demand side can be made along with the basic orientation and decision behavior. This demarcation supports the target- and needs-oriented customer approach and contributes to cooperative and successful project management.

Keywords: differentiation of customer types, modular construction methods, conventional construction methods, stereotypical customer types

Procedia PDF Downloads 111
8060 Lean Implementation Analysis on the Safety Performance of Construction Projects in the Philippines

Authors: Kim Lindsay F. Restua, Jeehan Kyra A. Rivero, Joneka Myles D. Taguba

Abstract:

Lean construction is defined as an approach in construction with the purpose of reducing waste in the process without compromising the value of the project. There are numerous lean construction tools that are applied in the construction process, which maximizes the efficiency of work and satisfaction of customers while minimizing waste. However, the complexity and differences of construction projects cause a rise in challenges on achieving the lean benefits construction can give, such as improvement in safety performance. The objective of this study is to determine the relationship between lean construction tools and their effects on safety performance. The relationship between construction tools applied in construction and safety performance is identified through Logistic Regression Analysis, and Correlation Analysis was conducted thereafter. Based on the findings, it was concluded that almost 60% of the factors listed in the study, which are different tools and effects of lean construction, were determined to have a significant relationship with the level of safety in construction projects.

Keywords: correlation analysis, lean construction tools, lean construction, logistic regression analysis, risk management, safety

Procedia PDF Downloads 187
8059 Quality Management in Construction Project

Authors: Harsh Panchal, Saurabh Amrutkar

Abstract:

Quality management is an essential part of any project that has directly related to the performance of a project. Quality management is depended on multiple factors at different stages in a project, right from time management to construction logistics. A project is a mixture of various components that include iternary management, health and safety, crew productivity, and many more. From the survey conducted, we came to the conclusion that advancement in technology and indigenous approach to any project will result in maximum quality standards and better project performance. In this paper, we discuss various components of the factors above that lead to compromise the quality of a project and how it can be controlled in order to achieve maximum quality assurance using quality planning and total quality management. The paper also focuses on limitations and problems faced in each factor responsible for quality management and to tackle them using techniques and processes based on activities and identifying the sequence, approaching critical path, and duration. The project management concept that deals with the sequence of scope cost time give us an overview regarding the ongoing quality management, in a nutshell, giving us hints to regulate the current procedure for maximum achievable quality. It also deals with the problems faced by engineers that make the mundane work process slow, reducing the quality outcome drastically.

Keywords: management, performance, project, quality

Procedia PDF Downloads 168
8058 'Pacta Sunt Servanda': Which Form of Contract to Use in the Construction Industry

Authors: Ahmed Stifi, Sascha Gentes

Abstract:

The contract in its simplest definition is an agreement involving parties with a number of documents which may be as little as a marriage contract involving two parties or as big as a contract of construction and operation of a nuclear power plant involving companies and stakeholders with hundreds or even thousands of documents. All parties in the construction industry, not only the contract experts, agree that the success of a project is linked primarily to the form of contract regulating the relationship between stakeholders of the project. Therefore it is essential for the construction industry to study, analyze and improve its contracts forms continuously. However, it should be mentioned that different contract forms are developed to suit the construction evolution in term of its machinery, materials and construction process. There exist some similarities in some clauses and variations in many of these forms depending upon the type of project, the kind of clients and more importantly the laws and regulations governing the transaction in the country where the project is carried out. This paper will discuss the most important forms of construction contracts starting from national level, intended to the contract form in Germany and moving on to the international level introducing FIDIC contracts and its different forms, some newly developed contracts forms namely the integrated form of agreement, the new engineering contract and the project alliance agreement. The result of the study shows that many of the contract’s paragraphs are similar and the main difference comes in the approach of the relationship between the parties. Is it based on co-operation and mutual trust, or in some cases a load of responsibility for a particular party which increases the problems and disputes that affects the success of the project negatively. Thus we can say that the form of the contract, that plays an essential role in the approach of the project management, which is ultimately the key factor for the success of the project. So we advise to use a form of contract, which enhance the mutual trust between the project parties, contribute to support the cooperation between them, distribute responsibility and risks on an equitable basis and build on the principle “win-win". In additional to the conventional role of the contract it should integrate all parties into one team to achieve the target value of the project.

Keywords: contract, FIDIC, integrated form of agreement, new engineering contract, project alliance agreemen

Procedia PDF Downloads 375
8057 Pavement Quality Evaluation Using Intelligent Compaction Technology: Overview of Some Case Studies in Oklahoma

Authors: Sagar Ghos, Andrew E. Elaryan, Syed Ashik Ali, Musharraf Zaman, Mohammed Ashiqur Rahman

Abstract:

Achieving desired density during construction is an important indicator of pavement quality. Insufficient compaction often compromises pavement performance and service life. Intelligent compaction (IC) is an emerging technology for monitoring compaction quality during the construction of asphalt pavements. This paper aims to provide an overview of findings from four case studies in Oklahoma involving the compaction quality of asphalt pavements, namely SE 44th St project (Project 1) and EOC Turnpike project (Project 2), Highway 92 project (Project 3), and 108th Avenue project (Project 4). For this purpose, an IC technology, the intelligent compaction analyzer (ICA), developed at the University of Oklahoma, was used to evaluate compaction quality. Collected data include GPS locations, roller vibrations, roller speed, the direction of movement, and temperature of the asphalt mat. The collected data were analyzed using a widely used software, VETA. The average densities for Projects 1, 2, 3 and 4, were found as 89.8%, 91.50%, 90.7% and 87.5%, respectively. The maximum densities were found as 94.6%, 95.8%, 95.9%, and 89.7% for Projects 1, 2, 3, and 4, respectively. It was observed that the ICA estimated densities correlated well with the field core densities. The ICA results indicated that at least 90% of the asphalt mats were subjected to at least two roller passes. However, the number of passes required to achieve the desired density (94% to 97%) differed from project to project depending on the underlying layer. The results of these case studies show both opportunities and challenges in using IC for monitoring compaction quality during construction in real-time.

Keywords: asphalt pavement construction, density, intelligent compaction, intelligent compaction analyzer, intelligent compaction measure value

Procedia PDF Downloads 158
8056 Constructability Driven Engineering in Oil and Gas Projects

Authors: Srikanth Nagarajan, P. Parthasarathy, Frits Lagers

Abstract:

Lower crude oil prices increased the pressure on oil and gas projects. Being competitive becomes very important and critical for the success in any industry. Increase in size of the project multiplies the magnitude of the issue. Timely completion of projects within the budget and schedule is very important for any project to succeed. A simple idea makes a larger impact on the total cost of the plant. In this robust world, the phases of engineering right from licensing technology, feed, different phases of detail engineering, procurement and construction has been so much compressed that they overlap with each other. Hence constructability techniques have become very important. Here in this paper, the focus will be on how these techniques can be implemented and reduce cost with the help of a case study. Constructability is a process driven by the need to impact project’s construction phase resulting in improved project delivery, costs and schedule. In construction phase of one of our fast-track mega project, it was noticed that there was an opportunity to reduce significant amount of cost and schedule by implementing Constructability study processes. In this case study, the actual methodology adopted during engineering and construction and the way for doing it better by implementing Constructability techniques with collaborative engineering efforts will be explained.

Keywords: being competitive, collaborative engineering, constructability, cost reduction

Procedia PDF Downloads 422
8055 Delay Studies in Construction: Synthesis, Critical Evaluation, and the Way Forward

Authors: Abdullah Alsehaimi

Abstract:

Over decades, there have been many studies of delay in construction, and this type of study continues to be popular in construction management research. A synthesis and critical evaluation of delay studies in developing countries reveals that poor project management is cited as one of the main causes of delay. However, despite such consensus, most of the previous studies fall short in providing clear recommendations demonstrating how project management practice could be improved. Moreover, the majority of recommendations are general and not devoted to solving the difficulties associated with particular delay causes. This paper aims to demonstrate that the root cause of this state of affairs is that typical research into delay tends to be descriptive and explanatory, making it inadequate for solving persistent managerial problems in construction. It is contended that many problems in construction could be mitigated via alternative research approaches, i.e. action and constructive research. Such prescriptive research methods can assist in the development and implementation of innovative tools tackling managerial problems of construction, including that of delay. In so doing, those methods will better connect research and practice, and thus strengthen the relevance of academic construction management.

Keywords: construction delay, action research, constructive research, industrial engineering

Procedia PDF Downloads 425
8054 A Case Study on the Guidelines for Application of Project Management Methods in Infrastructure Projects

Authors: Fernanda Varella Borges, Silvio Burrattino Melhado

Abstract:

Motivated by the importance of public infrastructure projects in the civil construction chain, this research shows the study of project management methods and the infrastructure projects’ characteristics. The research aims at the objective of improving management efficiency by proposing guidelines for the application of project management methods in infrastructure projects. Through literature review and case studies, the research analyses two major infrastructure projects underway in Brazil, identifying the critical points for achieving its success. As a result, the proposed guidelines indicate that special attention should be given to the management of stakeholders, focusing on their knowledge and experience, their different interests, the efficient management of their communication, and their behavior in the day-by-day project management process.

Keywords: construction, infrastructure, project management, public projects

Procedia PDF Downloads 496
8053 Risk Prioritization in Tunneling Construction Projects

Authors: David Nantes, George Gilbert

Abstract:

There are a lot of risks that might crop up as a tunneling project develops, and it's crucial to be aware of them. Due to the unexpected nature of tunneling projects and the interconnectedness of risk occurrences, the risk assessment approach presents a significant challenge. The purpose of this study is to provide a hybrid FDEMATEL-ANP model to help prioritize risks during tunnel construction projects. The ambiguity in expert judgments and the relative severity of interdependencies across risk occurrences are both taken into consideration by this model, thanks to the Fuzzy Decision-Making Trial and Evaluation Laboratory (FDEMATEL). The Analytic Network Process (ANP) method is used to rank priorities and assess project risks. The authors provide a case study of a subway tunneling construction project to back up the validity of their methodology. The results showed that the proposed method successfully isolated key risk factors and elucidated their interplay in the case study. The proposed method has the potential to become a helpful resource for evaluating dangers associated with tunnel construction projects.

Keywords: risk, prioritization, FDEMATEL, ANP, tunneling construction projects

Procedia PDF Downloads 93
8052 Enhance Construction Visual As-Built Schedule Management Using BIM Technology

Authors: Shu-Hui Jan, Hui-Ping Tserng, Shih-Ping Ho

Abstract:

Construction project control attempts to obtain real-time as-built schedule information and to eliminate project delays by effectively enhancing dynamic schedule control and management. Suitable platforms for enhancing an as-built schedule visually during the construction phase are necessary and important for general contractors. As the application of building information modeling (BIM) becomes more common, schedule management integrated with the BIM approach becomes essential to enhance visual construction management implementation for the general contractor during the construction phase. To enhance visualization of the updated as-built schedule for the general contractor, this study presents a novel system called the Construction BIM-assisted Schedule Management (ConBIM-SM) system for general contractors in Taiwan. The primary purpose of this study is to develop a web ConBIM-SM system for the general contractor to enhance visual as-built schedule information sharing and efficiency in tracking construction as-built schedule. Finally, the ConBIM-SM system is applied to a case study of a commerce building project in Taiwan to verify its efficacy and demonstrate its effectiveness during the construction phase. The advantages of the ConBIM-SM system lie in improved project control and management efficiency for general contractors, and in providing BIM-assisted as-built schedule tracking and management, to access the most current as-built schedule information through a web browser. The case study results show that the ConBIM-SM system is an effective visual as-built schedule management platform integrated with the BIM approach for general contractors in a construction project.

Keywords: building information modeling (BIM), construction schedule management, as-built schedule management, BIM schedule updating mechanism

Procedia PDF Downloads 375
8051 Implementation of Social Network Analysis to Analyze the Dependency between Construction Bid Packages

Authors: Kawalpreet Kaur, Panagiotis Mitropoulos

Abstract:

The division of the project scope into work packages is the most important step in the preconstruction phase of construction projects. The work division determines the scope and complexity of each bid package, resulting in dependencies between project participants performing these work packages. The coordination between project participants is necessary because of these dependencies. Excessive dependencies between the bid packages create coordination difficulties, leading to delays, added costs, and contractual friction among project participants. However, the literature on construction provides limited knowledge regarding work structuring approaches, issues, and challenges. Manufacturing industry literature provides a systematic approach to defining the project scope into work packages, and the implementation of social network analysis (SNA) in manufacturing is an effective approach to defining and analyzing the divided scope of work at the dependencies level. This paper presents a case study of implementing a similar approach using SNA in construction bid packages. The study uses SNA to analyze the scope of bid packages and determine the dependency between scope elements. The method successfully identifies the bid package with the maximum interaction with other trade contractors and the scope elements that are crucial for project performance. The analysis provided graphical and quantitative information on bid package dependencies. The study can be helpful in performing an analysis to determine the dependencies between bid packages and their scope elements and how these scope elements are critical for project performance. The study illustrates the potential use of SNA as a systematic approach to analyzing bid package dependencies in construction projects, which can guide the division of crucial scope elements to minimize negative impacts on project performance.

Keywords: work structuring, bid packages, work breakdown, project participants

Procedia PDF Downloads 79
8050 Innovation in Lean Thinking to Achieve Rapid Construction

Authors: Muhamad Azani Yahya, Vikneswaran Munikanan, Mohammed Alias Yusof

Abstract:

Lean thinking holds the potential for improving the construction sector, and therefore, it is a concept that should be adopted by construction sector players and academicians in the real industry. Bridging from that, a learning process for construction sector players regarding this matter should be the agenda in gaining the knowledge in preparation for their career. Lean principles offer opportunities for reducing lead times, eliminating non-value adding activities, reducing variability, and are facilitated by methods such as pull scheduling, simplified operations and buffer reduction. Thus, the drive for rapid construction, which is a systematic approach in enhancing efficiency to deliver a project using time reduction, while lean is the continuous process of eliminating waste, meeting or exceeding all customer requirements, focusing on the entire value stream and pursuing perfection in the execution of a constructed project. The methodology presented is shown to be valid through literature, interviews and questionnaire. The results show that the majority of construction sector players unfamiliar with lean thinking and they agreed that it can improve the construction process flow. With this background knowledge established and identified, best practices and recommended action are drawn.

Keywords: construction improvement, rapid construction, time reduction, lean construction

Procedia PDF Downloads 373
8049 Overcoming the Impacts of Covid-19 Outbreak Using Value Integrated Project Delivery Model

Authors: G. Ramya

Abstract:

Value engineering is a systematic approach, widely used to optimize the design or process or product in the designing stage. It used to achieve the client's obligation by increasing the functionality and attain the targeted cost in the cost planning. Value engineering effectiveness and benefits decrease along with the progress of the project since the change in the scope of the work and design will account for more cost all along the lifecycle of the project. Integrating the value engineering with other project management activities will promote cost minimization, client satisfaction, and ensure early completion of the project in time. Previous research studies suggested that value engineering can integrate with other project delivery activities, but research studies unable to frame a model that collaborates the project management activities with the job plan of value engineering approach. I analyzed various project management activities and their synergy between each other. The project management activities and processes like a)risk analysis b)lifecycle cost analysis c)lean construction d)facility management e)Building information modelling f)Contract administration, collaborated, and project delivery model planned along with the RIBA plan of work. The key outcome of the research is a value-driven project delivery model, which will succeed in dealing with the economic impact, constraints and conflicts arise due to the COVID-19 outbreak in the Indian construction sector. Benefits associated with the structured framework is construction project delivery that ensures early contractor involvement, mutual risk sharing, and reviving the project with a cost overrun and delay back on track ,are discussed. Keywords: Value-driven project delivery model, Integration, RIBA plan of work Themes: Design Economics

Keywords: value-driven project delivery model, Integration, RIBA

Procedia PDF Downloads 121
8048 Lessons-Learned in a Post-Alliance Framework

Authors: Olubukola Olumuyiwa Tokede, Dominic D. Ahiaga-Dagbui, John Morrison

Abstract:

The project environment in construction has been widely criticised for its inability to learn from experience effectively. As each project is bespoke, learning is ephemeral, as it is often confined within its bounds and seldom assimilated with others that are being delivered in the project environment. To engender learning across construction projects, collaborative contractual arrangements, such as alliancing and partnering, have been embraced to aid the transferability of lessons across projects. These cooperative arrangements, however, tend to be costly, and hence construction organisations could revert to less expensive traditional procurement approaches after successful collaborative project delivery. This research, therefore, seeks to assess the lessons-learned in a post-alliance contractual framework. Using a case-study approach, we examine the experiences of a public sector authority who engaged a project facilitator to foster learning during the delivery of a significant piece of critical infrastructure. It was found that the facilitator enabled optimal learning outcomes in post-alliance contractual frameworks by attenuating the otherwise adversarial relationship between clients and contractors. Further research will seek to assess the effectiveness of different knowledge-brokering agencies in construction projects.

Keywords: facilitation, knowledge-brokering, learning, projects

Procedia PDF Downloads 137
8047 The Reason of Principles of Construction Engineering and Management Being Necessary for Contracting Firms and Their Projects Managers

Authors: Mamoon Mousa Atout

Abstract:

The industries of construction are in continuous growth not only in Middle East rejoin but almost all over the world. For the last fifteen years, big expansion and increase of different types of projects has been observed. Many infrastructural projects have been developed, high rise buildings, big shopping malls, power sub-stations, roads, bridges, schools, universities and developing many of new cities with full and complete facilities. The growth and enlargement of the mentioned developed projects has been accomplished through many international and local contracting organizations. Senior management of these organizations depend on their qualified and experienced team whom are aware of the implications of project management, construction management, engineering management and resource management during tendering till final completion of the project. This research aims to find out why reasons of principles of construction engineering and management are necessary for contracting firms and their managers. Principles of construction management help contracting organizations to accomplish and deliver projects without delay. This can be maintained by establishing guidelines’ details for updating the adopted system of construction management that they have through qualified and experienced project managers. The research focuses on benefits of other essential skills of projects planning, monitoring and control. Defining roles and responsibilities of contractor project managers during tendering and execution is a part of the investigated factors that will be analyzed. Other skills like optimizing and utilizing the obtainable project resources to deliver the project within time, cost and quality will be also investigated to find out how these factors are affecting the performance of contracting firms, projects managers and projects. The conclusion of the research will help senior management team and the contractors project managers about the benefits of implications and benefits construction management system and its effect upon the performance and knowledge of contract values that they have, and the optimal profit margin of the firm it.

Keywords: construction management, contracting firms, project managers, planning processes, roles and responsibilities

Procedia PDF Downloads 299
8046 An Analysis of Gender Competencies of Project Managers in National Capital Region, Philippines using the Mann-Whitney U Test

Authors: Ryan Vincent Teodoro, Adrian Paul Virador, Jan Christopher Cardenas

Abstract:

In the field of construction, managerial positions are completely dominated by males. The researchers conducted this study to see if there is a significant difference between the competencies of male and female project managers in the construction field. To see if there is a significant difference, they subdivided the competency of project managers into three components; decision making, organizing skills, and resiliency. The researchers conducted a five-point Likert scale survey of 28 project managers in the construction field, 18 of them are males and 10 are females. The researchers used Cronbach’s alpha to translate the raw scores of the respondents into competency scores. Then, the competency scores are analyzed using the Mann-Whitney U Test to see if there is a significant difference between the male’s and female’s competency scores. A p-value of 0.808 was calculated, which is greater than 0.05, which means that the null hypothesis is accepted. Therefore, the researchers concluded that there is no significant difference between the competencies of male and female project managers in terms of decision making, organizing skills, and resiliency in the construction field in the National Capital Region, Philippines.

Keywords: competency, resiliency, project managers, Mann-Whitney U test

Procedia PDF Downloads 134
8045 Review on the Role of Sustainability Techniques in Development of Green Building

Authors: Ubaid Ur Rahman, Waqar Younas, Sooraj Kumar Chhabira

Abstract:

Environmentally sustainable building construction has experienced significant growth during the past 10 years at international level. This paper shows that the conceptual framework adopts sustainability techniques in construction to develop environment friendly building called green building. Waste occurs during the different construction phases which causes the environmental problems like, deposition of waste on ground surface creates major problems such as bad smell. It also gives birth to different health diseases and produces toxic waste agent which is specifically responsible for making soil infertile. Old recycled building material is used in the construction of new building. Sustainable construction is economical and saves energy sources. Sustainable construction is the major responsibility of designer and project manager. The designer has to fulfil the client demands while keeping the design environment friendly. Project manager has to deliver and execute sustainable construction according to sustainable design. Steel is the most appropriate sustainable construction material. It is more durable and easily recyclable. Steel occupies less area and has more tensile and compressive strength than concrete, making it a better option for sustainable construction as compared to other building materials. New technology like green roof has made the environment pleasant, and has reduced the construction cost. It minimizes economic, social and environmental issues. This paper presents an overview of research related to the material use of green building and by using this research recommendation are made which can be followed in the construction industry. In this paper, we go through detailed analysis on construction material. By making suitable adjustments to project management practices it is shown that a green building improves the cost efficiency of the project, makes it environmental friendly and also meets future generation demands.

Keywords: sustainable construction, green building, recycled waste material, environment

Procedia PDF Downloads 246
8044 Engaging Local Communities on Large-Scale Construction Project

Authors: Melissa Teo

Abstract:

It is increasingly important that project managers develop greater capabilities to better manage the social, cultural, political, environmental and economic impacts on proposed construction projects. These challenges are best resolved in consultation with communities rather than in conflict with them. This is particularly important on controversial projects which are projects that have obtained government sanctioned ‘development approval’ but not ‘community approval’. While a rich body of research and intellectual frameworks exist in the fields of urban geography and planning to understand and manage community concerns during the pre-development approval stages of new projects, current theoretical frameworks guiding community engagement in project management are inadequate. A new and innovative research agenda is needed to guide thinking about the role of local communities in the construction process and is an important research gap that needs to be filled. Within this context, this research aims to assess the effectiveness of strategies adopted by project teams to engage with local communities so as to capture lessons learnt to apply to future projects. This paper reports a research methodology which uses Arnstein’s model of participation to better understand how power differentials between the project team and local communities can influence the adoption of community engagement strategies. A case study approach is utilizing interviews and documentary analysis of a large-scale controversial construction project in Queensland, Australia is presented. The findings will result in a number of recommendations to guide community engagement practices on future projects.

Keywords: community engagement, construction, case study, project management

Procedia PDF Downloads 254
8043 Uncertain Time-Cost Trade off Problems of Construction Projects Using Fuzzy Set Theory

Authors: V. S. S. Kumar, B. Vikram

Abstract:

The development of effective decision support tools that adopted in the construction industry is vital in the world we live in today, since it can lead to substantial cost reduction and efficient resource consumption. Solving the time-cost trade off problems and its related variants is at the heart of scientific research for optimizing construction planning problems. In general, the classical optimization techniques have difficulties in dealing with TCT problems. One of the main reasons of their failure is that they can easily be entrapped in local minima. This paper presents an investigation on the application of meta-heuristic techniques to two particular variants of the time-cost trade of analysis, the time-cost trade off problem (TCT), and time-cost trade off optimization problem (TCO). In first problem, the total project cost should be minimized, and in the second problem, the total project cost and total project duration should be minimized simultaneously. Finally it is expected that, the optimization models developed in this paper will contribute significantly for efficient planning and management of construction project.

Keywords: fuzzy sets, uncertainty, optimization, time cost trade off problems

Procedia PDF Downloads 357
8042 Project Production Control (PPC) Implementation for an Offshore Facilities Construction Project

Authors: Muhammad Hakim Bin Mat Tasir, Erwan Shahfizad Hasidan, Hamidah Makmor Bakry, M. Hafiz B. Izhar

Abstract:

Every key performance indicator used to monitor a project’s construction progress emphasizes trade productivity or specific commodity run-down curves. Examples include the productivity of welding by the number of joints completed per day, quantity of NDT (Non-Destructive Tests) inspection per day, etc. This perspective is based on progress and productivity; however, it does not enable a system perspective of how we produce. This paper uses a project production system perspective by which projects are a collection of production systems comprising the interconnected network of processes and operations that represent all the work activities to execute a project from start to finish. Furthermore, it also uses the 5 Levels of production system optimization as a frame. The goal of the paper is to describe the application of Project Production Control (PPC) to control and improve the performance of several production processes associated with the fabrication and assembly of a Central Processing Platform (CPP) Jacket, part of an offshore mega project. More specifically, the fabrication and assembly of buoyancy tanks as they were identified as part of the critical path and required the highest demand for capacity. In total, seven buoyancy tanks were built, with a total estimated weight of 2,200 metric tons. These huge buoyancy tanks were designed to be reversed launching and self-upending of the jacket, easily retractable, and reusable for the next project, ensuring sustainability. Results showed that an effective application of PPC not only positively impacted construction progress and productivity but also exposed sources of detrimental variability as the focus of continuous improvement practices. This approach augmented conventional project management practices, and the results had a high impact on construction scheduling, planning, and control.

Keywords: offshore, construction, project management, sustainability

Procedia PDF Downloads 60
8041 Project Time Prediction Model: A Case Study of Construction Projects in Sindh, Pakistan

Authors: Tauha Hussain Ali, Shabir Hussain Khahro, Nafees Ahmed Memon

Abstract:

Accurate prediction of project time for planning and bid preparation stage should contain realistic dates. Constructors use their experience to estimate the project duration for the new projects, which is based on intuitions. It has been a constant concern to both researchers and constructors to analyze the accurate prediction of project duration for bid preparation stage. In Pakistan, such study for time cost relationship has been lacked to predict duration performance for the construction projects. This study is an attempt to explore the time cost relationship that would conclude with a mathematical model to predict the time for the drainage rehabilitation projects in the province of Sindh, Pakistan. The data has been collected from National Engineering Services (NESPAK), Pakistan and regression analysis has been carried out for the analysis of results. Significant relationship has been found between time and cost of the construction projects in Sindh and the generated mathematical model can be used by the constructors to predict the project duration for the upcoming projects of same nature. This study also provides the professionals with a requisite knowledge to make decisions regarding project duration, which is significantly important to win the projects at the bid stage.

Keywords: BTC Model, project time, relationship of time cost, regression

Procedia PDF Downloads 382
8040 Study on Improvement the Performance of Construction Project Using Lean Principles

Authors: Sumaya Adina

Abstract:

The productivity of the construction industry has faced numerous challenges, rising costs, and scarce resources over the past forty years; therefore, one approach for improving and enhancing the framework is the use of lean techniques. Lean method outcomes from the use of a brand-form of manufacturing control in production. At a time when sustainability and efficiency are essential, lean offers a clear path to make the construction industry fit for the future. An excessive number of construction professionals and experts have efficiently optimised development initiatives using lean construction (LC) techniques to reduce waste, maximise value creation, and focus on the process that creates real added value and continuous improvement, strengthening flexibility and adaptability. The present research has been undertaken to study the improvement in the performance of construction projects using lean principles. The study work is divided into three stages. Initially, a questionnaire survey was conducted on visual management techniques to improve the performance of the construction projects. The questionnaire was distributed to civil engineers, architects, site managers, project managers, and full-time executives, with nearly 100 questionnaires shared with respondents. A total of 83 responses were received to determine the reliability of the data, and analysis was done using SPSS software. In the second stage, the impact of value stream mapping on the real-time project is determined and its performance in the form of time and cost reduction is evaluated. The case study examines a bunker-building project located in Kabul Afghanistan; the project was planned conventionally without considering the lean concepts. To reduce overall kinds of waste in the project, a plan was developed using the Vico Control software to visualize the value stream of the project. Finally, the impact of value stream mapping on the project's total cash flow is evaluated and compared by plotting the total cash flow curve using Vico software. As a result, labour costs were reduced by 33%. The duration of the project was reduced by 17% reducing the duration of the project also improved the cash flow of the entire project by 14% and increased the cash flow from negative 67% to negative 44%.

Keywords: lean construction, cost and time overrun, value stream mapping, construction effeciency

Procedia PDF Downloads 9
8039 Causes of Construction Delays in Qatar Construction Projects

Authors: Murat Gunduz, Mohanad H. A. AbuHassan

Abstract:

Construction industry mainly focuses on the superstructure, infrastructure, and oil and gas industry. The development of infrastructure projects in developing countries attracted a lot of foreign construction contractors, consultants, suppliers and diversified workforce to interfere and to be evolved in such huge investment. Reducing worksite delays in such projects require knowledge and attention. Therefore, it is important to identify the influencing delay attributes affecting construction projects. The significant project factors affecting construction delays were investigated. Data collection was carried out through an online web survey system to capture significant factors. Significant factors were determined with importance index and relevant recommendations are made. The output of the data analysis would lead the industry experts better assess the impact of construction delays on construction projects.

Keywords: construction industry, delays, importance index, frequency index

Procedia PDF Downloads 365
8038 Designing a Method to Control and Determine the Financial Performance of the Real Cost Sub-System in the Information Management System of Construction Projects

Authors: Alireza Ghaffari, Hassan Saghi

Abstract:

Project management is more complex than managing the day-to-day affairs of an organization. When the project dimensions are broad and multiple projects have to be monitored in different locations, the integrated management becomes even more complicated. One of the main concerns of project managers is the integrated project management, which is mainly rooted in the lack of accurate and accessible information from different projects in various locations. The collection of dispersed information from various parts of the network, their integration and finally the selective reporting of this information is among the goals of integrated information systems. It can help resolve the main problem, which is bridging the information gap between executives and senior managers in the organization. Therefore, the main objective of this study is to design and implement an important subset of a project management information system in order to successfully control the cost of construction projects so that its results can be used to design raw software forms and proposed relationships between different project units for the collection of necessary information.

Keywords: financial performance, cost subsystem, PMIS, project management

Procedia PDF Downloads 109
8037 Mobile Application for Construction Sites Management

Authors: A. Khelifi, M. Al Kaabi, B. Al Rawashdeh

Abstract:

The infrastructure is one of the most important pillars of the UAE, where it spends millions of dollars for investments in the construction sectors. The research done by Kuwait Finance House (KFH) Research showed clearly that the UAE investments in the construction sectors have exceeded 30 billion dollars in 2013. There are many construction companies in the UAE and each one of them is taking the responsibilities to build different infrastructures. The large scale construction projects consist of multi human activities which can affect the efficiency and productivity of the running projects. The Construction Administration System is developed to increase the efficiency and productivity at the construction sites. It runs on two platforms: web server and mobile phone and supports two main users: mobile user and institution employee. With Construction Administration Mobile Application the user can manage and control several projects, create several reports and send these reports in Portable Document Format (PDF) formats through emails, view the physical location of each project, capturing and save photos. An institution employee can use the system to view all existing workers and projects, send emails and view the progress of each project.

Keywords: construction sites, management, mobile application, Portable Document Format (PDF)

Procedia PDF Downloads 375
8036 Risk Factors Affecting Construction Project Cost in Oman

Authors: Omar Amoudi, Latifa Al Brashdi

Abstract:

Construction projects are always subject to risks and uncertainties due to its unique and dynamic nature, outdoor work environment, the wide range of skills employed, various parties involved in addition to situation of construction business environment at large. Altogether, these risks and uncertainties affect projects objectives and lead to cost overruns, delay, and poor quality. Construction projects in Oman often experience cost overruns and delay. Managing these risks and reducing their impacts on construction cost requires firstly identifying these risks, and then analyzing their severity on project cost to obtain deep understanding about these risks. This in turn will assist construction managers in managing and tacking these risks. This paper aims to investigate the main risk factors that affect construction projects cost in the Sultanate of Oman. In order to achieve the main aim, literature review was carried out to identify the main risk factors affecting construction cost. Thirty-three risk factors were identified from the literature. Then, a questionnaire survey was designed and distributed among construction professionals (i.e., client, contractor and consultant) to obtain their opinion toward the probability of occurrence for each risk factor and its possible impact on construction project cost. The collected data was analyzed based on qualitative aspects and in several ways. The severity of each risk factor was obtained by multiplying the probability occurrence of a risk factor with its impact. The findings of this study reveal that the most significant risk factors that have high severity impact on construction project cost are: Change of Oil Price, Delay of Materials and Equipment Delivery, Changes in Laws and Regulations, Improper Budgeting, and Contingencies, Lack of Skilled Workforce and Personnel, Delays Caused by Contractor, Delays of Owner Payments, Delays Caused by Client, and Funding Risk. The results can be used as a basis for construction managers to make informed decisions and produce risk response procedures and strategies to tackle these risks and reduce their negative impacts on construction project cost.

Keywords: construction cost, construction projects, Oman, risk factors, risk management

Procedia PDF Downloads 347
8035 Contributing Factors Affecting the Safety in Construction Sites of Bangladesh

Authors: Farzana Rahman, Mohammed Hossain Ezaz, Dipak Halder, Proshanta Mondal

Abstract:

Site safety is an important function regardless of project size. A key goal, which must be met for a successful project, is to finish the project with a good safety record. Construction safety is an important issue in all over the world. Today, developed countries strictly follow the safety procedure to avoid any hazard, accident or fatality. However, for a least developed country like Bangladesh, still accidents and fatalities are quite high due to lack of safety management. With the increased volume of construction work in Bangladesh, the need for proper attention in safety issues has become essential for human, economic and other consideration. Recently lots of accidents are taking place in construction sites of Bangladesh causing severe injury to death to the workers and pedestrians. There are a number of reasons/factors that these high numbers are widespread to the construction industry that are not found in most other businesses. The objective of this research work is to identify and explore the various factor that affect the construction site safety in Bangladesh. A questionnaire surveys was conducted to the reputed construction companies of Bangladesh to examine the present safety situation in construction sites. Nine factors were selected for the survey. The finding shows that 78% of organizations’ from the respondents are conscious about the safety procedure and they usually provide safety measures for the workers. Promotion of safety measures at the working site results in a better working environment, higher productivity and greater contentment among the workers.

Keywords: construction sites, fatalities, safety issues, safety situation

Procedia PDF Downloads 569