Search results for: inventory constraints
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 1896

Search results for: inventory constraints

1836 A Social Network Analysis for Formulating Construction Defect Generation Mechanisms

Authors: Hamad Aljassmi, Sangwon Han

Abstract:

Various solutions for preventing construction defects have been suggested. However, a construction company may have difficulties adopting all these suggestions due to financial and practical constraints. Based on this recognition, this paper aims to identify the most significant defect causes and formulate their defect generation mechanism in order to help a construction company to set priorities of its defect prevention strategies. For this goal, we conducted a questionnaire survey of 106 industry professionals and identified five most significant causes including: (1) organizational culture, (2) time pressure and constraints, (3) workplace quality system, (4) financial constraints upon operational expenses and (5) inadequate employee training or learning opportunities.

Keywords: defect, quality, failure, risk

Procedia PDF Downloads 603
1835 Virtual Container Yard: A Paradigm Shift in Container Inventory Management

Authors: Lalith Edirisinghe, Zhihong Jin, A.W. Wijeratne, Hansa Edirisinghe, Lakshmi Ranwala Rashika Mudunkotuwa

Abstract:

A paradigm shift in container inventory management (CIM) is a long-awaited industry need. Virtual container yard (VCY) is a concept developed in 2013 and its primary objective is to minimize shipping transport cost through implementing container exchange between carriers. Shipping lines always try to maintain lower container idle time and provide higher customer satisfaction. However, it is disappointing to note that carriers turn a blind eye to the escalating cost resulted from the present inefficient CIM mechanism. The cost of empty container management is simply transferred to the importers and exporters as freight adjustments. It also creates an environmental hazard. Therefore, it has now become a problem for the society. Therefore, a paradigm shift may be required as the present CIM system is not working for common interests of human beings as it should be.

Keywords: collaboation, inventory, shipping, virtual container yard

Procedia PDF Downloads 240
1834 CAD Tool for Parametric Design modification of Yacht Hull Surface Models

Authors: Shahroz Khan, Erkan Gunpinar, Kemal Mart

Abstract:

Recently parametric design techniques became a vital concept in the field of Computer Aided Design (CAD), which helps to provide sophisticated platform to the designer in order to automate the design process in efficient time. In these techniques, design process starts by parameterizing the important features of design models (typically the key dimensions), with the implementation of design constraints. The design constraints help to retain the overall shape of the model while modifying its parameters. However, the process of initializing an appropriate number of design parameters and constraints is the crucial part of parametric design techniques, especially for complex surface models such as yacht hull. This paper introduces a method to create complex surface models in favor of parametric design techniques, a method to define the right number of parameters and respective design constraints, and a system to implement design parameters in contract to design constraints schema. For this, in our proposed approach the design process starts by dividing the yacht hull into three sections. Each section consists of different shape lines, which form the overall shape of yacht hull. The shape lines are created using Cubic Bezier Curves, which allow larger design flexibility. Design parameters and constraints are defined on the shape lines in 3D design space to facilitate the designers for better and individual handling of parameters. Afterwards, shape modifiers are developed, which allow the modification of each parameter while satisfying the respective set of criteria and design constraints. Such as, geometric continuities should be maintained between the shape lines of the three sections, fairness of the hull surfaces should be preserved after modification and while design modification, effect of a single parameter should be negligible on other parameters. The constraints are defined individually on shape lines of each section and mutually between the shape lines of two connecting sections. In order to validate and visualize design results of our shape modifiers, a real time graphic interface is created.

Keywords: design parameter, design constraints, shape modifies, yacht hull

Procedia PDF Downloads 283
1833 Multi-Period Supply Chain Design under Uncertainty

Authors: Amir Azaron

Abstract:

In this research, a stochastic programming approach is developed for designing supply chains with uncertain parameters. Demands and selling prices of products at markets are considered as the uncertain parameters. The proposed mathematical model will be multi-period two-stage stochastic programming, which takes into account the selection of retailer sites, suppliers, production levels, inventory levels, transportation modes to be used for shipping goods, and shipping quantities among the entities of the supply chain network. The objective function is to maximize the chain’s net present value. In order to maximize the chain’s NPV, the sum of first-stage investment costs on retailers, and the expected second-stage processing, inventory-holding and transportation costs should be kept as low as possible over multiple periods. The effects of supply uncertainty where suppliers are unreliable will also be investigated on the efficiency of the supply chain.

Keywords: supply chain management, stochastic programming, multiobjective programming, inventory control

Procedia PDF Downloads 279
1832 Validity Study of The Zimbardo’s Stanford Time Perspective Inventory in Indonesia Students Context

Authors: Anggi Permana, Zahrah Nabila Putri, Anisa Dwi Arifani, Veany Aprillia

Abstract:

This research aims to evaluate the validity of Zimbardo’s Stanford Time Perspective Inventory (STPI) in Indonesian context. The model of validity used in this study is the criterion-based validity, in which the associated variables are depression and subjective well-being (SWB). BDI (Beck Depression Inventory) was used to measure depression, while PANAS (Positive Affect and Negative Affect Scale) and SWLS (Satisfaction with Life Scale) were used to measure subjective well-being. The analysis showed that STPI variables are closely related to STPI Dimension, Present Hedonistic showed pro validity to SWB, Future indicated contra validity to SWB, and Present Fatalistic revealed contra validity to depression and pro validity to SWB. The subjects of this research are from the same university.

Keywords: BDI, PANAS, STPI, subjective well-being, SWLS

Procedia PDF Downloads 223
1831 Analysis of Inventory Control, Lot Size and Reorder Point for Engro Polymers and Chemicals

Authors: Ali Akber Jaffri, Asad Naseem, Javeria Khan

Abstract:

The purpose of this study is to determine safety stock, maximum inventory level, reordering point, and reordering quantity by rearranging lot sizes for supplier and customer in MRO (maintenance repair operations) warehouse of Engro Polymers & Chemicals. To achieve the aim, physical analysis method and excel commands were carried out to elicit the customer and supplier data provided by the company. Initially, we rearranged the current lot sizes and MOUs (measure of units) in SAP software. Due to change in lot sizes we have to determine the new quantities for safety stock, maximum inventory, reordering point and reordering quantity as per company's demand. By proposed system, we saved extra cost in terms of reducing the time of receiving from vendor and in issuance to customer, ease of material handling in MRO warehouse and also reduce human efforts. The information requirements identified in this study can be utilized in calculating Economic Order Quantity.

Keywords: carrying cost, economic order quantity, fast moving, lead time, lot size, MRO, maximum inventory, ordering cost, physical inspection, reorder point

Procedia PDF Downloads 219
1830 Research on Characteristics and Inventory Planning Counter-Measure of Mature Industrial Zones in the Background of China's New Normal

Authors: Dong Chen, Han Song, Tingting Wei

Abstract:

Industrial zones have made significant contributions to the economic development of Chinese urban areas for decades. In the background of China's New Normal, numbers of mature industrial zones are stepping into a new stage of inventory development instead of increment development. The aim of this study is to discover new characteristics and problems and corresponding inventory planning guidance of mature industrial zones. A case of Yangzhou Hi-Tech Industrial Development Zone is reported in this study. Based on a historical analysis and data analysis of land-use, it is found that land-use of the zone is near saturation and signs of land updating have begun to appear. It is observed that the zone is facing problems including disorder of land development, low economic productivity and single function. Through the data of economic output, tax contribution, industrial category, industry life cycle and environmental influence, a comprehensive assessment based on two dimensions, economic benefits and industrial matchup, is made upon every parcel in the zone. According to the assessment, the zone is divided into spatial units of the update with specific planning guidance. It comes to a conclusion as four directions of inventory planning guidance in mature industrial zones: moving industries with poor economic benefit and negative environmental influence, adding urban function and new industrial function to the zone, optimizing the function of important space, and restricting the mass layout of the real estate industry to provide space for industrial upgrading.

Keywords: China's new normal, mature industrial zones, land-use, inventory planning

Procedia PDF Downloads 433
1829 Analysis of Constraints and Opportunities in Dairy Production in Botswana

Authors: Som Pal Baliyan

Abstract:

Dairy enterprise has been a major source of employment and income generation in most of the economies worldwide. Botswana government has also identified dairy as one of the agricultural sectors towards diversification of the mineral dependent economy of the country. The huge gap between local demand and supply of milk and milk products indicated that there are not only constraints but also; opportunities exist in this sub sector of agriculture. Therefore, this study was an attempt to identify constraints and opportunities in dairy production industry in Botswana. The possible ways to mitigate the constraints were also identified. The findings should assist the stakeholders especially, policy makers in the formulation of effective policies for the growth of dairy sector in the country. This quantitative study adopted a survey research design. A final survey followed by a pilot survey was conducted for data collection. The purpose of the pilot survey was to collect basic information on the nature and extent of the constraints, opportunities and ways to mitigate the constraints in dairy production. Based on the information from pilot survey, a four point Likert’s scale type questionnaire was constructed, validated and tested for its reliability. The data for the final survey were collected from purposively selected twenty five dairy farms. The descriptive statistical tools were employed to analyze data. Among the twelve constraints identified; high feed costs, feed shortage and availability, lack of technical support, lack of skilled manpower, high prevalence of pests and diseases and, lack of dairy related technologies were the six major constraints in dairy production. Grain feed production, roughage feed production, manufacturing of dairy feed, establishment of milk processing industry and, development of transportation systems were the five major opportunities among the eight opportunities identified. Increasing production of animal feed locally, increasing roughage feed production locally, provision of subsidy on animal feed, easy access to sufficient financial support, training of the farmers and, effective control of pests and diseases were identified as the six major ways to mitigate the constraints. It was recommended that the identified constraints and opportunities as well as the ways to mitigate the constraints need to be carefully considered by the stakeholders especially, policy makers during the formulation and implementation of the policies for the development of dairy sector in Botswana.

Keywords: dairy enterprise, milk production, opportunities, production constraints

Procedia PDF Downloads 373
1828 A Multi Objective Reliable Location-Inventory Capacitated Disruption Facility Problem with Penalty Cost Solve with Efficient Meta Historic Algorithms

Authors: Elham Taghizadeh, Mostafa Abedzadeh, Mostafa Setak

Abstract:

Logistics network is expected that opened facilities work continuously for a long time horizon without any failure; but in real world problems, facilities may face disruptions. This paper studies a reliable joint inventory location problem to optimize cost of facility locations, customers’ assignment, and inventory management decisions when facilities face failure risks and doesn’t work. In our model we assume when a facility is out of work, its customers may be reassigned to other operational facilities otherwise they must endure high penalty costs associated with losing service. For defining the model closer to real world problems, the model is proposed based on p-median problem and the facilities are considered to have limited capacities. We define a new binary variable (Z_is) for showing that customers are not assigned to any facilities. Our problem involve a bi-objective model; the first one minimizes the sum of facility construction costs and expected inventory holding costs, the second one function that mention for the first one is minimizes maximum expected customer costs under normal and failure scenarios. For solving this model we use NSGAII and MOSS algorithms have been applied to find the pareto- archive solution. Also Response Surface Methodology (RSM) is applied for optimizing the NSGAII Algorithm Parameters. We compare performance of two algorithms with three metrics and the results show NSGAII is more suitable for our model.

Keywords: joint inventory-location problem, facility location, NSGAII, MOSS

Procedia PDF Downloads 504
1827 A Comparative Study of GTC and PSP Algorithms for Mining Sequential Patterns Embedded in Database with Time Constraints

Authors: Safa Adi

Abstract:

This paper will consider the problem of sequential mining patterns embedded in a database by handling the time constraints as defined in the GSP algorithm (level wise algorithms). We will compare two previous approaches GTC and PSP, that resumes the general principles of GSP. Furthermore this paper will discuss PG-hybrid algorithm, that using PSP and GTC. The results show that PSP and GTC are more efficient than GSP. On the other hand, the GTC algorithm performs better than PSP. The PG-hybrid algorithm use PSP algorithm for the two first passes on the database, and GTC approach for the following scans. Experiments show that the hybrid approach is very efficient for short, frequent sequences.

Keywords: database, GTC algorithm, PSP algorithm, sequential patterns, time constraints

Procedia PDF Downloads 362
1826 Comparative Connectionism: Study of the Biological Constraints of Learning Through the Manipulation of Various Architectures in a Neural Network Model under the Biological Principle of the Correlation Between Structure and Function

Authors: Giselle Maggie-Fer Castañeda Lozano

Abstract:

The main objective of this research was to explore the role of neural network architectures in simulating behavioral phenomena as a potential explanation for selective associations, specifically related to biological constraints on learning. Biological constraints on learning refer to the limitations observed in conditioning procedures, where learning is expected to occur. The study involved simulations of five different experiments exploring various phenomena and sources of biological constraints in learning. These simulations included the interaction between response and reinforcer, stimulus and reinforcer, specificity of stimulus-reinforcer associations, species differences, neuroanatomical constraints, and learning in uncontrolled conditions. The overall results demonstrated that by manipulating neural network architectures, conditions can be created to model and explain diverse biological constraints frequently reported in comparative psychology literature as learning typicities. Additionally, the simulations offer predictive content worthy of experimental testing in the pursuit of new discoveries regarding the specificity of learning. The implications and limitations of these findings are discussed. Finally, it is suggested that this research could inaugurate a line of inquiry involving the use of neural networks to study biological factors in behavior, fostering the development of more ethical and precise research practices.

Keywords: comparative psychology, connectionism, conditioning, experimental analysis of behavior, neural networks

Procedia PDF Downloads 43
1825 Optimal MRO Process Scheduling with Rotable Inventory to Minimize Total Earliness

Authors: Murat Erkoc, Kadir Ertogral

Abstract:

Maintenance, repair and overhauling (MRO) of high cost equipment used in many industries such as transportation, military and construction are typically subject to regulations set by local governments or international agencies. Aircrafts are prime examples for this kind of equipment. Such equipment must be overhauled at certain intervals for continuing permission of use. As such, the overhaul must be completed by strict deadlines, which often times cannot be exceeded. Due to the fact that the overhaul is typically a long process, MRO companies carry so called rotable inventory for exchange of expensive modules in the overhaul process of the equipment so that the equipment continue its services with minimal interruption. The extracted module is overhauled and returned back to the inventory for future exchange, hence the name rotable inventory. However, since the rotable inventory and overhaul capacity are limited, it may be necessary to carry out some of the exchanges earlier than their deadlines in order to produce a feasible overhaul schedule. An early exchange results with a decrease in the equipment’s cycle time in between overhauls and as such, is not desired by the equipment operators. This study introduces an integer programming model for the optimal overhaul and exchange scheduling. We assume that there is certain number of rotables at hand at the beginning of the planning horizon for a single type module and there are multiple demands with known deadlines for the exchange of the modules. We consider an MRO system with identical parallel processing lines. The model minimizes total earliness by generating optimal overhaul start times for rotables on parallel processing lines and exchange timetables for orders. We develop a fast exact solution algorithm for the model. The algorithm employs full-delay scheduling approach with backward allocation and can easily be used for overhaul scheduling problems in various MRO settings with modular rotable items. The proposed procedure is demonstrated by a case study from the aerospace industry.

Keywords: rotable inventory, full-delay scheduling, maintenance, overhaul, total earliness

Procedia PDF Downloads 521
1824 Job Shop Scheduling: Classification, Constraints and Objective Functions

Authors: Majid Abdolrazzagh-Nezhad, Salwani Abdullah

Abstract:

The job-shop scheduling problem (JSSP) is an important decision facing those involved in the fields of industry, economics and management. This problem is a class of combinational optimization problem known as the NP-hard problem. JSSPs deal with a set of machines and a set of jobs with various predetermined routes through the machines, where the objective is to assemble a schedule of jobs that minimizes certain criteria such as makespan, maximum lateness, and total weighted tardiness. Over the past several decades, interest in meta-heuristic approaches to address JSSPs has increased due to the ability of these approaches to generate solutions which are better than those generated from heuristics alone. This article provides the classification, constraints and objective functions imposed on JSSPs that are available in the literature.

Keywords: job-shop scheduling, classification, constraints, objective functions

Procedia PDF Downloads 420
1823 Mediating Role of Burnout in Personality and Marital Satisfaction of Single and Dual Career Couples

Authors: Sara Subhan

Abstract:

Married couples tend to experience various bio-psycho-social issues that may eventually impact the quality of their marital relationship and mental wellbeing. This study aimed to find out the comparison between the single and dual-career couples’ personality, burnout and marital satisfaction. For that purpose Big Five Inventory, Couple Satisfaction Inventory, and Maslach Burnout Inventory-General Survey was used to measure the relationship between variables. The main study was carried out on 200 samples of single and dual-earner couples with the age range of 23-52 (mean= 34.58; standard deviation= 6.51) by using a purposive sampling strategy. The results showed that burnout tendencies like exhaustion, cynicism and professional efficacy are playing a mediation role between the personality and marital satisfaction of both single and dual career couples. Also, the results revealed that dual-career couples are more likely to have marital satisfaction as compared to single career couples. The results were further discussed in the light of its implications in its cultural context and counseling areas.

Keywords: dual career couples, marital satisfaction, burnout tendencies, personality

Procedia PDF Downloads 144
1822 Application and Verification of Regression Model to Landslide Susceptibility Mapping

Authors: Masood Beheshtirad

Abstract:

Identification of regions having potential for landslide occurrence is one of the basic measures in natural resources management. Different landslide hazard mapping models are proposed based on the environmental condition and goals. In this research landslide hazard map using multiple regression model were provided and applicability of this model is investigated in Baghdasht watershed. Dependent variable is landslide inventory map and independent variables consist of information layers as Geology, slope, aspect, distance from river, distance from road, fault and land use. For doing this, existing landslides have been identified and an inventory map made. The landslide hazard map is based on the multiple regression provided. The level of similarity potential hazard classes and figures of this model were compared with the landslide inventory map in the SPSS environments. Results of research showed that there is a significant correlation between the potential hazard classes and figures with area of the landslides. The multiple regression model is suitable for application in the Baghdasht Watershed.

Keywords: landslide, mapping, multiple model, regression

Procedia PDF Downloads 306
1821 Inventory Policy with Continuous Price Reduction in Solar Photovoltaic Supply Chain

Authors: Xiangrong Liu, Chuanhui Xiong

Abstract:

With the concern of large pollution emissions from coal-fired power plants and new commitment to green energy, global solar power industry was emerging recently. Due to the advanced technology, the price of solar photovoltaic(PV) module was reduced at a fast rate, which arose an interesting but challenge question to solar supply chain. This research is modeling the inventory strategies for a PV supply chain with a PV manufacturer, an assembler and an end customer. Through characterizing the manufacturer's and PV assembler's optimal decision in decentralized and centralized situation, this study shed light on how to improve supply chain performance through parameters setting in the contract design. The results suggest the assembler to lower the optimal stock level gradually each period before price reduction and set up a newsvendor base-stock policy in all periods after price reduction. As to the PV module manufacturer, a non-stationary produce-up-to policy is optimal.

Keywords: photovoltaic, supply chain, inventory policy, base-stock policy

Procedia PDF Downloads 327
1820 Supply Chain Optimisation through Geographical Network Modeling

Authors: Cyrillus Prabandana

Abstract:

Supply chain optimisation requires multiple factors as consideration or constraints. These factors are including but not limited to demand forecasting, raw material fulfilment, production capacity, inventory level, facilities locations, transportation means, and manpower availability. By knowing all manageable factors involved and assuming the uncertainty with pre-defined percentage factors, an integrated supply chain model could be developed to manage various business scenarios. This paper analyse the utilisation of geographical point of view to develop an integrated supply chain network model to optimise the distribution of finished product appropriately according to forecasted demand and available supply. The supply chain optimisation model shows that small change in one supply chain constraint is possible to largely impact other constraints, and the new information from the model should be able to support the decision making process. The model was focused on three areas, i.e. raw material fulfilment, production capacity and finished products transportation. To validate the model suitability, it was implemented in a project aimed to optimise the concrete supply chain in a mining location. The high level of operations complexity and involvement of multiple stakeholders in the concrete supply chain is believed to be sufficient to give the illustration of the larger scope. The implementation of this geographical supply chain network modeling resulted an optimised concrete supply chain from raw material fulfilment until finished products distribution to each customer, which indicated by lower percentage of missed concrete order fulfilment to customer.

Keywords: decision making, geographical supply chain modeling, supply chain optimisation, supply chain

Procedia PDF Downloads 330
1819 Fibromyalgia and Personality: A Review of the Different Personality Types Identified

Authors: Lize Tibiriçá, Ronnie Lee, Samantha Behbahani

Abstract:

Fibromyalgia (FM) is a musculoskeletal disorder affecting men and women of different ages and cultures. The cause of this disorder is unknown; however, studies suggest an etiology that involves biological and psychosocial factors. Few studies have shown that a personality type such as neuroticism is associated with chronic pain conditions. Past research has explored whether patients with FM present with a specific personality trait. However, studies have used different methods (i.e. Minnesota Multiphasic Personality Inventory (MMPI), Sociotropy and Autonomy Scale (SAS) and Dysfunctional Attitude Scale (DAS), Tridimensional Personality Questionnaire or Temperament and Character Inventory (TCI), Karolinska scale of personality, Big Five Inventory or NEO Personality Inventory) to explore the connection between FM and a personality type. They have identified personality types that present similar characteristics but vary in the name (i.e. high harm avoidance and low novelty seeking, psychasthenia/muscular tension/somatic anxiety, neuroticism). Although Zuckerman-Kuhlman Personality Questionnaire and the Big Five Inventory differ in terms of content and structure, both of them identify neuroticism as the personality type of FM patients, and the former also identifies these patients as having a low sociability personality trait. Previous research also shows a trend of sociotropic personality style with FM patients that also suffer from Major Depressive Disorder. Participants in these studies were, for the most part, adult female and researchers have recognized that as a limitation and whether their findings can be generalized to men and younger patients with FM. Furthermore, most studies reviewed were conducted in Europe (i.e. Spain) and had a cross-sectional design. Future research should replicate past studies in different countries and consider conducting a longitudinal study. Although it is suspected that FM course is modulated by FM patients’ personality, it is not known whether individuals with similar personalities will develop FM. This review sought to explain the differences and similarities between the personality types identified. Limitations in the studies reviewed were addressed, and considerations for future research and treatment were discussed.

Keywords: chronic pain, fibromyalgia, neuroticism, personality type

Procedia PDF Downloads 302
1818 Testing Psychopathy as a Unified Theory of Crime and the Psychometric properties of the Youth Psychopathic Traits Inventory - Short Version among South African Youth

Authors: Leon Holtzhausen, Emma Campbell

Abstract:

This study aimed to explore the psychometric properties of the Youth Psychopathic Traits Inventory- short version (YPI-S) and the applicability of Psychopathy as a Unified Theory of Crime among 213 young adults in South Africa. The deviant behaviour variety scale and the YPI-S were used in this study. Results from factor analysis and reliability measures indicated the YPI-S seemed to have good psychometric properties when applied to the South African sample, however applicability of the behavioural dimension was a challenge. The results related to the association between deviant behaviours and psychopathic traits suggested that Psychopathy as a Unified Theory of Crime could be applied in the South African context. It is however important to note that future research should explore how the relevant scales could be culturally and contextually adapted for better psychometric outcomes.

Keywords: testing psychopathy, adverse childhood experiences, youth psychopathic traits inventory, young adults

Procedia PDF Downloads 49
1817 Verifying Environmental Performance through Inventory and Assessment: Case Study of the Los Alamos National Laboratory Waste Compliance and Tracking System

Authors: Oral S. Saulters, Shanon D. Goldberg, Wendy A. Staples, Ellena I. Martinez, Lorie M. Sanchez, Diego E. Archuleta, Deborah L. Williams, Scot D. Johnson

Abstract:

To address an important set of unverified field conditions, the Los Alamos National Laboratory Waste Compliance and Tracking System (WCATS) Wall-to-Wall Team performed an unprecedented and advanced inventory. This reconciliation involved confirmation analysis for approximately 5850 hazardous, low-level, mixed low-level, and transuranic waste containers located in more than 200 staging and storage areas across 33 technical areas. The interdisciplinary team scoped, planned, and developed the multidimensional assessments. Through coordination with cross-functional site hosts, they were able to verify and validate data while resolving discrepancies identified in WCATS. The results were extraordinary with an updated inventory, tailored outreach, more cohesive communications, and timely closed-loop feedback.

Keywords: circular economy, environmental performance data, social-ecological-technological systems, waste management

Procedia PDF Downloads 107
1816 Quality-Of-Service-Aware Green Bandwidth Allocation in Ethernet Passive Optical Network

Authors: Tzu-Yang Lin, Chuan-Ching Sue

Abstract:

Sleep mechanisms are commonly used to ensure the energy efficiency of each optical network unit (ONU) that concerns a single class delay constraint in the Ethernet Passive Optical Network (EPON). How long the ONUs can sleep without violating the delay constraint has become a research problem. Particularly, we can derive an analytical model to determine the optimal sleep time of ONUs in every cycle without violating the maximum class delay constraint. The bandwidth allocation considering such optimal sleep time is called Green Bandwidth Allocation (GBA). Although the GBA mechanism guarantees that the different class delay constraints do not violate the maximum class delay constraint, packets with a more relaxed delay constraint will be treated as those with the most stringent delay constraint and may be sent early. This means that the ONU will waste energy in active mode to send packets in advance which did not need to be sent at the current time. Accordingly, we proposed a QoS-aware GBA using a novel intra-ONU scheduling to control the packets to be sent according to their respective delay constraints, thereby enhancing energy efficiency without deteriorating delay performance. If packets are not explicitly classified but with different packet delay constraints, we can modify the intra-ONU scheduling to classify packets according to their packet delay constraints rather than their classes. Moreover, we propose the switchable ONU architecture in which the ONU can switch the architecture according to the sleep time length, thus improving energy efficiency in the QoS-aware GBA. The simulation results show that the QoS-aware GBA ensures that packets in different classes or with different delay constraints do not violate their respective delay constraints and consume less power than the original GBA.

Keywords: Passive Optical Networks, PONs, Optical Network Unit, ONU, energy efficiency, delay constraint

Procedia PDF Downloads 263
1815 Lexicographic Rules on the Use of Technologies for Realization of the National Signs-Terms Inventory of Cultural Heritage Field in Libras

Authors: Gláucio de Castro Júnior, Daniela Prometi, Patrícia Tuxi

Abstract:

The project 'Inventory Signs-terms of the cultural heritage field in Libras' provides for the establishment of an inventory of signs, terms relating to the field of cultural heritage in Libras, from the results of research in progress as the pilot project' Accessibility Communication, Translation and Interpretation to the Application Portal Libras Heritage 'and the Pilot Project' registration-signal terms for the preparation of bilingual lexicon Libras / Portuguese terms available in the Portal Heritage. The project's goal is to spread the lexicographical rules on the use of technologies in video graphic records of sign language and foster the training of undergraduate students and graduate to the registration of the linguistic diversity of Libras through social and communicative interaction with the community deaf and enable access to Deaf information relating to the field of cultural heritage in Libras. As a result, we expect the spread of the inventory of cultural heritage-signs in terms Libras in application usage 'Portal Heritage'. To achieve the proposed objectives are accomplished technical consulting and continuous training for the production of academic material through theoretical and practical meetings, taught by experts Libras LIP / UNB in partnership with some institutions. The Inventory project signals-Terms under Heritage in Libras field initially took place in Rio de Janeiro in order to allow its development in the Midwest region, due to technical, elected some cities in Brazil, including Manaus in Amazon Macapa in Amapa, Salvador Bahia, Goiás and Goiânia in Florianopolis in Santa Catarina. At the end of all this process, the assessment by preparing a technical report presenting all the advances and points achieved in the project looking for social improvement, economic, environmental and language in the use of technology will be conducted.

Keywords: signs-terms, equity-cultural accessibility, technology, sign language

Procedia PDF Downloads 398
1814 The Phonemic Inventory of Tenyidie Affricates: An Acoustic Study

Authors: NeisaKuonuo Tungoe

Abstract:

Tenyidie, also known as Angami, is spoken by the Angami tribe of Nagaland, North-East India, bordering Myanmar (Burma). It belongs to the Tibeto-Burman language group, falling under the Kuki-Chin-Naga sub-family. Tenyidie studies have seen random attempts at explaining the phonemic inventory of Tenyidie. Different scholars have variously emphasized the grammar or the history of Tenyidie. Many of these claims have been stimulating, but they were often based on a small amount of merely suggestive data or on auditory perception only. The principal objective of this paper is to analyse the affricate segments of Tenyidie as an acoustic study. There are seven categories to the inventory of Tenyidie; Plosives, Nasals, Affricates, Laterals, Rhotics, Fricatives, Semi vowels and Vowels. In all, there are sixty phonemes in the inventory. As mentioned above, the only prominent readings on Tenyidie or affricates in particular are only reflected through auditory perception. As noted above, this study aims to lay out the affricate segments based only on acoustic conclusions. There are seven affricates found in Tenyidie. They are: 1) Voiceless Labiodental Affricate - / pf /, 2) Voiceless Aspirated Labiodental Affricate- / pfh /, 3) Voiceless Alveolar Affricate - / ts /, 4) Voiceless Aspirated Alveolar Affricate - / tsh /, 5) Voiced Alveolar Affricate - / dz /, 6) Voiceless Post-Alveolar Affricate / tʃ / and 7) Voiced Post- Alveolar Affricate- / dʒ /. Since the study is based on acoustic features of affricates, five informants were asked to record their voice with Tenyidie phonemes and English phonemes. Throughout the study of the recorded data, PRAAT, a scientific software program that has made itself indispensible for the analyses of speech in phonetics, have been used as the main software. This data was then used as a comparative study between Tenyidie and English affricates. Comparisons have also been drawn between this study and the work of another author who has stated that there are only six affricates in Tenyidie. The study has been quite detailed regarding the specifics of the data. Detailed accounts of the duration and acoustic cues have been noted. The data will be presented in the form of spectrograms. Since there aren’t any other acoustic related data done on Tenyidie, this study will be the first in the long line of acoustic researches on Tenyidie.

Keywords: tenyidie, affricates, praat, phonemic inventory

Procedia PDF Downloads 389
1813 South Atlantic Architects Validation of the Construction Decision Making Inventory

Authors: Tulio Sulbaran, Sandeep Langar

Abstract:

Architects are an integral part of the construction industry and are continuously incorporating decisions that influence projects during their life cycle. These decisions aim at selecting best alternative from the ones available. Unfortunately, this decision making process is mainly unexplored in the construction industry. No instrument to measure construction decision, based on knowledgebase of decision-makers, has existed. Additionally, limited literature is available on the topic. Recently, an instrument to gain an understanding of the construction decision-making process was developed by Dr. Tulio Sulbaran from the University of Texas, San Antonio. The instrument’s name is 'Construction Decision Making Inventory (CDMI)'. The CDMI is an innovative idea to measure the 'What? When? How? Moreover, Who?' of the construction decision-making process. As an innovative idea, its statistical validity (accuracy of the assessment) is yet to be assessed. Thus, the purpose of this paper is to describe the results of a case study with architects in the south-east of the United States aimed to determine the CDMI validity. The results of the case study are important because they assess the validity of the tool. Furthermore, as the architects evaluated each question within the measurements, this study is also guiding the enhancement of the CDMI.

Keywords: decision, support, inventory, architect

Procedia PDF Downloads 304
1812 Nurse Schedule Problem in Mubarak Al Kabeer Hospital

Authors: Khaled Al-Mansour, Nawaf Esmael, Abdulaziz Al-Zaid, Mohammed Al Ateeqi, Ali Al-Yousfi, Sayed Al-Zalzalah

Abstract:

In this project we will create the new schedule of nurse according to the preference of them. We did our project in Mubarak Al Kabeer Hospital (in Kuwait). The project aims to optimize the schedule of nurses in Mubarak Al Kabeer Hospital. The schedule of the nurses was studied and understood well to do any modification for their schedule to make the nurses feel as much comfort as they are. First constraints were found to know what things we can change and what things we can’t, the hard constraints are the hospital and ministry policies where we can’t change anything about, and the soft constraints are things that make nurses more comfortable. Data were collected and nurses were interviewed to know what is more better for them. All these constraints and date have been formulated to mathematical equations. This report will first contain an introduction to the topic which includes details of the problem definition. It will also contain information regarding the optimization of a nurse schedule and its contents and importance; furthermore, the report will contain information about the data needed to solve the problem and how it was collected. The problem requires formulation and that is also to be shown. The methodology will be explained which will state what has already been done. We used the lingo software to find the best schedule for the nurse. The schedule has been made according to what the nurses prefer, and also took consideration of the hospital policy when we make the schedule.

Keywords: nurse schedule problem, Kuwait, hospital policy, optimization of schedules

Procedia PDF Downloads 252
1811 Soft Computing Employment to Optimize Safety Stock Levels in Supply Chain Dairy Product under Supply and Demand Uncertainty

Authors: Riyadh Jamegh, Alla Eldin Kassam, Sawsan Sabih

Abstract:

In order to overcome uncertainty conditions and inability to meet customers' requests due to these conditions, organizations tend to reserve a certain safety stock level (SSL). This level must be chosen carefully in order to avoid the increase in holding cost due to excess in SSL or shortage cost due to too low SSL. This paper used soft computing fuzzy logic to identify optimal SSL; this fuzzy model uses the dynamic concept to cope with high complexity environment status. The proposed model can deal with three input variables, i.e., demand stability level, raw material availability level, and on hand inventory level by using dynamic fuzzy logic to obtain the best SSL as an output. In this model, demand stability, raw material, and on hand inventory levels are described linguistically and then treated by inference rules of the fuzzy model to extract the best level of safety stock. The aim of this research is to provide dynamic approach which is used to identify safety stock level, and it can be implanted in different industries. Numerical case study in the dairy industry with Yogurt 200 gm cup product is explained to approve the validity of the proposed model. The obtained results are compared with the current level of safety stock which is calculated by using the traditional approach. The importance of the proposed model has been demonstrated by the significant reduction in safety stock level.

Keywords: inventory optimization, soft computing, safety stock optimization, dairy industries inventory optimization

Procedia PDF Downloads 105
1810 The Association between Masculinity and Anxiety in Canadian Men

Authors: Nikk Leavitt, Peter Kellett, Cheryl Currie, Richard Larouche

Abstract:

Background: Masculinity has been associated with poor mental health outcomes in adult men and is colloquially referred to as toxic. Masculinity is traditionally measured using the Male Role Norms Inventory, which examines behaviors that may be common in men but that are themselves associated with poor mental health regardless of gender (e.g., aggressiveness). The purpose of this study was to examine if masculinity is associated with generalized anxiety among men using this inventory vs. a man’s personal definition of it. Method: An online survey collected data from 1,200 men aged 18-65 across Canada in July 2022. Masculinity was measured using: 1) the Male Role Norms Inventory Short Form and 2) by asking men to self-define what being masculine means. Men were then asked to rate the extent they perceived themselves to be masculine on a scale of 1 to 10 based on their definition of the construct. Generalized anxiety disorder was measured using the GAD-7. Multiple linear regression was used to examine associations between each masculinity score and anxiety score, adjusting for confounders. Results: The masculinity score measured using the inventory was positively associated with increased anxiety scores among men (β = 0.02, p < 0.01). Masculinity subscales most strongly correlated with higher anxiety were restrictive emotionality (β = 0.29, p < 0.01) and dominance (β = 0.30, p < 0.01). When traditional masculinity was replaced by a man’s self-rated masculinity score in the model, the reverse association was found, with increasing masculinity resulting in a significantly reduced anxiety score (β = -0.13, p = 0.04). Discussion: These findings highlight the need to revisit the ways in which masculinity is defined and operationalized in research to better understand its impacts on men’s mental health. The findings also highlight the importance of allowing participants to self-define gender-based constructs, given they are fluid and socially constructed.

Keywords: masculinity, generalized anxiety disorder, race, intersectionality

Procedia PDF Downloads 48
1809 Pareto Optimal Material Allocation Mechanism

Authors: Peter Egri, Tamas Kis

Abstract:

Scheduling problems have been studied by the algorithmic mechanism design research from the beginning. This paper is focusing on a practically important, but theoretically rather neglected field: the project scheduling problem where the jobs connected by precedence constraints compete for various nonrenewable resources, such as materials. Although the centralized problem can be solved in polynomial-time by applying the algorithm of Carlier and Rinnooy Kan from the Eighties, obtaining materials in a decentralized environment is usually far from optimal. It can be observed in practical production scheduling situations that project managers tend to cache the required materials as soon as possible in order to avoid later delays due to material shortages. This greedy practice usually leads both to excess stocks for some projects and materials, and simultaneously, to shortages for others. The aim of this study is to develop a model for the material allocation problem of a production plant, where a central decision maker—the inventory—should assign the resources arriving at different points in time to the jobs. Since the actual due dates are not known by the inventory, the mechanism design approach is applied with the projects as the self-interested agents. The goal of the mechanism is to elicit the required information and allocate the available materials such that it minimizes the maximal tardiness among the projects. It is assumed that except the due dates, the inventory is familiar with every other parameters of the problem. A further requirement is that due to practical considerations monetary transfer is not allowed. Therefore a mechanism without money is sought which excludes some widely applied solutions such as the Vickrey–Clarke–Groves scheme. In this work, a type of Serial Dictatorship Mechanism (SDM) is presented for the studied problem, including a polynomial-time algorithm for computing the material allocation. The resulted mechanism is both truthful and Pareto optimal. Thus the randomization over the possible priority orderings of the projects results in a universally truthful and Pareto optimal randomized mechanism. However, it is shown that in contrast to problems like the many-to-many matching market, not every Pareto optimal solution can be generated with an SDM. In addition, no performance guarantee can be given compared to the optimal solution, therefore this approximation characteristic is investigated with experimental study. All in all, the current work studies a practically relevant scheduling problem and presents a novel truthful material allocation mechanism which eliminates the potential benefit of the greedy behavior that negatively influences the outcome. The resulted allocation is also shown to be Pareto optimal, which is the most widely used criteria describing a necessary condition for a reasonable solution.

Keywords: material allocation, mechanism without money, polynomial-time mechanism, project scheduling

Procedia PDF Downloads 310
1808 Applying (1, T) Ordering Policy in a Multi-Vendor-Single-Buyer Inventory System with Lost Sales and Poisson Demand

Authors: Adel Nikfarjam, Hamed Tayebi, Sadoullah Ebrahimnejad

Abstract:

This paper considers a two-echelon inventory system with a number of warehouses and a single retailer. The retailer replenishes its required items from warehouses, and assembles them into a single final product. We assume that each warehouse supplies only one kind of the raw material for the retailer. The demand process of the final product is assumed to be Poissson, and unsatisfied demand of the final product will be lost. The retailer applies one-for-one-period ordering policy which is also known as (1, T) ordering policy. In this policy the retailer orders to each warehouse a fixed quantity of each item at fixed time intervals, which the fixed quantity is equal to the utilization of the item in the final product. Since, this policy eliminates all demand uncertainties at the upstream echelon, the standard lot sizing model can be applied at all warehouses. In this paper, we calculate the total cost function of the inventory system. Then, based on this function, we present a procedure to obtain the optimal time interval between two consecutive order placements from retailer to the warehouses, and the optimal order quantities of warehouses (assuming that there are positive ordering costs at warehouses). Finally, we present some numerical examples, and conduct numerical sensitivity analysis for cost parameters.

Keywords: two-echelon supply chain, multi-vendor-single-buyer inventory system, lost sales, Poisson demand, one-for-one-period policy, lot sizing model

Procedia PDF Downloads 287
1807 An Optimization Modelling to Evaluate Flights Scheduling at Tourist Airports

Authors: Dimitrios J. Dimitriou

Abstract:

Airport’s serving a tourist destination are an essential counterpart of the tourist demand supply chain, and their productivity is related to the region’s attractiveness and is enhanced by the air transport business. In this paper, the evaluation framework of the scheduled flights between two tourist airports is taken into consideration. By adopting a systemic approach, the arrivals from an airport that its connectivity heavily depended on the departures of another major airport are reviewed. The methodology framework, based on inventory control theory and the numerical example, promotes the use of the modelling formulation. The results would be essential for comparison and exercising to other similar cases.

Keywords: airport connectivity, inventory control, optimization, optimum allocation

Procedia PDF Downloads 315