1725 Stochastic Approach for Technical-Economic Viability Analysis of Electricity Generation Projects with Natural Gas Pressure Reduction Turbines

Authors: Roberto M. G. Velásquez, Jonas R. Gazoli, Nelson Ponce Jr, Valério L. Borges, Alessandro Sete, Fernanda M. C. Tomé, Julian D. Hunt, Heitor C. Lira, Cristiano L. de Souza, Fabio T. Bindemann, Wilmar Wounnsoscky

Abstract:

Nowadays, society is working toward reducing energy losses and greenhouse gas emissions, as well as seeking clean energy sources, as a result of the constant increase in energy demand and emissions. Energy loss occurs in the gas pressure reduction stations at the delivery points in natural gas distribution systems (city gates). Installing pressure reduction turbines (PRT) parallel to the static reduction valves at the city gates enhances the energy efficiency of the system by recovering the enthalpy of the pressurized natural gas, obtaining in the pressure-lowering process shaft work and generating electrical power. Currently, the Brazilian natural gas transportation network has 9,409 km in extension, while the system has 16 national and 3 international natural gas processing plants, including more than 143 delivery points to final consumers. Thus, the potential of installing PRT in Brazil is 66 MW of power, which could yearly avoid the emission of 235,800 tons of CO2 and generate 333 GWh/year of electricity. On the other hand, an economic viability analysis of these energy efficiency projects is commonly carried out based on estimates of the project's cash flow obtained from several variables forecast. Usually, the cash flow analysis is performed using representative values of these variables, obtaining a deterministic set of financial indicators associated with the project. However, in most cases, these variables cannot be predicted with sufficient accuracy, resulting in the need to consider, to a greater or lesser degree, the risk associated with the calculated financial return. This paper presents an approach applied to the technical-economic viability analysis of PRTs projects that explicitly considers the uncertainties associated with the input parameters for the financial model, such as gas pressure at the delivery point, amount of energy generated by TRP, the future price of energy, among others, using sensitivity analysis techniques, scenario analysis, and Monte Carlo methods. In the latter case, estimates of several financial risk indicators, as well as their empirical probability distributions, can be obtained. This is a methodology for the financial risk analysis of PRT projects. The results of this paper allow a more accurate assessment of the potential PRT project's financial feasibility in Brazil. This methodology will be tested at the Cuiabá thermoelectric plant, located in the state of Mato Grosso, Brazil, and can be applied to study the potential in other countries.

Keywords: pressure reduction turbine, natural gas pressure drop station, energy efficiency, electricity generation, monte carlo methods

Procedia PDF Downloads 113
1724 China Pakistan Economic Corridor: An Unfolding Fiasco in World Economy

Authors: Debarpita Pande

Abstract:

On 22nd May 2013 Chinese Premier Li Keqiang on his visit to Pakistan tabled a proposal for connecting Kashgar in China’s Xinjiang Uygur Autonomous Region with the south-western Pakistani seaport of Gwadar via the China Pakistan Economic Corridor (hereinafter referred to as CPEC). The project, popularly termed as 'One Belt One Road' will encompass within it a connectivity component including a 3000-kilometre road, railways and oil pipeline from Kashgar to Gwadar port along with an international airport and a deep sea port. Superficially, this may look like a 'game changer' for Pakistan and other countries of South Asia but this article by doctrinal method of research will unearth some serious flaws in it, which may change the entire economic system of this region heavily affecting the socio-economic conditions of South Asia, further complicating the complete geopolitical situation of the region disturbing the world economic stability. The paper besets with a logical analyzation of the socio-economic issues arising out of this project with an emphasis on its impact on the Pakistani and Indian economy due to Chinese dominance, serious tension in international relations, security issues, arms race, political and provincial concerns. The research paper further aims to study the impact of huge burden of loan given by China towards this project where Pakistan already suffers from persistent debts in the face of declining foreign currency reserves along with that the sovereignty of Pakistan will also be at stake as the entire economy of the country will be held hostage by China. The author compares this situation with the fallout from projects in Sri Lanka, Tajikistan, and several countries of Africa, all of which are now facing huge debt risks brought by Chinese investments. The entire economic balance will be muddled by the increment in Pakistan’s demand of raw materials resulting to the import of the same from China, which will lead to exorbitant price-hike and limited availability. CPEC will also create Chinese dominance over the international movement of goods that will take place between the Atlantic and the Pacific oceans and hence jeopardising the entire economic balance of South Asia along with Middle Eastern countries like Dubai. Moreover, the paper also analyses the impact of CPEC in the context of international unrest and arms race between Pakistan and India as well as India and China due to border disputes and Chinese surveillance. The paper also examines the global change in economic dynamics in international trade that CPEC will create in the light of U.S.-China relationship. The article thus reflects the grave consequences of CPEC on the international economy, security and bilateral relations, which surpasses the positive impacts of it. The author lastly suggests for more transparency and proper diplomatic planning in the execution of this mega project, which can be a cause of economic complexity in international trade in near future.

Keywords: China, CPEC, international trade, Pakistan

Procedia PDF Downloads 174
1723 Genomic Analysis of Whole Genome Sequencing of Leishmania Major

Authors: Fatimazahrae Elbakri, Azeddine Ibrahimi, Meryem Lemrani, Dris Belghyti

Abstract:

Leishmaniasis represents a major public health problem because of the number of cases recorded each year and the wide distribution of the disease. It is a parasitic disease of flagellated protozoa transmitted by the bite of certain species of sandfly, causing a spectrum of clinical pathology in humans ranging from disfiguring skin lesions to fatal visceral leishmaniasis. Cutaneous leishmaniasis due to Leishmania major is a polymorphic disease; in fact, the infection can be asymptomatic, localized, or disseminated. The objective of this work is to determine the genomic diversity that contributes to clinical variability by trying to identify the variation in chromosome number and to extract SNPs and SNPs and InDels; it is based on four sequences (WGS) of Leishmania major available on NCBI in Fastq form, from three countries: Tunisia, Algeria, and Israel, the analysis is set up from a pipeline to facilitate the discovery of genetic diversity, in particular SNP and chromosomal somy.

Keywords: Leshmania major, cutaneous Leishmania, NGS, genomic, somy, variant calling

Procedia PDF Downloads 79
1722 Achieving Design-Stage Elemental Cost Planning Accuracy: Case Study of New Zealand

Authors: Johnson Adafin, James O. B. Rotimi, Suzanne Wilkinson, Abimbola O. Windapo

Abstract:

An aspect of client expenditure management that requires attention is the level of accuracy achievable in design-stage elemental cost planning. This has been a major concern for construction clients and practitioners in New Zealand (NZ). Pre-tender estimating inaccuracies are significantly influenced by the level of risk information available to estimators. Proper cost planning activities should ensure the production of a project’s likely construction costs (initial and final), and subsequent cost control activities should prevent unpleasant consequences of cost overruns, disputes and project abandonment. If risks were properly identified and priced at the design stage, observed variance between design-stage elemental cost plans (ECPs) and final tender sums (FTS) (initial contract sums) could be reduced. This study investigates the variations between design-stage ECPs and FTS of construction projects, with a view to identifying risk factors that are responsible for the observed variance. Data were sourced through interviews, and risk factors were identified by using thematic analysis. Access was obtained to project files from the records of study participants (consultant quantity surveyors), and document analysis was employed in complementing the responses from the interviews. Study findings revealed the discrepancies between ECPs and FTS in the region of -14% and +16%. It is opined in this study that the identified risk factors were responsible for the variability observed. The values obtained from the analysis would enable greater accuracy in the forecast of FTS by Quantity Surveyors. Further, whilst inherent risks in construction project developments are observed globally, these findings have important ramifications for construction projects by expanding existing knowledge on what is needed for reasonable budgetary performance and successful delivery of construction projects. The findings contribute significantly to the study by providing quantitative confirmation to justify the theoretical conclusions generated in the literature from around the world. This therefore adds to and consolidates existing knowledge.

Keywords: accuracy, design-stage, elemental cost plan, final tender sum

Procedia PDF Downloads 268
1721 Decision Framework for Cross-Border Railway Infrastructure Projects

Authors: Dimitrios J. Dimitriou, Maria F. Sartzetaki

Abstract:

Transport infrastructure assets are key components of the national asset portfolio. The decision to invest in a new infrastructure in transports could take from a few years to some decades. This is mainly because of the need to reserve and spent many capitals, the long payback period, the number of the stakeholders involved in decision process and –many times- the investment and business risks are high. Therefore, the decision assessment framework is an essential challenge linked with the key decision factors meet the stakeholder expectations highlighting project trade-offs, financial risks, business uncertainties and market limitations. This paper examines the decision process for new transport infrastructure projects in cross border regions, where a wide range of stakeholders with different expectation is involved. According to a consequences analysis systemic approach, the relationship of transport infrastructure development, economic system development and stakeholder expectation is analyzed. Adopting the on system of system methodological approach, the decision making framework, variables, inputs and outputs are defined, highlighting the key shareholder’s role and expectations. The application provides the methodology outputs presenting the proposed decision framework for a strategic railway project in north Greece deals with the upgrade of the existing railway corridor connecting Greece, Turkey and Bulgaria.

Keywords: decision making, system of system, cross-border, infrastructure project

Procedia PDF Downloads 314
1720 Enhancing Dispute Resolution in Construction: The Potential Contributions of Dispute Boards and the Roadblock to Vaster Adoption

Authors: Zeyad M. Abdelgawad, A. Samer Ezeldin, Waleed El Nemr

Abstract:

The Egyptian construction industry has evolved significantly over the past decade, driven by enhanced economic sectors and the need for industrial development. This complexity requires diverse and flexible alternative dispute resolution (ADR) techniques. Dispute boards (DB) are globally recognized as effective ADR methods, especially since their introduction to World Bank projects in 1995. Despite their advantages, dispute boards remain underutilized in Egypt aside from the World Bank-financed projects due to several misconceptions. The study reveals the perceptions hindering the wider adoption of dispute boards in the Egyptian construction industry through detailed literature review and interviews with the experts. The perceptions encompassed the lack of awareness and understanding of dispute boards and implementation procedures, misconceptions about the costs associated with implementing dispute boards and the impact on the bid prices, the common orientation of resolving disputes internally and avoid resorting to external parties to preserve the long-term relationship, and lack of trust in the ability of the dispute boards to positively affect the project performance. In response to these identified misconceptions, a proposed alternative draft to the FIDIC 2017 clause twenty-one “Disputes and Arbitration” is provided, offering a way for a practical application of the dispute boards within the Egyptian context.

Keywords: alternative dispute resolution, claim management system, dispute boards, Egyptian construction industry, FIDIC

Procedia PDF Downloads 21
1719 Surveillance of Super-Extended Objects: Bimodal Approach

Authors: Andrey V. Timofeev, Dmitry Egorov

Abstract:

This paper describes an effective solution to the task of a remote monitoring of super-extended objects (oil and gas pipeline, railways, national frontier). The suggested solution is based on the principle of simultaneously monitoring of seismoacoustic and optical/infrared physical fields. The principle of simultaneous monitoring of those fields is not new but in contrast to the known solutions the suggested approach allows to control super-extended objects with very limited operational costs. So-called C-OTDR (Coherent Optical Time Domain Reflectometer) systems are used to monitor the seismoacoustic field. Far-CCTV systems are used to monitor the optical/infrared field. A simultaneous data processing provided by both systems allows effectively detecting and classifying target activities, which appear in the monitored objects vicinity. The results of practical usage had shown high effectiveness of the suggested approach.

Keywords: C-OTDR monitoring system, bimodal processing, LPboost, SVM

Procedia PDF Downloads 470
1718 Effects of Turbulence Penetration on Valve Leakage in Nuclear Reactor Coolant System

Authors: Gupta Rajesh, Paudel Sagar, Sharma Utkarsh, Singh Amit Kumar

Abstract:

Thermal stratification has drawn much attention because of the malfunctions at various nuclear plants in U.S.A that raised significant safety concerns. The concerns due to this phenomenon relate to thermal stresses in branch pipes connected to the reactor coolant system piping. This stress limits the lifetime of the piping system, and even leading to penetrating cracks. To assess origin of valve damage in the pipeline, it is essential to determine the effect of turbulence penetration on valve leakage; since stratified flow is generally generated by turbulent penetration or valve leakage. As a result, we concluded with the help of coupled fluent-structural analysis that the pipe with less turbulence has less chance of failure there by requiring less maintenance.

Keywords: nuclear reactor coolant system, thermal stratification, turbulent penetration, coupled fluent-structural analysis, Von-Misses stress

Procedia PDF Downloads 293
1717 Integrating Microcontroller-Based Projects in a Human-Computer Interaction Course

Authors: Miguel Angel Garcia-Ruiz, Pedro Cesar Santana-Mancilla, Laura Sanely Gaytan-Lugo

Abstract:

This paper describes the design and application of a short in-class project conducted in Algoma University’s Human-Computer Interaction (HCI) course taught at the Bachelor of Computer Science. The project was based on the Maker Movement (people using and reusing electronic components and everyday materials to tinker with technology and make interactive applications), where students applied low-cost and easy-to-use electronic components, the Arduino Uno microcontroller board, software tools, and everyday objects. Students collaborated in small teams by completing hands-on activities with them, making an interactive walking cane for blind people. At the end of the course, students filled out a Technology Acceptance Model version 2 (TAM2) questionnaire where they evaluated microcontroller boards’ applications in HCI classes. We also asked them about applying the Maker Movement in HCI classes. Results showed overall students’ positive opinions and response about using microcontroller boards in HCI classes. We strongly suggest that every HCI course should include practical activities related to tinkering with technology such as applying microcontroller boards, where students actively and constructively participate in teams for achieving learning objectives.

Keywords: maker movement, microcontrollers, learning, projects, course, technology acceptance

Procedia PDF Downloads 173
1716 Assessment of the Impact of Road Transportation Improvement on Rural Development

Authors: Mohammad Mirwais Arghandiwal, Fujita Motohiro, Wisinee Wisetjindawat

Abstract:

Since 2001, the new government of Afghanistan addressed the improvement of transportation in rural areas as one of the key issues for the country development. This paper thus, aims to show the impotency of transportation in the rural area of Kabul province. A field survey in Kabul Province capital of Afghanistan has been conducted during March, 2015, and 201 questionnaires were collected from four districts named Shakar Dara, Paghman, Char Asyab, and Khak Jabar to investigate the impacts of road transportation on the people’s daily life. The districts had their road projects constructed during the last 3-5 years. The interviewees are chosen randomly from a different category of districts residences. As transportation is one of the most important factors for the development of the communities, during the survey it was very easily to observe a positive effect on the life of people. The improvement on the accessibility has had a positive impact on the land and land price. In this paper, a model is created to show the relationship between different factors and the land price improvement. In the end, a recommendation is presented on the establishment of the community council for a better use and maintenance of road projects. We emphasize on a public and private partnership at a community level in the districts during the construction period too. In addition, the communities should be encouraged on their positive role in the improvement of transportation through their participation and collaboration with the local government.

Keywords: accessibility, Afghanistan, poverty, rural area, transportation development

Procedia PDF Downloads 436
1715 Performance Evaluation and Planning for Road Safety Measures Using Data Envelopment Analysis and Fuzzy Decision Making

Authors: Hamid Reza Behnood, Esmaeel Ayati, Tom Brijs, Mohammadali Pirayesh Neghab

Abstract:

Investment projects in road safety planning can benefit from an effectiveness evaluation regarding their expected safety outcomes. The objective of this study is to develop a decision support system (DSS) to support policymakers in taking the right choice in road safety planning based on the efficiency of previously implemented safety measures in a set of regions in Iran. The measures considered for each region in the study include performance indicators about (1) police operations, (2) treated black spots, (3) freeway and highway facility supplies, (4) speed control cameras, (5) emergency medical services, and (6) road lighting projects. To this end, inefficiency measure is calculated, defined by the proportion of fatality rates in relation to the combined measure of road safety performance indicators (i.e., road safety measures) which should be minimized. The relative inefficiency for each region is modeled by the Data Envelopment Analysis (DEA) technique. In a next step, a fuzzy decision-making system is constructed to convert the information obtained from the DEA analysis into a rule-based system that can be used by policy makers to evaluate the expected outcomes of certain alternative investment strategies in road safety.

Keywords: performance indicators, road safety, decision support system, data envelopment analysis, fuzzy reasoning

Procedia PDF Downloads 353
1714 Understanding Complexity at Pre-Construction Stage in Project Planning of Construction Projects

Authors: Mehran Barani Shikhrobat, Roger Flanagan

Abstract:

The construction planning and scheduling based on using the current tools and techniques is resulted deterministic in nature (Gantt chart, CPM) or applying a very little probability of completion (PERT) for each task. However, every project embodies assumptions and influences and should start with a complete set of clearly defined goals and constraints that remain constant throughout the duration of the project. Construction planners continue to apply the traditional methods and tools of “hard” project management that were developed for “ideal projects,” neglecting the potential influence of complexity on the design and construction process. The aim of this research is to investigate the emergence and growth of complexity in project planning and to provide a model to consider the influence of complexity on the total project duration at the post-contract award pre-construction stage of a project. The literature review showed that complexity originates from different sources of environment, technical, and workflow interactions. They can be divided into two categories of complexity factors, first, project tasks, and second, project organisation management. Project tasks may originate from performance, lack of resources, or environmental changes for a specific task. Complexity factors that relate to organisation and management refer to workflow and interdependence of different parts. The literature review highlighted the ineffectiveness of traditional tools and techniques in planning for complexity. However, this research focus on understanding the fundamental causes of the complexity of construction projects were investigated through a questionnaire with industry experts. The results were used to develop a model that considers the core complexity factors and their interactions. System dynamics were used to investigate the model to consider the influence of complexity on project planning. Feedback from experts revealed 20 major complexity factors that impact project planning. The factors are divided into five categories known as core complexity factors. To understand the weight of each factor in comparison, the Analytical Hierarchy Process (AHP) analysis method is used. The comparison showed that externalities are ranked as the biggest influence across the complexity factors. The research underlines that there are many internal and external factors that impact project activities and the project overall. This research shows the importance of considering the influence of complexity on the project master plan undertaken at the post-contract award pre-construction phase of a project.

Keywords: project planning, project complexity measurement, planning uncertainty management, project risk management, strategic project scheduling

Procedia PDF Downloads 138
1713 Challenges in the Construction of a 6M Diameter and 1.6km Long Tunnel Under Crossing a Channel in the West of Singapore

Authors: David Loh, Wan Chee Wai, Pei Nan, Chen Zhe

Abstract:

To increase the conveyance capacity to Western Singapore and to meet Singapore’s long-term water needs in a more cost-effective manner, four new transmission pipelines consisting of two 2200 mm diameter water pipes and two 1200mm diameter water pipes will be needed by 2024 to convey water from a Water Reclamation Plant to existing networks in the west region of Singapore. Out of the several possible routes studied, the most cost-effective and technically feasible route was selected to lay the proposed 1.6km-long pipelines that cross a channel via a 6m diameter subsea tunnel. This paper outlines the challenges the team faced throughout the project thus far. It also examined the difficulties such as (1) construction of a 56m-deep launching shaft near a highly sensitive 700mm diameter Gas Transmission Pipeline (GTP) and at a location with high groundwater; (2) manpower and supply disruptions caused by the COVID-19 pandemic situation.

Keywords: underwater tunnel, subsea engineering, subsea tunnel construction, waterpipe construction

Procedia PDF Downloads 28
1712 The Impact of Structural Empowerment on Risk Management Practices: A Case Study of Saudi Arabia Construction Small and Medium-Sized Enterprises

Authors: S. Alyami, S. Mohammad

Abstract:

These Risk management practices have a significant impact on construction SMEs. The effective utilisation of these practices depends on culture change in order to optimise decision making for critical activities within construction projects. Thus, successful implementation of empowerment strategies would enhance operational employees to participate in effective decision making. However, there remain many barriers to individuals and organisations within empowerment strategies that require empirical investigation before the industry can benefit from their implementation. Gaps in understanding the relationship between employee empowerment and risk management practices still exist. This research paper aims to examine the impact of the structural empowerment on risk management practices in construction SMEs. The questionnaire has been distributed to participants (162 employees) that involve projects and civil engineers within a case study from Saudi construction SMEs. Partial least squares based structural equation modeling (PLS-SEM) was utilised to perform analysis. The results reveal a positive relationship between empowerment and risk management practices. The study shows how structural empowerment contributes to operational employees in risk management practices through involving activities such as decision making, self-efficiency, and autonomy. The findings of this study will contribute to close the current gaps in the construction SMEs context.

Keywords: construction SMEs, culture, decision making, empowerment, risk management

Procedia PDF Downloads 119
1711 Portfolio Management for Construction Company during Covid-19 Using AHP Technique

Authors: Sareh Rajabi, Salwa Bheiry

Abstract:

In general, Covid-19 created many financial and non-financial damages to the economy and community. Level and severity of covid-19 as pandemic case varies over the region and due to different types of the projects. Covid-19 virus emerged as one of the most imperative risk management factors word-wide recently. Therefore, as part of portfolio management assessment, it is essential to evaluate severity of such risk on the project and program in portfolio management level to avoid any risky portfolio. Covid-19 appeared very effectively in South America, part of Europe and Middle East. Such pandemic infection affected the whole universe, due to lock down, interruption in supply chain management, health and safety requirements, transportations and commercial impacts. Therefore, this research proposes Analytical Hierarchy Process (AHP) to analyze and assess such pandemic case like Covid-19 and its impacts on the construction projects. The AHP technique uses four sub-criteria: Health and safety, commercial risk, completion risk and contractual risk to evaluate the project and program. The result will provide the decision makers with information which project has higher or lower risk in case of Covid-19 and pandemic scenario. Therefore, the decision makers can have most feasible solution based on effective weighted criteria for project selection within their portfolio to match with the organization’s strategies.

Keywords: portfolio management, risk management, COVID-19, analytical hierarchy process technique

Procedia PDF Downloads 109
1710 Familiarity with Engineering Project Management And Their Duties In Projects

Authors: Mokhtar Nikgoo

Abstract:

Today's industrial world has undergone tremendous changes in certain periods. These changes are called environmental changes. And they have a direct impact on organizations and bodies. Therefore, the importance of knowing these changes is clear. This importance has caused the manufacturing organizations to move towards multiple products and constantly change and expand their system. This research tries to show how the organization moves in this category by defining the basic steps of implementing a project. One of the most important features of a hard-to-order production organization is the definition of different production projects from different customers. Therefore, the lack of sufficient understanding of the type of work causes the project to be defined for the organization in question, and the managers of the organization (in every organizational level) are constantly involved with different projects. In the implementation of the production project of the aforementioned organizations, directing the facilities and people of the organization towards the implementation of the project is of particular importance. Therefore, it is felt necessary to define the project manager and his basic duties. Considering the importance of this topic, the project chapter deals with project management and its importance and examines all the different issues in that category from the perspective of implementation. A project includes certain activities of the organization that require the use of different resources and all the activities of the organization in order to implement the project with defined facilities and at the designated times. Project management is planning, organizing and controlling the organization's resources for a short-term goal that has been created for short-term and medium-term goals and objectives. Project management has the important task of centering and integrating (coordinating) task and line managers. In other words, project management requires having a strong and appropriate relationship with the internal people of the system to carry out the assigned activities and must have a general and technical knowledge related to various activities in the project environment. It seems that everything with project management in It is communication. One of the characteristics of production organizations under the order is the relationship between the customer (customers) and the organization until the completion of the defined project. Due to the nature of the work, it is necessary for a person to establish this relationship between the client and the organization's people and to establish this relationship in such a way that it does not cause a lack of coordination in the organization's activities. Therefore, project management has a very important role at this stage, because the relationship between the client and his organization will be any problems and problems and points of view that the client has, he must inform the management so that he can implement the cases with its analysis and special processes. To be transferred to other departments and line managers.

Keywords: project management, crisis management, project delays bill, project duration

Procedia PDF Downloads 58
1709 A Study of Possible Approach to Facilitate Social Sustainability of Industrial Land Redevelopment-Led Urban Regeneration

Authors: Hung Hing Chan, Tai-Shan Hu

Abstract:

Kaohsiung has been an industrial city of Taiwan for over a hundred year. Consequently, there are several abandoned industrial lands left when the process of deindustrialization has started, resulting in the decay of the adjacent urban communities. These industrial lands, which are brownfields that are potentially or already contaminated by hazardous substances, have created social injustice to the surrounding communities. The redevelopments of industrial lands bring a sustainable development to the communities, while the redevelopments can be in different forms, depending on the natural conditions. This research studies the possible approaches to facilitate social sustainability of urban regeneration resulted from the industrial land redevelopment projects, which has always been ignored. The aim of the research is to find out the best western practices of brownfield redevelopment to facilitate social aspect of sustainable urban regeneration and make a contribution to the industrial land redevelopment of Taiwan. The research is conducted via literature review and case study. Industrial land redevelopment has been a social focus in the blighted communities to promote urban regeneration after the post-industrial age. The tendency of this kind of redevelopment is towards constructing the built environment, as a result the environmental and economic aspect of sustainability of the redeveloped industrial land will be boosted, while the social aspect will not be necessarily better since the local communities affected are rarely engaged in the decision-making process and inadequate resource allocation to the projects is not guaranteed. To ensure the improvement of social sustainability is reached, the recommendations of this research, such as civic engagement, a formation of dedicated brownfield regeneration agency and resource allocation to employ brownfield process manager and to strategic communication, should be incorporated into the real practices of industrial land-led urban regeneration. Besides, the case study also shows that the social sustainability of industrial land-led urban regeneration can be promoted by (1) upholding the local feature and public participation in the regeneration process, (2) allocating resources and enforcing responsibility system, and (3) assuring financial resource for the urban regeneration projects and residents. Subsequent research will involve in-depth interviews with the chiefs of the village of related communities in Kaohsiung and questionnaire with the community members to comprehend their opinions regarding social sustainability, aiming at evaluating the social sustainability and finding out which kind of redevelopment project tends to support the social dimension of sustainable development more.

Keywords: brownfield, industrial land, redevelopment, social sustainability, urban regeneration

Procedia PDF Downloads 218
1708 A Review of Sustainable Energy-Saving Solutions in Active and Passive Solar Systems of Zero Energy Buildings Based on the Internet of Things

Authors: Hanieh Sadat Jannesari, Hoori Jannesar, Alireza Hajian HosseinAbadi

Abstract:

In general, buildings are responsible for a considerable share of consumed energy and carbon emissions worldwide and play a significant role in formulating sustainable development strategies. Therefore, a lot of effort is put into the design and construction of zero-energy buildings (ZEBs) to help eliminate the problems associated with the reduction of energy resources and environmental degradation. Two strategies are significant in designing ZEBs: minimizing the need for energy utilization in buildings (particularly for cooling and heating) through highly energy-efficient designs and using renewable energies and other technologies to meet the remaining energy needs. This paper reviews the works related to these two strategies concerning sustainable energy-saving solutions using renewable energy technologies and the Internet of Things in ZEBs. Drawing on the theories and recently implemented projects of energy engineers in ZEBs, we have reported the required technologies within the framework of this paper’s objectives. Overall, solutions based on renewable and sustainable technologies such as photovoltaic (PV) modules, thermal collectors, Phase Change Material (PCM) techniques, etc., are used in active and passive systems designed for various applications in such buildings as cooling, heating, lighting, cooking, etc. The results obtained from examining these projects show that it is possible to minimize the amount of energy required to be produced for and consumed by these buildings.

Keywords: active and passive renewable energy systems, internet of things, storage, zero energy buildings

Procedia PDF Downloads 31
1707 Branding Tourism Destinations; The Trending Initiatives for Edifice Image Choices of Foreign Policy

Authors: Mehtab Alam, Mudiarasan Kuppusamy, Puvaneswaran Kunaserkaran

Abstract:

The purpose of this paper is to bridge the gap and complete the relationship between tourism destinations and image branding as a choice of edifice foreign policy. Such options became a crucial component for individuals interested in leisure and travel activities. The destination management factors have been evaluated and analyzed using the primary and secondary data in a mixed-methods approach (quantitative sample of 384 and qualitative 8 semi-structured interviews at saturated point). The study chose the Environmental Management Accounting (EMA) and Image Restoration (IR) theories, along with a schematic diagram and an analytical framework supported by NVivo software 12, for two locations in Abbottabad, KPK, Pakistan: Shimla Hill and Thandiani. This incorporates the use of PLS-SEM model for assessing validity of data while SPSS for data screening of descriptive statistics. The results show that destination management's promotion of tourism has significantly improved Pakistan's state image. The use of institutional setup, environmental drivers, immigration, security, and hospitality as well as recreational initiatives on destination management is encouraged. The practical ramifications direct the heads of tourism projects, diplomats, directors, and policymakers to complete destination projects before inviting people to Pakistan. The paper provides the extent of knowledge for academic tourism circles to use tourism destinations as brand ambassadors.

Keywords: tourism, management, state image, foreign policy, image branding

Procedia PDF Downloads 69
1706 Local Residents' Perceptions of Economic Impacts of Urban Riverfront Development: Case of Sabarmati Riverfront Development

Authors: Smriti Mishra, Jaydip Barman, Shashi Kant Pandey

Abstract:

Many scholars suggest that waterfront development projects have an all round impact on cities. However, their research stops short of considering the perception of local residents, of what they think about the impact of such developments and the kind of waterfront development which they would prefer to support. Therefore, this paper attempts to address this imbalance in the literature by analysing a survey of residents' perceptions of such developments. The paper discusses the issue in the Indian context by considering Sabarmati Riverfront Development Project (SRFD) of Ahmadabad. It gives an overview of the project components of the SRFD; discusses its development issues and concerns associated with it. It further examines the structural relationship between socio-economic and demographic attributes of local residents and their attitudes and perception towards the economic impact of such developments. The study suggests that the economic component that riverfront development will attract more investment in their community and that riverfront development will increase real estate tax revenue emerged as strong components. While the economic component of substantial premiums to developers, land owners and local government and the other of cost of developing riverfront facilities are too much of a burden on government and public sector agencies appear to be weaker economic components of the perceived economic impacts of urban riverfront development. This paper also gives an overview of the urban waterfront development in the global scenario. It highlights the need to consider residents perception in the development of such projects.

Keywords: urban waterfront development, riverfront, economic impact, resident perception, SRFD

Procedia PDF Downloads 530
1705 Aspects on the Problems of Road Asset Management and Maintenance in Albania

Authors: Diana Bardhi

Abstract:

Road safety is an essential part of the economic and social development of any industrialized country. Decisions to maintain and improve the reliability, functionality of infrastructure structures can only be achieved through integrated road life cycle planning and management. There has always been a tendency to review road maintenance strategies, but there is still no serious and reliable administration due to not only insufficient funds but also problems in the proper reorganization of this system. The safety and performance of the road system depend on the ongoing activity of road maintenance management. For it to be effective, it is necessary to intervene before the degradation has caused irreparable damage or damage with a high economic cost of repairs. Investments in road infrastructure during 2006-2014 show that the life of these projects presents problems related to the maintenance and management of life cycle performance in a wide range of constituent elements. Maintenance planning includes various problems that depend on the degree of degradation of asphalt layers, the degree of damage to road structures (bridges, tunnels, culverts, and the economic planning of resources for their repair). The purpose of this study is first to provide a brief overview of the problems in the field of maintenance and life cycle management of road infrastructure investments, proposing ways to reorganize the sector of administration and maintenance of ongoing roads and secondly testing and evaluating the work and nature of standards of different types of road infrastructure projects, through a methodology consisting of a) development, b) data collection, and c) analysis.

Keywords: infrastructure, maintenance, depreciation, efficiency

Procedia PDF Downloads 161
1704 Student Project on Using a Spreadsheet for Solving Differential Equations by Euler's Method

Authors: Andriy Didenko, Zanin Kavazovic

Abstract:

Engineering students often have certain difficulties in mastering major theoretical concepts in mathematical courses such as differential equations. Student projects were proposed to motivate students’ learning and can be used as a tool to promote students’ interest in the material. Authors propose a student project that includes the use of Microsoft Excel. This instructional tool is often overlooked by both educators and students. An integral component of the experimental part of such a project is the exploration of an interactive spreadsheet. The aim is to assist engineering students in better understanding of Euler’s method. This method is employed to numerically solve first order differential equations. At first, students are invited to select classic equations from a list presented in a form of a drop-down menu. For each of these equations, students can select and modify certain key parameters and observe the influence of initial condition on the solution. This will give students an insight into the behavior of the method in different configurations as solutions to equations are given in numerical and graphical forms. Further, students could also create their own equations by providing functions of their own choice and a variety of initial conditions. Moreover, they can visualize and explore the impact of the length of the time step on the convergence of a sequence of numerical solutions to the exact solution of the equation. As a final stage of the project, students are encouraged to develop their own spreadsheets for other numerical methods and other types of equations. Such projects promote students’ interest in mathematical applications and further improve their mathematical and programming skills.

Keywords: student project, Euler's method, spreadsheet, engineering education

Procedia PDF Downloads 135
1703 Public Art and Public Space in an Emerging Knowledge Economy: The Case of Doha

Authors: Grichting Anna, Al Sada Sara, Caccayam Angelica, Khan Urshi

Abstract:

The Qatar Museums Authority recently announced a series of public art initiatives in Doha with the purpose of 'bringing art out of the walls of the museum' to make it accessible to the public on a daily basis and to encourage discussion and debate. While the installation of sculptures in public spaces is not new in Doha, the practice of integrating art in public spaces and architectural projects is reaching a new dimension as internationally renowned artists – such as Damien Hirst and Richard Serra - are being commissioned to install their works in the public spaces and buildings of the city of Doha as well as in more remote desert locations. This research discusses the changing presence, role and context of public art in Doha, both from a historical and cultural overview, and the different forms and media as well as the typologies of urban and public spaces in which the art is installed. It examines the process of implementing site-specific artworks, looking at questions of scale, history, social meaning and formal aesthetics. The methodologies combine theoretical research on the understanding of public art and its role and placement in public space, as well as empirical research on contemporary public art projects in Doha, based on documentation and interviews and as well as site and context analysis of the urban or architectural spaces within which the art is situated. Surveys and interviews – using social media - in different segments of the contemporary Qatari society, including all nationalities and social groups, are used to measure and qualify the impacts and effects on the population.

Keywords: public space, public art, urban design, knowledge economy

Procedia PDF Downloads 523
1702 Tackling Exclusion and Radicalization through Islamic Practices and Discourses: Case Study of Muslim Organizations in Switzerland

Authors: Baptiste Brodard

Abstract:

In Switzerland, as well as in other European countries, specific social issues related to Muslims have recently emerged in public debates. In addition to the question of terrorism and radicalization, Muslim migrant populations are highly affected by social problems such as crime, poverty, marginalization, and overrepresentation in prisons. This situation has drawn the state’s attention to the need for implementing new responses to the challenges of religious extremism, crime, and social exclusion particularly involving Muslims. While local authorities have begun to implement trainings and projects to tackle these new social issues, Muslim grassroots associations have developed some initiatives to address the needs of the population, mainly focusing on problems related to Islam and Muslims but also addressing the rest of the population. Finally, some local authorities have acknowledged the need for these alternative initiatives as well as their positive contributions to society. The study is based on a Ph.D. research grounded on a case study of three Islamic networks in Switzerland, including various local organizations tackling social exclusion and religious radicalization through innovative grassroots projects. Using an ethnographic approach, it highlights, on the one hand, the specificities of such organizations by exploring the role of Islamic norms within the social work practices. On the other hand, it focuses on the inclusion of such faith-based projects within the mainstream society, observing the relationships between Islamic organisations and both the state and other civil society organizations. Finally, the research study aims to identify some innovative ways and trends of social work involving the inclusion of community key actors within the process. Results showed similar trends with Islamic social work developed in other European countries such as France and the United Kingdom, but also indicate a range of specificities linked to the Swiss socio-political context, which shapes the involvement of religious actors in different ways. By exploring faith-based commitment to addressing concrete social issues, the study finally contributes to shedding light on the link between Islam, social work and activism within the European context.

Keywords: exclusion, Islam, Muslims, social work, Switzerland

Procedia PDF Downloads 128
1701 Factor Analysis Based on Semantic Differential of the Public Perception of Public Art: A Case Study of the Malaysia National Monument

Authors: Yuhanis Ibrahim, Sung-Pil Lee

Abstract:

This study attempts to address factors that contribute to outline public art factors assessment, memorial monument specifically. Memorial monuments hold significant and rich message whether the intention of the art is to mark and commemorate important event or to inform younger generation about the past. Public monument should relate to the public and raise awareness about the significant issue. Therefore, by investigating the impact of the existing public memorial art will hopefully shed some lights to the upcoming public art projects’ stakeholders to ensure the lucid memorial message is delivered to the public directly. Public is the main actor as public is the fundamental purpose that the art was created. Perception is framed as one of the reliable evaluation tools to assess the public art impact factors. The Malaysia National Monument was selected to be the case study for the investigation. The public’s perceptions were gathered using a questionnaire that involved (n-115) participants to attain keywords, and next Semantical Differential Methodology (SDM) was adopted to evaluate the perceptions about the memorial monument. These perceptions were then measured with Reliability Factor and then were factorised using Factor Analysis of Principal Component Analysis (PCA) method to acquire concise factors for the monument assessment. The result revealed that there are four factors that influence public’s perception on the monument which are aesthetic, audience, topology, and public reception. The study concludes by proposing the factors for public memorial art assessment for the next future public memorial projects especially in Malaysia.

Keywords: factor analysis, public art, public perception, semantical differential methodology

Procedia PDF Downloads 501
1700 Quantitative Analysis of Multiprocessor Architectures for Radar Signal Processing

Authors: Deepak Kumar, Debasish Deb, Reena Mamgain

Abstract:

Radar signal processing requires high number crunching capability. Most often this is achieved using multiprocessor platform. Though multiprocessor platform provides the capability of meeting the real time computational challenges, the architecture of the same along with mapping of the algorithm on the architecture plays a vital role in efficiently using the platform. Towards this, along with standard performance metrics, few additional metrics are defined which helps in evaluating the multiprocessor platform along with the algorithm mapping. A generic multiprocessor architecture can not suit all the processing requirements. Depending on the system requirement and type of algorithms used, the most suitable architecture for the given problem is decided. In the paper, we study different architectures and quantify the different performance metrics which enables comparison of different architectures for their merit. We also carried out case study of different architectures and their efficiency depending on parallelism exploited on algorithm or data or both.

Keywords: radar signal processing, multiprocessor architecture, efficiency, load imbalance, buffer requirement, pipeline, parallel, hybrid, cluster of processors (COPs)

Procedia PDF Downloads 412
1699 Design of a Professional Development Framework in Teaching and Learning for Engineering Educators

Authors: Orla McConnell, Cormac MacMahon, Jen Harvey

Abstract:

Ireland’s national professional development framework for those who teach in higher education, aims to provide guidance and leadership in the planning, developing and engaging in professional development practices. A series of pilot projects have been initiated to help explore the framework’s likely utility and acceptance by educators and their institutions. These projects require engagement with staff in the interpretation and adaption of the framework within their working contexts. The purpose of this paper is to outline the development of one such project with engineering educators at three Institutes of Technology seeking designation as a technological university. The initiative aims to gain traction in the acceptance of the framework with the engineering education community by linking core and discipline-specific teaching and learning competencies with professional development activities most valued by engineering educators. Informed by three strands of literature: professional development in higher education; engineering education; and teaching and learning training provisions, the project begins with a survey of all those involved in teaching and learning in engineering across the three institutes. Based on engagement with key stakeholders, subsequent qualitative research informs the contextualization of the national framework for discipline-specific and institutional piloting. The paper concludes by exploring engineering educator perceptions of the national framework’s utility based on their engagement with the pilot process. Feedback from the pilot indicates that there is a significant gap between the professional development needs of engineering educators and the current professional development provision in teaching and learning.

Keywords: engineering education, pilot, professional development, teaching and learning

Procedia PDF Downloads 330
1698 An Interior Design Project Interventions about Changing Student Beliefs about Poverty, Homelessness, and Community Service

Authors: Alireza Derambakhsh

Abstract:

The reason for this study was to inspect undergraduate interior design student state of mind toward destitution, vagrancy, and group administration. An auxiliary intention was to figure out whether introduction to plan ventures for the individuals who have encountered hardship would change student convictions. All first year recruits (n = 18), sophomore (n = 26), junior (n = 17), and senior (n = 25) interior design undergraduate students at a public university completed a questionnaire in light of a few current scales. Amid the semester, the sophomores dealt with assignments that were intended to provide exposure to different socio-economic groups. Students finished three projects. Initially, the outline of a makeshift destitute asylum. Second, a re-model of a childcare focus office and gathering region that gives administrations to low-salary families, and third, the outline of a low-wage, private home. In these ventures, students were obliged to direct broad data assembling so they could better comprehend the issues connected with destitution. Toward the end of the semester, the sophomores finished the survey again and were asked extra inquiries in regards to the class and projects. Students’ sentiments towards the poor were more individualistic when contrasted with the white collar class, yet when the working class correlation was uprooted, some of their mentality gave a more unpredictable comprehension of destitution and vagrancy. The semester-long intercession fundamentally moved students' understanding that underscored auxiliary and multifaceted reason.

Keywords: interior design, destitution, vagrancy, group administration

Procedia PDF Downloads 431
1697 Residential Building Facade Retrofit

Authors: Galit Shiff, Yael Gilad

Abstract:

The need to retrofit old buildings lies in the fact that buildings are responsible for the main energy use and CO₂ emission. Existing old structures are more dominant in their effect than new energy-efficient buildings. Nevertheless not every case of urban renewal that aims to replace old buildings with new neighbourhoods necessarily has a financial or sustainable justification. Façade design plays a vital role in the building's energy performance and the unit's comfort conditions. A retrofit façade residential methodology and feasibility applicative study has been carried out for the past four years, with two projects already fully renovated. The intention of this study is to serve as a case study for limited budget façade retrofit in Mediterranean climate urban areas. The two case study buildings are set in Israel. However, they are set in different local climatic conditions. One is in 'Sderot' in the south of the country, and one is in' Migdal Hahemek' in the north of the country. The building typology is similar. The budget of the projects is around $14,000 per unit and includes interventions at the buildings' envelope while tenants are living in. Extensive research and analysis of the existing conditions have been done. The building's components, materials and envelope sections were mapped, examined and compared to relevant updated standards. Solar radiation simulations for the buildings in their surroundings during winter and summer days were done. The energy rate of each unit, as well as the building as a whole, was calculated according to the Israeli Energy Code. The buildings’ facades were documented with the use of a thermal camera during different hours of the day. This information was superimposed with data about the electricity use and the thermal comfort that was collected from the residential units. Later in the process, similar tools were further used in order to compare the effectiveness of different design options and to evaluate the chosen solutions. Both projects showed that the most problematic units were the ones below the roof and the ones on top of the elevated entrance floor (pilotis). Old buildings tend to have poor insulation on those two horizontal surfaces which require treatment. Different radiation levels and wall sections in the two projects influenced the design strategies: In the southern project, there was an extreme difference in solar radiations levels between the main façade and the back elevation. Eventually, it was decided to invest in insulating the main south-west façade and the side façades, leaving the back north-east façade almost untouched. Lower levels of radiation in the northern project led to a different tactic: a combination of basic insulation on all façades, together with intense treatment on areas with problematic thermal behavior. While poor execution of construction details and bad installation of windows in the northern project required replacing them all, in the southern project it was found that it is more essential to shade the windows than replace them. Although the buildings and the construction typology was chosen for this study are similar, the research shows that there are large differences due to the location in different climatic zones and variation in local conditions. Therefore, in order to reach a systematic and cost-effective method of work, a more extensive catalogue database is needed. Such a catalogue will enable public housing companies in the Mediterranean climate to promote massive projects of renovating existing old buildings, drawing on minimal analysis and planning processes.

Keywords: facade, low budget, residential, retrofit

Procedia PDF Downloads 208
1696 Research Action Fields at the Nexus of Digital Transformation and Supply Chain Management: Findings from Practitioner Focus Group Workshops

Authors: Brandtner Patrick, Staberhofer Franz

Abstract:

Logistics and Supply Chain Management are of crucial importance for organisational success. In the era of Digitalization, several implications and improvement potentials for these domains arise, which at the same time could lead to decreased competitiveness and could endanger long-term company success if ignored or neglected. However, empirical research on the issue of Digitalization and benefits purported to it by practitioners is scarce and mainly focused on single technologies or separate, isolated Supply Chain blocks as e.g. distribution logistics or procurement only. The current paper applies a holistic focus group approach to elaborate practitioner use cases at the nexus of the concepts of Supply Chain Management (SCM) and Digitalization. In the course of three focus group workshops with over 45 participants from more than 20 organisations, a comprehensive set of benefit entitlements and areas for improvement in terms of applying digitalization to SCM is developed. The main results of the paper indicate the relevance of Digitalization being realized in practice. In the form of seventeen concrete research action fields, the benefit entitlements are aggregated and transformed into potential starting points for future research projects in this area. The main contribution of this paper is an empirically grounded basis for future research projects and an overview of actual research action fields from practitioners’ point of view.

Keywords: digital supply chain, digital transformation, supply chain management, value networks

Procedia PDF Downloads 177