Search results for: construction safety practices
10358 Navigating through Organizational Change: TAM-Based Manual for Digital Skills and Safety Transitions
Authors: Margarida Porfírio Tomás, Paula Pereira, José Palma Oliveira
Abstract:
Robotic grasping is advancing rapidly, but transferring techniques from rigid to deformable objects remains a challenge. Deformable and flexible items, such as food containers, demand nuanced handling due to their changing shapes. Bridging this gap is crucial for applications in food processing, surgical robotics, and household assistance. AGILEHAND, a Horizon project, focuses on developing advanced technologies for sorting, handling, and packaging soft and deformable products autonomously. These technologies serve as strategic tools to enhance flexibility, agility, and reconfigurability within the production and logistics systems of European manufacturing companies. Key components include intelligent detection, self-adaptive handling, efficient sorting, and agile, rapid reconfiguration. The overarching goal is to optimize work environments and equipment, ensuring both efficiency and safety. As new technologies emerge in the food industry, there will be some implications, such as labour force, safety problems and acceptance of the new technologies. To overcome these implications, AGILEHAND emphasizes the integration of social sciences and humanities, for example, the application of the Technology Acceptance Model (TAM). The project aims to create a change management manual, that will outline strategies for developing digital skills and managing health and safety transitions. It will also provide best practices and models for organizational change. Additionally, AGILEHAND will design effective training programs to enhance employee skills and knowledge. This information will be obtained through a combination of case studies, structured interviews, questionnaires, and a comprehensive literature review. The project will explore how organizations adapt during periods of change and identify factors influencing employee motivation and job satisfaction. This project received funding from European Union’s Horizon 2020/Horizon Europe research and innovation program under grant agreement No101092043 (AGILEHAND).Keywords: change management, technology acceptance model, organizational change, health and safety
Procedia PDF Downloads 4610357 GIS Based Project Management Information System for Infrastructure Projects
Authors: Riki Panchal, Debasis Sarkar
Abstract:
This paper describes the work done for the GIS-based project management for different infrastructure projects. It is a review paper which gives the idea of the trends in the construction project management and various models adopted for the betterment of the project planning and execution. Traditional scheduling and progress control techniques such as bar charts and the critical path method fail to provide information pertaining to the spatial aspects of a construction project. An integrated system was developed to represent construction progress not only in terms of a CPM schedule but also in terms of a graphical representation of the construction that is synchronized with the work schedule. Hence, it is suggested to work on the common platform from where all the data can be shared and analyzed.Keywords: GIS, project management, integrated model, infrastructure project
Procedia PDF Downloads 52010356 A Study on the Construction Process and Sustainable Renewal Development of High-Rise Residential Areas in Chongqing (1978-2023)
Authors: Xiaoting Jing, Ling Huang
Abstract:
After the reform and opening up, Chongqing has formed far more high-rise residential areas than other cities in its more than 40 years of urban construction. High-rise residential areas have become one of the main modern living models in Chongqing and an important carrier reflecting the city's high quality of life. Reviewing the construction process and renewal work helps understand the characteristics of high-rise residential areas in Chongqing at different stages, clarify current development demands, and look forward to the focus of future renewal work. Based on socio-economic development and policy background, the article sorts the construction process of high-rise residential areas in Chongqing into four stages: the early experimental construction period of high-rise residential areas (1978-1996), the rapid start-up period of high-rise commodity housing construction (1997-2006), the large-scale construction period of high-rise commodity housing and public rental housing (2007-2014), and the period of renewal and renovation of high-rise residential areas and step-by-step construction of quality commodity housing (2015-present). Based on the construction demands and main construction types of each stage, the article summarizes that the construction of high-rise residential areas in Chongqing features large scale, high speed, and high density. It points out that a large number of high-rise residential areas built after 2000 will become important objects of renewal and renovation in the future. Based on existing renewal work experience, it is urgent to explore a path for sustainable renewal and development in terms of policy mechanisms, digital supervision, and renewal and renovation models, leading the high-rise living in Chongqing toward high-quality development.Keywords: high-rise residential areas, construction process, renewal and renovation, Chongqing
Procedia PDF Downloads 7010355 Regional Identity Construction of Acehnese English Teachers in Professional Practice
Authors: Ugahara Bin Mahyuddin Yunus
Abstract:
In English Language Teaching, it cannot be denied that the backgrounds of English teachers do affect the way they teach English to their students, which in turn will affect their students’ English learning itself. Thus, it is very important to understand who the English teachers are so that how they teach English to their students can be understood. One of their backgrounds that is essential to be highlighted is their culture. Certainly, they wittingly or not will bring the perspectives and values of their culture into their daily teaching practices. In other words, their cultural identities do shape how they teach their students. Cultural identities themselves actually consist of some elements, one of which is regional identity. Indeed, the culture of the region in which English teachers identify with has impact on their beliefs and actions during teaching. For this reason, this study aims to understand how the regional identity of English teachers influence the way they teach English to their students. This study is a qualitative study conducted in a multilingual and multicultural setting, namely Aceh, Indonesia. Here, four Acehnese English teachers were involved as the research participants. In addition, this study adopted poststructuralist perspective to identity as the theoretical framework. Three research instruments were used in this study, namely semi-structured interviews, classroom observation, and teacher journal. The data gained from these instruments were then analyzed by using thematic analysis. Obviously, the research about the regional identity of English teachers in English Language Teaching has been studied worldwide. However, little is still known about it in Indonesian context, let alone Indonesia itself is a super diverse country with 34 regions. As a result, this study presents a good opportunity to advance the knowledge of how the regional identity construction of English teachers in this setting is. The findings of the study revealed that their regional identity construction in teaching was highly influenced by their indigenous language and religious faith. Even, how they teach English in classroom, in fact, is related to these two things. The conclusion that can be drawn from this study is for these English teachers, in fact, their regional identity itself constitutes their use of local language and religious identity, which are considered by them as their core identity.Keywords: English language teaching, English teachers, identity construction, regional identity
Procedia PDF Downloads 24410354 Comparative Study on Fire Safety Evaluation Methods for External Cladding Systems: ISO 13785-2 and BS 8414
Authors: Kyungsuk Cho, H. Y. Kim, S. U. Chae, J. H. Choi
Abstract:
Technological development has led to the construction of super-tall buildings and insulators are increasingly used as exterior finishing materials to save energy. However, insulators are usually combustible and vulnerable to fire. Fires like that at Wooshin Golden Suite Building in Busan, Korea in 2010 and that at CCTV Building in Beijing, China are the major examples of fire spread accelerated by combustible insulators. The exterior finishing materials of a high-rise building are not made of insulators only, but they are integrated with the building’s external cladding system. There is a limit in evaluating the fire safety of a cladding system with a single small-unit material such as a cone calorimeter. Therefore, countries provide codes to evaluate the fire safety of exterior finishing materials using full-scale tests. This study comparesKeywords: external cladding systems, fire safety evaluation, ISO 13785-2, BS 8414
Procedia PDF Downloads 24210353 An Analysis of Prefabricated Construction Waste: A Case Study Approach
Authors: H. Hakim, C. Kibert, C. Fabre, S. Monadizadeh
Abstract:
Construction industry is an industry saddled with chronic problems of high waste generation. Waste management that is to ensure materials are utilized in an efficient manner would make a major contribution to mitigating the negative environmental impacts of construction waste including finite resources depletion and growing occupied landfill areas to name a few. Furthermore, ‘material resource efficiency’ has been found an economically smart approach specially when considered during the design phase. One effective strategy is to utilizing off-site construction process which includes a series of prefabricated systems such as mobile, modular, and HUD construction (Department of Housing and Urban Development manufactured buildings). These types of buildings are by nature material and resource-efficient. Despite conventional construction that is exposed to adverse weather conditions, manufactured construction production line is capable of creating repetitive units in a factory controlled environment. A factory can have several parallel projects underway with a high speed and in a timely manner which simplifies the storage of excess materials and re-allocating to the next projects. The literature reports that prefabricated construction significantly helps reduce errors, site theft, rework, and delayed problems and can ultimately lead to a considerable waste reduction. However, there is not sufficient data to quantify this reduction when it comes to a regular modular house in the U.S. Therefore, this manuscript aims to provide an analysis of waste originated from a manufactured factory trend. The analysis was made possible with several visits and data collection of Homes of Merits, a Florida Manufactured and Modular Homebuilder. The results quantify and verify a noticeable construction waste reduction.Keywords: construction waste, modular construction, prefabricated buildings, waste management
Procedia PDF Downloads 26810352 An Interpretative Phenomenological Analysis of the Death Practices and Rituals of the Isneg People in Apayao
Authors: Ivy Angelique Malit, Marion Nicole Dela Vega, Marjorie Mae Mendoza
Abstract:
Death practices and rituals of the Philippines is rich with facts about our history mostly on our beliefs of the afterlife before the arrival of the western culture which is still being practiced by the indigenous people of the Philippines. The death practices and rituals are acts of showing the inner thoughts, and feelings towards the person who died. The meanings behind those practices and rituals become the reason why the indigenous people still treasure these death practices and rituals as a part of their culture. This study seeks to know the experiences of the death practices and rituals of one of the Indigenous groups in Apayao, the Isnegs and the meaning of those experiences. The researchers aimed to look at it on a psychological lens. In which the researchers aim (1) to know their experiences of their death practices from the perspective of their thoughts, feelings and actions, and (2) to seek the meaning behind their death rituals. The design used in the research is a qualitative design and Interpretative Phenomenological Analysis. The participants were gathered by using purposive sampling. The researchers gathered the data from a form of a semi-structured interview with guide questions. The researchers used Thematic Analysis to analyze the verbatim transcriptions from the interview. The experiences of death practices and rituals of the Isneg people have been presented in the aspects of their thoughts, feelings and behavior. The experiences were presented with 7 superordinate themes namely, (1) Refusal of Reality (2) Feelings of mixed emotions (3) Oblivious Acts of the participants (4) Conflict with self and culture (5) Negative thinking of the participants (6) Process of Acceptance (8) Act of Love. The make meaning behind the death practices and rituals of the Isneg people have been presented with 2 superordinate themes, (1) Act of Respect and (2) Act of Loyalty. The results of the research show that the experiences and meaning behind their death practices and burials were being based more by their own beliefs. In their culture, which has been passed through by their ancestors and becomes the foundation of their beliefs and their newly found religion which was introduced by the travelling missionaries. Doing those death practices and rituals is their way to show their affections, like respect and loyalty towards the person who died.Keywords: death practices, interpretative phenomenological analysis, isneg people, rituals, theory of grieving
Procedia PDF Downloads 25510351 Causes of Cost Overrun in Building Construction Projects: Case Study from Al Madinah, Saudi Arabia
Authors: Z. Hamed, K. Sa'deya, E. Abdelrasheed, I. Mahamid
Abstract:
The construction industry is one of the main sectors that play basic role in the urban and rural development of a society. It provides important ingredients for the development of an economy. However, many construction projects experience extensive cost overrun. This study was conducted to identify the causes of cost overrun in building construction contracts in Al Madinah, Saudi Arabia and test the importance of these causes from contractors' perspective. To achieve the study objectives, a questionnaire survey was conducted to identify and rank cost overrun causes from the perspective of contractors. The findings found that the top five cost overrun causes are: lack of experience in the line of work, lack of labor productivity, delay in payments, rework and material waste. It is hoped that the findings will guide efforts to improve the performance of construction industry in Saudi Arabia and other developing countries.Keywords: building, contractor, cost increase, cost overrun
Procedia PDF Downloads 15610350 Circular Economy: Development of Quantitative Material Wastage Management Plan for Effective Waste Reduction in Building Construction Industry
Authors: Kwok Tak Kit
Abstract:
Combating climate change is becoming a hot topic in various sectors. Building construction and infrastructure sectors contributed a significant proportion of waste and GHGs emissions in the economy of different countries and cities. Many types of research had conducted and discussed the topic of waste management and waste management being a macro-level control is well developed in the building and construction industry. However, there is little research and studies on the micro-level of waste management, “building construction material wastage management,” and fewer reviews about regulatory control in the building construction sector. In this paper, we will focus on the potentialities and importance of material wastage management and review the deficiencies of the current standard to take into account the reduction of material wastage in a systematic and quantitative approach.Keywords: quantitative measurement, material wastage management plan, waste management, uncalculated waste, circular economy
Procedia PDF Downloads 15410349 A Comparative Study on the Impact of Global Warming of Applying Low Carbon Factor Concrete Products
Authors: Su-Hyun Cho, Chang-U Chae
Abstract:
Environmental impact assessment techniques have been developed as a result of the worldwide efforts to reduce the environmental impact of global warming. By using the quantification method in the construction industry, it is now possible to manage the greenhouse gas is to systematically evaluate the impact on the environment over the entire construction process. In particular, the proportion of greenhouse gas emissions at the production stage of construction material occupied is high, and efforts are needed in particular in the construction field. In this study, intended for concrete products for the construction materials, by using the LCA evaluation method, we compared the results of environmental impact assessment and carbon emissions of developing products that have been applied low-carbon technologies compared to existing products. As a results, by introducing a raw material of industrial waste, showed carbon reduction. Through a comparison of the carbon emission reduction effect of low-carbon technologies, it is intended to provide academic data for the evaluation of greenhouse gases in the construction sector and the development of low-carbon technologies of the future.Keywords: CO₂ emissions, CO₂ reduction, ready-mixed concrete, environmental impact assessment
Procedia PDF Downloads 47910348 Project Time and Quality Management during Construction
Authors: Nahed Al-Hajeri
Abstract:
Time and cost is an integral part of every construction plan and can affect each party’s contractual obligations. The performance of both time and cost are usually important to the client and contractor during the project. Almost all construction projects are experiencing time overrun. These time overruns always contributed as expensive to both client and contractor. Construction of any project inside the gathering centers involves complex management skills related to work force, materials, plant, machineries, new technologies etc. It also involves many agencies interdependent on each other like the vendors, structural and functional designers including various types of specialized engineers and it includes support of contractors and specialized contractors. This paper mainly highlights the types of construction delays due to which project suffer time and cost overrun. This paper also speaks about the delay causes and factors that contribute to the construction sequence delay for the oil and gas projects. Construction delay is supposed to be one of the repeated problems in the construction projects and it has an opposing effect on project success in terms of time, cost and quality. Some effective methods are identified to minimize delays in construction projects such as: 1. Site management and supervision, 2. Effective strategic planning, 3. Clear information and communication channel. Our research paper studies the types of delay with some real examples with statistic results and suggests solutions to overcome this problem.Keywords: non-compensable delay, delays caused by force majeure, compensable delay, delays caused by the owner or the owner’s representative, non-excusable delay, delay caused by the contractor or the contractor’s representative, concurrent delay, delays resulting from two separate causes at the same time
Procedia PDF Downloads 24210347 Identifying Barriers of Implementing Building Information Modelling in Construction
Authors: Kasra HosseinMostofi, Mohamadamin Oyar Hossein, Reza Mehdizadeh Anvigh
Abstract:
BIM is an innovative concept for the majority of firms operating in industry. BIM offers a new paradigm to design, construct, operate, and maintain a facility. However, even with the most conscientious use, stakeholders can run into trouble during its implementation on a project or within an organization. At times, project stakeholders are unaware of the challenges that they can face with the implementation at the project level or an organizational level. Therefore, the study aimed to identify and compile barriers associated with the BIM implementation at the project and organizational level, as per the literature. Despite the fact that innumerable advantageous involved in exploiting BIM, there are some barriers to implement it properly. These barriers have been proved as impediments for academicians and members of construction team project to take the maximum advantage of its utilization. Although some research has been conducted to identify these barriers regarding BIM implementation in construction industry, more research is needed to be carried out among academicians to identify these barriers in institutions, and most importantly, to make suggestions for eliminating these obstacles.Keywords: building information modelling, construction, design and construction, designers
Procedia PDF Downloads 18510346 Towards an Intelligent Ontology Construction Cost Estimation System: Using BIM and New Rules of Measurement Techniques
Authors: F. H. Abanda, B. Kamsu-Foguem, J. H. M. Tah
Abstract:
Construction cost estimation is one of the most important aspects of construction project design. For generations, the process of cost estimating has been manual, time-consuming and error-prone. This has partly led to most cost estimates to be unclear and riddled with inaccuracies that at times lead to over- or under-estimation of construction cost. The development of standard set of measurement rules that are understandable by all those involved in a construction project, have not totally solved the challenges. Emerging Building Information Modelling (BIM) technologies can exploit standard measurement methods to automate cost estimation process and improves accuracies. This requires standard measurement methods to be structured in ontologically and machine readable format; so that BIM software packages can easily read them. Most standard measurement methods are still text-based in textbooks and require manual editing into tables or Spreadsheet during cost estimation. The aim of this study is to explore the development of an ontology based on New Rules of Measurement (NRM) commonly used in the UK for cost estimation. The methodology adopted is Methontology, one of the most widely used ontology engineering methodologies. The challenges in this exploratory study are also reported and recommendations for future studies proposed.Keywords: BIM, construction projects, cost estimation, NRM, ontology
Procedia PDF Downloads 55110345 Evaluating the Relationship between Neighbourhood Satisfaction and Urban Safety: The Case Study of Riverwood, Sydney
Authors: Samaneh Arasteh
Abstract:
Neighbourhood satisfaction and safety are the two main components of urban life and have a substantial impact on residents’ quality of life. The relationship between these two components, especially in areas surrounding our individual private dwellings, is highly influential on many social, economic, and wellbeing activities that may benefit neighbourhood residents. Neighbourhood and urban design – which are liable to be affected by the perceived quality of local public spaces – are likely to be significant factors influencing broader residents’ feelings of safety. With this in mind, this study reviews recent normative literature on how these design processes have influenced neighbourhood satisfaction including perceived safety with a focus on different aspects of public spaces including planning, management, and design in a mix-tenure neighbourhood. Following the study aim, Riverwood in Sydney’s southwest was chosen as a case study to gain a detailed understanding of the context by engaging with community members, residents, non-government organisations, and experts. Moreover, archival studies on neighbourhood satisfaction and safety, expert interviews, and resident questionnaires are presented to shed light on the relationship between neighbourhood satisfaction and perception of safety. The study argues that for the safer neighbourhood in urban areas, social-cultural factors need to be aligned toward strengthening physical factors and since making the environments safer, it is important to understand practical and achievable mechanisms which are required to improve existing estates. Findings show that increasing the clarity of community social and physical environmental involvements can promote residents’ feelings of safety and following neighbourhood satisfaction.Keywords: neighbourhood satisfaction, public space, Riverwood, urban safety
Procedia PDF Downloads 18210344 Developing a Total Quality Management Model Using Structural Equation Modeling for Indonesian Healthcare Industry
Authors: Jonny, T. Yuri M. Zagloel
Abstract:
This paper is made to present an Indonesian Healthcare model. Currently, there are nine TQM (Total Quality Management) practices in healthcare industry. However, these practices are not integrated yet. Therefore, this paper aims to integrate these practices as a model by using Structural Equation Modeling (SEM). After administering about 210 questionnaires to various stakeholders of this industry, a LISREL program was used to evaluate the model's fitness. The result confirmed that the model is fit because the p-value was about 0.45 or above required 0.05. This has signified that previously mentioned of nine TQM practices are able to be integrated as an Indonesian healthcare model.Keywords: healthcare, total quality management (TQM), structural equation modeling (SEM), linear structural relations (LISREL)
Procedia PDF Downloads 29410343 A Case Study of Coalface Workers' Attitude towards Occupational Health and Safety Key Performance Indicators
Authors: Gayan Mapitiya
Abstract:
Maintaining good occupational health and safety (OHS) performance is significant at the coalface, especially in industries such as mining, power, and construction. Coalface workers are vulnerable to high OHS risks such as working at heights, working with mobile plants and vehicles, working with underground and above ground services, chemical emissions, radiation hazards and explosions at everyday work. To improve OHS performance of workers, OHS key performance indicators (KPIs) (for example, lost time injuries (LTI), serious injury frequency rate (SIFR), total reportable injury frequency rate (TRIFR) and number of near misses) are widely used by managers in making OHS business decisions such as investing in safety equipment and training programs. However, in many organizations, workers at the coalface hardly see any relevance or value addition of OHS KPIs to their everyday work. Therefore, the aim of the study was to understand why coalface workers perceive that OHS KPIs are not practically relevant to their jobs. Accordingly, this study was conducted as a qualitative case study focusing on a large electricity and gas firm in Australia. Semi-structured face to face interviews were conducted with selected coalface workers to gather data on their attitude towards OHS KPIs. The findings of the study revealed that workers at the coalface generally have no understanding of the purpose of KPIs, the meaning of each KPI, origin of KPIs, and how KPIs are correlated to organizational performance. Indeed, KPIs are perceived as ‘meaningless obstacles’ imposed on workers by managers without a rationale. It is recommended to engage coalface workers (a fair number of representatives) in both KPIs setting and revising processes while maintaining a continuous dialogue between workers and managers in regards OHS KPIs.Keywords: KPIs, coalface, OHS risks, case-study
Procedia PDF Downloads 11610342 Risk Management Practices In The Construction Industry In Malawi
Authors: Taonga Temwani Chibaka
Abstract:
This qualitative research study was conducted to identify the common risk factors that affect the construction industry in Malawi in the building and infrastructure (civil works) projects. The study then evaluates the possible risk responses that are done to mitigate the various risk factors that were identified. I addition the research also established the barriers to risk management implementation with lastly mapping out as where the identified risk factors fall on which stage of the project and then also map out the knowledge areas that need to be worked on the cases on Malawian construction industry in order to mitigate most of the identified risk factors. The study involved the interviewing the professionals from the construction industry in Malawi where insights and ideas were collected, analysed and interpreted. The key study findings show that risks related to clients group are perceived as most critical followed by the contractor related, consultant related and then external group related factors respectively where preventive measures are the most applied risk response technique where the aim to avoid most of the risk factors from happening. Most of the risk factors identified were internal risks and in managerial category which suggested that risk planning was to be emphasized at pre-contract stage to minimize these risks since a bigger percentage of the risk factors were mapped out at implementation stage. Furthermore, barriers to risk management were identified and the key barriers were lack of awareness; lack of knowledge; lack of formal policies in place; regarded as costly and limited time which resulted in proposing that regulating authorities to purposefully introduce intense training on risk management to make known of this new knowledge area. The study then recommends that organisation should formally implement risk management where policies should be introduced to enforce all parties to undertake this. Risk planning was regarded as paramount and this to be done from pre-contract phase so as to mitigate 80% of the risk factors. Finally, training should be done on all project management knowledge areas.Keywords: risk management, risk factors, risks, malawi
Procedia PDF Downloads 32610341 Current Zonal Isolation Regulation and Standards: A Compare and Contrast Review in Plug and Abandonment
Authors: Z. A. Al Marhoon, H. S. Al Ramis, C. Teodoriu
Abstract:
Well-integrity is one of the major elements considered for drilling geothermal, oil, and gas wells. Well-integrity is minimizing the risk of unplanned fluid flow in the well bore throughout the well lifetime. Well integrity is maximized by applying technical concepts along with practical practices and strategic planning. These practices are usually governed by standardization and regulation entities. Practices during well construction can affect the integrity of the seal at the time of abandonment. On the other hand, achieving a perfect barrier system is impracticable due to the needed cost. This results in a needed balance between regulations requirements and practical applications. The guidelines are only effective when they are attainable in practical applications. Various governmental regulations and international standards have different guidelines on what constitutes high-quality isolation from unwanted flow. Each regulating or standardization body differ in requirements based on the abandonment objective. Some regulation account more for the environmental impact, water table contamination, and possible leaks. Other regulation might lean towards driving more economical benefits while achieving an acceptable isolation criteria. The research methodology used in this topic is derived from a literature review method combined with a compare and contrast analysis. The literature review on various zonal isolation regulations and standards has been conducted. A review includes guidelines from NORSOK (Norwegian governing entity), BSEE (USA offshore governing entity), API (American Petroleum Institute) combined with ISO (International Standardization Organization). The compare and contrast analysis is conducted by assessing the objective of each abandonment regulations and standardization. The current state of well barrier regulation is in balancing action. From one side of this balance, the environmental impact and complete zonal isolation is considered. The other side of the scale is practical application and associated cost. Some standards provide a fair amount of details concerning technical requirements and are often flexible with the needed associated cost. These guidelines cover environmental impact with laws that prevent major or disastrous environmental effects of improper sealing of wells. Usually these regulations are concerned with the near future of sealing rather than long-term. Consequently, applying these guidelines become more feasible from a cost point of view to the required plugging entities. On the other hand, other regulation have well integrity procedures and regulations that lean toward more restrictions environmentally with an increased associated cost requirements. The environmental impact is detailed and covered with its entirety, including medium to small environmental impact in barrier installing operations. Clear and precise attention to long-term leakage prevention is present in these regulations. The result of the compare and contrast analysis of the literature showed that there are various objectives that might tip the scale from one side of the balance (cost) to the other (sealing quality) especially in reference to zonal isolation. Furthermore, investing in initial well construction is a crucial part of ensuring safe final well abandonment. The safety and the cost saving at the end of the well life cycle is dependent upon a well-constructed isolation systems at the beginning of the life cycle. Long term studies on zonal isolation using various hydraulic or mechanical materials need to take place to further assess permanently abandoned wells to achieve the desired balance. Well drilling and isolation techniques will be more effective when they are operationally feasible and have reasonable associated cost to aid the local economy.Keywords: plug and abandon, P&A regulation, P&A standards, international guidelines, gap analysis
Procedia PDF Downloads 13410340 A Study of Quality Assurance and Unit Verification Methods in Safety Critical Environment
Authors: Miklos Taliga
Abstract:
In the present case study we examined the development and testing methods of systems that contain safety-critical elements in different industrial fields. Consequentially, we observed the classical object-oriented development and testing environment, as both medical technology and automobile industry approaches the development of safety critical elements that way. Subsequently, we examined model-based development. We introduce the quality parameters that define development and testing. While taking modern agile methodology (scrum) into consideration, we examined whether and to what extent the methodologies we found fit into this environment.Keywords: safety-critical elements, quality managent, unit verification, model base testing, agile methods, scrum, metamodel, object-oriented programming, field specific modelling, sprint, user story, UML Standard
Procedia PDF Downloads 58510339 Agroforestry Systems and Practices and Its Adoption in Kilombero Cluster of Sagcot, Tanzania
Authors: Lazaro E. Nnko, Japhet J. Kashaigili, Gerald C. Monela, Pantaleo K. T. Munishi
Abstract:
Agroforestry systems and practices are perceived to improve livelihood and sustainable management of natural resources. However, their adoption in various regions differs with the biophysical conditions and societal characteristics. This study was conducted in Kilombero District to investigate the factors influencing the adoption of different agroforestry systems and practices in agro-ecosystems and farming systems. A household survey, key informant interviews, and focus group discussion was used for data collection in three villages. Descriptive statistics and multinomial logistic regression in SPSS were applied for analysis. Results show that Igima and Ngajengwa villages had home garden practices dominated, as revealed by 63.3% and 66.7%, respectively, while Mbingu village had mixed intercropping practice with 56.67%. Agrosilvopasture systems were dominant in Igima and Ngajengwa villages with 56.7% and 66.7%, respectively, while in Mbingu village, the dominant system was agrosilviculture with 66.7%. The results from multinomial logistic regression show that different explanatory variable was statistical significance as predictors of the adoption of agroforestry systems and practices. Residence type and sex were the most dominant factor influencing the adoption of agroforestry systems. Duration of stay in the village, availability of extension education, residence, and sex were the dominant factor influencing the adoption of agroforestry practices. The most important and statistically significant factors among these were residence type and sex. The study concludes that agroforestry will be more successful if the local priorities, which include social-economic need characteristics of the society, will be considered in designing systems and practices. The socio-economic need of the community should be addressed in the process of expanding the adoption of agroforestry systems and practices.Keywords: agroforestry adoption, agroforestry systems, agroforestry practices, agroforestry, Kilombero
Procedia PDF Downloads 11810338 Recycling Strategies of Construction Waste in Egypt
Authors: Hanan Anwar
Abstract:
All systems recycle. The construction industry has not only become a major consumer of natural materials along with a source of pollution. Environmental integrated production, reusing and recycling is of great importance in Egypt nowadays. Governments should ensure that the technical, environmental and economic feasibility of alternative systems is considered and is taken into account before construction starts. Hereby this paper focuses on the recycle of building materials as a way for environment protection and sustainable development. Environmental management integrates the requirements of sustainable development. There are many methods used to reduce waste and increase profits through salvage, reuse, and the recycling of construction waste. Sustainable development as a tool to continual improvement cycle processes innovations to save money.Keywords: environment, management, reuse, recycling, sustainable development
Procedia PDF Downloads 31510337 An Introduction to Critical Chain Project Management Methodology
Authors: Ranjini Ramanath, Nanjunda P. Swamy
Abstract:
Construction has existed in our lives since time immemorial. However, unlike any other industry, construction projects have their own unique challenges – project type, purpose and end use of the project, geographical conditions, logistic arrangements, largely unorganized manpower and requirement of diverse skill sets, etc. These unique characteristics bring in their own level of risk and uncertainties to the project, which cause the project to deviate from its planned objectives of time, cost, quality, etc. over the many years, there have been significant developments in the way construction projects are conceptualized, planned, and managed. With the rapid increase in the population, increased rate of urbanization, there is a growing demand for infrastructure development, and it is required that the projects are delivered timely, and efficiently. In an age where ‘Time is Money,' implementation of new techniques of project management is required in leading to successful projects. This paper proposes a different approach to project management, which if applied in construction projects, can help in the accomplishment of the project objectives in a faster manner.Keywords: critical chain project management methodology, critical chain, project management, construction management
Procedia PDF Downloads 42310336 Linearization and Process Standardization of Construction Design Engineering Workflows
Authors: T. R. Sreeram, S. Natarajan, C. Jena
Abstract:
Civil engineering construction is a network of tasks involving varying degree of complexity and streamlining, and standardization is the only way to establish a systemic approach to design. While there are off the shelf tools such as AutoCAD that play a role in the realization of design, the repeatable process in which these tools are deployed often is ignored. The present paper addresses this challenge through a sustainable design process and effective standardizations at all stages in the design workflow. The same is demonstrated through a case study in the context of construction, and further improvement points are highlighted.Keywords: syste, lean, value stream, process improvement
Procedia PDF Downloads 12310335 Addressing Microbial Contamination in East Hararghe, Oromia, Ethiopia: Improving Water Sanitation Infrastructure and Promoting Safe Water Practices for Enhanced Food Safety
Authors: Tuji Jemal Ahmed, Hussen Beker Yusuf
Abstract:
Food safety is a major concern worldwide, with microbial contamination being one of the leading causes of foodborne illnesses. In Ethiopia, drinking water and untreated groundwater are a primary source of microbial contamination, leading to significant health risks. East Hararghe, Oromia, is one of the regions in Ethiopia that has been affected by this problem. This paper provides an overview of the impact of untreated groundwater on human health in Haramaya Rural District, East Hararghe and highlights the urgent need for sustained efforts to address the water sanitation supply problem. The use of untreated groundwater for drinking and household purposes in Haramaya Rural District, East Hararghe is prevalent, leading to high rates of waterborne illnesses such as diarrhea, typhoid fever, and cholera. The impact of these illnesses on human health is significant, resulting in significant morbidity and mortality, especially among vulnerable populations such as children and the elderly. In addition to the direct health impacts, waterborne illnesses also have indirect impacts on human health, such as reduced productivity and increased healthcare costs. Groundwater sources are susceptible to microbial contamination due to the infiltration of surface water, human and animal waste, and agricultural runoff. In Haramaya Rural District, East Hararghe, poor water management practices, inadequate sanitation facilities, and limited access to clean water sources contribute to the prevalence of untreated groundwater as a primary source of drinking water. These underlying causes of microbial contamination highlight the need for improved water sanitation infrastructure, including better access to safe drinking water sources and the implementation of effective treatment methods. The paper emphasizes the need for regular water quality monitoring, especially for untreated groundwater sources, to ensure safe drinking water for the population. The implementation of effective preventive measures, such as the use of effective disinfectants, proper waste disposal methods, and regular water quality monitoring, is crucial to reducing the risk of contamination and improving public health outcomes in the region. Community education and awareness-raising campaigns can also play a critical role in promoting safe water practices and reducing the risk of contamination. These campaigns can include educating the population on the importance of boiling water before drinking, the use of water filters, and proper sanitation practices. In conclusion, the use of untreated groundwater as a primary source of drinking water in East Hararghe, Oromia, Ethiopia, has significant impacts on human health, leading to widespread waterborne illnesses and posing a significant threat to public health. Sustained efforts are urgently needed to address the root causes of contamination, such as poor sanitation and hygiene practices, improper waste management, and the water sanitation supply problem, including the implementation of effective preventive measures and community-based education programs, ultimately improving public health outcomes in the region. A comprehensive approach that involves community-based water management systems, point-of-use water treatment methods, and awareness-raising campaigns can contribute to reducing the incidence of microbial contamination in the region.Keywords: food safety, health risks, microbial contamination, untreated groundwater
Procedia PDF Downloads 11510334 Balancing Aesthetics, Sustainability, and Safety in Handmade Fabric Face Masks: A Testimony of Creativity and Adaptability
Authors: Anne Mastamet-Mason, Oluwatosin Onakoya, Karla Tissiman
Abstract:
The COVID-19 pandemic that ravaged the world in 2020 brought about the need for handmade fabric face masks in South Africa and beyond. These masks showcased individuality and environmental responsibility and effectively aided our battle against the virus. These practical masks held significant meaning, representing human creativity, resilience, and commitment to sustainability in adversity. This paper examines how aesthetics, sustainability, and safety were achieved in the Handmade Fabric Face Masks. It analyses how their integration signified human agility and resilience to the pandemic while promoting dignity and environmental welfare. The research conducted a qualitative analysis to choose handmade fabric face masks and assess their aesthetic, sustainable, and safety features. The study involved interviewing a group of mask designers and users who evaluated the masks' efficacy in providing protection, aesthetics, and environmental sustainability. Although the designers demonstrated a high level of knowledge in the design aspects, the results indicated a need for more information regarding the functional safety measures and some environmental factors in mask selection and production. The mask analysis also revealed that the masks available in the market combined aesthetics and environmental protection but had limited safety measures. Despite the lack of balance of aesthetics, sustainability, and safety among the designers and the users of hand-fabric masks, functional aspects of fabrics and sustainability literacy are essentialKeywords: sustainable fashion, fabric mask, aesthetics, safety measures
Procedia PDF Downloads 6410333 Comparative Analysis of Traditional and Modern Roundabouts Using Sidra Intersection
Authors: Amir Mohammad Parvini, Amir Masoud Rahimi
Abstract:
Currently, most parts of the world have shifted from traditional roundabouts to modern roundabouts with respect to the role of roundabouts in reducing accidents, increasing safety, lowering the maintenance costs compared to traffic circles with their improper functional and safety experiences. In this study, field data collected from a current traditional roundabout was analyzed by the software AIMSUN and the obtained numbers were recorded. The modern roundabout was designed by changes in the traditional one, considering the geometric standards listed in regulations. Then, the modern roundabout was analyzed by applying a heterogeneous traffic by a micro-simulation software SIDRA (5.1). The function, capacity, and safety of the roundabout were analyzed assuming the superiority of modern roundabouts and acceptable LOS. The obtained results indicate that the function, capacity, and safety of modern roundabouts are better than traditional ones.Keywords: traditional roundabout, traffic circles, modern roundabout, AIMSUN, SIDRA
Procedia PDF Downloads 39910332 The Porsche Pavilion in Wolfsburg, Germany
Authors: H. Pasternak, T. Krausche
Abstract:
The Porsche Pavilion is an innovative stainless steel construction using the principle, often used in ship and car design, as an advantage for building a light but stiff structure. The Pavilion is a one of a kind and outstanding construction that you can find. It fits right in the existing parts of the Autostadt within the lagoon landscape and was built in only eight months. With its curving lines and exiting bends the structure is an extraordinary work which was designed by Henn architects, Munich. The monocoque has a good balance between material and support structure. The stiffness is achieved by the upper and lower side sheathing plates and the intermediate formers. Also the roof shell has no joints and a smooth surface. The assembling of the structure requires a large time and effort cost due to many welds which are necessary to connect all section to one large shell.Keywords: construction welding, exhibition building, light steel construction, monocoque
Procedia PDF Downloads 52410331 Reliability Analysis of Construction Schedule Plan Based on Building Information Modelling
Authors: Lu Ren, You-Liang Fang, Yan-Gang Zhao
Abstract:
In recent years, the application of BIM (Building Information Modelling) to construction schedule plan has been the focus of more and more researchers. In order to assess the reasonable level of the BIM-based construction schedule plan, that is whether the schedule can be completed on time, some researchers have introduced reliability theory to evaluate. In the process of evaluation, the uncertain factors affecting the construction schedule plan are regarded as random variables, and probability distributions of the random variables are assumed to be normal distribution, which is determined using two parameters evaluated from the mean and standard deviation of statistical data. However, in practical engineering, most of the uncertain influence factors are not normal random variables. So the evaluation results of the construction schedule plan will be unreasonable under the assumption that probability distributions of random variables submitted to the normal distribution. Therefore, in order to get a more reasonable evaluation result, it is necessary to describe the distribution of random variables more comprehensively. For this purpose, cubic normal distribution is introduced in this paper to describe the distribution of arbitrary random variables, which is determined by the first four moments (mean, standard deviation, skewness and kurtosis). In this paper, building the BIM model firstly according to the design messages of the structure and making the construction schedule plan based on BIM, then the cubic normal distribution is used to describe the distribution of the random variables due to the collecting statistical data of the random factors influencing construction schedule plan. Next the reliability analysis of the construction schedule plan based on BIM can be carried out more reasonably. Finally, the more accurate evaluation results can be given providing reference for the implementation of the actual construction schedule plan. In the last part of this paper, the more efficiency and accuracy of the proposed methodology for the reliability analysis of the construction schedule plan based on BIM are conducted through practical engineering case.Keywords: BIM, construction schedule plan, cubic normal distribution, reliability analysis
Procedia PDF Downloads 14910330 Layout Optimization of a Start-up COVID-19 Testing Kit Manufacturing Facility
Authors: Poojan Vora, Hardik Pancholi, Sanket Tajane, Harsh Shah, Elias Keedy
Abstract:
The global COVID-19 pandemic has affected the industry drastically in many ways. Even though the vaccine is being distributed quickly and despite the decreasing number of positive cases, testing is projected to remain a key aspect of the ‘new normal’. Improving existing plant layout and improving safety within the facility are of great importance in today’s industries because of the need to ensure productivity optimization and reduce safety risks. In practice, it is essential for any manufacturing plant to reduce nonvalue adding steps such as the movement of materials and rearrange similar processes. In the current pandemic situation, optimized layouts will not only increase safety measures but also decrease the fixed cost per unit manufactured. In our case study, we carefully studied the existing layout and the manufacturing steps of a new Texas start-up company that manufactures COVID testing kits. The effects of production rate are incorporated with the computerized relative allocation of facilities technique (CRAFT) algorithm to improve the plant layout and estimate the optimization parameters. Our work reduces the company’s material handling time and increases their daily production. Real data from the company are used in the case study to highlight the importance of colleges in fostering small business needs and improving the collaboration between college researchers and industries by using existing models to advance best practices.Keywords: computerized relative allocation of facilities technique, facilities planning, optimization, start-up business
Procedia PDF Downloads 13910329 The Use of Continuous Improvement Methods to Empower the Osh MS With Leading Key Performance Indicators
Authors: Maha Rashid Al-Azib, Almuzn Qasem Alqathradi, Amal Munir Alshahrani, Bilqis Mohammed Assiri, Ali Almuflih
Abstract:
The Occupational Safety and Health Management System in one of the largest Saudi companies has been experiencing in the last 10 years extensive direct and indirect expenses due to lack of proactive leading indicators and safety leadership effective procedures. And since there are no studies that are associated with this department of safety in the company, this research has been conducted. In this study we used a mixed method approach containing a literature review and experts input, then a qualitative questionnaire provided by Institute for Work and Health related to determining the company’s occupational safety and health management system level out from three levels (Compliance - Improvement - Continuous Learning) and the output regarding the company’s level was in Continuous Learning. After that Deming cycle was employed to create a set of proactive leading indicators and analyzed using the SMART method to make sure of its effectiveness and suitability to the company. The objective of this research is to provide a set of proactive indicators to contribute in making an efficient occupational safety and health management system that has less accidents which results in less expenses. Therefore, we provided the company with a prototype of an APP, designed and empowered with our final results to contribute in supporting decisions making processes.Keywords: proactive leading indicators, OSH MS, safety leadership, accidents reduction
Procedia PDF Downloads 80