2197 A Case Study on Problems Originated from Critical Path Method Application in a Governmental Construction Project

Authors: Mohammad Lemar Zalmai, Osman Hurol Turkakin, Cemil Akcay, Ekrem Manisali

Abstract:

In public construction projects, determining the contract period in the award phase is one of the most important factors. The contract period establishes the baseline for creating the cash flow curve and progress payment planning in the post-award phase. If overestimated, project duration causes losses for both the owner and the contractor. Therefore, it is essential to base construction project duration on reliable forecasting. In Turkey, schedules are usually built using the bar chart (Gantt) schedule, especially for governmental construction agencies. The usage of these schedules is limited for bidding purposes. Although the bar-chart schedule is useful in some cases, it lacks logical connections between activities; it would be harder to obtain the activities that have more effects than others on the project's total duration, especially in large complex projects. In this study, a construction schedule is prepared with Critical Path Method (CPM) that addresses the above-mentioned discrepancies. CPM is a simple and effective method that displays project time and critical paths, showing results of forward and backward calculations with considering the logic relationships between activities; it is a powerful tool for planning and managing all kinds of construction projects and is a very convenient method for the construction industry. CPM provides a much more useful and precise approach than traditional bar-chart diagrams that form the basis of construction planning and control. CPM has two main application utilities in the construction field; the first one is obtaining project duration, which is called an as-planned schedule that includes as-planned activity durations with relationships between subsequent activities. Another utility is during the project execution; each activity is tracked, and their durations are recorded in order to obtain as-built schedule, which is named as a black box of the project. The latter is more useful for delay analysis, and conflict resolutions. These features of CPM have been popular around the world. However, it has not been yet extensively used in Turkey. In this study, a real construction project is investigated as a case study; CPM-based scheduling is used for establishing both of as-built and as-planned schedules. Problems that emerged during the construction phase are identified and categorized. Subsequently, solutions are suggested. Two scenarios were considered. In the first scenario, project progress was monitored based as CPM was used to track and manage progress; this was carried out based on real-time data. In the second scenario, project progress was supposedly tracked based on the assumption that the Gantt chart was used. The S-curves of the two scenarios are plotted and interpreted. Comparing the results, possible faults of the latter scenario are highlighted, and solutions are suggested. The importance of CPM implementation has been emphasized and it has been proposed to make it mandatory for preparation of construction schedule based on CPM for public construction projects contracts.

Keywords: as-built, case-study, critical path method, Turkish government sector projects

Procedia PDF Downloads 95
2196 Colonization of Non-Planted Mangrove Species in the “Rehabilitation of Aquaculture Ponds to Mangroves” Projects in China

Authors: Yanmei Xiong, Baowen Liao, Kun Xin, Zhongmao Jiang, Hao Guo, Yujun Chen, Mei Li

Abstract:

Conversion of mangroves to aquaculture ponds represented as one major reason for mangrove loss in Asian countries in the 20th century. Recently the Chinese government has set a goal to increase 48,650 ha (more than the current mangrove area) of mangroves before the year of 2025 and “rehabilitation of aquaculture ponds to mangroves” projects are considered to be the major pathway to increase the mangrove area of China. It remains unclear whether natural colonization is feasible and what are the main influencing factors for mangrove restoration in these projects. In this study, a total of 17 rehabilitation sites in Dongzhai Bay, Hainan, China were surveyed for vegetation, soil and surface elevation five years after the rehabilitation project was initiated. Colonization of non-planted mangrove species was found at all sites and non-planted species dominated over planted species at 14 sites. Mangrove plants could only be found within the elevation range of -20 cm to 65 cm relative to the mean sea level. Soil carbon and nitrogen contents of the top 20 cm were generally low, ranging between 0.2%–1.4% and 0.03%–0.09%, respectively, and at each site, soil carbon and nitrogen were significantly lower at elevations with mangrove plants than lower elevations without mangrove plants. Seven sites located at the upper stream of river estuaries, where soil salinity was relatively lower, and nutrient was relatively higher, was dominated by non-planted Sonneratia caseolaris. Seven sites located at the down-stream of river estuaries or in the inner part of the bay, where soil salinity and nutrient were intermediate, were dominated by non-planted alien Sonneratia apetala. Another three sites located at the outer part of the bay, where soil salinity was higher and nutrient was lower, were dominated by planted species (Rhizophora stylosa, Kandelia obovata, Aegiceras corniculatum and Bruguiera sexangula) with non-planted S. apetala and Avicennia marina also found. The results suggest that natural colonization of mangroves is feasible in pond rehabilitation projects given the rehabilitation of tidal activities and appropriate elevations. Surface elevation is the major determinate for the success of mangrove rehabilitation, and soil salinity and nutrients are important in shaping vegetation structure. The colonization and dominance of alien species (Sonneratia apetala in this case) in some rehabilitation sites poses invasion risks and thus cautions should be taken when introducing alien mangrove species.

Keywords: coastal wetlands, ecological restoration, mangroves, natural colonization, shrimp pond rehabilitation, wetland restoration

Procedia PDF Downloads 112
2195 Unleashing the Potential of Green Finance in Architecture: A Promising Path for Balkan Countries

Authors: Luan Vardari, Dena Arapi Vardari

Abstract:

The Balkan countries, known for their diverse landscapes and cultural heritage, face the dual challenge of promoting economic growth while addressing pressing environmental concerns. In recent years, the concept of green finance has emerged as a powerful tool to achieve sustainable development and mitigate the environmental impact of various sectors, including architecture. This extended abstract explores the untapped potential of green finance in architecture within the Balkan region and highlights its role in driving sustainable construction practices and fostering a greener future. The abstract begins by defining green finance and emphasizing its relevance in the context of the architectural sector in Balkan countries. It underlines the benefits of green finance, such as economic growth, environmental conservation, and social well-being. Integrating green finance into architectural projects is important as a means to achieve sustainable development goals while promoting financial viability. Also, delves into the current state of green building practices in the Balkan countries and identifies the need for financial support to further drive adoption. It explores the existing regulatory frameworks and policies that promote sustainable architecture and discusses how green finance can complement these initiatives. Unique challenges faced by Balkan countries are highlighted, along with the potential opportunities that green finance presents in overcoming these challenges. We highlight successful sustainable architectural projects in the region to showcase the practical application of green finance in the Balkans. These projects exemplify the effective utilization of green finance mechanisms, resulting in tangible economic and environmental impacts, including job creation, energy efficiency, and reduced carbon emissions. The abstract concludes by identifying replicable models and lessons learned from these projects that can serve as a blueprint for future sustainable architecture initiatives in the Balkans. The importance of collaboration and knowledge sharing among stakeholders is emphasized. Engaging architects, financial institutions, governments, and local communities is crucial to promoting green finance in architecture. The abstract suggests the establishment of knowledge exchange platforms and regional/international networks to foster collaboration and facilitate the sharing of expertise among Balkan countries.

Keywords: sustainable finance, renewable energy, Balkan region, investment opportunities, green infrastructure, ESG criteria, architecture

Procedia PDF Downloads 45
2194 Breathing New Life into Old Media

Authors: Dennis Schmickle

Abstract:

Introductory statement: Augmented reality (AR) can be used to breathe life into traditional graphic design media, such as posters, book covers, and album art. AR superimposes a unique image/video on a user’s view of the real world, which makes it more immersive and realistic than traditional 2D media. This study developed a series of projects that utilize both traditional and AR media to teach the fundamental principles of graphic design. The results of this study suggest that AR can be an effective tool for teaching graphic design. Abstract: Traditional graphic design media, such as posters, book covers, and album art, could be considered to be “old media.” However, augmented reality (AR) can breathe life into these formats by making them more interactive and engaging for students and audiences alike. AR is a technology that superimposes a computer-generated image on a user’s view of the real world. This allows users to interact with digital content in a way that is more immersive and interactive than traditional 2D media. AR is becoming increasingly popular, as more and more people have access to smartphones and other devices that can support AR experiences. This study is comprised of a series of projects that utilize both traditional and AR media to teach the fundamental principles of graphic design. In these projects, students learn to create traditional design objects, such as posters, book covers, and album art. However, they are also required to create an animated version of their design and to use AR software to create an AR experience with which viewers can interact. The results of this study suggest that AR can be an effective and exciting tool for teaching graphic design. The students who participated in the study were able to learn the fundamental principles of graphic design, and they also developed the skills they need to create effective AR content. This study has implications for the future of graphic design education. As AR becomes more popular, it is likely that it will become an increasingly important tool for teaching graphic design.

Keywords: graphic design, augmented reality, print media, new media, AR, old media

Procedia PDF Downloads 44
2193 A Construction Scheduling Model by Applying Pedestrian and Vehicle Simulation

Authors: Akhmad F. K. Khitam, Yi Tai, Hsin-Yun Lee

Abstract:

In the modern research of construction management, the goals of scheduling are not only to finish the project within the limited duration, but also to improve the impact of people and environment. Especially for the impact to the pedestrian and vehicles, the considerable social cost should be estimated in the total performance of a construction project. However, the site environment has many differences between projects. These interactions affect the requirement and goal of scheduling. It is difficult for schedule planners to quantify these interactions. Therefore, this study use 3D dynamic simulation technology to plan the schedule of the construction engineering projects that affect the current space users (i.e., the pedestrians and vehicles). The proposed model can help the project manager find out the optimal schedule to minimize the inconvenience brought to the space users. Besides, a roadwork project and a building renovation project were analyzed for the practical situation of engineering and operations. Then this study integrates the proper optimization algorithms and computer technology to establish a decision support model. The proposed model can generate a near-optimal schedule solution for project planners.

Keywords: scheduling, simulation, optimization, pedestrian and vehicle behavior

Procedia PDF Downloads 120
2192 Exploratory Study of Community Interaction Project in Environment Education for Youth

Authors: Archana Vadeyar, Smita Phatak

Abstract:

Nurturing flora and fauna is the crux of Environment Education yet one tends to forget to nurture the human minds. Youth education presently is too academic, exam oriented and lacks all-round development. A project is whole-hearted purposeful activity proceeding in a social environment. Projects at +2 stages have become, just an easier way of securing marks. The purpose of this study was to explore the concept of an experiential environment education (EE) project for youth involving community interaction. Youth were encouraged to plan activities for children-based on EE through General knowledge (GK), language, math, science, fun games, quiz, sports, art and craft, stories. A purposive sample of 73 students was administered a self-prepared and validated questionnaire; supported by content analysis of reports from EE Journals of 21 students and some photos. Responses of students revealed that project was a joyful and motivating experience, with learnings and realizations, developed concern for others, made them feel responsible, happy and contented. Community interaction programs need to be included in the regular schedule to add more meaning to EE projects and cater to the needs of adolescents for diverting youth energy towards positive action.

Keywords: experiential, project, environment education, youth, community interaction

Procedia PDF Downloads 160
2191 Study of Teachers’ Views on Modern Methods of Teaching Regarding the Quality of Instruction in Shiraz High Schools

Authors: Nasrin Badrkhani, Hosein Dehghani

Abstract:

Teaching is an interaction between the teacher, student, and the concept in the classroom. As society needs thoughtful and creative people, there is a necessity to change the teaching methods and use modern and active methods of teaching. Teaching has to involve the student in thinking activities. Problem-solving, creativity, cooperation, and scientific thinking skills. Among the prominent characteristics of the modern methods, paying attention to the student struggle and the gradual and continuous learning (process-centered), emphasizing evaluating the students’ entire abilities and talents, and evaluating the students’ maximum ability can be mentioned. And student-centered teaching has to replace teacher-centered teaching. Among the modern methods, group work, role-playing, group discussion, cooperation, and engagement in judgments concerning societal values can be mentioned. This research uses a survey and a questionnaire with 38 questions on the Likert scale to examine the teacher’s ideas about the impact of modern methods of teaching on the quality of teaching. And also studies the relation between this factor and sex, major, and the teaching experience. The statistical population of this research is the teachers of Shiraz-Iran high schools. Morgan table is used for sampling; discriminant analysis is used for the mental of the questions. For the final examination of the questionnaire, Cronbach’s Alpha test and for the statistical analysis of SPSS Software are used. And in the inferential statistic level, T test and one-way variance are used. The results of this research showed that the teachers of this city have positive viewpoints about the use of modern teaching methods except engage in judgments concerning societal values. Both male and female teachers have the same viewpoints, and there isn’t any significant difference between the education degree and the use of modern methods. Also, this research confirms the results of similar research which were done in and out of Iran.

Keywords: learning, teaching, student, teacher, modern methods

Procedia PDF Downloads 41
2190 Identification of Successful Criteria for Measuring Large Infrastructure Projects Performance in Malaysia

Authors: M. A. N. Masrom, M. H. I. A. Rahim, G. K. Chen, S. Mohamed

Abstract:

Large infrastructure project is one of significant category in the development of Malaysian construction industry. This type of project has been recognized as a high complexity project with numerous construction risks, large cost involvement, highly technical requirements and divers of resources. Besides, the development of large infrastructure such as highway, railway, Mass Rapid Transit (MRT) and airport are also needed a large investment of public and private sector. To accomplish the development successfully, several challenges has to be determined prior the project commencement. To date, a comprehensive assessment of key success criteria particularly for large infrastructure in developing country such as Malaysia, is still not systematically defined and therefore, it needs further investigation. This paper aims to explore the potential success criteria that would be useful in gauging overall performance of large infrastructure implementation particularly in developing country. Previous successful criteria studies were used to develop a conceptual framework that possibly suitable for measuring large infrastructure performance. The findings show that successful criteria of infrastructure projects implementation could be grouped according to several key elements as it seems significant to the participants in prioritizing project challenges more systematically.

Keywords: successful criteria, performance, large infrastructure, Malaysia

Procedia PDF Downloads 384
2189 Diplomatic Public Relations Techniques for Official Recognition of Palestine State in Europe

Authors: Bilgehan Gultekin, Tuba Gultekin

Abstract:

Diplomatic public relations gives an ideal concept for recognition of palestine state in all over the europe. The first step of official recognition is approval of palestine state in international political organisations such as United Nations and Nato. So, diplomatic public relations provides a recognition process in communication scale. One of the aims of the study titled “Diplomatic Public Relations Techniques for Recognition of Palestine State in Europe” is to present some communication projects on diplomatic way. The study also aims at showing communication process at diplomatic level. The most important level of such kind of diplomacy is society based diplomacy. Moreover,The study provides a wider perspective that gives some creative diplomatic communication strategies for attracting society. To persuade the public for official recognition also is key element of this process. The study also finds new communication routes including persuasion techniques for society. All creative projects are supporting parts in original persuasive process of official recognition of Palestine.

Keywords: diplomatic public relations, diplomatic communication strategies, diplomatic communication, public relations

Procedia PDF Downloads 432
2188 Rational Allocation of Resources in Water Infrastructure Development Projects

Authors: M. Macchiaroli, V. Pellecchia, L. Dolores

Abstract:

Within any European and world model of management of the integrated water service (in Italy only since 2012 is regulated by a national Authority, that is ARERA), a significant part is covered by the development of assets in terms of hydraulic networks and wastewater collection networks, including all their relative building works. The process of selecting the investments to be made starts from the preventive analysis of critical issues (water losses, unserved areas, low service standards, etc.) who occur in the managed territory of the Operator. Through the Program of Interventions (Provision by ARERA n. 580/2019/R/idr), the Operator provides to program the projects that can meet the emerged needs to determine the improvement of the water service levels. This phase (analyzed and solved by the author with a work published in 2019) involves the use of evaluation techniques (cost-benefit analysis, multi-criteria, and multi-objective techniques, neural networks, etc.) useful in selecting the most appropriate design answers to the different criticalities. However, at this point, the problem of establishing the time priorities between the various works deemed necessary remains open. That is, it is necessary to hierarchize the investments. In this decision-making moment, the interests of the private Operator are often opposed, which favors investments capable of generating high profitability, compared to those of the public controller (ARERA), which favors investments in greater social impact. In support of the concertation between these two actors, the protocol set out in the research has been developed, based on the AHP and capable of borrowing from the programmatic documents an orientation path for the settlement of the conflict. The protocol is applied to a case study of the Campania Region in Italy and has been professionally applied in the shared decision process between the manager and the local Authority.

Keywords: analytic hierarchy process, decision making, economic evaluation of projects, integrated water service

Procedia PDF Downloads 107
2187 Mine Project Evaluations in the Rising of Uncertainty: Real Options Analysis

Authors: I. Inthanongsone, C. Drebenstedt, J. C. Bongaerts, P. Sontamino

Abstract:

The major concern in evaluating the value of mining projects related to the deficiency of the traditional discounted cash flow (DCF) method. This method does not take uncertainties into account and, hence it does not allow for an economic assessment of managerial flexibility and operational adaptability, which are increasingly determining long-term corporate success. Such an assessment can be performed with the real options valuation (ROV) approach, since it allows for a comparative evaluation of unforeseen uncertainties in a project life cycle. This paper presents an economic evaluation model for open pit mining projects based on real options valuation approach. Uncertainties in the model are caused by metal prices and cost uncertainties and the system dynamics (SD) modeling method is used to structure and solve the real options model. The model is applied to a case study. It can be shown that that managerial flexibility reacting to uncertainties may create additional value to a mining project in comparison to the outcomes of a DCF method. One important insight for management dealing with uncertainty is seen in choosing the optimal time to exercise strategic options.

Keywords: DCF methods, ROV approach, system dynamics modeling methods, uncertainty

Procedia PDF Downloads 476
2186 Change of Education Business in the Age of 5G

Authors: Heikki Ruohomaa, Vesa Salminen

Abstract:

Regions are facing huge competition to attract companies, businesses, inhabitants, students, etc. This way to improve living and business environment, which is rapidly changing due to digitalization. On the other hand, from the industry's point of view, the availability of a skilled labor force and an innovative environment are crucial factors. In this context, qualified staff has been seen to utilize the opportunities of digitalization and respond to the needs of future skills. World Manufacturing Forum has stated in the year 2019- report that in next five years, 40% of workers have to change their core competencies. Through digital transformation, new technologies like cloud, mobile, big data, 5G- infrastructure, platform- technology, data- analysis, and social networks with increasing intelligence and automation, enterprises can capitalize on new opportunities and optimize existing operations to achieve significant business improvement. Digitalization will be an important part of the everyday life of citizens and present in the working day of the average citizen and employee in the future. For that reason, the education system and education programs on all levels of education from diaper age to doctorate have been directed to fulfill this ecosystem strategy. Goal: The Fourth Industrial Revolution will bring unprecedented change to societies, education organizations and business environments. This article aims to identify how education, education content, the way education has proceeded, and overall whole the education business is changing. Most important is how we should respond to this inevitable co- evolution. Methodology: The study aims to verify how the learning process is boosted by new digital content, new learning software and tools, and customer-oriented learning environments. The change of education programs and individual education modules can be supported by applied research projects. You can use them in making proof- of- the concept of new technology, new ways to teach and train, and through the experiences gathered change education content, way to educate and finally education business as a whole. Major findings: Applied research projects can prove the concept- phases on real environment field labs to test technology opportunities and new tools for training purposes. Customer-oriented applied research projects are also excellent for students to make assignments and use new knowledge and content and teachers to test new tools and create new ways to educate. New content and problem-based learning are used in future education modules. This article introduces some case study experiences on customer-oriented digital transformation projects and how gathered knowledge on new digital content and a new way to educate has influenced education. The case study is related to experiences of research projects, customer-oriented field labs/learning environments and education programs of Häme University of Applied Sciences.

Keywords: education process, digitalization content, digital tools for education, learning environments, transdisciplinary co-operation

Procedia PDF Downloads 157
2185 Role of Leadership in Project Management

Authors: Miriam Filipová, Peter Balco

Abstract:

At present, in Slovak and Czech Republic, the education within the field of Project Management is carried out either within the higher education or via commercial entities, whilst the most used contents are the commonly used methodologies of project management. Obtaining a diploma after completing a university degree or a training certificate does not automatically mean the success of the project or the success of the project manager. The importance of leadership and soft skills in project management is either not included at all within the training of project managers, or it is only partially reflected. From the methodology perspective, the most important things during the preparation and management of the projects are preparation of the project plan, resource planning, and project realization in accordance with the chosen methodology. However, the key element on which the success of the project depends on are the people – whether they are team members on the supplier's side, the stakeholders, or the end users. This research focuses on the real needs of working project managers, on the development of their strengths, expertise, skills, and knowledge regarding leadership and soft skills. At the same time, it looks into identifying the elements that they consider to be key to the success of the projects they have managed and successfully delivered. The result of this research is the input for creating recommendations for a comprehensive education of project managers in the field of leadership and soft skills.

Keywords: project management, leadership, soft skills, education, academic degree, certificates, skills, talents, knowledge

Procedia PDF Downloads 138
2184 Escalation of Commitment and Turnover in Top Management Teams

Authors: Dmitriy V. Chulkov

Abstract:

Escalation of commitment is defined as continuation of a project after receiving negative information about it. While literature in management and psychology identified various factors contributing to escalation behavior, this phenomenon has received little analysis in economics, potentially due to the apparent irrationality of escalation. In this study, we present an economic model of escalation with asymmetric information in a principal-agent setup where the agents are responsible for a project selection decision and discover the outcome of the project before the principal. Our theoretical model complements the existing literature on several accounts. First, we link the incentive to escalate commitment to a project with the turnover decision by the manager. When a manager learns the outcome of the project and stops it that reveals that a mistake was made. There is an incentive to continue failing projects and avoid admitting the mistake. This incentive is enhanced when the agent may voluntarily resign from the firm before the outcome of the failing project is revealed, and thus not bear the full extent of reputation damage due to project failure. As long as some successful managers leave the firm for extraneous reasons, outside firms find it difficult to link failing projects with certainty to managers that left a firm. Second, we demonstrate that non-CEO managers have reputation concerns separate from those of the CEO, and thus may escalate commitment to projects they oversee, when such escalation can attenuate damage to reputation from impending project failure. Such incentive for escalation will be present for non-CEO managers if the CEO delegates responsibility for a project to a non-CEO executive. If reputation matters for promotion to the CEO, the incentive for a rising executive to escalate in order to protect reputation is distinct from that of a CEO. Third, our theoretical model is supported by empirical analysis of changes in the firm’s operations measured by the presence of discontinued operations at the time of turnover among the top four members of the top management team. Discontinued operations are indicative of termination of failing projects at a firm. The empirical results demonstrate that in a large dataset of over three thousand publicly traded U.S. firms for a period from 1993 to 2014 turnover by top executives significantly increases the likelihood that the firm discontinues operations. Furthermore, the type of turnover matters as this effect is strongest when at least one non-CEO member of the top management team leaves the firm and when the CEO departure is due to a voluntary resignation and not to a retirement or illness. Empirical results are consistent with the predictions of the theoretical model and suggest that escalation of commitment is primarily observed in decisions by non-CEO members of the top management team.

Keywords: discontinued operations, escalation of commitment, executive turnover, top management teams

Procedia PDF Downloads 348
2183 Role of Obama's Administration Counter-Terrorism Strategies towards Pakistan

Authors: Ahmed Bux Jamali

Abstract:

The purpose of this study is to examine and evaluate the overall counterterrorism cooperation during Obama Administration towards Pakistan. It aims and focuses on the performances and measures taken by United States of America during President Obama in office in order to eradicate terrorism from Pakistan. Being a grave national security threat, terrorism played a disastrous role in the domestic peace and stability of both countries. For the sake of curbing this menace in South Asia in general and Pakistan in particular, the role of Obama Administration is viable and results-oriented despite major ups and downs in Pakistan U.S Relations during that period of time. Obama administration formulated policies when he comes to office in 2009 by looking at the already efforts done by Bush Administration to counterterrorism from Pakistan. Obama’s foreign policy was revolving around defense and diplomacy when it comes to dealing with Pakistan. The concept of smart power was indeed a core principle of Obama’s administration to gain the strategic objectives in Pakistan. Obama’s strategies in terms of providing military aid packages and various assistance programs, working on institutional building and strengthening the economy helped Pakistan in strengthening the military capabilities to go for militant operation in the safe havens area in the tribal areas of Pakistan. It further helped building institutional mechanism in the governmental policies to counter terrorism and militancy. The training of combat forces, artillery, and equipment provided by US proved fatal for the militant terrorist organizations seeking hideouts in the tribal areas of Pakistan. Resultantly, many top leaders of al Qaeda and many affiliated militant groups were captured and given to US as well. Despite many ups and downs in the bilateral relations on various domestic and international issues, both countries didn’t compromise the elimination of terrorist phenomena from Pakistan which was indeed a great success of the Obama administration’s counterterrorism and counterinsurgency strategies in the long run.

Keywords: counterterrorism cooperation, national security strategy, Obama administration, Pakistan-US relations

Procedia PDF Downloads 158
2182 Design of a Multidisciplinary Project-Oriented Capstone Course for Mechanical Engineering Education

Authors: Chi-Cheng Cheng, Che-Hsin Lin, Yu-Jen Wang, Chua-Chin Wang

Abstract:

The project-oriented capstone course has become a required element for most engineering educational units. It is not only because the capstone course is an important criterion for international accreditation of engineering degree programs under Washington Accord, but also the capstone course provides an opportunity for students to apply what they have learned in their school years to actual engineering problems. Nevertheless, most project-oriented capstone courses are conducted with one single project for all students or teams. In other words, students work to reach the same or similar goals by coming up with different layouts and approaches. It appears not suitable for a multidisciplinary engineering department. Therefore, a one-year multidisciplinary project-oriented capstone course was designed for the junior year of the undergraduate program. About one-half of faculty members in the department needs to be involved in generating as many projects as possible to meet different students' interests and specialties. Project achievement has to be displayed and demonstrated in the annual exposition and competition at the end of this course. Significant success in attracting attention and hardworking of students on projects was witnessed for the past two pilot years. Analysis of course evaluation demonstrates positive impact on all perspectives despite of slightly negative influence due to poor communication and collaboration between students and their project supervisors.

Keywords: Capstone course, CDIO, engineering education, project-oriented learning

Procedia PDF Downloads 428
2181 Definition and Core Components of the Role-Partner Allocation Problem in Collaborative Networks

Authors: J. Andrade-Garda, A. Anguera, J. Ares-Casal, M. Hidalgo-Lorenzo, J.-A. Lara, D. Lizcano, S. Suárez-Garaboa

Abstract:

In the current constantly changing economic context, collaborative networks allow partners to undertake projects that would not be possible if attempted by them individually. These projects usually involve the performance of a group of tasks (named roles) that have to be distributed among the partners. Thus, an allocation/matching problem arises that will be referred to as Role-Partner Allocation problem. In real life this situation is addressed by negotiation between partners in order to reach ad hoc agreements. Besides taking a long time and being hard work, both historical evidence and economic analysis show that such approach is not recommended. Instead, the allocation process should be automated by means of a centralized matching scheme. However, as a preliminary step to start the search for such a matching mechanism (or even the development of a new one), the problem and its core components must be specified. To this end, this paper establishes (i) the definition of the problem and its constraints, (ii) the key features of the involved elements (i.e., roles and partners); and (iii) how to create preference lists both for roles and partners. Only this way it will be possible to conduct subsequent methodological research on the solution method.     

Keywords: collaborative network, matching, partner, preference list, role

Procedia PDF Downloads 206
2180 Pareto Optimal Material Allocation Mechanism

Authors: Peter Egri, Tamas Kis

Abstract:

Scheduling problems have been studied by the algorithmic mechanism design research from the beginning. This paper is focusing on a practically important, but theoretically rather neglected field: the project scheduling problem where the jobs connected by precedence constraints compete for various nonrenewable resources, such as materials. Although the centralized problem can be solved in polynomial-time by applying the algorithm of Carlier and Rinnooy Kan from the Eighties, obtaining materials in a decentralized environment is usually far from optimal. It can be observed in practical production scheduling situations that project managers tend to cache the required materials as soon as possible in order to avoid later delays due to material shortages. This greedy practice usually leads both to excess stocks for some projects and materials, and simultaneously, to shortages for others. The aim of this study is to develop a model for the material allocation problem of a production plant, where a central decision maker—the inventory—should assign the resources arriving at different points in time to the jobs. Since the actual due dates are not known by the inventory, the mechanism design approach is applied with the projects as the self-interested agents. The goal of the mechanism is to elicit the required information and allocate the available materials such that it minimizes the maximal tardiness among the projects. It is assumed that except the due dates, the inventory is familiar with every other parameters of the problem. A further requirement is that due to practical considerations monetary transfer is not allowed. Therefore a mechanism without money is sought which excludes some widely applied solutions such as the Vickrey–Clarke–Groves scheme. In this work, a type of Serial Dictatorship Mechanism (SDM) is presented for the studied problem, including a polynomial-time algorithm for computing the material allocation. The resulted mechanism is both truthful and Pareto optimal. Thus the randomization over the possible priority orderings of the projects results in a universally truthful and Pareto optimal randomized mechanism. However, it is shown that in contrast to problems like the many-to-many matching market, not every Pareto optimal solution can be generated with an SDM. In addition, no performance guarantee can be given compared to the optimal solution, therefore this approximation characteristic is investigated with experimental study. All in all, the current work studies a practically relevant scheduling problem and presents a novel truthful material allocation mechanism which eliminates the potential benefit of the greedy behavior that negatively influences the outcome. The resulted allocation is also shown to be Pareto optimal, which is the most widely used criteria describing a necessary condition for a reasonable solution.

Keywords: material allocation, mechanism without money, polynomial-time mechanism, project scheduling

Procedia PDF Downloads 311
2179 Thermodynamic Evaluation of Coupling APR-1400 with a Thermal Desalination Plant

Authors: M. Gomaa Abdoelatef, Robert M. Field, Lee, Yong-Kwan

Abstract:

Growing human populations have placed increased demands on water supplies and a heightened interest in desalination infrastructure. Key elements of the economics of desalination projects are thermal and electrical inputs. With growing concerns over the use of fossil fuels to (indirectly) supply these inputs, coupling of desalination with nuclear power production represents a significant opportunity. Individually, nuclear and desalination technologies have a long history and are relatively mature. For desalination, Reverse Osmosis (RO) has the lowest energy inputs. However, the economically driven output quality of the water produced using RO, which uses only electrical inputs, is lower than the output water quality from thermal desalination plants. Therefore, modern desalination projects consider that RO should be coupled with thermal desalination technologies (MSF, MED, or MED-TVC) with attendant steam inputs to permit blending to produce various qualities of water. A large nuclear facility is well positioned to dispatch large quantities of both electrical and thermal power. This paper considers the supply of thermal energy to a large desalination facility to examine heat balance impact on the nuclear steam cycle. The APR1400 nuclear plant is selected as prototypical from both a capacity and turbine cycle heat balance perspective to examine steam supply and the impact on electrical output. Extraction points and quantities of steam are considered parametrically along with various types of thermal desalination technologies to form the basis for further evaluations of economically optimal approaches to the interface of nuclear power production with desalination projects. In our study, the thermodynamic evaluation will be executed by DE-TOP which is the IAEA desalination program, it is approved to be capable of analyzing power generation systems coupled to desalination systems through various steam extraction positions, taking into consideration the isolation loop between the APR-1400 and the thermal desalination plant for safety concern.

Keywords: APR-1400, desalination, DE-TOP, IAEA, MSF, MED, MED-TVC, RO

Procedia PDF Downloads 508
2178 A Geoprocessing Tool for Early Civil Work Notification to Optimize Fiber Optic Cable Installation Cost

Authors: Hussain Adnan Alsalman, Khalid Alhajri, Humoud Alrashidi, Abdulkareem Almakrami, Badie Alguwaisem, Said Alshahrani, Abdullah Alrowaished

Abstract:

Most of the cost of installing a new fiber optic cable is attributed to civil work-trenching-cost. In many cases, information technology departments receive project proposals in their eReview system, but not all projects are visible to everyone. Additionally, if there was no IT scope in the proposed project, it is not likely to be visible to IT. Sometimes it is too late to add IT scope after project budgets have been finalized. Finally, the eReview system is a repository of PDF files for each project, which commits the reviewer to manual work and limits automation potential. This paper details a solution to address the late notification of the eReview system by integrating IT Sites GIS data-sites locations-with land use permit (LUP) data-civil work activity, which is the first step before securing the required land usage authorizations and means no detailed designs for any relevant project before an approved LUP request. To address the manual nature of eReview system, both the LUP System and IT data are using ArcGIS Desktop, which enables the creation of a geoprocessing tool with either Python or Model Builder to automate finding and evaluating potentially usable LUP requests to reduce trenching between two sites in need of a new FOC. To achieve this, a weekly dump was taken from LUP system production data and loaded manually onto ArcMap Desktop. Then a custom tool was developed in model builder, which consisted of a table of two columns containing all the pairs of sites in need of new fiber connectivity. The tool then iterates all rows of this table, taking the sites’ pair one at a time and finding potential LUPs between them, which satisfies the provided search radius. If a group of LUPs was found, an iterator would go through each LUP to find the required civil work between the two sites and the LUP Polyline feature and the distance through the line, which would be counted as cost avoidance if an IT scope had been added. Finally, the tool will export an Excel file named with sites pair, and it will contain as many rows as the number of LUPs, which met the search radius containing trenching and pulling information and cost. As a result, multiple projects have been identified – historical, missed opportunity, and proposed projects. For the proposed project, the savings were about 75% ($750,000) to install a new fiber with the Euclidean distance between Abqaiq GOSP2 and GOSP3 DCOs. In conclusion, the current tool setup identifies opportunities to bundle civil work on single projects at a time and between two sites. More work is needed to allow the bundling of multiple projects between two sites to achieve even more cost avoidance in both capital cost and carbon footprint.

Keywords: GIS, fiber optic cable installation optimization, eliminate redundant civil work, reduce carbon footprint for fiber optic cable installation

Procedia PDF Downloads 202
2177 Conceptual Model for Knowledge Sharing Model in Creating Idea for Mobile Application

Authors: Hanafizan Hussain

Abstract:

This study shows that several projects will be conducted at the workshop in which using the conceptual model for knowledge sharing approach to create an idea for mobile application. The sharing idea has been done through the collaborative activity in which a group of different field sought to define the mobile application which will lead to new media approach of using social media platform. The collaborative activity will be provided and implemented in the form of one day workshop to determine the approach towards the theme given. The activity later will be continued for four weeks for the participant to prepare for the pitch day workshop. This paper shows the pitch of idea including the interface and prototype for the said products. The collaboration between the members with different field of study shows that social media influenced the knowledge sharing model and its creation or innovations. One of the projects supported a collaborative activity in which a group of young designers sought to define the knowledge sharing model of their ability in creating idea for mobile applications.

Keywords: mobile application, collaborative activity, conceptual knowledge sharing model, social media platform

Procedia PDF Downloads 121
2176 Critical Success Factors of OCOP Business Model in Pattani Province Thailand: A Qualitative Approach

Authors: Poonsook Thatchaopas, Nik Kamariah Nikmat, Nattakarn Eakuru

Abstract:

Since 2003, the Thai Government has implemented several initiatives to encourage and incubate entrepreneurial skills and motivation among her citizens. One of the initiatives is the “One College One Product” business model or well known as ‘OCOP’, launched by the Vocational Education Commission to encourage partnership between college students to choose at least one product for business venture. In line with this mission, several business enterprises were established such as food products, restaurants, spa, Thai massage, minimart, computer maintenance, karaoke centre, internet café, mini theater etc. Currently, these business incubator projects can be observed at 404 vocational colleges and 21 incubation centres to encourage entrepreneurial small and medium enterprise (SME) development. However, the number of successful OCOP projects is still minimal. Out of the 404 individual OCOP projects at Vocational Colleges around Thailand, very few became successful. The objective of this paper is to identify the critical success factors needed to be a successful OCOP business entrepreneur. This study uses qualitative method by interviewing business partners of an OCOP business called Crispy Roti Krua Acheeva Brand (CRKAB). It is a snack food company that is developed at Pattani Vocational College in South Thailand. This project was initiated by three female entrepreneurs who were alumni student cum owners of the CRKAB. The finding shows that the main critical success factors are self-confidence, creativity or innovativeness, knowledge, skills and perseverance. Additionally, they reiterated that the keys to business success are product quality, perceived price, promotion, branding, new packaging to increase sales and continuous developments. The results implies for a student business SME to be successful, the company should have credible partners and effective marketing plan.

Keywords: student entrepreneurship, business incubator, food industry, qualitative, Thailand

Procedia PDF Downloads 374
2175 Modified Fuzzy Delphi Method to Incorporate Healthcare Stakeholders’ Perspectives in Selecting Quality Improvement Projects’ Criteria

Authors: Alia Aldarmaki, Ahmad Elshennawy

Abstract:

There is a global shift in healthcare systems’ emphasizing engaging different stakeholders in selecting quality improvement initiatives and incorporating their preferences to improve the healthcare efficiency and outcomes. Although experts bring scientific knowledge based on the scientific model and their personal experience, other stakeholders can bring new insights and information into the decision-making process. This study attempts to explore the impact of incorporating different stakeholders’ preference in identifying the most significant criteria that should be considered in healthcare for electing the improvement projects. A Framework based on a modified Fuzzy Delphi Method (FDM) was built. In addition to, the subject matter experts, doctors/physicians, nurses, administrators, and managers groups contribute to the selection process. The research identifies potential criteria for evaluating projects in healthcare, then utilizes FDM to capture expertise knowledge. The first round in FDM is intended to validate the identified list of criteria from experts; which includes collecting additional criteria from experts that the literature might have overlooked. When an acceptable level of consensus has been reached, a second round is conducted to obtain experts’ and other related stakeholders’ opinions on the appropriate weight of each criterion’s importance using linguistic variables. FDM analyses eliminate or retain the criteria to produce a final list of the critical criteria to select improvement projects in healthcare. Finally, reliability and validity were investigated using Cronbach’s alpha and factor analysis, respectively. Two case studies were carried out in a public hospital in the United Arab Emirates to test the framework. Both cases demonstrate that even though there were common criteria between the experts and the stakeholders, still stakeholders’ perceptions bring additional critical criteria into the evaluation process, which can impact the outcomes. Experts selected criteria related to strategical and managerial aspects, while the other participants preferred criteria related to social aspects such as health and safety and patients’ satisfaction. The health and safety criterion had the highest important weight in both cases. The analysis showed that Cronbach’s alpha value is 0.977 and all criteria have factor loading greater than 0.3. In conclusion, the inclusion of stakeholders’ perspectives is intended to enhance stakeholders’ engagement, improve transparency throughout the decision process, and take robust decisions.

Keywords: Fuzzy Delphi Method, fuzzy number, healthcare, stakeholders

Procedia PDF Downloads 102
2174 Problems of Innovation Development of Wireless Data Transfer Branch in the Cellular Market of Kazakhstan

Authors: Yessengeldy Kuanyshpayev

Abstract:

Now in some countries of the world the cellular market is on the point of saturation, in others - positive dynamics of development kept on. The reasons for it are also different, but there are united by their general susceptibility to innovation changes, if they are really innovative. If to take as an example the cellular market of Kazakhstan it is defined by the low percent of smart phones at consumers, the low population density, undercapacity of the 3G channel, and absence of universal access to the LTE technology that limits dynamical growth of this branch. These moments are aggravated by failures of starting commercial projects by private companies which prevent to be implemented and widely adopted to a new product among consumers. The object of the research is possible integration of wireless and program technologies at which introduction the idea can regenerate in an innovation. The analysis of existing projects in the market and the possible union of the technologies through a prism of theoretical bases of innovative activity shows that efficiency of the company by development and introduction of innovations is possible only thanks to strict observance of all terms and conditions of the innovative process which main term is profit. Despite that fact that on a global scale the innovativeness issue of companies is very popular, there are no research about possibility of innovative breaks in the field of wireless access to the Internet in the cellular market of Kazakhstan.

Keywords: innovation, the effectiveness of company, commercialization, cellular market

Procedia PDF Downloads 366
2173 The Tramway in French Cities: Complication of Public Spaces and Complexity of the Design Process

Authors: Elisa Maître

Abstract:

The redeployment of tram networks in French cities has considerably modified public spaces and the way citizens use them. Above and beyond the image that trams have of contributing to the sustainable urban development, the question of safety for users in these spaces has not been studied much. This study is based on an analysis of use of public spaces laid out for trams, from the standpoint of legibility and safety concerns. The study also examines to what extent the complexity of the design process, with many interactions between numerous and varied players in this process has a role in the genesis of these problems. This work is mainly based on the analysis of links between the uses of these re-designed public spaces (through observations, interviews of users and accident studies) and the analysis of the design conditions and processes of the projects studied (mainly based on interviews with the actors of these projects). Practical analyses were based three points of view: that of the planner, that of the user (based on observations and interviews) and that of the road safety expert. The cities of Montpellier, Marseille and Nice are the three fields of study on which the demonstration of this thesis is based. On part, the results of this study allow showing that the insertion of tram poses some problems complication of public areas of French cities. These complications related to the restructuring of public spaces for the tram, create difficulties of use and safety concerns. On the other hand, interviews depth analyses, fully transcribed, have led us to develop particular dysfunction scenarios in the design process. These elements lead to question the way the legibility and safety of these new forms of public spaces are taken into account. Then, an in-depth analysis of the design processes of public spaces with trams systems would also be a way of better understanding the choices made, the compromises accepted, and the conflicts and constraints at work, weighing on the layout of these spaces. The results presented concerning the impact that spaces laid out for trams have on the difficulty of use, suggest different possibilities for improving the way in which safety for all users is taken into account in designing public spaces.

Keywords: public spaces, road layout, users, design process of urban projects

Procedia PDF Downloads 212
2172 Analysis of Stress and Strain in Head Based Control of Cooperative Robots through Tetraplegics

Authors: Jochen Nelles, Susanne Kohns, Julia Spies, Friederike Schmitz-Buhl, Roland Thietje, Christopher Brandl, Alexander Mertens, Christopher M. Schlick

Abstract:

Industrial robots as part of highly automated manufacturing are recently developed to cooperative (light-weight) robots. This offers the opportunity of using them as assistance robots and to improve the participation in professional life of disabled or handicapped people such as tetraplegics. Robots under development are located within a cooperation area together with the working person at the same workplace. This cooperation area is an area where the robot and the working person can perform tasks at the same time. Thus, working people and robots are operating in the immediate proximity. Considering the physical restrictions and the limited mobility of tetraplegics, a hands-free robot control could be an appropriate approach for a cooperative assistance robot. To meet these requirements, the research project MeRoSy (human-robot synergy) develops methods for cooperative assistance robots based on the measurement of head movements of the working person. One research objective is to improve the participation in professional life of people with disabilities and, in particular, mobility impaired persons (e.g. wheelchair users or tetraplegics), whose participation in a self-determined working life is denied. This raises the research question, how a human-robot cooperation workplace can be designed for hands-free robot control. Here, the example of a library scenario is demonstrated. In this paper, an empirical study that focuses on the impact of head movement related stress is presented. 12 test subjects with tetraplegia participated in the study. Tetraplegia also known as quadriplegia is the worst type of spinal cord injury. In the experiment, three various basic head movements were examined. Data of the head posture were collected by a motion capture system; muscle activity was measured via surface electromyography and the subjective mental stress was assessed via a mental effort questionnaire. The muscle activity was measured for the sternocleidomastoid (SCM), the upper trapezius (UT) or trapezius pars descendens, and the splenius capitis (SPL) muscle. For this purpose, six non-invasive surface electromyography sensors were mounted on the head and neck area. An analysis of variance shows differentiated muscular strains depending on the type of head movement. Systematically investigating the influence of different basic head movements on the resulting strain is an important issue to relate the research results to other scenarios. At the end of this paper, a conclusion will be drawn and an outlook of future work will be presented.

Keywords: assistance robot, human-robot interaction, motion capture, stress-strain-concept, surface electromyography, tetraplegia

Procedia PDF Downloads 295
2171 Evaluation of Environmental Impact Assessment of Dam Using GIS/Remote Sensing-Review

Authors: Ntungamili Kenosi, Moatlhodi W. Letshwenyo

Abstract:

Negative environmental impacts due to construction of large projects such as dams have become an important aspect of land degradation. This paper will review the previous literature on the previous researches or study in the same area of study in the other parts of the world. After dam has been constructed, the actual environmental impacts are investigated and compared to the predicted results of the carried out Environmental Impact Assessment. GIS and Remote Sensing, play an important role in generating automated spatial data sets and in establishing spatial relationships. Results from other sources shows that the normalized vegetation index (NDVI) analysis was used to detect the spatial and temporal change of vegetation biomass in the study area. The result indicated that the natural vegetation biomass is declining. This is mainly due to the expansion of agricultural land and escalating human made structures in the area. Urgent environmental conservation is necessary when adjoining projects site. Less study on the evaluation of EIA on dam has been conducted in Botswana hence there is a need for the same study to be conducted and then it will be easy to be compared to other studies around the world.

Keywords: Botswana, dam, environmental impact assessment, GIS, normalized vegetation index (NDVI), remote sensing

Procedia PDF Downloads 388
2170 Collaborative Governance in Dutch Flood Risk Management: An Historical Analysis

Authors: Emma Avoyan

Abstract:

The safety standards for flood protection in the Netherlands have been revised recently. It is expected that all major flood-protection structures will have to be reinforced to meet the new standards. The Dutch Flood Protection Programme aims at accomplishing this task through innovative integrated projects such as construction of multi-functional flood defenses. In these projects, flood safety purposes will be combined with spatial planning, nature development, emergency management or other sectoral objectives. Therefore, implementation of dike reinforcement projects requires early involvement and collaboration between public and private sectors, different governmental actors and agencies. The development and implementation of such integrated projects has been an issue in Dutch flood risk management since long. Therefore, this article analyses how cross-sector collaboration within flood risk governance in the Netherlands has evolved over time, and how this development can be explained. The integrative framework for collaborative governance is applied as an analytical tool to map external factors framing possibilities as well as constraints for cross-sector collaboration in Dutch flood risk domain. Supported by an extensive document and literature analysis, the paper offers insights on how the system context and different drivers changing over time either promoted or hindered cross-sector collaboration between flood protection sector, urban development, nature conservation or any other sector involved in flood risk governance. The system context refers to the multi-layered and interrelated suite of conditions that influence the formation and performance of complex governance systems, such as collaborative governance regimes, whereas the drivers initiate and enable the overall process of collaboration. In addition, by applying a method of process tracing we identify a causal and chronological chain of events shaping cross-sectoral interaction in Dutch flood risk management. Our results indicate that in order to evaluate the performance of complex governance systems, it is important to firstly study the system context that shapes it. Clear understanding of the system conditions and drivers for collaboration gives insight into the possibilities of and constraints for effective performance of complex governance systems. The performance of the governance system is affected by the system conditions, while at the same time the governance system can also change the system conditions. Our results show that the sequence of changes within the system conditions and drivers over time affect how cross-sector interaction in Dutch flood risk governance system happens now. Moreover, we have traced the potential of this governance system to shape and change the system context.

Keywords: collaborative governance, cross-sector interaction, flood risk management, the Netherlands

Procedia PDF Downloads 113
2169 Cooperative Robot Application in a Never Explored or an Abandoned Sub-Surface Mine

Authors: Michael K. O. Ayomoh, Oyindamola A. Omotuyi

Abstract:

Autonomous mobile robots deployed to explore or operate in a never explored or an abandoned sub-surface mine requires extreme effectiveness in coordination and communication. In a bid to transmit information from the depth of the mine to the external surface in real-time and amidst diverse physical, chemical and virtual impediments, the concept of unified cooperative robots is seen to be a proficient approach. This paper presents an effective [human → robot → task] coordination framework for effective exploration of an abandoned underground mine. The problem addressed in this research is basically the development of a globalized optimization model premised on time series differentiation and geometrical configurations for effective positioning of the two classes of robots in the cooperation namely the outermost stationary master (OSM) robots and the innermost dynamic task (IDT) robots for effective bi-directional signal transmission. In addition, the synchronization of a vision system and wireless communication system for both categories of robots, fiber optics system for the OSM robots in cases of highly sloppy or vertical mine channels and an autonomous battery recharging capability for the IDT robots further enhanced the proposed concept. The OSM robots are the master robots which are positioned at strategic locations starting from the mine open surface down to its base using a fiber-optic cable or a wireless communication medium all subject to the identified mine geometrical configuration. The OSM robots are usually stationary and function by coordinating the transmission of signals from the IDT robots at the base of the mine to the surface and in a reverse order based on human decisions at the surface control station. The proposed scheme also presents an optimized number of robots required to form the cooperation in a bid to reduce overall operational cost and system complexity.

Keywords: sub-surface mine, wireless communication, outermost stationary master robots, inner-most dynamic robots, fiber optic

Procedia PDF Downloads 194
2168 Modeling the International Economic Relations Development: The Prospects for Regional and Global Economic Integration

Authors: M. G. Shilina

Abstract:

The interstate economic interaction phenomenon is complex. ‘Economic integration’, as one of its types, can be explored through the prism of international law, the theories of the world economy, politics and international relations. The most objective study of the phenomenon requires a comprehensive multifactoral approach. In new geopolitical realities, the problems of coexistence and possible interconnection of various mechanisms of interstate economic interaction are actively discussed. Currently, the Eurasian continent states support the direction to economic integration. At the same time, the existing international economic law fragmentation in Eurasia is seen as the important problem. The Eurasian space is characterized by a various types of interstate relations: international agreements (multilateral and bilateral), and a large number of cooperation formats (from discussion platforms to organizations aimed at deep integration). For their harmonization, it is necessary to have a clear vision to the phased international economic relations regulation options. In the conditions of rapid development of international economic relations, the modeling (including prognostic) can be optimally used as the main scientific method for presenting the phenomenon. On the basis of this method, it is possible to form the current situation vision and the best options for further action. In order to determine the most objective version of the integration development, the combination of several approaches were used. The normative legal approach- the descriptive method of legal modeling- was taken as the basis for the analysis. A set of legal methods was supplemented by the international relations science prognostic methods. The key elements of the model are the international economic organizations and states' associations existing in the Eurasian space (the Eurasian Economic Union (EAEU), the European Union (EU), the Shanghai Cooperation Organization (SCO), Chinese project ‘One belt-one road’ (OBOR), the Commonwealth of Independent States (CIS), BRICS, etc.). A general term for the elements of the model is proposed - the interstate interaction mechanisms (IIM). The aim of building a model of current and future Eurasian economic integration is to show optimal options for joint economic development of the states and IIMs. The long-term goal of this development is the new economic and political space, so-called the ‘Great Eurasian Community’. The process of achievement this long-term goal consists of successive steps. Modeling the integration architecture and dividing the interaction into stages led us to the following conclusion: the SCO is able to transform Eurasia into a single economic space. Gradual implementation of the complex phased model, in which the SCO+ plays a key role, will allow building an effective economic integration for all its participants, to create an economically strong community. The model can have practical value for politicians, lawyers, economists and other participants involved in the economic integration process. A clear, systematic structure can serve as a basis for further governmental action.

Keywords: economic integration, The Eurasian Economic Union, The European Union, The Shanghai Cooperation Organization, The Silk Road Economic Belt

Procedia PDF Downloads 131