Search results for: construction site layout
5742 Deviations and Defects of the Sub-Task’s Requirements in Construction Projects
Authors: Abdullah Almusharraf, Andrew Whyte
Abstract:
The sub-task pattern in terms of the deviations and defects should be identified and understand in order to improve the quality practices in construction projects. Therefore, the sub-task susceptibility to exposure to deviations and defects have been evaluated and classified via six classifications that have proposed in this study. 34 case studies on specific sub-task (from compression member in construction concrete structure) have been collected from seven construction projects in order to examined study’s classifications. The study revealed that the sub-task has high sensitive to deviation where (91%) of the cases recorded as deviations, however, only (19%) of cases recorded as defects. Another findings were that the actual work during the execution process has high source of deviation for this sub-task (74%) while only (26%) of the deviation source was due to both design documentations with the actual work. These findings significantly imply that it could be used the study’s classifications to determine the pattern of each sub-task and develop the proactive actions to overcome issues of the sub-task deviations and defects.Keywords: sub-tasks, deviations, defects, quality, construction projects
Procedia PDF Downloads 4445741 Geographical Information System-Based Approach for Vertical Takeoff and Landing Takeoff and Landing Site Selection
Authors: Chamnan Kumsap, Somsarit Sinnung, Suriyawate Boonthalarath, Teeranai Srithamarong
Abstract:
This research paper addresses the GIS analysis approach to the investigation of suitable sites for a vertical takeoff and landing drone. The study manipulated GIS and terrain layers into a proper input before the spatial analysis that included slope, reclassify, classify, and buffer was applied to the individual layers. The output layers were weighted, and multi-criteria analyzed before those patches failing to comply with filtering out criteria were discarded. Field survey for each suitable candidate site was conducted to cross-check the proposed approach with the real world. Conclusion was extracted for the VTOL takeoff and landing sites, and discussion was provided with further study being suggested on the mission simulation of selected takeoff and landing sites.Keywords: GIS approach, site selection, VTOL, takeoff and landing
Procedia PDF Downloads 1045740 Usefulness of Web Sites in Starting Up Wineries: A Comparative study of Canadian, Moroccan and American Small Firms
Authors: Jocelyn D. Perreault
Abstract:
An exploratory study has been launched in 2013-2014 in the province of Quebec, the state of Vermont (USA) and the region of Zaer in Morocco. We have realized three first case studies in order to better understand the marketing strategies of starting up vineries, which are defined as having a maximum of five years of operations. The methodology used consisted of visiting the vineyards; conducting semi-directed interviews with owner-managers; visiting points-of-sale of the wines and analysing the web sites using an assessment grid. The results indicate many differences between the three firms in their use of their web sites. More precisely, we have noticed that: -The Quebec vineyard uses its web site in collaboration with the touristic actors of its region and the association of the wine makers of the province of Quebec.Positioning is as a touristic attraction. -In comparison,the Moroccan firm limits the content of the web site to itself and its activities and somehow to the wine industry.Positioning is as a wine specialist. -The american firm associated its web site more to farm markets actors and activities of the region.Positioning is as an agricultural actor. -The positionings of the three vineyards are very different from each others and will be discussed more thoroughly during the presentation to better understand the use of web sites, thus contributing to the «brand image». -Improvements to the three web sites have been identified and suggested by more than a hundred of persons using the same grid and comprising students of bachelor and MBA degrees from our university. In general, the web sites have been considered satisfying but requiring several improvements at different levels. Changes or updates have been observed for the Quebec winery web site but practically no changes have been made to the others in the last months. The assessment grid will be presented in more details as well as the global and the partial scores given by the respondents. In conclusion, we have noticed that only one winery is considered as a «heavy and strategic user» of its web site and of Facebook and Twitter.Keywords: web site, wineries, marketing, positioning, starting up strategies
Procedia PDF Downloads 3035739 The Utilization of Recycled Construction and Demolition Waste Aggregate in Asphaltic Concrete
Authors: Inas Kamel, Noor Z. Habib
Abstract:
Utilizing construction and demolition wastes in hotmix asphalt (HMA) pavement construction can reduce the adverse environmental effect of its inadequate disposal and reduce the pressure of extracting and processing mineral aggregates (MA). This study aims to examine the viability of replacing MA by recycled construction and demolition waste aggregates (RCDWA) in the wearing course of asphaltic concrete (AC) pavements without compromising its loadbearing capacity. The Marshall Method was used to evaluate the performance of AC wearing course specimens by replacing MA by 10%, 20% and 30% RCDWA. Grade 60/70 bitumen was used in the range 3.0-5.5%, with 05% increments, to generate the optimum bitumen content (OBC). From the volumetric analysis and test property curves, the mixture containing 20% RCDWA was chosen as the preferred mix at 5.1% OBC. It possessed a 10% increase in Marshall Stability compared to the reference specimen, containing 100% MA, and a 6% increase in Marshall flow.Keywords: aggregate, asphaltic concrete, Marshall method, optimum bitumen content, recycled construction and demolition waste
Procedia PDF Downloads 1565738 Integrating Sustainable Construction Principles into Curriculum Design for Built Environment Professional Programs in Nigeria
Authors: M. Yakubu, M. B. Isah, S. Bako
Abstract:
This paper presents the findings of a research which sought to investigate the readiness to integrate sustainable construction principles into curriculum design for built environment professional programs in the Nigerian Universities. Developing the knowledge and understanding that construction professionals acquire of sustainable construction practice leads to considerable improvement in the environmental performance of the construction sector. Integrating sustainable environmental issues within the built environment education curricula provide the basis of this research. An integration of sustainable development principles into the universities built environment professional programmes are carried out with a view of finding solutions to the key issues identified. The perspectives of academia have been assessed and findings tested for validity through the analysis of primary quantitative data that has been collected. The secondary data generated has shown that there are significant differences in the approach to curriculum design within the built environment professional programmes, and this reveals that there is no ‘best practice’ that is clearly identifiable. Sequel to the above, this research reveals that engaging all stakeholders would be a useful component of built environment curriculum development, and that the curriculum be negotiated with interested parties. These parties have been identified as academia, government, construction industry and built environment professionals.Keywords: built environment, curriculum development, sustainable construction, sustainable development
Procedia PDF Downloads 4205737 The Successful in Construction Project via Effectiveness of Project Team
Authors: Zarabizan Zakaria, Hayati Zainal
Abstract:
The construction industry is one of the most important sectors that contribute to the nation’s economy and catalyze towards the growth of other industries. However, some construction projects have not been completed on its stipulated time and duration, scope and budget due to several factors. This problem arises due to the weaknesses of human factors, especially from ineffective leadership quality practiced by project managers and contractors in managing project teams. Therefore, a construction project should impose the element of Project Team. The project team is formed in the implementation of the project which includes the project brief, project scope, customer requirements and provided designs. Many organizations in the construction sector use teams to meet today's global competition and customer expectations, however, team effectiveness evaluation is required. In insuring the construction team is successful and effectiveness, the construction department must encourage, measure, set up, and evaluate or review the effectiveness of project team that was formed. In order to produce a better outcome for a high-end project, an effective and efficient project team is required which also help in increasing overall productivity. The purpose of this study is to determine the role of team effectiveness in the construction project team based on the overall construction project performance. It examines several different factors which related to team effectiveness. It also examines the relationship between team effectiveness factor and project performance aspect. Team Effect Review and Project Performance Review are developed to be used for data collection. Data collected were analyzed using several statistical tests. Results obtained from data analysis are validated using semi-structured interviews. Besides that, a comprehensive survey were developed to assess the way construction project teams in order to maintain its effectiveness throughout the project phase. In order to determine a project successful it has been found that Project Team Leadership is the most important factor. In addition, the definition of team effectiveness in the construction project team is developed based on the perspective of project clients and project team members. The results of this study are expected to provide an idea on the factors that are needed to be focused on improving the team's effectiveness towards project performance aspects. At the same time, the definition of team effectiveness from team members and owner views has been developed in order to provide a better understanding of the word team's effectiveness in construction projects.Keywords: project team, leadership, construction project, project successful
Procedia PDF Downloads 1775736 Factors Affecting Implementation of Construction Health and Safety Regulations, Their Effects and Mitigation Measures in Building Construction Project Sites of Hawassa City
Authors: Tadewos Awugchew Wudineh
Abstract:
Health and safety issues have always been a major problem and concern in the building construction industry. The health and safety regulations are stated to eliminate the potential hazards and to reduce the consequential risks. However, the importance of the regulations seems to be overlooked in building construction sites of Hawassa City. Accordingly, many companies don’t follow the regulations as construction workers are more likely to be injured and killed by construction accident than any other type of employment. This paper aimed to identify factors that affect the implementation of construction health and safety regulations, their effects and mitigation measures in building construction project sites of Hawassa City. To reach this objective, a review of literature as well as the Ethiopian construction health and safety regulations have been undertaken. Mainly a five-point Likert scale questionnaire was distributed, and statistical analysis was used to summarize, interpret the data, and to find the significances of the responses. In addition, interviews were carried out. Accordingly, the findings indicate that the top factors which affect the implementation of CHS regulations are, availability and development of a clear health and safety policy, health and safety inspections by top management, conducting health and safety training and orientation, provision of healthy and safe working environment and employment of trained safety officers. The study revealed that implementation or non-implementation of CHS regulations have effects on the worker’s productivity, job satisfaction, rate of accidents, and cost greatly. Thus, the suggestion to minimize the impact on worker’s job performance are, developing of a clear health and safety policy, management commitment towards implementation of health and safety regulations, health and safety education and training and conducting regular health and safety inspections. It was concluded from the study that good implementation of health and safety regulations are the results from administrative and management commitment which calls for more attention to be paid to improve the implementation of CHS regulations in building construction sites of Hawassa City.Keywords: construction health and safety regulations, effects, factors, mitigation
Procedia PDF Downloads 2605735 Experimental Procedure of Identifying Ground Type by Downhole Test: A Case Study
Authors: Seyed Abolhassan Naeini, Maedeh Akhavan Tavakkoli
Abstract:
Evaluating the shear wave velocity (V_s) and primary wave velocity (Vₚ) is necessary to identify the ground type of the site. Identifying the soil type based on different codes can affect the dynamic analysis of geotechnical properties. This study aims to separate the underground layers at the project site based on the shear wave and primary wave velocity (Sₚ) in different depths and determine dynamic elastic modulus based on the shear wave velocity. Bandar Anzali is located in a tectonically very active area. Several active faults surround the study site. In this case, a field investigation of downhole testing is conducted as a geophysics method to identify the ground type.Keywords: downhole, geophysics, shear wave velocity, case-study
Procedia PDF Downloads 1395734 Analysis of Landscape Pattern Evolution in Banan District, Chongqing, Based on GIS and FRAGSTATS
Authors: Wenyang Wan
Abstract:
The study of urban land use and landscape pattern is the current hotspot in the fields of planning and design, ecology, etc., which is of great significance for the construction of the overall humanistic ecosystem of the city and optimization of the urban spatial structure. Banan District, as the main part of the eastern eco-city planning of Chongqing Municipality, is a new high ground for highlighting the ecological characteristics of Chongqing, realizing effective transformation of ecological value, and promoting the integrated development of urban and rural areas. The analytical methods of land use transfer matrix (GIS) and landscape pattern index (Fragstats) were used to study the characteristics and laws of the evolution of land use landscape pattern in Banan District from 2000 to 2020, which provide some reference value for Banan District to alleviate the ecological contradiction of landscape. The results of the study show that: ① Banan District is rich in land use types, of which the area of cultivated land will still account for 57.15% of the total area of the landscape until 2020, accounting for an absolute advantage in the land use structure of Banan District; ② From 2000 to 2020, land use conversion in Banan District is characterized as: Cropland > woodland > grassland > shrubland > built-up land > water bodies > wetlands, with cropland converted to built-up land being the largest; ③ From 2000 to 2020, the landscape elements of Banan District were distributed in a balanced way, and the landscape types were rich and diversified, but due to the influence of human interference, it also presented the characteristics that the shape of the landscape elements tended to be irregular, and the dominant patches were distributed in a scattered manner, and the patches had poor connectivity. It is recommended that in future regional ecological construction, the layout should be rationally optimized, the relationship between landscape components should be coordinated, and the connectivity between landscape patches should be strengthened, and the degree of landscape fragmentation should be reduced.Keywords: land use transfer, landscape pattern evolution, GIS and FRAGSTATS, Banan District
Procedia PDF Downloads 805733 Unstructured Learning: Development of Free Form Construction in Waldorf and Normative Preschools
Authors: Salam Kodsi
Abstract:
In this research, we sought to focus on constructive play and examine its components in the context of two different educational approaches: Waldorf and normative schools. When they are free to choose, construction is one of the forms of play most favored by children. Its short-term and long-term cognitive contributions are apparent in various areas of development. The lack of empirical studies about play in Waldorf schools, which addresses the possibility of this incidental learning inspired the need to enrich the body of existing knowledge. 90 children (4-6 yrs.old) four preschools ( two normative, two Waldorf) participated in a small homogeneous city. Naturalistic observations documented the time frame, physical space, and construction materials related to the freeform building; processes of construction among focal representative children and its products. The study’s main finding with respect to the construction output points to a connection between educational approach and level of construction sophistication. Higher levels of sophistication were found at the Waldorf preschools than at the mainstream preschools. This finding emerged due to the differences in the level of sophistication among the older children in the two types of preschools, while practically no differences emerged among the younger children. Discussion of the research findings considered the differences between the play environments in terms of time, physical space, and construction materials. The construction processes were characterized according to the design model stages. The construction output was characterized according to the sophistication scale dimensions and the connections between approach, age and gender, and sophistication level.Keywords: constructive play, preschool, design process model, complexity
Procedia PDF Downloads 1185732 Contributing Factors to Building Failures and Defects in the Nigerian Construction Industry
Authors: Ndibarafinia Tobin
Abstract:
Building defect and failure are common phenomena in the Nigerian construction industry. The activities of the inexperienced labor force in the Nigerian construction industry have tarnished the image of practicing construction professionals in recent past. Defects and collapse can cause unnecessary expenditure, delays, loss of lives, property and left many people injured. They are also generating controversies among parties involved. Also, if this situation is left unanswered and untreated, it will lead to more serious problems in the future upcoming construction projects in Nigeria. Quite a number of factors are responsible for collapse of high-rise, reinforced concrete buildings in Nigeria. Government, professional bodies and stakeholders are asking countless questions as to who should be responsible and how solutions could be proffered. Therefore this study is aimed to identify the contributing factors to high-rise buildings defects and failures in Nigeria, which frequently occur in construction project in order to minimize time and cost and also the roles of professionals and other participants play in the industry in terms of the use of building materials, placement and curing of concrete, modification in the use of a building, collapse of building induced by fire and other causes. The data is collected from questionnaire from various players in construction industry in Nigeria. This study is succeeds in identifying the causes of building failure and also suggesting possible measures to be taken by government and other regulatory bodies in the building industry to avert this and also improve the effectiveness of managing appraisal process of failures and defects in the future.Keywords: building defects, building failures, Nigerian construction industry, professionals
Procedia PDF Downloads 2975731 Analysis Mechanized Boring (TBM) of Tehran Subway Line 7
Authors: Shahin Shabani, Pouya Pourmadadi
Abstract:
Tunnel boring machines (TBMs) have been used for the construction of various tunnels for mining projects for the purpose of access, conveyance of ore and waste, drainage, exploration, water supply and water diversion. Several mining projects have seen the successful and economic beneficial use of TBMs, and there is an increasing awareness of the benefits of TBMs for mining projects. Key technical considerations for the use of TBMs for the construction of tunnels for mining projects include geological issues (rock type, rock alteration, rock strength, rock abrasivity, durability, ground water inflows), depth of cover and the potential for overstressing/rockbursts, site access and terrain, portal locations, TBM constraints, minimum tunnel size, tunnel support requirements, contractor and labor experience, and project schedule demands. This study focuses on tunnelling mining, with the goal to develop methods and tools to be used to gain understanding of these processes, and to analyze metro of Tehran. The Metro Line 7 of Tehran is one of the Longest (26 Km) and deepest (27m) of projects that’s under implementation. Because of major differences like passing under all geotechnical layers of the town and encountering part of it with underground water table and also using mechanized excavation system, is one of special metro projects.Keywords: TBM, tunnel boring machines economic, metro, line 7
Procedia PDF Downloads 3845730 The Learning Impact of a 4-Dimensional Digital Construction Learning Environment
Authors: Chris Landorf, Stephen Ward
Abstract:
This paper addresses a virtual environment approach to work integrated learning for students in construction-related disciplines. The virtual approach provides a safe and pedagogically rigorous environment where students can apply theoretical knowledge in a simulated real-world context. The paper describes the development of a 4-dimensional digital construction environment and associated learning activities funded by the Australian Office for Learning and Teaching. The environment was trialled with over 1,300 students and evaluated through questionnaires, observational studies and coursework analysis. Results demonstrate a positive impact on students’ technical learning and collaboration skills, but there is need for further research in relation to critical thinking skills and work-readiness.Keywords: architectural education, construction industry, digital learning environments, immersive learning
Procedia PDF Downloads 4115729 Influence of Reinforcement Stiffness on the Performance of Back-to-Back Reinforced Earth Wall upon Rainwater Infiltration
Authors: Gopika Rajagopal, Sudheesh Thiyyakkandi
Abstract:
Back-to-back reinforced earth (RE) walls are extensively used in these days as bridge abutments and highway ramps, owing to their cost efficiency and ease of construction. High quality select fill is the most suitable backfill material due to its excellent engineering properties and constructability. However, industries are compelled to use low quality, locally available soil because of its ample availability on site. However, several failure cases of such walls are reported, especially subsequent to rainfall events. The stiffness of reinforcement is one of the major factors affecting the performance of RE walls. The present study focused on analyzing the effect of reinforcement stiffness on the performance of complete select fill, complete marginal fill, and hybrid-fill (i.e., combination of select and marginal fills) back-to-back RE walls, immediately after construction and upon rainwater infiltration through finite element modelling. A constant width to height (W/H) ratio of 3 and height (H) of 6 m was considered for the numerical analysis and the stiffness of reinforcement layers was varied from 500 kN/m to 10000 kN/m. Results showed that reinforcement stiffness had a noticeable influence on the response of RE wall, subsequent to construction as well as rainwater infiltration. Facing displacement was found to decrease and maximum reinforcement tension and factor of safety were observed to increase with increasing the stiffness of reinforcement. However, beyond a stiffness of 5000 kN/m, no significant reduction in facing displacement was observed. The behavior of fully marginal fill wall considered in this study was found to be reasonable even after rainwater infiltration when the high stiffness reinforcement layers are used.Keywords: back-to-back reinforced earth wall, finite element modelling, rainwater infiltration, reinforcement stiffness
Procedia PDF Downloads 1555728 Scheduling Building Projects: The Chronographical Modeling Concept
Authors: Adel Francis
Abstract:
Most of scheduling methods and software apply the critical path logic. This logic schedule activities, apply constraints between these activities and try to optimize and level the allocated resources. The extensive use of this logic produces a complex an erroneous network hard to present, follow and update. Planning and management building projects should tackle the coordination of works and the management of limited spaces, traffic, and supplies. Activities cannot be performed without the resources available and resources cannot be used beyond the capacity of workplaces. Otherwise, workspace congestion will negatively affect the flow of works. The objective of the space planning is to link the spatial and temporal aspects, promote efficient use of the site, define optimal site occupancy rates, and ensures suitable rotation of the workforce in the different spaces. The Chronographic scheduling modelling belongs to this category and models construction operations as well as their processes, logical constraints, association and organizational models, which help to better illustrate the schedule information using multiple flexible approaches. The model defined three categories of areas (punctual, surface and linear) and four different layers (space creation, systems, closing off space, finishing, and reduction of space). The Chronographical modelling is a more complete communication method, having the ability to alternate from one visual approach to another by manipulation of graphics via a set of parameters and their associated values. Each individual approach can help to schedule a certain project type or specialty. Visual communication can also be improved through layering, sheeting, juxtaposition, alterations, and permutations, allowing for groupings, hierarchies, and classification of project information. In this way, graphic representation becomes a living, transformable image, showing valuable information in a clear and comprehensible manner, simplifying the site management while simultaneously utilizing the visual space as efficiently as possible.Keywords: building projects, chronographic modelling, CPM, critical path, precedence diagram, scheduling
Procedia PDF Downloads 1555727 Using Construction Wastes and Recyclable Materials in Sustainable Concrete Manufacture
Authors: Mohamed T. El-Hawary, Carsten Koenke, Amr M. El-Nemr, Nagy F. Hanna
Abstract:
Sustainable construction materials using solid construction wastes are of great environmental and economic significance. Construction wastes, demolishing wastes, and wastes coming out from the preparation of traditional materials could be used in sustainable concrete manufacture, which is the main scope of this paper. Ceramics, clay bricks, marble, recycled concrete, and many other materials should be tested and validated for use in the manufacture of green concrete. Introducing waste materials in concrete helps in reducing the required landfills, leaving more space for land investments, and decrease the environmental impact of the concrete buildings industry in both stages -construction and demolition-. In this paper, marble aggregate is used as a replacement for the natural aggregate in sustainable green concrete production. The results showed that marble aggregates can be used as a full replacement for the natural aggregates in eco-friendly green concrete.Keywords: coarse aggregate replacement, economical designs, green concrete, marble aggregates, sustainability, waste management
Procedia PDF Downloads 1485726 Enhance Construction Visual As-Built Schedule Management Using BIM Technology
Authors: Shu-Hui Jan, Hui-Ping Tserng, Shih-Ping Ho
Abstract:
Construction project control attempts to obtain real-time as-built schedule information and to eliminate project delays by effectively enhancing dynamic schedule control and management. Suitable platforms for enhancing an as-built schedule visually during the construction phase are necessary and important for general contractors. As the application of building information modeling (BIM) becomes more common, schedule management integrated with the BIM approach becomes essential to enhance visual construction management implementation for the general contractor during the construction phase. To enhance visualization of the updated as-built schedule for the general contractor, this study presents a novel system called the Construction BIM-assisted Schedule Management (ConBIM-SM) system for general contractors in
Keywords: building information modeling (BIM), construction schedule management, as-built schedule management, BIM schedule updating mechanism
Procedia PDF Downloads 3755725 Anti-Site Disorder Effects on the Magnetic Properties of Sm₂NiMnO₆ Thin Films
Authors: Geetanjali Singh, R. J. Choudhary, Anjana Dogra
Abstract:
Here we report the effects of anti-site disorder, present in the sample, on the magnetic properties of Sm₂NiMnO₆ (SNMO) thin films. To our best knowledge, there are no studies available on the thin films of SNMO. Thin films were grown using pulsed laser deposition technique on SrTiO₃ (STO) substrate under oxygen pressure of 800 mTorr. X-ray diffraction (XRD) profiles show that the film grown is epitaxial. Field cooled (FC) and zero field cooled (ZFC) magnetization curve increase as we decrease the temperature till ~135K. A broad dip was observed in both the curves below this temperature which is more dominating in ZFC curve. An additional sharp cusplike shape was observed at low temperature (~20 K) which is due to the re-entrant spin-glass like properties present in the sample. Super-exchange interaction between Ni²⁺-O-Mn⁴⁺ is attributed to the FM ordering in these samples. The spin-glass feature is due to anti-site disorder within the homogeneous sample which was stated to be due to the mixed valence states Ni³⁺ and Mn³⁺ present in the sample. Anti-site disorder was found to play very crucial role in different magnetic phases of the sample.Keywords: double perovskite, pulsed laser deposition, spin-glass, magnetization
Procedia PDF Downloads 2625724 Analysis of the Evolution of Landscape Spatial Patterns in Banan District, Chongqing, China
Authors: Wenyang Wan
Abstract:
The study of urban land use and landscape pattern is the current hotspot in the fields of planning and design, ecology, etc., which is of great significance for the construction of the overall humanistic ecosystem of the city and optimization of the urban spatial structure. Banan District, as the main part of the eastern eco-city planning of Chongqing Municipality, is a high ground for highlighting the ecological characteristics of Chongqing, realizing effective transformation of ecological value, and promoting the integrated development of urban and rural areas. The analytical methods of land use transfer matrix (GIS) and landscape pattern index (Fragstats) were used to study the characteristics and laws of the evolution of land use landscape pattern in Banan District from 2000 to 2020, which provide some reference value for Banan District to alleviate the ecological contradiction of landscape. The results of the study show that ① Banan District is rich in land use types, of which the area of cultivated land will still account for 57.15% of the total area of the landscape until 2020, accounting for an absolute advantage in land use structure of Banan District; ② From 2000 to 2020, land use conversion in Banan District is characterized as Cropland > woodland > grassland > shrubland > built-up land > water bodies > wetlands, with cropland converted to built-up land being the largest; ③ From 2000 to 2020, the landscape elements of Banan District were distributed in a balanced way, and the landscape types were rich and diversified, but due to the influence of human interference, it also presented the characteristics that the shape of the landscape elements tended to be irregular, and the dominant patches were distributed in a scattered manner, and the patches had poor connectivity. It is recommended that in future regional ecological construction, the layout should be rationally optimized, the relationship between landscape components should be coordinated, the connectivity between landscape patches should be strengthened, and the degree of landscape fragmentation should be reduced.Keywords: land use transfer, landscape pattern evolution, GIS and Fragstats, Banan district
Procedia PDF Downloads 725723 The Modified WBS Based on LEED Rating System in Decreasing Energy Consumption and Cost of Buildings
Authors: Mehrab Gholami Zangalani, Siavash Rajabpour
Abstract:
In compliance with the Statistical Centre of Iran (SCI)’s results, construction and housing section in Iran is consuming 40% of energy, which is 5 times more than the world average consumption. By considering the climate in Iran, the solutions in terms of design, construction and exploitation of the buildings by utilizing the LEED rating system (LRS) is presented, regarding to the reasons for the high levels of energy consumption during construction and housing in Iran. As a solution, innovative Work Break Structure (WBS) in accordance with LRS and Iranian construction’s methods is unveiled in this research. Also, by amending laws pertaining to the construction in Iran, the huge amount of energy and cost can be saved. Furthermore, with a scale-up of these results to the scale of big cities such as Tehran (one of the largest metropolitan areas in the middle east) in which the license to build more than two hundred and fifty units each day is issued, the amount of energy and cost that can be saved is estimated.Keywords: costs reduction, energy statistics, leed rating system (LRS), work brake structure (WBS)
Procedia PDF Downloads 5285722 An Empirical Study of Barriers to Total Quality Management Implementation in Construction Industries
Authors: Dhafer Alqahtani
Abstract:
Total quality management (TQM) has become a widely accepted approach in the modern industry over recent years. There is a general consensus that by adopting TQM, the overall effectiveness and performance of an industry can be improved. It is also proved that as long as TQM is adopted fully and practiced effectively in the industry, potential benefits of TQM will be delivered. But despite the benefits of TQM as articulated by many quality gurus and academicians, these benefits are not achieved in practice. Many service industries have found it difficult to implement TQM successfully. This paper, therefore, explores the barriers to TQM’s successful implementation in construction firms. The aim is to identify and rank the barriers to successful TQM implementation in order to make them know and get a better understanding by the managers and practitioners of the Construction Industries. The research methodology adopted in this study was an extensive literature review on barriers to TQM implementation followed by a survey of selected construction firms using the self-administered instrument. The results also showed that only lack of effective communication and lack of top management support were not significantly associated with the level of implementation of TQM.Keywords: total quality management, construction firms, barriers, successful implementation
Procedia PDF Downloads 1005721 Lean: A Sustainable Approach to Design and Construction for Environmental Sustainability
Authors: Evelyn Lami Ashelo Allu, Fidelis A. Emuze
Abstract:
This study aims to contribute to the pursuit of environmental sustainability through the built environment practices of design and construction. Activities within the built environment and particularly within the construction industry have a significant role in ensuring environmental sustainability. The adoption of Lean principles and approaches would ensure that project deliverables are sustainable. This is because the processes that integrate lean principles reduce waste, add value to productivity, ensures customer satisfaction and are mindful of future productivity. Additionally, the lean principles for development are sustainable in themselves and thus promotes environmental sustainability. The study encourages further research with other methodologies and recommends the development of monitoring and evaluation mechanisms in order to promote the global concern for environmental sustainability.Keywords: built environment, construction, design, lean, sustainability
Procedia PDF Downloads 2655720 Diffable’s Aspiration Dreams in Spatial Planning
Authors: Tety Widyaningrum, Sapnah Rahmawati, Abdulmuluk Attim
Abstract:
Space was a container that includes land space, sea space and air space, including space in the earth as a whole region, where humans and other living creatures, operate and maintain its survival. Whereas spatial planning was a form of the structure of space and spatial pattern. At this time, the arrangement of space became a matter of considerable concern because through spatial planning was what will determine how the future city hall, how the welfare of the population that is in it, and how space can be a comfortable space to live. This spatial arrangement became a subject that must be considered not only by the Government as policy makers but also of concern to the entire community in it. As a place to stay, this space should be able to ensure the safety and comfort of the whole community, even people with disabilities, though. For development and spatial planning in Indonesia. It was still very low which was still concerned about the disabled. The spatial arrangement made generalizations. This caused the right for disabled people was less fulfilled. In accordance with the Declaration on the Rights of Persons with Disabilities who explains that people with disabilities had the right to be able to facilitate their efforts to become self-sufficient or not depends on the other party. It was also strengthened by According to the Law of the Republic of Indonesia No. 4 of 1997 on Persons with Disabilities; disabilities were part of the Indonesian people who had the status, rights, obligations and the same role with other Indonesian community in all aspects of life and livelihood. As observed, during the disabled were still used as objects that hadn’t been involved in the formulation of development planning of space in Indonesia, so the infrastructure space was still very far from the concept of friendly to the disabled. As an example of a sidewalk in Indonesia were still in bad condition, potholes, and uneven and don’t meet the eligibility standards. In addition, there were sidewalks that abused become a trade causing run down and chaotic atmosphere. In addition, pedestrians are also disturbed because the sidewalks were often still used as a parking lot or flowers to decorate the layout of the city, so the legroom was becoming increasingly limited. The development of infrastructure for pedestrians was also still concerned with aspects of aesthetic than functional. Therefore, the participation of disabled people must be involved in spatial planning exist. It aims to achieve spatial and environmentally friendly to the disabled. These dream space activities carried out by giving questionnaires and the dream images to the disabled about how the layout of the space they want what they want and what development was also in line with the principle of their convenience. This then will be taken into consideration for government in planning layout that was friendly to the whole community.Keywords: diffable, aspiration, spatial, planning
Procedia PDF Downloads 2955719 Barriers to E-Tendering Adoption and Implementation in the Ghanaian Construction Industry
Authors: Aynur Kazaz, Yusif Inusah
Abstract:
In the bid to improve transparency and efficiency as well as to reduce the cost of the public procurement process, Ghana started implementing an electronic Government Procurement System, known as the Ghana Electronic Procurement System (GHANEPS) in November 2019. The implementation of e-tendering technology is new to the stakeholders. Therefore, this research is aimed to identify the critical barriers to e-tendering implementation in the Ghanaian construction industry. Examples of barriers to e-tendering implementation were first identified through a literature review, and questionnaires and interview questions were prepared to gather the data. This study contributes to the in-depth understanding of global e-tendering barriers in the Ghanaian construction industry. The findings could help researchers, practitioners, and governments make strategic investment decisions and overcome e-tendering challenges.Keywords: barriers, challenges, construction industry, e-procurement, e-tendering
Procedia PDF Downloads 1315718 Dark Heritage Tourism and Visitor Behaviour: The Case of Elmina Castle, Ghana
Authors: Girish Prayag, Wantanee Suntikul, Elizabeth Agyeiwaah
Abstract:
Current research on dark tourism largely follows residents’ perspectives with limited evaluations of tourists’ experiences. Unravelling the case of a dark heritage site in Elmina, Ghana, this paper develops a theoretical model to understand the relationships among four constructs namely, motivation, tourism impacts, place attachment, and satisfaction. Based on a sample of 414 domestic tourists, PLS-SEM confirmed several relationships and inter-relationships among the four constructs. For example, motivation had a positive relationship with perceptions of positive and negative tourism impacts suggesting that the more tourists were motivated to visit the site for cultural/learning experiences, the more positive and negative tourism impacts they perceived. Implications for dark tourism and heritage site management are offered.Keywords: dark tourism, motivation, place attachment, tourism impacts
Procedia PDF Downloads 4325717 Molecular Docking Study of Quinazoline and Quinoline Derivatives against EGFR
Authors: Asli Faiza, Khamouli Saida
Abstract:
With the development of computer tools over the past 20 years. Molecular modeling and, more precisely, molecular docking has very quickly entered field of pharmaceutical research. EGFR enzyme involved in cancer disease.Our work consists of studying the inhibition of EGFR (1M17) with deferent inhibitors derived from quinazoline and quinoline by molecular docking. The values of ligands L148 and L177 are the best ligands for inhibit the activity of 1M17 since it forms a stable complex with this enzyme by better binding to the active site. The results obtained show that the ligands L148 and L177 give weak interactions with the active site residues EGFR (1M17), which stabilize the complexes formed of this ligands, which gives a better binding at the level of the active site, and an RMSD of L148 [1,9563 Å] and of L177 [ 1,2483 Å]. [1, 9563, 1.2483] ÅKeywords: docking, EGFR, quinazoline, quinoliène, MOE
Procedia PDF Downloads 685716 A Note on Metallurgy at Khanak: An Indus Site in Tosham Mining Area, Haryana
Authors: Ravindra N. Singh, Dheerendra P. Singh
Abstract:
Recent discoveries of Bronze Age artefacts, tin slag, furnaces and crucibles, together with new geological evidence on tin deposits in Tosham area of Bhiwani district in Haryana (India) provide the opportunity to survey the evidence for possible sources of tin and the use of bronze in the Harappan sites of north western India. Earlier, Afghanistan emerged as the most promising eastern source of tin utilized by Indus Civilization copper-smiths. Our excavations conducted at Khanak near Tosham mining area during 2014 and 2016 revealed ample evidence of metallurgical activities as attested by the occurrence of slag, ores and evidences of ashes and fragments of furnaces in addition to the bronze objects. We have conducted petrological, XRD, EDAX, TEM, SEM and metallography on the slag, ores, crucible fragments and bronze objects samples recovered from Khanak excavations. This has given positive indication of mining and metallurgy of poly-mettalic Tin at the site; however, it can only be ascertained after the detailed scientific examination of the materials which is underway. In view of the importance of site, we intend to excavate the site horizontally in future so as to obtain more samples for scientific studies.Keywords: archaeometallurgy, problem of tin, metallography, indus civilization
Procedia PDF Downloads 3005715 Probabilistic Model for Evaluating Seismic Soil Liquefaction Based on Energy Approach
Authors: Hamid Rostami, Ali Fallah Yeznabad, Mohammad H. Baziar
Abstract:
The energy-based method for evaluating seismic soil liquefaction has two main sections. First is the demand energy, which is dissipated energy of earthquake at a site, and second is the capacity energy as a representation of soil resistance against liquefaction hazard. In this study, using a statistical analysis of recorded data by 14 down-hole array sites in California, an empirical equation was developed to estimate the demand energy at sites. Because determination of capacity energy at a site needs to calculate several site calibration factors, which are obtained by experimental tests, in this study the standard penetration test (SPT) N-value was assumed as an alternative to the capacity energy at a site. Based on this assumption, the empirical equation was employed to calculate the demand energy for 193 liquefied and no-liquefied sites and then these amounts were plotted versus the corresponding SPT numbers for all sites. Subsequently, a discrimination analysis was employed to determine the equations of several boundary curves for various liquefaction likelihoods. Finally, a comparison was made between the probabilistic model and the commonly used stress method. As a conclusion, the results clearly showed that energy-based method can be more reliable than conventional stress-based method in evaluation of liquefaction occurrence.Keywords: energy demand, liquefaction, probabilistic analysis, SPT number
Procedia PDF Downloads 3685714 Factory Virtual Environment Development for Augmented and Virtual Reality
Authors: Michal Gregor, Jiri Polcar, Petr Horejsi, Michal Simon
Abstract:
Machine visualization is an area of interest with fast and progressive development. We present a method of machine visualization which will be applicable in real industrial conditions according to current needs and demands. Real factory data were obtained in a newly built research plant. Methods described in this paper were validated on a case study. Input data were processed and the virtual environment was created. The environment contains information about dimensions, structure, disposition, and function. Hardware was enhanced by modular machines, prototypes, and accessories. We added new functionalities and machines into the virtual environment. The user is able to interact with objects such as testing and cutting machines, he/she can operate and move them. Proposed design consists of an environment with two degrees of freedom of movement. Users are in touch with items in the virtual world which are embedded into the real surroundings. This paper describes the development of the virtual environment. We compared and tested various options of factory layout virtualization and visualization. We analyzed possibilities of using a 3D scanner in the layout obtaining process and we also analyzed various virtual reality hardware visualization methods such as Stereoscopic (CAVE) projection, Head Mounted Display (HMD), and augmented reality (AR) projection provided by see-through glasses.Keywords: augmented reality, spatial scanner, virtual environment, virtual reality
Procedia PDF Downloads 4085713 Earthquakes and Buildings: Lesson Learnt from Past Earthquakes in Turkey
Authors: Yavuz Yardım
Abstract:
The most important criteria for structural engineering is the structure’s ability to carry intended loads safely. The key element of this ability is mathematical modeling of really loadings situation into a simple loads input to use in structure analysis and design. Amongst many different types of loads, the most challenging load is earthquake load. It is possible magnitude is unclear and timing is unknown. Therefore the concept of intended loads and safety have been built on experience of previous earthquake impact on the structures. Understanding and developing these concepts is achieved by investigating performance of the structures after real earthquakes. Damage after an earthquake provide results of thousands of full-scale structure test under a real seismic load. Thus, Earthquakes reveille all the weakness, mistakes and deficiencies of analysis, design rules and practice. This study deals with lesson learnt from earthquake recoded last two decades in Turkey. Results of investigation after several earthquakes exposes many deficiencies in structural detailing, inappropriate design, wrong architecture layout, and mainly mistake in construction practice.Keywords: earthquake, seismic assessment, RC buildings, building performance
Procedia PDF Downloads 264