Search results for: low cost housing projects
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 8417

Search results for: low cost housing projects

8087 A Sociological Investigation on the Population and Public Spaces of Nguyen Cong Tru, a Soviet-Style Collective Housing Complex in Hanoi in Regards to Its New Community-Focused Architectural Design

Authors: Duy Nguyen Do, Bart Julien Dewancker

Abstract:

Many Soviet-style collective housing complexes (also known as KTT) were built since the 1960s in Hanoi to support the post-war population growth. Those low-rise buildings have created well-knitted, robust communities, so much to the point that in most complexes, all families in one housing block would know each other, occasionally interact and provide supports in need. To understand how the community of collective housing complexes have developed and maintained in order to adapt their advantages into modern housing designs, the study is executed on the site of Nguyen Cong Tru KTT. This is one of the oldest KTT in Hanoi, completed in 1954. The complex also has an unique characteristic that is closely related to its community: the symbiotic relationship with Hom – a flea market that has been co-developing with Nguyen Cong Tru KTT since its beginning. The research consists of three phases: the first phase is a sociological investigation with Nguyen Cong Tru KTT’s current residents and a site survey on the complex’s economic and architectural characteristics. In the second phase, the collected data is analyzed to find out people’s opinions with the KTT’s concerning their satisfaction with the current housing status, floor plan organization, community, the relationship between the KTT’s dedicated public spaces with the flea market and their usage. Simultaneously, the master plan and gathered information regarding current architectural characteristics of the complex are also inspected. On the third phase, the analyses’ results will provide information regarding the issues, positive trends and significant historical features of the complex’s architecture in order to generate suitable proposals for the redesigning project of Nguyen Cong Tru KTT, a design focused on vitalizing modern apartments’ communities.

Keywords: collective house community, collective house public space, community-focused, redesigning Nguyen Cong Tru KTT, sociological investigation

Procedia PDF Downloads 362
8086 Analyze and Improve Project Delivery Time Enhancing Business Management System of Review and Approval Process for Project Design Submittals

Authors: Abdulaziz Alnajem, Amit Sharma

Abstract:

Business Case: Project delivery and enhancing activities' completion in the shortest possible time is critical during execution to proceed with the subsequent phases of Procurement, C & C phases of Contracts to have the required Production facilities/Infrastructure in place to achieve the Company strategic objective of 4.0 MBOPD oil production. SOR (Statement of requirement): Design and Engineering phase of Projects execution takes a long time. It is observed that, in most of the cases, company has crossed the Project Design Submittals review time as per the Contract/Company Standards, resulting into delays in projects completion, and cost impact to the company. Study Scope: Scope of the study covers the process from date of first submission of D & E documents by the contractor to final approval by the controlling team to proceed with the procurement of materials. This scope covers projects handled by the company’s project management teams and includes only the internal review process by the company.

Keywords: business management system, project management, oil and gas, analysis, improvement, design, delays

Procedia PDF Downloads 217
8085 The Significance of a Well-Defined Systematic Approach in Risk Management for Construction Projects within Oil Industry

Authors: Batool Ismaeel, Umair Farooq, Saad Mushtaq

Abstract:

Construction projects in the oil industry can be very complex, having unknown outcomes and uncertainties that cannot be easily predicted. Each project has its unique risks generated by a number of factors which, if not controlled, will impact the successful completion of the project mainly in terms of schedule, cost, quality, and safety. This paper highlights the historic risks associated with projects in the south and east region of Kuwait Oil Company (KOC) collated from the company’s lessons learned database. Starting from Contract Award through to handover of the project to the Asset owner, the gaps in project execution in terms of managing risk will be brought to discussion and where a well-defined systematic approach in project risk management reflecting many claims, change of scope, exceeding budget, delays in engineering phase as well as in the procurement and fabrication of long lead items should be adopted. This study focuses on a proposed feasible approach in risk management for engineering, procurement and construction (EPC) level projects including the various stakeholders involved in executing the works from International to local contractors and vendors in KOC. The proposed approach covers the areas categorized into organizational, design, procurement, construction, pre-commissioning, commissioning and project management in which the risks are identified and require management and mitigation. With the effective deployment and implementation of the proposed risk management system and the consideration of it as a vital key in achieving the project’s target, the outcomes will be more predictable in the future, and the risk triggers will be managed and controlled. The correct resources can be allocated on a timely basis for the company for avoiding any unpredictable outcomes during the execution of the project. It is recommended in this paper to apply this risk management approach as an integral part of project management and investigate further in the future, the effectiveness of this proposed system for newly awarded projects and compare the same with those projects of similar budget/complexity that have not applied this approach to risk management.

Keywords: construction, project completion, risk management, uncertainties

Procedia PDF Downloads 153
8084 Identification of Social Responsibility Factors within Mega Construction Projects

Authors: Ali Alotaibi, Francis Edum-Fotwe, Andrew Price /

Abstract:

Mega construction projects create buildings and major infrastructure to respond to work and life requirements while playing a vital role in promoting any nation’s economy. However, the industry is often criticised for not balancing economic, environmental and social dimensions of their projects, with emphasis typically on one aspect to the detriment of the others. This has resulted in many negative impacts including environmental pollution, waste throughout the project lifecycle, low productivity, and avoidable accidents. The identification of comprehensive Social Responsibility (SR) indicators, which combine social, environmental and economic aspects, is urgently needed. This is particularly the case in the context of the Kingdom of Saudi Arabia (KSA), which often has mega public construction projects. The aim of this paper is to develop a set of wide-ranging SR indicators which encompass social, economic and environmental aspects unique to the KSA. A qualitative approach was applied to explore relevant indicators through a review of the existing literature, international standards and reports. A list of appropriate indicators was developed, and its comprehensiveness was corroborated by interviews with experts on mega construction projects working with SR concepts in the KSA. The findings present 39 indicators and their metrics, covering 10 economic, 12 environmental and 17 social aspects of SR mapped against their references. These indicators are a valuable reference for decision-makers and academics in the KSA to understand factors related to SR in mega construction projects. The indicators are related to mega construction projects within the KSA and require validation in a real case scenario or within a different industry to demonstrate their generalisability.

Keywords: social responsibility, construction projects, economic, social, environmental, indicators

Procedia PDF Downloads 168
8083 Successful Optimization of a Shallow Marginal Offshore Field and Its Applications

Authors: Kumar Satyam Das, Murali Raghunathan

Abstract:

This note discusses the feasibility of field development of a challenging shallow offshore field in South East Asia and how its learnings can be applied to marginal field development across the world especially developing marginal fields in this low oil price world. The field was found to be economically challenging even during high oil prices and the project was put on hold. Shell started development study with the aim to significantly reduce cost through competitively scoping and revive stranded projects. The proposed strategy to achieve this involved Improve Per platform recovery and Reduction in CAPEX. Methodology: Based on various Benchmarking Tool such as Woodmac for similar projects in the region and economic affordability, a challenging target of 50% reduction in unit development cost (UDC) was set for the project. Technical scope was defined to the minimum as to be a wellhead platform with minimum functionality to ensure production. The evaluation of key project decisions like Well location and number, well design, Artificial lift methods and wellhead platform type under different development concept was carried out through integrated multi-discipline approach. Key elements influencing per platform recovery were Wellhead Platform (WHP) location, Well count, well reach and well productivity. Major Findings: Reservoir being shallow posed challenges in well design (dog-leg severity, casing size and the achievable step-out), choice of artificial lift and sand-control method. Integrated approach amongst relevant disciplines with challenging mind-set enabled to achieve optimized set of development decisions. This led to significant improvement in per platform recovery. It was concluded that platform recovery largely depended on the reach of the well. Choice of slim well design enabled designing of high inclination and better productivity wells. However, there is trade-off between high inclination Gas Lift (GL) wells and low inclination wells in terms of long term value, operational complexity, well reach, recovery and uptime. Well design element like casing size, well completion, artificial lift and sand control were added successively over the minimum technical scope design leading to a value and risk staircase. Logical combinations of options (slim well, GL) were competitively screened to achieve 25% reduction in well cost. Facility cost reduction was achieved through sourcing standardized Low Cost Facilities platform in combination with portfolio execution to maximizing execution efficiency; this approach is expected to reduce facilities cost by ~23% with respect to the development costs. Further cost reductions were achieved by maximizing use of existing facilities nearby; changing reliance on existing water injection wells and utilizing existing water injector (W.I.) platform for new injectors. Conclusion: The study provides a spectrum of technically feasible options. It also made clear that different drivers lead to different development concepts and the cost value trade off staircase made this very visible. Scoping of the project through competitive way has proven to be valuable for decision makers by creating a transparent view of value and associated risks/uncertainty/trade-offs for difficult choices: elements of the projects can be competitive, whilst other parts will struggle, even though contributing to significant volumes. Reduction in UDC through proper scoping of present projects and its benchmarking paves as a learning for the development of marginal fields across the world, especially in this low oil price scenario. This way of developing a field has on average a reduction of 40% of cost for the Shell projects.

Keywords: benchmarking, full field development, CAPEX, feasibility

Procedia PDF Downloads 158
8082 From De Soto’s Solution to Urban Disaster: The Effects of Land Titling Policies on the Development of Cities of the Global South in the Case of Lima Peru

Authors: Jitka Molnarova

Abstract:

Based on De Soto’s idea that a formal land title can provide a secure home and access to credit to poor urban families, a large number of developing countries accepted the formalization of informal settlements as the ultimate solution for their housing crises and struggles with poverty. After two decades of implementation, very little is known about the effects this policy has on the quality of the neighborhoods it produces and on the development of cities in general. Using the capital of Peru -where the solution originated- as a case study, this paper illustrates the negative outcomes this policy has on urban development arguing that land titling encourages 1) expansion of the city often to areas of high physical risk, 2) production of precarious housing on unserviced land, and 3) practices of illegal land trafficking. The evidence is based on interviews with community leaders and officials working at the Cooperation for Formalization of Informal Property (COFOPRI), comparison of satellite images documenting the expansion of Lima in the past twenty years, and a technical evaluation of dozens of houses that have been or are in the process of being granted a land title.

Keywords: COFOPRI, De Soto, housing policies, land titling, land trafficking, Lima, Peru, precarious housing, urban expansion

Procedia PDF Downloads 187
8081 Factors Affecting Time Performance in Building Construction Projects

Authors: Ibraheem A. K. Mahameed

Abstract:

The aim of this study is to identify the risks affecting time performance of building construction projects in the West Bank in Palestine from contractors’ viewpoint. 38 risks that might affect time performance of building construction projects were defined through a detailed literature review. These risks have been classified into 6 groups: project, managerial, consultant, financial, external, and construction items. A questionnaire survey was performed to rank the considered risks in terms of severity and frequency. The analysis of the survey indicated that the top five risks affecting time performance of building construction projects in Palestine are: award project to the lowest price, political situation, poor communication and coordination between construction parties, change orders, and financial status of contractor.

Keywords: delay, time performance, construction, building

Procedia PDF Downloads 470
8080 Schedule Risk Management for Complex Projects: The Royal Research Ship: Sir David Attenborough Case Study

Authors: Chatelier Charlene, Oyegoke Adekunle, Ajayi Saheed, Jeffries Andrew

Abstract:

This study seeks to understand Schedule Risk Assessments as a priori for better performance whilst exploring the strategies employed to deliver complex projects like the New Polar research ship. This high-profile vessel was offered to Natural Environment Research Council and British Antarctic Survey (BAS) by Cammell Laird Shipbuilders. The Research Ship was designed to support science in extreme environments, with the expectancy to provide a wide range of specialist scientific facilities, instruments, and laboratories to conduct research over multiple disciplines. Aim: The focus is to understand the allocation and management of schedule risk on such a Major Project. Hypothesising that "effective management of schedule risk management" could be the most critical factor in determining whether the intended benefits mentioned are delivered within time and cost constraints. Objective 1: Firstly, the study seeks to understand the allocation and management of schedule risk in Major Projects. Objective 2: Secondly, it explores "effective management of schedule risk management" as the most critical factor determining the delivery of intended benefits. Methodology: This study takes a retrospective review of schedule risk management and how it influences project performance using a case study approach for the RRS (Royal Research Ship) Sir David Attenborough. Research Contribution: The outcomes of this study will contribute to a better understanding of project performance whilst building on its under-researched relationship to schedule risk management for complex projects. The outcomes of this paper will guide further research on project performance and enable the understanding of how risk-based estimates over time impact the overall risk management of the project.

Keywords: complexity, major projects, performance management, schedule risk management, uncertainty

Procedia PDF Downloads 96
8079 Housing Recovery in Heavily Damaged Communities in New Jersey after Hurricane Sandy

Authors: Chenyi Ma

Abstract:

Background: The second costliest hurricane in U.S. history, Sandy landed in southern New Jersey on October 29, 2012, and struck the entire state with high winds and torrential rains. The disaster killed more than 100 people, left more than 8.5 million households without power, and damaged or destroyed more than 200,000 homes across the state. Immediately after the disaster, public policy support was provided in nine coastal counties that constituted 98% of the major and severely damaged housing units in NJ overall. The programs include Individuals and Households Assistance Program, Small Business Loan Program, National Flood Insurance Program, and the Federal Emergency Management Administration (FEMA) Public Assistance Grant Program. In the most severely affected counties, additional funding was provided through Community Development Block Grant: Reconstruction, Rehabilitation, Elevation, and Mitigation Program, and Homeowner Resettlement Program. How these policies individually and as a whole impacted housing recovery across communities with different socioeconomic and demographic profiles has not yet been studied, particularly in relation to damage levels. The concept of community social vulnerability has been widely used to explain many aspects of natural disasters. Nevertheless, how communities are vulnerable has been less fully examined. Community resilience has been conceptualized as a protective factor against negative impacts from disasters, however, how community resilience buffers the effects of vulnerability is not yet known. Because housing recovery is a dynamic social and economic process that varies according to context, this study examined the path from community vulnerability and resilience to housing recovery looking at both community characteristics and policy interventions. Sample/Methods: This retrospective longitudinal case study compared a literature-identified set of pre-disaster community characteristics, the effects of multiple public policy programs, and a set of time-variant community resilience indicators to changes in housing stock (operationally defined by percent of building permits to total occupied housing units/households) between 2010 and 2014, two years before and after Hurricane Sandy. The sample consisted of 51 municipalities in the nine counties in which between 4% and 58% of housing units suffered either major or severe damage. Structural equation modeling (SEM) was used to determine the path from vulnerability to the housing recovery, via multiple public programs, separately and as a whole, and via the community resilience indicators. The spatial analytical tool ArcGIS 10.2 was used to show the spatial relations between housing recovery patterns and community vulnerability and resilience. Findings: Holding damage levels constant, communities with higher proportions of Hispanic households had significantly lower levels of housing recovery while communities with households with an adult >age 65 had significantly higher levels of the housing recovery. The contrast was partly due to the different levels of total public support the two types of the community received. Further, while the public policy programs individually mediated the negative associations between African American and female-headed households and housing recovery, communities with larger proportions of African American, female-headed and Hispanic households were “vulnerable” to lower levels of housing recovery because they lacked sufficient public program support. Even so, higher employment rates and incomes buffered vulnerability to lower housing recovery. Because housing is the "wobbly pillar" of the welfare state, the housing needs of these particular groups should be more fully addressed by disaster policy.

Keywords: community social vulnerability, community resilience, hurricane, public policy

Procedia PDF Downloads 372
8078 Examination of the Impact of Projects Based on Reggio Emilia Approach on the Creative Thinking Skills of Preschool Children: A Qualitative Study

Authors: Arzu Akar Gençer, Mübeccel Gönen

Abstract:

The objective of the study is to investigate the impact of the projects based on Reggio Emilia Approach, on the creative thinking skills of preschool children. The study is carried out with eighteen 6 years old children in a class of a preschool, and entailed the development of projects based on Reggio Emilia approach with the children, for a period of 3 months. The study employs qualitative model. The children were analyzed with reference to the creative thinking aspects (rationality, originality, flexibility, and applicability) of the projects applied. As the projects based on Reggio Emilia approach arose out of the interests and curiosity of the children, and had their roots in the existing class culture, it is possible to conclude that they have an impact on the creativity of the children with reference to the aspects of creative thinking.

Keywords: Reggio Emilia approach, project, creativity, preschool children

Procedia PDF Downloads 581
8077 Housing First, Not Housing Only: The Life Skills Project

Authors: Sara Cumming, Julianne DiSanto, Leah Burton

Abstract:

Homelessness in Canada is a persistent problem. It has been widely argued that the best tactic for eradicating homelessness is to approach social issues from a Housing First perspective—an approach that centers on quickly moving people into permanent and independent housing and then providing them additional support and services as needed. It is recognized that life skills training is both necessary and an effective way to reduce cyclical homelessness; however, there is a scarcity of research on effective ways to teach life skills; this problem was exacerbated in a pandemic context, where in-person delivery was severely restricted or no longer possible. Very little attention has been paid to the diverse cultural needs of clients in a multicultural context and the need to foster cultural knowledge/awareness in individuals to successfully contribute to the cultural safety of communities. This research attempts to fill these gaps in the literature and in practice by employing a community-engaged research (CER) approach. Academic, government, funders, front-line staff, and clients at 15 not-for-profits from across the Greater Toronto Area in Ontario, Canada, collaborated to co-create a virtual, client-centric, equity, diversity, and inclusion (EDI) informed life skill learning management system. We employed a triangulation methodology for this research. An environmental scan was conducted for best practices. Two separate Creative Problem Solving Sessions were held with over 100 front-line workers, managers, and executive directors who work with homeless populations. Quantitative and open-ended surveys were completed by over 200 individuals with experience with homelessness. All sections of this research aimed to discover the areas of skills that individuals need to maintain housing and to ascertain what a more client-driven EDI approach to life skills training should include. This research will showcase which life skills are deemed essential for homeless and precariously housed individuals.

Keywords: homelessness, Housing First, life skills, community engaged research

Procedia PDF Downloads 65
8076 Cloud Computing Impact on e-Government Adoption

Authors: Ali Elshabrawy

Abstract:

Cloud computing is expected to be important for e Government in near future. Governments need it for solving some of its e Government, financial, infrastructure, legacy systems and integration problems. It reduces information technology (IT) infrastructure needs and support costs, and offers on-demand infrastructure and computational power, improved collaboration capabilities, which are important for e Government projects start up and sustainability. Budget pressures will continue to drive more and more government IT to hybrid and even public clouds, and more cooperation between cloud service providers and governmental agencies are expected, Or developing governmental private, community clouds. Motivation to convince governments to use cloud computing services, will create a pressure on cloud service providers to cope with government's requirements for interoperability, security standards, open data and integration between their cloud systems There will be significant legal action arising out of governmental uses of cloud computing, and legislation addressing both IT and business needs and consumer fears and protections. Cloud computing is a considered a revolution for IT and E business in general and e commerce, e Government in particular. As governments faces increasing challenges regarding IT infrastructure required for e Government projects implementation. As a result of Lack of required financial resources allocated for e Government projects in developed and developing countries. Cloud computing can play a major role to solve some of e Government projects challenges such as, lack of financial resources, IT infrastructure, Human resources trained to manage e Government applications, interoperability, cost efficiency challenges. If we could solve some security issues related to cloud computing usage which considered critical for e Government projects. Pretty sure it’s Just a matter of time before cloud service providers will find out solutions to attract governments as major customers for their business.

Keywords: cloud computing, e-government, adoption, supply side barriers, e-government requirements, challenges

Procedia PDF Downloads 346
8075 Problems in Establishing Alliances to Comply with SDG 17 in the Successful Execution of Environmental Conservation Projects

Authors: Elena Bulmer

Abstract:

The research for this study has found that the formation of alliances for the successful revitalization of the global partnership for sustainable development, as defined by UN Sustainable Development Goal 17, entails considerable difficulty. This study uses for its empirical work marine environmental conservation projects and analyses the potential involvement of nonhuman actors as primordial stakeholders in these types of projects. The idea is to extend the scope of SDG 17 for it to also consider nonhuman subjects in order for it to better achieve its goal. The results of this study may be extrapolated to the business and management fields, which depend on natural resources for the development of their products. In the same way, in these areas, natural resources as nonhuman actors are not present in the stakeholder maps of these projects. Environmental Conservation projects are thus especially interesting to study with regards to their stakeholder context and have been used as the experimental setting for the empirical work of this study. The primordial stakeholders of these projects are not social objects and therefore go beyond the present limits of present stakeholder theory. The study that has been used to analyse this concept is a marine conservation project based in Spain, and to shed light in potential extending the role of the 17th Sustainable Development Goal to include nonhuman beings to be able to better achieve the rest of the SDGs, in this case, SDG 14 whose aim is to promote the conservation and sustainability of the world´s oceans.

Keywords: SDG 17, sustainability, stakeholder management, environmental conservation projects

Procedia PDF Downloads 214
8074 Multiple-Material Flow Control in Construction Supply Chain with External Storage Site

Authors: Fatmah Almathkour

Abstract:

Managing and controlling the construction supply chain (CSC) are very important components of effective construction project execution. The goals of managing the CSC are to reduce uncertainty and optimize the performance of a construction project by improving efficiency and reducing project costs. The heart of much SC activity is addressing risk, and the CSC is no different. The delivery and consumption of construction materials is highly variable due to the complexity of construction operations, rapidly changing demand for certain components, lead time variability from suppliers, transportation time variability, and disruptions at the job site. Current notions of managing and controlling CSC, involve focusing on one project at a time with a push-based material ordering system based on the initial construction schedule and, then, holding a tremendous amount of inventory. A two-stage methodology was proposed to coordinate the feed-forward control of advanced order placement with a supplier to a feedback local control in the form of adding the ability to transship materials between projects to improve efficiency and reduce costs. It focused on the single supplier integrated production and transshipment problem with multiple products. The methodology is used as a design tool for the CSC because it includes an external storage site not associated with one of the projects. The idea is to add this feature to a highly constrained environment to explore its effectiveness in buffering the impact of variability and maintaining project schedule at low cost. The methodology uses deterministic optimization models with objectives that minimizing the total cost of the CSC. To illustrate how this methodology can be used in practice and the types of information that can be gleaned, it is tested on a number of cases based on the real example of multiple construction projects in Kuwait.

Keywords: construction supply chain, inventory control supply chain, transshipment

Procedia PDF Downloads 122
8073 Partner Selection for Innovation Projects Related to New Product Concept Design

Authors: Odd Jarl Borch, Marina Z. Solesvik

Abstract:

The paper analyses partner selection approaches related to large scale R&D-based innovation projects at the different stages of development. We emphasize innovation projects in the maritime value chain and how partners are selected to improve quality according to high spec customer demands, and to reduce investment costs on new production technology such as advanced offshore service vessels. We elaborate on the differences in innovation approach and especially the role that purposive inflows and outflows of knowledge from external partners may be used to accelerate internal innovation. We present three cases related to different projects in terms of specificity and scope. We explore how the partner selection criteria change over time when the goals move from wide scope to a very specific R&D tasks.

Keywords: partner selection, innovation, offshore industry, concept design

Procedia PDF Downloads 514
8072 Analysis of Delay Causes in Construction Projects in Saudi Arabia

Authors: Ibrahim Mahamid, A. Al-Ghonamy, M. Aichouni

Abstract:

This study aims at identifying the risk matrix for delay causes in construction projects in Saudi Arabia from consultants’ viewpoint. A questionnaire survey was undertaken of 51 consultants working on construction projects in the Northern Province of Saudi Arabia. 35 delay causes were identified through a literature review. The study concluded that the top delay causes in construction projects in Saudi Arabia from consultants’ perspective are: bid award for lowest price, changes in material types and specifications during construction, contract management, duration of contract period, fluctuation of prices of materials, frequent changes in design, improper planning, inflationary pressure, lack of adequate manpower, long period of design and time of implementation, payments delay, poor labor productivity, and rework.

Keywords: delays, construction, consultants, contributors, risk map

Procedia PDF Downloads 541
8071 Developing a Framework for Sustainable Social Housing Delivery in Greater Port Harcourt City Rivers State, Nigeria

Authors: Enwin Anthony Dornubari, Visigah Kpobari Peter

Abstract:

This research has developed a framework for the provision of sustainable and affordable housing to accommodate the low-income population of Greater Port Harcourt City. The objectives of this study among others, were to: examine UN-Habitat guidelines for acceptable and sustainable social housing provision, describe past efforts of the Rivers State Government and the Federal Government of Nigeria to provide housing for the poor in the Greater Port Harcourt City area; obtain a profile of prospective beneficiaries of the social housing proposed by this research as well as perceptions of their present living conditions, and living in the proposed self-sustaining social housing development, based on the initial simulation of the proposal; describe the nature of the framework, guideline and management of the proposed social housing development and explain the modalities for its implementation. The study utilized the mixed methods research approach, aimed at triangulating findings from the quantitative and qualitative paradigms. Opinions of professional of the built environment; Director, Development Control, Greater Port Harcourt City Development Authority; Directors of Ministry of Urban Development and Physical Planning; Housing and Property Development Authority and managers of selected Primary Mortgage Institutions were sought and analyzed. There were four target populations for the study, namely: members of occupational sub-groups for FGDs (Focused Group Discussions); development professionals for KIIs (Key Informant Interviews), household heads in selected communities of GPHC; and relevant public officials for IDI (Individual Depth Interview). Focus Group Discussions (FGDs) were held with members of occupational sub-groups in each of the eight selected communities (Fisherfolk). The table shows that there were forty (40) members across all occupational sub-groups in each selected community, yielding a total of 320 in the eight (8) communities of Mgbundukwu (Mile 2 Diobu), Rumuodomaya, Abara (Etche), Igwuruta-Ali(Ikwerre), Wakama(Ogu-Bolo), Okujagu (Okrika), Akpajo (Eleme), and Okoloma (Oyigbo). For key informant interviews, two (2) members were judgmentally selected from each of the following development professions: urban and regional planners; architects; estate surveyors; land surveyors; quantity surveyors; and engineers. Concerning Population 3-Household Heads in Selected Communities of GPHC, a stratified multi-stage sampling procedure was adopted: Stage 1-Obtaining a 10% (a priori decision) sample of the component communities of GPHC in each stratum. The number in each stratum was rounded to one whole number to ensure representation of each stratum. Stage 2-Obtaining the number of households to be studied after applying the Taro Yamane formula, which aided in determining the appropriate number of cases to be studied at the precision level of 5%. Findings revealed, amongst others, that poor implementation of the UN-Habitat global shelter strategy, lack of stakeholder engagement, inappropriate locations, undue bureaucracy, lack of housing fairness and equity and high cost of land and building materials were the reasons for the failure of past efforts towards social housing provision in the Greater Port Harcourt City area. The study recommended a public-private partnership approach for the implementation and management of the framework. It also recommended a robust and sustained relationship between the management of the framework and the UN-Habitat office and other relevant government agencies responsible for housing development and all investment partners to create trust and efficiency.

Keywords: development, framework, low-income, sustainable, social housing

Procedia PDF Downloads 249
8070 Major Causes of Delay in Construction Projects

Authors: Y. Gholipour, E. Rezazadeh

Abstract:

Delay is one of the most serious and common problems of construction project that can affect project delivery unfavorably. This research presents the most important causes of delay in large dam projects based on a survey on some executed dam construction in Iran. In this survey a randomly selected samples of owners, consultants and contractors have been involved. The outcome of this survey revealed that scheduled payments, site management, shop drawing review process, unforeseen ground conditions and contractor experience as the most important factors affecting on delay in dam construction projects.

Keywords: delay, dam construction, project management, Iran

Procedia PDF Downloads 444
8069 The Study of Strength and Weakness Points of Various Techniques for Calculating the Volume of Done Work in Civil Projects

Authors: Ali Fazeli Moslehabadi

Abstract:

One of the topics discussed in civil projects, during the execution of the project, which the continuous change of work volumes is usually the characteristics of these types of projects, is how to calculate the volume of done work. The difference in volumes announced by the execution unit with the estimated volume by the technical office unit, has direct effect on the announced progress of the project. This issue can show the progress of the project more or less than actual value and as a result making mistakes for stakeholders and project managers and misleading them. This article intends to introduce some practical methods for calculating the volume of done work in civil projects. It then reviews the strengths and weaknesses of each of them, in order to resolve these contradictions and conflicts.

Keywords: technical skills, systemic skills, communication skills, done work volume calculation techniques

Procedia PDF Downloads 157
8068 Resale Housing Development Board Price Prediction Considering Covid-19 through Sentiment Analysis

Authors: Srinaath Anbu Durai, Wang Zhaoxia

Abstract:

Twitter sentiment has been used as a predictor to predict price values or trends in both the stock market and housing market. The pioneering works in this stream of research drew upon works in behavioural economics to show that sentiment or emotions impact economic decisions. Latest works in this stream focus on the algorithm used as opposed to the data used. A literature review of works in this stream through the lens of data used shows that there is a paucity of work that considers the impact of sentiments caused due to an external factor on either the stock or the housing market. This is despite an abundance of works in behavioural economics that show that sentiment or emotions caused due to an external factor impact economic decisions. To address this gap, this research studies the impact of Twitter sentiment pertaining to the Covid-19 pandemic on resale Housing Development Board (HDB) apartment prices in Singapore. It leverages SNSCRAPE to collect tweets pertaining to Covid-19 for sentiment analysis, lexicon based tools VADER and TextBlob are used for sentiment analysis, Granger Causality is used to examine the relationship between Covid-19 cases and the sentiment score, and neural networks are leveraged as prediction models. Twitter sentiment pertaining to Covid-19 as a predictor of HDB price in Singapore is studied in comparison with the traditional predictors of housing prices i.e., the structural and neighbourhood characteristics. The results indicate that using Twitter sentiment pertaining to Covid19 leads to better prediction than using only the traditional predictors and performs better as a predictor compared to two of the traditional predictors. Hence, Twitter sentiment pertaining to an external factor should be considered as important as traditional predictors. This paper demonstrates the real world economic applications of sentiment analysis of Twitter data.

Keywords: sentiment analysis, Covid-19, housing price prediction, tweets, social media, Singapore HDB, behavioral economics, neural networks

Procedia PDF Downloads 115
8067 Research Methodology of Living Environment of Modern Residential Development in St. Petersburg

Authors: Kalina Alina Aidarovna, Khayrullina Yulia Sergeevna

Abstract:

The question of forming quality housing and living environment remains a vexed problem in the current situation of high-rise apartment building in big cities of Russia. At this start up stage of the modern so-called "mass housing" market it needs to identify key quality characteristics on a different scale from apartments to the district. This paper describes the methodology of qualitative assessment of modern mass housing construction, made on the basis of the ITMO university in cooperation with the institute of spatial planning "Urbanika," based on the case study of St. Petersburg’s residential mass housing built in 2011-2014. The methodology of the study of housing and living environment goes back to the native and foreign urbanists of 60s - 80s, such Jane Jacobs, Jan Gehl, Oscar Newman, Krasheninnikov, as well as Sommer, Stools, Kohnen and Sherrod, Krasilnikova, Sychev, Zhdanov, Tinyaeva considering spatial features of living environment in a wide range of its characteristics (environmental control, territorial and personalization, privacy, etc.). Assessment is carrying out on the proposed system of criteria developed for each residential environment scale-district, quarter, courtyard, building surrounding grounds, houses, and flats. Thus the objects of study are planning unit of residential development areas (residential area, neighborhood, quarter) residential units areas (living artist, a house), and households (apartments) consisting of residential units. As a product of identified methodology, after the results of case studies of more than 700 residential complexes in St. Petersburg, we intend the creation of affordable online resource that would allow conducting a detailed qualitative evaluation or comparative characteristics of residential complexes for all participants of the construction market-developers, designers, realtors and buyers. Thereby the main objective of the rating may be achieved to improve knowledge, requirements, and demand for quality housing and living environment among the major stakeholders of the construction market.

Keywords: methodology of living environment, qualitative assessment of mass housing, scale-district, vexed problem

Procedia PDF Downloads 459
8066 [Keynote Speech]: Feature Selection and Predictive Modeling of Housing Data Using Random Forest

Authors: Bharatendra Rai

Abstract:

Predictive data analysis and modeling involving machine learning techniques become challenging in presence of too many explanatory variables or features. Presence of too many features in machine learning is known to not only cause algorithms to slow down, but they can also lead to decrease in model prediction accuracy. This study involves housing dataset with 79 quantitative and qualitative features that describe various aspects people consider while buying a new house. Boruta algorithm that supports feature selection using a wrapper approach build around random forest is used in this study. This feature selection process leads to 49 confirmed features which are then used for developing predictive random forest models. The study also explores five different data partitioning ratios and their impact on model accuracy are captured using coefficient of determination (r-square) and root mean square error (rsme).

Keywords: housing data, feature selection, random forest, Boruta algorithm, root mean square error

Procedia PDF Downloads 323
8065 Maintenance Alternatives Related to Costs of Wind Turbines Using Finite State Markov Model

Authors: Boukelkoul Lahcen

Abstract:

The cumulative costs for O&M may represent as much as 65%-90% of the turbine's investment cost. Nowadays the cost effectiveness concept becomes a decision-making and technology evaluation metric. The cost of energy metric accounts for the effect replacement cost and unscheduled maintenance cost parameters. One key of the proposed approach is the idea of maintaining the WTs which can be captured via use of a finite state Markov chain. Such a model can be embedded within a probabilistic operation and maintenance simulation reflecting the action to be done. In this paper, an approach of estimating the cost of O&M is presented. The finite state Markov model is used for decision problems with number of determined periods (life cycle) to predict the cost according to various options of maintenance.

Keywords: cost, finite state, Markov model, operation and maintenance

Procedia PDF Downloads 533
8064 The Importance of Adopting Sustainable Practices in Power Projects

Authors: Sikander Ali Abbassi, Wazir Muhmmad Laghari, Bashir Ahmed Laghari

Abstract:

Attaining sustainable development is one of the greatest challenges facing Pakistan today. A challenge that can only be met by developing and deploying confidence among the people. Transparency in project activities at all stages and other measures will also enhance its social and economic growth. Adopting sustainable practices and sensible policies, we mean that project activity should be economically viable, socially acceptable and environment friendly. In order to achieve this objective, there must be a continued commitment to encourage and ensure the public participation in development of power projects. Since Pakistan is an energy deficient country, it has to initiate power projects on a large scale in the near future. Therefore, it is the need of the hour to tackle these projects in a sustainable way, so that it can be benefited to the maximum possible level and have the least adverse effects on people and the environment. In order to get desirable results, careful planning, efficient implementation, standardized operational practices and community participation are the key parameters which ensure the positive impacts on economy, prosperity and the well being of our people. This paper pinpoints the potential environmental hazards due to project activity and emphasizes to adopt sustainable approaches in power projects.

Keywords: environmental hazards, sustainable practices, environment friendly, power projects

Procedia PDF Downloads 389
8063 Risk Prioritization in Tunneling Construction Projects

Authors: David Nantes, George Gilbert

Abstract:

There are a lot of risks that might crop up as a tunneling project develops, and it's crucial to be aware of them. Due to the unexpected nature of tunneling projects and the interconnectedness of risk occurrences, the risk assessment approach presents a significant challenge. The purpose of this study is to provide a hybrid FDEMATEL-ANP model to help prioritize risks during tunnel construction projects. The ambiguity in expert judgments and the relative severity of interdependencies across risk occurrences are both taken into consideration by this model, thanks to the Fuzzy Decision-Making Trial and Evaluation Laboratory (FDEMATEL). The Analytic Network Process (ANP) method is used to rank priorities and assess project risks. The authors provide a case study of a subway tunneling construction project to back up the validity of their methodology. The results showed that the proposed method successfully isolated key risk factors and elucidated their interplay in the case study. The proposed method has the potential to become a helpful resource for evaluating dangers associated with tunnel construction projects.

Keywords: risk, prioritization, FDEMATEL, ANP, tunneling construction projects

Procedia PDF Downloads 92
8062 The Effect of Configuration Space and Visual Perception in Public Space Usage at Villa Bukit Tidar Housing in Malang City

Authors: Aisyiyah Fauziah Rahmah

Abstract:

Generally, an urban city has a rapid growth, it has frequent a variety of problems, especially of convenience in public space usage. The density of population in urban areas and the high activity is also indicated as a cause of urban resident lifestyle for the worse in social relationships and allow for the stress. Streets and green space (parks) are the only public space in a residential area which is used as a place to build social activity, to meet and interact with the other housing dweller. The high level of activity and social interaction that occurs will affect the spatial arrangement. It can be effected the space structures in housing more complex. Ease in access to public space is the reason many dweller prefer doing social activities there. Hillier in Carmona et al (2003) explains that the pattern and intensity of movement of individuals is influenced by the configuration of space, even the space structure can be regarded as the single most influential determinant of movements in the space. Whyte in Zhang and Lawson (2009) also suggest some factors such as seats, trees, water and legibility of space encourage people to stay in public outdoor space. Furthermore this activities can attract more activities. Villa Bukit Tidar is a housing in Lowokwaru District which highest number of people in Malang City, so social activity is also high there. It has natural and recreational concept and provided with view of Malang City from heights. This potential is able to attract the people who live there to stay in public outdoor space and doing activities there. From this study we can find whether the ease of access to public space and visual satisfaction of Villa Bukit Tidar housing affect the usage of public space. This study was carried out by observing the streets pattern and plot pattern to know the configuration space of Villa Bukit Tidar housing through values of connectivity and integrity by resulting from space sintax analysis. Distributing questionnaires also carried out to determine the level of satisfaction and importance perception of visual condition in the public space in Villa Bukit Tidar housing through Important Performance Analysis (IPA). Results of this research indicated that the public spaces in Villa Bukit Tidar housing who has high connectivity and integrity is considered to be visually satisfied and it has a higher public space usage than has low connectivity and integrity are considered to be visually dissatisfied.

Keywords: configuration space, visual perception, social activities, public space usage

Procedia PDF Downloads 492
8061 Socio-Economic Insight of the Secondary Housing Market in Colombo Suburbs: Seller’s Point of Views

Authors: R. G. Ariyawansa, M. A. N. R. M. Perera

Abstract:

“House” is a powerful symbol of socio-economic background of individuals and families. In fact, housing provides all types of needs/wants from basic needs to self-actualization needs. This phenomenon can be realized only having analyzed hidden motives of buyers and sellers of the housing market. Hence, the aim of this study is to examine the socio-economic insight of the secondary housing market in Colombo suburbs. This broader aim was achieved via analyzing the general pattern of the secondary housing market, identifying socio-economic motives of sellers of the secondary housing market, and reviewing sellers’ experience of buyer behavior. A purposive sample of 50 sellers from popular residential areas in Colombo such as Maharagama, Kottawa, Piliyandala, Punnipitiya, and Nugegoda was used to collect primary data instead of relevant secondary data from published and unpublished reports. The sample was limited to selling price ranging from Rs15 million to Rs25 million, which apparently falls into middle and upper-middle income houses in the context. Participatory observation and semi-structured interviews were adopted as key data collection tools. Data were descriptively analyzed. This study found that the market is mainly handled by informal agents who are unqualified and unorganized. People such as taxi/tree-wheel drivers, boutique venders, security personals etc. are engaged in housing brokerage as a part time career. Few fulltime and formally organized agents were found but they were also not professionally qualified. As far as housing quality is concerned, it was observed that 90% of houses was poorly maintained and illegally modified. They are situated in poorly maintained neighborhoods as well. Among the observed houses, 2% was moderately maintained and 8% was well maintained and modified. Major socio-economic motives of sellers were “migrating foreign countries for education and employment” (80% and 10% respectively), “family problems” (4%), and “social status” (3%). Other motives were “health” and “environmental/neighborhood problems” (3%). This study further noted that the secondary middle income housing market in the area directly related with the migrants who motivated for education in foreign countries, mainly Australia, UK and USA. As per the literature, families motivated for education tend to migrate Colombo suburbs from remote areas of the country. They are seeking temporary accommodation in lower middle income housing. However, the secondary middle income housing market relates with the migration from Colombo to major global cities. Therefore, final transaction price of this market may depend on migration related dates such as university deadlines, visa and other agreements. Hence, it creates a buyers’ market lowering the selling price. Also it was revealed that the buyers tend to trust more on this market as far as the quality of construction of houses is concerned than brand new houses which are built for selling purpose.

Keywords: informal housing market, hidden motives of buyers and sellers, secondary housing market, socio-economic insight

Procedia PDF Downloads 168
8060 Feasibility Studies in Public Construction Projects in South Africa: Barriers and Implications

Authors: Kenneth O. Otasowie, Matthew Ikuabe, Clinton Aigbavboa, Ayodeji Oke

Abstract:

The practice of feasibility studies plays a huge role in the success of construction projects. Feasibility studies according to several research should be the reason for embarking on any project. However, it has been discovered that in South Africa (SA), feasibility studies are mainly done in the private sector construction but skipped in the construction of most public projects. Hence, this study aims to evaluate the barriers to feasibility studies practice in public projects and the implications. A survey design was adopted. A total number of One hundred and fifty (150) questionnaires were administered to Quantity Surveyors, Construction managers, Construction project managers, Project managers, Architects and Civil and Structural engineers in Guateng Province, SA and ninety (90) were returned and found suitable for analysis. Collected data was analysed using percentage, mean item score, standard deviation, one-sample t-test. The findings show that political interference and corruption are the most significant barriers to feasibility studies practice in the public construction projects in SA, while late project completion, poor quality infrastructure are among the implication of not conducting feasibility studies in SA public projects. Therefore, the study recommends the development of a framework for public projects execution that will reduce the interference of the political class in the country, that way the risk of late project completion and poor quality infrastructure will be mitigated.

Keywords: arriers, feasibility studies, public construction, South Africa.

Procedia PDF Downloads 89
8059 Comfort Needs and Energy Practices in Low-Income, Tropical Housing from a Socio-Technical Perspective

Authors: Tania Sharmin

Abstract:

Energy use, overheating and thermal discomfort in low-income tropical housing remains an under-researched area. This research attempts to explore these aspects in the Loving Community, a housing colony created for former leprosy patients and their families in Ahmedabad in India. The living conditions in these households and working practices of the inhabitants in terms of how the building and its internal and external spaces are used, will be explored through interviews and monitoring which will be based on a household survey and a focus group discussion (FGD). The findings from the study will provide a unique and in-depth account of how the relocation of the affected households to the new, flood-resistant and architecturally-designed buildings may have affected the dwellers’ household routines (health and well-being, comfort, satisfaction and working practices) and overall living conditions compared to those living in poorly-designed, existing low-income housings. The new houses were built under an innovative building project supported by De Montfort University Leicester (DMU)’s Square Mile India project. A comparison of newly-built and existing building typologies will reveal how building design can affect people’s use of space and energy use. The findings will be helpful to design healthier, energy efficient and socially acceptable low-income housing in future, thus addressing United Nation’s sustainable development goals on three aspects: 3 (health and well-being), 7 (energy) and 11 (safe, resilient and sustainable human settlements). This will further facilitate knowledge exchange between policy makers, developers, designers and occupants focused on strategies to increase stakeholders’ participation in the design process.

Keywords: thermal comfort, energy use, low-income housing, tropical climate

Procedia PDF Downloads 122
8058 A Study on Performance Prediction in Early Design Stage of Apartment Housing Using Machine Learning

Authors: Seongjun Kim, Sanghoon Shim, Jinwooung Kim, Jaehwan Jung, Sung-Ah Kim

Abstract:

As the development of information and communication technology, the convergence of machine learning of the ICT area and design is attempted. In this way, it is possible to grasp the correlation between various design elements, which was difficult to grasp, and to reflect this in the design result. In architecture, there is an attempt to predict the performance, which is difficult to grasp in the past, by finding the correlation among multiple factors mainly through machine learning. In architectural design area, some attempts to predict the performance affected by various factors have been tried. With machine learning, it is possible to quickly predict performance. The aim of this study is to propose a model that predicts performance according to the block arrangement of apartment housing through machine learning and the design alternative which satisfies the performance such as the daylight hours in the most similar form to the alternative proposed by the designer. Through this study, a designer can proceed with the design considering various design alternatives and accurate performances quickly from the early design stage.

Keywords: apartment housing, machine learning, multi-objective optimization, performance prediction

Procedia PDF Downloads 481