Search results for: sports project
5377 Concept to Enhance the Project Success and Promote the Implementation of Success Factors in Infrastructure Projects
Abstract:
Infrastructure projects are often subjected to delays and cost overruns and mistakenly described as unsuccessful projects. These projects have many peculiarities such as public attention, impact on the environment, subjected to special regulations, etc. They also deal with several stakeholders with different motivations and face unique risks. With this in mind we need to reconsider our approach to manage them, define their success factors and implement these success factors. Infrastructure projects are not only lacking a unified meaning of project success or a definition of success factors, but also a clear method to implement these factors. This paper investigates this gap and introduces a concept to implement success factors in an efficient way, taking into consideration the specific characteristics of infrastructure projects. This concept consists of six enablers such as project organization, project team, project management workflow, contract management, communication and knowledge transfer and project documentations. These enablers allow other success factors to be efficiently implemented in projects. In conclusion, this paper provides project managers as well as company managers with a tool to define and implement success factors efficiently in their projects, along with upgrading their assets for the coming projects. This tool consists of processes and validated checklists to ensure the best use of company resources and knowledge. Due to the special features of infrastructure projects this tool will be tested in the German infrastructure market. However, it is meant to be adaptable to other markets and industries.Keywords: infrastructure projects, operative success factors, project success, success factors, transportation projects
Procedia PDF Downloads 1285376 Building Information Modelling (BIM) and Unmanned Aerial Vehicles (UAV) Technologies in Road Construction Project Monitoring and Management: Case Study of a Project in Cyprus
Authors: Yiannis Vacanas, Kyriacos Themistocleous, Athos Agapiou, Diofantos Hadjimitsis
Abstract:
Building Information Modelling (BIM) technology is considered by construction professionals as a very valuable process in modern design, procurement and project management. Construction professionals of all disciplines can use a single 3D model which BIM technology provides, to design a project accurately and furthermore monitor the progress of construction works effectively and efficiently. Unmanned Aerial Vehicles (UAVs), a technology initially developed for military applications, is now without any difficulty accessible and has already been used by commercial industries, including the construction industry. UAV technology has mainly been used for collection of images that allow visual monitoring of building and civil engineering projects conditions in various circumstances. UAVs, nevertheless, have undergone significant advances in equipment capabilities and now have the capacity to acquire high-resolution imagery from many angles in a cost effective manner, and by using photogrammetry methods, someone can determine characteristics such as distances, angles, areas, volumes and elevations of an area within overlapping images. In order to examine the potential of using a combination of BIM and UAV technologies in construction project management, this paper presents the results of a case study of a typical road construction project where the combined use of the two technologies was used in order to achieve efficient and accurate as-built data collection of the works progress, with outcomes such as volumes, and production of sections and 3D models, information necessary in project progress monitoring and efficient project management.Keywords: BIM, project management, project monitoring, UAV
Procedia PDF Downloads 3035375 Appraisal of Transaction Cost in South African Construction Projects
Authors: Kenneth O. Otasowie, Matthew Ikuabe, Clinton Aigbavboa, Ayodeji Oke
Abstract:
Construction project cost are not only made up of production costs. This cost comprises of many other elements such as the preparation of a bidding document, cost estimations, drafting contractual agreements and monitoring that contractual obligations are met. Several studies have stressed the need for transaction costs (TC) to be defined in a way that covers all phases of a project and not only the pre-contract phase. Hence, this study aims to appraise transaction cost in South African (SA) construction projects by assessing what constitutes transaction cost, influencing factors and possible optimisation measures. A survey design was adopted. A total number of eighty (80) questionnaires were administered to quantity surveyors, procurement managers and project managers in Guateng Province, SA and seventy-two (72) were returned and found suitable for analysis. Collected data was analysed using percentage, mean item score, standard deviation, one-sample t-test. The findings show that external technical interaction, uncertainty, human factors are the most significant constituents of TC in SA, while technical competency, experience in similar project type and project characteristics are the leading influencing factors. Furthermore, understanding project characteristics, clear communication and technically competent project teams are most of the significant measures for optimising TC in SA construction projects. Therefore, this study recommends that a competent project team and a clear communication are fundamental to proper management of TC in SA construction projects.Keywords: construction projects, project cost, South Africa, transaction cost
Procedia PDF Downloads 995374 Effect of Pre-Construction on Construction Schedule and Client Loyalty
Authors: Jong Hoon Kim, Hyun-Soo Lee, Moonseo Park, Min Jeong, Inbeom Lee
Abstract:
Pre-construction is essential in achieving the success of a construction project. Due to the early involvement of project participants in the construction phase, project managers are able to plan ahead and solve issues well in advance leading to the success of the project and the satisfaction of the client. This research utilizes quantitative data derived from construction management projects in order to identify the relationship between pre-construction, construction schedule, and client satisfaction. A total of 65 construction projects and 93 clients were investigated for this research in an attempt to identify (a) the relationship between pre-construction and schedule reduction, and (b) pre-construction and client loyalty. Based on the quantitative analysis, this research was able to establish a negative correlation based on 65 construction projects between pre-construction and project schedule existed. This finding represents that the more pre-construction is performed for a certain project, the overall construction schedule decreased. Then, to determine the relationship between pre-construction and client satisfaction, Net Promoter Score (NPS) of 93 clients from the 65 projects was utilized. Pre-construction and NPS was further analyzed and a positive correlation was found between the two. This infers that clients tend to be more satisfied with projects with higher ratio of pre-construction than those projects with less pre-construction.Keywords: client loyalty, NPS, pre-construction, schedule reduction
Procedia PDF Downloads 3605373 Pavement Quality Evaluation Using Intelligent Compaction Technology: Overview of Some Case Studies in Oklahoma
Authors: Sagar Ghos, Andrew E. Elaryan, Syed Ashik Ali, Musharraf Zaman, Mohammed Ashiqur Rahman
Abstract:
Achieving desired density during construction is an important indicator of pavement quality. Insufficient compaction often compromises pavement performance and service life. Intelligent compaction (IC) is an emerging technology for monitoring compaction quality during the construction of asphalt pavements. This paper aims to provide an overview of findings from four case studies in Oklahoma involving the compaction quality of asphalt pavements, namely SE 44th St project (Project 1) and EOC Turnpike project (Project 2), Highway 92 project (Project 3), and 108th Avenue project (Project 4). For this purpose, an IC technology, the intelligent compaction analyzer (ICA), developed at the University of Oklahoma, was used to evaluate compaction quality. Collected data include GPS locations, roller vibrations, roller speed, the direction of movement, and temperature of the asphalt mat. The collected data were analyzed using a widely used software, VETA. The average densities for Projects 1, 2, 3 and 4, were found as 89.8%, 91.50%, 90.7% and 87.5%, respectively. The maximum densities were found as 94.6%, 95.8%, 95.9%, and 89.7% for Projects 1, 2, 3, and 4, respectively. It was observed that the ICA estimated densities correlated well with the field core densities. The ICA results indicated that at least 90% of the asphalt mats were subjected to at least two roller passes. However, the number of passes required to achieve the desired density (94% to 97%) differed from project to project depending on the underlying layer. The results of these case studies show both opportunities and challenges in using IC for monitoring compaction quality during construction in real-time.Keywords: asphalt pavement construction, density, intelligent compaction, intelligent compaction analyzer, intelligent compaction measure value
Procedia PDF Downloads 1575372 A Case Study on Machine Learning-Based Project Performance Forecasting for an Urban Road Reconstruction Project
Authors: Soheila Sadeghi
Abstract:
In construction projects, predicting project performance metrics accurately is essential for effective management and successful delivery. However, conventional methods often depend on fixed baseline plans, disregarding the evolving nature of project progress and external influences. To address this issue, we introduce a distinct approach based on machine learning to forecast key performance indicators, such as cost variance and earned value, for each Work Breakdown Structure (WBS) category within an urban road reconstruction project. Our proposed model leverages time series forecasting techniques, namely Autoregressive Integrated Moving Average (ARIMA) and Long Short-Term Memory (LSTM) networks, to predict future performance by analyzing historical data and project progress. Additionally, the model incorporates external factors, including weather patterns and resource availability, as features to improve forecast accuracy. By harnessing the predictive capabilities of machine learning, our performance forecasting model enables project managers to proactively identify potential deviations from the baseline plan and take timely corrective measures. To validate the effectiveness of the proposed approach, we conduct a case study on an urban road reconstruction project, comparing the model's predictions with actual project performance data. The outcomes of this research contribute to the advancement of project management practices in the construction industry by providing a data-driven solution for enhancing project performance monitoring and control.Keywords: project performance forecasting, machine learning, time series forecasting, cost variance, schedule variance, earned value management
Procedia PDF Downloads 395371 Questionnaire for the Evaluation of Entrepreneurship Project Psychopedagogical Practices: Construction Proceedings and Validation
Authors: Cristina Costa-Lobo, Sandra Fernandes, Miguel Magalhães, José Dinis-Carvalho, Alfredo Regueiro, Ana Carvalho
Abstract:
This paper is a report on the findings of the construction and the validation of a questionnaire monetized in a portuguese higher education context with undergraduate students. The Questionnaire for the Evaluation of Entrepreneurship Project Psychopedagogical Practices consists of six scales: Critical appraisal of the project, Developed Learning and Skills, Teamwork, Teacher and Tutor Roles, Evaluation of Student Performance, and Project Effectiveness as a Teaching-Learning Methodology. The proceedings of its construction are analyzed, and the validity and internal consistency analysis are described. Findings indicate good indicators of validity, good fidelity and an interpretable factorial structure.Keywords: entrepreneurship project, higher education, psychopedagogical practices, teacher and tutor roles
Procedia PDF Downloads 3815370 When It Wasn’t There: Understanding the Importance of High School Sports
Authors: Karen Chad, Louise Humbert, Kenzie Friesen, Dave Sandomirsky
Abstract:
Background: The pandemic of COVID-19 presented many historical challenges to the sporting community. For organizations and individuals, sport was put on hold resulting in social, economic, physical, and mental health consequences for all involved. High school sports are seen as an effective and accessible pathway for students to receive health, social, and academic benefits. Studies examining sport cessation due to COVID-19 found substantial negative outcomes on the physical and mental well-being of participants in the high school setting. However, the pandemic afforded an opportunity to examine sport participation and the value people place upon their engagement in high school sport. Study objectives: (1) Examine the experiences of students, parents, administrators, officials, and coaches during a year without high school sports; (2) Understand why participants are involved in high school sports; and (3) Learn what supports are needed for future involvement. Methodology: A mixed method design was used, including semi-structured interviews and a survey (SurveyMonkey software), which was disseminated electronically to high school students, coaches, school administrators, parents, and officials. Results: 1222 respondents completed the survey. Findings showed: (1) 100% of students participate in high school sports to improve their mental health, with >95% said it keeps them active and healthy, helps them make friends and teaches teamwork, builds confidence and positive self-perceptions, teaches resiliency, enhances connectivity to their school, and supports academic learning; (2) Top three reasons teachers coach is their desire to make a difference in the lives of students, enjoyment, and love of the sport, and to give back. Teachers said what they enjoy most is contributing to and watching athletes develop, direct involvement with student sport success, and the competitiveatmosphere; (3) 90% of parents believe playing sports is a valuable experience for their child, 95% said it enriches student academic learning and educational experiences, and 97% encouraged their child to play school sports; (4) Officials participate because of their enjoyment and love of the sport, experience, and expertise, desire to make a difference in the lives of children, the competitive/sporting atmosphere and growing the sport. 4% of officials said it was financially motivated; (5) 100% of administrators said high school sports are important for everyone. 80% believed the pandemic will decrease teachers coaching and increase student mental health and well-being. When there was no sport, many athletes got a part-time job and tried to stay active, with limited success. Coaches, officials, and parents spent more time with family. All participants did little physical activity, were bored; and struggled with mental health and poor physical health. Respondents recommended better communication, promotion, and branding of high school sport benefits, equitable funding for all sports, athlete development, compensation and recognition for coaching, and simple processes to strengthen the high school sport model. Conclusions: High school sport is an effective vehicle for athletes, parents, coaches, administrators, and officials to derive many positive outcomes. When it is taken away, serious consequences prevail. Paying attention to important success factors will be important for the effectiveness of high school sports.Keywords: physical activity, high school, sports, pandemic
Procedia PDF Downloads 1465369 A Case Study of Business Analytic Use in European Football: Analysis and Implications
Authors: M. C. Schloesser
Abstract:
The purpose of this paper is to explore the use and impact of business analytics in European football. Despite good evidence from other major sports leagues, research on this topic in Europe is currently very scarce. This research relies on expert interviews on the use and objective of business analytics. Along with revenue data over 16 seasons spanning from 2004/05 to 2019/20 from Manchester City FC, we conducted a time series analysis to detect a structural breakpoint on the different revenue streams, i.e., sponsorship and ticketing, after analytical tools have been implemented. We not only find that business analytics have indeed been applied at Manchester City FC and revenue increase is the main objective of their utilization but also that business analytics is indeed a good means to increase revenues if applied sufficiently. We can thereby support findings from other sports leagues. Consequently, professional sports organizations are advised to apply business analytics if they aim to increase revenues. This research has shown that analytical practices do, in fact, support revenue growth and help to work more efficiently. As the knowledge of analytical practices is very confidential and not publicly available, we had to select one club as a case study which can be considered a research limitation. Other practitioners should explore other clubs or leagues. Further, there are other factors that can lead to increased revenues that need to be considered. Additionally, sports organizations need resources to be able to apply and utilize business analytics. Consequently, findings might only apply to the top teams of the European football leagues. Nonetheless, this paper combines insights and results on usage, objectives, and impact of business analytics in European professional football and thereby fills a current research gap.Keywords: business analytics, expert interviews, revenue management, time series analysis
Procedia PDF Downloads 795368 The Mashishing Marking Memories Project: A Culture-Centered Approach to Participation
Authors: Nongcebo Ngcobo
Abstract:
This research explores the importance of including a multitude of voices in the cultural heritage narrative, particularly in South Africa. The Mashishing project is an extension of and builds on the existing ‘Biesje Poort project’ which is a rock art project that was funded by the National Heritage Council in 2010 - 2013. Hence, the Mashishing marking memories project applies comparable Biesje Poort project objectives, though in a different geographical area. The wider project objectives are to transfer skills, promote social cohesion and empowerment, and lastly to add to the knowledge base of the Mashishing region and the repository of the local museum in the Lydenburg museum. This study is located in the Mashishing area, in Mpumalanga, South Africa. In this area, there were no present multi-vocal heritage projects. This research assesses the Mashishing marking memories project through the culture-centered approach for communication for social change, which examines the impact that the diverse participants have on the operations of the Mashishing project and also investigates whether the culturally diverse participants facilitates or hinders effective participation within the project. Key findings of this research uncovered the significance of participation and diverse voices in the cultural heritage field. Furthermore, this study highlights how unequal power relations affect effective participation. As a result, this study encourages the importance of bringing the researcher and the participant in a safe space to facilitate mutual learning. It also encourages an exchange of roles, where the researcher shifts from being an authoritarian figure to being in the role of a listener.Keywords: culture, heritage, participation, social change
Procedia PDF Downloads 1215367 Educational Framework for Coaches on Injury Prevention in Adolescent Team Sports
Authors: Chantell Gouws, Lourens Millard, Anne Naude, Jan-Wessel Meyer, Brandon Stuwart Shaw, Ina Shaw
Abstract:
Background: Millions of South African youths participate in team sports, with netball and rugby being two of the largest worldwide. This increased participation and professionalism have resulted in an increase in the number of musculoskeletal injuries. Objective: This study examined the extent to which sport coaching knowledge translates to the injuries and prevention of injuries in adolescents participating in netball and rugby. Methods: Thirty-four South African sports coaches participated in the study. Eighteen netball coaches and 16 rugby coaches with varying levels of coaching experience were selected to participate. An adapted version of Nash and Sproule’s questionnaire was used to investigate the coaches’ knowledge with regards to sport-specific common injuries, injury prevention, fitness/conditioning, individual technique development, training programs, mental training, and preparation of players. The analysis of data was carried out using a number of different techniques outlined by Nash and Sproule (2012). These techniques were determined by the type of data. Descriptive data was used to provide statistical analysis. Quantitative data was used to determine the educational framework and knowledge of sports coaches on injury prevention. Numerical data was obtained through questions on sports injuries, as well as coaches’ sports knowledge levels. Participants’ knowledge was measured using a standardized scoring system. Results: For the 0-4 years of netball coaching experience, 76.4% of the coaches had knowledge and experience and 33.3% appropriate first aid knowledge, while for the 9-12 years and 13-16 years, 100% of the coaches had knowledge and experience and first aid knowledge. For the 0-4 years in rugby coaching experience, 59.1% had knowledge and experience and 71% the appropriate first aid knowledge; for the 17-20 years, 100% had knowledge and experience and first aid, while for higher or equal to 25 years, 45.5% had knowledge and experience. In netball, 90% of injuries consisted of ankle injuries, followed by 70% for knee, 50% for shoulder, 20% for lower leg, and 15% for finger injuries. In rugby, 81% of the injuries occurred at the knee, followed by 50% for the shoulder, 40% for the ankle, 31% for the head and neck, and 25% for hamstring injuries. Six hours of training resulted in a 13% chance of injuries in netball and a 32% chance in rugby. For 10 hours of training, the injury prevalence was 10% in netball and 17% in rugby, while 15 hours resulted in an injury incidence of 58% in netball players and a 25% chance in rugby players. Conclusion: This study highlights the need for coaches to improve their knowledge in relation to injuries and injury prevention, along with factors that act as a preventative measure and promotes players’ well-being.Keywords: musculoskeletal injury, sport coaching, sport trauma
Procedia PDF Downloads 1615366 Risk Management in Construction Projects
Authors: Mustafa Dogru, Ruveyda Komurlu
Abstract:
Companies and professionals in the construction sector face various risks in every project depending on the characteristics, size, complexity, the location of the projects and the techniques used. Some risks’ effects may increase as the project progresses whereas new risks may emerge. Because of the ever-changing nature of the risks, risk management is a cyclical process that needs to be repeated throughout the project. Since the risks threaten the success of the project, risk management is an important part of the entire project management process. The aims of this study are to emphasize the importance of risk management in construction projects, summarize the risk identification process, and introduce a number of methods for preventing risks such as alternative design, checklists, prototyping and test-analysis-correction technique etc. Following the literature review conducted to list the techniques for preventing risks, case studies has been performed to compare and evaluate the success of the techniques in a number of completed projects with the same typology, performed domestic and international. Findings of the study suggest that controlling and minimizing the level of the risks in construction projects, taking optimal precautions for different risks, and mitigating or eliminating the effects of risks are important in order to prevent additional costs for the project. Additionally, focusing on the risks that have highest impact is the most rational way to minimize the effects of the risks on projects.Keywords: construction projects, construction management, project management, risk management
Procedia PDF Downloads 3195365 Improving Internal Efficiency of Local Universities and Colleges: Asseessing the Impact of the 085 Project in Shanghai
Authors: Qing Hui Wang, You Lin Fang, Min Chen
Abstract:
In 2003 the percentage of students in Shanghai taking part in tertiary education reached 53% of the age cohort, which is at the universal level according to Trow's typology. This achievement led to a conscientious effort by the government to improve internal efficiency of local universities and colleges through a series of programs, the most important of which is the 085 Project. This paper considers the effects of the 085 Project- the 5 initiatives launched in 2008 on increasing the investment to improve institutional overall visibilities, teaching excellence, knowledge innovation, faculty development as well as internationalization. Using the approach of ERC (a theory of equality, reciprocity, and competition) model, it was found that the initiatives helped the lower tier universities and colleges make full play in the aspects of strategic planning and identifying themselves. It was also found that the rate of growth of social resources for universities as a whole increased more quickly after the implementation of the 085 Project.Keywords: 085 Project, impact, internal efficiency, local universities and colleges
Procedia PDF Downloads 4685364 Contractor Selection by Using Analytical Network Process
Authors: Badr A. Al-Jehani
Abstract:
Nowadays, contractor selection is a critical activity of the project owner. Selecting the right contractor is essential to the project manager for the success of the project, and this cab happens by using the proper selecting method. Traditionally, the contractor is being selected based on his offered bid price. This approach focuses only on the price factor and forgetting other essential factors for the success of the project. In this research paper, the Analytic Network Process (ANP) method is used as a decision tool model to select the most appropriate contractor. This decision-making method can help the clients who work in the construction industry to identify contractors who are capable of delivering satisfactory outcomes. Moreover, this research paper provides a case study of selecting the proper contractor among three contractors by using ANP method. The case study identifies and computes the relative weight of the eight criteria and eleven sub-criteria using a questionnaire.Keywords: contractor selection, project management, decision-making, bidding
Procedia PDF Downloads 885363 A Comparative Analysis of Safety Orientation and Safety Performance in Organizations: A Project Management Perspective
Authors: Dina Alfreahat, Zoltan Sebestyen
Abstract:
Safety is considered as one of the project’s success factors. Poor safety management may result in accidents that impact human, economic, and legal issues. Therefore, it is necessary to consider safety and health as a project success factor along with other project success factors, such as time, cost, and quality. Organizations have a knowledge deficit of the implementation of long-term safety practices, and due to cost control, safety problems tend to receive the least priority. They usually assume that safety management involves expenditures unrelated to production goals, thereby considering it unnecessary for profitability and competitiveness. The purpose of this study is to introduce, analysis and identify the correlation between the orientation of the public safety procedures of an organization and the public safety standards applied in the project. Therefore, the authors develop the process and collect the possible mathematical-statistical tools supporting the previously mentioned goal. The result shows that the adoption of management to safety is a major factor in implementing the safety standard in the project and thereby improving safety performance. It may take time and effort to adopt the mindset of safety orientation service development, but at the same time, the higher organizational investment in safety and health programs will contribute to the loyalty of staff to safety compliance.Keywords: project management perspective, safety orientation, safety performance, safety standards
Procedia PDF Downloads 1795362 The Construct of Assessment Instrument for Value, Attitude and Professionalism among Students Faculty of Sports Science and Coaching
Authors: Ahmad Hashim, Thariq Khan Azizuddin Khan, Zulakbal Abd Karim, Nohazira Abdul Karim
Abstract:
This research aims to obtain the validity and reliability of a survey instrument to evaluate the values, attitudes, and professionalism of sports science students, from the Faculty of Sports Science and Coaching, Universiti Pendidikan Sultan Idris (UPSI). It is a survey which is divided into two components namely first; moral, self-esteem, proactive, self-reliant and voluntary and second; ethics and professionalism. Development of the survey instrument is based on the Malaysian Education Development Plan, Higher Education Malaysia. There are 50 items prepared based on the five-point Likert scale which were tested at the pilot test level. It involved 212 research subjects selected based on random sampling. In addition, the research method applied is in the form of pre-experimental one group pre-test-post-test. Results of the analysis showed that overall field expert validity is r = .89, while the Cronbach alpha reliability correlation value of outdoor education instrument evaluation survey is r = .85. Next, this survey was tested again for construct validity using the factor analysis method for statistical analysis which would validate each item tested was supposed to be in the right component. From the analysis, results show that Bartlett's test is significant p < .05 and Kaiser-Meyer-Olkin index range is r = .87. The result showed 39 survey items are produced out of 50 items of the survey based on this factor analysis method. Research has shown that the survey instrument developed is valid and reliable to be used for the Faculty of Sports Sciences and Coaching, UPSI.Keywords: values, attitudes, professionalism, ethics, professionalism
Procedia PDF Downloads 1915361 Project Time Prediction Model: A Case Study of Construction Projects in Sindh, Pakistan
Authors: Tauha Hussain Ali, Shabir Hussain Khahro, Nafees Ahmed Memon
Abstract:
Accurate prediction of project time for planning and bid preparation stage should contain realistic dates. Constructors use their experience to estimate the project duration for the new projects, which is based on intuitions. It has been a constant concern to both researchers and constructors to analyze the accurate prediction of project duration for bid preparation stage. In Pakistan, such study for time cost relationship has been lacked to predict duration performance for the construction projects. This study is an attempt to explore the time cost relationship that would conclude with a mathematical model to predict the time for the drainage rehabilitation projects in the province of Sindh, Pakistan. The data has been collected from National Engineering Services (NESPAK), Pakistan and regression analysis has been carried out for the analysis of results. Significant relationship has been found between time and cost of the construction projects in Sindh and the generated mathematical model can be used by the constructors to predict the project duration for the upcoming projects of same nature. This study also provides the professionals with a requisite knowledge to make decisions regarding project duration, which is significantly important to win the projects at the bid stage.Keywords: BTC Model, project time, relationship of time cost, regression
Procedia PDF Downloads 3825360 Demonstration of Risk Factors Associated with Male Athlete Triad in Young Elite Athlete from Pakistan
Authors: Muhammad Saleem
Abstract:
Background: Inattentive food choices and engagement in excessive physical activities by male athletes can potentially lead to adverse health consequences. Objective: The aim was to ascertain the occurrence of risk factors associated with the Male Athlete Triad among young elite athletes in Pakistan. Methodology: In 2018, a cross-sectional study based on questionnaires was conducted at the Pakistan Sports Board. The study aimed to explore the risk factors related to the Male Athlete Triad in young elite athletes who were part of national training camps in major metropolitan areas. The study included proficient male elite athletes aged 18 to 25 years, capable of understanding the English questionnaire. The athletes completed a survey encompassing aspects like demographic information, educational background, Body Mass Index (BMI), sports involvement, and hours of participation. Additionally, they filled out the Eating Attitude Test-26 (EAT-26) and questionnaires assessing risks of amenorrhea and low bone mineral density. The prevalence of risk factors for each of the three components was individually evaluated. The collected data underwent analysis using SPSS-20, with descriptive statistics being applied. Results: The study comprised a sample of 90 elite athletes (mean age: 23.57 ± 2.37 years, mean BMI: 21.97 ± 1.90) engaged in various sports. The EAT-26 results indicated that 50% of athletes were at risk of developing an eating disorder. Moreover, 83.3% exhibited disordered eating behaviors that necessitated referral. Risks for amenorrhea were observed in 15% of the participants, and regarding low bone mineral density, notable risks were absent except for the consumption of caffeinated beverages, which was noted in 51.7% of participants. Conclusion: The study identified a significant prevalence of disordered eating risk among male elite athletes in Pakistan. However, the risks associated with amenorrhea and low bone mineral density were not a major concern in this particular group.Keywords: 1. health and physical education risk factors male athlete associated with the male athlete traid in young elite athlete from pakistan., 2. sports sciences pakistan, 3. risk factors sports sciences pakistan, 4. triad and young elite athlete from pakistan
Procedia PDF Downloads 885359 The Academic Achievement of Writing via Project-Based Learning
Authors: Duangkamol Thitivesa
Abstract:
This paper focuses on the use of project work as a pretext for applying the conventions of writing, or the correctness of mechanics, usage, and sentence formation, in a content-based class in a Rajabhat University. Its aim was to explore to what extent the student teachers’ academic achievement of the basic writing features against the 70% attainment target after the use of project is. The organization of work around an agreed theme in which the students reproduce language provided by texts and instructors is expected to enhance students’ correct writing conventions. The sample of the study comprised of 38 fourth-year English major students. The data was collected by means of achievement test and student writing works. The scores in the summative achievement test were analyzed by mean score, standard deviation, and percentage. It was found that the student teachers do more achieve of practicing mechanics and usage, and less in sentence formation. The students benefited from the exposure to texts during conducting the project; however, their automaticity of how and when to form phrases and clauses into simple/complex sentences had room for improvement.Keywords: project-based learning, project work, writing conventions, academic achievement
Procedia PDF Downloads 3335358 Sustainable Framework Integration for Construction Project Management: A Multi-Dimensional Analysis
Authors: Tharaki S. Hettiarachchi
Abstract:
Sustainable construction has gained massive attention in the present world as the construction industry is highly responsible for carbon emissions and other types of unsustainable practices. Yet, the construction industry has not been able to completely attain sustainable goals. Therefore, the present study aims to identify the extent to which sustainability has been considered within the scope of construction project management and to analyze the challenges, gaps, and constraints associated. Accordingly, this study develops a sustainable framework to integrate in construction project management. In accomplishing the research aim, this research integrates a qualitative approach while relying on secondary data sources. The data shall be then analyzed with the use of a systematic literature review (SLR) method while following the PRISMA (2020) guideline and represented in a statistical form. The outcomes of this study may become highly significant in identifying the nature of the existing sustainable frameworks associated with construction project management scopes and to develop a new framework to integrate in order to enhance the effectiveness of sustainable applications in construction management. The outcomes of this research may benefit present and future construction professionals and academicians to organize sustainable construction-related knowledge in a useful way to apply in practical implementation for effective project management. Overall, this study directs present and future construction professionals toward an advanced construction project management mechanism.Keywords: construction, framework development, project management, sustainability
Procedia PDF Downloads 605357 Cost Overruns in Mega Projects: Project Progress Prediction with Probabilistic Methods
Authors: Yasaman Ashrafi, Stephen Kajewski, Annastiina Silvennoinen, Madhav Nepal
Abstract:
Mega projects either in construction, urban development or energy sectors are one of the key drivers that build the foundation of wealth and modern civilizations in regions and nations. Such projects require economic justification and substantial capital investment, often derived from individual and corporate investors as well as governments. Cost overruns and time delays in these mega projects demands a new approach to more accurately predict project costs and establish realistic financial plans. The significance of this paper is that the cost efficiency of megaprojects will improve and decrease cost overruns. This research will assist Project Managers (PMs) to make timely and appropriate decisions about both cost and outcomes of ongoing projects. This research, therefore, examines the oil and gas industry where most mega projects apply the classic methods of Cost Performance Index (CPI) and Schedule Performance Index (SPI) and rely on project data to forecast cost and time. Because these projects are always overrun in cost and time even at the early phase of the project, the probabilistic methods of Monte Carlo Simulation (MCS) and Bayesian Adaptive Forecasting method were used to predict project cost at completion of projects. The current theoretical and mathematical models which forecast the total expected cost and project completion date, during the execution phase of an ongoing project will be evaluated. Earned Value Management (EVM) method is unable to predict cost at completion of a project accurately due to the lack of enough detailed project information especially in the early phase of the project. During the project execution phase, the Bayesian adaptive forecasting method incorporates predictions into the actual performance data from earned value management and revises pre-project cost estimates, making full use of the available information. The outcome of this research is to improve the accuracy of both cost prediction and final duration. This research will provide a warning method to identify when current project performance deviates from planned performance and crates an unacceptable gap between preliminary planning and actual performance. This warning method will support project managers to take corrective actions on time.Keywords: cost forecasting, earned value management, project control, project management, risk analysis, simulation
Procedia PDF Downloads 4035356 Through Integrated Project Management and Systems Engineering to Support System Design Development: A Project Management-based Systems Engineering Approach
Authors: Xiaojing Gao, James Njuguna
Abstract:
This paper emphasizes the importance of integrating project management and systems engineering for innovative system design and production development. The research highlights the need for a flexible approach that unifies these disciplines, as their isolation often leads to communication challenges and complexity within multidisciplinary teams. The paper aims to elucidate the intricate relationship between project management and systems engineering, recommending the consolidation of engineering disciplines into a single lifecycle for improved support of the design and development process. The research identifies a synergy between these disciplines, focusing on streamlining information communication during product design and development. The insights gained from this process can lead to product design optimization. Additionally, the paper introduces a proposed Project Management-Based Systems Engineering (PMBSE) framework, emphasizing effective communication, efficient processes, and advanced tools to enhance product development outcomes within the product lifecycle.Keywords: system engineering, product design and development, project management, cross-disciplinary
Procedia PDF Downloads 785355 Enhancing Project Success: A Case Study of Investment Strategies and Planning Practices in Rwanda’s Housing Projects Managed by Rwanda Social Security Board
Authors: Amina Umulisa
Abstract:
Background: Despite efforts to enhance profitability and project planning, Rwanda has experienced a decline in project success rates, notably in housing projects managed by the Rwanda Social Security Board (RSSB). This study aims to assess the impact of investment strategies and project planning practices on the performance of pension funds projects in Rwanda, focusing on housing projects by RSSB. Methods: Using descriptive and correlational research designs, this study surveyed 109 randomly selected respondents from a pool of 148 workers. Data analysis was conducted using descriptive and inferential statistics in STATA version 18. Results: Findings revealed that 54% of respondents acknowledged the importance of personnel generation. Additionally, 61% agreed with the effectiveness of training programs, and 79% supported the cost of human resource utilization. In terms of project management practices, 65.7% could determine when a project needed adjustments, 65.7% agreed with the approved budget, and 73% supported forecasted expenses. Furthermore, 68% agreed with order placement, 76.0% with using the right materials, and 64.4% with defining project scope. The study found significant associations between order placement and project quality outcomes (r=0.711, P-value <0.001), as well as with time management (Pearson was 0.701 and sing was 0.00) and cost management (r=0.885, P-value <0.001). Moreover, project time targets were found to significantly affect quality management (Pearson was 0.798, sing was 0.000), time management, and cost management (r=0.740, P-value <0.001). Conclusion: The findings highlight the positive association between the project implementation stage and quality management, indicating effective project planning practices among senior staff. However, there is a need to enhance project team collaboration and coordination to improve the performance of constructed houses.Keywords: project success rates, investment strategies, training programs, cost management
Procedia PDF Downloads 525354 A Review of the Major Factors of Cost Overrun in Construction Projects
Authors: Hassan Abdelgadir
Abstract:
Cost overruns have harmed the economies and reputations of several construction companies around the world. Many project management systems have been developed to keep track of a project's budget. However, due to several cost overrun difficulties in the construction industry, cost management is still deemed inadequate. As a result, the goal of this term paper is to identify and group prospective construction project cost overrun reasons based on their origin groups.Basically, all potential cost overrun elements were rigorously checked through 1iterature analysis before being divided into seven (7) groups of originating components, including project, contract, client, contractor, consultant, labor, and external. Each potential factor was completely defined with examples.Keywords: construction projects, cost overruns, construction company, factors effect costoverruns
Procedia PDF Downloads 755353 A Knowledge-Based Development of Risk Management Approaches for Construction Projects
Authors: Masoud Ghahvechi Pour
Abstract:
Risk management is a systematic and regular process of identifying, analyzing and responding to risks throughout the project's life cycle in order to achieve the optimal level of elimination, reduction or control of risk. The purpose of project risk management is to increase the probability and effect of positive events and reduce the probability and effect of unpleasant events on the project. Risk management is one of the most fundamental parts of project management, so that unmanaged or untransmitted risks can be one of the primary factors of failure in a project. Effective risk management does not apply to risk regression, which is apparently the cheapest option of the activity. However, the main problem with this option is the economic sensitivity, because what is potentially profitable is by definition risky, and what does not pose a risk is economically interesting and does not bring tangible benefits. Therefore, in relation to the implemented project, effective risk management is finding a "middle ground" in its management, which includes, on the one hand, protection against risk from a negative direction by means of accurate identification and classification of risk, which leads to analysis And it becomes a comprehensive analysis. On the other hand, management using all mathematical and analytical tools should be based on checking the maximum benefits of these decisions. Detailed analysis, taking into account all aspects of the company, including stakeholder analysis, will allow us to add what will become tangible benefits for our project in the future to effective risk management. Identifying the risk of the project is based on the theory that which type of risk may affect the project, and also refers to specific parameters and estimating the probability of their occurrence in the project. These conditions can be divided into three groups: certainty, uncertainty, and risk, which in turn support three types of investment: risk preference, risk neutrality, specific risk deviation, and its measurement. The result of risk identification and project analysis is a list of events that indicate the cause and probability of an event, and a final assessment of its impact on the environment.Keywords: risk, management, knowledge, risk management
Procedia PDF Downloads 665352 Project Management Tools within SAP S/4 Hana Program Environment
Authors: Jagoda Bruni, Jan Müller-Lucanus, Gernot Stöger-Knes
Abstract:
The purpose of this article is to demonstrate modern project management approaches in the SAP S/R Hana surrounding a programming environment composed of multiple focus-diversified projects. We would like to propose innovative and goal-oriented management standards based on the specificity of the SAP transformations and customer-driven expectations. Due to the regular sprint-based controlling and management tools' application, it has been data-proven that extensive analysis of productive hours of the employees as much as a thorough review of the project progress (per GAP, per business process, and per Lot) within the whole program, can have a positive impact on customer satisfaction and improvement for projects' budget. This has been a collaborative study based on real-life experience and measurements in collaboration with our customers.Keywords: project management, program management, SAP, controlling
Procedia PDF Downloads 915351 Factors Militating the Organization of Intramural Sport Programs in Secondary Schools: A Case Study of the Ekiti West Local Government Area of Ekiti State, Nigeria
Authors: Adewole Taiwo Adelabu
Abstract:
The study investigated the factors militating the organization of intramural sports programs in secondary schools in Ekiti State, Nigeria. The purpose of the study was to identify the factors affecting the organization of sports in secondary schools and also to proffer possible solutions to these factors. The study employed the inferential statistics of chi-square (x2). Five research hypotheses were formulated. The population for the study was all the students in the government-owned secondary schools in Ekiti West Local Government of Ekiti State Nigeria. The sample for the study was 60 students in three schools within the local government selected through simple random sampling techniques. The instrument used for the study was a self-developed questionnaire by the researcher for data collection. The instrument was presented to experts and academicians in the field of Human Kinetics and Health Education for construct and content validation. A reliability test was conducted which involves 10 students who are not part of the study. The test-retest coefficient of 0.74 was obtained which attested to the fact that the instrument was reliable enough for the study. The validated questionnaire was administered to the students in their various schools by the researcher with the help of two research assistants; the questionnaires were filled and returned to the researcher immediately. The data collected were analyzed using the descriptive statistics of frequency count, percentage and mean to analyze demographic data in section A of the questionnaire, while inferential statistics of chi-square was used to test the hypotheses at 0.05 alpha level. The results of the study revealed that personnel, fund, schedule (time) were significant factors that affect the organization of intramural sport programs among students in secondary schools in Ekiti West Local Government Area of the State. The study also revealed that organization of intramural sports programs among students of secondary schools will improve and motivate students’ participation in sports beyond the local level. However, facilities and equipment is not a significant factor affecting the organization of intramural sports among secondary school students in Ekiti West Local Government Area.Keywords: challenge, intramural sport, militating, programmes
Procedia PDF Downloads 1495350 A Strategic Partner Evaluation Model for the Project Based Enterprises
Authors: Woosik Jang, Seung H. Han
Abstract:
The optimal partner selection is one of the most important factors to pursue the project’s success. However, in practice, there is a gaps in perception of success depending on the role of the enterprises for the projects. This frequently makes a relations between the partner evaluation results and the project’s final performances, insufficiently. To meet this challenges, this study proposes a strategic partner evaluation model considering the perception gaps between enterprises. A total 3 times of survey was performed; factor selection, perception gap analysis, and case application. After then total 8 factors are extracted from independent sample t-test and Borich model to set-up the evaluation model. Finally, through the case applications, only 16 enterprises are re-evaluated to “Good” grade among the 22 “Good” grade from existing model. On the contrary, 12 enterprises are re-evaluated to “Good” grade among the 19 “Bad” grade from existing model. Consequently, the perception gaps based evaluation model is expected to improve the decision making quality and also enhance the probability of project’s success.Keywords: partner evaluation model, project based enterprise, decision making, perception gap, project performance
Procedia PDF Downloads 1575349 Quo Vadis, European Football: An Analysis of the Impact of Over-The-Top Services in the Sports Rights Market
Authors: Farangiz Davranbekova
Abstract:
Subject: The study explores the impact of Over-the-Top services in the sports rights market, focusing on football games. This impact is analysed in the big five European football markets. The research entails how the pay-TV market is combating the disruptors' entry, how the fans are adjusting to these changes and how leagues and football clubs are orienting in the transitional period of more choice. Aims and methods: The research aims to offer a general overview of the impact of OTT players in the football rights market. A theoretical framework of Jenkins’ five layers of convergence is implemented to analyse the transition the sports rights market is witnessing from various angles. The empirical analysis consists of secondary research data as and seven expert interviews from three different clusters. The findings are bound by the combination of the two methods offering general statements. Findings: The combined secondary data as well as expert interviews, conducted on five layers of convergence found: 1. Technological convergence presents that football content is accessible through various devices with innovative digital features, unlike the traditional TV set box. 2. Social convergence demonstrates that football fans multitask using various devices on social media when watching the games. These activities are complementary to traditional TV viewing. 3. Cultural convergence points that football fans have a new layer of fan engagement with leagues, clubs and other fans using social media. Additionally, production and consumption lines are blurred. 4. Economic convergence finds that content distribution is diversifying and/or eroding. Consumers now have more choices, albeit this can be harmful to them. Entry barriers are decreased, and bigger clubs feel more powerful. 5. Global convergence shows that football fans are engaging with not only local fans but with fans around the world that social media sites enable. Recommendation: A study on smaller markets such as Belgium or the Netherlands would benefit the study on the impact of OTT. Additionally, examination of other sports will shed light on this matter. Lastly, once the direct-to-consumer model is fully taken off in Europe, it will be of importance to examine the impact of such transformation in the market.Keywords: sports rights, OTT, pay TV, football
Procedia PDF Downloads 1565348 An Investigation of Project-Based Learning: A Case Study of Tourism Students
Authors: Benjaporn Yaemjamuang
Abstract:
The purposes of this study were to investigate the success of project-based learning and to evaluate the performance and level of satisfaction of tourism students who participated in the study. This paper drew upon a data collection from a senior tourism students survey conducted in Rajamangala University during summer 2013. The purposive sampling was utilized to obtain the sample which included 45 tourism students. The pretest and posttest method was utilized. The findings revealed that the majority of respondents had gained higher knowledge after the posttest significantly. The respondents’ knowledge increased about 53.33 percent from pretest to posttest. Also, the findings revealed the top three highest level of satisfaction as follows: 1) the role of teacher and students, 2) the research activities of the project-based learning, 3) the learning methods of the project-based learning. Moreover, the mean score of all categories was 3.98 with a standard deviation of 0.88 which indicated that the average level of satisfaction was high.Keywords: performance, project-based learning, satisfaction, tourism
Procedia PDF Downloads 291