Search results for: project management function
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 17273

Search results for: project management function

17003 Evolution of Performance Measurement Methods in Conditions of Uncertainty: The Implementation of Fuzzy Sets in Performance Measurement

Authors: E. A. Tkachenko, E. M. Rogova, V. V. Klimov

Abstract:

One of the basic issues of development management is connected with performance measurement as a prerequisite for identifying the achievement of development objectives. The aim of our research is to develop an improved model of assessing a company’s development results. The model should take into account the cyclical nature of development and the high degree of uncertainty in dealing with numerous management tasks. Our hypotheses may be formulated as follows: Hypothesis 1. The cycle of a company’s development may be studied from the standpoint of a project cycle. To do that, methods and tools of project analysis are to be used. Hypothesis 2. The problem of the uncertainty when justifying managerial decisions within the framework of a company’s development cycle can be solved through the use of the mathematical apparatus of fuzzy logic. The reasoned justification of the validity of the hypotheses made is given in the suggested article. The fuzzy logic toolkit applies to the case of technology shift within an enterprise. It is proven that some restrictions in performance measurement that are incurred to conventional methods could be eliminated by implementation of the fuzzy logic apparatus in performance measurement models.

Keywords: logic, fuzzy sets, performance measurement, project analysis

Procedia PDF Downloads 351
17002 'Pacta Sunt Servanda': Which Form of Contract to Use in the Construction Industry

Authors: Ahmed Stifi, Sascha Gentes

Abstract:

The contract in its simplest definition is an agreement involving parties with a number of documents which may be as little as a marriage contract involving two parties or as big as a contract of construction and operation of a nuclear power plant involving companies and stakeholders with hundreds or even thousands of documents. All parties in the construction industry, not only the contract experts, agree that the success of a project is linked primarily to the form of contract regulating the relationship between stakeholders of the project. Therefore it is essential for the construction industry to study, analyze and improve its contracts forms continuously. However, it should be mentioned that different contract forms are developed to suit the construction evolution in term of its machinery, materials and construction process. There exist some similarities in some clauses and variations in many of these forms depending upon the type of project, the kind of clients and more importantly the laws and regulations governing the transaction in the country where the project is carried out. This paper will discuss the most important forms of construction contracts starting from national level, intended to the contract form in Germany and moving on to the international level introducing FIDIC contracts and its different forms, some newly developed contracts forms namely the integrated form of agreement, the new engineering contract and the project alliance agreement. The result of the study shows that many of the contract’s paragraphs are similar and the main difference comes in the approach of the relationship between the parties. Is it based on co-operation and mutual trust, or in some cases a load of responsibility for a particular party which increases the problems and disputes that affects the success of the project negatively. Thus we can say that the form of the contract, that plays an essential role in the approach of the project management, which is ultimately the key factor for the success of the project. So we advise to use a form of contract, which enhance the mutual trust between the project parties, contribute to support the cooperation between them, distribute responsibility and risks on an equitable basis and build on the principle “win-win". In additional to the conventional role of the contract it should integrate all parties into one team to achieve the target value of the project.

Keywords: contract, FIDIC, integrated form of agreement, new engineering contract, project alliance agreemen

Procedia PDF Downloads 342
17001 The Project Evaluation to Develop the Competencies, Capabilities, and Skills in Repairing Computers of People in Jompluak Local Municipality, Bang Khonthi District, Samut Songkram Province

Authors: Wilailuk Meepracha

Abstract:

The results of the study on the project evaluation to develop the competencies, capabilities, and skills in repairing computers of people in Jompluak Local Municipality, Bang Khonthi District, Samut Songkram Province showed that the overall result was good (4.33). When considering on each aspect, it was found that the highest one was on process evaluation (4.60) followed by product evaluation (4.50) and the least one was on feeding factor (3.97). When considering in details, it was found that: 1) the context aspect was high (4.23) with the highest item on the arrangement of the training situation (4.67) followed by the appropriateness of the target (4.30) and the least aspect was on the project cooperation (3.73). 2) The evaluation of average overall primary factor or feeding factor showed high value (4.23) while the highest aspect was on the capability of the trainers (4.47) followed by the suitable venue (4.33) while the least aspect was on the insufficient budget (3.47). 3) The average result of process evaluation was very high (4.60). The highest aspect was on the follow-op supervision (4.70) followed by responsibility of each project staffs (4.50) while the least aspect was on the present situation and the problems of the community (4.40). 4) The overall result of the product evaluation was very high (4.50). The highest aspect was on the diversity of the activities and the community integration (4.67) followed by project target achievement (4.63) while the least aspect was on continuation and regularity of the activities (4.33). The trainees reported high satisfaction on the project management at very high level (43.33%) while 40% reported high level and 16.67% reported moderate level. Suggestions for the project were on the additional number of the computer sets (37.78%) followed by longer training period especially on computer skills (43.48%).

Keywords: project evaluation, competency development, the capability on computer repairing and computer skills

Procedia PDF Downloads 282
17000 Feasibility Study of Potential and Economic of Rice Straw VSPP Power Plant in Thailand

Authors: Sansanee Sansiribhan, Anusorn Rattanathanaophat, Chirapan Nuengchaknin

Abstract:

The potential feasibility of a 9.5 MWe capacity rice straw power plant project in Thailand was studied by evaluating the rice straw resource. The result showed that Thailand had a high rice straw biomass potential at the provincial level, especially, the provinces in the central, northeastern and western Thailand, which could feasibly develop plants. The economic feasibility of project was also investigated. The financial feasibility is also evaluated based on two important factors in the project, i.e., NPV ≥ 0 and IRR ≥ 11%. It was found that the rice straw power plant project at 9.5 MWe was financially feasible with the cost of fuel in the range of 30.6-47.7 USD/t.

Keywords: power plant, project feasibility, rice straw, Thailand

Procedia PDF Downloads 315
16999 Designing for Sustainable Public Housing from Property Management and Financial Feasibility Perspectives

Authors: Kung-Jen Tu

Abstract:

Many public housing properties developed by local governments in Taiwan in the 1980s have deteriorated severely as these rental apartment buildings aged. The lack of building maintainability considerations during project design phase as well as insufficient maintenance funds have made it difficult and costly for local governments to maintain and keep public housing properties in good shape. In order to assist the local governments in achieving and delivering sustainable public housing, this paper intends to present a developed design evaluation method to be used to evaluate the presented design schemes from property management and financial feasibility perspectives during project design phase of public housing projects. The design evaluation results, i.e. the property management and financial implications of presented design schemes that could occur later during the building operation and maintenance phase, will be reported to the client (the government) and design schemes revised consequently. It is proposed that the design evaluation be performed from two main perspectives: (1) Operation and property management perspective: Three criteria such as spatial appropriateness, people and vehicle circulation and control, property management working spaces are used to evaluate the ‘operation and PM effectiveness’ of a design scheme. (2) Financial feasibility perspective: Four types of financial analyses are performed to assess the long term financial feasibility of a presented design scheme, such as operational and rental income analysis, management fund analysis, regular operational and property management service expense analysis, capital expense analysis. The ongoing Chung-Li Public Housing Project developed by the Taoyuan City Government will be used as a case to demonstrate how the presented design evaluation method is implemented. The results of property management assessment as well as the annual operational and capital expenses of a proposed design scheme are presented.

Keywords: design evaluation method, management fund, operational and capital expenses, rental apartment buildings

Procedia PDF Downloads 277
16998 Geometric Properties of Some q-Bessel Functions

Authors: İbrahim Aktaş, Árpád Baricz

Abstract:

In this paper, the radii of star likeness of the Jackson and Hahn-Exton q-Bessel functions are considered, and for each of them three different normalizations is applied. By applying Euler-Rayleigh inequalities for the first positive zeros of these functions tight lower, and upper bounds for the radii of starlikeness of these functions are obtained. The Laguerre-Pólya class of real entire functions plays an important role in this study. In particular, we obtain some new bounds for the first positive zero of the derivative of the classical Bessel function of the first kind.

Keywords: bessel function, lommel function, radius of starlikeness and convexity, Struve function

Procedia PDF Downloads 251
16997 On the Fractional Integration of Generalized Mittag-Leffler Type Functions

Authors: Christian Lavault

Abstract:

In this paper, the generalized fractional integral operators of two generalized Mittag-Leffler type functions are investigated. The special cases of interest involve the generalized M-series and K-function, both introduced by Sharma. The two pairs of theorems established herein generalize recent results about left- and right-sided generalized fractional integration operators applied here to the M-series and the K-function. The note also results in important applications in physics and mathematical engineering.

Keywords: Fox–Wright Psi function, generalized hypergeometric function, generalized Riemann– Liouville and Erdélyi–Kober fractional integral operators, Saigo's generalized fractional calculus, Sharma's M-series and K-function

Procedia PDF Downloads 409
16996 A Case Study: Social Network Analysis of Construction Design Teams

Authors: Elif D. Oguz Erkal, David Krackhardt, Erica Cochran-Hameen

Abstract:

Even though social network analysis (SNA) is an abundantly studied concept for many organizations and industries, a clear SNA approach to the project teams has not yet been adopted by the construction industry. The main challenges for performing SNA in construction and the apparent reason for this gap is the unique and complex structure of each construction project, the comparatively high circulation of project team members/contributing parties and the variety of authentic problems for each project. Additionally, there are stakeholders from a variety of professional backgrounds collaborating in a high-stress environment fueled by time and cost constraints. Within this case study on Project RE, a design & build project performed at the Urban Design Build Studio of Carnegie Mellon University, social network analysis of the project design team will be performed with the main goal of applying social network theory to construction project environments. The research objective is to determine a correlation between the network of how individuals relate to each other on one’s perception of their own professional strengths and weaknesses and the communication patterns within the team and the group dynamics. Data is collected through a survey performed over four rounds conducted monthly, detailed follow-up interviews and constant observations to assess the natural alteration in the network with the effect of time. The data collected is processed by the means of network analytics and in the light of the qualitative data collected with observations and individual interviews. This paper presents the full ethnography of this construction design team of fourteen architecture students based on an elaborate social network data analysis over time. This study is expected to be used as an initial step to perform a refined, targeted and large-scale social network data collection in construction projects in order to deduce the impacts of social networks on project performance and suggest better collaboration structures for construction project teams henceforth.

Keywords: construction design teams, construction project management, social network analysis, team collaboration, network analytics

Procedia PDF Downloads 178
16995 Design Standardization in Aramco: Strategic Analysis

Authors: Mujahid S. Alturais

Abstract:

The construction of process plants in oil and gas-producing countries, such as Saudi Arabia, necessitates substantial investment in design and building. Each new plant, while unique, includes common building types, suggesting an opportunity for design standardization. This study investigates the adoption of standardized Issue For Construction (IFC) packages for non-process buildings in Saudi Aramco. A SWOT analysis presents the strengths, weaknesses, opportunities, and threats of this approach. The approach's benefits are illustrated using the Hawiyah Unayzah Gas Reservoir Storage Program (HUGRSP) as a case study. Standardization not only offers significant cost savings and operational efficiencies but also expedites project timelines, reduces the potential for change orders, and fosters local economic growth by allocating building tasks to local contractors. Standardization also improves project management by easing interface constraints between different contractors and promoting adaptability to future industry changes. This research underscores the standardization of non-process buildings as a powerful strategy for cost optimization, efficiency enhancement, and local economic development in process plant construction within the oil and gas sector.

Keywords: building, construction, management, project, standardization

Procedia PDF Downloads 35
16994 Enhance Engineering Learning Using Cognitive Simulator

Authors: Lior Davidovitch

Abstract:

Traditional training based on static models and case studies is the backbone of most teaching and training programs of engineering education. However, project management learning is characterized by dynamics models that requires new and enhanced learning method. The results of empirical experiments evaluating the effectiveness and efficiency of using cognitive simulator as a new training technique are reported. The empirical findings are focused on the impact of keeping and reviewing learning history in a dynamic and interactive simulation environment of engineering education. The cognitive simulator for engineering project management learning had two learning history keeping modes: manual (student-controlled), automatic (simulator-controlled) and a version with no history keeping. A group of industrial engineering students performed four simulation-runs divided into three identical simple scenarios and one complicated scenario. The performances of participants running the simulation with the manual history mode were significantly better than users running the simulation with the automatic history mode. Moreover, the effects of using the undo enhanced further the learning process. The findings indicate an enhancement of engineering students’ learning and decision making when they use the record functionality of the history during their engineering training process. Furthermore, the cognitive simulator as educational innovation improves students learning and training. The practical implications of using simulators in the field of engineering education are discussed.

Keywords: cognitive simulator, decision making, engineering learning, project management

Procedia PDF Downloads 227
16993 Particle Swarm Optimization and Quantum Particle Swarm Optimization to Multidimensional Function Approximation

Authors: Diogo Silva, Fadul Rodor, Carlos Moraes

Abstract:

This work compares the results of multidimensional function approximation using two algorithms: the classical Particle Swarm Optimization (PSO) and the Quantum Particle Swarm Optimization (QPSO). These algorithms were both tested on three functions - The Rosenbrock, the Rastrigin, and the sphere functions - with different characteristics by increasing their number of dimensions. As a result, this study shows that the higher the function space, i.e. the larger the function dimension, the more evident the advantages of using the QPSO method compared to the PSO method in terms of performance and number of necessary iterations to reach the stop criterion.

Keywords: PSO, QPSO, function approximation, AI, optimization, multidimensional functions

Procedia PDF Downloads 555
16992 Converting Scheduling Time into Calendar Date Considering Non-Interruptible Construction Tasks

Authors: Salman Ali Nisar, Suzuki Koji

Abstract:

In this paper we developed a new algorithm to convert the project scheduling time into calendar date in order to handle non-interruptible activities not to be split by non-working days (such as weekend and holidays). In a construction project some activities might require not to be interrupted even on non-working days, or to be finished on the end day of business days. For example, concrete placing work might be required to be completed by the end day of weekdays i.e. Friday, and curing in the weekend. This research provides an algorithm that imposes time constraint for start and finish times of non-interruptible activities. The algorithm converts working days, which is obtained by Critical Path Method (CPM), to calendar date with consideration of the start date of a project. After determining the interruption by non-working days, the start time of a certain activity should be postponed, if there is enough total float value. Otherwise, the duration is shortened by hiring additional resources capacity or/and using overtime work execution. Then, time constraints are imposed to start time and finish time of the activity. The algorithm is developed in Excel Spreadsheet for microcomputer and therefore we can easily get a feasible, calendared construction schedule for such a construction project with some non-interruptible activities.

Keywords: project management, scheduling, critical path method, time constraint, non-interruptible tasks

Procedia PDF Downloads 478
16991 The Benefits of Security Culture for Improving Physical Protection Systems at Detection and Radiation Measurement Laboratory

Authors: Ari S. Prabowo, Nia Febriyanti, Haryono B. Santosa

Abstract:

Security function that is called as Physical Protection Systems (PPS) has functions to detect, delay and response. Physical Protection Systems (PPS) in Detection and Radiation Measurement Laboratory needs to be improved continually by using internal resources. The nuclear security culture provides some potentials to support this research. The study starts by identifying the security function’s weaknesses and its strengths of security culture as a purpose. Secondly, the strengths of security culture are implemented in the laboratory management. Finally, a simulation was done to measure its effectiveness. Some changes were happened in laboratory personnel behaviors and procedures. All became more prudent. The results showed a good influence of nuclear security culture in laboratory security functions.

Keywords: laboratory, physical protection system, security culture, security function

Procedia PDF Downloads 155
16990 Simulation Programs to Education of Crisis Management Members

Authors: Jiri Barta

Abstract:

This paper deals with a simulation programs and technologies using in the educational process for members of the crisis management. Risk analysis, simulation, preparation and planning are among the main activities of workers of crisis management. Made correctly simulation of emergency defines the extent of the danger. On this basis, it is possible to effectively prepare and plan measures to minimize damage. The paper is focused on simulation programs that are trained at the University of Defence. Implementation of the outputs from simulation programs in decision-making processes of crisis staffs is one of the main tasks of the research project.

Keywords: crisis management, continuity, critical infrastructure, dangerous substance, education, flood, simulation programs

Procedia PDF Downloads 445
16989 An Integrated Mixed-Integer Programming Model to Address Concurrent Project Scheduling and Material Ordering

Authors: Babak H. Tabrizi, Seyed Farid Ghaderi

Abstract:

Concurrent planning of project scheduling and material ordering can provide more flexibility to the project scheduling problem, as the project execution costs can be enhanced. Hence, the issue has been taken into account in this paper. To do so, a mixed-integer mathematical model is developed which considers the aforementioned flexibility, in addition to the materials quantity discount and space availability restrictions. Moreover, the activities duration has been treated as decision variables. Finally, the efficiency of the proposed model is tested by different instances. Additionally, the influence of the aforementioned parameters is investigated on the model performance.

Keywords: material ordering, project scheduling, quantity discount, space availability

Procedia PDF Downloads 345
16988 A Universal Approach to Categorize Failures in Production

Authors: Konja Knüppel, Gerrit Meyer, Peter Nyhuis

Abstract:

The increasing interconnectedness and complexity of production processes raise the susceptibility of production systems to failure. Therefore, the ability to respond quickly to failures is increasingly becoming a competitive factor. The research project "Sustainable failure management in manufacturing SMEs" is developing a methodology to identify failures in the production and select preventive and reactive measures in order to correct failures and to establish sustainable failure management systems.

Keywords: failure categorization, failure management, logistic performance, production optimization

Procedia PDF Downloads 346
16987 Managing Inter-Organizational Innovation Project: Systematic Review of Literature

Authors: Lamin B Ceesay, Cecilia Rossignoli

Abstract:

Inter-organizational collaboration is a growing phenomenon in both research and practice. The partnership between organizations enables firms to leverage external resources, experiences, and technology that lie with other firms. This collaborative practice is a source of improved business model performance, technological advancement, and increased competitive advantage for firms. However, the competitive intents, and even diverse institutional logics of firms, make inter-firm innovation-based partnership even more complex, and its governance more challenging. The purpose of this paper is to present a systematic review of research linking the inter-organizational relationship of firms with their innovation practice and specify the different project management issues and gaps addressed in previous research. To do this, we employed a systematic review of the literature on inter-organizational innovation using two complementary scholarly databases - ScienceDirect and Web of Science (WoS). Article scoping relies on the combination of keywords based on similar terms used in the literature:(1) inter-organizational relationship, (2) business network, (3) inter-firm project, and (4) innovation network. These searches were conducted in the title, abstract, and keywords of conceptual and empirical research papers done in English. Our search covers between 2010 to 2019. We applied several exclusion criteria including Papers published outside the years under the review, papers in a language other than English, papers neither listed in WoS nor ScienceDirect and papers that are not sharply related to the inter-organizational innovation-based partnership were removed. After all relevant search criteria were applied, a final list of 84 papers constitutes the data for this review. Our review revealed an increasing evolution of inter-organizational relationship research during the period under the review. The descriptive analysis of papers according to Journal outlets finds that International Journal of Project Management (IJPM), Journal of Industrial Marketing, Journal of Business Research (JBR), etc. are the leading journal outlets for research in the inter-organizational innovation project. The review also finds that Qualitative methods and quantitative approaches respectively are the leading research methods adopted by scholars in the field. However, literature review and conceptual papers constitute the least in the field. During the content analysis of the selected papers, we read the content of each paper and found that the selected papers try to address one of the three phenomena in inter-organizational innovation research: (1) project antecedents; (2) project management and (3) project performance outcomes. We found that these categories are not mutually exclusive, but rather interdependent. This categorization also helped us to organize the fragmented literature in the field. While a significant percentage of the literature discussed project management issues, we found fewer extant literature on project antecedents and performance. As a result of this, we organized the future research agenda addressed in several papers by linking them with the under-researched themes in the field, thus providing great potential to advance future research agenda especially, in the under-researched themes in the field. Finally, our paper reveals that research on inter-organizational innovation project is generally fragmented which hinders a better understanding of the field. Thus, this paper contributes to the understanding of the field by organizing and discussing the extant literature to advance the theory and application of inter-organizational relationship.

Keywords: inter-organizational relationship, inter-firm collaboration, innovation projects, project management, systematic review

Procedia PDF Downloads 89
16986 Uncertain Time-Cost Trade off Problems of Construction Projects Using Fuzzy Set Theory

Authors: V. S. S. Kumar, B. Vikram

Abstract:

The development of effective decision support tools that adopted in the construction industry is vital in the world we live in today, since it can lead to substantial cost reduction and efficient resource consumption. Solving the time-cost trade off problems and its related variants is at the heart of scientific research for optimizing construction planning problems. In general, the classical optimization techniques have difficulties in dealing with TCT problems. One of the main reasons of their failure is that they can easily be entrapped in local minima. This paper presents an investigation on the application of meta-heuristic techniques to two particular variants of the time-cost trade of analysis, the time-cost trade off problem (TCT), and time-cost trade off optimization problem (TCO). In first problem, the total project cost should be minimized, and in the second problem, the total project cost and total project duration should be minimized simultaneously. Finally it is expected that, the optimization models developed in this paper will contribute significantly for efficient planning and management of construction project.

Keywords: fuzzy sets, uncertainty, optimization, time cost trade off problems

Procedia PDF Downloads 329
16985 Factors Contributing to Building Construction Project’s Cost Overrun in Jordan

Authors: Ghaleb Y. Abbasi, Sufyan Al-Mrayat

Abstract:

This study examined the contribution of thirty-six factors to building construction project’s cost overrun in Jordan. A questionnaire was distributed to a random sample of 350 stakeholders comprised of owners, consultants, and contractors, of which 285 responded. SPSS analysis was conducted to identify the top five causes of cost overrun, which were a large number of variation orders, inadequate quantities provided in the contract, misunderstanding of the project plan, incomplete bid documents, and choosing the lowest price in the contract bidding. There was an agreement among the study participants in ranking the factors contributing to cost overrun, which indicated that these factors were very commonly encountered in most construction projects in Jordan. Thus, it is crucial to enhance the collaboration among the different project stakeholders to understand the project’s objectives and set a realistic plan that takes into consideration all the factors that might influence the project cost, which might eventually prevent cost overrun.

Keywords: cost, overrun, building construction projects, Jordan

Procedia PDF Downloads 74
16984 Modeling Metrics for Monitoring Software Project Performance Based on the GQM Model

Authors: Mariayee Doraisamy, Suhaimi bin Ibrahim, Mohd Naz’ri Mahrin

Abstract:

There are several methods to monitor software projects and the objective for monitoring is to ensure that the software projects are developed and delivered successfully. A performance measurement is a method that is closely associated with monitoring and it can be scrutinized by looking at two important attributes which are efficiency and effectiveness both of which are factors that are important for the success of a software project. Consequently, a successful steering is achieved by monitoring and controlling a software project via the performance measurement criteria and metrics. Hence, this paper is aimed at identifying the performance measurement criteria and the metrics for monitoring the performance of a software project by using the Goal Question Metrics (GQM) approach. The GQM approach is utilized to ensure that the identified metrics are reliable and useful. These identified metrics are useful guidelines for project managers to monitor the performance of their software projects.

Keywords: component, software project performance, goal question metrics, performance measurement criteria, metrics

Procedia PDF Downloads 323
16983 Collaborative Research between Malaysian and Australian Universities on Learning Analytics: Challenges and Strategies

Authors: Z. Tasir, S. N. Kew, D. West, Z. Abdullah, D. Toohey

Abstract:

Research on Learning Analytics is progressively developing in the higher education field by concentrating on the process of students' learning. Therefore, a research project between Malaysian and Australian Universities was initiated in 2015 to look at the use of Learning Analytics to support the development of teaching practice. The focal point of this article is to discuss and share the experiences of Malaysian and Australian universities in the process of developing the collaborative research on Learning Analytics. Three aspects of this will be discussed: 1) Establishing an international research project and team members, 2) cross-cultural understandings, and 3) ways of working in relation to the practicalities of the project. This article is intended to benefit other researchers by highlighting the challenges as well as the strategies used in this project to ensure such collaborative research succeeds.

Keywords: academic research project, collaborative research, cross-cultural understanding, international research project

Procedia PDF Downloads 220
16982 The Impact of the Business Process Reengineering on the Practices of the Human Resources Management in the Franco Tunisian Company-Network

Authors: Nesrine Bougarech, Habib Affes

Abstract:

This research lays the emphasis on the business process reengineering (BPR) which consists in radically altering the organizational processes through the optimal use of information technology (IT) to attain major enhancements in terms of quality, performance and productivity. A survey of the business process reengineering (BPR) was carried out in three French groups and their subsidiaries in Tunisia. The data collected were qualitatively analyzed in an attempt to test the main indicators of the success of a business process reengineering project (BPR) and to compare the importance of these indicators in the context of France versus Tunisia. The study corroborates that the respect of the inherent principles of the business process reengineering (BPR) and the diversity of the human resources involved in the project can lead to better productivity, higher quality of the goods or services and lower cost. Additionally, our results mirror the extent to which the respect of the principles and the diversity of resources are more important in the French companies than in their Tunisian subsidiaries.

Keywords: business process reengineering (BPR), human resources management (HRM), information technology (IT), management

Procedia PDF Downloads 384
16981 BIM-based Construction Noise Management Approach With a Focus on Inner-City Construction

Authors: Nasim Babazadeh

Abstract:

Growing demand for a quieter dwelling environment has turned the attention of construction companies to reducing the propagated noise of their project. In inner-city constructions, close distance between the construction site and surrounding buildings lessens the efficiency of passive noise control methods. Dwellers of the nearby areas may file complaints and lawsuits against the construction companies due to the emitted construction noise, thereby leading to the interruption of processes, compensation costs, or even suspension of the project. Therefore, construction noise should be predicted along with the project schedule. The advantage of managing the noise in the pre-construction phase is two-fold. Firstly, changes in the time plan and construction methods can be applied more flexibly. Thus, the costs related to rescheduling can be avoided. Secondly, noise-related legal problems are expected to be reduced. To implement noise mapping methods for the mentioned prediction, the required detailed information (such as the location of the noisy process, duration of the noisy work) can be exported from the 4D BIM model. The results obtained from the noise maps would be used to help the planners to define different work scenarios. The proposed approach has been applied for the foundation and earthwork of a site located in a residential area, and the obtained results are discussed.

Keywords: building information modeling, construction noise management, noise mapping, 4D BIM

Procedia PDF Downloads 153
16980 A Conceptual Framework of Impact of Lean on the Performance of Construction Industry

Authors: Jaber Shurrab, Matloub Hussain

Abstract:

The rapid pace of changes in the construction industry, technological advancements, and rising costs present tremendous challenges for project managers. Project managers are under severe pressure to minimize the waste, improve the efficiency of the entire operations and the philosophy of ‘lean thinking’ so that ‘more could be achieved with less’ is becoming very popular. Though, lean management has strong roots in manufacturing industry and over the last decade lean philosophy has started gaining attention in the service industry as well. However, little has been known in the context of waste minimization and lean implementation in the construction industry and this paper deals with this important issue. The primary objective of this paper is to propose a conceptual framework for the exploration of appropriate lean techniques applicable to medium and large construction companies and measure their impact on the competitiveness and economic performance of construction companies of United Arab Emirates (UAE). To this end, a comprehensive literature review and interviews with eight project managers of medium and large construction companies of UAE have been conducted. It has been found that competitive, reduce waste and costs are critical to the construction industry. This is an ongoing research in lean management, giving project managers a practical framework for improving the efficiency of their project through various lean techniques. Originality/value: Research significance emphasizes increasing the effectiveness of the construction industry, influences the development of lean construction framework which improves lean construction practices using the lean techniques. This contributes to the effort of applying lean techniques in the construction industry. Limited publications were done in the construction industry mainly in United Arab Emirates (UAE) compared to the lean manufacturing. This research will recommend a systematic approach for the implementing of the anticipated framework within a cyclical look-ahead period and emphasizes the practical implications of the proposed approach.

Keywords: construction, lean, lean manufacturing, waste

Procedia PDF Downloads 260
16979 The Effect of Principled Human Resource Management and Training Based on Existing Standards in Order to Improve the Quality of Construction Projects

Authors: Arsalan Salahi

Abstract:

Today, the number of changes in the construction industry and urban mass house building is increasing, which makes you need to pay more attention to targeted planning for human resource management and training. The human resources working in the construction industry have various problems and deficiencies, and in order to solve these problems, there is a need for basic management and training of these people in order to lower the construction costs and increase the quality of the projects, especially in mass house building projects. The success of any project in reaching short and long-term professional goals depends on the efficient combination of work tools, financial resources, raw materials, and most importantly, human resources. Today, due to the complexity and diversity of each project, specialized management fields have emerged to maximize the potential benefits of each component of that project. Human power is known as the most important resource in construction projects for its successful implementation, but unfortunately, due to the low cost of human power compared to other resources, such as materials and machinery, little attention is paid to it. With the correct management and training of human resources, which depends on its correct planning and development, it is possible to improve the performance of construction projects. In this article, the training and motivation of construction industry workers and their effects on the effectiveness of projects in this industry have been researched. In this regard, some barriers to the training and motivation of construction workers and personnel have been identified and solutions have been provided for construction companies. Also, the impact of workers and unskilled people on the efficiency of construction projects is investigated. The results of the above research show that by increasing the use of correct and basic training for human resources, we will see positive results and effects on the performance of construction projects.

Keywords: human resources, construction industry, principled training, skilled and unskilled workers

Procedia PDF Downloads 59
16978 Analysis of the Interference from Risk-Determining Factors of Cooperative and Conventional Construction Contracts

Authors: E. Harrer, M. Mauerhofer, T. Werginz

Abstract:

As a result of intensive competition, the building sector is suffering from a high degree of rivalry. Furthermore, there can be observed an unbalanced distribution of project risks. Clients are aimed to shift their own risks into the sphere of the constructors or planners. The consequence of this is that the number of conflicts between the involved parties is inordinately high or even increasing; an alternative approach to counter on that developments are cooperative project forms in the construction sector. This research compares conventional contract models and models with partnering agreements to examine the influence on project risks by an early integration of the involved parties. The goal is to show up deviations in different project stages from the design phase to the project transfer phase. These deviations are evaluated by a survey of experts from the three spheres: clients, contractors and planners. By rating the influence of the participants on specific risk factors it is possible to identify factors which are relevant for a smooth project execution.

Keywords: building projects, contract models, partnering, project risks

Procedia PDF Downloads 248
16977 Characteristic Function in Estimation of Probability Distribution Moments

Authors: Vladimir S. Timofeev

Abstract:

In this article the problem of distributional moments estimation is considered. The new approach of moments estimation based on usage of the characteristic function is proposed. By statistical simulation technique, author shows that new approach has some robust properties. For calculation of the derivatives of characteristic function there is used numerical differentiation. Obtained results confirmed that author’s idea has a certain working efficiency and it can be recommended for any statistical applications.

Keywords: characteristic function, distributional moments, robustness, outlier, statistical estimation problem, statistical simulation

Procedia PDF Downloads 475
16976 Encouraging Skills and Entrepreneurial Spirit to Improve Employability of Young Artists

Authors: Olga Lasaga, Carmen Parra

Abstract:

Within the EU 'New Skills for New Jobs' initiative, the art and music sector is considered one of the most vulnerable. Its graduates are faced with the threat of the dole or of not finding work in the sector in which they trained. In this regard, an increasing number of students are graduating every year from European Conservatories and Fine Arts Centres, while the number of job opportunities in this sector has stagnated or decreased. Moreover, the traditional teaching of these institutes does not favour the acquisition of basic skills, such as team building, entrepreneurship, marketing, website design and the design of events, which are among the most important facets of project management and are precisely those aspects that are often most related to the improvement of employability in the art world. To remedy this situation, the results of the European Erasmus+ OMEGA project (Opening More Employment Gates for Art and Music Students) are presented. The OMEGA project aims to increase the employability of art and music students by equipping them with additional skills needed for the search for work. As a result of this project, a manual has been created, a pilot course has been designed and taught, and a comparative study has been conducted on the state of play of the participating countries.

Keywords: artists, employability, entrepreneurship, musicians, skills

Procedia PDF Downloads 218
16975 Data Driven Infrastructure Planning for Offshore Wind farms

Authors: Isha Saxena, Behzad Kazemtabrizi, Matthias C. M. Troffaes, Christopher Crabtree

Abstract:

The calculations done at the beginning of the life of a wind farm are rarely reliable, which makes it important to conduct research and study the failure and repair rates of the wind turbines under various conditions. This miscalculation happens because the current models make a simplifying assumption that the failure/repair rate remains constant over time. This means that the reliability function is exponential in nature. This research aims to create a more accurate model using sensory data and a data-driven approach. The data cleaning and data processing is done by comparing the Power Curve data of the wind turbines with SCADA data. This is then converted to times to repair and times to failure timeseries data. Several different mathematical functions are fitted to the times to failure and times to repair data of the wind turbine components using Maximum Likelihood Estimation and the Posterior expectation method for Bayesian Parameter Estimation. Initial results indicate that two parameter Weibull function and exponential function produce almost identical results. Further analysis is being done using the complex system analysis considering the failures of each electrical and mechanical component of the wind turbine. The aim of this project is to perform a more accurate reliability analysis that can be helpful for the engineers to schedule maintenance and repairs to decrease the downtime of the turbine.

Keywords: reliability, bayesian parameter inference, maximum likelihood estimation, weibull function, SCADA data

Procedia PDF Downloads 38
16974 The Causes and Effects of Housing Project Abandonment in Malaysia

Authors: Abdul Aziz Abdullah, Anuar Alias, Khor Hooi Ting, Guan Ngah Mei

Abstract:

One of the major sectors which contribute significant growth to socio-economic development is the construction and development industry. This industry is most badly hurt during the 1997 and 2008 economic crisis thus causing many government and private projects to be deferred and abandoned. The purpose of this study is to examine the causes and effects of housing project abandonment in Malaysia. This objective is achieved through rigorous review of literatures and documents related to housing and abandoned housing project. The finding revealed there are several causes of housing project abandonment. The significant causes are: economic recession, inadequacy of finance, poor marketing and sales strategies, technical problems faced during construction, problems caused by compensations demanded by squatters for resettlement, insolvency of contractor, cost overrun and currency fluctuation amongst others. However the alarming effect of housing project is: house buyers of abandoned project have the monthly payment although the house is delivered to house buy. In other case house buyers have to entangle in many legal action with the financial institution. This finding provides the various ministries in the Government some insights on real causes and effects of abandoned project. Perhaps this finding can enhance the current solution the Ministry of Housing Local Government on addressing the prevailing issue of reviving existing abandoned project in the country.

Keywords: abandoned project, abandonment, housing project, ministry of housing and local government, causes and effect

Procedia PDF Downloads 508