Search results for: procurement management
9686 Mechanisms for Strategic Adoption of Innovation Procurement
Authors: Carolina B. A. Morais, Antonio Bob Santos
Abstract:
In order to determine how innovation procurement can strengthen public efficiency and foster the modernization of public services, while at the same time promoting the opening of new private markets, this paper aims to present the two key instruments for the practice of innovation procurement at a European, national, and regional level – Pre-Commercial Procurement (PCP), and Public Procurement of Innovative Solutions (PPI). Thus, it starts with a theoretical framework on the emergence of this topic in the European Innovation Policy (Section 2), then continues with the identification and systematization of the main mechanisms for its effective adoption, both on the demand and supply side of the market (Section 3), as well as to expose and describe methods and tools for positioning innovation at the heart of public entities. The innovative projects best distinguished by the European Commission for their good practices in innovation procurement are identified, and the main methodology for the development and management of innovation procurement – Forward Commitment Procurement (FCP) – is applied to them in a pioneering way (Section 4). The relevance of innovation in public procurement is systematized and reflected upon in Section 5.Keywords: innovation procurement, innovation policy, innovation, pubic procurement
Procedia PDF Downloads 1209685 Assessing Indicators, Challenges and Benefits of Sustainable Procurement in Construction Projects
Authors: Taha Anjamrooz, Sareh Rajabi, Salwa Bheiry
Abstract:
Procurement is a key process in construction project management. The present construction procurement practices have been extensively analyzed for disregarding sustainability in the project life cycle. Currently, there is a gap of information on status-quo of sustainable procurement in construction field. Thus, the aim of this study is to review sustainable procurement practices in the construction field. Disregard of three sustainability pillars is one of the major drawbacks of present construction procurement practices. Sustainable procurement is a developing idea that can enhance procurement practices and improve the sustainability performance of the construction projects. At present, sustainable procurement is still not entirely used in the construction projects. A comprehensive literature review indicated that the construction industry is still not entirely informed about the benefits and challenges of using sustainable procurement, and about important indicators that play major impacts on those benefits and challenges. This study assesses the major indicator, benefits and challenges encountered in applying sustainable procurement in the construction industry. In addition, this study investigates understanding of construction professionals on the benefits and challenges of utilizing sustainable procurement for construction projects through selected indicators that are categorized according to society and community needs.Keywords: sustainability, sustainable development, sustainable procurement, procurement, construction industry
Procedia PDF Downloads 1949684 Changing Skills with the Transformation of Procurement Function
Authors: Ömer Faruk Ada, Türker Baş, M. Yaman Öztek
Abstract:
In this study, we aim to investigate the skills to be owned by procurement professionals in order to fulfill their developing and changing role completely. Market conditions, competitive pressure, and high financial costs make it more important than ever for organizations to be able to use resources more efficiently. Research shows that procurement expenses consist more than 50 % of the operating expenses. With increasing profit impact of procurement, reviewing the position of the procurement function within the organization has become inevitable. This study is significant as it indicates the necessary skills that procurement professionals must have to keep in step with the transformation of procurement units from transaction oriented to value chain oriented. In this study, the transformation of procurement is investigated from the perspective of procurement professionals and we aim to answer following research questions: • How do procurement professionals perceive their role within the organization? • How has their role changed and what challenges have they had to face? • What portfolio of skills do they believe will enable them to fulfill their role effectively? Literature review consists of the first part of the study by investigating the changing role of procurement from different perspectives. In the second part, we present the results of the in-depth interviews with 15 procurement professionals and we used descriptive analysis as a methodology. In the light of these results, we classified procurement skills under operational, tactical and strategic levels and Procurement Skills Framework has been developed. This study shows the differences in the perception of purchasing by professionals and the organizations. The differences in the perception are considered as an important barrier beyond the procurement transformation. Although having the necessary skills has a significant effect for procurement professionals to fulfill their role completely and keep in step with the transformation of the procurement function, It is not the only factor and the degree of high-level management and organizational support has also a direct impact during this transformation.Keywords: procuement skills, procurement transformation, strategic procurement, value chain
Procedia PDF Downloads 4159683 Critical Evaluation of Key Performance Indicators in Procurement Management Information System: In Case of Bangladesh
Authors: Qazi Mahdia Ghyas
Abstract:
Electronic Government Procurement (e-GP) has implemented in Bangladesh to ensure the good Governance. e-GP has transformed Bangladesh's procurement process electronically. But, to our best knowledge, there is no study to understand the key features of e-GP in Bangladesh. So, this study tries to identify the features of performance improvement after implementing an e-GP system that will help for further improvements. Data was collected from the PROMIS Overall Report (Central Procurement Technical Unit website) for the financial year from Q1 _July- Sep 2015-16 to Q4 _Apr- Jun 2021-22. This study did component factor analysis on KPIs and found nineteen KPIs that are statistically significant and represent time savings, efficiency, accountability, anti-corruption and compliance key features in procurement activities of e-GP. Based on the analysis, some practical measures have been recommended for better improvement of e-GP. This study has some limitations. Because of having multicollinearity issues, all the 42 KPIs (except 19) did not show a good fit for component factor analysis.Keywords: public procurement, electronic government procurement, KPI, performance evaluation
Procedia PDF Downloads 959682 Influence of Procurement Methods on Cost Performance of Building Projects in Gombe State, Nigeria
Authors: S. U. Kunya, S. Abdulkadir, M. A. Anas, L. Z. Adam
Abstract:
Procurement methods is described as systems of contractual arrangements used by the contractor in order to secure the design and construction services based on the stipulated cost and within the required time and quality. Despite that, major projects in the Nigerian construction industry failed because of wrong procurement methods with major consequences leads to cost overrun which needs to find lasting solution. The aim of the study is to evaluate the influence of procurement methods on cost performance of building projects in Gombe State, Nigeria. Study adopts descriptive and explorative design approach. Data were collected through administering of one hundred questionnaire using convenient sampling techniques. Data analyses using percentages, mean value and Anova analysis. Major finding show that more than fifty percent (50%) of procurement methods available are mainly utilized in the study area and the top procurement methods that have high impacts on cost performance as compare with the other methods is project management and direct labour procurement methods. The results of hypothesis’ tests with pvalue 0.12 and 0.07 validated that there was no significant variation in the perception of stakeholders’ on the impacts of procurements methods on cost performance. Therefore, the study concluded that projects management and direct labour are the most appropriate procurement methods that will ensure successful completion of project at stipulated cost in building projects.Keywords: cost, effects, performance, procurement, projects
Procedia PDF Downloads 2239681 Knowledge Management Challenges within Traditional Procurement System
Authors: M. Takhtravanchi, C. Pathirage
Abstract:
In the construction industry, project members are conveyor of project knowledge which is, often, not managed properly to be used in future projects. As construction projects are temporary and unique, project members are willing to be recruited once a project is completed. Therefore, poor management of knowledge across construction projects will lead to a considerable amount of knowledge loss; the ignoring of which would be detrimental to project performance. This issue is more prominent in projects undertaken through the traditional procurement system, as this system does not incentives project members for integration. Thus, disputes exist between the design and construction phases based on the poor management of knowledge between those two phases. This paper aims to highlight the challenges of the knowledge management that exists within the traditional procurement system. Expert interviews were conducted and challenges were identified and analysed by the Interpretive Structural Modelling (ISM) approach in order to summarise the relationships among them. Two identified key challenges are the Culture of an Organisation and Knowledge Management Policies. A knowledge of the challenges and their relationships will help project manager and stakeholders to have a better understanding of the importance of knowledge management.Keywords: challenges, construction industry, knowledge management, traditional procurement system
Procedia PDF Downloads 4319680 Assessment of Procurement-Demand of Milk Plant Using Quality Control Tools: A Case Study
Authors: Jagdeep Singh, Prem Singh
Abstract:
Milk is considered as an essential and complete food. The present study was conducted at Milk Plant Mohali especially in reference to the procurement section where the cash inflow was maximum, with the objective to achieve higher productivity and reduce wastage of milk. In milk plant it was observed that during the month of Jan-2014 to March-2014 the average procurement of milk was Rs. 4, 19, 361 liter per month and cost of procurement of milk is Rs 35/- per liter. The total cost of procurement thereby equal to Rs. 1crore 46 lakh per month, but there was mismatch in procurement-production of milk, which leads to an average loss of Rs. 12, 94, 405 per month. To solve the procurement-production problem Quality Control Tools like brainstorming, Flow Chart, Cause effect diagram and Pareto analysis are applied wherever applicable. With the successful implementation of Quality Control tools an average saving of Rs. 4, 59, 445 per month is done.Keywords: milk, procurement-demand, quality control tools,
Procedia PDF Downloads 5329679 A Theoretical Framework for Conceptualizing Integration of Environmental Sustainability into Supplier Selection
Authors: Tonny Ograh, Joshua Ayarkwa, Dickson Osei-Asibey, Alex Acheampong, Peter Amoah
Abstract:
Theories are used to improve the conceptualization of research ideas. These theories enhance valuable elucidations that help us to grasp the meaning of research findings. Nevertheless, the use of theories to promote studies in green supplier selection in procurement decisions has attracted little attention. With the emergence of sustainable procurement, public procurement practitioners in Ghana are yet to achieve relevant knowledge on green supplier selections due to insufficient knowledge and inadequate appropriate frameworks. The flagrancy of the consequences of public procurers’ failure to integrate environmental considerations into supplier selection explains the adoption of a multi-theory approach for comprehension of the dynamics of green integration into supplier selection. In this paper, the practicality of three theories for improving the understanding of the influential factors enhancing the integration of environmental sustainability into supplier selection was reviewed. The three theories are Resource-Based Theory, Human Capital Theory and Absorptive Capacity Theory. This review uncovered knowledge management, top management commitment, and environmental management capabilities as important elements needed for the integration of environmental sustainability into supplier selection in public procurement. The theoretical review yielded a framework that conceptualizes knowledge and capabilities of practitioners relevant to the incorporation of environmental sustainability into supplier selection in public procurement.Keywords: environmental, sustainability, supplier selection, environmental procurement, sustainable procurement
Procedia PDF Downloads 1799678 Linking Sustainable Public Procurement and the Sustainable Development Goals Targets in Zambia: A Preliminary Investigation
Authors: Charles P. Mukumba, Kahilu K. Shakantu
Abstract:
Achieving the Sustainable Development Goals [SDGs] is a key to achieving transformational results that support Zambia’s development. Public procurement is an integral to the government’s mission to deliver goods and services, in a timely and economic manner beyond the value of money spent. This study explores the link between sustainable public procurement and the SDG targets in Zambia. And to validate the established links with the public sector procurement in Zambia. The study employed qualitative research using semi-structured interviews with 18 public procurement officials. The collected data was analysed using thematic analysis. The findings indicate that public procurement plays a fundamental role in achieving the sustainable development goals [SDGs] by helping to deliver core public services that support SDGs and also by systematising and co-delivering added value along the way. The study further established the importance of sustainable public procurement within the context of development. The interviews were limited to mainstream public sector procurement entities in Lusaka, Zambia. Sustainable public procurement actions have the potential to impact SDG goals. Promoting sustainable public procurement will enhance sustainable development and significantly improve supply chain that would benefit the economy, society and environment. Findings will inform policy-makers how to strategically design sustainable public procurement policy by attuning it to procuring entities objectives and priorities in order to contribute to the attainment of SDGs.Keywords: sustainable public procurement, sustainable development goals, target, Zambia
Procedia PDF Downloads 1479677 Monitoring System for Electronic Procurement Systems
Authors: Abdulah Fajar
Abstract:
Electronic Procurement System has been implemented at government institution in Indonesia. This system has been developed centrally at Institution of National Procurement Policy (LKPP) and implemented autonomously at either local or national government institution. The lack of competency at many institution on Information Technology Management arise several major problems. The main concern of LKPP to local administrator is assured that the system is running normally and always be able to serve the needs of its users. Monitoring system has been identified as the one of solution to prevent the problems appeared. Monitoring system is developed using Simple Network Management Protocol (SNMP) and implemented at LKPP. There are two modules; Main Dashboard and Local Agent. Main Dashboard is intended for LKPP and Local Agent is intended to implement at local autonomous e-procurement system (LPSE). There are several resources that must be monitored such as computation, memory and network traffic. Agile paradigm is applied to this project to assure user and system requirement is met. The length of project is the one of reason why agile paradigm has been chosen. The system has been successfully delivered to LKPP.Keywords: procurement system, SNMP, LKPP, LPSE
Procedia PDF Downloads 4279676 Causes of Non-Compliance With Public Procurement Act, 2007 Among Some Selected State Own Public Tertiary Education Institutions in Southwest, Nigeria
Authors: Ibitoye Olabode Clement
Abstract:
The huge amount of grants for infrastructures development in Tertiary Institutions in Nigeria calls for transparency and accountability in the procurement process. However, questions have been raised concerning the judicious and appropriate use of the funds, and it was doubtful if the institutions complied with due process. This paper examined the causes of non-compliance with the Public Procurement Act (2007) in the procurement of Goods, Works, and Services through either direct or indirect processes of procurement, mostly in Tertiary Institutions of State government subvention institutions in Nigeria. Nigeria has over 120 public universities, polytechnics, and colleges of Education. This paper will take samples of some selected Institutions in southwest Nigeria. The institutions comprise 5 Universities, 5 Polytechnics, and 5 Colleges of Education / Health and Technology. The opinions of the institutions’ Procurement Officers on the tremendous investment through grants and interventions for infrastructure development in Tertiary Education Institutions (TEI) in Nigeria call for transparency and accountability in the procurement process. However, there are a lot of questions have been raised as to the judicious use of the funds, and it was doubtful if the institutions complied with due process. This study examined the causes of non-compliance with the Public Procurement Act (2007) in the procurement of Goods, Works, and Services in most State Government Public Institutions in Southwest Nigeria. Over, 120 public institutions comprising 5 Universities, 5 Polytechnics, and 5 Colleges of Education / Health and Technology were used for the study. The opinions of the institutions’ Procurement Officers on the causes of non-compliance with the Act in their procurement process were sought using a structured questionnaire. The results revealed that non-independent of Procurement Officers, non-compliance with the Act by some at the managerial level, claiming inadequate knowledge of the Act, non-employment of qualified and experienced Procurement officers, insufficient publicity of the Act, and non-existence of corporate governance led to poor management of procurement record and non-provision of incentive, Inability to separate the duties of Internal Auditors and Procurement Officers, Inability to translate procurement entity at large which makes nearly all at departmental level believe they procurement officers. Conclusively, on taking the Procurement Officers through interviewing having it that: the right educational and professional qualifications, understanding of the Act, sufficient cognate working experience, recruiting most professionals needed if not all, and occupying management position will enhance compliance. Hence, in addition, adopting an external empowered department from the Bureau should raise for monitoring the compliance mostly in State Government Tertiary Education Institution. Also, an organizational culture with a corporate governance structure that supports the engagement of the right and qualified personnel to handle procurement, encourages them to perform at their best and rewards excellent service by giving incentives, and operates within an administrative environment devoid of corruption.Keywords: non compliance of procurement act, tertiary education institution, university, polytechnic and college of education/ health science and technology, Nigeria
Procedia PDF Downloads 1049675 The Relationship between Procurement Strategies and Sustainability Outcomes: A Systematic Literature Review
Authors: Cathy T. Mpanga Kowet, Aghaegbuna Obinna U. Ozumba
Abstract:
This study examined and identified the inconsistencies, relationships, gaps and recurring themes in literature regarding the relationship between procurement strategies employed in the construction projects for sustainable buildings and realization of sustainability goals. A systematic literature review of studies on the relationship between various procurement strategies and attainment of sustainability outcomes was conducted. Using specific terms, papers published between 2002 and 2018 were identified and screened according to an inclusion and exclusion criteria. Current findings reveal that, although the attainment of sustainability goals is achievable with both traditional and contemporary procurement strategies, only projects delivered using modern procurement strategies are capable of meeting and exceeding targeted sustainability objectives. However, traditional procurement strategy remains the preferred method for most green building construction projects. The results suggest implications for decision makers in considering the impact of selected procurement strategies on targeted sustainability goals, in the early stages of sustainable building construction projects. The study shows that there is a gap between the reported appropriate procurement strategies and what is being practiced currently. Theoretically, the study expands on the literature on adoption and diffusion of contemporary procurement strategies, by consolidating existing studies to highlight the current gaps. While the study is at the literature review stage, deductions will serve as basis for field work involving empirical data.Keywords: green buildings construction, procurement method, procurement strategy, sustainability objectives, sustainability outcomes
Procedia PDF Downloads 1729674 Public Procurement and Innovation: A Municipal Approach
Authors: M. Moso-Diez, J. L. Moragues-Oregi, K. Simon-Elorz
Abstract:
Innovation procurement is designed to steer the development of solutions towards concrete public sector needs as a driver for innovation from the demand side (in public services as well as in market opportunities for companies), is horizontally emerging as a new policy instrument. In 2014 the new EU public procurement directives 2014/24/EC and 2014/25/EC reinforced the support for Public Procurement for Innovation, dedicating funding instruments that can be used across all areas supported by Horizon 2020, and targeting potential buyers of innovative solutions: groups of public procurers with similar needs. Under this programme, new policy adapters and networks emerge, aiming to embed innovation criteria into new procurement processes. As these initiatives are in process, research related to is scarce. We argue that Innovation Public Procurement can arise as an innovative policy instrument to public procurement in different policy domains, in spite of existing institutional and cultural barriers (legal guarantee versus innovation). The presentation combines insights from public procurement to supply management chain management in a sustainability and innovation policy arena, as a means of providing understanding of: (1) the circumstances that emerge; (2) the relationship between public and private actors; and (3) the emerging capacities in the definition of the agenda. The policy adopters are the contracting authorities that mainly are at municipal level where they interact with the supply management chain, interconnecting sustainability and climate measures with other policy priorities such as innovation and urban planning; and through the Competitive Dialogue procedure. We found that geography and territory affect both the level of municipal budget (due to municipal income per capita) and its institutional competencies (due to demographic reasons). In spite of the relevance of institutional determinants for public procurement, other factors play an important role such as human factors as well as both public policy and private intervention. The experience is a ‘city project’ (Bilbao) in the field of brownfield decontamination. Brownfield sites typically refer to abandoned or underused industrial and commercial properties—such as old process plants, mining sites, and landfills—that are available but contain low levels of environmental contaminants that may complicate reuse or redevelopment of the land. This article concludes that Innovation Public Procurement in sustainability and climate issues should be further developed both as a policy instrument and as a policy research line that could enable further relevant changes in public procurement as well as in climate innovation.Keywords: innovation, city projects, public policy, public procurement
Procedia PDF Downloads 3099673 Evaluating the Implementation of Public Procurement Principles at Tendering Stage: SME Contractors' Perspective
Authors: Charles Poleni Mukumba, Kahilu Kajimo-Shakantu
Abstract:
Purpose: Principles of public procurement are the foundation of good public procurement, representing best practices in delivering public services by the government and its organs. They provide guidance in the public procurement cycle to achieve the best value for public resources. Tendering stage in the procurement cycle is the most critical, as tendering information is made available to bidders. The paper evaluates the implementation of public procurement principles at the tendering stage. Design/Methodology/Approach: The research was conducted by using qualitative methods with 18 SME contractors in Lusaka as the sample. The samples are business owners and managers of purposively selected SME contractors. The collected data was analysed using thematic and content analysis. Findings: The findings indicate inconsistency in accessing information critical for tendering success by bidders. Further, the findings suggest that adjustments to technical specifications are made to suit certain preferred bidders by procuring officials. Research Limitations/Implications: The interviews were limited to SME contractors registered with the national council for construction and involved in public sector construction works in Lusaka, Zambia. Practical Implications: Implementing principles of public procurement at the tendering stage creates equal, open, and fair competition for the bidders in cost terms to deliver standardised and quality works to the public sector. Original/Value: The findings reveal how principles of public procurement play a critical role in enhancing the efficient performance of the procurement cycle at the tendering stage.Keywords: evaluating, implementation, public procurement principles, tendering stage, SME contractors
Procedia PDF Downloads 849672 An Analysis of Present Supplier Selection Criteria of State Pharmaceutical Corporation (SPC) Sri Lanka: A Case Study
Authors: Gamalath M. B. P. Abeysekara
Abstract:
Primary objective of any organization is to enhance the bottom line profit. Strategic procurement is one of the prominent aspects in view of receiving this ultimate objective. Strategic procurement is an activity used in each and every organization in their operations. Pharmaceutical procurement is an especially significant task for any organizations, particularly state sector concerned. The whole pharmaceutical procurement requirement of the country is procured through the State Pharmaceutical Corporation (SPC) of Sri Lanka. They follow Pharmaceutical Procurement Guideline of 2006 as the procurement principle. The main objective of this project is to identify the importance of State Pharmaceutical Corporation supplier selection criteria and critical analysis of pharmaceutical procurement procedure. State Pharmaceutical Corporations applied net price, product quality, past performance, and delivery of suppliers’ as main criteria for the selection suppliers. Data collection for this study was taken place through a questionnaire, given to fifty doctors within the Colombo district attached to five main state hospitals. Data analysis is carried out with mean and standard deviation functions. The ultimate outcomes indicated product quality, net price, and delivery of suppliers’ are the most important criteria behind the selection of suppliers. Critical analysis proved State Pharmaceutical Corporation should focus on net price reduction, improving laboratory testing facilities and effective communication between up and down stream of supply chain.Keywords: government procurement procedure, pharmaceutical procurement supplier selection criteria, importance of SPC supplier selection criteria
Procedia PDF Downloads 4519671 The Good, the Bad and the Ugly in E-Procurement: A Case Study of Agricultural Company in Vietnam
Authors: D. T. Tran, H. P. Tran, L. G. Hoang, V. N. H. Bui, Q. T. Nguyen, A. K. Das
Abstract:
This paper provides some insight information about a current situation of e-procurement implementation in Vietnam, including opportunities and challenges. A case study of Phuc Thien Company which is classified as a medium enterprise in the country, specialising on animal feed production. Since the technological development rapidly changes, companies have implemented advanced technologies in supply chain management to increase efficiency and gain collaboration amidst partners in their manufacturing and development activities. The findings of this research reveal strengths and ongoing weaknesses when Phuc Thien company internally implemented eProcurement system. Although cost savings, visibility of payment and speedy procurement process are one of the largest benefits of eProcurement implementation, the company faces greater hurdles, such as employee capability to use technology and their resistance to change, that overshadow everything else. In terms of governmental policy, the adaptation of e-invoicing has commenced since June 2015 in Vietnam, legal regulations and administrative framework related to e-Procurement carries various ambiguous in its content and extremely fragment. Hence, this adds a great burden to enterprises in general and Phuc Thien in particular in view of creating higher competitive advantage for animal feed industry in Vietnam as well as South East Asia region.Keywords: procurement, e-procurement, animal feed industry, efficiency
Procedia PDF Downloads 3349670 Integrated Formulation of Project Scheduling and Material Procurement Considering Different Discount Options
Authors: Babak H. Tabrizi, Seyed Farid Ghaderi
Abstract:
On-time availability of materials in the construction sites plays an outstanding role in successful achievement of project’s deliverables. Thus, this paper has investigated formulation of project scheduling and material procurement at the same time, by a mixed-integer programming model, aiming to minimize/maximize penalty/reward to deliver the project and minimize material holding, ordering, and procurement costs, respectively. We have taken both all-units and incremental discount possibilities into consideration to address more flexibility from the procurement side with regard to real world conditions. Finally, the applicability and efficiency of the mathematical model is tested by different numerical examples.Keywords: discount strategies, material purchasing, project planning, project scheduling
Procedia PDF Downloads 2619669 Prevention of Corruption in Public Purchases
Authors: Anatoly Krivinsh
Abstract:
The results of dissertation research "Preventing and combating corruption in public procurement" are presented in this publication. The study was conducted 2011 till 2013 in a Member State of the European Union, in the Republic of Latvia. Goal of the thesis is to explore corruption prevention and combating issues in public procurement sphere, to identify the prevalence rates, determinants and contributing factors and prevention opportunities in Latvia. In the first chapter the author analyses theoretical aspects of understanding corruption in public procurement, with particular emphasis on corruption definition problem, its nature, causes and consequences. A separate section is dedicated to the public procurement concept, mechanism and legal framework. In the first part of this work the author presents cognitive methodology of corruption in public procurement field, based on which the author has carried out an analysis of corruption situation in public procurement in Republic of Latvia. In the second chapter of the thesis, the author analyzes the problem of corruption in public procurement, including its historical aspects, typology and classification of corruption subjects involved, corruption risk elements in public procurement and their identification. During the development of the second chapter author's practical experience in public procurements was widely used. The third and fourth chapter deals with issues related to the prevention and combating corruption in public procurement, namely the operation of the concept, principles, methods and techniques, subjects in Republic of Latvia, as well as an analysis of foreign experience in preventing and combating corruption. The fifth chapter is devoted to the corruption prevention and combating perspectives and their assessment. In this chapter the author has made the evaluation of corruption prevention and combating measures efficiency in Republic of Latvia, assessment of anti-corruption legislation development stage in public procurement field in Latvia.Keywords: prevention of corruption, public purchases, good governance, human rights
Procedia PDF Downloads 3329668 Examining the Relationship Between Green Procurement Practices and Firm’s Performance in Ghana
Authors: Alexander Otchere Fianko, Clement Yeboah, Evans Oteng
Abstract:
Prior research concludes that Green Procurement Practices positively drive Organisational Performance. Nonetheless, the nexus and conditions under which Green Procurement Practices contribute to a Firm’s Performance are less understood. The purpose of this quantitative relational study was to examine the relationship between Green Procurement Practices and 500 Firms’ Performances in Ghana. The researchers further seek to draw insights from the resource-based view to conceptualize Green Procurement Practices and Environmental Commitment as resource capabilities to enhance Firm Performance. The researchers used insights from the contingent resource-based view to examine Green Leadership Orientation conditions under which Green Procurement Practices contribute to Firm Performance through Environmental Commitment Capabilities. The study’s conceptual framework was tested on primary data from some firms in the Ghanaian market. PROCESS Macro was used to test the study’s hypotheses. Beyond that, Environmental Commitment Capabilities mediated the association between Green Procurement Practices and the Firm’s Performance. The study further seeks to find out whether Green Leadership Orientation positively moderates the indirect relationship between Green Procurement Practices and Firm Performance through Environmental Commitment Capabilities. While conventional wisdom suggests that improved Green Procurement Practices help improve a Firm’s Performance, this study tested this presumed relationship between Green Procurement Practices and Firm Performance and provides theoretical arguments and empirical evidence to justify how Environmental Commitment Capabilities uniquely and in synergy with Green Leadership Orientation transform this relationship. The study results indicated a positive correlation between Green Procurement Practices and Firm Performance. This result suggests that firms that prioritize environmental sustainability and demonstrate a strong commitment to environmentally responsible practices tend to experience better overall performance. This includes financial gains, operational efficiency, enhanced reputation, and improved relationships with stakeholders. The study's findings inform policy formulation in Ghana related to environmental regulations, incentives, and support mechanisms. Policymakers can use the insights to design policies that encourage and reward firms for their Green Procurement Practices, thereby fostering a more sustainable and environmentally responsible business environment. The findings from such research can influence the design and development of educational programs in Ghana, specifically in fields related to sustainability, environmental management, and corporate social responsibility (CSR). Institutions may consider integrating environmental and sustainability topics into their business and management courses to create awareness and promote responsible practices among future business professionals. Also, the study results can also promote the adoption of environmental accounting practices in Ghana. By recognizing and measuring the environmental impacts and costs associated with business activities, firms can better understand the financial implications of their Green Procurement Practices and develop strategies for improved performance.Keywords: environmental commitment, firm’s performance, green procurement practice, green leadership orientation
Procedia PDF Downloads 809667 Barriers to E-Tendering Adoption and Implementation in the Ghanaian Construction Industry
Authors: Aynur Kazaz, Yusif Inusah
Abstract:
In the bid to improve transparency and efficiency as well as to reduce the cost of the public procurement process, Ghana started implementing an electronic Government Procurement System, known as the Ghana Electronic Procurement System (GHANEPS) in November 2019. The implementation of e-tendering technology is new to the stakeholders. Therefore, this research is aimed to identify the critical barriers to e-tendering implementation in the Ghanaian construction industry. Examples of barriers to e-tendering implementation were first identified through a literature review, and questionnaires and interview questions were prepared to gather the data. This study contributes to the in-depth understanding of global e-tendering barriers in the Ghanaian construction industry. The findings could help researchers, practitioners, and governments make strategic investment decisions and overcome e-tendering challenges.Keywords: barriers, challenges, construction industry, e-procurement, e-tendering
Procedia PDF Downloads 1319666 Purpose in Procurement: Much Discussed, Less Conceptualized – An Exploratory Study of CPO Perceptions Based on the Gioia Methodology
Authors: Laurin Zemmrich, Nicolai Stickler
Abstract:
With the ongoing debate over how to incorporate sustainability, resilience, and value creation into business strategies, many procurement departments are put under pressure by governments, consumers, non-governmental organizations, and other stakeholders to disclose more information about their supply chains. According to practitioners and experts, procurement benefits the supply chain by increasing transparency and accountability, recruiting new suppliers, and supporting sustainable and ethical sourcing strategies. While most procurement departments establish these objectives, the bulk of activities are not carried out or are not regularly monitored. With the full potential of targeted sourcing still to be realized, procurement executives, in particular, are seeking for short-term cost-cutting impacts to appease external shareholders. We overcome this limitation by using an abductive approach to research and integrating empirical data from a Gioia methodology study design with relevant literature. Our analysis demonstrates that the procurement department has six essential levers aligned with sustainability, resilience, and value creation objectives and contributes to developing a new intra- and interorganizational purpose within the supply chain. Three enablers are identified as having a value-creating effect on supply chain interactions. Additionally, we discovered two impacts that alter the power balance between buyers and suppliers during transactions and have a cost-cutting or cost-avoiding effect. While cost-cutting, cost-avoidance, and dependency-reduction impacts are desirable, redistributing power may also have negative consequences. The article establishes a first strategy framework for evaluating the influence of the procurement department on supply chain transactions, allowing managers to understand better and apply the sourcing function inside a supply chain and embed it throughout the business.Keywords: supply chain management, resilience, sustainability, value creation, purpose
Procedia PDF Downloads 1189665 Public Procurement Development Stages in Georgia
Authors: Giorgi Gaprindashvili
Abstract:
One of the best examples, in evolution of the public procurement, from post-soviet countries are reforms carried out in Georgia, which brought them close to international standards of procurement. In Georgia, public procurement legislation started functioning in 1998. The reform has passed several stages and came in the form as it is today. It should also be noted, that countries with economy in transition, including Georgia, implemented all the reforms in public procurement based on recommendations and support of World Bank, the United Nations and other international organizations. The first law on public procurement in Georgia was adopted on December 9, 1998 which aimed regulation of the procurement process of budget-organizations, transparent and competitive environment for private companies to access state funds legally. The priorities were identified quite clearly in the wording of the law, but operation/function of this law could not be reached on its level, because of some objective and subjective reasons. The high level of corruption in all levels of governance, can be considered as a main obstacle reason and of course, it is natural, that it had direct impact on the procurement process, as well as on transparency and rational use of state funds. This circumstances were the reasons that reforms in this sphere continued, to improve procurement process, in particular, the first wave of reforms began in 2001. Public procurement agency carried out reform with World Bank with main purpose of smartening the procurement legislation and its harmonization with international treaties and agreements. Also with the support of World Bank various activities were carried out to raise awareness of participants involved in procurement system. Further major changes in the legislation were filed in May 2005, which was also directed towards the improvement and smarten of the procurement process. The third wave of the reform began in 2010, which more or less guaranteed the transparency of the procurement process, which later became the basis for the rational spending of state funds. The reform of the procurement system completely changed the procedures. Carried out reform in Georgia resulted in introducing new electronic tendering system, which benefit the transparency of the process, after this became the basis for the further development of a competitive environment, which become a prerequisite for the state rational spending. Increased number of supplier organizations participating in the procurement process resulted in reduction of the estimated cost and the actual cost from 20% up to 40%, it is quite large saving for the procuring organizations and allows them to use the freed-up funds for their other needs. Assessment of the reforms in Georgia in the field of public procurement can be concluded, that proper regulation of the sector and relevant policy may proceed to rational and transparent spending of the budget from country’s state institutions. Also, the business sector has the opportunity to work in competitive market conditions and to make a preliminary analysis, which is a prerequisite for future strategy and development.Keywords: public administration, public procurement, reforms, transparency
Procedia PDF Downloads 3669664 Designing Supplier Partnership Success Factors in the Coal Mining Industry
Authors: Ahmad Afif, Teuku Yuri M. Zagloel
Abstract:
Sustainable supply chain management is a new pattern that has emerged recently in industry and companies. The procurement process is one of the key factors for efficiency in supply chain management practices. Partnership is one of the procurement strategies for strategic items. The success factors of the partnership must be determined to avoid things that endanger the financial and operational status of the company. The current supplier partnership research focuses on the selection of general criteria and sustainable supplier selection. Currently, there is still limited research on the success factors of supplier partnerships that focus on strategic items in the coal mining industry. Meanwhile, the procurement of coal mining has its own characteristics, and there are regulations related to the procurement of goods. Therefore, this research was conducted to determine the categories of goods that are included in the strategic items and to design the success factors of supplier partnerships. The main factors studied are general, financial, production, reputation, synergies, and sustainable. The research was conducted using the Kraljic method to determine the categories of goods that are included in the strategic items. To design a supplier partnership success factor using the Hybrid Multi Criteria Decision Making method. Integrated Fuzzy AHP-Fuzzy TOPSIS is used to determine the weight of the success factors of supplier partnerships and to rank suppliers on the factors used.Keywords: supplier, partnership, strategic item, success factors, and coal mining industry
Procedia PDF Downloads 1309663 Financial Management Performance in Organization Profitability
Authors: Adekunle Olakunle Felix
Abstract:
Research will be based on the financial management importance within organization and its important role in non-economic and economic activities that provide us the useful information about the efficient procurement and utilization of finance in a profitable manner. Due to industrialization, financial management become a vital part of business and it is very important for the business concern that with a good financial management to earn maximum profit.Keywords: management, business, profitability, organization, financial, efficiency
Procedia PDF Downloads 3599662 E-Procurement Adoption and Effective Service Delivery in the Uganda Coffee Industry
Authors: Taus Muganda
Abstract:
This research explores the intricate relationship between e-procurement adoption and effective service delivery in the Uganda Coffee Industry, focusing on the processes involved, key actors, and the impact of digital transformation. The study is guided by three prominent theories, Actor-Network Theory, Resource-Based View Theory, and Institutional Theory to comprehensively explore the dynamics of e-procurement in the context of the coffee sector. The primary aim of this project is to examine the e-procurement adoption process and its role in enhancing service delivery within the Uganda Coffee Industry. The research questions guiding this inquiry are: firstly, whether e-procurement adoption and implementation contribute to achieving quality service delivery; and secondly, how e-procurement adoption can be effectively realized within the Uganda Coffee Industry. To address these questions, the study has laid out specific objectives. Firstly, it seeks to investigate the impact of e-procurement on effective service delivery, analysing how the integration of digital processes influences the overall quality of services provided in the coffee industry. Secondly, it aims to critically analyse the measures required to achieve effective delivery outcomes through the adoption and implementation of e-procurement, assessing the strategies that can maximize the benefits of digital transformation. Furthermore, the research endeavours to identify and examine the key actor’s instrumental in achieving effective service delivery within the Uganda Coffee Industry. By utilizing Actor-Network Theory, the study will elucidate the network of relationships and collaborations among actors involved in the e-procurement process. The research contributes to addressing a critical gap in the sector. Despite coffee being the leading export crop in Uganda, constituting 16% of total exports, there is a recognized need for digital transformation, specifically in the realm of e-procurement, to enhance the productivity of producers and contribute to the economic growth of the country. The study aims to provide insights into transforming the Uganda Coffee Industry by focusing on improving the e-procurement services delivered to actors in the coffee sector. The three forms of e-procurement investigated in this research—E-Sourcing, E-Payment, and E-Invoicing—serve as focal points in understanding the multifaceted dimensions of digital integration within the Uganda Coffee Industry. This research endeavours to offer practical recommendations for policymakers, industry stakeholders, and the UCDA to strategically leverage e-procurement for the benefit of the entire coffee value chain.Keywords: e-procurement, effective service delivery, actors, actor-network theory, resource-based view theory, institutional theory, e-invocing, e-payment, e-sourcing
Procedia PDF Downloads 709661 Managing the Cloud Procurement Process: Findings from a Case Study
Authors: Andreas Jede, Frank Teuteberg
Abstract:
Cloud computing (CC) has already gained overall appreciation in research and practice. Whereas the willingness to integrate cloud services in various IT environments is still unbroken, the previous CC procurement processes run mostly in an unorganized and non-standardized way. In practice, a sufficiently specific, yet applicable business process for the important acquisition phase is often lacking. And research does not appropriately remedy this deficiency yet. Therefore, this paper introduces a field-tested approach for CC procurement. Based on an extensive literature review and augmented by expert interviews, we designed a model that is validated and further refined through an in-depth real-life case study. For the detailed process description, we apply the event-driven process chain notation (EPC). The gained valuable insights into the case study may help CC research to shift to a more socio-technical area. For practice, next to giving useful organizational instructions we will provide extended checklists and lessons learned.Keywords: cloud procurement process, IT-organization, event-driven process chain, in-depth case study
Procedia PDF Downloads 3939660 Reshoring Strategies for Enhanced Supply Chain Resilience: A Comprehensive Analysis of Procurement Challenges and Solutions in the United States
Authors: Emilia Segun-Ajao
Abstract:
The strategy of relocation aimed at strengthening supply chain resilience in the United States is examined, taking into account recent global disturbances and vulnerabilities in offshore manufacturing. It explains the procurement challenges faced by enterprises and offers solutions to mitigate risks and improve resilience. Through the analysis of innovative approaches, including technological advances, policy considerations, and strategic frameworks, this study provides insights to decision-makers about the complexity of supply chain management. Reshoring has gained attention as a strategy to improve supply chain resilience in the face of global disruptions. This analysis focuses on the importance of relocating as a multifaceted approach to strengthening supply chains, advocating economic benefits, technological advances, and policy frameworks to create a more robust supply landscape in the United States.Keywords: collaborative partnerships, supply chain resilience, procurement challenges, technology adoption
Procedia PDF Downloads 639659 Collaborative Procurement in the Pursuit of Net- Zero: A Converging Journey
Authors: Bagireanu Astrid, Bros-Williamson Julio, Duncheva Mila, Currie John
Abstract:
The Architecture, Engineering, and Construction (AEC) sector plays a critical role in the global transition toward sustainable and net-zero built environments. However, the industry faces unique challenges in planning for net-zero while struggling with low productivity, cost overruns and overall resistance to change. Traditional practices fall short due to their inability to meet the requirements for systemic change, especially as governments increasingly demand transformative approaches. Working in silos and rigid hierarchies and a short-term, client-centric approach prioritising immediate gains over long-term benefit stands in stark contrast to the fundamental requirements for the realisation of net-zero objectives. These practices have limited capacity to effectively integrate AEC stakeholders and promote the essential knowledge sharing required to address the multifaceted challenges of achieving net-zero. In the context of built environment, procurement may be described as the method by which a project proceeds from inception to completion. Collaborative procurement methods under the Integrated Practices (IP) umbrella have the potential to align more closely with net-zero objectives. This paper explores the synergies between collaborative procurement principles and the pursuit of net zero in the AEC sector, drawing upon the shared values of cross-disciplinary collaboration, Early Supply Chain involvement (ESI), use of standards and frameworks, digital information management, strategic performance measurement, integrated decision-making principles and contractual alliancing. To investigate the role of collaborative procurement in advancing net-zero objectives, a structured research methodology was employed. First, the study focuses on a systematic review on the application of collaborative procurement principles in the AEC sphere. Next, a comprehensive analysis is conducted to identify common clusters of these principles across multiple procurement methods. An evaluative comparison between traditional procurement methods and collaborative procurement for achieving net-zero objectives is presented. Then, the study identifies the intersection between collaborative procurement principles and the net-zero requirements. Lastly, an exploration of key insights for AEC stakeholders focusing on the implications and practical applications of these findings is made. Directions for future development of this research are recommended. Adopting collaborative procurement principles can serve as a strategic framework for guiding the AEC sector towards realising net-zero. Synergising these approaches overcomes fragmentation, fosters knowledge sharing, and establishes a net-zero-centered ecosystem. In the context of the ongoing efforts to amplify project efficiency within the built environment, a critical realisation of their central role becomes imperative for AEC stakeholders. When effectively leveraged, collaborative procurement emerges as a powerful tool to surmount existing challenges in attaining net-zero objectives.Keywords: collaborative procurement, net-zero, knowledge sharing, architecture, built environment
Procedia PDF Downloads 739658 The Significance of a Well-Defined Systematic Approach in Risk Management for Construction Projects within Oil Industry
Authors: Batool Ismaeel, Umair Farooq, Saad Mushtaq
Abstract:
Construction projects in the oil industry can be very complex, having unknown outcomes and uncertainties that cannot be easily predicted. Each project has its unique risks generated by a number of factors which, if not controlled, will impact the successful completion of the project mainly in terms of schedule, cost, quality, and safety. This paper highlights the historic risks associated with projects in the south and east region of Kuwait Oil Company (KOC) collated from the company’s lessons learned database. Starting from Contract Award through to handover of the project to the Asset owner, the gaps in project execution in terms of managing risk will be brought to discussion and where a well-defined systematic approach in project risk management reflecting many claims, change of scope, exceeding budget, delays in engineering phase as well as in the procurement and fabrication of long lead items should be adopted. This study focuses on a proposed feasible approach in risk management for engineering, procurement and construction (EPC) level projects including the various stakeholders involved in executing the works from International to local contractors and vendors in KOC. The proposed approach covers the areas categorized into organizational, design, procurement, construction, pre-commissioning, commissioning and project management in which the risks are identified and require management and mitigation. With the effective deployment and implementation of the proposed risk management system and the consideration of it as a vital key in achieving the project’s target, the outcomes will be more predictable in the future, and the risk triggers will be managed and controlled. The correct resources can be allocated on a timely basis for the company for avoiding any unpredictable outcomes during the execution of the project. It is recommended in this paper to apply this risk management approach as an integral part of project management and investigate further in the future, the effectiveness of this proposed system for newly awarded projects and compare the same with those projects of similar budget/complexity that have not applied this approach to risk management.Keywords: construction, project completion, risk management, uncertainties
Procedia PDF Downloads 1539657 Driving Green Public Procurement – A Framework for a Supporting Structure for Public Authorities Based on Good Practices in Europe
Authors: Pia Moschall, Kathrin Sackmann
Abstract:
Considering a purchasing volume of around two trillion Euros per year, which equals about 14% of the European Union’s gross domestic product, European public authorities have significant market power. Making use of this market power by prioritizing the procurement of green products and services offers a great potential to contribute to the Green New Deal. The market demand that is created by Green Public Procurement (GPP) sets incentives for European producers to design and develop Green Products and Eco-Innovations. However, most procurement still does not consider environmental criteria. The goal of the work is to encourage the adaptation of GPP in the European Union. To this end, the drivers for the adaptation were investigated over different case studies. The paper analyzes good-practice cases from European authorities from 2010 to 2020 that were provided by the European Commission. This analysis was guided by Philipp Mayring’s method of qualitative content analysis, whereby the inductively formed categories led to the identification of nine major drivers. The most important ones are ‘use of official guidelines and standards, ‘political support and requirements as well as ‘market research and involvement.’ Further, the paper discusses mutual dependencies between several drivers and how to exploit them. A supporting infrastructure was identified as a crucial factor for the successful adaption of green public procurement. In the next step, the work aims to examine on which administrative level the single drivers can be implemented most effectively. Practical implications of this research are recommendations on how to create a supporting structure on a municipal, federal and national level, including training for the responsible staff, support tools, as well as guidelines and standards for involved stakeholders.Keywords: content analysis, green public procurement, public authorities, sustainable procurement
Procedia PDF Downloads 146