Search results for: planting schedule
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 742

Search results for: planting schedule

742 The Effects of Planting Date on the Yield and Yield Components of Corn (Zea mays L.) Cultivar, Single Cross 704

Authors: Mehranoosh Gholipoor

Abstract:

The effects of planting date on performance and yield components of maize single cross 704 was carried out in 2003.this experiment was designed in randomized complete block pattern with 3 replications in the field of College campus of Agricultural Sciences and Natural Resources in Gorgan. Treatments consisted of four planting dates (May5, May19, June4 and June19) respectively. The results showed that the planting on June4 were the best time for planting date in the field of seed performance and many other measurement qualities while planting date on June19 had the lowest seed performance in corn, due to a severe reduction in seed numbers had the highest In 1000 seed weight. Between the planting date on May 5 and May19 were observed no significant differences

Keywords: corn, planting date, performance and yield components

Procedia PDF Downloads 358
741 The Response to Various Planting Conditions of Thein Corn Inbred Lines

Authors: K. Boonlertnirun, C. Rawdsiri, R. Suvannasara, S. Boonlertnirun

Abstract:

Thein corn variety well adapted to several planting conditions is usually accepted by most farmers. The objectives of this work were to evaluate yield potential of Thein corn inbred line grown in various nitrogen rates and plant conditions for selecting good inbred lines to be germ plasm for further breeding program. Split plot design with three replications was utilized as experimental design, three planting conditions: normal (control), low nitrogen, and high plant density condition, and sixteen inbred lines of Thein corn were used as main and subplot respectively. The results showed that no interaction between inbred line and planting condition in terms of yield. Correlation between planting conditions based on yield of inbred line was positive at medium level. Thein corn inbreds, namely L7, L5, L16, and L14 lines were tolerant to low nitrogen condition because they could produce high yield under all planting conditions and they were selected to be germ plasm for further breeding program.

Keywords: inbred line, planting condition, Thein corn, planting conditions

Procedia PDF Downloads 372
740 Analysis of Maize Yield under Climate Change, Adaptations in Varieties and Planting Date in Northeast China in Recent Thirty Years

Authors: Zhan Fengmei Yao, Hui Li, Jiahua Zhang

Abstract:

The Northeast China (NEC) was the most important agriculture areas and known as the Golden-Maize-Belt. Based on observed crop data and crop model, we design four simulating experiments and separate relative impacts and contribution under climate change, planting date shift, and varieties change as well change of varieties and planting date. Without planting date and varieties change, maize yields had no significant change trend at Hailun station located in the north of NEC, and presented significant decrease by 0.2-0.4 t/10a at two stations, which located in the middle and the south of NEC. With planting date change, yields showed a significant increase by 0.09 - 0.47 t/10a. With varieties change, maize yields had significant increase by 1.8~ 1.9 t/10a at Hailun and Huadian stations, but a non-significant and low increase by 0.2t /10a at Benxi located in the south of NEC. With change of varieties and planting date, yields presented a significant increasing by 0.53-2.0 t/10a. Their contribution to yields was -25% ~ -55% for climate change, 15% ~ 35% for planting date change, and 20% ~110% for varieties change as well 30% ~135% for varieties with planting date shift. It found that change in varieties and planting date were highest yields and were responsible for significant increases in maize yields, varieties was secondly, and planting date was thirdly. It found that adaptation in varieties and planting date greatly improved maize yields, and increased yields annual variability. The increase of contribution with planting date and varieties change in 2000s was lower than in 1990s. Yields with the varieties change and yields with planting date and varieties change all showed a decreasing trend at Huadian and Benxi since 2002 or so. It indicated that maize yields increasing trend stagnated in the middle and south of NEC, and continued in the north of NEC.

Keywords: climate change, maize yields, varieties, planting date, impacts

Procedia PDF Downloads 361
739 Wheat Yield and Yield Components under Raised Bed Planting System

Authors: Hamidreza Miri, Farahnaz Momtazi

Abstract:

Wheat is one of the most important crops in Fars province, and because of water shortage, there is a great emphasis on its water use efficiency in the production field. A field experiment was conducted in 2021 and 2022 in order to evaluate wheat yield and its components in raised planting system in Arsanjan, Fars province. The experiment was conducted as a split plot with three irrigation treatments (irrigation equal to evapotranspiration, 80% of evapotranspiration irrigation (moderate drought stress), and 60% of evapotranspiration irrigation (severe drought stress)) as the main plot and three planting methods (conventional flat planting, 60 cm raised bed planting and 120 cm raised bed planting) as a subplot. The results indicated that drought stress significantly decreased traits such as plant height, grain yield, ear number, seed number, and biological yield while increasing seed protein. Raised bed planting significantly increased the traits in comparison with conventional flat planting. So that plating with a 120 cm raised bed increased grain yield by 22.1% and 25.9% in the first and second years, respectively. This increase was 17% for biological, 75 for ear number, and 21% for seed number. Planting in raised bed system reduced the adverse effect of drought stress on wheat traits. In conclusion, based on the observed results planting in raised bed system can be adopted as an appropriate planting pattern for improving yield and water productivity in experimental regions and similar climates.

Keywords: wheat, raised bed planting, drought stress, yield, water use

Procedia PDF Downloads 65
738 Seven Years Assessment on the Suitability of Cocoa Clones Cultivation in High-Density Planting and Its Management in Malaysia

Authors: O. Rozita, N. M. Nik Aziz

Abstract:

High-density planting is usually recommended for a small area of planting in order to increase production. The normal planting distance for cocoa (Theobroma cacao L.) in Malaysia is 3 m x 3 m. The study was conducted at Cocoa Research and Development Centre, Malaysia Cocoa Board, Jengka, Pahang with the objectives to evaluate the suitability of seven cocoa clones under four different planting densities and to study the interaction between cocoa clones and planting densities. The study was arranged in the split plot with randomized complete block design and replicated three times. The cocoa clone was assigned as the main plot and planting density was assigned as a subplot. The clones used in this study were PBC 123, PBC 112, MCBC4, MCBC 5, QH 1003, QH 22, and BAL 244. The planting distance were 3 m x 3 m (1000 stands/ha), 3 m x 1.5 m (2000 stands/ha), 3 m x 1 m (3000 stands/ha) and (1.5 m x 1.5 m) x 3 m (3333 stands/ha). Evaluation on yield performance was carried out for seven years. Clones of PBC 123, QH 1003, and QH 22 obtained the higher yield, meanwhile MCBC 4, MCBC 5, and BAL 244 obtained the lowest yield. In general, high-density planting can increase cocoa production with good management practices. Among the cocoa management practices, the selection of suitable clones with small branching habits and moderately vigorous and proper pruning activity were the most important factor in high-density planting.

Keywords: clones, management, planting density, Theobroma cacao, yield

Procedia PDF Downloads 375
737 Effect of Planting Techniques on Mangrove Seedling Establishment in Kuwait Bay

Authors: L. Al-Mulla, B. M. Thomas, N. R. Bhat, M. K. Suleiman, P. George

Abstract:

Mangroves are halophytic shrubs habituated in the intertidal zones in the tropics and subtropics, forming a complex and highly dynamic coastal ecosystem. Historical evidence indicating the existence followed by the extinction of mangrove in Kuwait; hence, continuous projects have been established to reintroduce this plant to the marine ecosystem. One of the major challenges in establishing large-scale mangrove plantations in Kuwait is the very high rate of seedling mortality, which should ideally be less than 20%. This study was conducted at three selected locations in the Kuwait bay during 2016-2017, to evaluate the effect of four planting techniques on mangrove seedling establishment. Coir-pillow planting technique, comp-mat planting technique, and anchored container planting technique were compared with the conventional planting method. The study revealed that the planting techniques significantly affected the establishment of mangrove seedlings in the initial stages of growth. Location-specific difference in seedling establishment was also observed during the course of the study. However, irrespective of the planting techniques employed, high seedling mortality was observed in all the planting locations towards the end of the study; which may be attributed to the physicochemical characteristics of the mudflats selected.

Keywords: Avicennia marina (Forsk.) Vierh, coastal pollution, heavy metal accumulation, marine ecosystem, sedimentation, tidal inundation

Procedia PDF Downloads 152
736 A Probability Analysis of Construction Project Schedule Using Risk Management Tool

Authors: A. L. Agarwal, D. A. Mahajan

Abstract:

Construction industry tumbled along with other industry/sectors during recent economic crash. Construction business could not regain thereafter and still pass through slowdown phase, resulted many real estate as well as infrastructure projects not completed on schedule and within budget. There are many theories, tools, techniques with software packages available in the market to analyze construction schedule. This study focuses on the construction project schedule and uncertainties associated with construction activities. The infrastructure construction project has been considered for the analysis of uncertainty on project activities affecting project duration and analysis is done using @RISK software. Different simulation results arising from three probability distribution functions are compiled to benefit construction project managers to plan more realistic schedule of various construction activities as well as project completion to document in the contract and avoid compensations or claims arising out of missing the planned schedule.

Keywords: construction project, distributions, project schedule, uncertainty

Procedia PDF Downloads 350
735 Effect of Tillage Practices and Planting Patterns on Growth and Yield of Maize (Zee Maize)

Authors: O. R. Obalowu, F. B. Akande, T. P Abegunrin

Abstract:

Maize (Zea may) is mostly grown and consumed by Nigeria farmers using different tillage practices which have a great effect on its growth and yield. In order to maximize output, there is need to recommend a suitable tillage practice for crop production which will increase the growth and yield of maize. This study investigated the effect of tillage practices and planting pattern on the growth and yield of maize. The experiment was arranged in a 4x3x3 Randomized Complete Block Design (RCBD) layout, with four tillage practices consisting of no-tillage (NT), disc ploughing only (Ponly), disc ploughing followed by harrowing (PH), and disc ploughing, harrowing then ridging (PHR). Three planting patterns which include; 65 x 75, 75 x 75 and 85 x 75 cm spacing within and between the rows respectively, were randomly applied on the plots. All treatments were replicated three times. Data which consist of plant height, stem girth, leaf area and weight of maize per plots were taken and recorded. Data gathered were analyzed using Analysis of Variance (ANOVA) in the Minitab Software Package. The result shows that PHR under the third planting pattern has the highest growth rate (216.50 cm) while NT under the first planting pattern has the lowest mean value of growth rate (115.60 cm). Also, Ponly under the first planting pattern gives a better maize yield (19.45 kg) when compared with other tillage practices while NT under first planting pattern recorded the least yield of maize (9.40 kg). In conclusion, considering soil and weather conditions of the research area, plough only under the first planting pattern (65 x 75 cm) is the best alternative for the production of the Swan maize variety.

Keywords: tillage practice, planting pattern, disc ploughing, harrowing, ridging

Procedia PDF Downloads 491
734 Nurse Schedule Problem in Mubarak Al Kabeer Hospital

Authors: Khaled Al-Mansour, Nawaf Esmael, Abdulaziz Al-Zaid, Mohammed Al Ateeqi, Ali Al-Yousfi, Sayed Al-Zalzalah

Abstract:

In this project we will create the new schedule of nurse according to the preference of them. We did our project in Mubarak Al Kabeer Hospital (in Kuwait). The project aims to optimize the schedule of nurses in Mubarak Al Kabeer Hospital. The schedule of the nurses was studied and understood well to do any modification for their schedule to make the nurses feel as much comfort as they are. First constraints were found to know what things we can change and what things we can’t, the hard constraints are the hospital and ministry policies where we can’t change anything about, and the soft constraints are things that make nurses more comfortable. Data were collected and nurses were interviewed to know what is more better for them. All these constraints and date have been formulated to mathematical equations. This report will first contain an introduction to the topic which includes details of the problem definition. It will also contain information regarding the optimization of a nurse schedule and its contents and importance; furthermore, the report will contain information about the data needed to solve the problem and how it was collected. The problem requires formulation and that is also to be shown. The methodology will be explained which will state what has already been done. We used the lingo software to find the best schedule for the nurse. The schedule has been made according to what the nurses prefer, and also took consideration of the hospital policy when we make the schedule.

Keywords: nurse schedule problem, Kuwait, hospital policy, optimization of schedules

Procedia PDF Downloads 268
733 Feature Selection for Production Schedule Optimization in Transition Mines

Authors: Angelina Anani, Ignacio Ortiz Flores, Haitao Li

Abstract:

The use of underground mining methods have increased significantly over the past decades. This increase has also been spared on by several mines transitioning from surface to underground mining. However, determining the transition depth can be a challenging task, especially when coupled with production schedule optimization. Several researchers have simplified the problem by excluding operational features relevant to production schedule optimization. Our research objective is to investigate the extent to which operational features of transition mines accounted for affect the optimal production schedule. We also provide a framework for factors to consider in production schedule optimization for transition mines. An integrated mixed-integer linear programming (MILP) model is developed that maximizes the NPV as a function of production schedule and transition depth. A case study is performed to validate the model, with a comparative sensitivity analysis to obtain operational insights.

Keywords: underground mining, transition mines, mixed-integer linear programming, production schedule

Procedia PDF Downloads 169
732 Enhance Construction Visual As-Built Schedule Management Using BIM Technology

Authors: Shu-Hui Jan, Hui-Ping Tserng, Shih-Ping Ho

Abstract:

Construction project control attempts to obtain real-time as-built schedule information and to eliminate project delays by effectively enhancing dynamic schedule control and management. Suitable platforms for enhancing an as-built schedule visually during the construction phase are necessary and important for general contractors. As the application of building information modeling (BIM) becomes more common, schedule management integrated with the BIM approach becomes essential to enhance visual construction management implementation for the general contractor during the construction phase. To enhance visualization of the updated as-built schedule for the general contractor, this study presents a novel system called the Construction BIM-assisted Schedule Management (ConBIM-SM) system for general contractors in Taiwan. The primary purpose of this study is to develop a web ConBIM-SM system for the general contractor to enhance visual as-built schedule information sharing and efficiency in tracking construction as-built schedule. Finally, the ConBIM-SM system is applied to a case study of a commerce building project in Taiwan to verify its efficacy and demonstrate its effectiveness during the construction phase. The advantages of the ConBIM-SM system lie in improved project control and management efficiency for general contractors, and in providing BIM-assisted as-built schedule tracking and management, to access the most current as-built schedule information through a web browser. The case study results show that the ConBIM-SM system is an effective visual as-built schedule management platform integrated with the BIM approach for general contractors in a construction project.

Keywords: building information modeling (BIM), construction schedule management, as-built schedule management, BIM schedule updating mechanism

Procedia PDF Downloads 375
731 Effect of Plant Density and Planting Pattern on Yield and Quality of Single Cross 704 Silage Corn (Zea mays L.) in Isfahan

Authors: Seyed Mohammad Ali Zahedi

Abstract:

This field experiment was conducted in Isfahan in 2011 in order to study the effect of plant density and planting pattern on growth, yield and quality of silage corn (SC 704) using a randomized complete block design with split plot layout and four replications. The main plot consisted of three planting patterns (60 and 75 cm single planting row and 75 cm double planting row referred to as 60S, 75S and 75T, respectively). The subplots consisted of four levels of plant densities (65000, 80000, 95000 and 110000 plants per hectare). Each subplot consisted of 7 rows, each with 10m length. Vegetative and reproductive characteristics of plants at silking and hard dough stages (when the plants were harvested for silage) were evaluated. Results of variance analysis showed that the effects of planting pattern and plant density were significant on leaf area per plant, leaf area index (at silking), plant height, stem diameter, dry weights of leaf, stem and ear in silking and harvest stages and on fresh and dry yield, dry matter percentage and crude protein percentage at harvest. There was no planting pattern × plant density interaction for these parameters. As row space increased from 60 cm with single planting to 75 cm with single planting, leaf area index and plant height increased, but leaf area per plant, stem diameter, dry weight of leaf, stem and ear, dry matter percentage, dry matter yield and crude protein percentage decreased. Dry matter yield reduced from 24.9 to 18.5 t/ha and crude protein percentage decreased from 6.11 to 5.60 percent. When the plant density increased from 65000 to 110000 plant per hectare, leaf area index, plant height, dry weight of leaf, stem and ear and dry matter yield increased from 19.2 to 23.3 t/ha, whereas leaf area per plant, stem diameter, dry matter percentage and crude protein percentage decreased from 6.30 to 5.25. The best results were obtained with 60 cm row distance with single planting and 110000 plants per hectare.

Keywords: silage corn, plant density, planting pattern, yield

Procedia PDF Downloads 338
730 The Constraint of Machine Breakdown after a Match up Scheduling of Paper Manufacturing Industry

Authors: John M. Ikome

Abstract:

In the process of manufacturing, a machine breakdown usually forces a modified flow shop out of the prescribed state, this strategy reschedules part of the initial schedule to match up with the pre-schedule at some point with the objective to create a schedule that is reliable with the other production planning decisions like material flow, production and suppliers by utilizing a critical decision-making concept. We propose a rescheduling strategy and a match-up point that will have a determination procedure through an advanced feedback control mechanism to increase both the schedule quality and stability. These approaches are compared with alternative re-scheduling methods under different experimental settings.

Keywords: scheduling, heuristics, branch, integrated

Procedia PDF Downloads 408
729 Development of Construction Cost Optimization System Using Genetic Algorithm Method

Authors: Hyeon-Seung Kim, Young-Hwan Kim, Sang-Mi Park, Min-Seo Kim, Jong-Myeung Shin, Leen-Seok Kang

Abstract:

The project budget at the planned stage might be changed by the insufficient government budget or the design change. There are many cases more especially in the case of a project performed for a long period of time. If the actual construction budget is insufficient comparing with the planned budget, the construction schedule should also be changed to match the changed budget. In that case, most project managers change the planned construction schedule by a heuristic approach without a reasonable consideration on the work priority. This study suggests an optimized methodology to modify the construction schedule according to the changed budget. The genetic algorithm was used to optimize the modified construction schedule within the changed budget. And a simulation system of construction cost histogram in accordance with the construction schedule was developed in the BIM (Building Information Modeling) environment.

Keywords: 5D, BIM, GA, cost optimization

Procedia PDF Downloads 588
728 Effect of Pre-Construction on Construction Schedule and Client Loyalty

Authors: Jong Hoon Kim, Hyun-Soo Lee, Moonseo Park, Min Jeong, Inbeom Lee

Abstract:

Pre-construction is essential in achieving the success of a construction project. Due to the early involvement of project participants in the construction phase, project managers are able to plan ahead and solve issues well in advance leading to the success of the project and the satisfaction of the client. This research utilizes quantitative data derived from construction management projects in order to identify the relationship between pre-construction, construction schedule, and client satisfaction. A total of 65 construction projects and 93 clients were investigated for this research in an attempt to identify (a) the relationship between pre-construction and schedule reduction, and (b) pre-construction and client loyalty. Based on the quantitative analysis, this research was able to establish a negative correlation based on 65 construction projects between pre-construction and project schedule existed. This finding represents that the more pre-construction is performed for a certain project, the overall construction schedule decreased. Then, to determine the relationship between pre-construction and client satisfaction, Net Promoter Score (NPS) of 93 clients from the 65 projects was utilized. Pre-construction and NPS was further analyzed and a positive correlation was found between the two. This infers that clients tend to be more satisfied with projects with higher ratio of pre-construction than those projects with less pre-construction.

Keywords: client loyalty, NPS, pre-construction, schedule reduction

Procedia PDF Downloads 360
727 Strategy Management of Soybean (Glycine max L.) for Dealing with Extreme Climate through the Use of Cropsyst Model

Authors: Aminah Muchdar, Nuraeni, Eddy

Abstract:

The aims of the research are: (1) to verify the cropsyst plant model of experimental data in the field of soybean plants and (2) to predict planting time and potential yield soybean plant with the use of cropsyst model. This research is divided into several stages: (1) first calibration stage which conducted in the field from June until September 2015.(2) application models stage, where the data obtained from calibration in the field will be included in cropsyst models. The required data models are climate data, ground data/soil data,also crop genetic data. The relationship between the obtained result in field with simulation cropsyst model indicated by Efficiency Index (EF) which the value is 0,939.That is showing that cropsyst model is well used. From the calculation result RRMSE which the value is 1,922%.That is showing that comparative fault prediction results from simulation with result obtained in the field is 1,92%. The conclusion has obtained that the prediction of soybean planting time cropsyst based models that have been made valid for use. and the appropriate planting time for planting soybeans mainly on rain-fed land is at the end of the rainy season, in which the above study first planting time (June 2, 2015) which gives the highest production, because at that time there was still some rain. Tanggamus varieties more resistant to slow planting time cause the percentage decrease in the yield of each decade is lower than the average of all varieties.

Keywords: soybean, Cropsyst, calibration, efficiency Index, RRMSE

Procedia PDF Downloads 180
726 Reliability Analysis of Construction Schedule Plan Based on Building Information Modelling

Authors: Lu Ren, You-Liang Fang, Yan-Gang Zhao

Abstract:

In recent years, the application of BIM (Building Information Modelling) to construction schedule plan has been the focus of more and more researchers. In order to assess the reasonable level of the BIM-based construction schedule plan, that is whether the schedule can be completed on time, some researchers have introduced reliability theory to evaluate. In the process of evaluation, the uncertain factors affecting the construction schedule plan are regarded as random variables, and probability distributions of the random variables are assumed to be normal distribution, which is determined using two parameters evaluated from the mean and standard deviation of statistical data. However, in practical engineering, most of the uncertain influence factors are not normal random variables. So the evaluation results of the construction schedule plan will be unreasonable under the assumption that probability distributions of random variables submitted to the normal distribution. Therefore, in order to get a more reasonable evaluation result, it is necessary to describe the distribution of random variables more comprehensively. For this purpose, cubic normal distribution is introduced in this paper to describe the distribution of arbitrary random variables, which is determined by the first four moments (mean, standard deviation, skewness and kurtosis). In this paper, building the BIM model firstly according to the design messages of the structure and making the construction schedule plan based on BIM, then the cubic normal distribution is used to describe the distribution of the random variables due to the collecting statistical data of the random factors influencing construction schedule plan. Next the reliability analysis of the construction schedule plan based on BIM can be carried out more reasonably. Finally, the more accurate evaluation results can be given providing reference for the implementation of the actual construction schedule plan. In the last part of this paper, the more efficiency and accuracy of the proposed methodology for the reliability analysis of the construction schedule plan based on BIM are conducted through practical engineering case.

Keywords: BIM, construction schedule plan, cubic normal distribution, reliability analysis

Procedia PDF Downloads 147
725 Improving Efficiencies of Planting Configurations on Draft Environment of Town Square: The Case Study of Taichung City Hall in Taichung, Taiwan

Authors: Yu-Wen Huang, Yi-Cheng Chiang

Abstract:

With urban development, lots of buildings are built around the city. The buildings always affect the urban wind environment. The accelerative situation of wind caused of buildings often makes pedestrians uncomfortable, even causes the accidents and dangers. Factors influencing pedestrian level wind including atmospheric boundary layer, wind direction, wind velocity, planting, building volume, geometric shape of the buildings and adjacent interference effects, etc. Planting has many functions including scraping and slowing urban heat island effect, creating a good visual landscape, increasing urban green area and improve pedestrian level wind. On the other hand, urban square is an important space element supporting the entrance to buildings, city landmarks, and activity collections, etc. The appropriateness of urban square environment usually dominates its success. This research focuses on the effect of tree-planting on the wind environment of urban square. This research studied the square belt of Taichung City Hall. Taichung City Hall is a cuboid building with a large mass opening. The square belt connects the front square, the central opening and the back square. There is often wind draft on the square belt. This phenomenon decreases the activities on the squares. This research applies tree-planting to improve the wind environment and evaluate the effects of two types of planting configuration. The Computational Fluid Dynamics (CFD) simulation analysis and extensive field measurements are applied to explore the improve efficiency of planting configuration on wind environment. This research compares efficiencies of different kinds of planting configuration, including the clustering array configuration and the dispersion, and evaluates the efficiencies by the SET*.

Keywords: micro-climate, wind environment, planting configuration, comfortableness, computational fluid dynamics (CFD)

Procedia PDF Downloads 310
724 Short-Term Effects of Seed Dressing With Azorhizobium Caulinodans on Establishment, Development and Yield of Early Maturing Maize ( Zea Mays L.) In Zimbabwe

Authors: Gabriel Vusanimuzi Nkomo

Abstract:

The majority of soils in communal areas of Zimbabwe are sandy and inherently infertile and sustainable cultivation is not feasible without addition of plant nutrients. Most farmers find it difficult to raise the capital required for investments in mineral fertilizer and find it cheaper to use low nutrition animal manure. An experiment was conducted to determine the effects of nitrokara biofertiliser on early growth, development and maize yield while also comparing nitrokara biofertiliser on availability of nitrogen and phosphorous in soil. The experiment was conducted at Africa University Farm. The experiment had six treatments (nitrokara +300kg/ha Compound D, nitrokara+ 300kg/ha Compound D(7N;14P;7K) + 75kg/ha Ammonium Nitrate(AN), nitrokara +300kg/ha Compound D +150kg AN, nitrokara +300kg/ha Compound D +225kg/ha AN, nitrokara +300kg/ha Compound D + 300 kg/ha AN and 0 nitrokara+300kg/ha Compound D +0 AN). Early maturing SC 403 maize (Zea mays) was inoculated with nitrokara and a compound mineral fertilizer at 300 kg/ha at planting while ammonium nitrate was applied at 45 days after planting. There were no significant differences (P > 0.05) on emergence % from 5days up to 10 days after planting using maize seed inoculated with nitrokara. Emergence percentage varied with the number of days. At 5 days the emergence % was 62% to a high of 97 % at 10 days after emergence among treatments. There were no significant differences (P > 0.05) on plant biomass on treatments 1 to 6 at 4 weeks after planting as well as at 8 weeks after planting. There were no significant differences among the treatments on the availability of nitrogen after 6 weeks (P > 0.05). However at 8 and 10 weeks after planting there were significant differences among treatments on nitrogen availability (P < 0.05). There were no significant differences among the treatments at week 6 after planting on soil pH (p > 0.05). However there were significant differences among treatments pH at weeks 9 and 12 (p < 0.05). There were significant differences among treatments on phosphorous availability at 6, 8 and 10 weeks after planting (p < 0.05). There were no significant differences among treatments on stem diameter at 3 and 6 weeks after planting (p > 0.05).However at 9 and 12 weeks after planting there were significant differences among treatments on stem diameter (p < 0.05).There were no significant differences among treatments on plant height from week 3 up to week 6 on plant height (P > 0.05).However there were significant differences among treatments at week 9 and 12 (p < 0.05). There were significant differences among treatments on days to early, 50% and 100% anthesis (P < 0.05). There were significant differences during early, 50% and 100% days to silking among the treatments (P < 0.05).Also there were significant differences during early, 50% and 100% days to silking among the treatments (P < 0.05).The study revealed that inoculation of nitrokara biofertiliser at planting with subsequent addition of ammonium nitrate has a positive effect on maize crop development and yield.

Keywords: nitrokara, biofertiliser, symbiotic, plant biomass, inoculated

Procedia PDF Downloads 551
723 Development of Work Breakdown Structure for EVMS in South Korea

Authors: Dong-Ho Kim, Su-Sang Lim, Sang-Won Han, Chang-Taek Hyun

Abstract:

In the construction site, the cost and schedules are the most important management elements. Despite efforts to integrated management the cost and schedule, WBS classification is struggling to differ from each other. The cost and schedule can be integrated and can be managed due to the characteristic of the detail system in the case of Korea around the axis of pressure and official fixture system. In this research, the Work Breakdown Structure (WBS) integrating the cost and schedules around in government office construction, WBS which can be used in common was presented in order to analyze the detail system of the public institution construction and improve. As to this method, the efficient administration of not only the link application of the cost and schedule but also construction project is expected.

Keywords: WBS, EVMS, integrated cost and schedule, Korea case

Procedia PDF Downloads 384
722 Effect of Planting Date on Quantitative and Qualitative Characteristics of Different Bread Wheat and Durum Cultivars

Authors: Mahdi Nasiri Tabrizi, A. Dadkhah, M. Khirkhah

Abstract:

In order to study the effect of planting on yield, yield components and quality traits in bread and durum wheat varieties, a field split-plot experiment based on complete randomized design with three replications was conducted in Agricultural and Natural Resources Research Center of Razavi Khorasan located in city of Mashhad during 2013-2014. Main factor were consisted of five sowing dates (first October, fifteenth December, first March, tenth March, twentieth March) and as sub-factors consisted of different bread wheat (Bahar, Pishgam, Pishtaz, Mihan, Falat and Karim) and two durum wheat (Dena and Dehdasht). According to results of analysis variance the effect of planting date was significant on all examined traits (grain yield, biological yield, harvest index, number of grain per spike, thousands kernel weight, number of spike per square meter, plant height, the number of days to heading, the number of days to maturity, during the grain filling period, percentage of wet gluten, percentage of dry gluten, gluten index, percentage of protein). By delay in planting, majority of traits significantly decreased, except quality traits (percentage of wet gluten, percentage of dry gluten and percentage of protein). Results of means comparison showed, among planting date the highest grain yield and biological yield were related to first planting date (Octobr) with mean of production of 5/6 and 1/17 tons per hectare respectively and the highest bread quality (gluten index) with mean of 85 and percentage of protein with mean of 13% to fifth planting date also the effect of genotype was significant on all traits. The highest grain yield among of studied wheat genotypes was related to Dehdasht cultivar with an average production of 4.4 tons per hectare. The highest protein percentage and bread quality (gluten index) were related to Dehdasht cultivar with 13.4% and Falat cultivar with number of 90 respectively. The interaction between cultivar and planting date was significant on all traits and different varieties had different trend for these traits. The highest grain yield was related to first planting date (October) and Falat cultivar with an average of production of 6/7 tons per hectare while in grain yield did not show a significant different with Pishtas and Mihan cultivars also the most of gluten index (bread quality index) and protein percentage was belonged to the third planting date and Karim cultivar with 7.98 and Dena cultivar with 7.14% respectively.

Keywords: yield component, yield, planting date, cultivar, quality traits, wheat

Procedia PDF Downloads 430
721 Development of Intelligent Construction Management System Using Web-Camera Image and 3D Object Image

Authors: Hyeon-Seung Kim, Bit-Na Cho, Tae-Woon Jeong, Soo-Young Yoon, Leen-Seok Kang

Abstract:

Recently, a construction project has been large in the size and complicated in the site work. The web-cameras are used to manage the construction site of such a large construction project. They can be used for monitoring the construction schedule as compared to the actual work image of the planned work schedule. Specially, because the 4D CAD system that the construction appearance is continually simulated in a 3D CAD object by work schedule is widely applied to the construction project, the comparison system between the real image of actual work appearance by web-camera and the simulated image of planned work appearance by 3D CAD object can be an intelligent construction schedule management system (ICON). The delayed activities comparing with the planned schedule can be simulated by red color in the ICON as a virtual reality object. This study developed the ICON and it was verified in a real bridge construction project in Korea. To verify the developed system, a web-camera was installed and operated in a case project for a month. Because the angle and zooming of the web-camera can be operated by Internet, a project manager can easily monitor and assume the corrective action.

Keywords: 4D CAD, web-camera, ICON (intelligent construction schedule management system), 3D object image

Procedia PDF Downloads 507
720 The Effect Of Flights Schedules On Airline Choice Model For International Round-Trip Flights

Authors: Claudia Munoz, Henry Laniado

Abstract:

In this research, the impact of outbound and return flight schedule preferences on airline choice for international trips is quantified. Several studies have used airline choice data to identify preferences and trade-offs of different air carrier service attributes, such as travel time, fare and frequencies. However, estimation of the effect return flight schedules have on airline choice for an international round-trip flight has not yet been studied in detail. The multinomial logit model found shows that airfare, travel time, arrival preference schedule in the outward journey, departure preference in the return journey and the schedule combination of round-trip flights are significantly affecting passenger choice behavior in international round-trip flights. it results indicated that return flight schedule preference plays a substantial role in air carrier choice and has a similar effect to outbound flight schedule preference. Thus, this study provides an analytical tool designed to provide a better understanding of international round-trip flight demand determinants and support carrier decisions.

Keywords: flight schedule, airline choice, return flight, passenger choice behavior

Procedia PDF Downloads 16
719 Renovation Planning Model for a Shopping Mall

Authors: Hsin-Yun Lee

Abstract:

In this study, the pedestrian simulation VISWALK integration and application platform ant algorithms written program made to construct a renovation engineering schedule planning mode. The use of simulation analysis platform construction site when the user running the simulation, after calculating the user walks in the case of construction delays, the ant algorithm to find out the minimum delay time schedule plan, and add volume and unit area deactivated loss of business computing, and finally to the owners and users of two different positions cut considerations pick out the best schedule planning. To assess and validate its effectiveness, this study constructed the model imported floor of a shopping mall floor renovation engineering cases. Verify that the case can be found from the mode of the proposed project schedule planning program can effectively reduce the delay time and the user's walking mall loss of business, the impact of the operation on the renovation engineering facilities in the building to a minimum.

Keywords: pedestrian, renovation, schedule, simulation

Procedia PDF Downloads 413
718 Round Addition DFA on Lightweight Block Ciphers with On-The-Fly Key Schedule

Authors: Hideki Yoshikawa, Masahiro Kaminaga, Arimitsu Shikoda, Toshinori Suzuki

Abstract:

Round addition differential fault analysis (DFA) using operation bypassing for lightweight block ciphers with on-the-fly key schedule is presented. For 64-bit KLEIN and 64-bit LED, it is shown that only a pair of correct ciphertext and faulty ciphertext can derive the secret master key. For PRESENT, one correct ciphertext and two faulty ciphertexts are required to reconstruct the secret key.

Keywords: differential fault analysis (DFA), round addition, block cipher, on-the-fly key schedule

Procedia PDF Downloads 703
717 Optimizing Skill Development in Golf Putting: An Investigation of Blocked, Random, and Increasing Practice Schedules

Authors: John White

Abstract:

This study investigated the effects of practice schedules on learning and performance in golf putting, specifically focusing on the impact of increasing contextual interference (CI). University students (n=7) were randomly assigned to blocked, random, or increasing practice schedules. During acquisition, participants performed 135 putting trials using different weighted golf balls. The blocked group followed a specific sequence of ball weights, while the random group practiced with the balls in a random order. The increasing group started with a blocked schedule, transitioned to a serial schedule, and concluded with a random schedule. Retention and transfer tests were conducted 24 hours later. The results indicated that high levels of CI (random practice) were more beneficial for learning than low levels of CI (blocked practice). The increasing practice schedule, incorporating blocked, serial, and random practice, demonstrated advantages over traditional blocked and random schedules. Additionally, EEG was used to explore the neurophysiological effects of the increasing practice schedule.

Keywords: skill acquisition, motor control, learning, contextual interference

Procedia PDF Downloads 96
716 Yield Performance of Two Locally Adapted and Two Introductions of Common Cowpea in Response to Amended In-Row-Spaces and Planting Dates

Authors: Ayman M. A. Rashwan, Mohamed F. Mohamed, Mohamed M. A. Abdalla

Abstract:

A field experiment was conducted in the Agricultural Research Station, at El-Ghoraieb, Assiut to study dry seed yield performance of two locally adapted cultivars (‘Azmerly’ and ‘Cream 7’) and two line introductions (IT81D-1032 and IT82D-812) of common cowpea (Vigna unguiculata (L.) Walp) grown at three different within-row spaces (20, 30 and 40 cm) and two planting dates in the summer (April 15th and 30th) and in the fall season (Aug. 12th and 27th) of two successive seasons. The data showed that total dry-seed yield produced by plants grown at 20 cm was greater than at 30 cm in all cvs/lines in both years. Increases in 1000-seed weight were detected in cv ‘Azmerly’ and line IT82D-812 when they were grown at 30 cm as compared with 20 cm in the summer season. However, in the fall season such increases were found in all cvs/lines. Planting at 40 cm produced seeds of greater weight than planting at 30 cm for all cvs/lines in the fall season and also in cv. Cream 7 and line IT82D-812 in the summer season. Planting on April 15th in the summer and also planting on Aug. 12th in the fall had plants which showed increases in 1000-seed weight and total dry-seed yield. The greatest 1000-seed weight was found in the line IT81D-1032 in the summer season and in the line IT82D-812 in the fall season. The sum up results revealed that ‘Azmerly’ produced greater dry-seed yield than ‘Cream 7’ and both of them were superior to the line IT82D-812 and IT81D-1032 in the summer season. In the fall, however, the line IT82D-812 produced greater dry-seed yield than the other cultivars/lines.

Keywords: Cowpea, Assiut, fall, planting dates, El-Ghoraieb, dry-seed yield

Procedia PDF Downloads 634
715 Agronomic Manipulation in Cultivation Practices of Scented Rice: For Sustainable Crop Production

Authors: Damini Thawait, S. K. Dwivedi, Amit K. Patel, Samaptika Kar

Abstract:

The experiment was carried out at Raipur during season of 2012 to find out the optimum planting patterns for scented rice cultivation. The treatment (T2) planting of two to three seedlings hill-1 transplanted in the spacing of 25 cm from plant to plant and 25 cm from row to row recorded significantly good grain quality i.e. higher head rice recovery (41.41) along with higher gain length (8.05).

Keywords: rice, scented, quality, yield

Procedia PDF Downloads 419
714 The Trial Using Bio-Product for Reducing Arsenic Heavy Metal in Soil in Grow Organic Vegetables

Authors: Nittaya Nokham, Nattaphon Kamon, Pipatpong Pimkhot, Pedcharada Yusuk

Abstract:

Testing efficacy of a bio-product (bp) to reduce amount of arsenic was carried out in soil which were used for cultivation of organic vegetables, at Watchan Royal Project Development Center, Kulayaniwattana district, Chiang Mai. The test consists of 6 treatments e.g. Tr.1) Control: To underlie the planting pits (pp)with compost; Tr.2) Using bp: To underlie thepp with compost mixed with (+) bp at 100 g/pit; Tr.3) Using bp: To underlie the pp with compost + bp at 100 g/pit and to spray the vegetables with bp at 2 l/20 l of water, once a week; Tr.4) Using bp: To spread the compost bp on the planting area at 3 kg/1 m2 ; Tr.5) Using bp: To spread the compost + bp on the planting area at 3 kg/1 m2and to spray vegetables with bp at 2 l/20 l of water; Tr.6) Using bp: To spray vegetables with bp at 2 l/20 l of water. Result showed that after first trial of pointed cabbage cultivation, only Tr.6 had a small reduction of arsenic; while the others had higher amount of the metal. After second trial of growing red oak leaf, Tr.6 had more reduction of arsenic while Tr.5 and Tr.3 had less reduction compared to Tr.6 but more reduction than the others. In the third trial of growing mustard, very small reduction could be found on Tr.6 and Tr.5 but more reduction in Tr.3. For the fourth (last) trial with cos romaine lettuce: Tr.6, Tr.5 showed most reduction of arsenic to about half of the original amount. So, it can be concluded that this bio-product can help reducing arsenic when using this product by spraying the bp to vegetables at concentration of 2 l/20 l of water once week (Tr.6), or using the bio-product mixed with compost to spread on the planting area at 3 kg/1 m2 together with spraying the product (Tr.5). The results obtained from continuous planting 4 kinds of vegetables at the same area. The amount of arsenic found in roots and stem is very small in the 4 vegetables.

Keywords: organic vegetables, bio-product, arsenic, soil

Procedia PDF Downloads 281
713 Evaluation of Wheat Varieties for Water Use Efficiency under Staggering Sowing Times and Variable Irrigation Regimes under Timely and Late Sown Conditions

Authors: Vaibhav Baliyan, S. S. Parihar

Abstract:

With the rise in temperature during reproductive phase and moisture stress, winter wheat yields are likely to decrease because of limited plant growth, higher rate of night respiration, higher spikelet sterility or number of grains per spike and restricted embryo development thereby reducing grain number. Crop management practices play a pivotal role in minimizing adverse effects of terminal heat stress on wheat production. Amongst various agronomic management practices, adjusting sowing date, crop cultivars and irrigation scheduling have been realized to be simple yet powerful, implementable and eco-friendly mitigation strategies to sustain yields under elevated temperature conditions. Taking into account, large variability in wheat production in space and time, a study was conducted to identify the suitable wheat varieties under both early and late planting with suitable irrigation schedule for minimizing terminal heat stress effect and thereby improving wheat production. Experiments were conducted at research farms of Indian Agricultural Research Institute, New Delhi, India, separately for timely and late sown conditions with suitable varieties with staggering dates of sowing from 1st November to 30th November in case of timely sown and from 1st December to 31st December for late sown condition. The irrigation schedule followed for both the experiments were 100% of ETc (evapotranspiration of crop), 80% of ETc and 60% of ETc. Results of the timely sown experiment indicated that 1st November sowing resulted in higher grain yield followed by 10th November. However, delay in sowing thereafter resulted in gradual decrease in yield and the maximum reduction was noticed under 30th November sowing. Amongst the varieties, HD3086 produced higher grain yield compared to other varieties. Irrigation applied based on 100% of ETc gave higher yield comparable to 80% of ETc but both were significantly higher than 60% of ETc. It was further observed that even liberal irrigation under 100% of ETc could not compensate the yield under delayed sowing suggesting that rise in temperature beyond January adversely affected the growth and development of crop as well as forced maturity resulting in significant reduction of yield attributing characters due to terminal heat stress. Similar observations were recorded under late sown experiment too. Planting on 1st December along with 100% ETc of irrigation schedule resulted in significantly higher grain yield as compared to other dates and irrigation regimes. Further, it was observed that reduction in yield under late sown conditions was significantly large than the timely sown conditions irrespective of the variety grown and irrigation schedule followed. Delayed sowing resulted in reducing crop growth period and forced maturity in turn led to significant deterioration in all the yield attributing characters and there by reduction in yield suggesting that terminal heat stress had greater impact on yield under late sown crop than timely sown due to temperature rise coinciding with reproductive phase of the crop.

Keywords: climate, irrigation, mitigation, wheat

Procedia PDF Downloads 120