Search results for: international research project.

6953 Project Management Maturity Models and Organizational Project Management Maturity Model (OPM3®): A Critical Morphological Evaluation

Authors: Farrokh J., Azhar K. Mansur

Abstract:

There exists a strong correlation between efficient project management and competitive advantage for organizations. Therefore, organizations are striving to standardize and assess the rigor of their project management processes and capabilities i.e. project management maturity. Researchers and standardization organizations have developed several project management maturity models (PMMMs) to assess project management maturity of the organizations. This study presents a critical evaluation of some of the leading PMMMs against OPM3® in a multitude of ways to look at which PMMM is the most comprehensive model - which could assess most aspects of organizations and also help the organizations in gaining competitive advantage over competitors. After a detailed morphological analysis of the models, it is concluded that OPM3® is the most promising maturity model that can really provide a competitive advantage to the organizations due to its unique approach of assessment and improvement strategies.

Keywords: Project management maturity, project managemen tmaturity models, competitive advantage.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 4992
6952 HEXAFLY-INT Project: Design of a High Speed Flight Experiment

Authors: S. Di Benedetto, M. P. Di Donato, A. Rispoli, S. Cardone, J. Riehmer, J. Steelant, L. Vecchione

Abstract:

Thanks to a coordinated funding by the European Space Agency (ESA) and the European Commission (EC) within the 7th framework program, the High-Speed Experimental Fly Vehicles – International (HEXAFLY-INT) project is aimed at the flight validation of hypersonics technologies enabling future trans-atmospheric flights. The project, which is currently involving partners from Europe, Russian Federation and Australia operating under ESA/ESTEC coordination, will achieve the goal of designing, manufacturing, assembling and flight testing an unpowered high speed vehicle in a glider configuration by 2018. The main technical challenges of the project are specifically related to the design of the vehicle gliding configuration and to the complexity of integrating breakthrough technologies with standard aeronautical technologies, e.g. high temperature protection system and airframe cold structures. Also, the sonic boom impact, which is one of the environmental challenges of the high speed flight, will be assessed. This paper provides a comprehensive and detailed update on all the current projects activities carried out to date on both the vehicle and mission design.

Keywords: Design, flight testing, hypersonics, integration.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2270
6951 Hybrid Project Management Model Based on Lean and Agile Approach

Authors: F. Z. Eddoug, J. Benhra, R. Benabbou

Abstract:

Excellence and Success are the ultimate goal for any project and in order to achieve it, every project manager looks for the convenient tools and methods. This work proposes a framework that seeks an efficient management of general project through a lean and agile approach. In order to get this objective, the article was divided in two stages, the first one was emphasized on exploring and analyzing the existing project management models and then in the second one the desired framework was created, beginning by focusing on seven existing models and then proposing for each phase of the framework the convenient lean and agile tools.

Keywords: Agility, hybrid project management, lean, scrum.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 357
6950 Project Management and Software Development Processes: Integrating PMBOK and OPEN

Authors: Maurício Covolan Rosito, Daniel Antonio Callegari, Ricardo Melo Bastos

Abstract:

Software organizations are constantly looking for better solutions when designing and using well-defined software processes for the development of their products and services. However, while the technical aspects are virtually easier to arrange, many software development processes lack more support on project management issues. When adopting such processes, an organization needs to apply good project management skills along with technical views provided by those models. This research proposes the definition of a new model that integrates the concepts of PMBOK and those available on the OPEN metamodel, helping not only process integration but also building the steps towards a more comprehensive and automatable model.

Keywords: OPEN metamodel, PMBOK metamodel, Project Management, Software Process

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 3149
6949 The Effect of Critical Activity on Critical Path and Project Duration in Precedence Diagram Method

Authors: J. Nisar, S. Halim

Abstract:

The additional relationships i.e., start-to-start, finish-to-finish, and start-to-finish, between activity in Precedence Diagram Method (PDM) provides a more flexible schedule than traditional Critical Path Method (CPM). But, changing the duration of critical activities in the PDM network will have an anomalous effect on the critical path and the project completion date. In this study, we classified the critical activities in two groups i.e., 1. activity on single critical path and 2. activity on multi-critical paths, and six classes i.e., normal, reverse, neutral, perverse, decrease-reverse and increase-normal, based on their effects on project duration in PDM. Furthermore, we determined the maximum float of time by which the duration each type of critical activities can be changed without effecting the project duration. This study would help the project manager to clearly understand the behavior of each critical activity on critical path, and he/she would be able to change the project duration by shortening or lengthening activities based on project budget and project deadline.

Keywords: Construction project management, critical path method, project scheduling, precedence diagram method.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1412
6948 A Concept of Successful Collaborative Design towards Sustainability of Project Development

Authors: Yani Rahmawati, Nadjadji Anwar, Christiono Utomo

Abstract:

Development in construction industry is leading to involve complexities in engineering systems; whereas it also required to its sustainability towards social, environmental, and economical aspects. Experts with requisite background and expertise are involved in order to integrate knowledge in achieving whole criteria through design process. Collaborative design is needed in order to attain optimum design through shared solution and goal from experts. This study is conducted to explore issues and approaches development of collaborative design research in construction and its influence to sustainability of the development. Literature review method is used in order to conceptually figure future research direction of collaborative design research. This research is a part of beginning process in doctoral research program, and will be used to support dissertation’s conceptual definition.

Keywords: Collaborative design, multi-discipline design, design process, sustainability of project development.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2170
6947 Benefits of Construction Management Implications and Processes by Projects Managers on Project Completion

Authors: Mamoon Mousa Atout

Abstract:

Projects managers in construction industry usually face a difficult organizational environment especially if the project is unique. The organization lacks the processes to practice construction management correctly, and the executive’s technical managers who have lack of experience in playing their role and responsibilities correctly. Project managers need to adopt best practices that allow them to do things effectively to make sure that the project can be delivered without any delay even though the executive’s technical managers should follow a certain process to avoid any factor might cause any delay during the project life cycle. The purpose of the paper is to examine the awareness level of projects managers about construction management processes, tools, techniques and implications to complete projects on time. The outcome and the results of the study are prepared based on the designed questionnaires and interviews conducted with many project managers. The method used in this paper is a quantitative study. A survey with a sample of 100 respondents was prepared and distributed in a construction company in Dubai, which includes nine questions to examine the level of their awareness. This research will also identify the necessary benefits of processes of construction management that has to be adopted by projects managers to mitigate the maximum potential problems which might cause any delay to the project life cycle.

Keywords: Construction Methodology, Design Process, Project Managers, Scheduling and Resource Planning.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2025
6946 The Relationship between Depression Interpersonal Communication and Media Using Among International Students

Authors: Birol Gülnar, Hacer Aker

Abstract:

Student-s movements have been going increasing in last decades. International students can have different psychological and sociological problems in their adaptation process. Depression is one of the most important problems in this procedure. This research purposed to reveal level of foreign students- depression, kinds of interpersonal communication networks (host/ethnic interpersonal communication) and media usage (host/ethnic media usage). Additionally study aimed to display the relationship between depression and communication (host/ethnic interpersonal communication and host/ethnic media usage) among foreign university students. A field research was performed among 283 foreign university students who have been attending 8 different universities in Turkey. A purposeful sampling technique was used in this research cause of data collect facilities. Results indicated that 58.3% of foreign students- depression stage was “intermediate" while 33.2% of foreign students- depression level was “low". Add to this, host interpersonal communication behaviors and Turkish web sites usages were negatively and significantly correlated with depression.

Keywords: International students, depression, interpersonal communication behaviors, media using.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2836
6945 Sexual and Gender Based Crimes in International Criminal Law: Moving Forwards or Backwards?

Authors: Khadija Ali

Abstract:

Prosecution of sexual violence in international criminal law requires not only an understanding of the mechanisms employed to prosecute sexual violence but also a critical analysis of the factors facilitating perpetuation of such crimes in armed conflicts. The extrapolations laid out in this essay delve into the jurisprudence of international criminal law pertaining to sexual and gender based violence followed by the core question of this essay – has the entrenchment of sexual violence as international crimes in the Rome Statute been successful to address such violence in armed conflicts?

Keywords: Conflict, Gender, International Criminal Law Sexual Violence.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2394
6944 Classification of Construction Projects

Authors: M. Safa, A. Sabet, S. MacGillivray, M. Davidson, K. Kaczmarczyk, C. T. Haas, G. E. Gibson, D. Rayside

Abstract:

In order to address construction project requirements and specifications, scholars and practitioners need to establish taxonomy according to a scheme that best fits their need. While existing characterization methods are continuously being improved, new ones are devised to cover project properties which have not been previously addressed. One such method, the Project Definition Rating Index (PDRI), has received limited consideration strictly as a classification scheme. Developed by the Construction Industry Institute (CII) in 1996, the PDRI has been refined over the last two decades as a method for evaluating a project's scope definition completeness during front-end planning (FEP). The main contribution of this study is a review of practical project classification methods, and a discussion of how PDRI can be used to classify projects based on their readiness in the FEP phase. The proposed model has been applied to 59 construction projects in Ontario, and the results are discussed.

Keywords: Project classification, project definition rating index (PDRI), project goals alignment, risk.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 5126
6943 Projectification: Using Project Management Methodology to Manage the Academic Program Review

Authors: Adam Marks, Munir Majdalawieh, Maytha Al Ali

Abstract:

While research is rich with what criteria could be included in the academic program review processes, there is rarely any mention of how this significant and complex process should be managed. This paper proposes using project management methodology in alignment with the program review criteria of the Dickeson’s Prioritizing Academic Programs model. Project management and academic program review share two distinct characteristics; one is their life cycle, and the second is the core knowledge areas they use. This aligned and structured approach offers academic administrators a step-by-step guide that can help them manage this process and effectively assess academic programs.

Keywords: Project management, academic program, program review, education, higher education institution, strategic management.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 906
6942 The Characteristics of Thai Movies and Factors Contributing to Becoming Widely Known in International Markets

Authors: Tanyatorn Panyasopon

Abstract:

Many Thai movies have been very popular domestically and internationally. Some movies were box office hits and receiving awards. However, there has not yet been research about how Thai movies can sell in international markets The objectives of the research were 1) To analyze the characteristics of Thai movies that can sell to world audiences; 2) To investigate the factors making Thai movies into foreign markets. Thai film professionals were interviewed. Their ideas were analyzed to find out what factors contributing to Thai movies widely seen in worldwide markets. Nine foreign audiences were also interviewed to reveal what characteristics of Thai movies would be well accepted by the markets. The results showed that major characteristics of Thai movies proving successful worldwide were cultural and exotic Thai movies, outstanding genres, well-known actors, music and songs. Factors contributing to global market were marketing, qualities of Thai movies, and financial support from the government.

Keywords: Characteristics, factors, international markets, Thai movies.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 4971
6941 Scrum as the Method Supporting the Implementation of Knowledge Management in an Organization

Authors: Andrej Miklošík, Eva Hvizdová, Štefan Žák

Abstract:

Many companies have switched their processes to project-oriented in the last years. This brings new possibilities and effectiveness not only in the field of external processes connected with the product delivery but also the internal processes as well. However centralized project organization which is based on the role of project manager in the team has proved insufficient in some cases. Agile methods of project organization are trying to solve this problem by bringing new view on the project organization, roles, processes and competences. Scrum is one of these methods which builds on the principles of knowledge management to drive the project to effectiveness from all view angles. Using this method to organize internal and delivery projects helps the organization to create and share knowledge throughout the company. It also supports forming unique competences of individuals and project teams and drives innovations in the company.

Keywords: agile software development, knowledge management, knowledge dissemination, project management, SCRUM

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2563
6940 Application of Agile Project Methodology in Computational Fluid Dynamics Engineering Project

Authors: Mohammed Bilal, Noor Hyder

Abstract:

Agile methodology is a popular project management methodology and is widely used in many engineering projects. In the recent years agile methodology is successful in countering the inherent problems seen in traditional methodology. The application of the Agile methodology in the computational fluid dynamic project had improved the project delivery performance. Computational Fluid Dynamics (CFD) is the method to solve and analyze the fluid flow problems by the application of the numerical analysis. In this paper, study is conducted using agile methodology and results are compared with waterfall methodology. The result shows that the agile methodology is improves the final delivery of the project.

Keywords: Agile methodology, traditional methodology, engineering management, engineering technology, Computational Fluid Dynamics, project management.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 278
6939 An Intelligent System Framework for Generating Activity List of a Project Using WBS Mind map and Semantic Network

Authors: H. Iranmanesh, M. Madadi

Abstract:

Work Breakdown Structure (WBS) is one of the most vital planning processes of the project management since it is considered to be the fundamental of other processes like scheduling, controlling, assigning responsibilities, etc. In fact WBS or activity list is the heart of a project and omission of a simple task can lead to an irrecoverable result. There are some tools in order to generate a project WBS. One of the most powerful tools is mind mapping which is the basis of this article. Mind map is a method for thinking together and helps a project manager to stimulate the mind of project team members to generate project WBS. Here we try to generate a WBS of a sample project involving with the building construction using the aid of mind map and the artificial intelligence (AI) programming language. Since mind map structure can not represent data in a computerized way, we convert it to a semantic network which can be used by the computer and then extract the final WBS from the semantic network by the prolog programming language. This method will result a comprehensive WBS and decrease the probability of omitting project tasks.

Keywords: Expert System, Mind map, Semantic network, Work breakdown structure,

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2547
6938 Impacts of Project-Overload on Innovation inside Organizations: Agent-Based Modeling

Authors: Farnaz Motamediyan Dehkordi, Anthony Thompson, Tobias Larsson

Abstract:

Market competition and a desire to gain advantages on globalized market, drives companies towards innovation efforts. Project overload is an unpleasant phenomenon, which is happening for employees inside those organizations trying to make the most efficient use of their resources to be innovative. But what are the impacts of project overload on organization-s innovation capabilities? Advanced engineering teams (AE) inside a major heavy equipment manufacturer are suffering from project overload in their quest for innovation. In this paper, Agent-based modeling (ABM) is used to examine the current reality of the company context, and of the AE team, where the opportunities and challenges for reducing the risk of project overload and moving towards innovation were identified. Project overload is more likely to stifle innovation and creativity inside teams. On the other hand, motivations on proper challenging goals are more likely to help individual to alleviate the negative aspects of low level of project overload.

Keywords: Innovation, Creativity, Project overload, Agentbased modelling.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1800
6937 How International College Students Understand Entrepreneurial Readiness and Business-Related Skills: A Qualitative Study

Authors: Aleksandar Chonevski

Abstract:

The free-market economy provides many opportunities for entrepreneurship or starting one’s own business, attracting many students to study business at for-profit colleges in the United States. This is also true for international students, many of whom are filled with the hope of making a better life for themselves and their families through entrepreneurial endeavors. This qualitative research showed that not all graduates business students start their own business. In investigating this phenomenon, the effectiveness of entrepreneurship curricula at international colleges needs to be examined in order to adjust, improve and reform entrepreneurship curricula. This qualitative study will explore how business skills learned in college for-profit play a role in the entrepreneurial readiness of undergraduate business students in the south Florida. Business curricula helps international students achieve goals and transform their actions to understand challenges in a corporate society. Students will be interviewed to gain information about the students’ experience with entrepreneurship curricula in a for-profit college in south Florida.

Keywords: Business skills, college curriculum, entrepreneurial readiness, international students.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 790
6936 Application of Data Mining Tools to Predicate Completion Time of a Project

Authors: Seyed Hossein Iranmanesh, Zahra Mokhtari

Abstract:

Estimation time and cost of work completion in a project and follow up them during execution are contributors to success or fail of a project, and is very important for project management team. Delivering on time and within budgeted cost needs to well managing and controlling the projects. To dealing with complex task of controlling and modifying the baseline project schedule during execution, earned value management systems have been set up and widely used to measure and communicate the real physical progress of a project. But it often fails to predict the total duration of the project. In this paper data mining techniques is used predicting the total project duration in term of Time Estimate At Completion-EAC (t). For this purpose, we have used a project with 90 activities, it has updated day by day. Then, it is used regular indexes in literature and applied Earned Duration Method to calculate time estimate at completion and set these as input data for prediction and specifying the major parameters among them using Clem software. By using data mining, the effective parameters on EAC and the relationship between them could be extracted and it is very useful to manage a project with minimum delay risks. As we state, this could be a simple, safe and applicable method in prediction the completion time of a project during execution.

Keywords: Data Mining Techniques, Earned Duration Method, Earned Value, Estimate At Completion.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1761
6935 The Cost of Innovation in Software Development Projects

Authors: Mihai Liviu Despa

Abstract:

The paper tackles the topic of determining the cost of innovation in software development projects. Innovation can be achieved either in a planned or unplanned manner. The paper approaches the scenarios were innovation is planned for. As a starting point an innovative software development project is analyzed. The project is depicted step by step as it was implemented, from inception to delivery. Costs that are proprietary to innovation in software development are isolated based on the author’s personal experience in managing the above mentioned project. Innovation costs components identified by the author are then validated using open discussions with software development professionals and projects managers on LinkedIn groups. In order to receive relevant feedback only groups that focus on software development and innovation management are targeted. Additional innovation cost components suggested by software development professionals and projects managers are also considered. Based on the identified cost components an indicator is built. The indicator is meant to formalize the process of determining the cost of innovation in a software development project. The indicator aggregates all the innovation cost components that are identified in the research process. The process of calculating each cost component is also described. Conclusions are formulated and new related research topics are submitted for debate.

Keywords: Innovation cost, IT project management, software development.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2017
6934 Feasibility Study of a Solar Farm Project with an Executive Approach

Authors: Amir Reza Talaghat

Abstract:

Since 2015, a new approach and policy regarding energy resources protection and using renewable energies has been started in Iran which was developing new projects. Investigating about the feasibility study of these new projects helped to figure out five steps to prepare an executive feasibility study of the concerned projects, which are proper site selections, authorizations, design and simulation, economic study and programming, respectively. The results were interesting and essential for decision makers and investors to start implementing of these projects in reliable condition. The research is obtained through collection and study of the project's documents as well as recalculation to review conformity of the results with GIS data and the technical information of the bidders. In this paper, it is attempted to describe the result of the performed research by describing the five steps as an executive methodology, for preparing a feasible study of installing a 10 MW – solar farm project. The corresponding results of the research also help decision makers to start similar projects is explained in this paper as follows: selecting the best location for the concerned PV plant, reliable and safe conditions for investment and the required authorizations to start implementing the solar farm project in the concerned region, selecting suitable component to achieve the best possible performance for the plant, economic profit of the investment, proper programming to implement the project on time.

Keywords: Solar farm, solar energy, execution of PV power plant, PV power plant, feasibility study.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1671
6933 A Study of Recycle Materials to Develop for Auto Part

Authors: Sittichai Kaewkuekool, Vanchai Laemlaksakul

Abstract:

At the present, auto part industries have become higher challenge in strategy market. As this consequence, manufacturers need to have better response to customers in terms of quality, cost, and delivery time. Moreover, they need to have a good management in factory to comply with international standard maximum capacity and lower cost. This would lead companies to have to order standard part from aboard and become the major cost of inventory. The development of auto part research by recycling materials experiment is to compare the auto parts from recycle materials to international auto parts (CKD). Factors studied in this research were the recycle material ratios of PU-foam, felt, and fabric. Results of recycling materials were considered in terms of qualities and properties on the parameters such as weight, sound absorption, water absorption, tensile strength, elongation, and heat resistance with the CKD. The results were showed that recycling materials would be used to replace for the CKD.

Keywords: International auto parts, recycling materials.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2031
6932 Identifying Project Delay Factors in the Australian Construction Industry

Authors: Syed Sohaib Bin Hasib, Hiyam Al-Kilidar

Abstract:

Meeting project deadlines is a major challenge for most construction projects. In this study, perceptions of contractors, clients, and consultants are compared relative to a list of factors derived from the review of the extant literature on project delay. 59 causes (categorized into 8 groups) of project delays were identified from the literature. A survey was devised to get insights and ranking of these factors from clients, consultants & contractors in the Australian construction industry. Findings showed that project delays in the Australian construction industry are mainly the result of skill shortages, interference in execution, and poor coordination and communication between the project stakeholders.

Keywords: Construction, delay factors, time delay, Australian construction industry.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1136
6931 Sustainability: An Ethical Approach Towards Project Business Success

Authors: G. S. Dangayach

Abstract:

For any country the project management has been a vital part for its development. The highly competitive business world has created tremendous pressure on the project managers to achieve success. The pressure is derived from survival and profit building in business organizations which compels the project managers to pursue unethical practices. As a result unethical activities in business projects can be found easily where situations or issues arise due to dubious business practice, high corruption, or absolute violation of the law. The recent spur on Commonwealth games to be organized in New Delhi indicates towards the same. It has been seen that the project managers mainly focus on cost, time, and quality rather than social impact and long term effects of the project. Surprisingly the literature as well as the practitioner-s perspective also does not identify the role of ethics in project success. This paper identifies ethics as the fourth most important dimension in the project based organizations. The paper predicts that the approach of considering ethics will result in sustainability of the project. It will increase satisfaction and loyalty of the customers as well as create harmony, trust, brotherhood, values and morality among the team members. This paper is conceptual in nature as inadequate literature exists linking the project success with an ethical approach.

Keywords: Ethics, Loyalty, Morality, Project success

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2728
6930 The Analysis on Leadership Skills in UK Automobile Manufacturing Enterprises

Authors: Yanting Cao, Kazumitsu Nawata

Abstract:

The UK has strong economic growth, which attracts other countries to invest there through globalization. This research process will be based on quantitative and qualitative descriptive analysis using interviews. The secondary analysis will involve a case study approach to understand the important aspects of leadership skills. The research outcomes will be identifying the strength and weakness of the leadership skills of UK automobile manufacturing enterprises and suggest the best practices adopted by the respective countries for better results.

Keywords: engineering management, leadership, industrial project management, project managers, automobile manufacturing

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1329
6929 A Study of Factors Affecting the Elapsed Time of Housing Renewal Project Implementation in Seoul

Authors: In Su Na, Gunwon Lee, Seiyong Kim

Abstract:

This study analyzed the effect of area variables and economic variables on the length of each period of the project in order to analyze the effect of agreement rate on project implementation in housing renewal projects. In conclusion, as can be seen from these results, a low agreement rate may not translate into project promotion, and a higher agreement rate may not translate into project delay. The expectation of the policy is that the lower the agreement rate, the more projects would be promoted, but that is not the actual effect. From a policy consistency viewpoint, changing the agreement rate frequently, depending on the decision of the public, is not reasonable. The policy of using agreement rate as a necessary condition for project implementation should be reconsidered.

Keywords: Area and Economic Variables, Elapsed time, Housing Renewal Project.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1582
6928 Core Tourism Products and Destination Image: Case Study of Sabah, Malaysia

Authors: Nur Adilah Md Zain, Mohd Salehuddin Mohd Zahari, Mohd Hafiz Hanafiah, Muhammad Izzat Zulkifly

Abstract:

This paper empirically investigates the relationship between Sabah state core tourism products and its destination image. Through a descriptive design using a quantitative method with a self-reported and self-administered questionnaire, this research surveyed the individual international tourists who had visited Sabah and experienced the state’s core tourism products. The research findings clearly indicate that Sabah, one of the states in Malaysia has a lot of valuable resources in the eyes of the international tourists. Interestingly, it was found that Sabah’s core tourism products namely unique marine resources, various nature attractions and cultural diversities have undoubtedly contributed to the state’s tourism image. Good feedbacks and the promising insights from the international tourists’ point of view offer varying consequences, repercussion, and implication to the state government and the relevant authorities. Collaboration and cooperation between all responsible authorities are therefore crucial in strengthening the “total tourism experience” among the international tourists in this state.

Keywords: Tourism core products, marine, cultural, nature, destination image, Sabah.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 3375
6927 Building Information Modeling and Its Application in the State of Kuwait

Authors: Michael Gerges, Ograbe Ahiakwo, Martin Jaeger, Ahmad Asaad

Abstract:

Recent advances of Building Information Modeling (BIM) especially in the Middle East have increased remarkably. Dubai has been taking a lead on this by making it mandatory for BIM to be adopted for all projects that involve complex architecture designs. This is because BIM is a dynamic process that assists all stakeholders in monitoring the project status throughout different project phases with great transparency. It focuses on utilizing information technology to improve collaboration among project participants during the entire life cycle of the project from the initial design, to the supply chain, resource allocation, construction and all productivity requirements. In view of this trend, the paper examines the extent of applying BIM in the State of Kuwait, by exploring practitioners’ perspectives on BIM, especially their perspectives on main barriers and main advantages. To this end structured interviews were carried out based on questionnaires and with a range of different construction professionals. The results revealed that practitioners perceive improved communication and mitigated project risks by encouraged collaboration between project participants. However, it was also observed that the full implementation of BIM in the State of Kuwait requires concerted efforts to make clients demanding BIM, counteract resistance to change among construction professionals and offer more training for design team members. This paper forms part of an on-going research effort on BIM and its application in the State of Kuwait and it is on this basis that further research on the topic is proposed.

Keywords: Building Information Modeling, BIM, construction industry, Kuwait.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2894
6926 Stochastic Mixed 0-1 Integer Programming Applied to International Transportation Problems under Uncertainty

Authors: Y. Wu

Abstract:

Today-s business has inevitably been set in the global supply chain management environment. International transportation has never played such an important role in the global supply chain network, because movement of shipments from one country to another tends to be more frequent than ever before. This paper studies international transportation problems experienced by an international transportation company. Because of the limited fleet capacity, the transportation company has to hire additional trucks from two countries in advance. However, customer-s shipment information is uncertain, and decisions have to be made before accurate information can be obtained. This paper proposes a stochastic mixed 0-1 programming model to solve the international transportation problems under uncertain demand. A series of experiments demonstrate the effectiveness of the proposed stochastic model.

Keywords: Global supply chain management, international transportation, stochastic programming.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1579
6925 Interface Terminologies: A Case Study on the International Classification of Primary Care

Authors: Laurent Letrilliart, Anne-Katty Bacis, François Mennerat, Cyrille Colin

Abstract:

The International Classification of Primary Care (ICPC), which belongs to the WHO Family of International Classifications (WHO-FIC), has a low granularity, which is convenient for describing general medical practice. However, its lack of specificity makes it useful to be used along with an interface terminology. An international survey has been performed, using a questionnaire sent by email to experts from 25 countries, in order to describe the terminologies interfacing with ICPC. Eleven interface terminologies have been identified, developed in Argentina, Australia, Belgium (2), Canada, Denmark, France, Germany, Norway, South Africa, and The Netherlands. Globally, these systems have been poorly assessed until now.

Keywords: Terminology, controlled vocabulary, thesaurus, classification, International Classification of Primary Care.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1663
6924 Terrorism as a Threat to International Peace: A Study on 9/11 Terrorism

Authors: Aftab

Abstract:

This paper is a theory-oriented study that seeks to generalize the process through which terrorism leads to the disruption of international peace. For this, it scrutinizes 9/11 terrorism based on five analytical domains of threat—security disorder, political tensions, economic adversity, socio-ideological intolerance, and the fear and cost of counterterrorism—each of which is explored in light of specific indicators. By applying qualitative correlation method, the paper finds that terrorism immediately entails five distinct kinds of negative impacts that lead to both internal disorders caused by state weakness and global disorder caused by international tensions, which in consequence, causes international peace to be disrupted. Thus, in following inductive process, the findings of this paper help to make a general inference that terrorism is a threat to international peace. 

Keywords: Domains, global disorder, internal disorder, international peace, terrorism, threat.