3328 Enabling Factors towards Safety Improvement for Industrialised Building System (IBS)

Authors: Nasyairi Mat Nasir, Zulhabri Ismail, Faridah Ismail, Sharifah Nur Aina Syed Alwee, Masnizan Che Mat

Abstract:

The utilisation of Industrial Building System (IBS) in construction industry will lead to a safe site condition since minimum numbers of workers are required to be on-site, timely material delivery, systematic component storage, reduction of construction material and waste. These matters are being promoted in the Construction Industry Master Plan (CIMP 2006-2015). However, the enabling factors of IBS that will foster a safer working environment are indefinite; on that basis a research has been conducted. The purpose of this paper is to discuss and identify the relevant factors towards safety improvement for IBS. A quantitative research by way of questionnaire surveys have been conducted to 314 construction companies. The target group was Grade 5 to Grade 7 contractors registered with Construction Industry Development Board (CIDB) which specialise in IBS. The findings disclosed seven factors linked to the safety improvement of IBS construction site in Malaysia. The factors were historical, economic, psychological, technical, procedural, organisational and the environmental factors. From the findings, a psychological factor ranked as the highest and most crucial factor contributing to safer IBS construction site. The psychological factor included the self-awareness and influences from workmates behaviour. Followed by organisational factors, where project management style will encourage the safety efforts. From the procedural factors, it was also found that training was one of the significant factors to improve safety culture of IBS construction site. Another important finding that formed as a part of the environmental factor was storage of IBS components, in which proper planning of the layout would able to contribute to a safer site condition. To conclude, in order to improve safety of IBS construction site, a welltrained and skilled workers are required for IBS projects, thus proper training is permissible and should be emphasised.

Keywords: Enabling Factors, Industrialised Building System, Safety Improvement.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2875
3327 Developing Emission Factors of Fugitive Particulate Matter Emissions for Construction Sites in the Middle East Area

Authors: Hala A. Hassan, Vasiliki K. Tsiouri, Konstantinos E. Konstantinos

Abstract:

Fugitive particulate matter (PM) is a major source of airborne pollution in the Middle East countries. The meteorological conditions and topography of the area makes it highly susceptible to wind-blown particles which raise many air quality concerns. Air quality tools such as field monitoring, emission factors and dispersion modeling have been used in previous research studies to analyze the release and impacts of fugitive PM in the region. However, these tools have been originally developed based on experiments made for European and North American regions. In this work, an experimental campaign was conducted on April-May 2014 in a construction site in Doha city, Qatar. The ultimate goal is to evaluate the applicability of the existing emission factors for construction sites in dry and arid areas like the Middle East.

Keywords: Air pollution, construction, emissions, middle east, fugitive particulate matter.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 3310
3326 Operation Planning of Concrete Box Girder Bridge by 4D CAD Visualization Techniques

Authors: Mohammad Rohani, Gholamali Shafabakhsh, Abdolhosein Haddad, Ehsan Asnaashari

Abstract:

Visual simulation has emerged as a key planning tool in built environment because it enables architects, engineers and project managers to visualize construction process evolution before the project actual commences. This provides an efficient technology for reducing time and cost through planning and controlling resources, machines and materials. With the development of infrastructure projects and the massive civil constructions such as bridges, urban tunnels and highways as well as sensitivity of their construction operations, it is very necessary to apply proper planning methods. Implementation of visual techniques into management of construction projects can provide a fundamental foundation for projects with massive activities and duplicate items. So, the purpose of this paper is to develop visual simulation management techniques for infrastructure projects such as highways bridges by the use of Four-Dimensional Computer-Aided design Models. This project simulates operational assembly-line for Box-Girder Concrete Bridges which it would be able to optimize the sequence and interaction of project activities and on the other hand, it would minimize any unintended conflicts prior to project start. In this paper, after introducing the various planning methods by building information model and concrete bridges in highways, an executive case study is demonstrated and then a visual technique (4D CAD) will be applied for the case. In the final step, the user feedback for interacting by this system evaluated according to six criteria.

Keywords: 4D application area, Box-Girder concrete bridges, CAD model, visual planning.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1525
3325 Nearly Zero-Energy Regulation and Buildings Built with Prefabricated Technology: The Case of Hungary

Authors: András Horkai, Attila Talamon, Viktória Sugár

Abstract:

There is an urgent need nowadays to reduce energy demand and the current level of greenhouse gas emission and use renewable energy sources increase in energy efficiency. On the other hand, the European Union (EU) countries are largely dependent on energy imports and are vulnerable to disruption in energy supply, which may, in turn, threaten the functioning of their current economic structure. Residential buildings represent a significant part of the energy consumption of the building stock. Only a small part of the building stock is exchanged every year, thus it is essential to increase the energy efficiency of the existing buildings. Present paper focuses on the buildings built with industrialized technology only, and their opportunities in the boundaries of nearly zero-energy regulation. Current paper shows the emergence of panel construction method, and past and present of the ‘panel’ problem in Hungary with a short outlook to Europe. The study shows as well as the possibilities for meeting the nearly zero and cost optimized requirements for residential buildings by analyzing the renovation scenarios of an existing residential typology.

Keywords: Budapest, energy consumption, industrialized technology, nearly zero-energy buildings.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 864
3324 Attentiveness of Building Commissioning in the Malaysian Construction Industry

Authors: Kho Mei Ye, Hamzah Abdul Rahman

Abstract:

This paper provides some thoughts about the lack of attentiveness of building commissioning in the construction industry and the lack of handling in project commissioning as an integral part of the project life-cycle. Many have perceived commissioning as the problem solving process of a project, rather than the start up of the equipment, or the handing over of the project to the client. Therefore, there is a lack of proper attention in the planning of commissioning as a vital part of the project life-cycle. This review paper aims to highlight the benefits of building commissioning and to propose the lacking of knowledge gap on building commissioning. Finally, this paper hopes to propose the shift of focus on this matter in future research.

Keywords: building, commissioning, construction, delay

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2104
3323 Ghazal Ozon River and Preserving the Existent Aquatics While Constructing the Siazakh Dam

Authors: Reza Gharehkhani

Abstract:

The main purpose of the dam is to control the surface streams and rivers across the country. Dam construction and formation of river and big water reservoirs and resources happen in the glen is a big incident which would change its surrounding area considerably. In fact, constructing a dam the glen width is close and fishes don't migrate from upstream to downstream and ultimately it would led to their death. To resolve this, it seems necessity to create a passage for fishes during the construction of dam. It is provided establishing a set of stepped pools overlooking each other as a fish way or fish ladder a proper pathway for moving fishes. In this article we first examine the surrounding environment and then Ghazal Ozon River and preserving the aquatics.

Keywords: Ghazal Ozon River, fish way, Dam construction, fish

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1177
3322 Research on Laws and Regulations of Sustainable Construction in China

Authors: Wei Zhang, Jing Dong

Abstract:

This paper introduced the status quo of laws and regulations of sustainable construction in China and investigated the existing problems of current laws and regulations through person-interviews in Beijing, Shanghai, Chongqing and Shenzhen in China. The problems include incomplete legal system, lack of guidance of higher-level laws, backward in some laws and regulations, unclear legal liability and poor law enforcement. Aimed at these problems, this paper also put forward some improvement approaches, such as filling the legal gap, revising laws and regulations, establishing incentive system and keeping pace with level of development.

Keywords: Improvement, laws and regulations, status quo, sustainable construction

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2275
3321 The Reach of Shopping Center Layout Form on U Subway - Based On Kernel Density Estimate

Authors: Wen Liu

Abstract:

With the rapid progress of modern cities, the railway construction must be developing quickly in China.As a typical high-density country, shopping center on the subway should be one important factor during the process of urban development. The paper discusses the influence of the layout of shopping center on the subway, and put it in the time and space’s axis of Shanghai urban development. We usethe digital technology to establish the database of relevant information. And then get the change role about shopping center on subway in Shanghaiby the Kernel density estimate.The result shows the development of shopping center on subway has a relationship with local economic strength, population size, policysupport, and city construction. And the suburbanization trend of shopping center would be increasingly significant.By this case research, we could see the Kernel density estimate is an efficient analysis method on the spatial layout. It could reveal the characters of layout form of shopping center on subway in essence. And it can also be applied to the other research of space form.

Keywords: Shanghai, Shopping center on the subway, Layout form, The Kernel density estimate.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1743
3320 Technological Deep Assessment of Automotive Parts Manufacturers Case of Iranian Manufacturers

Authors: Manouchehre Ansari, Mahmoud Dehghan Nayeri, Reza Yousefi Zenouz

Abstract:

In order to develop any strategy, it is essential to first identify opportunities, threats, weak and strong points. Assessment of technology level provides the possibility of concentrating on weak and strong points. The results of technology assessment have a direct effect on decision making process in the field of technology transfer or expansion of internal research capabilities so it has a critical role in technology management. This paper presents a conceptual model to analyze the technology capability of a company as a whole and in four main aspects of technology. This model was tested on 10 automotive parts manufacturers in IRAN. Using this model, capability level of manufacturers was investigated in four fields of managing aspects, hard aspects, human aspects, and information and knowledge aspects. Results show that these firms concentrate on hard aspect of technology while others aspects are poor and need to be supported more. So this industry should develop other aspects of technology as well as hard aspect to have effective and efficient use of its technology. These paper findings are useful for the technology planning and management in automotive part manufactures in IRAN and other Industries which are technology followers and transport their needed technologies.

Keywords: Technology, Technological evaluation, TechnologyMaturity

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1693
3319 Study on Clarification of the Core Technology in a Monozukuri Company

Authors: Nishiyama Toshiaki, Tadayuki Kyountani, Nguyen Huu Phuc, Shigeyuki Haruyama, Oke Oktavianty

Abstract:

It is important to clarify the company’s core technology in product development process to strengthen their power in providing technology that meets the customer requirement. QFD method is adopted to clarify the core technology through identifying the high element technologies that are related to the voice of customer, and offer the most delightful features for customer. AHP is used to determine the importance of evaluating factors. A case study was conducted by using this approach in Japan’s Monozukuri Company (so called manufacturing company) to clarify their core technology based on customer requirements.

Keywords: QFD, product development process, core technology, AHP.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1054
3318 Focusing on the Utilization of Information and Communication Technology for Improving Children’s Potentials in Science: Challenges for Sustainable Development in Nigeria

Authors: Osagiede Mercy Afe

Abstract:

After the internet explosion in the 90’s, technology was immediately integrated into the school system. Technology which symbolizes advancement in human knowledge was seen as a setback by many educators. Efforts have been made to help stem this erroneous believes and help educators realize the benefits of technology and ways of implementing it in the classrooms especially in the sciences. This advancement created a constantly expanding gap between the pupil’s perception on the use of technology within the learning atmosphere and the teacher’s perception and limitations hence, the focus of this paper is on the need to refocus on the use of Science and Technology in enhancing children’s potentials in learning at school especially in Science for sustainable development in Nigeria. The paper recommended measures for facilitating the sustenance of science and technology in Nigerian schools so as to enhance the potentials of our children in Science and Technology for a better tomorrow.

Keywords: Children’s potential, Educational system, ICT, Sustainable development.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1674
3317 Critical Factors Affecting the Implementation of Total Quality Management in the Construction Industry in U.A.E

Authors: Firas Mohamad Al-Sabek

Abstract:

The purpose of the paper is to examine the most critical and important factor which will affect the implementation of Total Quality Management (TQM) in the construction industry in the United Arab Emirates. It also examines the most effected Project outcome from implementing TQM. A framework was also proposed depending on the literature studies. The method used in this paper is a quantitative study. A survey with a sample of 60 respondents was created and distributed in a construction company in Abu Dhabi, which includes 15 questions to examine the most critical factor that will affect the implementation of TQM in addition to the most effected project outcome from implementing TQM. The survey showed that management commitment is the most important factor in implementing TQM in a construction company. Also it showed that Project cost is most effected outcome from the implementation of TQM. Management commitment is very important for implementing TQM in any company. If the management loose interest in quality then everyone in the organization will do so. The success of TQM will depend mostly on the top of the pyramid. Also cost is reduced and money is saved when the project team implement TQM. While if no quality measures are present within the team, the project will suffer a commercial failure. Based on literature, more factors can be examined and added to the model. In addition, more construction companies could be surveyed in order to obtain more accurate results. Also this study could be conducted outside the United Arab Emirates for further enchantment.

Keywords: Construction project, total quality management, management commitment, cost, theoretical framework.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 4005
3316 Barriers to the Uptake of Technology in the Quantity Surveying Industry

Authors: Mnisi Blessing, Christopher Amoah

Abstract:

The usage of modern technology is widespread in industrialised nations. The issue still pertains to developing countries since they struggle to use technology in the building sector. The study aims to identify the barriers to technology usage in quantity surveying firms. Quantity Surveyors were interviewed via Microsoft teams due to the dispersed nature of the participants. However, where the interview was not possible, the interview guide was emailed to the participants to fill in. In all, 12 participants were interviewed out of the 25 participants contacted. The data received were analysed using the content analysis process. The study's findings demonstrate that quantity surveyors have access to a wide range of technology that significantly enhances their project activities. However, quantity surveying companies are hesitant to use technology for several reasons, including the cost and maintenance associated with it. Other obstacles include a lack of knowledge, poor market acceptance, legal obstacles, and budgetary constraints. Despite the advantages associated with modern technology applications, quantity surveying firms are not using them, which may ultimately affect their work output. Therefore, firms need to re-examine these obstacles, inhibiting their adoption of technology in the work process to enhance their production. The study reveals the main hindrances to technology usage, which may help firms institute measures to address them.

Keywords: Technology usage barriers, technology implementation, technology acceptance, quantity surveying.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 179
3315 Transformation of Linear Economy to Circular Economy in Hong Kong Building and Construction Industry

Authors: Kwok Tak Kit

Abstract:

This research focuses mainly on the transformation of circular economy and specifically on the building and construction industry in Hong Kong. This research is going to investigate the current status of development and transformation of linear economy of Hong Kong into circular economy. The research is based on literature review and different published reports to outline the possibilities for further development and transformation of circular economy in Hong Kong. Different key factors affecting the transformation particularly in building and construction industry are discussed.

Keywords: Circular economy, LEED net zero, carbon emission, waste reduction, waste management.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 371
3314 Resources and Strategies towards the Development of a Sustainable Construction Materials Industry in Botswana

Authors: G. Malumbela, E. U. Masuku

Abstract:

The economy of Botswana has increased extensively since its independence. In contrast to this increase, the construction industry which is one of the key indicators of a developing nation continues to be highly dependent on imported building material products from the neighbouring countries of South Africa, Namibia, Zimbabwe, and Zambia. Only two companies in the country currently blend cement. Even then, the overwhelming majority of raw materials used in the blends are imported. Furthermore, there are no glass manufacturers in Botswana. The ceramic industry is limited to the manufacture of clay bricks notwithstanding a few studios on crockery and sanitary ware which nonetheless use imported clay. This paper presents natural resources and industrial waste products in Botswana that can be used for the development of sustainable building materials. It also investigates at the distribution and cost of other widely used building materials in the country. Finally, the present paper looks at projects and national strategies aimed at a country-wide development of a sustainable building materials industry together with their successes and hitches.

Keywords: Botswana construction industry, construction materials, natural resources, sustainable materials.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1878
3313 Optimization of Transportation Cost of Plaster of Paris Cement

Authors: K. M. Oba

Abstract:

The transportation modelling technique was adopted in the solution of the problem of transportation of Plaster of Paris (POP) cement from three supply locations (construction materials markets) to three demand locations (construction sites) in Port Harcourt. The study was carried out for 40 kg bags of POP cement fully loaded on 600 bags per truck from the three selected construction materials markets in Port Harcourt. The costs of transporting the POP cement were determined and subjected to the North-West Corner, Least Cost, and Vogel’s approximation methods to determine the initial feasible solution. Of the three results, the Least Cost Method turned out to have the lowest cost. Using the Stepping Stone Method, the optimum shipping cost was finally attained after two successive iterations. The optimum shipping cost was calculated to be $1,690 or ₦1,774,500 as of October 2023. As a result of this study, the application of transportation modelling can boost the effective management of the transportation of POP cement in construction projects.

Keywords: Cost of POP cement, management of transportation, optimization of shipping cost, Plaster of Paris, transportation model.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 115
3312 Time-Cost-Quality Trade-off Software by using Simplified Genetic Algorithm for Typical Repetitive Construction Projects

Authors: Refaat H. Abd El Razek, Ahmed M. Diab, Sherif M. Hafez, Remon F. Aziz

Abstract:

Time-Cost Optimization "TCO" is one of the greatest challenges in construction project planning and control, since the optimization of either time or cost, would usually be at the expense of the other. Since there is a hidden trade-off relationship between project and cost, it might be difficult to predict whether the total cost would increase or decrease as a result of the schedule compression. Recently third dimension in trade-off analysis is taken into consideration that is quality of the projects. Few of the existing algorithms are applied in a case of construction project with threedimensional trade-off analysis, Time-Cost-Quality relationships. The objective of this paper is to presents the development of a practical software system; that named Automatic Multi-objective Typical Construction Resource Optimization System "AMTCROS". This system incorporates the basic concepts of Line Of Balance "LOB" and Critical Path Method "CPM" in a multi-objective Genetic Algorithms "GAs" model. The main objective of this system is to provide a practical support for typical construction planners who need to optimize resource utilization in order to minimize project cost and duration while maximizing its quality simultaneously. The application of these research developments in planning the typical construction projects holds a strong promise to: 1) Increase the efficiency of resource use in typical construction projects; 2) Reduce construction duration period; 3) Minimize construction cost (direct cost plus indirect cost); and 4) Improve the quality of newly construction projects. A general description of the proposed software for the Time-Cost-Quality Trade-Off "TCQTO" is presented. The main inputs and outputs of the proposed software are outlined. The main subroutines and the inference engine of this software are detailed. The complexity analysis of the software is discussed. In addition, the verification, and complexity of the proposed software are proved and tested using a real case study.

Keywords: Project management, typical (repetitive) large scale projects, line of balance, multi-objective optimization, genetic algorithms, time-cost-quality trade-offs.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 3005
3311 Review of the Model-Based Supply Chain Management Research in the Construction Industry

Authors: Aspasia Koutsokosta, Stefanos Katsavounis

Abstract:

This paper reviews the model-based qualitative and quantitative Operations Management research in the context of Construction Supply Chain Management (CSCM). Construction industry has been traditionally blamed for low productivity, cost and time overruns, waste, high fragmentation and adversarial relationships. The construction industry has been slower than other industries to employ the Supply Chain Management (SCM) concept and develop models that support the decision-making and planning. However the last decade there is a distinct shift from a project-based to a supply-based approach of construction management. CSCM comes up as a new promising management tool of construction operations and improves the performance of construction projects in terms of cost, time and quality. Modeling the Construction Supply Chain (CSC) offers the means to reap the benefits of SCM, make informed decisions and gain competitive advantage. Different modeling approaches and methodologies have been applied in the multi-disciplinary and heterogeneous research field of CSCM. The literature review reveals that a considerable percentage of the CSC modeling research accommodates conceptual or process models which present general management frameworks and do not relate to acknowledged soft Operations Research methods. We particularly focus on the model-based quantitative research and categorize the CSCM models depending on their scope, objectives, modeling approach, solution methods and software used. Although over the last few years there has been clearly an increase of research papers on quantitative CSC models, we identify that the relevant literature is very fragmented with limited applications of simulation, mathematical programming and simulation-based optimization. Most applications are project-specific or study only parts of the supply system. Thus, some complex interdependencies within construction are neglected and the implementation of the integrated supply chain management is hindered. We conclude this paper by giving future research directions and emphasizing the need to develop optimization models for integrated CSCM. We stress that CSC modeling needs a multi-dimensional, system-wide and long-term perspective. Finally, prior applications of SCM to other industries have to be taken into account in order to model CSCs, but not without translating the generic concepts to the context of construction industry.

Keywords: Construction supply chain management, modeling, operations research, optimization and simulation.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2789
3310 Research on Building Urban Sustainability along the Coastal Area in China

Authors: Sun Jiaojiao, Fu Jiayan

Abstract:

At present, in China, the research about the urban sustainability construction is still in the exploratory stage. The ecological problems of the coastal area are more sensitive and complicated. In the background of global warming with serious ecological damage, this paper deeply researches on the main characteristics of urban sustainability and measures how to build urban sustainability. Through combining regional environmental with economic ability along the coastal area, then authors put forward the system planning framework, construction strategy and the evaluation index system, in order to seek the way of building urban sustainability along coastal area in China.

Keywords: Urban sustainability, coastal areas, construction strategy, evaluation index system.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1884
3309 Applications of Mobile Aluminum Light Structure Housing System in Sustainable Building Process

Authors: Haining Wang, Hong Zhang

Abstract:

Problems exist in the present construction industry in China. Conflicts hinder the development of the whole society, such as contradictions between resource reservation and a huge population, living space needs and low building production efficiency, as well as environment protection and high pollution production pattern. In order to solve the problems and find a solution, research is needed to explore a building system. By investigating the whole architectural process and contrasting analysis of light structures and heavy structures, the paper raised the concepts to cope with the existing challenges, such as design conception based on product and real construction processes, design methods focusing on components, and maximum utilization of the temporary building by optimizing the construction speed and building performance. The project was not only designed in virtual reality, but was also physically constructed in the real world. A series of aluminum light structure housing systems were dictated at last, with the characteristics of high performance, extremely rapid construction speed and also flexible function. It can be used in lots of aspects ranging from a single building in a remote area to a large residential community.

Keywords: Aluminum house, light structure, rapid assembly, repeat construction.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1484
3308 A Construction Management Tool: Determining a Project Schedule Typical Behaviors Using Cluster Analysis

Authors: Natalia Rudeli, Elisabeth Viles, Adrian Santilli

Abstract:

Delays in the construction industry are a global phenomenon. Many construction projects experience extensive delays exceeding the initially estimated completion time. The main purpose of this study is to identify construction projects typical behaviors in order to develop a prognosis and management tool. Being able to know a construction projects schedule tendency will enable evidence-based decision-making to allow resolutions to be made before delays occur. This study presents an innovative approach that uses Cluster Analysis Method to support predictions during Earned Value Analyses. A clustering analysis was used to predict future scheduling, Earned Value Management (EVM), and Earned Schedule (ES) principal Indexes behaviors in construction projects. The analysis was made using a database with 90 different construction projects. It was validated with additional data extracted from literature and with another 15 contrasting projects. For all projects, planned and executed schedules were collected and the EVM and ES principal indexes were calculated. A complete linkage classification method was used. In this way, the cluster analysis made considers that the distance (or similarity) between two clusters must be measured by its most disparate elements, i.e. that the distance is given by the maximum span among its components. Finally, through the use of EVM and ES Indexes and Tukey and Fisher Pairwise Comparisons, the statistical dissimilarity was verified and four clusters were obtained. It can be said that construction projects show an average delay of 35% of its planned completion time. Furthermore, four typical behaviors were found and for each of the obtained clusters, the interim milestones and the necessary rhythms of construction were identified. In general, detected typical behaviors are: (1) Projects that perform a 5% of work advance in the first two tenths and maintain a constant rhythm until completion (greater than 10% for each remaining tenth), being able to finish on the initially estimated time. (2) Projects that start with an adequate construction rate but suffer minor delays culminating with a total delay of almost 27% of the planned time. (3) Projects which start with a performance below the planned rate and end up with an average delay of 64%, and (4) projects that begin with a poor performance, suffer great delays and end up with an average delay of a 120% of the planned completion time. The obtained clusters compose a tool to identify the behavior of new construction projects by comparing their current work performance to the validated database, thus allowing the correction of initial estimations towards more accurate completion schedules.

Keywords: Cluster analysis, construction management, earned value, schedule.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1140
3307 Injury Prevention among Construction Workers: A Case Study on Iranian Steel Bar Bending Workers

Authors: S. Behnam Asl, H. Sadeghi Naeini, L. Sadat Ensaniat, R. Khorshidian, S. Alipour, S. Behnam Asl

Abstract:

Nowadays the construction industry is growing specially among developing counties. Iran also has a critical role in these industries in terms of workers disorders. Work-related musculoskeletal disorders (WMSDs) assign 7% of the whole diseases in the society, which make some limitations. One of the main factors, which are ended to WMSDs, is awkward posture. Steel bar bending is considered as one of the prominent performance among construction workers. In this case study we conducted to find the major tasks of bar benders and the most important related risk factors. This study was carried out among twenty workers (18-45 years) as our volunteer samples in some construction sites with less than 6 floors in two regions of Tehran municipality. The data was gathered through in depth observation, interview and questionnaire. Also postural analysis was done by OWAS. In another part of study we used NMQ for gathering some data about psychosocial effects of work related disorders. Our findings show that 64% of workers were not aware of work risks, also about 59% of workers had troubles in their wrists, hands, and especially among workers who worked in steel bar bending. In 46% cases low back pain were prevalence. Considering with gathered data and results, awkward postures and long term tasks and its duration are known as the main risk factors in WMSDs among construction workers, so work-rest schedule and also tools design should be considered to make an ergonomic condition for the mentioned workers.

Keywords: Bar benders, construction workers, musculoskeletal disorders (WMSDs), OWAS method.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 3321
3306 Traditionally Sustainability Analyses of Hydraulic-Architectural Bridge Construction in Iran

Authors: Karim Shiraazi, Zargham OstadiAsl, Vahid Sheikhloie, Ahadollah Azami, Shahin Hassanimehr

Abstract:

Bridge is an architectural symbol in Iran as Badgir (wind catcher); fire temples and arch are vaults are such. Therefore, from the very old ages, construction of bridges in Iran has mixed with architecture, social customs, alms and charity and holiness. Since long ago, from Mad, Achaemenid, Parthian and Sassanid times which construction of bridges got an inseparable relation with social dependency and architecture, based on those dependency bridges and dams got holy names; as Dokhtar castle and Dokhtar bridges were constructed. This method continued even after Islam and whenever Iranians got free from political fights and the immunity of roads were established the bridge construction did also prospered. In ancient times bridge construction passes through it growing and completion process and in Sassanid time in some way it reached to the peak of art and glory; as after Islam especially during 4th. century (Arab calendar) it put behind a period of glory and in Safavid time it reached to an exceptional glory and magnificence by constructing glorious bridges on Zayandeh Roud River in Isfahan. Having a combined style and changeability into bridge barrier, some of these bridges develop into magnificent constructions. The sustainable structures, mentioned above, are constructed for various reasons as follows: connecting two sides of a river, storing water, controlling floods, using water energy to operate water windmills, making lanes of streams for farms- use, and building recreational places for people, etc. These studies carried in bridges reveals the fact that in construction and designing mentioned above, lots of technological factors have been taken into consideration such as exceeding floods in the rives, hydraulic and hydrology of the rivers and bridges, geology, foundation, structure, construction material, and adopting appropriate executing methods, all of which are being analyzed in this article.

Keywords: Hydraulic-Architectural Bridge, Sustainability, Construction

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2007
3305 Appropriate Technology: Revisiting the Movement in Developing Countries for Sustainability

Authors: Jayshree Patnaik, Bhaskar Bhowmick

Abstract:

The economic growth of any nation is steered and dependent on innovation in technology. It can be preferably argued that technology has enhanced the quality of life. Technology is linked both with an economic and a social structure. But there are some parts of the world or communities which are yet to reap the benefits of technological innovation. Business and organizations are now well equipped with cutting-edge innovations that improve the firm performance and provide them with a competitive edge, but rarely does it have a positive impact on any community which is weak and marginalized. In recent times, it is observed that communities are actively handling social or ecological issues with the help of indigenous technologies. Thus, "Appropriate Technology" comes into the discussion, which is quite prevalent in the rural third world. Appropriate technology grew as a movement in the mid-1970s during the energy crisis, but it lost its stance in the following years when people started it to describe it as an inferior technology or dead technology. Basically, there is no such technology which is inferior or sophisticated for a particular region. The relevance of appropriate technology lies in penetrating technology into a larger and weaker section of community where the “Bottom of the pyramid” can pay for technology if they find the price is affordable. This is a theoretical paper which primarily revolves around how appropriate technology has faded and again evolved in both developed and developing countries. The paper will try to focus on the various concepts, history and challenges faced by the appropriate technology over the years. Appropriate technology follows a documented approach but lags in overall design and diffusion. Diffusion of technology into the poorer sections of community remains unanswered until the present time. Appropriate technology is multi-disciplinary in nature; therefore, this openness allows having a varied working model for different problems. Appropriate technology is a friendly technology that seeks to improve the lives of people in a constraint environment by providing an affordable and sustainable solution. Appropriate technology needs to be defined in the era of modern technological advancement for sustainability.

Keywords: Appropriate technology, community, developing country, sustainability.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1814
3304 Technology Trend and Level Assessment Using Patent Data for Preliminary Feasibility Study on R and D Program

Authors: Seongmin Yim

Abstract:

The Korean government has applied preliminary feasibility study for new and huge R&D programs since 2008.The study is carried out from the viewpoints of technology, policy, and Economics. Then integrate the separate analysis and finally arrive at a definite result; whether a program is feasible or unfeasible, This paper describes the concept and method of the feasibility analysis focused on technological viability assessment for technical analysis. It consists of technology trend assessment and technology level assessment. Through the analysis, we can determine the chance of schedule delay or cost overrun occurring in the proposed plan.

Keywords: Preliminary Feasibility Study, Technological viability, Technology Trend Assessment, Technology Level Assessment

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1751
3303 The Reason of Principles of Construction Engineering and Management Being Necessary for Contracting Firms and Their Projects Managers

Authors: Mamoon Mousa Atout

Abstract:

The industries of construction are in continuous growth not only in Middle East rejoin but almost all over the world. For the last fifteen years, big expansion and increase of different types of projects has been observed. Many infrastructural projects have been developed, high rise buildings, big shopping malls, power sub-stations, roads, bridges, schools, universities and developing many of new cities with full and complete facilities. The growth and enlargement of the mentioned developed projects has been accomplished through many international and local contracting organizations. Senior management of these organizations depend on their qualified and experienced team whom are aware of the implications of project management, construction management, engineering management and resource management during tendering till final completion of the project. This research aims to find out why reasons of principles of construction engineering and management are necessary for contracting firms and their managers. Principles of construction management help contracting organizations to accomplish and deliver projects without delay. This can be maintained by establishing guidelines’ details for updating the adopted system of construction management that they have through qualified and experienced project managers. The research focuses on benefits of other essential skills of projects planning, monitoring and control. Defining roles and responsibilities of contractor project managers during tendering and execution is a part of the investigated factors that will be analyzed. Other skills like optimizing and utilizing the obtainable project resources to deliver the project within time, cost and quality will be also investigated to find out how these factors are affecting the performance of contracting firms, projects managers and projects. The conclusion of the research will help senior management team and the contractors project managers about the benefits of implications and benefits construction management system and its effect upon the performance and knowledge of contract values that they have, and the optimal profit margin of the firm it.

Keywords: Construction management, contracting firms, project managers, planning processes, roles and responsibilities.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1693
3302 Deviations and Defects of the Sub-Task’s Requirements in Construction Projects

Authors: Abdullah Almusharraf, Andrew Whyte

Abstract:

The sub-task pattern in terms of deviations and defects should be identified and understood in order to improve the quality of practices in construction projects. Therefore, sub-task susceptibility to exposure to deviations and defects has been evaluated and classified via six classifications proposed in this study. Thirty-four case studies of specific sub-tasks (from compression members in constructed concrete structures) were collected from seven construction projects in order to examine the study’s proposed classifications. The study revealed that the sub-task has a high sensitivity to deviation, where 91% of the cases were recorded as deviations; however, only 19% of cases were recorded as defects. Other findings were that the actual work during the execution process is a high source of deviation for this sub-task (74%), while only 26% of the source of deviation was due to both design documentation and the actual work. These findings significantly imply that the study’s proposed classifications could be used to determine the pattern of each sub-task and develop proactive actions to overcome issues of sub-task deviations and defects.

Keywords: Sub-tasks, deviations, defects, quality, construction projects.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2104
3301 Schmitt Trigger Based SRAM Using Finfet Technology- Shorted Gate Mode

Authors: Vasundara Patel K. S., Harsha N. Bhushan, Kiran G. Gadag, Nischal Prasad B. N., Mohmmed Haroon

Abstract:

The most widely used semiconductor memory types are the Dynamic Random Access Memory (DRAM) and Static Random Access memory (SRAM). Competition among memory manufacturers drives the need to decrease power consumption and reduce the probability of read failure. A technology that is relatively new and has not been explored is the FinFET technology. In this paper, a single cell Schmitt Trigger Based Static RAM using FinFET technology is proposed and analyzed. The accuracy of the result is validated by means of HSPICE simulations with 32nm FinFET technology and the results are then compared with 6T SRAM using the same technology.

Keywords: Schmitt trigger based SRAM, FinFET, and Static Noise Margin.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2806
3300 Origins of Chicago Common Brick: Examining a Masonry Shell Encasing a New Ando Museum

Authors: Daniel Joseph Whittaker

Abstract:

This paper examines the broad array of historic sites from which Chicago common brick has emerged, and the methods this brick has been utilized within and around a new hybrid structure recently completed-and periodically opened to the public, as a private art, architecture, design, and social activism gallery space. Various technical aspects regarding the structural and aesthetic reuse methods of salvaged brick within the interior and exterior of this new Tadao Ando-designed building in Lincoln Park, Chicago, are explored. This paper expands specifically upon the multiple possible origins of Chicago common brick, as well as the extant brick currently composing the surrounding alley which is integral to demarcating the southern site boundary of the old apartment building now gallery. Themes encompassing Chicago’s archeological and architectural history, local resource extraction, and labor practices permeate this paper’s investigation into urban, social and architectural history and building construction technology advancements through time.

Keywords: Masonry construction, history brickmaking, private museums, Chicago Illinois, Tadao Ando.

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 874
3299 Analysis of Causality between Defect Causes Using Association Rule Mining

Authors: Sangdeok Lee, Sangwon Han, Changtaek Hyun

Abstract:

Construction defects are major components that result in negative impacts on project performance including schedule delays and cost overruns. Since construction defects generally occur when a few associated causes combine, a thorough understanding of defect causality is required in order to more systematically prevent construction defects. To address this issue, this paper uses association rule mining (ARM) to quantify the causality between defect causes, and social network analysis (SNA) to find indirect causality among them. The suggested approach is validated with 350 defect instances from concrete works in 32 projects in Korea. The results show that the interrelationships revealed by the approach reflect the characteristics of the concrete task and the important causes that should be prevented.

Keywords: Causality, defect causes, social network analysis, association rule mining.