Operation Planning of Concrete Box Girder Bridge by 4D CAD Visualization Techniques
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 33122
Operation Planning of Concrete Box Girder Bridge by 4D CAD Visualization Techniques

Authors: Mohammad Rohani, Gholamali Shafabakhsh, Abdolhosein Haddad, Ehsan Asnaashari

Abstract:

Visual simulation has emerged as a key planning tool in built environment because it enables architects, engineers and project managers to visualize construction process evolution before the project actual commences. This provides an efficient technology for reducing time and cost through planning and controlling resources, machines and materials. With the development of infrastructure projects and the massive civil constructions such as bridges, urban tunnels and highways as well as sensitivity of their construction operations, it is very necessary to apply proper planning methods. Implementation of visual techniques into management of construction projects can provide a fundamental foundation for projects with massive activities and duplicate items. So, the purpose of this paper is to develop visual simulation management techniques for infrastructure projects such as highways bridges by the use of Four-Dimensional Computer-Aided design Models. This project simulates operational assembly-line for Box-Girder Concrete Bridges which it would be able to optimize the sequence and interaction of project activities and on the other hand, it would minimize any unintended conflicts prior to project start. In this paper, after introducing the various planning methods by building information model and concrete bridges in highways, an executive case study is demonstrated and then a visual technique (4D CAD) will be applied for the case. In the final step, the user feedback for interacting by this system evaluated according to six criteria.

Keywords: 4D application area, Box-Girder concrete bridges, CAD model, visual planning.

Digital Object Identifier (DOI): doi.org/10.5281/zenodo.1126321

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1586

References:


[1] G. O. Young, “Synthetic structure of industrial plastics (Book style with paper title and editor),” in Plastics, 2nd ed. vol. 3, J. Peters, Ed. New York: McGraw-Hill, 1964, pp. 15–64.
[2] Li, H., et al., Virtual prototyping for planning bridge construction. Automation in Construction, 2012. 27(0): p. 1-10.
[3] Guo, S., Identification and Resolution of Work Space Conflicts in Building Construction. Journal of Construction Engineering and Management, 2002. 128(4): p. 287-295.
[4] Liu, W., et al., Using BIM to Improve the Design and Construction of Bridge Projects: A Case Study of a Long-span Steel-box Arch Bridge Project. International Journal of Advanced Robotic Systems, 2014. 11(0): p. 125.
[5] Hartmann, T., J. Gao, and M. Fischer, Areas of Application for 3D and 4D Models on Construction Projects. Journal of Construction Engineering and Management, 2008. 134(10): p. 776-785.
[6] Behzadan, A.H., ARVISCOPE: Georeferenced Visualization of Dynamic Construction Processes in Three-Dimensional Outdoor Augmented Reality., in Dept. of Civil and Environmental Engineering. 2008, University of Michigan: Ann Arbor, MI.
[7] Rohani, M., M. Fan, and C. Yu, Advanced visualization and simulation techniques for modern construction management. Indoor and Built Environment, 2014. 23(5): p. 665-674.
[8] Collier, E. and M. Fischer, Four-dimensional modeling in design and construction, in CIFE Technical Report. 1995, Stanford University: Stanford.
[9] McKinney, K. and M. Fischer, Generating, evaluating and visualizing construction schedules with CAD tools. Automation in Construction, 1998. 7(6): p. 433-447.
[10] Kamat, V.R., VITASCOPE: Extensible and Scalable 3D Visualization of Simulated Construction Operations, in Dept. of Civil and Environmental Engineering. 2003, Virginia Tech.: Blacksburg, VA.
[11] Kamat, V. and J. Martinez, Visualizing Simulated Construction Operations in 3D. Journal of Computing in Civil Engineering, 2001. 15(4): p. 329-337.
[12] Kamat, V.R. and J.C. Martinez, CEPM 4: comparison of simulation-driven construction operations visualization and 4D CAD, in Proceedings of the 34th conference on Winter simulation: exploring new frontiers. 2002, Winter Simulation Conference: San Diego, California. p. 1765-1770.
[13] Akbas, R., Geometry-based modeling and simulation of construction processes, in Civil and Environmental Engineering. 2003, Stanford University: Stanford, California.
[14] Suyang, D. and V.R. Kamat. Collaborative visualization of simulated processes using tabletop fiducial augmented reality. in Simulation Conference (WSC), Proceedings of the 2011 Winter. 2011.
[15] Huang, T., et al., A virtual prototyping system for simulating construction processes. Automation in Construction, 2007. 16(5): p. 576-585.
[16] Fard, M.G., D4ar- 4 dimensional augmented reality - models or automation and interactive visualization of construction progress monitoring. 2010, University of Illinois at Urbana-Champaign. p. 217.
[17] Golparvar-Fard, M., et al., Evaluation of image-based modeling and laser scanning accuracy for emerging automated performance monitoring techniques. Automation in Construction, 2011. 20(8): p. 1143-1155.
[18] El-Omari, S. and O. Moselhi, Integrating 3D laser scanning and photogrammetry for progress measurement of construction work. Automation in Construction, 2008. 18(1): p. 1-9.
[19] Lee, K.M., et al., Bridge information models for construction of a concrete box-girder bridge. Structure and Infrastructure Engineering, 2012. 8(7): p. 687-703.
[20] Hartle, R.A. and M. Baker Jr, Bridge Inspector's Reference Manual: BIRM. 2002: US Department of Transportation, Federal Highway Administration, National Highway Institute.
[21] municipality, T. Monthly Installation of One km of Sadr Bridge Height. 2015; available from: http://en.tehran.ir/default.aspx?tabid=77&ArticleId=807.
[22] Wang, H.J., J.P. Zhang, and K.W.A. Chau, 4D dynamic management for construction planning and resource utilization. Automation in Construction, 2004. 13(5): p. 575-589.