Search results for: research projects
6329 Public-Private Partnership Transportation Projects: An Exploratory Study
Authors: Medya Fathi
Abstract:
When public transportation projects were delivered through design-bid-build and later design-build, governments found a serious issue: inadequate funding. With population growth, governments began to develop new arrangements in which the private sectors were involved to cut the financial burden. This arrangement, Public-Private Partnership (PPP), has its own risks; however, performance outputs can motivate or discourage its use. On top of such output are time and budget, which can be affected by the type of project delivery methods. Project completion within or ahead of schedule as well as within or under budget is among any owner’s objectives. With a higher application of PPP in the highway industry in the US and insufficient research, the current study addresses the schedule and cost performance of PPP highway projects and determines which one outperforms the other. To meet this objective, after collecting performance data of all PPP projects, schedule growth and cost growth are calculated, and finally, statistical analysis is conducted to evaluate the PPP performance. The results show that PPP highway projects on average have saved time and cost; however, the main benefit is a faster delivery rather than an under-budget completion. This study can provide better insights to understand PPP highways’ performance and assist practitioners in applying PPP for transportation projects with the opportunity to save time and cost.
Keywords: Cost, delivery method, highway, public-private partnership, schedule, transportation.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 4746328 Causes of Construction Delays in Qatar Construction Projects
Authors: Murat Gunduz, Mohanad H. A. AbuHassan
Abstract:
Construction industry mainly focuses on the superstructure, infrastructure, and oil and gas industry. The development of infrastructure projects in developing countries attracted a lot of foreign construction contractors, consultants, suppliers and diversified workforce to interfere and to be evolved in such huge investment. Reducing worksite delays in such projects require knowledge and attention. Therefore, it is important to identify the influencing delay attributes affecting construction projects. The significant project factors affecting construction delays were investigated. Data collection was carried out through an online web survey system to capture significant factors. Significant factors were determined with importance index and relevant recommendations are made. The output of the data analysis would lead the industry experts better assess the impact of construction delays on construction projects.
Keywords: Construction industry, delays, importance index.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 26736327 Towards a Systematic Planning of Standardization Projects in Plant Engineering
Authors: M. Amberg, M. Gepp, S. Horn
Abstract:
In today-s economy plant engineering faces many challenges. For instance the intensifying competition in this business is leading to cost competition and needs for a shorter time-to-market. To remain competitive companies need to make their businesses more profitable by implementing improvement programs such as standardization projects. But they have difficulties to tap their full economic potential for various reasons. One of them is non-holistic planning and implementation of standardization projects. This paper describes a new conceptual framework - the layer-model. The model combines and expands existing proven approaches in order to improve design, implementation and management of standardization projects. Based on a holistic approach it helps to systematically analyze the effects of standardization projects on different business layers and enables companies to better seize the opportunities offered by standardization.Keywords: layer model, plant engineering, standardization.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 16076326 Strategic Leadership and Sustainable Project Management in Enugu, Nigeria
Authors: Nnadi Ezekiel Ejiofor
Abstract:
The study investigates the connection between strategic leadership and project management sustainability, with an emphasis on building projects Nigeria. The study set out to accomplish two specific goals: first, it sought to establish a link between creative project management and resource efficiency in construction projects in Nigeria; and second, it sought to establish a link between innovative thinking and waste minimization in those same projects. A structured questionnaire was used to collect primary data from 45 registered construction enterprises in the study area as part of the study's descriptive research approach. Due to the nonparametric nature of the data, Spearman Rank Order Correlation was used to evaluate the acquired data. The findings demonstrate that creative project management had a significant positive impact on resource efficiency in construction projects carried out by project management firms (r =.849; p.001), and that innovative thinking had a significant impact on waste reduction in those same projects (r =.849; p.001). It was determined that strategic leadership had a significant impact on the sustainability of project management, and it was thus advised that project managers should foresee, prepare for, and effectively communicate present and future developments to project staff in order to ensure that the objective of sustainable initiatives, such as recycling and reuse, is implemented in construction projects.
Keywords: Construction, project management, strategic leadership, sustainability, waste reduction.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1156325 Project Management in Student Satellite Projects: A University – Industry Collaboration View
Authors: Muhammad Fiaz, Naqvi Najam Abbas, Baseerat Rizwan, Yang Naiding
Abstract:
This research contribution propels the idea of collaborating environment for the execution of student satellite projects in the backdrop of project management principles. The recent past has witnessed a technological shift in the aerospace industry from the big satellite projects to the small spacecrafts especially for the earth observation and communication purposes. This vibrant shift has vitalized the academia and industry to share their resources and to create a win-win paradigm of mutual success and technological development along with the human resource development in the field of aerospace. Small student satellites are the latest jargon of academia and more than 100 CUBESAT projects have been executed successfully all over the globe and many new student satellite projects are in the development phase. The small satellite project management requires the application of specific knowledge, skills, tools and techniques to achieve the defined mission requirements. The Authors have presented the detailed outline for the project management of student satellites and presented the role of industry to collaborate with the academia to get the optimized results in academic environment.
Keywords: Project Management, Academia-Industry Collaboration, Satellite, Aerospace
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 26216324 Digital Transformation in Developing Countries: A Study into BIM Adoption in Thai Design and Engineering SMEs
Authors: Prompt Udomdech, Eleni Papadonikolaki, Andrew Davies
Abstract:
Building Information Modelling (BIM) is the major technological trend among built environment organisations. Digitalising businesses and operations, BIM brings forth a digital transformation in any built environment industry. The adoption of BIM presents challenges for organisations, especially Small- and Medium-sized Enterprises (SMEs). The main problem for built environment SMEs is the lack of project actors with adequate BIM competences. The research highlights learning in projects as the key and explores into the learning of BIM in projects of designers and engineers within Thai design and engineering SMEs. The study uncovers three impeding attributes which are: a) lack of English proficiency; b) unfamiliarity with digital technologies; and c) absence of public standards. This research expands on the literature of BIM competences and adoption.
Keywords: BIM competences and adoption, digital transformation, learning in projects, SMEs, and developing built environment industry.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 9976323 Information and Communication Technologies in Collaboration Projects via the Internet
Authors: Murat Öztok, Nesrin Özdener
Abstract:
The aim of this study is to determine the basic information and communication technology (ICT) skills that may be needed by students studying in the 8th grade of the primary education in their cooperative project works implemented via the Internet. Within the scope of the study, the curriculum used for European Computer Driving License (ECDL) and the curriculum used in Turkey are also compared in terms of the ability to use ICT, which is aimed to be provided to the students. The research population of the study, during which the pre test – post test control group experimental model was used, consisted of 40 students from three different schools. In the first stage of the study, the skills that might be needed by students for their cooperative project works implemented via the Internet were determined through examination of the completed Comenious, e – twinning and WorldLinks projects. In the second stage of the study, the curriculums of the Turkish Ministry of National Education (MEB) and ECDL were evaluated by seven different teachers in line with these skills. Also in this study the ECDL and MEB curriculums were compared in terms of capability to provide the skills to implement cooperative projects via the Internet. In line with the findings of the study, the skills that might be needed by students to implement cooperative projects via the Internet were outlined, and existence of a significant difference was established in favor of the ECDL curriculum upon comparison of both curriculums in accordance with this outline (U = 50,500; p <0,05). The findings of the study also suggested that the students had considerable deficiencies in implementation of cooperative projects via the Internet without the ICT infrastructure.
Keywords: Collaboration Projects, Comenius, Curriculum, ICT.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 16606322 A Taxonomy Proposal on Criterion Structure for Evaluating Freight Village Concepts in Early-Stage Design Projects
Authors: Rıza Gürhan Korkut, Metin Çelik, Süleyman Özkaynak
Abstract:
The early-stage design and development projects for the freight village initiatives require a comprehensive analysis of both qualitative and quantitative data. Considering the literature review on structural and operational management requirements, this study proposed an original taxonomy on criterion structure to assess freight village conceptualization. The potential challenges and uncertainties of the developed taxonomy are extended. Besides requirement analysis, this study is also expected to contribute to forthcoming research on benchmarking of freight villages in different regions. The methodology used in this research is a systematic review on several articles as per their modelling approaches, sustainability, entities and decisions made together with the uncertainties and features of their models taken into consideration. The major findings of the study that are the categories for assessing the projects attributes on their environmental, socio-economical, accessibility and location aspects.Keywords: Freight village, logistics centers, operational management, taxonomy.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 8306321 The Cost of Innovation in Software Development Projects
Authors: Mihai Liviu Despa
Abstract:
The paper tackles the topic of determining the cost of innovation in software development projects. Innovation can be achieved either in a planned or unplanned manner. The paper approaches the scenarios were innovation is planned for. As a starting point an innovative software development project is analyzed. The project is depicted step by step as it was implemented, from inception to delivery. Costs that are proprietary to innovation in software development are isolated based on the author’s personal experience in managing the above mentioned project. Innovation costs components identified by the author are then validated using open discussions with software development professionals and projects managers on LinkedIn groups. In order to receive relevant feedback only groups that focus on software development and innovation management are targeted. Additional innovation cost components suggested by software development professionals and projects managers are also considered. Based on the identified cost components an indicator is built. The indicator is meant to formalize the process of determining the cost of innovation in a software development project. The indicator aggregates all the innovation cost components that are identified in the research process. The process of calculating each cost component is also described. Conclusions are formulated and new related research topics are submitted for debate.
Keywords: Innovation cost, IT project management, software development.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 20716320 Template Design Packages for Repetitive Construction Projects
Authors: Ali Youniss Aidbaiss, G. Unnikrishnan, Anoob Hakim
Abstract:
Scope changes, scope creeps, cost and time overruns have become common in projects in the oil and gas sector. Even in repetitive projects, failure to implement lessons learnt and correct past mistakes have resulted in various setbacks. This paper describes the concept of reusing successfully implemented design packages as templates for repetitive projects, and thereby lowering the instances of project failures. Units or systems successfully installed in projects can be identified and taken up for preparing template design packages. Standardization of units and systems helps to develop templates from successful designs which can be repeatedly used with confidence. These packages can be used with minimum modifications for developing FEED packages faster, saving cost and other valuable resources. Lessons learnt from the completed project incorporated in the templates avoid repeating past mistakes during detailed design, procurement and execution. With template packages, consistent quality can be maintained for similar projects, avoiding scope creep and scope changes which will ultimately result in cost and time savings.
Keywords: Engineering work package, repetitive construction, template design package, time saving in projects.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 13326319 Investigating the Effect of Refinancing on Financial Behavior of Energy Efficiency Projects
Authors: Zohreh Soltani, Seyedmohammadhossein Hosseinian
Abstract:
Reduction of energy consumption in built infrastructure, through the installation of energy-efficient technologies, is a major approach to achieving sustainability. In practice, the viability of energy efficiency projects strongly depends on the cost reimbursement and profitability. These projects are subject to failure if the actual cost savings do not reimburse the project cost promptly. In such cases, refinancing could be a solution to benefit from the long-term returns of the project, if implemented wisely. However, very little is still known about the effect of refinancing options on financial performance of energy efficiency projects. In order to fill this gap, the present study investigates the financial behavior of energy efficiency projects with focus on refinancing options, such as Leveraged Loans. A System Dynamics (SD) model is introduced, and the model application is presented using an actual case-study data. The case study results indicate that while high-interest start-ups make using Leveraged Loan inevitable, refinancing can rescue the project and bring about profitability. This paper also presents some managerial implications of refinancing energy efficiency projects based on the case-study analysis. Results of this study help to implement financially viable energy efficiency projects so that the community could benefit from their environmental advantages widely.Keywords: Energy efficiency projects, leveraged loan, refinancing, sustainability.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 12196318 Public-Private Partnership Projects in Canada: A Case Study Approach
Authors: Samuel Carpintero
Abstract:
Public-private partnerships (PPP) arrangements have been extensively used in Canada, where the participation of private companies in financing and managing infrastructure projects has increased significantly in the last decade, particularly in the transportation sector. This paper analyses the evolution of the PPP market for transportation projects in Canada and examines the participation of Spanish developers in this market, which have been particularly successful in winning PPP contracts during the last decade.Keywords: PPP, concession, infrastructure, construction.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 26436317 Challenges and Proposed Solutions toward Successful Dealing with E-Waste in Kuwait
Authors: Salem Alajmi, Bader Altaweel
Abstract:
Kuwait, like many parts of the world, has started facing the dangerous growth of electrical and electronic waste. This growth has been noted in last two decades, emerging with the development of mobile phones, computers, TVs, as well as other electronic devices and electrical equipment. Kuwait is already among the highest global producers of electronic waste (e-waste) in kg per capita. Furthermore, Kuwait is among the global countries that set high-level future targets in renewable energy projects. Accumulation of this electronic waste, as well as accelerated renewable energy projects, will lead to the increase of future threats to the country. In this research, factors that lead to the increase the e-waste in Kuwait are presented. Also, the current situations of dealing with e-waste in the country as well as the associated challenges are examined. The impact of renewable energy projects on future e-waste accumulation is considered. Moreover, this research proposes the best strategies and practices toward successfully dealing with the waste of electronic devices and renewable energy technologies.
Keywords: E-waste, landfill, environmental management, valuable metals, hazardous materials.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 15866316 Key Issues in Transfer Stage of BOT Project: Experience from China
Authors: Wang Liguang, Zhang Xueqing
Abstract:
The build-operate-transfer (BOT) project delivery system has provided effective routes to mobilize private sector funds, innovative technologies, management skills and operational efficiencies for public infrastructure development and have been widely used in China during the last 20 years. Many BOT projects in China will be smoothly transferred to the government soon and the transfer stage, which is considered as the last stage, must be studied carefully and handled well to achieve the overall success of BOT projects. There will be many issues faced by both the public sector and private sector in the transfer stage of BOT projects, including project post-assessment, technology and documents transfer, personal training and staff transition, etc. and sometimes additional legislation is needed for future operation and management of facilities. However, most previous studies focused on the bidding, financing, and building and operation stages instead of transfer stage. This research identifies nine key issues in the transfer stage of BOT projects through a comprehensive study on three cases in China, and the expert interview and expert discussion meetings are held to validate the key issues and give detail analysis. A proposed framework of transfer management is prepared based on the experiences derived and lessons drawn from the case studies and expert interview and discussions, which is expected to improve the transfer management of BOT projects in practice.
Keywords: BOT project, key issues, transfer management transfer stage.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 10546315 Risk Evaluation of Information Technology Projects Based on Fuzzy Analytic Hierarchal Process
Authors: H. Iranmanesh, S. Nazari Shirkouhi, M. R. Skandari
Abstract:
Information Technology (IT) projects are always accompanied by various risks and because of high rate of failure in such projects, managing risks in order to neutralize or at least decrease their effects on the success of the project is strongly essential. In this paper, fuzzy analytical hierarchy process (FAHP) is exploited as a means of risk evaluation methodology to prioritize and organize risk factors faced in IT projects. A real case of IT projects, a project of design and implementation of an integrated information system in a vehicle producing company in Iran is studied. Related risk factors are identified and then expert qualitative judgments about these factors are acquired. Translating these judgments to fuzzy numbers and using them as an input to FAHP, risk factors are then ranked and prioritized by FAHP in order to make project managers aware of more important risks and enable them to adopt suitable measures to deal with these highly devastative risks.Keywords: Information technology projects, Risk evaluation, Analytic hierarchal process, fuzzy logic.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 19426314 Strategic Investment in Infrastructure Development to Facilitate Economic Growth in the United States
Authors: Arkaprabha Bhattacharyya, Makarand Hastak
Abstract:
The COVID-19 pandemic is unprecedented in terms of its global reach and economic impacts. Historically, investment in infrastructure development projects has been touted to boost the economic growth of a nation. The State and Local governments responsible for delivering infrastructure assets work under tight budgets. Therefore, it is important to understand which infrastructure projects have the highest potential of boosting economic growth in the post-pandemic era. This paper presents relationships between infrastructure projects and economic growth. Statistical relationships between investment in different types of infrastructure projects (transit, water and wastewater, highways, power, manufacturing etc.) and indicators of economic growth are presented using historic data between 2002 and 2020 from the U.S. Census Bureau and U.S. Bureau of Economic Analysis (BEA). The outcome of the paper is the comparison of statistical correlations between investment in different types of infrastructure projects and indicators of economic growth. The comparison of the statistical correlations is useful in ranking the types of infrastructure projects based on their ability to influence economic prosperity. Therefore, investment in the infrastructures with the higher rank will have a better chance of boosting the economic growth. Once, the ranks are derived, they can be used by the decision-makers in infrastructure investment related decision-making process.
Keywords: Economic growth, infrastructure development, infrastructure projects, strategic investment.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 6766313 Managing a Cross-Disciplinary Research Project in a University: The Case of LEARNIT
Authors: Yulia Stukalina
Abstract:
This paper explores the main issues related to implementing a cross-disciplinary research project (LEARNIT) based on collaboration between universities from three European countries. The paper discusses the importance of using the holistic approach to managing scientific projects with due account for the complicated nature of the educational environment of a modern university. To illustrate this approach, the author describes some actions to be taken for supporting different focus areas of LEARNIT project, in the process using integrated tangible, non-tangible, and semi-tangible resources of the partner university. The methodology of the paper is based on the academic literature and research papers analysis within management discipline. The analysis reported in the paper is also based on the author’s professional experience in the area of managing international research projects in a university.
Keywords: LEARNIT, focus area, project management, resources.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 14176312 Benefits of Construction Management Implications and Processes by Projects Managers on Project Completion
Authors: Mamoon Mousa Atout
Abstract:
Projects managers in construction industry usually face a difficult organizational environment especially if the project is unique. The organization lacks the processes to practice construction management correctly, and the executive’s technical managers who have lack of experience in playing their role and responsibilities correctly. Project managers need to adopt best practices that allow them to do things effectively to make sure that the project can be delivered without any delay even though the executive’s technical managers should follow a certain process to avoid any factor might cause any delay during the project life cycle. The purpose of the paper is to examine the awareness level of projects managers about construction management processes, tools, techniques and implications to complete projects on time. The outcome and the results of the study are prepared based on the designed questionnaires and interviews conducted with many project managers. The method used in this paper is a quantitative study. A survey with a sample of 100 respondents was prepared and distributed in a construction company in Dubai, which includes nine questions to examine the level of their awareness. This research will also identify the necessary benefits of processes of construction management that has to be adopted by projects managers to mitigate the maximum potential problems which might cause any delay to the project life cycle.
Keywords: Construction Methodology, Design Process, Project Managers, Scheduling and Resource Planning.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 20866311 A Survey of Key Challenges of Adopting Agile in Global Software Development: A Case Study with Malaysia Perspective
Authors: Amna Batool
Abstract:
Agile methodology is the current most popular technique in software development projects. Agile methods in software development bring optimistic impact on software performances, quality and customer satisfaction. There are some organizations and small-medium enterprises adopting agile into their local software development projects as well as in distributed software development projects. Adopting agile methods in local software development projects is valuable. However, agile global software deployment needs an attention. There are different key challenges in agile global software development that need to resolve and enhance the global software development cycles. The proposed systematic literature review investigates all key challenges of agile in global software development. Moreover, a quantitative methodology (an actual survey) targeted to present a real case scenario of these particular key challenges faced by one of the software houses that is BestWeb Malaysia. The outcomes of systematic literature and the results of quantitative methodology are compared with each other to evaluate if the key challenges pointed out in systematic review still exist. The proposed research and its exploratory results can assist small medium enterprises to avoid these challenges by adopting the best practices in their global software development projects. Moreover, it is helpful for novice researchers to get valuable information altogether.Keywords: Agile software development, ASD challenges, agile global software development. challenges in agile global software development.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 9536310 Core Issues Affecting Software Architecture in Enterprise Projects
Authors: Halûk Gümüşkaya
Abstract:
In this paper we analyze the core issues affecting software architecture in enterprise projects where a large number of people at different backgrounds are involved and complex business, management and technical problems exist. We first give general features of typical enterprise projects and then present foundations of software architectures. The detailed analysis of core issues affecting software architecture in software development phases is given. We focus on three main areas in each development phase: people, process, and management related issues, structural (product) issues, and technology related issues. After we point out core issues and problems in these main areas, we give recommendations for designing good architecture. We observed these core issues and the importance of following the best software development practices and also developed some novel practices in many big enterprise commercial and military projects in about 10 years of experience.Keywords: Software architecture, enterprise projects.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 36066309 A Model for Managing Intellectual Property, Commercialisation and Technology Transfer within a Collaborative Research Environment
Authors: J. F. Arthur, R. M. Hodge
Abstract:
The Defence Materials Technology Centre has evolved from the Australian Cooperative Research Centres Program. The Centre receives funding from Government, industry and research sources to fund collaborative research within its participant organisations. The research centre is structured as a company with a small administrative staff and plays the role of the “honest broker” within the collaboration. A corporate culture has been established that is pervasive into the research projects are undertaken. The model is an effective mechanism to deliver outcomes to each of the participant stakeholders.
Keywords: Collaboration, Research Centre.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 16856308 Evaluation of an Offshore Wind Power Project: Economic, Strategic and Environmental Value
Authors: Paula Ferreira, Filipa Vieira
Abstract:
The use of wind energy for electricity generation is growing rapidly across the world and in Portugal. However, the geographical characteristics of the country along with the average wind regime and with the environmental restrictions imposed to these projects create limitations to the exploit of the onshore wind resource. The best onshore wind spots are already committed and the possibility of offshore wind farms in the Portuguese cost is now being considered. This paper aims to make a contribution to the evaluation of offshore wind power projects in Portugal. The technical restrictions are addressed and the strategic, environmental and financial interest of the project is analysed from the private company and public points of view. The results suggest that additional support schemes are required to ensure private investors interest for these projects. Assuming an approach of direct substitution of energy sources for electricity generation, the avoided CO2 equivalent emissions for an offshore wind power project were quantified. Based on the conclusions, future research is proposed to address the environmental and social impacts of these projects.Keywords: Feed-in tariff, offshore wind power, project evaluation.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 19566307 Impact of Safety and Quality Considerations of Housing Clients on the Construction Firms’ Intention to Adopt Quality Function Deployment: A Case of Construction Sector
Authors: Saif Ul Haq
Abstract:
The current study intends to examine the safety and quality considerations of clients of housing projects and their impact on the adoption of Quality Function Deployment (QFD) by the construction firm. Mixed method research technique has been used to collect and analyze the data wherein a survey was conducted to collect the data from 220 clients of housing projects in Saudi Arabia. Then, the telephonic and Skype interviews were conducted to collect data of 15 professionals working in the top ten real estate companies of Saudi Arabia. Data were analyzed by using partial least square (PLS) and thematic analysis techniques. Findings reveal that today’s customer prioritizes the safety and quality requirements of their houses and as a result, construction firms adopt QFD to address the needs of customers. The findings are of great importance for the clients of housing projects as well as for the construction firms as they could apply QFD in housing projects to address the safety and quality concerns of their clients.Keywords: Construction industry, quality considerations, quality function deployment, safety considerations.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 9026306 European Union Funds at Public Universities in the Czech Republic – Example of Promoting Human Resources for New Research Infrastructure
Authors: Jan Sedlacek
Abstract:
The paper focuses on the implementation phase of the strategy of the European Union and the national strategy of the Czech Republic to promote academic and research staff with the potential to produce results that provide innovation useful for economic growth. It deals with the use of financial resources of the Operational Program Education for Competitiveness at the University of West Bohemia in Pilsen. The author presents an example of two strategic projects in the field of human resources – Excellence in Human Resources as a Source of Competitiveness and New Excellence of Human Resources. The subject of this paper is the potential contribution of newly recruited postdoctoral within these projects for the University of West Bohemia in Pilsen and its internal environment.Keywords: EU funds, public universities, human resources, results of research, funding.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 15726305 Daily Site Risks Associated with Construction Projects and On-spot Corrective Measurements: Case Study of Revamping Projects in Kuwait Oil Company Fields Area
Authors: Yousef S. Al-Othman
Abstract:
The growth and expansion of the industrial facilities comes proportional to the market increasing demand of products and services. Furthermore, raw material producers such as oil companies usually undergo massive revamping projects to maintain a synchronized supply. These revamping projects are usually delivered through challenging construction projects held and associated with daily site risks related to the construction process. Henceforth, a case study related to these risks and corresponding on-spot corrective measurements has been made on a certain number of construction project contractors at Kuwait Oil Company (KOC) to derive the benefits and overall effectiveness of the on-spot corrective measurements during the construction phase of a project, and how would the same help in avoiding major incidents, ensuring a smooth, cost effective and on time delivery of the project. Findings of this case study shall have an added value to the overall risk management process by minimizing the daily site risks that may affect the project lead time, resulting in an undisturbed on-site construction process.
Keywords: Oil and gas, risk management, construction projects, project lead time.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 8936304 Identification of Social Responsibility Factors within Mega Construction Projects
Authors: Ali Alotaibi, Francis Edum-Fotwe, Andrew Price /
Abstract:
Mega construction projects create buildings and major infrastructure to respond to work and life requirements while playing a vital role in promoting any nation’s economy. However, the industry is often criticised for not balancing economic, environmental and social dimensions of their projects, with emphasis typically on one aspect to the detriment of the others. This has resulted in many negative impacts including environmental pollution, waste throughout the project lifecycle, low productivity, and avoidable accidents. The identification of comprehensive Social Responsibility (SR) indicators, which combine social, environmental and economic aspects, is urgently needed. This is particularly the case in the context of the Kingdom of Saudi Arabia (KSA), which often has mega public construction projects. The aim of this paper is to develop a set of wide-ranging SR indicators which encompass social, economic and environmental aspects unique to the KSA. A qualitative approach was applied to explore relevant indicators through a review of the existing literature, international standards and reports. A list of appropriate indicators was developed, and its comprehensiveness was corroborated by interviews with experts on mega construction projects working with SR concepts in the KSA. The findings present 39 indicators and their metrics, covering 10 economic, 12 environmental and 17 social aspects of SR mapped against their references. These indicators are a valuable reference for decision-makers and academics in the KSA to understand factors related to SR in mega construction projects. The indicators are related to mega construction projects within the KSA and require validation in a real case scenario or within a different industry to demonstrate their generalisability.
Keywords: Social responsibility, construction projects, economic, social, environmental, indicators.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 18526303 Minimizing Risk Costs through Optimal Responses in NPD Projects
Authors: Chan-Sik Kim, Jong-Seong Kim, Se Won Lee, Hoo-Gon Choi
Abstract:
In rapidly changing market environment, firms are investing a lot of time and resources into new product development (NPD) projects to make profit and to obtain competitive advantage. However, failure rate of NPD projects is becoming high due to various internal and external risks which hinder successful NPD projects. To reduce the failure rate, it is critical that risks have to be managed effectively and efficiently through good strategy, and treated by optimal responses to minimize risk cost. Four strategies are adopted to handle the risks in this study. The optimal responses are characterized by high reduction of risk costs with high efficiency. This study suggests a framework to decide the optimal responses considering the core risks, risk costs, response efficiency and response costs for successful NPD projects. Both binary particles warm optimization (BPSO) and multi-objective particle swarm optimization (MOPSO) methods are mainly used in the framework. Although several limitations exist in use for real industries, the frame work shows good strength for handling the risks with highly scientific ways through an example.
Keywords: NPD projects, risk cost, strategy, optimal responses, Particle Swarm Optimization.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 19586302 Effectiveness of Business Software Systems Development and Enhancement Projects versus Work Effort Estimation Methods
Authors: Beata Czarnacka-Chrobot
Abstract:
Execution of Business Software Systems (BSS) Development and Enhancement Projects (D&EP) is characterized by the exceptionally low effectiveness, leading to considerable financial losses. The general reason for low effectiveness of such projects is that they are inappropriately managed. One of the factors of proper BSS D&EP management is suitable (reliable and objective) method of project work effort estimation since this is what determines correct estimation of its major attributes: project cost and duration. BSS D&EP is usually considered to be accomplished effectively if product of a planned functionality is delivered without cost and time overrun. The goal of this paper is to prove that choosing approach to the BSS D&EP work effort estimation has a considerable influence on the effectiveness of such projects execution.
Keywords: Business software systems, development and enhancement projects, effectiveness, work effort estimation methods, software product size, software product functionality, project duration, project cost.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 20846301 Techniques of Construction Management in Civil Engineering
Authors: Mamoon M. Atout
Abstract:
The Middle East Gulf region has witnessed rapid growth and development in many areas over the last two decades. The development of the real-estate sector, construction industry and infrastructure projects are a major share of the development that has participated in the civilization of the countries of the Gulf. Construction industry projects were planned and managed by different types of experts, who came from all over the world having different types of experiences in construction management and industry. Some of these projects were completed on time, while many were not, due to many accumulating factors. Many accumulated factors are considered as the principle reason for the problem experienced at the project construction stage, which reflected negatively on the project success. Specific causes of delay have been identified by construction managers to avoid any unexpected delays through proper analysis and considerations to some implications such as risk assessment and analysis for many potential problems to ensure that projects will be delivered on time. Construction management implications were adopted and considered by project managers who have experience and knowledge in applying the techniques of the system of engineering construction management. The aim of this research is to determine the benefits of the implications of construction management by the construction team and level of considerations of the techniques and processes during the project development and construction phases to avoid any delay in the projects. It also aims to determine the factors that participate to project completion delays in case project managers are not well committed to their roles and responsibilities. The results of the analysis will determine the necessity of the applications required by the project team to avoid the causes of delays that help them deliver projects on time, e.g. verifying tender documents, quantities and preparing the construction method of the project.
Keywords: Construction management, control process, cost control, planning and scheduling, roles and responsibilities.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 14296300 Knowledge Acquisition and Client Organisations: Case Study of a Student as Producer
Authors: Barry Ardley, Abi Hunt, Nick Taylor
Abstract:
As a theoretical and practical framework this study uses the student as producer approach to learning in higher education, as adopted by the Lincoln International Business School, University of Lincoln, UK. Student as producer positions learners as skilled and capable agents, able to participate as partners with tutors in live research projects. To illuminate the nature of this approach to learning and to highlight its critical issues, the authors report on two guided student consultancy projects. These were set up with the assistance of two local organisations in the city of Lincoln UK. Using the student as producer model to deliver the projects enabled learners to acquire and develop a range of key skills and knowledge, not easily accessible in more traditional educational settings. This paper presents a systematic case study analysis of the eight organising principles of the student as producer model, as adopted by university tutors. The experience of tutors implementing student as producer suggests that the model can be widely applied to benefit not only the learning and teaching experiences of higher education students, and staff, but additionally, a university’s research programme and its community partners.
Keywords: Experiential learning, consultancy clients, student as producer.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 246