Towards a Systematic Planning of Standardization Projects in Plant Engineering
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 33126
Towards a Systematic Planning of Standardization Projects in Plant Engineering

Authors: M. Amberg, M. Gepp, S. Horn

Abstract:

In today-s economy plant engineering faces many challenges. For instance the intensifying competition in this business is leading to cost competition and needs for a shorter time-to-market. To remain competitive companies need to make their businesses more profitable by implementing improvement programs such as standardization projects. But they have difficulties to tap their full economic potential for various reasons. One of them is non-holistic planning and implementation of standardization projects. This paper describes a new conceptual framework - the layer-model. The model combines and expands existing proven approaches in order to improve design, implementation and management of standardization projects. Based on a holistic approach it helps to systematically analyze the effects of standardization projects on different business layers and enables companies to better seize the opportunities offered by standardization.

Keywords: layer model, plant engineering, standardization.

Digital Object Identifier (DOI): doi.org/10.5281/zenodo.1083423

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1615

References:


[1] Large Industrial Plant Manufacturer-s Group VDMA, "Large industrial plant manufacturing - Industry concerned about the future," Status Report 2009/2010, Frankfurt: VDMA, March 2010.
[2] K. Gottwald, "The chinese large industrial plant manufacturing", Whitepaper (in german), Frankfurt, March 2008.
[3] M. Ranjan, "EPC - A better approach," Chemical Engineering World, vol. 44, no. 4, July 2009.
[4] D. Baccarini, "The concept of project complexity - a review," Int. Journal of Project Management, vol. 14, no. 4, pp. 201-201, 1996.
[5] N. Jazdi, C. Maga, Th. Eben, "Improved systematisation in plant engineering and industrial solution business - increased efficiency through domain engineering," at - Automatisierungstechnik, vol. 58, no. 8, pp. 524-532, 2010.
[6] M. Amberg, M. Gepp, S. Horn "A model-based approach for systematization of standardization," in Proc. ICBM 2012 Conf., 2012, to be published.
[7] I. Albrecht, Standardization of projects (Book style, in german). Lichtenberg: Harland media, 2006, pp. 82-118.
[8] L. Rocha-Lona, J. Garza-Reyes, "Developing a Business based on the EFQM model," in 19th International Conference on Flexible Automation and Intelligent Manufacturing, School of Science & Technology, University of Teesside, Middlesbrough, 6 - 8 July 2009.
[9] Balvir Talwar, "Comparative study of framework, criteria and criterion weighting of excellence models," Measuring Business Excellence, vol. 15, no. 1, pp. 49 - 65, 2011.
[10] E. Westerveld, "The project excellence model: linking success criteria and critical success factors," International Journal of Project Management, vol. 21, no. 6, pp. 411-418, 2003.
[11] JR Turner, The handbook of project based management (Book style). 2nd ed., Maidenblad: McGraw Hill, 1997.
[12] M. Amberg, M. Gepp, S. Horn, "Model-based approach for holistic implementation of PLM systems," User forum: Implementation of PLM solutions, GfSE - German Chapter of INCOSE, Hamburg, September 30th 2011.
[13] U. Epple, A. Schueller, "PRO+ Layer Model," Working paper, unpublished.
[14] J. Wateridge, "How can IS/IT projects be measured for success," International Journal of Project Management, vol. 16, no. 1, pp 59-63, 1998.