Techniques of Construction Management in Civil Engineering

Authors: Mamoon M. Atout

Abstract:

The Middle East Gulf region has witnessed rapid growth and development in many areas over the last two decades. The development of the real-estate sector, construction industry and infrastructure projects are a major share of the development that has participated in the civilization of the countries of the Gulf. Construction industry projects were planned and managed by different types of experts, who came from all over the world having different types of experiences in construction management and industry. Some of these projects were completed on time, while many were not, due to many accumulating factors. Many accumulated factors are considered as the principle reason for the problem experienced at the project construction stage, which reflected negatively on the project success. Specific causes of delay have been identified by construction managers to avoid any unexpected delays through proper analysis and considerations to some implications such as risk assessment and analysis for many potential problems to ensure that projects will be delivered on time. Construction management implications were adopted and considered by project managers who have experience and knowledge in applying the techniques of the system of engineering construction management. The aim of this research is to determine the benefits of the implications of construction management by the construction team and level of considerations of the techniques and processes during the project development and construction phases to avoid any delay in the projects. It also aims to determine the factors that participate to project completion delays in case project managers are not well committed to their roles and responsibilities. The results of the analysis will determine the necessity of the applications required by the project team to avoid the causes of delays that help them deliver projects on time, e.g. verifying tender documents, quantities and preparing the construction method of the project.

Keywords: Construction management, control process, cost control, planning and scheduling, roles and responsibilities.

Digital Object Identifier (DOI): doi.org/10.5281/zenodo.1127531

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 1426

References:


[1] Bon, R and Crosthwaite, D. (2000): The Future of international construction. Thomas Telford, London, UK.
[2] Mohammed A.H. and S.A “Causes of Delay in Large Building Construction Project” Journal of Construction Engineering & Management Vol. 2, Issue No.11, Page 45-62 1995.
[3] Alan C. Twort and J. Gordon (2004): Civil Engineering Project Management. Construction management, P25 4thed, Elsevier Butterworth-Heinemann, Jordan Hill, Oxford OX2 8DP.
[4] Matt Steven, (2012): The Construction MBA: Practical Approaches to Construction Contracting, Chapter 1, McGraw-Hill, USA.
[5] Richard F. and David L, (1993): Construction Management in Practice: Communications, P.144, Chapter 7, 5th ed. Longman Scientific & Technical, UK.
[6] Ajibade A. and Henry A. “Construction Delays and their Causative Factors in Nigeria” Journal of Construction Engineering and Project Management Vol. 132, No.07, Page 667-685, 2006.
[7] Sidney M. Levy, (2012): Project Management in Construction: Organizing Project Team, P.111 Chapter 6, 6th ed. McGraw-Hill, USA
[8] Hensey M.” Essential Tools of Total Quality Management” Journal of Construction Engineering & Management Vol. 9 Issue 4 Page 329-339. 199.
[9] Ankrah, N A and Proverbs, D (2004) Treading the softer areas of CM: critical review of culture. In: Khosrowshahi, F (Ed.) ''20th Annual ARCOM Conference'', 1-3 September 2004, Herriot Watt University. Association of Researchers in Construction Management, Vol. 1, 551-8.
[10] Danial W. and Bolivar A.(2011): Structure of the Construction Industry: Construction Management Resources Driven, P 14, Chapter 1, 4th ed. Published by E1 Sevier Ltd, U.K, 2005.
[11] Naief M., “A Comparative Evaluation of Construction and Manufacturing Material Management” International PhD Journal of project management Vol. 20, Page 263-267, 2002.
[12] John S. (2009): Construction Business Management: Risk Management: P.34, Chapter 3, 1st ed., Pearson Education, Inc, Upper Saddle River, New Jersey, 07458.