Daily Site Risks Associated with Construction Projects and On-spot Corrective Measurements: Case Study of Revamping Projects in Kuwait Oil Company Fields Area
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 33104
Daily Site Risks Associated with Construction Projects and On-spot Corrective Measurements: Case Study of Revamping Projects in Kuwait Oil Company Fields Area

Authors: Yousef S. Al-Othman

Abstract:

The growth and expansion of the industrial facilities comes proportional to the market increasing demand of products and services. Furthermore, raw material producers such as oil companies usually undergo massive revamping projects to maintain a synchronized supply. These revamping projects are usually delivered through challenging construction projects held and associated with daily site risks related to the construction process. Henceforth, a case study related to these risks and corresponding on-spot corrective measurements has been made on a certain number of construction project contractors at Kuwait Oil Company (KOC) to derive the benefits and overall effectiveness of the on-spot corrective measurements during the construction phase of a project, and how would the same help in avoiding major incidents, ensuring a smooth, cost effective and on time delivery of the project. Findings of this case study shall have an added value to the overall risk management process by minimizing the daily site risks that may affect the project lead time, resulting in an undisturbed on-site construction process.

Keywords: Oil and gas, risk management, construction projects, project lead time.

Digital Object Identifier (DOI): doi.org/10.5281/zenodo.3669250

Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 893

References:


[1] ‘’Managing project risk using combined analytic hierarchy process and risk map” Prasanta Kumar Dey Aston Triangle, Birmingham, West Midlands B47ET, United Kingdom, March 2010. www.elsevier.com/locate/asoc
[2] Veronika, Alin, Riantini, Leni S., & Trigunarsyah, Bambang (2006) ‘’Corrective action recommendation for project cost variance in construction material management’’. In Kanok-Nukulchai, Worsak, Munasinghe, Sunil, & Anwar, Naveed (Eds.) The Tenth East Asia-Pacific Conference on Structural Engineering and Construction, August 3-5, 2006, Bangkok, Thailand.  
[3] https://www.schedulereader.com/blog/8-reasons-for-construction-project-delays
[4] ‘’A Study on Potential Physical Hazards at Construction Sites’’. Salim Mkubwa Salim, Fairuz I. Romli*, Jailani Besar, Negin Ozve Aminian, Department of Aerospace Engineering, Faculty of Engineering, University Putra Malaysia, 43400 Serdang, Selangor, Malaysia.
[5] ‘’Analysis of Safety Risks on the Construction Site’’. P Mesaros, M Spisakova and D Mackova, P Mesaros et al 2019 IOP Conf. Ser.: Earth Environ. Sci. 222 012012