Search results for: Project Managers
1441 Causes of Delays in Construction Projects: A Case Study for Petrochemical Industry of Iran
Authors: S. Bagher Daryaii
Abstract:
Delays in construction projects are one of the most common risky problems and regardless of the causes, the delays can occur in all projects and all industries. The impact of delays has a wide range from neglectable ones to losing the project's importance or its economic justification. In this paper, by doing research and interview with managers, executors, consultants and supervisors of construction projects in the petrochemical industry, their opinions about reasons of delays in projects have been gathered.
Keywords: Analysis of delays, causes of delays, delays in petrochemical projects, project delays.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 4521440 Innovativeness, Risk Taking, Focusing on Opportunity Attitudes on Nurse Managers and Nurses
Authors: Melek Kalkan, Hatice Odacı, Hatice Epli Koç
Abstract:
The aim of this study is to compare the innovativeness, risk taking, and focusing on opportunity of the nurse managers and nurses. The data are collected from nurse managers and nurses in Ondokuz Mayıs University, Faculty of Medicine Hospital and Karadeniz Technical University, Faculty of Medicine Hospital. The study sample consisted of 151 participants, 76 nurse managers (50.3%) and 75 nurses (49.7%). All participants have been assessed by Participant Information Form and Corporate Entrepreneurship Scale. In data analysis, independent t-test has applied. The results show that there are significant differences between nurse managers and nurses on innovativeness (t = 2.42, p < 0.05), risk taking (t = 3.62, p < 0.01), and focusing on opportunity (t = 2.16, p < 0.05). Consequently, it can be said that nurse managers have more innovativeness than nurses and tend to take more risks and focus more on opportunities.
Keywords: Focusing on opportunity attitudes, innovativeness, risk taking, nurse.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 24771439 An Overview of Project Management Application in Computational Fluid Dynamics
Authors: Sajith Sajeev
Abstract:
The application of Computational Fluid Dynamics (CFD) is widespread in engineering and industry, including aerospace, automotive, and energy. CFD simulations necessitate the use of intricate mathematical models and a substantial amount of computational power to accurately describe the behavior of fluids. The implementation of CFD projects can be difficult, and a well-structured approach to project management is required to assure the timely and cost-effective delivery of high-quality results. This paper's objective is to provide an overview of project management in CFD, including its problems, methodologies, and best practices. The study opens with a discussion of the difficulties connected with CFD project management, such as the complexity of the mathematical models, the need for extensive computational resources, and the difficulties associated with validating and verifying the results. In addition, the study examines the project management methodologies typically employed in CFD, such as the Traditional/Waterfall model, Agile and Scrum. Comparisons are made between the advantages and disadvantages of each technique, and suggestions are made for their effective implementation in CFD projects. The study concludes with a discussion of the best practices for project management in CFD, including the utilization of a well-defined project scope, a clear project plan, and effective teamwork. In addition, it highlights the significance of continuous process improvement and the utilization of metrics to monitor progress and discover improvement opportunities. This article is a resource for project managers, researchers, and practitioners in the field of CFD. It can aid in enhancing project outcomes, reducing risks, and enhancing the productivity of CFD projects. This paper provides a complete overview of project management in CFD and is a great resource for individuals who wish to implement efficient project management methods in CFD projects.
Keywords: Project management, Computational Fluid Dynamics, Traditional/Waterfall methodology, agile methodology, scrum methodology.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 7771438 French Managers and Their Subordinates’ Well-Being
Authors: B. Gangloff, N. Malleh
Abstract:
Well-being at work has many positive aspects. Our general hypothesis is that employees who feel well-being at work will be positively valued by their superiors, and that this positive value, which evokes the concept of social norms, allows us to assign to well-being at work a normative status. Three populations (line managers, students destined to become human resource managers, and employees) responded to a well-being questionnaire. Managers had to indicate, for each item, if they appreciated (or not) an employee feeling the well-being presented in the item; students had to indicate which items an employee should check if s/he wants to be positively (versus negatively) appreciated by his/her superior; and employees had to indicate to what degree each item corresponded to the well-being they used to feel. Three hypotheses are developed and confirmed: Managers positively value employees feeling some sense of well-being; students are aware of this positivity; spontaneously employees show a state of well-being, which means, knowing that spontaneous self-presentation is often produced by social desirability, that employees are aware of the well-being positivity. These data are discussed under a conceptual and applied angle.
Keywords: Normativity, well-being at work, organization, evaluation.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 11251437 An Investigation on the Variation of Software Development Productivity
Authors: Zhizhong Jiang, Peter Naudé, Craig Comstock
Abstract:
The productivity of software development is one of the major concerns for project managers. Given the increasing complexity of the software being developed and the concomitant rise in the typical project size, the productivity has not consistently improved. By analyzing the latest release of ISBSG data repository with 4106 projects ever developed, we report on the factors found to significantly influence productivity, and present an original model for the estimation of productivity during project design. We further illustrate that software development productivity has experienced irregular variations between the years 1995 and 2005. Considering the factors significant to productivity, we found its variations are primarily caused by the variations of average team size for the development and the unbalanced use of the less productive development language 3GL.
Keywords: Development Platform, Function Point, Language, Productivity, Software Engineering, Team Size.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 16761436 Impact of Strategic Emotional Intelligence to Transformational Leadership of Managers: A Case Study
Authors: L. N. A. C. Jayawardena, Ales Gregar
Abstract:
Emotional Intelligence (EI) has been identified as an important factor for corporate success. However, there are few empirical findings on the impact of Strategic EI per se. The ooverall objective of the study was to empirically examine the relationship between the Strategic EI and Transformational Leadership style of managers. Sixty four managers were selected from the banking industry in Czech Republic. Genos EI Inventory, and the Multifactor Leadership Questionnaire – Form 5X-Short were employed as the major research instruments of the study. Descriptive and inferential analyses of survey data were conducted using SPSS software. Variations were observed among the components of Strategic EI between males, and females. Study concludes positive a relationship between Strategic EI of Czech managers and their transformational leadership style. Improving awareness and usage of EI, will contribute to facilitate career success through enhanced levels of transformational leadership of managers.
Keywords: Strategic Emotional Intelligence, Transformational leadership, Socio-demographic factors.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 25571435 The Management of the Urban Project between Challenge and Need: The Case of the Modernization Project of Constantine
Authors: Nedjima Mouhoubi, Souad Sassi Boudemagh
Abstract:
In this article, and through the modernization project of metropolis of Constantine (PMMC) experience in Algeria, discussed to highlight the importance of management in an urban project at various levels: strategic and operational. The statement we attended to reach is to evaluate the modernization project of metropolis of Constantine in the light of management and prove the relation between a good urban management and the success of an urban project.Keywords: Urban project, strategic management, operational management, the modernization project of Constantine.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 14641434 The Reliability of Management Earnings Forecasts in IPO Prospectuses: A Study of Managers’ Forecasting Preferences
Authors: Maha Hammami, Olfa Benouda Sioud
Abstract:
This study investigates the reliability of management earnings forecasts with reference to these two ingredients: verifiability and neutrality. Specifically, we examine the biasedness (or accuracy) of management earnings forecasts and company specific characteristics that can be associated with accuracy. Based on sample of 102 IPO prospectuses published for admission on NYSE Euronext Paris from 2002 to 2010, we found that these forecasts are on average optimistic and two of the five test variables, earnings variability and financial leverage are significant in explaining ex post bias. Acknowledging the possibility that the bias is the result of the managers’ forecasting behavior, we then examine whether managers decide to under-predict, over-predict or forecast accurately for self-serving purposes. Explicitly, we examine the role of financial distress, operating performance, ownership by insiders and the economy state in influencing managers’ forecasting preferences. We find that managers of distressed firms seem to over-predict future earnings. We also find that when managers are given more stock options, they tend to under-predict future earnings. Finally, we conclude that the management earnings forecasts are affected by an intentional bias due to managers’ forecasting preferences.
Keywords: Intentional bias, Management earnings forecasts, neutrality, verifiability.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 22431433 The Analysis on Leadership Skills in UK Automobile Manufacturing Enterprises
Authors: Yanting Cao, Kazumitsu Nawata
Abstract:
The UK has strong economic growth, which attracts other countries to invest there through globalization. This research process will be based on quantitative and qualitative descriptive analysis using interviews. The secondary analysis will involve a case study approach to understand the important aspects of leadership skills. The research outcomes will be identifying the strength and weakness of the leadership skills of UK automobile manufacturing enterprises and suggest the best practices adopted by the respective countries for better results.
Keywords: engineering management, leadership, industrial project management, project managers, automobile manufacturing
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 14161432 Project Management Success for Contractors
Authors: Hamimah Adnan, Norfashiha Hashim, Mohd Arif Marhani, Mohd Asri Yeop Johari
Abstract:
The aim of this paper is to provide a better understanding of the implementation of Project Management practices by UiTM contractors to ensure project success. A questionnaire survey was administered to 120 UiTM contractors in Malaysia. The purpose of this method was to gather information on the contractors- project background and project management skills. It was found that all of the contractors had basic knowledge and understanding of project management skills. It is suggested that a reasonable project plan and an appropriate organizational structure are influential factors for project success. It is recommended that the contractors need to have an effective program of work and up to date information system are emphasized.Keywords: Project management, success, contractors.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 31881431 Probabilistic Model Development for Project Performance Forecasting
Authors: Milad Eghtedari Naeini, Gholamreza Heravi
Abstract:
In this paper, based on the past project cost and time performance, a model for forecasting project cost performance is developed. This study presents a probabilistic project control concept to assure an acceptable forecast of project cost performance. In this concept project activities are classified into sub-groups entitled control accounts. Then obtain the Stochastic S-Curve (SS-Curve), for each sub-group and the project SS-Curve is obtained by summing sub-groups- SS-Curves. In this model, project cost uncertainties are considered through Beta distribution functions of the project activities costs required to complete the project at every selected time sections through project accomplishment, which are extracted from a variety of sources. Based on this model, after a percentage of the project progress, the project performance is measured via Earned Value Management to adjust the primary cost probability distribution functions. Then, accordingly the future project cost performance is predicted by using the Monte-Carlo simulation method.Keywords: Monte Carlo method, Probabilistic model, Project forecasting, Stochastic S-curve
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 27151430 Modeling Managerial Competences for Effective Small Firm Performance in a Developing Economy
Authors: M. Aminu Sanda
Abstract:
This paper explores competencies that managers of small firms in Ghana use to enhance operational flexibility towards the attainment of higher productivity. This is because the requisite competence required of such managers to be effective performers continues to be a challenge. Data was collected from managers of three hundred small firms using a standardized self-completion questionnaire and analyzed using the Amos-based structural equation model approach. Findings from factor and confirmatory factor analyses showed that the only competence exhibited by managers toward effective performance is realistic practices evident at the workplace. It is concluded that a manager’s self-confidence and involvement in areas that he/she is good at, and his/her possession of skills that enables performance at high capacity are indications of the manger’s effectiveness. The study outcome provides a knowledge base helpful to policy-makers, especially in Ghana, in determining the requisite managerial competences required by small firm managers for effective performance.
Keywords: Managerial competence, small firm, effective performance, developing economy, Ghana.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 13831429 Development of a Support Tool for Cost and Schedule Integration Managment at Program Level
Authors: H. J. Yang, R. Z. Jin, I. J. Park, C. T. Hyun
Abstract:
There has been gradual progress of late in construction projects, particularly in big-scale megaprojects. Due to the long-term construction period, however, with large-scale budget investment, lack of construction management technologies, and increase in the incomplete elements of project schedule management, a plan to conduct efficient operations and to ensure business safety is required. In particular, as the project management information system (PMIS) is meant for managing a single project centering on the construction phase, there is a limitation in the management of program-scale businesses like megaprojects. Thus, a program management information system (PgMIS) that includes program-level management technologies is needed to manage multiple projects. In this study, a support tool was developed for managing the cost and schedule information occurring in the construction phase, at the program level. In addition, a case study on the developed support tool was conducted to verify the usability of the system. With the use of the developed support tool program, construction managers can monitor the progress of the entire project and of the individual subprojects in real time.
Keywords: Cost∙Schedule integration management, Supporting Tool, UI, WBS, CBS, introduce PgMIS (Program Management Information System), PMIS (Project Management Information System)
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 14611428 A Proposed Innovation Management System Framework – A Solution for Organizations Aimed for Obtaining Performance
Authors: Andreea Maier, Stelian Brad, Mircea Fulea, Diana Nicoară, Dorin Maier
Abstract:
Today, any organization - regardless of the specific activity - must be prepared to face continuous radical changes, innovation thus becoming a condition of survival in a globalized market. Few managers have a wider vision that includes innovation, to enable better performance of the critical activities, namely the degree of novelty that it must submit an innovation to be considered as such. Companies need not only radical changes in the products or their services, but also to their business strategies. Not all managers have an overall view on the real size of necessary innovation potential. Unfortunately there is still no common understanding (and correct) of the term of innovation among managers. Moreover, not all managers are aware of the need for innovation. In these conditions, increasing the processes adaptability of firms (through innovation) to meet the needs and performance requirements is difficult without a systematic framework. To overcome this disadvantage, the authors propose a framework for designing an innovation management system,, to cover all the important aspects of a business system, to reach the actual performance of an organization.
Keywords: Innovation, innovation framework, innovation management system.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 19581427 The Impact of Demographic Profile on Strategic HRM Practices and Its Challenges Faced by HR Managers in IT Firm, India: An Empirical Study
Authors: P. Saravanan, A. Vasumathi
Abstract:
The authors conducted a study for the sample size of 75 HR managers from an Indian IT company through systematic sampling method. This study identifies that the female employees are facing lesser conflict than the male employees against their managers within the organization. There is a positive correlation between gender and conflict management with the superior towards the work. There is a significant variance between age and response towards appraisal system, succession planning and employee engagement. The education qualification plays a major role in determining the compensation factor for the employees working in the organization. The study determines the impact of demographic profile on strategic HRM practices and its challenges faced by HR managers in IT firm, India.Keywords: Strategic Human resource management, Change agent, Employee engagement, Performance management, Succession planning and Conflict management.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 36381426 Managers’ Capacity Building for Institutional Sustainability Performance
Authors: Analiza Acuña-Villacorte
Abstract:
The Institutional Sustainability Performance (ISP) of State Universities and Colleges (SUCs) in the Philippines reveals the level of compliance and fidelity of the latter to the mandates of the state. This performance evaluation procedure aims to perpetually monitor and sustain the quality of services provided by the state institutions in the country. Importantly, the SUC level rating is one of the key indicators of the merit system adopted by the state to give incentives to government institutions. With the crucial role of the ISP and SUC level in the performance of an institution and in sustaining quality assurance, this study theorized that the top managers’ capacity to influence is the critical factor in meeting the expectations of the state. This study assessed the top managers’ capacity to influence. The hypothesis in this study proved that leadership style of top managers has significant relationship to the managers’ capacity to influence for institutional sustainability performance. Thus, the subjects of this study were restricted only to the State Universities and Colleges (SUC) that qualified in the top 20 Institutional Sustainability Performance; the digital governance performance, and the SUC leveling status nationwide. The top managers and their subordinates with doctorate of Bulacan State University and Bataan Peninsula State University whose programs have been consistently submitted to accreditation and were ranked Levels III and IV were subjected and participated to the study. This study assessed the top managers’ capacity to influence. The hypothesis in this study proved that leadership style of top managers has significant relationship to the managers’ capacity to influence for institutional sustainability performance. Thus, the subjects of this study were restricted only to the State Universities and Colleges (SUC) that qualified in the top 20 Institutional Sustainability Performance; the digital governance performance, and the SUC leveling status nationwide. The top managers and their subordinates with doctorate of Bulacan State University and Bataan Peninsula State University whose programs have been consistently submitted to accreditation and were ranked Levels III and IV were subjected and participated to the study.
Keywords: Capacity to Influence, Descriptive Design, Institutional Sustainability Performance, Management.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 19031425 Risk Evaluation of Information Technology Projects Based on Fuzzy Analytic Hierarchal Process
Authors: H. Iranmanesh, S. Nazari Shirkouhi, M. R. Skandari
Abstract:
Information Technology (IT) projects are always accompanied by various risks and because of high rate of failure in such projects, managing risks in order to neutralize or at least decrease their effects on the success of the project is strongly essential. In this paper, fuzzy analytical hierarchy process (FAHP) is exploited as a means of risk evaluation methodology to prioritize and organize risk factors faced in IT projects. A real case of IT projects, a project of design and implementation of an integrated information system in a vehicle producing company in Iran is studied. Related risk factors are identified and then expert qualitative judgments about these factors are acquired. Translating these judgments to fuzzy numbers and using them as an input to FAHP, risk factors are then ranked and prioritized by FAHP in order to make project managers aware of more important risks and enable them to adopt suitable measures to deal with these highly devastative risks.Keywords: Information technology projects, Risk evaluation, Analytic hierarchal process, fuzzy logic.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 19421424 Operation Planning of Concrete Box Girder Bridge by 4D CAD Visualization Techniques
Authors: Mohammad Rohani, Gholamali Shafabakhsh, Abdolhosein Haddad, Ehsan Asnaashari
Abstract:
Visual simulation has emerged as a key planning tool in built environment because it enables architects, engineers and project managers to visualize construction process evolution before the project actual commences. This provides an efficient technology for reducing time and cost through planning and controlling resources, machines and materials. With the development of infrastructure projects and the massive civil constructions such as bridges, urban tunnels and highways as well as sensitivity of their construction operations, it is very necessary to apply proper planning methods. Implementation of visual techniques into management of construction projects can provide a fundamental foundation for projects with massive activities and duplicate items. So, the purpose of this paper is to develop visual simulation management techniques for infrastructure projects such as highways bridges by the use of Four-Dimensional Computer-Aided design Models. This project simulates operational assembly-line for Box-Girder Concrete Bridges which it would be able to optimize the sequence and interaction of project activities and on the other hand, it would minimize any unintended conflicts prior to project start. In this paper, after introducing the various planning methods by building information model and concrete bridges in highways, an executive case study is demonstrated and then a visual technique (4D CAD) will be applied for the case. In the final step, the user feedback for interacting by this system evaluated according to six criteria.
Keywords: 4D application area, Box-Girder concrete bridges, CAD model, visual planning.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 15791423 Neural Network Based Approach of Software Maintenance Prediction for Laboratory Information System
Authors: Vuk M. Popovic, Dunja D. Popovic
Abstract:
Software maintenance phase is started once a software project has been developed and delivered. After that, any modification to it corresponds to maintenance. Software maintenance involves modifications to keep a software project usable in a changed or a changing environment, to correct discovered faults, and modifications, and to improve performance or maintainability. Software maintenance and management of software maintenance are recognized as two most important and most expensive processes in a life of a software product. This research is basing the prediction of maintenance, on risks and time evaluation, and using them as data sets for working with neural networks. The aim of this paper is to provide support to project maintenance managers. They will be able to pass the issues planned for the next software-service-patch to the experts, for risk and working time evaluation, and afterward to put all data to neural networks in order to get software maintenance prediction. This process will lead to the more accurate prediction of the working hours needed for the software-service-patch, which will eventually lead to better planning of budget for the software maintenance projects.
Keywords: Laboratory information system, maintenance engineering, neural networks, software maintenance, software maintenance costs.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 11271422 Managing IT Departments in Higher Education Institutes: Coping with the Exponentially Growing Needs and Expectations
Authors: Balqees A. Al-Thuhli, Ali H. Al-Badi, Khamis Al-Gharbi
Abstract:
Information technology is changing rapidly and the users’ expectations are also growing. Dealing with these changes in information technology, while satisfying the users’ needs and expectations is a big challenge. IT managers need to explore new mechanisms/strategies to enable them to cope with such challenges.
The objectives of this research are to identify the significant challenges that might face IT managers in higher education institutes in the face of the high and ever growing customer expectations and to propose possible solutions to cope with such high-speed changes in information technology.
To achieve these objectives, interviews with the IT professionals from different higher education institutes in Oman were conducted. In addition, documentation (printed and online) related to these institutions were studied and an intensive literature review of published work was examined.
The findings of this research are expected to give a better understanding of the challenges that might face the IT managers at higher education institutes. This acquired understanding is expected to highlight the importance of being adaptable and fast in keeping up with the ever-growing technological changes. Moreover, adopting different tools and technologies could assist IT managers in developing their organisations’ IT policies and strategies.
Keywords: Information technology, IT rapid changes, CIO roles, challenges, IT managers, coping mechanisms, users' expectations.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 15981421 A Case Study of Al-Shifa: A Healthcare Information System in Oman
Authors: Khamis Al-Gharbi, Said M. Gattoufi, Ali H. Al-Badi, Ali Al-Hashmi
Abstract:
The case study presents the progression of a project management of Al-Shifa, a healthcare information system in Oman. The case study describes the evolution of the implementation of a healthcare information system tailored to meet the needs of the healthcare units under the supervision of the Ministry of Health (MOH) in Oman. A focus group methodology was used for collecting the relevant information from the main project's stakeholders. In addition reports about the project made available for the researchers. The case analysis is made based on the Project Management approach developed by the Project Management Institute (PMI). The main finding that there was no formal project management approach adopted by the MOH for the development and implementation of the herewith mentioned healthcare information system project. Furthermore, the project had suffered a scope creep in terms of features, cost and time-schedule. The recommendations of the authors, for the rescue of the project from its current dilemma, consist of technological, administrative and human resources development actions.
Keywords: Al-Shifa, Information system, Healthcare, Oman, Project Management.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 53671420 Project Management Maturity Models and Organizational Project Management Maturity Model (OPM3®): A Critical Morphological Evaluation
Authors: Farrokh J., Azhar K. Mansur
Abstract:
There exists a strong correlation between efficient project management and competitive advantage for organizations. Therefore, organizations are striving to standardize and assess the rigor of their project management processes and capabilities i.e. project management maturity. Researchers and standardization organizations have developed several project management maturity models (PMMMs) to assess project management maturity of the organizations. This study presents a critical evaluation of some of the leading PMMMs against OPM3® in a multitude of ways to look at which PMMM is the most comprehensive model - which could assess most aspects of organizations and also help the organizations in gaining competitive advantage over competitors. After a detailed morphological analysis of the models, it is concluded that OPM3® is the most promising maturity model that can really provide a competitive advantage to the organizations due to its unique approach of assessment and improvement strategies.
Keywords: Project management maturity, project managemen tmaturity models, competitive advantage.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 50481419 Empirical Study on Causes of Project Delays
Authors: Khan Farhan Rafat, Riaz Ahmed
Abstract:
Renowned offshore organizations are drifting towards collaborative exertion to win and implement international projects for business gains. However, devoid of financial constraints, with the availability of skilled professionals, and despite improved project management practices through state-of-the-art tools and techniques, project delays have become a norm these days. This situation calls for exploring the factor(s) affecting the bonding between project management performance and project success. In the context of the well-known 3M’s of project management (that is, manpower, machinery, and materials), machinery and materials are dependent upon manpower. Because the body of knowledge inveterate on the influence of national culture on men, hence, the realization of the impact on the link between project management performance and project success need to be investigated in detail to arrive at the possible cause(s) of project delays. This research initiative was, therefore, undertaken to fill the research gap. The unit of analysis for the proposed research excretion was the individuals who had worked on skyscraper construction projects. In reverent studies, project management is best described using construction examples. It is due to this reason that the project oriented city of Dubai was chosen to reconnoiter on causes of project delays. A structured questionnaire survey was disseminated online with the courtesy of the Project Management Institute local chapter to carry out the cross-sectional study. The Construction Industry Institute, Austin, of the United States of America along with 23 high-rise builders in Dubai were also contacted by email requesting for their contribution to the study and providing them with the online link to the survey questionnaire. The reliability of the instrument was warranted using Cronbach’s alpha coefficient of 0.70. The appropriateness of sampling adequacy and homogeneity in variance was ensured by keeping Kaiser–Meyer–Olkin (KMO) and Bartlett’s test of sphericity in the range ≥ 0.60 and < 0.05, respectively. Factor analysis was used to verify construct validity. During exploratory factor analysis, all items were loaded using a threshold of 0.4. Four hundred and seventeen respondents, including members from top management, project managers, and project staff, contributed to the study. The link between project management performance and project success was significant at 0.01 level (2-tailed), and 0.05 level (2-tailed) for Pearson’s correlation. Before initiating the moderator analysis test for linearity, multicollinearity, outliers, leverage points and influential cases, test for homoscedasticity and normality were carried out which are prerequisites for conducting moderator review. The moderator analysis, using a macro named PROCESS, was performed to verify the hypothesis that national culture has an influence on the said link. The empirical findings, when compared with Hofstede's results, showed high power distance as the cause of construction project delays in Dubai. The research outcome calls for the project sponsors and top management to reshape their project management strategy and allow for low power distance between management and project personnel for timely completion of projects.Keywords: Causes of construction project delays, construction industry, construction management, power distance.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 31201418 Hybrid Project Management Model Based on Lean and Agile Approach
Authors: F. Z. Eddoug, J. Benhra, R. Benabbou
Abstract:
Excellence and Success are the ultimate goal for any project and in order to achieve it, every project manager looks for the convenient tools and methods. This work proposes a framework that seeks an efficient management of general project through a lean and agile approach. In order to get this objective, the article was divided in two stages, the first one was emphasized on exploring and analyzing the existing project management models and then in the second one the desired framework was created, beginning by focusing on seven existing models and then proposing for each phase of the framework the convenient lean and agile tools.
Keywords: Agility, hybrid project management, lean, scrum.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 4191417 The Effect of Critical Activity on Critical Path and Project Duration in Precedence Diagram Method
Abstract:
The additional relationships i.e., start-to-start, finish-to-finish, and start-to-finish, between activity in Precedence Diagram Method (PDM) provides a more flexible schedule than traditional Critical Path Method (CPM). But, changing the duration of critical activities in the PDM network will have an anomalous effect on the critical path and the project completion date. In this study, we classified the critical activities in two groups i.e., 1. activity on single critical path and 2. activity on multi-critical paths, and six classes i.e., normal, reverse, neutral, perverse, decrease-reverse and increase-normal, based on their effects on project duration in PDM. Furthermore, we determined the maximum float of time by which the duration each type of critical activities can be changed without effecting the project duration. This study would help the project manager to clearly understand the behavior of each critical activity on critical path, and he/she would be able to change the project duration by shortening or lengthening activities based on project budget and project deadline.
Keywords: Construction project management, critical path method, project scheduling, precedence diagram method.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 14771416 Classification of Construction Projects
Authors: M. Safa, A. Sabet, S. MacGillivray, M. Davidson, K. Kaczmarczyk, C. T. Haas, G. E. Gibson, D. Rayside
Abstract:
In order to address construction project requirements and specifications, scholars and practitioners need to establish taxonomy according to a scheme that best fits their need. While existing characterization methods are continuously being improved, new ones are devised to cover project properties which have not been previously addressed. One such method, the Project Definition Rating Index (PDRI), has received limited consideration strictly as a classification scheme. Developed by the Construction Industry Institute (CII) in 1996, the PDRI has been refined over the last two decades as a method for evaluating a project's scope definition completeness during front-end planning (FEP). The main contribution of this study is a review of practical project classification methods, and a discussion of how PDRI can be used to classify projects based on their readiness in the FEP phase. The proposed model has been applied to 59 construction projects in Ontario, and the results are discussed.Keywords: Project classification, project definition rating index (PDRI), project goals alignment, risk.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 51931415 The Urban Project and the Urban Improvement to the Test of the Participation, Case: Project of Modernization of Constantine
Authors: Mouhoubi Nedjima, Sassi Boudemagh Souad
Abstract:
In the framework of the modernization of the city of Constantine and in order to restore its status as a regional metropolis introducing it into the network of cities international metropolises, has major urban project was launched: project of modernization and of metropolitanization of the city of Constantine. Our research project focuses on the management of the project for the modernization of the city of Constantine (PMMC) focusing on the management of some aspects of the urban project whose participation, with the objective assessment of the managerial approach business. In this contribution, we focus on two cases revealing taken into account in our research work on the question of participation of actors and their organizations. It is "the urban project of modernization of Constantine" and the operation relating to "the urban improvement in the city of the Brothers FERRAD in the district of Zouaghi". This project and this operation with the objective of improving the living conditions of citizens have faced several challenges and obstacles that have been in major part the factors of its failures. Through this study, we examined the management process and the mode of organization of the actors of the project as well as the level of participation of the citizen to finally proposed managerial solutions toconflict situations observed.
Keywords: The urban project, urban improvement, participation, Constantine.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 20591414 Scrum as the Method Supporting the Implementation of Knowledge Management in an Organization
Authors: Andrej Miklošík, Eva Hvizdová, Štefan Žák
Abstract:
Many companies have switched their processes to project-oriented in the last years. This brings new possibilities and effectiveness not only in the field of external processes connected with the product delivery but also the internal processes as well. However centralized project organization which is based on the role of project manager in the team has proved insufficient in some cases. Agile methods of project organization are trying to solve this problem by bringing new view on the project organization, roles, processes and competences. Scrum is one of these methods which builds on the principles of knowledge management to drive the project to effectiveness from all view angles. Using this method to organize internal and delivery projects helps the organization to create and share knowledge throughout the company. It also supports forming unique competences of individuals and project teams and drives innovations in the company.
Keywords: agile software development, knowledge management, knowledge dissemination, project management, SCRUM
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 26141413 Application of Agile Project Methodology in Computational Fluid Dynamics Engineering Project
Authors: Mohammed Bilal, Noor Hyder
Abstract:
Agile methodology is a popular project management methodology and is widely used in many engineering projects. In the recent years agile methodology is successful in countering the inherent problems seen in traditional methodology. The application of the Agile methodology in the computational fluid dynamic project had improved the project delivery performance. Computational Fluid Dynamics (CFD) is the method to solve and analyze the fluid flow problems by the application of the numerical analysis. In this paper, study is conducted using agile methodology and results are compared with waterfall methodology. The result shows that the agile methodology is improves the final delivery of the project.
Keywords: Agile methodology, traditional methodology, engineering management, engineering technology, Computational Fluid Dynamics, project management.
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 3621412 An Intelligent System Framework for Generating Activity List of a Project Using WBS Mind map and Semantic Network
Authors: H. Iranmanesh, M. Madadi
Abstract:
Work Breakdown Structure (WBS) is one of the most vital planning processes of the project management since it is considered to be the fundamental of other processes like scheduling, controlling, assigning responsibilities, etc. In fact WBS or activity list is the heart of a project and omission of a simple task can lead to an irrecoverable result. There are some tools in order to generate a project WBS. One of the most powerful tools is mind mapping which is the basis of this article. Mind map is a method for thinking together and helps a project manager to stimulate the mind of project team members to generate project WBS. Here we try to generate a WBS of a sample project involving with the building construction using the aid of mind map and the artificial intelligence (AI) programming language. Since mind map structure can not represent data in a computerized way, we convert it to a semantic network which can be used by the computer and then extract the final WBS from the semantic network by the prolog programming language. This method will result a comprehensive WBS and decrease the probability of omitting project tasks.Keywords: Expert System, Mind map, Semantic network, Work breakdown structure,
Procedia APA BibTeX Chicago EndNote Harvard JSON MLA RIS XML ISO 690 PDF Downloads 2608