Search results for: temporary contract
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 628

Search results for: temporary contract

478 Portable Cardiac Monitoring System Based on Real-Time Microcontroller and Multiple Communication Interfaces

Authors: Ionel Zagan, Vasile Gheorghita Gaitan, Adrian Brezulianu

Abstract:

This paper presents the contributions in designing a mobile system named Tele-ECG implemented for remote monitoring of cardiac patients. For a better flexibility of this application, the authors chose to implement a local memory and multiple communication interfaces. The project described in this presentation is based on the ARM Cortex M0+ microcontroller and the ADAS1000 dedicated chip necessary for the collection and transmission of Electrocardiogram signals (ECG) from the patient to the microcontroller, without altering the performances and the stability of the system. The novelty brought by this paper is the implementation of a remote monitoring system for cardiac patients, having a real-time behavior and multiple interfaces. The microcontroller is responsible for processing digital signals corresponding to ECG and also for the implementation of communication interface with the main server, using GSM/Bluetooth SIMCOM SIM800C module. This paper translates all the characteristics of the Tele-ECG project representing a feasible implementation in the biomedical field. Acknowledgment: This paper was supported by the project 'Development and integration of a mobile tele-electrocardiograph in the GreenCARDIO© system for patients monitoring and diagnosis - m-GreenCARDIO', Contract no. BG58/30.09.2016, PNCDI III, Bridge Grant 2016, using the infrastructure from the project 'Integrated Center for research, development and innovation in Advanced Materials, Nanotechnologies, and Distributed Systems for fabrication and control', Contract No. 671/09.04.2015, Sectoral Operational Program for Increase of the Economic Competitiveness co-funded from the European Regional Development Fund.

Keywords: Tele-ECG, real-time cardiac monitoring, electrocardiogram, microcontroller

Procedia PDF Downloads 245
477 A Conceptual Framework and a Mathematical Equation for Managing Construction-Material Waste and Cost Overruns

Authors: Saidu Ibrahim, Winston M. W. Shakantu

Abstract:

The problem of construction material waste remains unresolved, as a significant percentage of the materials delivered to some project sites end up as waste which might result in additional project cost. Cost overrun is a problem which affects 90% of the completed projects in the world. The argument on how to eliminate it has been on-going for the past 70 years, but there is neither substantial improvement nor significant solution for mitigating its detrimental effects. Research evidence has proposed various construction cost overruns and material-waste management approaches; nonetheless, these studies failed to give a clear indication on the framework and the equation for managing construction material waste and cost overruns. Hence, this research aims to develop a conceptual framework and a mathematical equation for managing material waste and cost overrun in the construction industry. The paper adopts the desktop methodological approach. This involves comparing the causes of material waste and those of cost overruns from the literature to determine the possible relationship. The review revealed a relationship between material waste and cost overrun that; increase in material waste would result to a corresponding increase in the amount of cost overrun at both the pre-contract and the post contract stages of a project. It was found from the equation that achieving an effective construction material waste management must ensure a “Good Quality-of-Planning, Estimating, and Design Management” and a “Good Quality- of-Construction, Procurement and Site Management”; a decrease in “Design Complexity” which would reduce “Material Waste” and subsequently reduce the amount of cost overrun by 86.74%. The conceptual framework and the mathematical equation developed in this study are recommended to the professionals of the construction industry.

Keywords: conceptual framework, cost overrun, material waste, project stags

Procedia PDF Downloads 264
476 Accounting for Rice Productivity Heterogeneity in Ghana: The Two-Step Stochastic Metafrontier Approach

Authors: Franklin Nantui Mabe, Samuel A. Donkoh, Seidu Al-Hassan

Abstract:

Rice yields among agro-ecological zones are heterogeneous. Farmers, researchers and policy makers are making frantic efforts to bridge rice yield gaps between agro-ecological zones through the promotion of improved agricultural technologies (IATs). Farmers are also modifying these IATs and blending them with indigenous farming practices (IFPs) to form farmer innovation systems (FISs). Also, different metafrontier models have been used in estimating productivity performances and their drivers. This study used the two-step stochastic metafrontier model to estimate the productivity performances of rice farmers and their determining factors in GSZ, FSTZ and CSZ. The study used both primary and secondary data. Farmers in CSZ are the most technically efficient. Technical inefficiencies of farmers are negatively influenced by age, sex, household size, education years, extension visits, contract farming, access to improved seeds, access to irrigation, high rainfall amount, less lodging of rice, and well-coordinated and synergized adoption of technologies. Albeit farmers in CSZ are doing well in terms of rice yield, they still have the highest potential of increasing rice yield since they had the lowest TGR. It is recommended that government through the ministry of food and agriculture, development partners and individual private companies promote the adoption of IATs as well as educate farmers on how to coordinate and synergize the adoption of the whole package. Contract farming concept and agricultural extension intensification should be vigorously pursued to the latter.

Keywords: efficiency, farmer innovation systems, improved agricultural technologies, two-step stochastic metafrontier approach

Procedia PDF Downloads 239
475 Treating On-Demand Bonds as Cash-In-Hand: Analyzing the Use of “Unconscionability” as a Ground for Challenging Claims for Payment under On-Demand Bonds

Authors: Asanga Gunawansa, Shenella Fonseka

Abstract:

On-demand bonds, also known as unconditional bonds, are commonplace in the construction industry as a means of safeguarding the employer from any potential non-performance by a contractor. On-demand bonds may be obtained from commercial banks, and they serve as an undertaking by the issuing bank to honour payment on demand without questioning and/or considering any dispute between the employer and the contractor in relation to the underlying contract. Thus, whether or not a breach had occurred under the underlying contract, which triggers the demand for encashment by the employer, is not a question the bank needs to be concerned with. As a result, an unconditional bond allows the beneficiary to claim the money almost without any condition. Thus, an unconditional bond is as good as cash-in-hand. In the past, establishing fraud on the part of the employer, of which the bank had knowledge, was the only ground on which a bank could dishonour a claim made under an on-demand bond. However, recent jurisprudence in common law countries shows that courts are beginning to consider unconscionable conduct on the part of the employer in claiming under an on-demand bond as a ground that contractors could rely on the prevent the banks from honouring such claims. This has created uncertainty in connection with on-demand bonds and their liquidity. This paper analyzes recent judicial decisions in four common law jurisdictions, namely, England, Singapore, Hong Kong, and Sri Lanka, to identify the scope of using the concept of “unconscionability” as a ground for preventing unreasonable claims for encashment of on-demand bonds. The objective of this paper is to argue that on-demand bonds have lost their effectiveness as “cash-in-hand” and that this is, in fact, an advantage and not an impediment to international commerce, as the purpose of such bonds should not be to provide for illegal and unconscionable conduct by the beneficiaries.

Keywords: fraud, performance guarantees, on-demand bonds, unconscionability

Procedia PDF Downloads 68
474 Mapping Contested Sites - Permanence Of The Temporary Mouttalos Case Study

Authors: M. Hadjisoteriou, A. Kyriacou Petrou

Abstract:

This paper will discuss ideas of social sustainability in urban design and human behavior in multicultural contested sites. It will focus on the potential of the re-reading of the “site” through mapping that acts as a research methodology and will discuss the chosen site of Mouttalos, Cyprus as a place of multiple identities. Through a methodology of mapping using a bottom up approach, a process of disassembling derives that acts as a mechanism to re-examine space and place by searching for the invisible and the non-measurable, understanding the site through its detailed inhabitation patterns. The significance of this study lies in the use of mapping as an active form of thinking rather than a passive process of representation that allows for a new site to be discovered, giving multiple opportunities for adaptive urban strategies and socially engaged design approaches. We will discuss the above thematic based on the chosen contested site of Mouttalos, a small Turkish Cypriot neighbourhood, in the old centre of Paphos (Ktima), SW of Cyprus. During the political unrest, between Greek and Turkish Cypriot communities, in 1963, the area became an enclave to the Turkish Cypriots, excluding any contact with the rest of the area. Following the Turkish invasion of 1974, the residents left their homes, plots and workplaces, resettling in the North of Cyprus. Greek Cypriot refugees moved into the area. The presence of the Greek Cypriot refugees is still considered to be a temporary resettlement. The buildings and the residents themselves exist in a state of uncertainty. The site is documented through a series of parallel investigations into the physical conditions and history of the site. Research methodologies use the process of mapping to expose the complex and often invisible layers of information that coexist. By registering the site through the subjective experiences, and everyday stories of inhabitants, a series of cartographic recordings reveals the space between: happening and narrative and especially space between different cultures and religions. Research put specific emphasis on engaging the public, promoting social interaction, identifying spatial patterns of occupation by previous inhabitants through social media. Findings exposed three main areas of interest. Firstly we identified inter-dependent relationships between permanence and temporality, characterised by elements such us, signage through layers of time, past events and periodical street festivals, unfolding memory and belonging. Secondly issues of co-ownership and occupation, found through particular narratives of exchange between the two communities and through appropriation of space. Finally formal and informal inhabitation of space, revealed through the presence of informal shared back yards, alternative paths, porous street edges and formal and informal landmarks. The importance of the above findings, was achieving a shift of focus from the built infrastructure to the soft network of multiple and complex relations of dependence and autonomy. Proposed interventions for this contested site were informed and led by a new multicultural identity where invisible qualities were revealed though the process of mapping, taking on issues of layers of time, formal and informal inhabitation and the “permanence of the temporary”.

Keywords: contested sites, mapping, social sustainability, temporary urban strategies

Procedia PDF Downloads 391
473 A Multi-Model Approach to Assess Atlantic Bonito (Sarda Sarda, Bloch 1793) in the Eastern Atlantic Ocean: A Case Study of the Senegalese Exclusive Economic Zone

Authors: Ousmane Sarr

Abstract:

The Senegalese coasts have high productivity of fishery resources due to the frequency of intense up-welling system that occurs along its coast, caused by the maritime trade winds making its waters nutrients rich. Fishing plays a primordial role in Senegal's socioeconomic plans and food security. However, a global diagnosis of the Senegalese maritime fishing sector has highlighted the challenges this sector encounters. Among these concerns, some significant stocks, a priority target for artisanal fishing, need further assessment. If no efforts are made in this direction, most stock will be overexploited or even in decline. It is in this context that this research was initiated. This investigation aimed to apply a multi-modal approach (LBB, Catch-only-based CMSY model and its most recent version (CMSY++); JABBA, and JABBA-Select) to assess the stock of Atlantic bonito, Sarda sarda (Bloch, 1793) in the Senegalese Exclusive Economic Zone (SEEZ). Available catch, effort, and size data from Atlantic bonito over 15 years (2004-2018) were used to calculate the nominal and standardized CPUE, size-frequency distribution, and length at retentions (50 % and 95 % selectivity) of the species. These relevant results were employed as input parameters for stock assessment models mentioned above to define the stock status of this species in this region of the Atlantic Ocean. The LBB model indicated an Atlantic bonito healthy stock status with B/BMSY values ranging from 1.3 to 1.6 and B/B0 values varying from 0.47 to 0.61 of the main scenarios performed (BON_AFG_CL, BON_GN_Length, and BON_PS_Length). The results estimated by LBB are consistent with those obtained by CMSY. The CMSY model results demonstrate that the SEEZ Atlantic bonito stock is in a sound condition in the final year of the main scenarios analyzed (BON, BON-bt, BON-GN-bt, and BON-PS-bt) with sustainable relative stock biomass (B2018/BMSY = 1.13 to 1.3) and fishing pressure levels (F2018/FMSY= 0.52 to 1.43). The B/BMSY and F/FMSY results for the JABBA model ranged between 2.01 to 2.14 and 0.47 to 0.33, respectively. In contrast, The estimated B/BMSY and F/FMSY for JABBA-Select ranged from 1.91 to 1.92 and 0.52 to 0.54. The Kobe plots results of the base case scenarios ranged from 75% to 89% probability in the green area, indicating sustainable fishing pressure and an Atlantic bonito healthy stock size capable of producing high yields close to the MSY. Based on the stock assessment results, this study highlighted scientific advice for temporary management measures. This study suggests an improvement of the selectivity parameters of longlines and purse seines and a temporary prohibition of the use of sleeping nets in the fishery for the Atlantic bonito stock in the SEEZ based on the results of the length-base models. Although these actions are temporary, they can be essential to reduce or avoid intense pressure on the Atlantic bonito stock in the SEEZ. However, it is necessary to establish harvest control rules to provide coherent and solid scientific information that leads to appropriate decision-making for rational and sustainable exploitation of Atlantic bonito in the SEEZ and the Eastern Atlantic Ocean.

Keywords: multi-model approach, stock assessment, atlantic bonito, healthy stock, sustainable, SEEZ, temporary management measures

Procedia PDF Downloads 36
472 Resolution Method for Unforeseen Ground Condition Problem Case in Coal Fired Steam Power Plant Project Location Adipala, Indonesia

Authors: Andi Fallahi, Bona Ryan Situmeang

Abstract:

The Construction Industry is notoriously risky. Much of the preparatory paperwork that precedes construction project can be viewed as the formulation of risk allocation between the owner and the Contractor. The Owner is taking the risk that his project will not get built on the schedule that it will not get built for what he has budgeted and that it will not be of the quality he expected. The Contractor Face a multitude of risk. One of them is an unforeseen condition at the construction site. The Owner usually has the upper hand here if the unforeseen condition occurred. Site data contained in Ground Investigation report is often of significant contractual importance in disputes related to the unforeseen ground condition. A ground investigation can never fully disclose all the details of the underground condition (Risk of an unknown ground condition can never be 100% eliminated). Adipala Coal Fired Steam Power Plant (CSFPP) 1 x 660 project is one of the large CSFPP project in Indonesia based on Engineering, Procurement, and Construction (EPC) Contract. Unforeseen Ground Condition it’s responsible by the Contractor has stipulated in the clausal of Contract. In the implementation, there’s indicated unforeseen ground condition at Circulating Water Pump House (CWPH) area which caused the Contractor should be changed the Method of Work that give big impact against Time of Completion and Cost Project. This paper tries to analyze the best way for allocating the risk between The Owner and The Contractor. All parties that allocating of sharing risk fairly can ultimately save time and money for all parties, and get the job done on schedule for the least overall cost.

Keywords: unforeseen ground condition, coal fired steam power plant, circulating water pump house, Indonesia

Procedia PDF Downloads 306
471 Beyond Adoption: Econometric Analysis of Impacts of Farmer Innovation Systems and Improved Agricultural Technologies on Rice Yield in Ghana

Authors: Franklin N. Mabe, Samuel A. Donkoh, Seidu Al-Hassan

Abstract:

In order to increase and bridge the differences in rice yield, many farmers have resorted to adopting Farmer Innovation Systems (FISs) and Improved Agricultural Technologies (IATs). This study econometrically analysed the impacts of adoption of FISs and IATs on rice yield using multinomial endogenous switching regression (MESR). Nine-hundred and seven (907) rice farmers from Guinea Savannah Zone (GSZ), Forest Savannah Transition Zone (FSTZ) and Coastal Savannah Zone (CSZ) were used for the study. The study used both primary and secondary data. FBO advice, rice farming experience and distance from farming communities to input markets increase farmers’ adoption of only FISs. Factors that increase farmers’ probability of adopting only IATs are access to extension advice, credit, improved seeds and contract farming. Farmers located in CSZ have higher probability of adopting only IATs than their counterparts living in other agro-ecological zones. Age and access to input subsidy increase the probability of jointly adopting FISs and IATs. FISs and IATs have heterogeneous impact on rice yield with adoption of only IATs having the highest impact followed by joint adoption of FISs and IATs. It is important for stakeholders in rice subsector to champion the provision of improved rice seeds, the intensification of agricultural extension services and contract farming concept. Researchers should endeavour to researched into FISs.

Keywords: farmer innovation systems, improved agricultural technologies, multinomial endogenous switching regression, treatment effect

Procedia PDF Downloads 393
470 The Determination of Self-Esteem, Life Satisfaction, Anxiety and Depression Levels among Patients with Stoma

Authors: Tugba Cinarli, Tugba Kavalali Erdogan, Sevil Masat, Dilek Kiymaz, Nida Kiyici, Zeliha Koc

Abstract:

This study was conducted in a descriptive and cross-sectional manner, in order to determine the self-esteem, life satisfaction and depression/anxiety levels of the patients with stoma. The study was conducted between June 15, 2016 and June 15, 2017 among 196 oncology patients that were hospitalized in the general surgery clinic of a public hospital in Turkey. The case group consisted of 98 cancer patients with stoma and the control group consisted of 98 cancer patients without stoma. The data were collected through the Coopersmith Self-Esteem Scale, Life Satisfaction Scale, the Hospital Anxiety and Depression Scale, and a 21-question survey that aimed to determine the sociodemographic and clinical properties of the patients. The data were analyzed with percentage analysis, Mann Whitney U-test, Chi-square test and Spearmen’s correlation test. It was determined that for the case group; 44.9% had colon cancer, 29.6% had rectal cancer; 50% underwent temporary colostomia, 15.3% underwent permanent colostomia, 34.7% underwent temporary ileostomy. The experimental group's findings for the Coopersmith Self-Esteem Scale, Life Satisfaction Scale, the Anxiety Subscale and the Depression subscale were 64 (20 - 84), 17 (5 - 38), 10 (1 - 18), and 9 (1 - 19), respectively. The control group's findings for the Coopersmith Self-Esteem Scale, Life Satisfaction Scale, the Anxiety Subscale and the Depression Subscale were 68 (32 - 92), 21 (7 - 31), 8.5 (1 - 18), and 8 (1 - 18), respectively. It was found that the Coopersmith Self-Esteem Scale, Life Satisfaction Scale, and the Anxiety Subscale findings were significantly different for the experimental and control groups (p<0.05). It was determined that the self-esteem levels were positively correlated with life satisfaction and negatively correlated with anxiety and depression; also, the life satisfaction levels were negatively correlated with anxiety and depression. It is suggested that the nursing interventions should be planned in order to improve life-satisfaction and self-esteem levels of the patients, and to decrease depression and anxiety.

Keywords: anxiety, cancer, life satisfaction, self-esteem

Procedia PDF Downloads 135
469 Digitalisation of Onboarding: A Case Study to Investigate the Impact of Virtual Reality Technology on Employees Social Interactions and Information Seeking During Job-Onboarding

Authors: Ewenam Gbormittah

Abstract:

Because of the effects of the pandemic, companies are focusing on the future of work arrangements for their employees. This includes adapting to a remote or hybrid working model. It is important that employers provide those working remotely or in a hybrid mode a rewarding onboarding experience and opportunities for interaction. Although, Information & Communication Technologies (ICT) have transformed the ways organisations manage employees over the years, there is still a need for a platform where organisations can adjust their onboarding to suit the social and interactive aspects of their employees, to facilitate successful integration. This study aimed to explore this matter by investigating whether Virtual Reality (VR) technology contributes to new employees integration into the organisation during their job-onboarding (JOB) process. The research questions are as follows: (1) To what extent does VR have an impact on employees successful integration into the organisation, and (2) How does VR help elements of new employees Psychological Contract (PC) during the course of interactions. An exploratory case study approach, which consisted of a semi-structured interview was conducted on 20 employees, split from two different case organisations. The results of the data were analysed according to each case, and then a cross-case comparison was provided. The results have generated 8 themes, presenting in excess of 7 sub-themes for CS1 and presented 7 themes, in excess of 7 sub-themes for CS2. The cross-case analysis has revealed that VR does have the potential to support employees integration into the organisation. However, the effects were shown to be stronger for employees in CS2, compared to employees in CS1. The results highlight practical implications for onboarding psychology and strategic talent solutions within recruitment. Such strategy this research particularly outlines, involves providing insights on how to manage the PC of employees from the recruitment stage to creating successful employment relationships.

Keywords: job-onboarding, psychological contract, virtual reality, case study one, case study two

Procedia PDF Downloads 28
468 Sovereign Debt Restructuring: A Study of the Inadequacies of the Contractual Approach

Authors: Salamah Ansari

Abstract:

In absence of a comprehensive international legal regime for sovereign debt restructuring, majority of the complications arising from sovereign debt restructuring are frequently left to the uncertain market forces. The resort to market forces for sovereign debt restructuring has led to a phenomenal increase in litigations targeting assets of defaulting sovereign nations, internationally across jurisdictions with the first major wave of lawsuits against sovereigns in the 1980s with the Latin American crisis. Recent experiences substantiate that majority of obstacles faced during sovereign debt restructuring process are caused by inefficient creditor coordination and collective action problems. Collective action problems manifest as grab race, rush to exits, holdouts, the free rider problem and the rush to the courthouse. On defaulting, for a nation to successfully restructure its debt, all the creditors involved must accept some reduction in the value of their claims. As a single holdout creditor has the potential to undermine the restructuring process, hold-out creditors are snowballing with the increasing probability of earning high returns through litigations. This necessitates a mechanism to avoid holdout litigations and reinforce collective action on the part of the creditor. This can be done either through a statutory reform or through market-based contractual approach. In absence of an international sovereign bankruptcy regime, the impetus is mostly on inclusion of collective action clauses in debt contracts. The preference to contractual mechanisms vis- a vis a statutory approach can be explained with numerous reasons, but that's only part of the puzzle in trying to understand the economics of the underlying system. The contractual approach proposals advocate the inclusion of certain clauses in the debt contract for an orderly debt restructuring. These include clauses such as majority voting clauses, sharing clauses, non- acceleration clauses, initiation clauses, aggregation clauses, temporary stay on litigation clauses, priority financing clauses, and complete revelation of relevant information. However, voluntary market based contractual approach to debt workouts has its own complexities. It is a herculean task to enshrine clauses in debt contracts that are detailed enough to create an orderly debt restructuring mechanism while remaining attractive enough for creditors. Introduction of collective action clauses into debt contracts can reduce the barriers in efficient debt restructuring and also have the potential to improve the terms on which sovereigns are able to borrow. However, it should be borne in mind that such clauses are not a panacea to the huge institutional inadequacy that persists and may lead to worse restructuring outcomes.

Keywords: sovereign debt restructuring, collective action clauses, hold out creditors, litigations

Procedia PDF Downloads 131
467 Activity-Based Safety Assessment of Real Estate Projects in Western India

Authors: Patel Parul, Harsh Ganvit

Abstract:

The construction industry is the second highest industry after agriculture provides employment in India. In developing countries like India, many construction projects are coming up to meet the demand. On the one hand, construction projects are increasing; on the other hand still, construction companies are struggling with many problems. One of the major problems is to ensure safe working conditions at the construction site. Due to a lack of safety awareness and ignorance of safety aspects, many fatal accidents are very common at the construction site in India. One of the key success factors for construction projects is “Accident-Free Construction Projects”. The construction projects can be divided into various categories like Infrastructure projects, industrial construction and real estate construction. Real estate projects are mainly comprised of commercial and residential projects. In the construction industry, private sectors play a huge role in urban and rural development and also contribute significantly to the growth of the nation. Infrastructure and Industrial projects are mainly executed by well-qualified construction contractors. For such projects, ensuring safety at construction projects is inevitable and probably one of the major clauses of contract documents as well. These projects are monitored from time to time by national agencies and researchers, too. However, Real estate projects are rarely monitored for safety aspects. No systematic contract system is followed for these projects. Safety is the most neglected aspect of these projects. In the current research projects, an attempt is made to carry out safety auditing for about 75 real estate projects. The objective of this work is to collect the activity-based safety survey of real estate projects in western India. The analysis of activity-based safety implementation for real estate projects is discussed in the present work. The activities are divided into three categories based on the data collected. The findings of this work will help local monitoring authorities to implement a safety management plan for real estate projects.

Keywords: construction safety, safety assessment, activity-based safety, real estate projects

Procedia PDF Downloads 25
466 Recent Developments and Expectations in the Legal Expenses Insurance in Turkey

Authors: İbrahim Arslan, Mücahit Ünal

Abstract:

An important issue to ensure justice is to simplify the right to seek justice. But there is a cost of seeking justice in civil law. It costs at least, attorneys' fees and judicial expenses during the beginning and in case of losing a trial. Indeed, most of the people refrain from seeking justice because of these expenses. Therefore, it is not inappropriate to say that the removal of obstacles staying on the way of seeking justice will increase the belief in justice. Legal expenses insurance is a private law contract of insurance in which the insurer is obliged to pay premiums of the insured, to provide the necessary services for the protection of legal interests of the insured person within the agreed scope. This type of insurance is being practiced in the Western world for a long time. The special rights, duties and obligations of the parties to a legal expenses insurance contract shall be governed by the Turkish Commercial Code (TCC) and the contractual agreements which are regularly closed in the form of general terms and conditions. If the number of the legal expenses insurance contracts concluded increase this will definitely improve the percentage of seeking justice before the courts. The general terms and conditions applicable in Turkey generally include litigation costs, referee fees, guarantee fund , enforcement costs , appeal costs borne decision corrections costs. In addition, besides the insured, other family members or the people specified in the policy are protected in the scope of personal/family legal expenses insurance. The commercial law disputes fall outside the scope of coverage in this insurance branch. The insured person chooses his own lawyer and the insurer is not allowed to give advice during the selection of a lawyer. In April 2015, the Prime Minister announced of a new era in the field of legal expenses insurance in Turkey and this announcement excited the insurance industry and legal community.

Keywords: insurance, in the Turkish law on legal protection insurance, legal protection insurance, legal protection

Procedia PDF Downloads 333
465 Risk Management Practices In The Construction Industry In Malawi

Authors: Taonga Temwani Chibaka

Abstract:

This qualitative research study was conducted to identify the common risk factors that affect the construction industry in Malawi in the building and infrastructure (civil works) projects. The study then evaluates the possible risk responses that are done to mitigate the various risk factors that were identified. I addition the research also established the barriers to risk management implementation with lastly mapping out as where the identified risk factors fall on which stage of the project and then also map out the knowledge areas that need to be worked on the cases on Malawian construction industry in order to mitigate most of the identified risk factors. The study involved the interviewing the professionals from the construction industry in Malawi where insights and ideas were collected, analysed and interpreted. The key study findings show that risks related to clients group are perceived as most critical followed by the contractor related, consultant related and then external group related factors respectively where preventive measures are the most applied risk response technique where the aim to avoid most of the risk factors from happening. Most of the risk factors identified were internal risks and in managerial category which suggested that risk planning was to be emphasized at pre-contract stage to minimize these risks since a bigger percentage of the risk factors were mapped out at implementation stage. Furthermore, barriers to risk management were identified and the key barriers were lack of awareness; lack of knowledge; lack of formal policies in place; regarded as costly and limited time which resulted in proposing that regulating authorities to purposefully introduce intense training on risk management to make known of this new knowledge area. The study then recommends that organisation should formally implement risk management where policies should be introduced to enforce all parties to undertake this. Risk planning was regarded as paramount and this to be done from pre-contract phase so as to mitigate 80% of the risk factors. Finally, training should be done on all project management knowledge areas.

Keywords: risk management, risk factors, risks, malawi

Procedia PDF Downloads 255
464 Legal Allocation of Risks: A Computational Analysis of Force Majeure Clauses

Authors: Farshad Ghodoosi

Abstract:

This article analyzes the effect of supervening events in contracts. Contracts serve an important function: allocation of risks. In spite of its importance, the case law and the doctrine are messy and inconsistent. This article provides a fresh look at excuse doctrines (i.e., force majeure, impracticability, impossibility, and frustration) with a focus on force majeure clauses. The article makes the following contributions: First, it furnishes a new conceptual and theoretical framework of excuse doctrines. By distilling the decisions, it shows that excuse doctrines rests on the triangle of control, foreseeability, and contract language. Second, it analyzes force majeure clauses used by S&P 500 companies to understand the stickiness and similarity of such clauses and the events they cover. Third, using computational and statistical tools, it analyzes US cases since 1810 in order to assess the weight given to the triangle of control, foreseeability, and contract language. It shows that the control factor plays an important role in force majeure analysis, while the contractual interpretation is the least important factor. The Article concludes that it is the standard for control -whether the supervening event is beyond the control of the party- that determines the outcome of cases in the force majeure context and not necessarily the contractual language. This article has important implications on COVID-19-related contractual cases. Unlike the prevailing narrative that it is the language of the force majeure clause that’s determinative, this article shows that the primarily focus of the inquiry will be on whether the effects of COVID-19 have been beyond the control of the promisee. Normatively, the Article suggests that the trifactor of control, foreseeability, and contractual language are not effective for allocation of legal risks in times of crises. It puts forward a novel approach to force majeure clauses whereby that the courts should instead focus on the degree to which parties have relied on (expected) performance, in particular during the time of crisis.

Keywords: contractual risks, force majeure clauses, foreseeability, control, contractual language, computational analysis

Procedia PDF Downloads 114
463 Factors Affecting Contractual Disputes in Construction ProJects in Sri Lanka

Authors: R. M. Rajapaksa

Abstract:

Construction industry is one of the key players in driving the economy of a country to achieve its prosperity. However, a dispute is one of the crucial factors which prevent the completion of construction contracts within the budgeted cost, scheduled time, and accepted quality. Disputes are inevitable in the construction contract. Accordingly, a study has been undertaken to identify the factors affecting contractual disputes in construction projects in Sri Lanka. The study was a mixed approach with major qualitative and minor quantitative. Qualitative study was set in the form of in-depth interviews with eighteen participants, and quantitative study was conducted using a questionnaire with twenty-four respondents from previously implemented projects by the National Water Supply & Drainage Board representing the employer, engineer and the Contractor to identify the factors affecting contractual disputes and to verify most critical factors respectively. Data analysis for qualitative and quantitative studies was carried out by means of transcribing, code & categorizeand average score methods, respectively. The study reveals that there are forty factors affecting the contractual disputes in construction contracts in Sri Lanka. The finding further illustrates that conflicting decisions by inexperience personnel in the higher position of the Employer, ambiguities resulting inadequate descriptions of the preliminary/general items in price schedule, unfair valuation and late confirmation of variations, unfair determination due to lack of experience of the Engineer/Consultant, under certification of progress payments, unfair grant of EOT & application of delay damages, unreasonable claims for variation of works, errors/discrepancies/ambiguities in the contract conditions and discrepancies & errors in designs & specifications are the most critical factors affecting contractual disputes. Finally, the study proposed remedial measures to most critical factors affecting contractual disputes.

Keywords: dispute, contractual, factors, employer, engineer, contractor, construction projects

Procedia PDF Downloads 185
462 A Method for Precise Vertical Position of the Implant When Using Computerized Surgical Guides and Bone Reduction

Authors: Abraham Finkelman

Abstract:

Computerized Surgical Guides have been proven to be a predictable way to perform dental implants, with a relatively high accuracy in comparison to a treatment plan. When using the CSG Bone supported, it allows us to make the necessary changes of the hard tissue prior to the implant placement and after the implant placement. The CSG gives us an accurate position for the drilling, and during the implant placement it allows us to alter the vertical position of the implant altering the final position of the abutment and avoiding any risk of any damage to the adjacent anatomical structures. Any Changes required to the bone level can be done prior to the fixation of the CSG using a reduction guide, which incur extra surgical fees and the need of a second surgical guide. Any changes of the bone level after the implant placement are at the risk of damaging the implant neck surface. The technique consists of a universal system that allows us to remove the excess bone around the implant sockets prior to the implant placement which then enables us to place the implant in the vertical position with accuracy as planned with the CSG. The systems consist of a hollow pin of different sizes and diameters. Depending on the implant system that we are using. Length sizes are from 6mm-16mm and a diameter of 2.6mm-4.8mm. Upon the completion of the drilling, the pin is then inserted into the implant socket-using the insertion tool. Once the insertion tool has unscrewed the pin, we can continue with the bone reduction. The bone reduction can be done using conventional methods upon the removal of all the excess bone around the pin. The insertion tool is then screwed into the pin and the pin is then removed. We now, have the new bone level at the crest of the implant socket which is our mark for the vertical position of the implant. In some cases, when we are locating the implant very close to anatomical structures, any form of deviation to the vertical position of the implant during the surgery, can cause damage to such anatomical structures, creating irreversible damages such as paresthesia or dysesthesia of the mandibular nerve. If we are planning for immediate loading and we have done our temporary restauration in base of our computerized plan, deviation in the vertical position of the implant will affect the position of the abutment, affecting the accuracy of the temporary prosthesis, extending the working time till we adapt the prosthesis to the new position.

Keywords: bone reduction, computer aided navigation, dental implant placement, surgical guides

Procedia PDF Downloads 309
461 Functioning of a Temporarily Single Parent Family System Due to Migration from the Perspective of Adolescents with Cerebral Palsy

Authors: A. Gagat-Matuła

Abstract:

There is a definite lack – in Poland, as well as around the world – of empirical studies of families raising handicapped child, in which one parent migrates. In diagnostics of the functioning of such families emphasis should be placed not only on the difficulties, but most of all it should be indicated what possibilities are there for the family and how it overcomes the difficulties. Migration of a parent on the one hand is a chance to improve the family’s material situation. In certain circumstances this may only be an “escape” into work from the issues associated with the upbringing and rehabilitation of a handicapped child. The aim of the study was to learn the functioning of a temporarily single parent family system as a result of migration of a parent from the perspective of adolescents with cerebral palsy. The study was conducted in the year 2013 in the area of Eastern Poland. It involved an analysis of 70 persons (with cerebral palsy in an intellectual capacity) from families in which at least one of the parents migrates. The study incorporated the diagnostic survey method. These tools were used: Family Evaluation Scales (SOR) adapted for Poland by Andrzej Margasiński. The explorations in this study indicate, that 47% of studied temporarily single parent families are balanced models. This is evidence of the resources at the disposal of the family which, despite the disability of the child and temporary separation, is able to function properly. The conducted studies show, that 37% of temporarily single parent families are imbalanced models in the perception of adolescents with cerebral palsy. These families experience functional difficulties and require psychological and pedagogical support. There is a need for building skills related to effective coping with family stress. Especially considering, that families of an imbalanced type do not use the internal and external resources of the family system. Such a situation may deepen the disarrangement of family life. In intermediate families (16%) there are also temporary difficulties in functioning. Separation anxiety experienced by mothers may disrupt relations and introduce additional stress factors. For that reason it is important to provide support for women with difficulties coping with the emotions associated with raising handicapped adolescents and migratory separation.

Keywords: child with cerebral palsy, family, migration, parents

Procedia PDF Downloads 390
460 Implementation of Proof of Work Using Ganache

Authors: Sakshi Singh, Shampa Chakraverty

Abstract:

One of the essential characteristics of Blockchain is the ability to validate the integrity of new transactions added to the Blockchain. Moreover, one of the essential consensus algorithms, Proof of Work, performs this job. In this work, we implemented the Proof of Work consensus method on the block formed by performing the transaction using Ganache. The primary goal of this implementation is to understand the process and record how Proof of Work works in reality on newly created blocks.

Keywords: proof of work, blockchain, ganache, smart contract

Procedia PDF Downloads 120
459 Law, Resistance, and Development in Georgia: A Case of Namakhvani HPP

Authors: Konstantine Eristavi

Abstract:

The paper will contribute to the discussion on the pitfalls, limits, and possibilities of legal and rights discourse in opposing large infrastructural projects in the context of neoliberal globalisation. To this end, the paper will analyse the struggle against the Namakhvani HPP project in Georgia. The latter has been hailed by the government as one of the largest energy projects in the history of the country, with an enormous potential impact on energy security, energy independence, economic growth, and development. This takes place against the backdrop of decades of market-led -or neoliberal- model of development in Georgia, characterised by structural adjustments, deregulation, privatisation, and Laissez-Fair approach to foreign investment. In this context, the Georgian state vies with other low and middle-income countries for foreign capital by offering to potential investors, on the one hand, exemptions from social and environmental regulations and, on the other hand, huge legal concessions and safeguards, thereby participating in what is often called a “race to the bottom.” The Namakhvani project is a good example of this. At every stage, the project has been marred with violations of laws and regulations concerning transparency, participation, social and environmental regulations, and so on. Moreover, the leaked contract between the state and the developer reveals the contractual safeguards which effectively insulate the investment throughout the duration of the contract from the changes in the national law that might adversely affect investors’ rights and returns. These clauses, aimed at preserving investors' economic position, place the contract above national law in many respects and even conflict with fundamental constitutional rights. In response to the perceived deficiencies of the project, one of the largest and most diverse social movements in the history of post-soviet Georgia has been assembled, consisting of the local population, conservative and leftist groups, human rights and environmental NGOs, etc. Crucially, the resistance movement is actively using legal tools. In order to analyse both the limitations and possibilities of legal discourse, the paper will distinguish between internal and immanent critiques. Law as internal critique, in the context of the struggles around the Namakhvani project, while potentially fruitful in hindering the project, risks neglecting and reproducing those factors -e.g., the particular model of development- that made such contractual concessions and safeguards and concomitant rights violations possible in the first place. On the other hand, the use of rights and law as part of immanent critique articulates a certain incapacity on the part of the addressee government to uphold existing laws and rights due to structural factors, hence, pointing to a need for a fundamental change. This 'ruptural' form of legal discourse that the movement employs makes it possible to go beyond the discussion around the breaches of law and enables a critical deliberation on the development model within which these violations and extraordinary contractual safeguards become necessary. It will be argued that it is this form of immanent critique that expresses the emancipatory potential of legal discourse.

Keywords: law, resistance, development, rights

Procedia PDF Downloads 57
458 The Integration Process of Non-EU Citizens in Luxembourg: From an Empirical Approach Toward a Theoretical Model

Authors: Angela Odero, Chrysoula Karathanasi, Michèle Baumann

Abstract:

Integration of foreign communities has been a forefront issue in Luxembourg for some time now. The country’s continued progress depends largely on the successful integration of immigrants. The aim of our study was to analyze factors which intervene in the course of integration of Non-EU citizens through the discourse of Non-EU citizens residing in Luxembourg, who have signed the Welcome and Integration Contract (CAI). The two-year contract offers integration services to assist foreigners in getting settled in the country. Semi-structured focus group discussions with 50 volunteers were held in English, French, Spanish, Serbo-Croatian or Chinese. Participants were asked to talk about their integration experiences. Recorded then transcribed, the transcriptions were analyzed with the help of NVivo 10, a qualitative analysis software. A systematic and reiterative analysis of decomposing and reconstituting was realized through (1) the identification of predetermined categories (difficulties, challenges and integration needs) (2) initial coding – the grouping together of similar ideas (3) axial coding – the regrouping of items from the initial coding in new ways in order to create sub-categories and identify other core dimensions. Our results show that intervening factors include language acquisition, professional career and socio-cultural activities or events. Each of these factors constitutes different components whose weight shifts from person to person and from situation to situation. Connecting these three emergent factors are two elements essential to the success of the immigrant’s integration – the role of time and deliberate effort from the immigrants, the community, and the formal institutions charged with helping immigrants integrate. We propose a theoretical model where the factors described may be classified in terms of how they predispose, facilitate, and / or reinforce the process towards a successful integration. Measures currently in place propose one size fits all programs yet integrative measures which target the family unit and those customized to target groups based on their needs would work best.

Keywords: integration, integration services, non-eu citizens, qualitative analysis, third country nationals

Procedia PDF Downloads 283
457 The Marriage of a Sui Juris Girl: Permission of Wali (Guardian) or Consent of Ward in the Context of Personal Law in Pakistan

Authors: Muhammad Farooq

Abstract:

The present article explores the woman's consent as a paramount element in contracting a Muslim marriage. Also, whether permission of the wali (guardian) is a condition per se for a valid nikah (marriage deed) in the eye of law and Sharia. The researcher attempts to treat it through the related issues, inter alia; the marriage guardian, the women's legal capacity to give consent whether she is a virgin or nonvirgin and how that consent is to be given or may be understood. Does her laugh, tears or salience needs a legal interpretation as well as other female manifestations of emotion explained by the Muslim jurists? The silence of Muslim Family Law Ordinance 1961 (hereafter; MFLO 1961) in this regard and the likely reasons behind such silence is also inquired in brief. Germane to the theme, the various cases in which the true notion of woman's consent is interpreted by courts in Pakistan are also examined. In order to address the issue in hand, it is proposed to provide a brief overview of a few contemporary writers' opinions in which the real place of woman's consent in Muslim marriage is highlighted. Key to the idea of young Muslim woman's marriage, the doctrine of kafa'a (equality or suitability) between the man and woman is argued here to be grounded in the patriarchal and social norms. It is, therefore, concluded that such concept was the result of analogical reasoning and has less importance in the present time. As such it is not a valid factor in current scenarios to validate or invalidate marital bonds. A standard qualitative convention is used for this research. Among primary and secondary sources; for examples, Qur'an, Sunnah, Books, Scholarly articles, texts of law and case law is used to point out the researcher's view. In summation, the article is concluded with a bold statement that a young woman being a party to the contract, is absolutely entitled to 'full and free' consent for the Muslim marriage contract. It is the woman, an indispensable partaker and her consent (not the guardian' permission) that does validate or invalidate the said agreement in the eye of contemporary personal law and in Sharia.

Keywords: consent of woman, ejab (declaration), Nikah (marriage agreement), qabol (acceptance), sui juris (of age; independent), wali (guardian), wilayah (guardianship)

Procedia PDF Downloads 117
456 Exploitation Pattern of Atlantic Bonito in West African Waters: Case Study of the Bonito Stock in Senegalese Waters

Authors: Ousmane Sarr

Abstract:

The Senegalese coasts have high productivity of fishery resources due to the frequency of intense up-welling system that occurs along its coast, caused by the maritime trade winds making its waters nutrients rich. Fishing plays a primordial role in Senegal's socioeconomic plans and food security. However, a global diagnosis of the Senegalese maritime fishing sector has highlighted the challenges this sector encounters. Among these concerns, some significant stocks, a priority target for artisanal fishing, need further assessment. If no efforts are made in this direction, most stock will be overexploited or even in decline. It is in this context that this research was initiated. This investigation aimed to apply a multi-modal approach (LBB, Catch-only-based CMSY model and its most recent version (CMSY++); JABBA, and JABBA-Select) to assess the stock of Atlantic bonito, Sarda sarda (Bloch, 1793) in the Senegalese Exclusive Economic Zone (SEEZ). Available catch, effort, and size data from Atlantic bonito over 15 years (2004-2018) were used to calculate the nominal and standardized CPUE, size-frequency distribution, and length at retentions (50 % and 95 % selectivity) of the species. These relevant results were employed as input parameters for stock assessment models mentioned above to define the stock status of this species in this region of the Atlantic Ocean. The LBB model indicated an Atlantic bonito healthy stock status with B/BMSY values ranging from 1.3 to 1.6 and B/B0 values varying from 0.47 to 0.61 of the main scenarios performed (BON_AFG_CL, BON_GN_Length, and BON_PS_Length). The results estimated by LBB are consistent with those obtained by CMSY. The CMSY model results demonstrate that the SEEZ Atlantic bonito stock is in a sound condition in the final year of the main scenarios analyzed (BON, BON-bt, BON-GN-bt, and BON-PS-bt) with sustainable relative stock biomass (B2018/BMSY = 1.13 to 1.3) and fishing pressure levels (F2018/FMSY= 0.52 to 1.43). The B/BMSY and F/FMSY results for the JABBA model ranged between 2.01 to 2.14 and 0.47 to 0.33, respectively. In contrast, The estimated B/BMSY and F/FMSY for JABBA-Select ranged from 1.91 to 1.92 and 0.52 to 0.54. The Kobe plots results of the base case scenarios ranged from 75% to 89% probability in the green area, indicating sustainable fishing pressure and an Atlantic bonito healthy stock size capable of producing high yields close to the MSY. Based on the stock assessment results, this study highlighted scientific advice for temporary management measures. This study suggests an improvement of the selectivity parameters of longlines and purse seines and a temporary prohibition of the use of sleeping nets in the fishery for the Atlantic bonito stock in the SEEZ based on the results of the length-base models. Although these actions are temporary, they can be essential to reduce or avoid intense pressure on the Atlantic bonito stock in the SEEZ. However, it is necessary to establish harvest control rules to provide coherent and solid scientific information that leads to appropriate decision-making for rational and sustainable exploitation of Atlantic bonito in the SEEZ and the Eastern Atlantic Ocean.

Keywords: multi-model approach, stock assessment, atlantic bonito, SEEZ

Procedia PDF Downloads 41
455 A Survey on Important Factors of the Ethereum Network Performance

Authors: Ali Mohammad Mobaser Azad, Alireza Akhlaghinia

Abstract:

Blockchain is changing our world and launching a new generation of decentralized networks. Meanwhile, Blockchain-based networks like Ethereum have been created and they will facilitate these processes using tools like smart contracts. The Ethereum has fundamental structures, each of which affects the activity of the nodes. Our purpose in this paper is to review similar research and examine various components to demonstrate the performance of the Ethereum network and to do this, and we used the data published by the Ethereum Foundation in different time spots to examine the number of changes that determine the status of network performance. This will help other researchers understand better Ethereum in different situations.

Keywords: blockchain, ethereum, smart contract, decentralization consensus algorithm

Procedia PDF Downloads 180
454 Sustainable Upgrade of Existing Heritage Infrastructure - Strengthening and Rehabilitation of The LH Ford Bridge

Authors: Vince Scolaro, Lakshman Prasad, Ted Polley, Sanjivan Deshpande

Abstract:

The LH Ford Bridge, built in the 1960s, comprises 28 spans, is 800m long and crosses the Macquarie River at Dubbo, NSW. The main bridge spans comprise three spans with a 63m center span (25m drop-in section) supported by halving joints from the main cantilevers and back spans of 28m. The main bridge spans were built using complex construction staging (the first of this type in NSW). They comprise twin precast boxes, in-situ reinforced concrete infills, and cantilevered outriggers stressed both longitudinally and transversely. Since construction, this bridge has undergone significantly increased design vehicle loads and showed signs of excessive shrinkage and creep leading to significant sagging of the centre span with evidence of previous failure and remediation of the halving joints. A comprehensive load rating assessment was undertaken taking account of the original complex construction staging. Deficiencies identified included inadequate capacity of the halving joints, failure of the bearings at the halving joints, inadequate shear capacity of the girder webs and inadequate girder flexural capacity to carry B-Double design vehicles. A unique strengthening system comprising two new piers (under each of the halving joints), new bearings and installation of external prestressing to the soffit of both drop-in-span and back spans was adopted. A portion of the dead load had to be transferred from the superstructure to the new piers via innovative soft/stiff bearing combinations to reduce new locked-in stresses resulting from the new pier supports. Significant temporary works comprised a precast concrete shell beam forming the pile cap/pier structure, addition of a temporary suspended scaffold (without overstressing the existing superstructure) and the installation of jacking stays for new bearing top and bottom plates. This paper presents how this existing historic and socially important bridge was strengthened and updated to increase its design life without the need for replacement.

Keywords: strengthening, creep, construction, box girder

Procedia PDF Downloads 105
453 Two Strain Dengue Dynamics Incorporating Temporary Cross Immunity with ADE Effect

Authors: Sunita Gakkhar, Arti Mishra

Abstract:

In this paper, a nonlinear host vector model has been proposed and analyzed for the two strain dengue dynamics incorporating ADE effect. The model considers that the asymptomatic infected people are more responsible for secondary infection than that of symptomatic ones and differentiates between them. The existence conditions are obtained for various equilibrium points. Basic reproduction number has been computed and analyzed to explore the effect of secondary infection enhancement parameter on dengue infection. Stability analyses of various equilibrium states have been performed. Numerical simulation has been done for the stability of endemic state.

Keywords: dengue, ade, stability, threshold, asymptomatic, infection

Procedia PDF Downloads 401
452 Identifying the Determinants of the Shariah Non-Compliance Risk via Principal Axis Factoring

Authors: Muhammad Arzim Naim, Saiful Azhar Rosly, Mohamad Sahari Nordin

Abstract:

The objective of this study is to investigate the factors affecting the rise of Shariah non-compliance risk that can bring Islamic banks to succumb to monetary loss. Prior literatures have never analyzed such risk in details despite lots of it arguing on the validity of some Shariah compliance products. The Shariah non-compliance risk in this context is looking to the potentially failure of the facility to stand from the court test say that if the banks bring it to the court for compensation from the defaulted clients. The risk may also arise if the customers refuse to make the financing payments on the grounds of the validity of the contracts, for example, when relinquishing critical requirement of Islamic contract such as ownership, the risk that may lead the banks to suffer loss when the customer invalidate the contract through the court. The impact of Shariah non-compliance risk to Islamic banks is similar to that of legal risks faced by the conventional banks. Both resulted into monetary losses to the banks respectively. In conventional banking environment, losses can be in the forms of summons paid to the customers if they won the case. In banking environment, this normally can be in very huge amount. However, it is right to mention that for Islamic banks, the subsequent impact to them can be rigorously big because it will affect their reputation. If the customers do not perceive them to be Shariah compliant, they will take their money and bank it in other places. This paper provides new insights of risks faced by credit intensive Islamic banks by providing a new extension of knowledge with regards to the Shariah non-compliance risk by identifying its individual components that directly affecting the risk together with empirical evidences. Not limited to the Islamic banking fraternities, the regulators and policy makers should be able to use findings in this paper to evaluate the components of the Shariah non-compliance risk and make the necessary actions. The paper is written based on Malaysia’s Islamic banking practices which may not directly related to other jurisdictions. Even though the focuses of this study is directly towards to the Bay Bithaman Ajil or popularly known as BBA (i.e. sale with deferred payments) financing modality, the result from this study may be applicable to other Islamic financing vehicles.

Keywords: Islamic banking, Islamic finance, Shariah Non-compliance risk, Bay Bithaman Ajil (BBA), principal axis factoring

Procedia PDF Downloads 275
451 Reproductive Traits for Holstein Cattle

Authors: Ashraf M. Ward, Ruban S. Yu

Abstract:

Data consisting of 2757 records from tow Holstein herds made between 2000 and 2010 were used to examine environmental factors affecting age at first calving (AFC) and calving intervals (CI) and consequently estimate genetic and phenotypic parameters and trends. The overall means and standard errors for AFC and CI were 39.4 ± 7.2 months and 487.5 ± 151.6 days respectively. The respective heritability estimates were 0.091 ± 0.05 and 0.044 ± 0.032, while the repeatability estimate for CI was 0.096 ± 0.001. The genetic trends for CI and AFC were -0.6 d/yr and -0.01 mo/yr respectively and were both significant (P < 0.001), indicating a decrease in mean breeding value over the study period. Phenotypic trends were -0.31 mo/yr and -0.35 d/yr for AFC and CI respectively though non-significant (P > 0.05). The low heritability for CI and AFC indicated that temporary environmental influences were much greater than genetic influences or permanent environmental influences on these traits.

Keywords: Holstein, reproductive, genetic parameters, heritability

Procedia PDF Downloads 692
450 Building Bridges on Roads With Major Constructions

Authors: Mohamed Zaidour

Abstract:

In this summary, we are going to look in brief at the bridges and their building and construction on most roads and we have followed a simple method to explain each field clearly because the geographical and climatic diversity of an area leads to different methods and types of roads and installation engineering in other areas In mountain areas we need to build retaining walls in areas of rain. It needs to construct ferries to discharge water from roads in areas of temporary or permanent rivers. There is a need to build bridges and construct road installations in the process of collecting the necessary information, such as soil type. This information needs it, engineer, when designing the constructor and in this section, we will identify the types and methods of calculation bridge columns rules phrases the walls are chock.

Keywords: bridges, buildings, concrete, constructions, roads

Procedia PDF Downloads 86
449 A Comparative Study of Insurance Policies Worldwide in Public Private Partnerships

Authors: Guanqun Shi, Xueqing Zhang

Abstract:

The frequent occurrence of failures in PPP projects which caused great loss has raised attention from the government as well as the concessionaire. PPPs are complex arrangements for its long operation period and multiple players. Many types of risks in PPP projects may cause the project fail. The insurance is an important tool to transfer the risks. Through a comparison and analysis of international government PPP guidelines and contracts as well as the case studies worldwide, we have identified eight main insurance principles, discussed thirteen insurance types in different stages. An overall procedure would be established to improve the practices in PPP projects.

Keywords: public private partnerships, insurance, contract, risk

Procedia PDF Downloads 253