Search results for: public projects
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 7308

Search results for: public projects

7188 Beyond the White Cube: A Study on the Site Specific Curatorial Practice of Kochi Muziris Biennale

Authors: Girish Chandran, Milu Tigi

Abstract:

Brian O'Doherty's seminal essay, Inside the white Cube theorized and named the dominant mode of display and exhibition of Modern Art museums. Ever since the advent of Biennales and other site-specific public art projects we have seen a departure from the white cube mode of exhibition. The physicality, materiality and context within which an artwork is framed has a role in the production of meaning of public art. Equally, artworks contribute to the meaning and identity of a place. This to and fro relationship between the site and artwork and its influence on the sense of place and production of meaning is being explored in this paper in the context of Kochi Muziris Biennale (KMB). Known as the Peoples biennale with over 5 lakh visitors, it is India's first Biennale and its largest art exhibition of contemporary art. The paper employs place theory and contemporary curatorial theories to present the case. The KMB has an interesting mix of exhibition spaces which includes existing galleries and halls, site-specific projects in public spaces, infill developments and adaptive reuse of heritage and other unused architecture. The biennale was envisioned as an event connecting to the history, socio-political peculiarities of the cultural landscape of Kerala and more specifically Kochi. The paper explains the role of spatial elements in forming a curatorial narrative connected to the above mentioned ambitions.The site-specific nature of exhibition and its use of unused architecture helps in the formation of exhibition spaces unique in type and materiality. The paper argues how this helps in the creation of an 'archeology of the place'. The research elucidates how a composite nature of experience helps connect with the thematic ambitions of the Biennale and how it brings about an aesthetics distinct to KMB.

Keywords: public art, curatorial practice, architecture, place, contemporary art, site specificity

Procedia PDF Downloads 130
7187 Strategic Investment in Infrastructure Development to Facilitate Economic Growth in the United States

Authors: Arkaprabha Bhattacharyya, Makarand Hastak

Abstract:

The COVID-19 pandemic is unprecedented in terms of its global reach and economic impacts. Historically, investment in infrastructure development projects has been touted to boost the economic growth of a nation. The State and Local governments responsible for delivering infrastructure assets work under tight budgets. Therefore, it is important to understand which infrastructure projects have the highest potential of boosting economic growth in the post-pandemic era. This paper presents relationships between infrastructure projects and economic growth. Statistical relationships between investment in different types of infrastructure projects (transit, water and wastewater, highways, power, manufacturing etc.) and indicators of economic growth are presented using historic data between 2002 and 2020 from the U.S. Census Bureau and U.S. Bureau of Economic Analysis (BEA). The outcome of the paper is the comparison of statistical correlations between investment in different types of infrastructure projects and indicators of economic growth. The comparison of the statistical correlations is useful in ranking the types of infrastructure projects based on their ability to influence economic prosperity. Therefore, investment in the infrastructures with the higher rank will have a better chance of boosting the economic growth. Once, the ranks are derived, they can be used by the decision-makers in infrastructure investment related decision-making process.

Keywords: economic growth, infrastructure development, infrastructure projects, strategic investment

Procedia PDF Downloads 142
7186 Role of Community Participation in Sustainability of Projects: A Multiple Case Study of Developmental Projects in Khyber Pakhtunkhwa, Pakistan

Authors: Sajid Ali Khan, Karim Ullah, Usman Ghani

Abstract:

Community participation is the collaboration of project beneficiaries; voluntarily or because of some incentives or persuasion agree to put effort and work with development projects. Sustainability of projects is the ability to maintain its services, operations, and other benefits during its anticipated time. This study investigated the dynamics of community participation and its contribution to the sustainability of projects. In multiple case-study designs with semi-structured questionnaires and interviews, this study analyzes community participation with the help of individual case analysis followed by cross-case analysis in the RAHA & CDLD developmental project. Finally, the study outcomes are linked with the specified literature in order to comprehend the phenomena. The findings of the study suggest an Analytical framework developed by the current study covering different barriers and enablers to community participation and its implications.

Keywords: community participation, enablers, barriers, project sustainability

Procedia PDF Downloads 212
7185 Optimising GIS in Cushioning the Environmental Impact of Infrastructural Projects

Authors: Akerele Akintunde Hareef

Abstract:

GIS is an integrating tool for storing, retrieving, manipulating, and analyzing spatial data. It is a tool which defines an area with respect to features and other relevant thematic delineations. On the other hand, Environmental Impact Assessment in short is both positive and negative impact of an infrastructure on an environment. Impact of infrastructural projects on the environment is an aspect of development that barely get extensive portion of pre-project execution phase and when they do, the effects are most times not implemented to cushion the impact they have on human and the environment. In this research, infrastructural projects like road constructions, water reticulation projects, building constructions, bridge etc. have immense impact on the environment and the people that reside in location of construction. Hence, the need for this research tends to portray the relevance of Environmental Impact assessment in calculating the vulnerability of human and the environment to imbalance necessitated by this infrastructural development and how the use of GIS application can be optimally applied to annul or minimize the effect.

Keywords: environmental impact assessment (EIA), geographic information system (GIS), infrastructural projects, environment

Procedia PDF Downloads 516
7184 Building Information Modelling for Construction Delay Management

Authors: Essa Alenazi, Zulfikar Adamu

Abstract:

The Kingdom of Saudi Arabia (KSA) is not an exception in relying on the growth of its construction industry to support rapid population growth. However, its need for infrastructure development is constrained by low productivity levels and cost overruns caused by factors such as delays to project completion. Delays in delivering a construction project are a global issue and while theories such as Optimism Bias have been used to explain such delays, in KSA, client-related causes of delays are also significant. The objective of this paper is to develop a framework-based approach to explore how the country’s construction industry can manage and reduce delays in construction projects through building information modelling (BIM) in order to mitigate the cost consequences of such delays.  It comprehensively and systematically reviewed the global literature on the subject and identified gaps, critical delay factors and the specific benefits that BIM can deliver for the delay management.  A case study comprising of nine hospital projects that have experienced delay and cost overruns was also carried out. Five critical delay factors related to the clients were identified as candidates that can be mitigated through BIM’s benefits. These factors are: Ineffective planning and scheduling of the project; changes during construction by the client; delay in progress payment; slowness in decision making by the client; and poor communication between clients and other stakeholders. In addition, data from the case study projects strongly suggest that optimism bias is present in many of the hospital projects. Further validation via key stakeholder interviews and documentations are planned.

Keywords: building information modelling (BIM), clients perspective, delay management, optimism bias, public sector projects

Procedia PDF Downloads 294
7183 Friendly Public Spaces in Iran

Authors: Bibi Somayeh Aliakbari, Niknaz Kachooei, Fatemeh Amiri Najafabadi

Abstract:

According to the results of contemporary urbanism, social living moved into buildings and the quality of urban space has been declining. But still, there are life in open public space and it is one of reason attendance and activities of people in open public spaces.The purpose of this research is finding reason creation friendly public space in urban spaces and also use these in new urban spaces.The research methodology consisted of a qualitative model based on observation and graphical analysis. In this paper case study is public space historical, moderns in urban scales and local scales in Iran.This paper shows that Existence of friendly public space in cities cause is attendance and activities of people in open public spaces that it is reason the revitalization of public open spaces in cities.

Keywords: public space, public open space, friendly public space, Iran

Procedia PDF Downloads 535
7182 Surveying Apps in Dam Excavation

Authors: Ali Mohammadi

Abstract:

Whenever there is a need to dig the ground, the presence of a surveyor is required to control the map. In projects such as dams and tunnels, these controls are more important because any mistakes can increase the cost. Also, time is great importance in These projects have and one of the ways to reduce the drilling time is to use techniques that can reduce the mapping time in these projects. Nowadays, with the existence of mobile phones, we can design apps that perform calculations and drawing for us on the mobile phone. Also, if we have a device that requires a computer to access its information, by designing an app, we can transfer its information to the mobile phone and use it, so we will not need to go to the office.

Keywords: app, tunnel, excavation, dam

Procedia PDF Downloads 23
7181 Risk Management in Construction Projects

Authors: Mustafa Dogru, Ruveyda Komurlu

Abstract:

Companies and professionals in the construction sector face various risks in every project depending on the characteristics, size, complexity, the location of the projects and the techniques used. Some risks’ effects may increase as the project progresses whereas new risks may emerge. Because of the ever-changing nature of the risks, risk management is a cyclical process that needs to be repeated throughout the project. Since the risks threaten the success of the project, risk management is an important part of the entire project management process. The aims of this study are to emphasize the importance of risk management in construction projects, summarize the risk identification process, and introduce a number of methods for preventing risks such as alternative design, checklists, prototyping and test-analysis-correction technique etc. Following the literature review conducted to list the techniques for preventing risks, case studies has been performed to compare and evaluate the success of the techniques in a number of completed projects with the same typology, performed domestic and international. Findings of the study suggest that controlling and minimizing the level of the risks in construction projects, taking optimal precautions for different risks, and mitigating or eliminating the effects of risks are important in order to prevent additional costs for the project. Additionally, focusing on the risks that have highest impact is the most rational way to minimize the effects of the risks on projects.

Keywords: construction projects, construction management, project management, risk management

Procedia PDF Downloads 280
7180 Framework for Government ICT Projects

Authors: Manal Rayes

Abstract:

In its efforts to utilize the information and communication technology to enhance the quality of public service delivery, national and local governments around the world are competing to introduce more ICT applications as tools to automate processes related to law enforcement or policy execution, increase citizen orientation, trust, and satisfaction, and create one-stop-shops for public services. In its implementation, e-Government ICTs need to maintain transparency, participation, and collaboration. Due to this diverse of mixed goals and requirements, e-Government systems need to be designed based on special design considerations in order to eliminate the risks of failure to compliance to government regulations, citizen dissatisfaction, or market repulsion. In this article we suggest a framework with guidelines for designing government information systems that takes into consideration the special requirements of the public sector. Then we introduce two case studies and show how applying those guidelines would result in a more solid system design.

Keywords: e-government, framework, guidelines, system design

Procedia PDF Downloads 327
7179 Project Time Prediction Model: A Case Study of Construction Projects in Sindh, Pakistan

Authors: Tauha Hussain Ali, Shabir Hussain Khahro, Nafees Ahmed Memon

Abstract:

Accurate prediction of project time for planning and bid preparation stage should contain realistic dates. Constructors use their experience to estimate the project duration for the new projects, which is based on intuitions. It has been a constant concern to both researchers and constructors to analyze the accurate prediction of project duration for bid preparation stage. In Pakistan, such study for time cost relationship has been lacked to predict duration performance for the construction projects. This study is an attempt to explore the time cost relationship that would conclude with a mathematical model to predict the time for the drainage rehabilitation projects in the province of Sindh, Pakistan. The data has been collected from National Engineering Services (NESPAK), Pakistan and regression analysis has been carried out for the analysis of results. Significant relationship has been found between time and cost of the construction projects in Sindh and the generated mathematical model can be used by the constructors to predict the project duration for the upcoming projects of same nature. This study also provides the professionals with a requisite knowledge to make decisions regarding project duration, which is significantly important to win the projects at the bid stage.

Keywords: BTC Model, project time, relationship of time cost, regression

Procedia PDF Downloads 355
7178 Innovation Knowledge Management for Public Sector in the Thailand

Authors: Supattra Kanchanopast

Abstract:

This article presents the process of change for innovation in the Thai public sector in order to create higher client satisfaction. Change management should concern the potentiality of the change agent or leader, the long-term vision or policy (political side) of the organization, the communication within the organization, suitable organizational culture and structure, preparedness of the personnel, and the fitness of the reward system. Sustaining innovation creation is not sophisticated, as traditionally believed. A basic management principle of identifying clarified and motivating goals needs to be followed by creating support systems after implementation and by ensuring the stakeholders’ benefit, derived from the innovation projects. Finally, creating an amiable atmosphere among the practitioners, including effective evaluation and reward schemes, will support the innovation. However, none of these will ever take place unless support is gained from the leaders of those organizations, and from the staff and clients involved also as well.

Keywords: change management, client satisfaction, innovation management, Thai public sector

Procedia PDF Downloads 228
7177 Neural Network Models for Actual Cost and Actual Duration Estimation in Construction Projects: Findings from Greece

Authors: Panagiotis Karadimos, Leonidas Anthopoulos

Abstract:

Predicting the actual cost and duration in construction projects concern a continuous and existing problem for the construction sector. This paper addresses this problem with modern methods and data available from past public construction projects. 39 bridge projects, constructed in Greece, with a similar type of available data were examined. Considering each project’s attributes with the actual cost and the actual duration, correlation analysis is performed and the most appropriate predictive project variables are defined. Additionally, the most efficient subgroup of variables is selected with the use of the WEKA application, through its attribute selection function. The selected variables are used as input neurons for neural network models through correlation analysis. For constructing neural network models, the application FANN Tool is used. The optimum neural network model, for predicting the actual cost, produced a mean squared error with a value of 3.84886e-05 and it was based on the budgeted cost and the quantity of deck concrete. The optimum neural network model, for predicting the actual duration, produced a mean squared error with a value of 5.89463e-05 and it also was based on the budgeted cost and the amount of deck concrete.

Keywords: actual cost and duration, attribute selection, bridge construction, neural networks, predicting models, FANN TOOL, WEKA

Procedia PDF Downloads 109
7176 Public Service Ethics in Public Administration: An Empirical Investigation

Authors: Kalsoom Sumra

Abstract:

The increasing concern of public sector reforms brings new challenges to public service ethics in developing countries not only at central level but also at local level. This paper aims to identify perceptions on public service ethics of public officials and examines more generally the understanding of public servants in Pakistan towards public service ethics in local public organizations. The study uses an independently administered structured questionnaire to collect data to know the extent of the recognition of public service ethics in local organizations. A total of 150 completed questionnaires are analyzed received from public servants working at the local level in Pakistan. The analysis explores how traditional, social patterns and cultural ethics can provide us with a rounded picture of the main antecedents, moderators of public service ethics in Pakistan. Moreover, the findings of this study contribute in association of public service ethics which are crucial in ongoing political and administrative culture of Pakistan, the most crucial core for public organizational ethical climate. This study also has numerous implications for local public administration and it highlights the importance of expanding research agenda on public service ethics in developing settings with challenging institutional contexts with imperfect training and operating environments. This study may well be particularly important for practice of public service ethics in developing countries in public administration. To the best of author’s knowledge, this study is the first of its kind to provide an initial step in practical implications to emphasize relevant public service ethics in public administration in developing transparent and accountable organization.

Keywords: public service ethics, accountability and transparency, public service reforms, public administration, organizational ethical climate

Procedia PDF Downloads 314
7175 Meeting the Challanges of Regulating Artificial Intelligence

Authors: Abdulrahman S. Shryan Aldossary

Abstract:

Globally, artificial intelligence (AI) is already performing legitimate tasks on behalf of humans. In Saudi Arabia, large-scale national projects, primarily based on AI technologies and receiving billions of dollars of funding, are projected for completion by 2030. However, the legal aspect of these projects is seriously vulnerable, given AI’s unprecedented ability to self-learn and act independently. This paper, therefore, identifies the critical legal aspects of AI that authorities and policymakers should be aware of, specifically whether AI can possess identity and be liable for the risk of public harm. The article begins by identifying the problematic characteristics of AI and what should be considered by legal experts when dealing with it. Also discussed are the possible competent institutions that could regulate AI in Saudi Arabia. Finally, a procedural proposal is presented for controlling AI, focused on Saudi Arabia but potentially of interest to other jurisdictions facing similar concerns about AI safety.

Keywords: regulation, artificial intelligence, tech law, automated systems

Procedia PDF Downloads 131
7174 Public Procurement and Innovation: A Municipal Approach

Authors: M. Moso-Diez, J. L. Moragues-Oregi, K. Simon-Elorz

Abstract:

Innovation procurement is designed to steer the development of solutions towards concrete public sector needs as a driver for innovation from the demand side (in public services as well as in market opportunities for companies), is horizontally emerging as a new policy instrument. In 2014 the new EU public procurement directives 2014/24/EC and 2014/25/EC reinforced the support for Public Procurement for Innovation, dedicating funding instruments that can be used across all areas supported by Horizon 2020, and targeting potential buyers of innovative solutions: groups of public procurers with similar needs. Under this programme, new policy adapters and networks emerge, aiming to embed innovation criteria into new procurement processes. As these initiatives are in process, research related to is scarce. We argue that Innovation Public Procurement can arise as an innovative policy instrument to public procurement in different policy domains, in spite of existing institutional and cultural barriers (legal guarantee versus innovation). The presentation combines insights from public procurement to supply management chain management in a sustainability and innovation policy arena, as a means of providing understanding of: (1) the circumstances that emerge; (2) the relationship between public and private actors; and (3) the emerging capacities in the definition of the agenda. The policy adopters are the contracting authorities that mainly are at municipal level where they interact with the supply management chain, interconnecting sustainability and climate measures with other policy priorities such as innovation and urban planning; and through the Competitive Dialogue procedure. We found that geography and territory affect both the level of municipal budget (due to municipal income per capita) and its institutional competencies (due to demographic reasons). In spite of the relevance of institutional determinants for public procurement, other factors play an important role such as human factors as well as both public policy and private intervention. The experience is a ‘city project’ (Bilbao) in the field of brownfield decontamination. Brownfield sites typically refer to abandoned or underused industrial and commercial properties—such as old process plants, mining sites, and landfills—that are available but contain low levels of environmental contaminants that may complicate reuse or redevelopment of the land. This article concludes that Innovation Public Procurement in sustainability and climate issues should be further developed both as a policy instrument and as a policy research line that could enable further relevant changes in public procurement as well as in climate innovation.

Keywords: innovation, city projects, public policy, public procurement

Procedia PDF Downloads 281
7173 Daily Site Risks Associated with Construction Projects and On-spot Corrective Measurements: Case Study of Revamping Projects in Kuwait Oil Company Fields Area

Authors: Yousef S. Al-Othman

Abstract:

The growth and expansion of the industrial facilities comes proportional to the market increasing demand of products and services. Furthermore, raw material producers such as oil companies usually undergo massive revamping projects to maintain a synchronized supply. These revamping projects are usually delivered through challenging construction projects held and associated with daily site risks related to the construction process. Henceforth, a case study related to these risks and corresponding on-spot corrective measurements has been made on a certain number of construction project contractors at Kuwait Oil Company (KOC) to derive the benefits and overall effectiveness of the on-spot corrective measurements during the construction phase of a project, and how would the same help in avoiding major incidents, ensuring a smooth, cost effective and on time delivery of the project. Findings of this case study shall have an added value to the overall risk management process by minimizing the daily site risks that may affect the project lead time, resulting in an undisturbed on-site construction process.

Keywords: oil and gas, risk management, construction projects, project lead time

Procedia PDF Downloads 83
7172 An Introduction to Critical Chain Project Management Methodology

Authors: Ranjini Ramanath, Nanjunda P. Swamy

Abstract:

Construction has existed in our lives since time immemorial. However, unlike any other industry, construction projects have their own unique challenges – project type, purpose and end use of the project, geographical conditions, logistic arrangements, largely unorganized manpower and requirement of diverse skill sets, etc. These unique characteristics bring in their own level of risk and uncertainties to the project, which cause the project to deviate from its planned objectives of time, cost, quality, etc. over the many years, there have been significant developments in the way construction projects are conceptualized, planned, and managed. With the rapid increase in the population, increased rate of urbanization, there is a growing demand for infrastructure development, and it is required that the projects are delivered timely, and efficiently. In an age where ‘Time is Money,' implementation of new techniques of project management is required in leading to successful projects. This paper proposes a different approach to project management, which if applied in construction projects, can help in the accomplishment of the project objectives in a faster manner.

Keywords: critical chain project management methodology, critical chain, project management, construction management

Procedia PDF Downloads 395
7171 Factors Affecting Time Performance in Building Construction Projects

Authors: Ibraheem A. K. Mahameed

Abstract:

The aim of this study is to identify the risks affecting time performance of building construction projects in the West Bank in Palestine from contractors’ viewpoint. 38 risks that might affect time performance of building construction projects were defined through a detailed literature review. These risks have been classified into 6 groups: project, managerial, consultant, financial, external, and construction items. A questionnaire survey was performed to rank the considered risks in terms of severity and frequency. The analysis of the survey indicated that the top five risks affecting time performance of building construction projects in Palestine are: award project to the lowest price, political situation, poor communication and coordination between construction parties, change orders, and financial status of contractor.

Keywords: delay, time performance, construction, building

Procedia PDF Downloads 433
7170 Implementation of Total Quality Management in Public Sector: Case of Tunisia

Authors: Rafla Hchaichi

Abstract:

The public administration is currently experiencing in the field of quality unprecedented effervescence. However, in a globalized world more and more competitive, public services are confronted with the need to improve their performances which push public companies to implement quality approaches. Quality approaches have taken diverse forms such as service commitment, labels, certifications and the Common Assessment Framework. This paper provides an overview on the strategy for administrative development in Tunisia since the Carthaginian civilization until today. It outlines the evolution of quality management in the Tunisian public context while focusing on the National Referential of Quality of Administrative Services.

Keywords: quality approach, the common assessment framework, service commitment, label, certification, quality of public service, performance of public service, Tunisian Public Service

Procedia PDF Downloads 516
7169 Cloud Computing Impact on e-Government Adoption

Authors: Ali Elshabrawy

Abstract:

Cloud computing is expected to be important for e Government in near future. Governments need it for solving some of its e Government, financial, infrastructure, legacy systems and integration problems. It reduces information technology (IT) infrastructure needs and support costs, and offers on-demand infrastructure and computational power, improved collaboration capabilities, which are important for e Government projects start up and sustainability. Budget pressures will continue to drive more and more government IT to hybrid and even public clouds, and more cooperation between cloud service providers and governmental agencies are expected, Or developing governmental private, community clouds. Motivation to convince governments to use cloud computing services, will create a pressure on cloud service providers to cope with government's requirements for interoperability, security standards, open data and integration between their cloud systems There will be significant legal action arising out of governmental uses of cloud computing, and legislation addressing both IT and business needs and consumer fears and protections. Cloud computing is a considered a revolution for IT and E business in general and e commerce, e Government in particular. As governments faces increasing challenges regarding IT infrastructure required for e Government projects implementation. As a result of Lack of required financial resources allocated for e Government projects in developed and developing countries. Cloud computing can play a major role to solve some of e Government projects challenges such as, lack of financial resources, IT infrastructure, Human resources trained to manage e Government applications, interoperability, cost efficiency challenges. If we could solve some security issues related to cloud computing usage which considered critical for e Government projects. Pretty sure it’s Just a matter of time before cloud service providers will find out solutions to attract governments as major customers for their business.

Keywords: cloud computing, e-government, adoption, supply side barriers, e-government requirements, challenges

Procedia PDF Downloads 329
7168 A Study of Factors Affecting the Elapsed Time of Housing Renewal Project Implementation in Seoul

Authors: In Su Na, Gunwon Lee, Seiyong Kim

Abstract:

This study analyzed the effect of area variables and economic variables on the length of each period of the project in order to analyze the effect of agreement rate on project implementation in housing renewal projects. In conclusion, as can be seen from these results, a low agreement rate may not translate into project promotion, and a higher agreement rate may not translate into project delay. The expectation of the policy is that the lower the agreement rate, the more projects would be promoted, but that is not the actual effect. From a policy consistency viewpoint, changing the agreement rate frequently, depending on the decision of the public, is not reasonable. The policy of using agreement rate as a necessary condition for project implementation should be reconsidered.

Keywords: Area and Economic Variables, Elapsed time, Housing Renewal Project

Procedia PDF Downloads 431
7167 Examination of the Impact of Projects Based on Reggio Emilia Approach on the Creative Thinking Skills of Preschool Children: A Qualitative Study

Authors: Arzu Akar Gençer, Mübeccel Gönen

Abstract:

The objective of the study is to investigate the impact of the projects based on Reggio Emilia Approach, on the creative thinking skills of preschool children. The study is carried out with eighteen 6 years old children in a class of a preschool, and entailed the development of projects based on Reggio Emilia approach with the children, for a period of 3 months. The study employs qualitative model. The children were analyzed with reference to the creative thinking aspects (rationality, originality, flexibility, and applicability) of the projects applied. As the projects based on Reggio Emilia approach arose out of the interests and curiosity of the children, and had their roots in the existing class culture, it is possible to conclude that they have an impact on the creativity of the children with reference to the aspects of creative thinking.

Keywords: Reggio Emilia approach, project, creativity, preschool children

Procedia PDF Downloads 544
7166 The Organizational Commitment of the Public Enterprises in Thailand

Authors: Routsukol Sunalai

Abstract:

The purpose of this study is to examine the impact of public enterprise reform policy on the attributes of organizational commitments in the public energy enterprises in Thailand. It compares three structural types of public energy enterprises: Totally state-owned public enterprises (type I), partially transformed public enterprises (type II), and totally transformed public enterprises (type III), based on the degree of state partially transformed public enterprises (type II), and totally transformed public enterprises (type III),based on the degree of reformed organizations, by analyzing the presence of the desirable attributes of organizational commitment as perceived by employees. Findings indicate that there are statistically significant differences in the level of some dimensions of organizational commitment (affective commitment and normative commitment) between the three types of public energy enterprises. The lack of a structural type difference holds for only continuance commitment. The results also indicate empirical evidence concerning the causal relationship between the antecedents and including organizational commitment also.

Keywords: management control, organizational commitment, public enterprises in Thailand, public enterprise reform

Procedia PDF Downloads 260
7165 Problems in Establishing Alliances to Comply with SDG 17 in the Successful Execution of Environmental Conservation Projects

Authors: Elena Bulmer

Abstract:

The research for this study has found that the formation of alliances for the successful revitalization of the global partnership for sustainable development, as defined by UN Sustainable Development Goal 17, entails considerable difficulty. This study uses for its empirical work marine environmental conservation projects and analyses the potential involvement of nonhuman actors as primordial stakeholders in these types of projects. The idea is to extend the scope of SDG 17 for it to also consider nonhuman subjects in order for it to better achieve its goal. The results of this study may be extrapolated to the business and management fields, which depend on natural resources for the development of their products. In the same way, in these areas, natural resources as nonhuman actors are not present in the stakeholder maps of these projects. Environmental Conservation projects are thus especially interesting to study with regards to their stakeholder context and have been used as the experimental setting for the empirical work of this study. The primordial stakeholders of these projects are not social objects and therefore go beyond the present limits of present stakeholder theory. The study that has been used to analyse this concept is a marine conservation project based in Spain, and to shed light in potential extending the role of the 17th Sustainable Development Goal to include nonhuman beings to be able to better achieve the rest of the SDGs, in this case, SDG 14 whose aim is to promote the conservation and sustainability of the world´s oceans.

Keywords: SDG 17, sustainability, stakeholder management, environmental conservation projects

Procedia PDF Downloads 179
7164 Self in Networks: Public Sphere in the Era of Globalisation

Authors: Sanghamitra Sadhu

Abstract:

A paradigm shift from capitalism to information technology is discerned in the era globalisation. The idea of public sphere, which was theorized in terms of its decline in the wake of the rise of commercial mass media has now emerged as a transnational or global sphere with the discourse being dominated by the ‘network society’. In other words, the dynamic of globalisation has brought about ‘a spatial turn’ in the social and political sciences which is also manifested in the public sphere, Especially the global public sphere. The paper revisits the Habermasian concept of the public sphere and focuses on the various social networking sites with their plausibility to create a virtual global public sphere. Situating Habermas’s notion of the bourgeois public sphere in the present context of global public sphere, it considers the changing dimensions of the public sphere across time and examines the concept of the ‘public’ with its shifting transformation from the concrete collective to the fluid ‘imagined’ category. The paper addresses the problematic of multimodal self-portraiture in the social networking sites as well as various online diaries/journals with an attempt to explore the nuances of the networked self.

Keywords: globalisation, network society, public sphere, self-fashioning, identity, autonomy

Procedia PDF Downloads 386
7163 Partner Selection for Innovation Projects Related to New Product Concept Design

Authors: Odd Jarl Borch, Marina Z. Solesvik

Abstract:

The paper analyses partner selection approaches related to large scale R&D-based innovation projects at the different stages of development. We emphasize innovation projects in the maritime value chain and how partners are selected to improve quality according to high spec customer demands, and to reduce investment costs on new production technology such as advanced offshore service vessels. We elaborate on the differences in innovation approach and especially the role that purposive inflows and outflows of knowledge from external partners may be used to accelerate internal innovation. We present three cases related to different projects in terms of specificity and scope. We explore how the partner selection criteria change over time when the goals move from wide scope to a very specific R&D tasks.

Keywords: partner selection, innovation, offshore industry, concept design

Procedia PDF Downloads 488
7162 Analysis of Delay Causes in Construction Projects in Saudi Arabia

Authors: Ibrahim Mahamid, A. Al-Ghonamy, M. Aichouni

Abstract:

This study aims at identifying the risk matrix for delay causes in construction projects in Saudi Arabia from consultants’ viewpoint. A questionnaire survey was undertaken of 51 consultants working on construction projects in the Northern Province of Saudi Arabia. 35 delay causes were identified through a literature review. The study concluded that the top delay causes in construction projects in Saudi Arabia from consultants’ perspective are: bid award for lowest price, changes in material types and specifications during construction, contract management, duration of contract period, fluctuation of prices of materials, frequent changes in design, improper planning, inflationary pressure, lack of adequate manpower, long period of design and time of implementation, payments delay, poor labor productivity, and rework.

Keywords: delays, construction, consultants, contributors, risk map

Procedia PDF Downloads 504
7161 Saving the Decolonized Subject from Neglected Tropical Diseases: Public Health Campaign and Household-Centred Sanitation in Colonial West Africa, 1900-1960

Authors: Adebisi David Alade

Abstract:

In pre-colonial West Africa, the deadliness of the climate vis-a- vis malaria and other tropical diseases to Europeans turned the region into the “white man’s grave.” Thus, immediately after the partition of Africa in 1885, civilisatrice and mise en valeur not only became a pretext for the establishment of colonial rule; from a medical point of view, the control and possible eradication of disease in the continent emerged as one of the first concerns of the European colonizers. Though geared toward making Africa exploitable, historical evidence suggests that some colonial Water, Sanitation and Hygiene (WASH) policies and projects reduced certain tropical diseases in some West African communities. Exploring some of these disease control interventions by way of historical revisionism, this paper challenges the orthodox interpretation of colonial sanitation and public health measures in West Africa. This paper critiques the deployment of race and class as analytical tools for the study of colonial WASH projects, an exercise which often reduces the complexity and ambiguity of colonialism to the binary of colonizer and the colonized. Since West Africa presently ranks high among regions with Neglected Tropical Diseases (NTDs), it is imperative to decentre colonial racism and economic exploitation in African history in order to give room for Africans to see themselves in other ways. Far from resolving the problem of NTDs by fiat in the region, this study seeks to highlight important blind spots in African colonial history in an attempt to prevent post-colonial African leaders from throwing away the baby with the bath water. As scholars researching colonial sanitation and public health in the continent rarely examine its complex meaning and content, this paper submits that the outright demonization of colonial rule across space and time continues to build ideological wall between the present and the past which not only inhibit fruitful borrowing from colonial administration of West Africa, but also prevents a wide understanding of the challenges of WASH policies and projects in most West African states.

Keywords: colonial rule, disease control, neglected tropical diseases, WASH

Procedia PDF Downloads 151
7160 Major Causes of Delay in Construction Projects

Authors: Y. Gholipour, E. Rezazadeh

Abstract:

Delay is one of the most serious and common problems of construction project that can affect project delivery unfavorably. This research presents the most important causes of delay in large dam projects based on a survey on some executed dam construction in Iran. In this survey a randomly selected samples of owners, consultants and contractors have been involved. The outcome of this survey revealed that scheduled payments, site management, shop drawing review process, unforeseen ground conditions and contractor experience as the most important factors affecting on delay in dam construction projects.

Keywords: delay, dam construction, project management, Iran

Procedia PDF Downloads 412
7159 The Study of Strength and Weakness Points of Various Techniques for Calculating the Volume of Done Work in Civil Projects

Authors: Ali Fazeli Moslehabadi

Abstract:

One of the topics discussed in civil projects, during the execution of the project, which the continuous change of work volumes is usually the characteristics of these types of projects, is how to calculate the volume of done work. The difference in volumes announced by the execution unit with the estimated volume by the technical office unit, has direct effect on the announced progress of the project. This issue can show the progress of the project more or less than actual value and as a result making mistakes for stakeholders and project managers and misleading them. This article intends to introduce some practical methods for calculating the volume of done work in civil projects. It then reviews the strengths and weaknesses of each of them, in order to resolve these contradictions and conflicts.

Keywords: technical skills, systemic skills, communication skills, done work volume calculation techniques

Procedia PDF Downloads 131