Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 7952

Search results for: project budget and gain or loss

7952 Solving One of the Variants of Necktie Paradox for Business Proposals

Authors: Natarajan Vijayarangan, Viswanath Kumar Ganesan, G. Kumudhavalli

Abstract:

This abstract figures out an uncertainty problem pertaining to evaluating business proposals or concept notes in an organisation. Let us consider business proposal evaluation process (BPEP) for execution of corporate research cum business projects in the organisation. Assume that two concept notes X and Y of BPEP are approved: one of them is a full-fledged type (100% financial approval given by the organisation) - X and other one is a conditional type (a partial financial approval given by the organisation) - Y. Then a penalty criteria has been introduced during the process. At the end of annual appraisal, if both of them complete as per the goals and objectives committed or figured out at the time of concept note submission, then both will get an incentive of $N from the organisation. If one of them doesn't fulfill the goals and objectives at the year-end appraisal, then d% reduction or cut will be levied on the project budget for the next year. If X fulfills the goals and objectives and Y doesn't , then X gets a gain of d% on Y's previous year budget and Y gets a loss of d% from the previous year budget for the next year. And vice-versa. Further, an incentive of $N will be given to those who gains. This process is a part of Necktie paradox and inherits an uncertainty principle on X or Y getting more than $N even if X or Y performs well.Solving the above problem and generalizing on finitely many concept notes will be a challenging task.

Keywords: concept notes, necktie paradox, annual appraisal, project budget and gain or loss

Procedia PDF Downloads 369
7951 Development of Construction Cost Optimization System Using Genetic Algorithm Method

Authors: Hyeon-Seung Kim, Young-Hwan Kim, Sang-Mi Park, Min-Seo Kim, Jong-Myeung Shin, Leen-Seok Kang

Abstract:

The project budget at the planned stage might be changed by the insufficient government budget or the design change. There are many cases more especially in the case of a project performed for a long period of time. If the actual construction budget is insufficient comparing with the planned budget, the construction schedule should also be changed to match the changed budget. In that case, most project managers change the planned construction schedule by a heuristic approach without a reasonable consideration on the work priority. This study suggests an optimized methodology to modify the construction schedule according to the changed budget. The genetic algorithm was used to optimize the modified construction schedule within the changed budget. And a simulation system of construction cost histogram in accordance with the construction schedule was developed in the BIM (Building Information Modeling) environment.

Keywords: 5D, BIM, GA, cost optimization

Procedia PDF Downloads 513
7950 Create a Dynamic Model in Project Control and Management

Authors: Hamed Saremi, Shahla Saremi

Abstract:

In this study, control and management of construction projects is evaluated through developing a dynamic model in which some means are used in order to evaluating planning assumptions and reviewing the effectiveness of some project control policies based on previous researches about time, cost, project schedule pressure management, source management, project control, adding elements and sub-systems from cost management such as estimating consumption budget from budget due to costs, budget shortage effects and etc. using sensitivity analysis, researcher has evaluated introduced model that during model simulation by VENSIM software and assuming optimistic times and adding information about doing job and changes rate and project is forecasted with 373 days (2 days sooner than forecasted) and final profit $ 1,960,670 (23% amount of contract) assuming 15% inflation rate in year and costs rate accordance with planned amounts and other input information and final profit.

Keywords: dynamic planning, cost, time, performance, project management

Procedia PDF Downloads 391
7949 Performance Evaluation of Construction Projects by Earned Value Management Method, Using Primavera P6 – A Case Study in Istanbul, Turkey

Authors: Mohammad Lemar Zalmai, Osman Hurol Turkakin, Cemil Akcay, Ekrem Manisali

Abstract:

Most of the construction projects are exposed to time and cost overruns due to various factors and this is a major problem. As a solution to this, the Earned Value Management (EVM) method is considered. EVM is a powerful and well-known method used in monitoring and controlling the project. EVM is a technique that project managers use to track the performance of their project against project baselines. EVM gives an early indication that either project is delayed or not, and the project is either over budget or under budget at any particular day by tracking it. Thus, it helps to improve the management control system of a construction project, to detect and control the problems in potential risk areas and to suggest the importance and purpose of monitoring the construction work. This paper explains the main parameters of the EVM system involved in the calculation of time and cost for construction projects. In this study, the project management software Primavera P6 is used to deals with the project monitoring process of a seven-storeyed (G+6) faculty building whose construction is in progress at Istanbul, Turkey. A comparison between the planned progress of construction activities and actual progress is performed, and the analysis results are interpreted. This case study justifies the benefits of using EVM for project cash flow analysis and forecasting.

Keywords: earned value management (EVM), construction cost management, construction planning, primavera P6, project management, project scheduling

Procedia PDF Downloads 79
7948 Advocacy for Increasing Health Care Budget in Parepare City with DALY Approach: Case Study on Improving Public Health Insurance Budget

Authors: Kasman, Darmawansyah, Alimin Maidin, Amran Razak

Abstract:

Background: In decentralization, advocacy is needed to increase the health budget in Parepare District. One of the advocacy methods recommended by the World Bank is the economic loss approach. Methods: This research is observational in the field of health economics that contributes directly to the magnitude of the economic loss of the community and the government and provides advocacy to the executive and legislative to see the harm it causes. Results: The research results show the amount of direct cost, which consists of household expenditure for transport Rp.295,865,500. Indirect Cost of YLD of Rp.14.688.000, and YLL of Rp.28.986.336.00, so the amount of DALY is Rp.43.674.336.000. The total economic loss of Rp.43.970.201.500. These huge economic losses can be prevented by increasing the allocation of health budgets for promotive and preventive efforts and expanding the coverage of health insurance for the community. Conclusion: There is a need to advocate the executive and legislative about the importance of guarantee on public health financing by conducting studies in terms of economic losses so that all strategic alliances believe that health is an investment.

Keywords: advocacy, economic lost, health insurance, economic losses

Procedia PDF Downloads 39
7947 Plasma Properties Effect on Fluorescent Tube Plasma Antenna Performance

Authors: A. N. Dagang, E. I. Ismail, Z. Zakaria

Abstract:

This paper presents the analysis on the performance of monopole antenna with fluorescent tubes. In this research, the simulation and experimental approach is conducted. The fluorescent tube with different length and size is designed using Computer Simulation Technology (CST) software and the characteristics of antenna parameter are simulated throughout the software. CST was used to simulate antenna parameters such as return loss, resonant frequency, gain and directivity. Vector Network Analyzer (VNA) was used to measure the return loss of plasma antenna in order to validate the simulation results. In the simulation and experiment, the supply frequency is set starting from 1 GHz to 10 GHz. The results show that the return loss of plasma antenna changes when size of fluorescent tubes is varied, correspond to the different plasma properties. It shows that different values of plasma properties such as plasma frequency and collision frequency gives difference result of return loss, gain and directivity. For the gain, the values range from 2.14 dB to 2.36 dB. The return loss of plasma antenna offers higher value range from -22.187 dB to -32.903 dB. The higher the values of plasma frequency and collision frequency, the higher return loss can be obtained. The values obtained are comparative to the conventional type of metal antenna.

Keywords: plasma antenna, fluorescent tube, CST, plasma parameters

Procedia PDF Downloads 232
7946 Indigenous Dayak People’s Perceptions of Wildlife Loss and Gain Related to Oil Palm Development

Authors: A. Sunkar, A. Saraswati, Y. Santosa

Abstract:

Controversies surrounding the impacts of oil palm plantations have resulted in some heated debates, especially concerning biodiversity loss and indigenous people well-being. The indigenous people of Dayak generally used wildlife to fulfill their daily needs thus were assumed to have experienced negative impacts due to oil palm developments within and surrounding their settlement areas. This study was conducted to identify the characteristics of the Dayak community settled around an oil palm plantation, to determine their perceptions of wildlife loss or gain as the results of the development of oil palm plantations, and to identify the determinant characteristic of the perceptions. The research was conducted on March 2018 in Nanga Tayap and Tajok Kayong Villages, which were located around the oil palm plantation of NTYE of Ketapang, West Kalimantan-Indonesia. Data were collected through in depth-structured interview, using closed and semi-open questionnaires and three-scale Likert statements. Interviews were conducted with 74 respondents using accidental sampling, and categorized into respondents who were dependent on oil palm for their livelihoods and those who were not. Data were analyzed using quantitative statistics method, Likert Scale, Chi-Square Test, Spearman Test, and Mann-Whitney Test. The research found that the indigenous Dayak people were aware of wildlife species loss and gain since the establishment of the plantation. Nevertheless, wildlife loss did not affect their social, economic, and cultural needs since they could find substitutions. It was found that prior to the plantation’s development, the local Dayak communities were already slowly experiencing some livelihood transitions through local village development. The only determinant characteristic of the community that influenced their perceptions of wildlife loss/gain was level of education.

Keywords: wildlife, oil palm plantations, indigenous Dayak, biodiversity loss and gain

Procedia PDF Downloads 89
7945 A Probability Analysis of Construction Project Schedule Using Risk Management Tool

Authors: A. L. Agarwal, D. A. Mahajan

Abstract:

Construction industry tumbled along with other industry/sectors during recent economic crash. Construction business could not regain thereafter and still pass through slowdown phase, resulted many real estate as well as infrastructure projects not completed on schedule and within budget. There are many theories, tools, techniques with software packages available in the market to analyze construction schedule. This study focuses on the construction project schedule and uncertainties associated with construction activities. The infrastructure construction project has been considered for the analysis of uncertainty on project activities affecting project duration and analysis is done using @RISK software. Different simulation results arising from three probability distribution functions are compiled to benefit construction project managers to plan more realistic schedule of various construction activities as well as project completion to document in the contract and avoid compensations or claims arising out of missing the planned schedule.

Keywords: construction project, distributions, project schedule, uncertainty

Procedia PDF Downloads 246
7944 An Explorative Study of the Application of Project Management in German Research Projects

Authors: Marcel Randermann, Roland Jochem

Abstract:

Research activities are mostly conducted in form of projects. In fact, research projects take the highest share of all project forms combined. However, project management is very rarely applied purposefully by researchers and scientists. More specifically no project management frameworks, methods or tools are not being used to plan, execute or control research project to ensure research success or improve project quality. In this qualitative study, several interviews were conducted with scientists and research managers from German institutions to gain insights into project management activities, to determine challenges and barriers, and to evaluate premises for successful project management. The analyses show that conventional project management is not easily applicable in scientific environments and researchers’ mindsets prevent a reasonable application.

Keywords: academics, project management methods, research and science projects, scientist's mindset

Procedia PDF Downloads 90
7943 Statistical Analysis of the Main Causes of Delay Factors of Infrastructure Projects

Authors: Seyed Ali Mohammadiborna, Mehdi Ravanshadnia

Abstract:

Project delays usually detrimentally affect perceptions of project success and can in some instances, result in increased costs and other time-related damages to project stakeholders. One of the realities in the national infrastructure projects is that since the primary stakeholders are state-affiliated, the delay factors of the projects have not been seriously taken into account despite the importance of on-time completion of projects. Project postponement has different economic and social consequences and leads to the technical and economic infeasibility of the infrastructure projects in the form of reduced productivity and exploitation capacity. The present study aimed at investigating delay factors of Iranian national infrastructure projects according to regulatory reports of the Plan and Budget Organization (BPO) of Iran. The present study scrutinized the influence of each of the factors that caused delays in national Iranian infrastructure projects according to the supervision reports of the planning and budget organization in 8 years. For this purpose, the study analyzed the information regarding the impact of 12 key delay factors causing delays in average 4867 projects per year in all provinces. The said factors were classified into the three groups of executive, credit, and financial and environmental-procurement factors.

Keywords: delays, infrastructure, projects, regulatory

Procedia PDF Downloads 54
7942 An Empirical Diagnosis of the Maladies and Therapies of Budgeting in Nigeria

Authors: Ben-Caleb Egbide, Omolehinwa O. Eddy, Adeyemi S. Keyinde, Eriabie Sylvester, Ojeka Stephen

Abstract:

The national budget remains an integral part of the developmental plan of the economy of any country. The budget reflects the fundamental values underlying the government’s economic policies and objectives and whose execution is expected to realize national/public desires. In Nigeria, over three decades budget had failed to deliver the desired benefits, suggesting the existence of infractions, which are yet to be empirically ascertained. This paper attempts a diagnosis of the infractions peculiar to Nigeria budgetary system and their suggested panacea. Data were collected through the administration of questionnaire to a cross section of organizations/institutions representing government agencies and the general public. Mann-Whitney U test was employed to gauge the consistency in perception of the two groups. The result revealed that budget indiscipline, official corruption, allocative inefficiency and poor budget governance are the most influential infractions of budgeting in Nigeria. Consequently, it was suggested that budget transparency, target budgeting, zero tolerance on corruption and budget discipline are the most cogent therapies to the malfunctioning in Nigerian budgetary system.

Keywords: budgeting, budget maladies, budget therapies, Nigeria

Procedia PDF Downloads 202
7941 The Effect of Critical Activity on Critical Path and Project Duration in Precedence Diagram Method

Authors: J. Nisar, S. Halim

Abstract:

The additional relationships i.e., start-to-start, finish-to-finish, and start-to-finish, between activity in Precedence Diagram Method (PDM) provides a more flexible schedule than traditional Critical Path Method (CPM). But, changing the duration of critical activities in the PDM network will have an anomalous effect on the critical path and the project completion date. In this study, we classified the critical activities in two groups i.e., 1. activity on single critical path and 2. activity on multi-critical paths, and six classes i.e., normal, reverse, neutral, perverse, decrease-reverse and increase-normal, based on their effects on project duration in PDM. Furthermore, we determined the maximum float of time by which the duration each type of critical activities can be changed without effecting the project duration. This study would help the project manager to clearly understand the behavior of each critical activity on critical path, and he/she would be able to change the project duration by shortening or lengthening activities based on project budget and project deadline.

Keywords: construction management, critical path method, project scheduling network, precedence diagram method

Procedia PDF Downloads 94
7940 The Budget Profile of the Municipality of AtaleIa-MG in the Context of the Micro-Region of Teofilo Otoni in Brazil

Authors: Jeferson Gomes Dos Santos, Mirelle Cristina De Abreu Quintela

Abstract:

Considering that after the 1988 Constitution, in Brazil, municipalities have acquired new roles in the face of a financial reality that jeopardizes more substantial actions, the Public Budget is essential for the establishment of guidelines for action, within each budgetary reality. Within this, the present work sought to understand the budget profile of the mining municipality of Ataleia, with a view to identifying its budget composition, in relation to the main sources of revenue and expenditure. To achieve the purposes of the study, information was collected on the municipality's finances, from the years 2000 to 2016, visualizing the progress of its revenues in terms of funding and origin, and expenses in terms of nature and purpose. It was evidenced that the municipality, having its budget revenue in the period, still shows great dependence on intergovernmental transfers, as the own collection was relatively low. The budget expenditure of the period was mainly influenced by social expenditures, but it must be said that the municipality complied with the limits of spending, minimum and maximum, established by law.

Keywords: expenses, municipal budget, planning, revenue

Procedia PDF Downloads 108
7939 Osmotic Dehydration of Fruit Slices in Concentrated Sugar Solution

Authors: Neda Amidi Fazli, Farid Amidi Fazli

Abstract:

Enriched fruits by minerals provide minerals which are needed to human body the minerals are used by body cells for daily activities. This paper indicates the result of mass transfer in fruit slices in 55% sucrose syrup in presence of calcium and phosphorus ions. Osmosis agent 55% (w/w) was prepared by solving sucrose in deionized water and adding calcium or phosphorus in 1 and 2% concentration. Dry matter, solid gain, water loss as well as weight reduction were calculated. Results showed that by increasing of calcium concentration in osmosis solution solid gain, water loss and weight reduction were increased in short experiment time in kiwi fruit but the parameters decreased in long experiment time by concentration increasing and rise of calcium concentration caused decrease of osmosis parameters in banana. In the case of phosphorus, increasing of ion concentration had adverse effect on all treatments, this may be due to different osmosis force that is created by two types of ions. The mentioned parameters decreased in all treatments by increasing of ion concentration. Highest mass transfer in kiwi fruit occurs when 1% calcium solution applied for 60 minutes, values obtained for solid gain, water loss and weight reduction were 42.60, 51.97, and 9.37 respectively. In the case of banana, when 2% phosphorus concentration was applied as osmosis agent for 60 minutes highest values for solid gain, water loss and weight reduction obtained as 21, 25.84, and 4.84 respectively.

Keywords: calcium, concentration, osmotic dehydration, phosphorus

Procedia PDF Downloads 180
7938 State Budget Accounting: Factors Affected and Basic Orientation to Vietnamese Public Sector Entities

Authors: Pham Quang Huy

Abstract:

State budget is considered as an effective tool for controlling, adjusting and regulating the market economy of any countries. To ensure that the activities of the state in the fields of politics, economy and society has been efficiency, it requires major sources of certain budget. These financial funds are formed from tax revenues and tax revenues beyond. Therefore, the Governments need to have an accounting regime to manage the receipt, expenditure which are suitable for recording a full range of items. From that, it can help to increase the transparency and accountability in budget system. One of the main requirements in Vietnamese policies is to improve that accounting system of revenues and expenditures which can provide many reports to meet the information required of government and users, as well as directions to the trends of international standards requirements. By using quantitative research methods and analytical models to exploring factors, the main purpose of this article is to identify the factors affecting budget accounting and providing some direction for Vietnamese public sector in the future. The results indicated that Vietnam budget accounting has been impacted by seven factors and aims to implement three main orientations in the public sector units.

Keywords: state budget, accounting, IPSAS, budget management, government, public sector

Procedia PDF Downloads 195
7937 Directors’ Liability for Losses Incurred in the Management of PT Merpati Nusantara Airlines, Persero

Authors: Eny Suastuti

Abstract:

This paper is about state’s capital equity in establishing State-owned Company (PT Merpati Persero). Under private law regime, PT Merpati Persero equity is a state asset allocated separately from the State Budget. Consequently, it is no longer a state asset; rather, it becomes a part of company assets. The adoption of Act No. 17 of 2003 on State Finance, Act No. 31 of 1999, which is amended by Act No. 20 of 2001 on Eradication of Corrupt Practices, Act No. 15 of 2004 on Auditing, Management, and Accountability of State Finance, and Act No. 15 of 2006 Audit Board raises legal issues of whether State-owned Company’s (PT Merpati Persero) loss may be deemed as loss on state finance made by the Directors of PT Merpati Persero, which implication leads to corrupt practices conducted by the Directors. The principle of civil law states that state assets are separated from the state budget is not a government asset. Therefore the case of a lease agreement 2 (two) units of Boeing 737-400 and Boeing 737-500 between PT Merpati Nusantara Airlines with companies Third Stone Aircraft Leasing Group (TALG) the United States cannot be prosecuted under Articles 2 and 3 of Act No. 31 of 1999 Jo Act No. 20 of 2001 on Eradication of Corrupt Practices (Law PTPK). From this paper, three things are found. First, state’s capital equity, which has been allocated separately from state assets in establishing the PT Merpati Perserois not state asset; rather, it is company’s asset. Second, in the case of mismanagement leading to company loss, the Directors of PT Merpati Persero may not be charged with committing corrupt practice as prescribed in Articles 2 and 3 of Corrupt Practices Eradication Law. Third, misperception has been made by judicial practices since the courts consider loss in certain transaction made by Directors of PT Merpati Persero to be loss of state finance whose implication is applicability of Articles 2 and 3 of Corrupt Practices Eradication Law.

Keywords: corrupt practice, loss, state's capital equity, state finance (PT Merpati Persero)

Procedia PDF Downloads 190
7936 Theoretical Investigation of Proton-Bore Fusion in Hot Spots

Authors: Morteza Habibi

Abstract:

As an alternative to D–T fuel, one can consider advanced fuels like D3-He and p-11B fuels, which have potential advantages concerning availability and/or environmental impact. Hot spots are micron-sized magnetically self-contained sources observed in pinched plasma devices. In hot spots, fusion power for 120 keV < Ti < 800 keV and 32 keV < Te < 129 keV exceeds bremsstrahlung loss and fraction of fusion power to bremsstrahlung loss reaches to 1.9. In this case, gain factor for a 150 kJ typical pulsed generator as a hot spot source will be 7.8 which is considerable for a commercial pinched plasma device.

Keywords: P-B fuel, hot spot, bremmsstrahlung loss, ion temperature

Procedia PDF Downloads 443
7935 The End Is Just the Beginning: The Importance of Project Post-Implementation Reviews

Authors: Catalin-Teodor Dogaru, Ana-Maria Dogaru

Abstract:

Success means different things to different people. For us, project managers, it becomes even harder to find a definition. Many factors have to be included in the evaluation. Moreover, literature is not very helpful, lacking consensus and neutrality. Post-implementation reviews (PIR) can be an efficient tool in evaluating how things worked on a certain project. Despite the visible progress, PIR is not a very detailed subject yet and there is not a common understanding in this matter. This may be the reason that some organizations include it in the projects’ lifecycle and some do not. Through this paper, we point out the reasons why all project managers should pay proper attention to this important step and to the elements, which can be assessed, beside the already famous triple constraints: cost, budget, and time. It is essential to take notice that PIR is not a checklist. It brings the edge in eliminating subjectivity and judging projects based on actual proof. Based on our experience, our success indicator model, presented in this paper, contributes to the success of the project! In the same time, it increases trust among customers who will perceive success more objectively.

Keywords: project, post implementation, review, success, indicators

Procedia PDF Downloads 304
7934 Strategic Thinking to Change Behavior and Improve Sanitation in Jodipan and Kesatrian, Malang, East Java, Indonesia

Authors: Prasanti Widyasih Sarli, Prayatni Soewondo

Abstract:

Greater access to sanitation in developing countries is urgent. However even though sanitation is crucial, overall budget for sanitation is limited. With this budget limitation, it is important to (1) allocate resources strategically to maximize impact and (2) take into account communal agency to potentially be a source for sanitation improvements. The Jodipan and Kesatrian Project in Malang, Indonesia is an interesting alternative for solving the sanitation problem in which resources were allocated strategically and communal agency was also observed. Although the projects initial goal was only to improve visually the situation in the slums, it became a new tourist destination, and the economic benefit that came with it had an effect also on the change of behavior of the residents and the government towards sanitation. It also grew from only including the Kesatrian Village to expanding to the Jodipan Village in the course of less than a year. To investigate the success of this project, in this paper a descriptive model will be used and data will be drawn from intensive interviews with the initiators of the project, residents affected by the project and government officials. In this research it is argued that three points mark the success of the project: (1) the strategic initial impact due to choice of location, (2) the influx of tourists that triggered behavioral change among residents and, (3) the direct economic impact which ensured its sustainability and growth by gaining government officials support and attention for more public spending in the area for slum development and sanitation improvement.

Keywords: behaviour change, sanitation, slum, strategic thinking

Procedia PDF Downloads 255
7933 Tax Expenditures: A Review and Analysis

Authors: Khalid Javed

Abstract:

This study examines a feature of the budget process called the tax expenditure budget. The tax expenditure concept relies heavily on a normative notion that shielding certain. Taxpayer income from taxation deprives government of its rightful revenues. This view is inconsistent with the proposition that income belongs to the taxpayers and that tax liability is determined through the democratic process, not through arbitrary, bureaucratic Assumptions. Furthermore, the methodology of the tax expenditure budget is problematic as its expansive tax base treats the multiple taxation of saving as the norm. By using an expansive view of income as the underlying assumption of the tax expenditure concept, this viewpoint institutionalizes a particular bias into the decision-making process.

Keywords: revenue, expenditure, tax budget, propostion

Procedia PDF Downloads 192
7932 The Significance of a Well-Defined Systematic Approach in Risk Management for Construction Projects within Oil Industry

Authors: Batool Ismaeel, Umair Farooq, Saad Mushtaq

Abstract:

Construction projects in the oil industry can be very complex, having unknown outcomes and uncertainties that cannot be easily predicted. Each project has its unique risks generated by a number of factors which, if not controlled, will impact the successful completion of the project mainly in terms of schedule, cost, quality, and safety. This paper highlights the historic risks associated with projects in the south and east region of Kuwait Oil Company (KOC) collated from the company’s lessons learned database. Starting from Contract Award through to handover of the project to the Asset owner, the gaps in project execution in terms of managing risk will be brought to discussion and where a well-defined systematic approach in project risk management reflecting many claims, change of scope, exceeding budget, delays in engineering phase as well as in the procurement and fabrication of long lead items should be adopted. This study focuses on a proposed feasible approach in risk management for engineering, procurement and construction (EPC) level projects including the various stakeholders involved in executing the works from International to local contractors and vendors in KOC. The proposed approach covers the areas categorized into organizational, design, procurement, construction, pre-commissioning, commissioning and project management in which the risks are identified and require management and mitigation. With the effective deployment and implementation of the proposed risk management system and the consideration of it as a vital key in achieving the project’s target, the outcomes will be more predictable in the future, and the risk triggers will be managed and controlled. The correct resources can be allocated on a timely basis for the company for avoiding any unpredictable outcomes during the execution of the project. It is recommended in this paper to apply this risk management approach as an integral part of project management and investigate further in the future, the effectiveness of this proposed system for newly awarded projects and compare the same with those projects of similar budget/complexity that have not applied this approach to risk management.

Keywords: construction, project completion, risk management, uncertainties

Procedia PDF Downloads 82
7931 Effect on Bandwidth of Using Double Substrates Based Metamaterial Planar Antenna

Authors: Smrity Dwivedi

Abstract:

The present paper has revealed the effect of double substrates over a bandwidth performance for planar antennas. The used material has its own importance to get minimum return loss and improved directivity. The author has taken double substrates to enhance the efficiency in terms of gain of antenna. Metamaterial based antenna has its own specific structure which increased the performance of antenna. Improved return loss is -20 dB, and the voltage standing wave ratio (VSWR) is 1.2, which is better than single substrate having return loss of -15 dB and VSWR of 1.4. Complete results are obtained using commercial software CST microwave studio.

Keywords: CST microwave studio, metamaterial, return loss, VSWR

Procedia PDF Downloads 173
7930 Hybrid MIMO-OFDM Detection Scheme for High Performance

Authors: Young-Min Ko, Dong-Hyun Ha, Chang-Bin Ha, Hyoung-Kyu Song

Abstract:

In recent years, a multi-antenna system is actively used to improve the performance of the communication. A MIMO-OFDM system can provide multiplexing gain or diversity gain. These gains are obtained in proportion to the increase of the number of antennas. In order to provide the optimal gain of the MIMO-OFDM system, various transmission and reception schemes are presented. This paper aims to propose a hybrid scheme that base station provides both diversity gain and multiplexing gain at the same time.

Keywords: DFE, diversity gain, hybrid, MIMO, multiplexing gain.

Procedia PDF Downloads 532
7929 The Successful in Construction Project via Effectiveness of Project Team

Authors: Zarabizan Zakaria, Hayati Zainal

Abstract:

The construction industry is one of the most important sectors that contribute to the nation’s economy and catalyze towards the growth of other industries. However, some construction projects have not been completed on its stipulated time and duration, scope and budget due to several factors. This problem arises due to the weaknesses of human factors, especially from ineffective leadership quality practiced by project managers and contractors in managing project teams. Therefore, a construction project should impose the element of Project Team. The project team is formed in the implementation of the project which includes the project brief, project scope, customer requirements and provided designs. Many organizations in the construction sector use teams to meet today's global competition and customer expectations, however, team effectiveness evaluation is required. In insuring the construction team is successful and effectiveness, the construction department must encourage, measure, set up, and evaluate or review the effectiveness of project team that was formed. In order to produce a better outcome for a high-end project, an effective and efficient project team is required which also help in increasing overall productivity. The purpose of this study is to determine the role of team effectiveness in the construction project team based on the overall construction project performance. It examines several different factors which related to team effectiveness. It also examines the relationship between team effectiveness factor and project performance aspect. Team Effect Review and Project Performance Review are developed to be used for data collection. Data collected were analyzed using several statistical tests. Results obtained from data analysis are validated using semi-structured interviews. Besides that, a comprehensive survey were developed to assess the way construction project teams in order to maintain its effectiveness throughout the project phase. In order to determine a project successful it has been found that Project Team Leadership is the most important factor. In addition, the definition of team effectiveness in the construction project team is developed based on the perspective of project clients and project team members. The results of this study are expected to provide an idea on the factors that are needed to be focused on improving the team's effectiveness towards project performance aspects. At the same time, the definition of team effectiveness from team members and owner views has been developed in order to provide a better understanding of the word team's effectiveness in construction projects.

Keywords: project team, leadership, construction project, project successful

Procedia PDF Downloads 104
7928 Skew Planar Wheel Antenna for First Person View of Unmanned Aerial Vehicle

Authors: Raymond Yudhi Purba, Levy Olivia Nur, Radial Anwar

Abstract:

This research presents the design and measurement of a skew planar wheel antenna that is used to visualize the first person view perspective of unmanned aerial vehicles. The antenna has been designed using CST Studio Suite 2019 to have voltage standing wave ratio (VSWR) ≤ 2, return loss ≤ -10 dB, bandwidth ≥ 100 MHz to covering outdoor access point band from 5.725 to 5.825 GHz, omnidirectional radiation pattern, and elliptical polarization. Dimensions of skew planar wheel antenna have been modified using parameter sweep technique to provide good performances. The simulation results provide VSWR 1.231, return loss -19.693 dB, bandwidth 828.8 MHz, gain 3.292 dB, and axial ratio 9.229 dB. Meanwhile, the measurement results provide VSWR 1.237, return loss -19.476 dB, bandwidth 790.5 MHz, gain 3.2034 dB, and axial ratio 4.12 dB.

Keywords: skew planar wheel, cloverleaf, first-person view, unmanned aerial vehicle, parameter sweep

Procedia PDF Downloads 68
7927 Measurement of Project Success in Construction Using Performance Indices

Authors: Annette Joseph

Abstract:

Background: The construction industry is dynamic in nature owing to the increasing uncertainties in technology, budgets, and development processes making projects more complex. Thus, predicting project performance and chances of its likely success has become difficult. The goal of all parties involved in construction projects is to successfully complete it on schedule, within planned budget and with the highest quality and in the safest manner. However, the concept of project success has remained ambiguously defined in the mind of the construction professionals. Purpose: This paper aims to study the analysis of a project in terms of its performance and measure the success. Methodology: The parameters for evaluating project success and the indices to measure success/performance of a project are identified through literature study. Through questionnaire surveys aimed at the stakeholders in the projects, data is collected from two live case studies (an ongoing and completed project) on the overall performance in terms of its success/failure. Finally, with the help of SPSS tool, the data collected from the surveys are analyzed and applied on the selected performance indices. Findings: The score calculated by using the indices and models helps in assessing the overall performance of the project and interpreting it to find out whether the project will be a success or failure. This study acts as a reference for firms to carry out performance evaluation and success measurement on a regular basis helping projects to identify the areas which are performing well and those that require improvement. Originality & Value: The study signifies that by measuring project performance; a project’s deviation towards success/failure can be assessed thus helping in suggesting early remedial measures to bring it on track ensuring that a project will be completed successfully.

Keywords: project, performance, indices, success

Procedia PDF Downloads 106
7926 Impact of Project Leader's Style on the Success of the Projects

Authors: Saadia Khalid

Abstract:

This paper discusses the various leadership styles of project manager which lead to the success of a project since it is important for a project manager to understand and adopt the skills required to cope up with the modern challenges of any project. A project manager must be able to handle a project effectively and efficiently and be ready to assess the factors effecting success or failure of the project. A project manager must be capable of handling a project by managing, directing and leading the projects with requisite knowledge and skills. In this paper a project manager’s characteristics linkage to project success have been developed and analyzed for three different projects/industries. A web-based survey has also been carried out which revealed that specific leadership styles/traits can lead to better performance and success of organizations. Some basic factors like project complexity, the age, gender and nationality of the project manager and type of project also play a vital role in success of a project.

Keywords: leadership style, project success, project management, project manager

Procedia PDF Downloads 329
7925 Economic Evaluation Offshore Wind Project under Uncertainly and Risk Circumstances

Authors: Sayed Amir Hamzeh Mirkheshti

Abstract:

Offshore wind energy as a strategic renewable energy, has been growing rapidly due to availability, abundance and clean nature of it. On the other hand, budget of this project is incredibly higher in comparison with other renewable energies and it takes more duration. Accordingly, precise estimation of time and cost is needed in order to promote awareness in the developers and society and to convince them to develop this kind of energy despite its difficulties. Occurrence risks during on project would cause its duration and cost constantly changed. Therefore, to develop offshore wind power, it is critical to consider all potential risks which impacted project and to simulate their impact. Hence, knowing about these risks could be useful for the selection of most influencing strategies such as avoidance, transition, and act in order to decrease their probability and impact. This paper presents an evaluation of the feasibility of 500 MV offshore wind project in the Persian Gulf and compares its situation with uncertainty resources and risk. The purpose of this study is to evaluate time and cost of offshore wind project under risk circumstances and uncertain resources by using Monte Carlo simulation. We analyzed each risk and activity along with their distribution function and their effect on the project.

Keywords: wind energy project, uncertain resources, risks, Monte Carlo simulation

Procedia PDF Downloads 273
7924 An Approach To Flatten The Gain Of Fiber Raman Amplifiers With Multi-Pumping

Authors: Surinder Singh, Adish Bindal

Abstract:

The effects of the pumping wavelength and their power on the gain flattening of a fiber Raman amplifier (FRA) are investigated. The multi-wavelength pumping scheme is utilized to achieve gain flatness in FRA. It is proposed that gain flatness becomes better with increase in number of pumping wavelengths applied. We have achieved flat gain with 0.27 dB fluctuation in a spectral range of 1475-1600 nm for a Raman fiber length of 10 km by using six pumps with wavelengths with in the 1385-1495 nm interval. The effect of multi-wavelength pumping scheme on gain saturation in FRA is also studied. It is proposed that gain saturation condition gets improved by using this scheme and this scheme is more useful for higher spans of Raman fiber length.

Keywords: FRA, WDM, pumping, flat gain

Procedia PDF Downloads 392
7923 Mobile Cloud Application in Design Build Bridge Construction

Authors: Meng Sun, Bin Wei

Abstract:

In the past decades, design-build has become a more popular project delivery system especially for the large scaled infrastructure project in North America. It provides a one-stop shopping system for the client therefore improves the efficiency of construction, and reduces the risks and overall cost for the clients. Compared to the project with traditional delivery method, design-build project requires contractor and designer to work together efficiently to deliver the best-value solutions through the construction process. How to facilitate a solid integration and efficient interaction between contractor and designer often affects the schedule, budget and quality of the construction therefore becomes a key factor to the success of a design-build project. This paper presents a concept of using modern mobile cloud technology to provide an integrated solution during the design-build construction. It uses mobile cloud architecture to provide a platform for real-time field progress, change request approval, job progress log, and project time entry with devices integration for field information and communications. The paper uses a real filed change notice as an example to demonstrate how mobile cloud technology applies in a design-build project and how it can improve the project efficiency.

Keywords: cloud, design-build, field change notice, mobile application

Procedia PDF Downloads 179