Search results for: procurement challenges
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 5536

Search results for: procurement challenges

5506 Anti-Graft Instruments and Their Role in Curbing Corruption: Integrity Pact and Its Impact on Indian Procurement

Authors: Jot Prakash Kaur

Abstract:

The paper aims to showcase that with the introduction of anti-graft instruments and willingness of the governments towards their implementation, a significant change can be witnessed in the anti-corruption landscape of any country. Since the past decade anti-graft instruments have been introduced by several international non-governmental organizations with the vision of curbing corruption. Transparency International’s ‘Integrity Pact’ has been one such initiative. Integrity Pact has been described as a tool for preventing corruption in public contracting. Integrity Pact has found its relevance in a developing country like India where public procurement constitutes 25-30 percent of Gross Domestic Product. Corruption in public procurement has been a cause of concern even though India has in place a whole architecture of rules and regulations governing public procurement. Integrity Pact was first adopted by a leading Oil and Gas government company in 2006. Till May 2015, over ninety organizations had adopted Integrity Pact, of which majority of them are central government units. The methodology undertaken to understand impact of Integrity Pact on Public procurement is through analyzing information received from important stakeholders of the instrument. Government, information was sought through Right to Information Act 2005 about the details of adoption of this instrument by various government organizations and departments. Contractor, Company websites and annual reports were used to find out the steps taken towards implementation of Integrity Pact. Civil Society, Transparency International India’s resource materials which include publications and reports on Integrity Pact were also used to understand the impact of Integrity Pact. Some of the findings of the study include organizations adopting Integrity pacts in all kinds of contracts such that 90% of their procurements fall under Integrity Pact. Indian State governments have found merit in Integrity Pact and have adopted it in their procurement contracts. Integrity Pact has been instrumental in creating a brand image of companies. External Monitors, an essential feature of Integrity Pact have emerged as arbitrators for the bidders and are the first line of procurement auditors for the organizations. India has cancelled two defense contracts finding it conflicting with the provisions of Integrity Pact. Some of the clauses of Integrity Pact have been included in the proposed Public Procurement legislation. Integrity Pact has slowly but steadily grown to become an integral part of big ticket procurement in India. Government’s commitment to implement Integrity Pact has changed the way in which public procurement is conducted in India. Public Procurement was a segment infested with corruption but with the adoption of Integrity Pact a number of clean up acts have been performed to make procurement transparent. The paper is divided in five sections. First section elaborates on Integrity Pact. Second section talks about stakeholders of the instrument and the role it plays in its implementation. Third section talks about the efforts taken by the government to implement Integrity Pact in India. Fourth section talks about the role of External Monitor as Arbitrator. The final section puts forth suggestions to strengthen the existing form of Integrity Pact and increase its reach.

Keywords: corruption, integrity pact, procurement, vigilance

Procedia PDF Downloads 312
5505 The Principles of Clarifications during the Phase of Tender Preparation in a Public Procurement Procedure

Authors: Adelina Vrancianu

Abstract:

A public procurement procedure starts with the publication of the contract notice and the tender documentation. The documentation provides bidders with general guidelines and rules governing the tender process. At this stage, the interested economic operators start to prepare their bid. During this process, they may encounter unclear elements that, if are not clarified, may have a negative impact on the future bid with the ultimate sanction of exclusion. Until the opening of the bids, the potential bidders have the right to ask questions in order to clarify certain aspects of the tender documentation. In correlation, the contracting authorities have the obligation to answer these questions in a reasoned time and with clarity. In practice, the two conditions are not met due to a number of factors. This essay tries to outline the general principles regarding the clarifications during the phase of tender preparation. The provisions of the new directive on public procurement will be taken in consideration in this process in regard to the old directive.

Keywords: tender preparation, tender documentation, clarifications, contract notice

Procedia PDF Downloads 274
5504 Strategic Public Procurement: A Lever for Social Entrepreneurship and Innovation

Authors: B. Orser, A. Riding, Y. Li

Abstract:

To inform government about how gender gaps in SME ( small and medium-sized enterprise) contracting might be redressed, the research question was: What are the key obstacles to, and response strategies for, increasing the engagement of women business owners among SME suppliers to the government of Canada? Thirty-five interviews with senior policymakers, supplier diversity organization executives, and expert witnesses to the Canadian House of Commons, Standing Committee on Government Operations and Estimates. Qualitative data were conducted and analysed using N’Vivo 11 software. High order response categories included: (a) SME risk mitigation strategies, (b) SME procurement program design, and (c) performance measures. Primary obstacles cited were government red tape and long and complicated requests for proposals (RFPs). The majority of 'common' complaints occur when SMEs have questions about the federal procurement process. Witness responses included use of outcome-based rather than prescriptive procurement practices, more agile procurement, simplified RFPs, making payment within 30 days a procurement priority. Risk mitigation strategies included provision of procurement officers to assess risks and opportunities for businesses and development of more agile procurement procedures and processes. Recommendations to enhance program design included: improved definitional consistency of qualifiers and selection criteria, better co-ordination across agencies; clarification about how SME suppliers benefit from federal contracting; goal setting; specification of categories that are most suitable for women-owned businesses; and, increasing primary contractor awareness about the importance of subcontract relationships. Recommendations also included third-party certification of eligible firms and the need to enhance SMEs’ financial literacy to reduce financial errors. Finally, there remains the need for clear and consistent pre-program statistics to establish baselines (by sector, issuing department) performance measures, targets based on percentage of contracts granted, value of contract, percentage of target employee (women, indigenous), and community benefits including hiring local employees. The study advances strategies to enhance federal procurement programs to facilitate socio-economic policy objectives.

Keywords: procurement, small business, policy, women

Procedia PDF Downloads 92
5503 A Review of Critical Factors in Budgetary Financing of Public Infrastructure in Nigeria

Authors: Akintayo Opawole, Godwin O. Jagboro

Abstract:

Research efforts on infrastructure development in Nigeria had not provided adequate assessment of issues essential for policy response by the government to address infrastructure deficiency. One major gap existing in previous studies is the assessment of challenges facing the budgetary financing model. Based on a case study of Osun State in Southwestern Nigeria, factors affecting budgetary financing of public infrastructure were identified from literature and brainstorming. Respondents were: 6 architects, 4 quantity surveyors, 6 town planners, 5 estate surveyors, 4 builders, 21 engineers and 26 economists/accountants ranging from principal to director who have been involved in policy making process with respect to infrastructure development in the public service of Osun state. The identified variables were subjected to factor analysis. The Kaiser-Meyer-Olkin measure of sampling adequacy tests carried out (KMO, 0.785) showed that the data collected were adequate for the analysis and the Bartlett’s test of sphericity (0.000) showed the data upon which the analysis was carried out was reliable. Results showed that factors such as poor collaboration between the state and local government establishments, absence of credible database system and inadequate funding of maintenance were the most significant to infrastructure development in the State. Policy responses to address challenges of infrastructure development in the state were identified to focus on creation of legal framework for liberation policy, enforcement of ‘due process’ in the procurement and establishment of monitoring system for project delivery.

Keywords: development, infrastructure, financing, procurement

Procedia PDF Downloads 392
5502 Determinants of Infrastructure Provision in Ghana

Authors: Clifford Kwakwa Amoah, De-Graft Owusu-Manu, Prince Antwi-Afari

Abstract:

Infrastructure is the lifeline for economic development of any country. Hence, obtaining infrastructure quality cannot be overemphasized. Nevertheless, challenges of infrastructure quality persist, and it is worse in developing countries despite the diverse study on the subject matter. Therefore, this study was formulated to identify the prevalent determinants of infrastructure quality using synthesis of extant literature (to identify key variables), and analysis of survey questionnaire of data collected by means of the inductive methodology approach, mean score ranking and descriptive statistics. The variables “partner with the private sector, growth stimulation and poverty reduction, and adherence to procurement core principles” were the most significant challenges that the government faces. Moreover, it would be of utmost concern to adopt some stringent measures to help improve and accelerate on the growth and development of the nation, thereby achieving the best quality required. This study is novel conducted to provide insight into some of the punitive measures, considered in ensuring that quality infrastructure is obtained in both developing (specifically) and developed economies. The research findings therefore provide some guidance for overcoming the accumulative challenges. Application of the stated findings will help bridge the gap of infrastructure challenges; this is because the study found strong empirical evidence that infrastructure plays a pivotal role in the productivity enhancement.

Keywords: challenges, development, economic growth, government, infrastructure quality

Procedia PDF Downloads 106
5501 Designing Supplier Partnership Success Factors in the Coal Mining Industry

Authors: Ahmad Afif, Teuku Yuri M. Zagloel

Abstract:

Sustainable supply chain management is a new pattern that has emerged recently in industry and companies. The procurement process is one of the key factors for efficiency in supply chain management practices. Partnership is one of the procurement strategies for strategic items. The success factors of the partnership must be determined to avoid things that endanger the financial and operational status of the company. The current supplier partnership research focuses on the selection of general criteria and sustainable supplier selection. Currently, there is still limited research on the success factors of supplier partnerships that focus on strategic items in the coal mining industry. Meanwhile, the procurement of coal mining has its own characteristics, and there are regulations related to the procurement of goods. Therefore, this research was conducted to determine the categories of goods that are included in the strategic items and to design the success factors of supplier partnerships. The main factors studied are general, financial, production, reputation, synergies, and sustainable. The research was conducted using the Kraljic method to determine the categories of goods that are included in the strategic items. To design a supplier partnership success factor using the Hybrid Multi Criteria Decision Making method. Integrated Fuzzy AHP-Fuzzy TOPSIS is used to determine the weight of the success factors of supplier partnerships and to rank suppliers on the factors used.

Keywords: supplier, partnership, strategic item, success factors, and coal mining industry

Procedia PDF Downloads 109
5500 Challenges of Sustainable Development of Small and Medium-Sized Enterprises in Georgia

Authors: Kharaishvili Eteri

Abstract:

The article highlights the importance of small and medium-sized enterprises in achieving the goals of sustainable development of the economy and increasing the well-being of the population. The opinion is put forward that it is necessary to adapt the activities of small and medium-sized firms in Georgia to sustainable business models. Therefore, it is important to identify the challenges that will ensure compliance with the goals and requirements of sustainable development of small and mediumsized enterprises. Objectives. The goal of the study is to reveal the challenges of sustainable development in small and medium-sized enterprises in Georgia and to develop recommendations for strategic development opportunities. Methodologies The challenges of sustainable development of small and medium-sized enterprises are investigated with the following methodology: bibliographic research of scientific works and reports of organizations is carried out; Based on the grouping of sustainable development goals, the performance indicators of these goals are studied; Differences with respect to the corresponding indicators of European countries are determined by the comparison method; The matrix scheme establishes the conditions and tools for sustainable development; Challenges of sustainable development are identified by factor analysis. Contributions Trends in the sustainable development of small and medium-sized enterprises are studied from the point of view of economic, social and environmental factors; To ensure sustainability, the conditions and tools for sustainable development are established (certified supply chains and global markets, allocation of financial resources necessary for sustainable development, proper public procurement, highly qualified workforce, etc.); Several main challenges have been identified in the sustainable development of small and medium-sized enterprises, including: limited internal resources; Institutional factors, especially vague and imperfect regulations, bureaucracy; low level of investments; Low level of qualification of human capital and others.

Keywords: small and medium-sized enterprises, sustainable development, conditions of sustainable development, strategic directions of sustainable development.

Procedia PDF Downloads 68
5499 Cost Overrun in Delivery of Public Projects in the Saudi Construction Industry: A Review

Authors: A. Aljohani, D. Moore, D. D. Ahiaga-Dagbui

Abstract:

Cost overruns are endemic in the delivery of construction projects. The problem is global. It occurs irrespective of type and size of the project, its location, procurement method or client. The size of overruns can be as high as 200% in some cases. Projects thus unfortunately often make the news headlines, not for their immense socio-economic contribution to society, but for being poorly procured. In Saudi Arabia, two-thirds of construction projects are publicly procured by the Saudi government, which has been invested Billions of dollars in infrastructure projects each year as part of an ambitious strategic development agenda to shift from mainly oil dependency to multi-source dependency. However, reports show that about 3,000 public projects face diverse issues related to time and cost overrun. As part of an on-going study to develop a framework for effective public procurement for the Saudi Arabian construction industry, this paper reports the initial findings of the causes of cost overruns in the context of the Gulf State. It also evaluates the interface between some of the front-end loading issues in public procurement in Saudi and their effects on project performance. A systematic review of the existing literature on construction cost overruns, with focus on the Saudi Arabian construction industry has been used. One of the initial findings is that a fixed-price contract is usually used by the client in an attempt to transfer all financial risks to the contractors. This has the unintended consequence of creating a turbulent environment for the delivery of the project which leads to project abandonment by contractors, poor quality of work and substantial rework. Further work is being undertaken to empirically verify the initial findings reported in this paper and their generalizability for the construction industry as a whole.

Keywords: cost overrun, public procurement, Saudi Arabia, construction projects

Procedia PDF Downloads 245
5498 Evaluation and Selection of Construction Contractors by Polish Public Clients

Authors: Kozik Renata, Leśniak Agnieszka, Plebankiewicz Edyta

Abstract:

Contracting authorities in the public sector are obligated to apply the principles provided for in the Polish law for the evaluation and selection of contractors. To analyze the methods of contractors, applied in practice by public clients, the notices of contract award results for construction works were analyzed. The analysis shows that the procedure selected more and more often is open to competitive bidding, where the assessment of the competence of contractors is not very precise, as well as non-competitive bidding, i.e. single source procurement. The share of procurement procedures, where the only criterion is price, is increasing. The solution to the problems existing here might be the introduction of one of the forms of pre-selection of contractors. The article also briefly discusses verification systems for companies applying for public contracts used in EU countries.

Keywords: certification, contractors selection, open tendering, public investors

Procedia PDF Downloads 260
5497 Examining the Relationship Between Green Procurement Practices and Firm’s Performance in Ghana

Authors: Clement Yeboah

Abstract:

Prior research concludes that environmental commitment positively drives organisational performance. Nonetheless, the nexus and conditions under which environmental commitment capabilities contribute to a firm’s performance are less understood. The purpose of this quantitative relational study was to examine the relationship between environmental commitment and 500 firms’ performances in Ghana. The researchers further seek to draw insights from the resource-based view to conceptualize environmental commitment and green procurement practices as resource capabilities to enhance firm performance. The researchers used insights from the contingent resource-based view to examine green leadership orientation conditions under which environmental commitment capability contributes to firm performance through green procurement practices. The study’s conceptual framework was tested on primary data from some firms in the Ghanaian market. PROCESS Macro was used to test the study’s hypotheses. Beyond that, green procurement practices mediated the association between environmental commitment capabilities and the firm’s performance. The study further seeks to find out whether green leadership orientation positively moderates the indirect relationship between environmental commitment capabilities and firm performance through green procurement practices. While conventional wisdom suggests that improved environmental commitment capabilities help improve a firm’s performance, this study tested this presumed relationship between environmental commitment capabilities and firm performance and provides theoretical arguments and empirical evidence to justify how green procurement practices uniquely and in synergy with green leadership orientation transform this relationship. The study results indicated a positive correlation between environmental commitment and firm performance. This result suggests that firms that prioritize environmental sustainability and demonstrate a strong commitment to environmentally responsible practices tend to experience better overall performance. This includes financial gains, operational efficiency, enhanced reputation, and improved relationships with stakeholders. The study's findings inform policy formulation in Ghana related to environmental regulations, incentives, and support mechanisms. Policymakers can use the insights to design policies that encourage and reward firms for their environmental commitments, thereby fostering a more sustainable and environmentally responsible business environment. The findings from such research can influence the design and development of educational programs in Ghana, specifically in fields related to sustainability, environmental management, and corporate social responsibility (CSR). Institutions may consider integrating environmental and sustainability topics into their business and management courses to create awareness and promote responsible practices among future business professionals. Also the study results can also promote the adoption of environmental accounting practices in Ghana. By recognizing and measuring the environmental impacts and costs associated with business activities, firms can better understand the financial implications of their environmental commitments and develop strategies for improved performance.

Keywords: firm’s performance, green procurement practice, environmental commitment, environmental management, sustainability

Procedia PDF Downloads 56
5496 The Role of Stakeholders in the Development of Sustainable Supply Chain Policy Framework in the Upstream Pharmaceutical Industry in Ghana

Authors: Gifty Kumadey, Albert Tchey Agbenyegah

Abstract:

This study explores the role of stakeholders in developing a sustainable supply chain policy framework in Ghana's pharmaceutical industry. It employs a qualitative research design to analyze policy documents, academic articles, and reports, shedding light on stakeholder involvement. The findings highlight the contributions of government agencies, regulatory bodies, pharmaceutical companies, suppliers, and civil society organizations. Key policies such as green procurement, waste management, and recycling initiatives are identified. However, challenges such as limited transparency, supplier engagement, and regulatory complexity impede implementation. The study recommends strengthening collaboration and promoting transparency to overcome these challenges. The findings provide valuable insights for policymakers, industry stakeholders, and researchers seeking to advance sustainable supply chain practices in Ghana's pharmaceutical industry.

Keywords: stakeholders, sustainable supply chain, policy framework, pharmaceutical industry

Procedia PDF Downloads 64
5495 Project Design Deliverables Sequence (PDD)

Authors: Nahed Al-Hajeri

Abstract:

There are several reasons which lead to a delay in project completion, out of all, one main reason is the delay in deliverable processing, i.e. submission and review of documents. Most of the project cycles start with a list of deliverables but without a sequence of submission of the same, means without a direction to move, leading to overlapping of activities and more interdependencies. Hence Project Design Deliverables (PDD) is developed as a solution to Organize Transmittals (Documents/Drawings) received from contractors/consultants during different phases of an EPC (Engineering, Procurement, and Construction) projects, which gives proper direction to the stakeholders from the beginning, to reduce inter-discipline dependency, avoid overlapping of activities, provide a list of deliverables, sequence of activities, etc. PDD attempts to provide a list and sequencing of the engineering documents/drawings required during different phases of a Project which will benefit both client and Contractor in performing planned activities through timely submission and review of deliverables. This helps in ensuring improved quality and completion of Project in time. The successful implementation begins with a detailed understanding the specific challenges and requirements of the project. PDD will help to learn about vendor document submissions including general workflow, sequence and monitor the submission and review of the deliverables from the early stages of Project. This will provide an overview for the Submission of deliverables by the concerned during the projects in proper sequence. The goal of PDD is also to hold responsible and accountability of all stakeholders during complete project cycle. We believe that successful implementation of PDD with a detailed list of documents and their sequence will help organizations to achieve the project target.

Keywords: EPC (Engineering, Procurement, and Construction), project design deliverables (PDD), econometrics sciences, management sciences

Procedia PDF Downloads 374
5494 Sustainability Study of Government Procurement of Public Services in Guangzhou: a Perspective Based on the Resources Dependence of Social Work

Authors: Li Pan

Abstract:

The recently prevalent government procurement of public services in China boasts a new form of government’s provision of public service through the purchasing of social work from social organizations, a new measure of the transformation in governmental functions as well as an unprecedented opportunity for the development of social organizations. For the past few years, the phenomenon of a surge in the number of social work organizations and social work staff emerged right with the initiatives of energetically carrying out the purchase of public services by the government. Such efforts have presented the strong determination of the Chinese government in building a small government by streamlining administration and delegating part of the governmental power to social organizations. This paper is based on the 2012-2014 performance appraisal project of the Guangzhou municipal government’s purchasing of public services and the project was carried out in the summer of 2015. During the process of the appraisal, several general problems hindering the sustainable development of government purchasing of public service have been observed. As Guangzhou is among the rank of pioneer cities in the conduct of the reform, it is representative and imperative to study the sustainability of government purchasing of public service. In 2012, Guangzhou local government started contracting out public service to the community social organizations to provide general family services and special services to community residents, since when integrated family service centers and special service centers were established as platforms to provide public social service in a city-wide range. Consequently, taking an example of the current rapid development of government purchase of the integrated family services and special services in Guangzhou, this paper puts up several proposals for the sustainable development of Guangzhou municipal government’s procurement of public services on the perspective of social work’s resource dependence.

Keywords: government procurement of public services, Guangzhou, integrated family service center, social work, sustainability.

Procedia PDF Downloads 242
5493 Clients’ Priorities in Design and Delivery of Green Projects: South African Perspective

Authors: Charles Mothobiso

Abstract:

This study attempts to identify the client’s main priority when delivering green projects. The aim is to compare whether clients’ interests are similar when delivering conventional buildings as compared to green buildings. Private clients invest more in green buildings as compared to government and parastatal entities. Private clients prioritize on maximizing a return on investment and they mainly invest in energy-saving buildings that have low life cycle costs. Private clients are perceived to be more knowledgeable about the benefits of green building projects as compared to government and parastatal clients. A shortage of expertise and managerial skill leads to the low adaptation of green buildings in government and parastatal projects. Other factors that seem to prevent the adoption of green buildings are the preparedness of the supply chain within the industry and inappropriate procurement strategies adopted by clients.

Keywords: construction clients, design team, green buildings, procurement

Procedia PDF Downloads 268
5492 Ensuring Continuity in Subcutaneous Depot Medroxy Progesterone Acetate (DMPA-SC) Contraception Service Provision Using Effective Commodity Management Practices

Authors: Oluwaseun Adeleke, Samuel O. Ikani, Fidelis Edet, Anthony Nwala, Mopelola Raji, Simeon Christian Chukwu

Abstract:

Background: The Delivering Innovations in Selfcare (DISC) project aims to increase access to self-care options for women of reproductive age, starting with self-inject subcutaneous depot medroxyprogesterone acetate (DMPA-SC) contraception services. However, the project has faced challenges in ensuring the continuous availability of the commodity in health facilities. Although most states in the country rely on the federal ministry of Health for supplies, some are gradually funding the procurement of Family Planning (FP) commodities. This attempt is, however, often accompanied by procurement delays and purchases inadequate to meet demand. This dilemma was further exacerbated by the commencement of demand generation activities by the project in supported states which geometrically increased commodity utilization rates and resulted in receding stock and occasional service disruptions. Strategies: The project deployed various strategies were implemented to ensure the continuous availability of commodities. These include facilitating inter-facility transfer, monthly tracking of commodity utilization, and alerting relevant authorities when stock levels reach a minimum. And supporting state-level procurement of DMPA-SC commodities through catalytic interventions. Results: Effective monitoring of commodity inventory at the facility level and strategic engagement with federal and state-level logistics units have proven successful in mitigating stock-out of commodities. It has helped secure up to 13,000 units of DMPA-SC commodities from federal logistics units and enabled state units to prioritize supported sites. This has ensured the continuity of DMPA-SC services and an increasing trend in the practice of self-injection. Conclusion: A functional supply chain is crucial to achieving commodity security, and without it, health programs cannot succeed. Stakeholder engagement, stock management and catalytic interventions have provided both short- and long-term measures to mitigate stock-outs and ensured a consistent supply of commodities to clients.

Keywords: family planning, contraception, DMPA-SC, self-care, self-injection, commodities, stock-out

Procedia PDF Downloads 52
5491 Normalized Enterprises Architectures: Portugal's Public Procurement System Application

Authors: Tiago Sampaio, André Vasconcelos, Bruno Fragoso

Abstract:

The Normalized Systems Theory, which is designed to be applied to software architectures, provides a set of theorems, elements and rules, with the purpose of enabling evolution in Information Systems, as well as ensuring that they are ready for change. In order to make that possible, this work’s solution is to apply the Normalized Systems Theory to the domain of enterprise architectures, using Archimate. This application is achieved through the adaptation of the elements of this theory, making them artifacts of the modeling language. The theorems are applied through the identification of the viewpoints to be used in the architectures, as well as the transformation of the theory’s encapsulation rules into architectural rules. This way, it is possible to create normalized enterprise architectures, thus fulfilling the needs and requirements of the business. This solution was demonstrated using the Portuguese Public Procurement System. The Portuguese government aims to make this system as fair as possible, allowing every organization to have the same business opportunities. The aim is for every economic operator to have access to all public tenders, which are published in any of the 6 existing platforms, independently of where they are registered. In order to make this possible, we applied our solution to the construction of two different architectures, which are able of fulfilling the requirements of the Portuguese government. One of those architectures, TO-BE A, has a Message Broker that performs the communication between the platforms. The other, TO-BE B, represents the scenario in which the platforms communicate with each other directly. Apart from these 2 architectures, we also represent the AS-IS architecture that demonstrates the current behavior of the Public Procurement Systems. Our evaluation is based on a comparison between the AS-IS and the TO-BE architectures, regarding the fulfillment of the rules and theorems of the Normalized Systems Theory and some quality metrics.

Keywords: archimate, architecture, broker, enterprise, evolvable systems, interoperability, normalized architectures, normalized systems, normalized systems theory, platforms

Procedia PDF Downloads 331
5490 Comparison of Fuel Cell Installation Methods at Large Commercial and Industrial Sites

Authors: Masood Sattari

Abstract:

Using fuel cell technology to generate electricity for large commercial and industrial sites is a growing segment in the fuel cell industry. The installation of these systems involves design, permitting, procurement of long-lead electrical equipment, and construction involving multiple utilities. The installation of each fuel cell system requires the same amount of coordination as the construction of a new structure requiring a foundation, gas, water, and electricity. Each of these components provide variables that can delay and possibly eliminate a new project. As the manufacturing process and efficiency of fuel cell systems improves, so must the installation methods to prevent a ‘bottle-neck’ in the installation phase of the deployment. Installation methodologies to install the systems vary among companies and this paper will examine the methodologies, describe the benefits and drawbacks for each, and provide guideline for the industry to improve overall installation efficiency.

Keywords: construction, installation, methodology, procurement

Procedia PDF Downloads 167
5489 PPPs as Panacea to Delivery of Public Sector Construction Project in Zimbabwe

Authors: Ringisai Abigail Mawondo-Dhliwayo, Kahilu Kajimo-Shakantu

Abstract:

Due to financial challenges which governments in general face, it is becoming more difficult for many to continually use their limited resources to undertake infrastructural development. Governments increasingly now need other delivery approaches, in particular, the Public-Private Partnerships which make it possible for the public sector to achieve infrastructural development without incurring any/minimum cost. The literature reviewed outlined that benefits of PPPs include timely delivery of quality projects with cost limits. The methodology utilized for the empirical study comprised six interviews and sixty questionnaires which were undertaken and administered by construction consultants and government officials involved in PPPs projects. The results obtained showed that PPPs are not widely used in Zimbabwe although the need for their use exists. The study also found some challenges which prevent or derail the rate at which PPPs are utilized, of which the primary one was a political influence. It is concluded that despite limitations, PPPs remain the most effective and viable option for the delivery of government projects. The study recommends that policy and framework for the implementation of PPPs be developed. More useful information could have been obtained if final users of PPPs projects were included in the sample for data collection.

Keywords: construction projects, procurement, public private partnerships, public sector

Procedia PDF Downloads 231
5488 Critical Success Factors Influencing Construction Project Performance for Different Objectives: Procurement Phase

Authors: Samart Homthong, Wutthipong Moungnoi

Abstract:

Critical success factors (CSFs) and the criteria to measure project success have received much attention over the decades and are among the most widely researched topics in the context of project management. However, although there have been extensive studies on the subject by different researchers, to date, there has been little agreement on the CSFs. The aim of this study is to identify the CSFs that influence the performance of construction projects, and determine their relative importance for different objectives across five stages in the project life cycle. A considerable literature review was conducted that resulted in the identification of 179 individual factors. These factors were then grouped into nine major categories. A questionnaire survey was used to collect data from three groups of respondents: client representatives, consultants, and contractors. Out of 164 questionnaires distributed, 93 were returned, yielding a response rate of 56.7%. Using the mean score, relative importance index, and weighted average method, the top 10 critical factors for each category were identified. The agreement of survey respondents on those categorised factors were analysed using Spearman’s rank correlation. A one-way analysis of variance was then performed to determine whether the mean scores among the various groups of respondents were statistically significant. The findings indicate the most CSFs in each category in procurement phase are: proper procurement programming of materials (time), stability in the price of materials (cost), and determining quality in the construction (quality). They are then followed by safety equipment acquisition and maintenance (health and safety), budgeting allowed in a contractual arrangement for implementing environmental management activities (environment), completeness of drawing documents (productivity), accurate measurement and pricing of bill of quantities (risk management), adequate communication among the project team (human resource), and adequate cost control measures (client satisfaction). An understanding of CSFs would help all interested parties in the construction industry to improve project performance. Furthermore, the results of this study would help construction professionals and practitioners take proactive measures for effective project management.

Keywords: critical success factors, procurement phase, project life cycle, project performance

Procedia PDF Downloads 166
5487 The Legal Effects of Coronavirus (COVID-19) on the Implementation of Administrative Contracts in Saudi Arabia: Application of Emergency Circumstances Theory

Authors: Ali Obaid Alyami

Abstract:

In Saudi Arabia, the pandemic of Coronavirus (COVID-19) has been affecting administrative contracts in many different ways. Lots of planned projects were stopped temporarily or implemented partially. Many contractors have suffered financial struggles and the absence of manpower. These administrative contracts are governed by Government Tenders and Procurement Law (GTPL) which was issued by a royal decree in 2019. This law addresses some challenges that could be stumbling blocks in the way of implementing a contract. One significant challenge is emergency circumstances that occur during the implementation of an administrative contract. The law provides some solutions for this disruption, but these solutions may not compensate for the whole damages that contractors suffer. This study will use the doctrinal methodology to analyze the rules of law and their application to the research problem. Most importantly, the issue that arises in this research is the possibility of governmental entities’ consideration, in administrative contracts, of the pandemic Coronavirus (COVID-19) as an emergency circumstance. This study points out the conditions for applying the theory of emergency circumstances on administrative contracts in addition to the definition of the theory and analyzing its elements. The other significant question is the limits on governmental entities to make a change in an administrative contract to achieve contractual rebalancing. GPTL and its implementing regulation set the conditions and limits of contractual rebalancing. However, this study finds that although GTPL provides rules for contractual rebalancing, there are some other mechanisms that contractors may take to fully compensate for the damages. For instance, when the loss cannot be minimized by GTPL, contractors might file lawsuits before the administrative judiciary. The study concludes that GTPL is a very comprehensive law system that stipulates specific rules for contractual rebalance and treats the emergency circumstances that obstruct the performance of administrative contracts.

Keywords: administrative contracts, emergency circumstances, balance of contract, administrative judiciary, government tenders, procurement law

Procedia PDF Downloads 50
5486 Green Public Procurement in Open Access and Traditional Journals: A Comparative Bibliometric Analysis

Authors: Alonso-Cañadas J., Galán-Valdivieso F., Saraite-Sariene L., García-Tabuyo M., Alonso-Morales N.

Abstract:

Green Public Procurement (GPP) has recently gained attention in the academic and policy arenas since climate change has shown the need to be addressed by both private companies and public entities. Such growing interest motivates this article, aiming to explore the most influential journals, publishers, categories, and topics, as well as the recent trends and future research lines in GPP. Based on the Web of Science database, 578 articles from 2004 to February 2022 devoted to GPP are analyzed using Bibliometrix, an R-tool to perform bibliometric analysis, and Google’s Big Query and Data Studio. This article introduces a variety of findings. First, the most influential journals by far are “Journal of Cleaner Production” and “Sustainability,” differing in that the latter is open access while the former publishes via traditional subscription. This result also occurs regarding the main publishers (Elsevier and MDPI). These features lead us to split the sample into open-access journals and traditional journals to deepen into the similarities and differences between them, confirming that traditional journals exhibit a higher degree of influence in the literature than their open-access counterparts in terms of the number of documents, number of citations and impact (according to the H index). Second, this research also highlights the recent emergence of green-related terms (sustainable, environment) and, parallelly, the increase in categorizing GPP papers in “green” WoS categories, particularly since 2019. Finally, a number of related topics are emerging and will lead the research, such as food security, infrastructures, and implementation barriers of GPP.

Keywords: bibliometric analysis, green public procurement, open access, traditional journals

Procedia PDF Downloads 72
5485 Development of E-Tendering Models for Nigerian Public Procuring Entities

Authors: Bello Abdullahi, Kabir Bala, Yahaya M. Ibrahim, Ahmed D. Ibrahim

Abstract:

Public sector tendering has traditionally been conducted using manual paper-based processes which are known to be inefficient, less transparent, and more prone to manipulations and errors. However, the advent of the Internet and its associated technologies has led to the development of numerous e-Tendering systems that addressed many of the problems associated with the manual paper-based tendering system. Currently, in Nigeria, the public tendering processes are largely conducted based on manual paper-based system that is bedevilled by a number of problems such as inordinate delays, inefficiencies, manipulation of the tender evaluation process, corruption, lack of transparency and competition, among other problems. These problems can be addressed through the adoption of existing web-based e-Tendering systems which are known to address most of these problems. However, these existing e-Tendering systems that have been developed are not based on the Nigerian legal procurement processes and as such their suitability for local application is very limited. This paper is part of a larger study that attempt to address this problem through the development of an e-Tendering system that is based on the requirements of the Nigerian public procuring entities. In this paper, the identified tendering processes commonly used by Nigerian public procuring entities in the selection of construction sources are presented. A multi-methods research approach was used to identify those tendering processes. Specifically, 19 existing business use cases used by Nigerian public procuring entities were identified and 61 system use cases were prescribed based on the identified business use cases. The use cases were used as the basis for the development of domain and software conceptual models. The models were successfully used to guide the development of an e-Tendering system called NPS-eTender. Ripple and Unified Process were adopted as the software development methodologies.

Keywords: e-tendering, e-procurement, requirement model, conceptual model, public sector tendering, public procurement

Procedia PDF Downloads 165
5484 3rd Generation Modular Execution: A Global Breakthrough in Modular Facility Construction System

Authors: Sean Bryner S. Rey, Eric Tanjutco

Abstract:

Modular execution strategies are performed to address the various challenges of any projects and are implemented on each project phase that covers Engineering, Procurement, Fabrication and Construction. It was until the recent years that the intent to surpass mechanical modularization approach were conceptualized to give solution to much greater demands of project components such as site location and adverse weather condition, material sourcing, construction schedule, safety risks and overall plot layout and allocation. The intent of this paper is to introduce the 3rd Generation Modular Execution with an overview of its advantages on project execution and will give emphasis on Engineering, Construction, Operation and Maintenance. Most importantly, the paper will present the key differentiator of 3rd Gen modular execution against other conventional project execution and the merits it bears for the industry.

Keywords: 3rd generation modular, process block, construction, operation & maintenance

Procedia PDF Downloads 448
5483 Market Acceptance of a Murabaha-Based Finance Structure within a Social Network of Non-Islamic Small and Medium Enterprise Owners in African Procurement

Authors: Craig M. Allen

Abstract:

Twenty two African entrepreneurs with Small and Medium Enterprises (SMEs) in a single social network centered around a non-Muslim population in a smaller African country, selected an Islamic financing structure, a form of Murabaha, based solely on market rationale. These entrepreneurs had all won procurement contracts from major purchasers of goods within their country and faced difficulty arranging traditional bank financing to support their supply-chain needs. The Murabaha-based structure satisfied their market-driven demand and provided an attractive alternative to the traditional bank-offered lending products. The Murabaha-styled trade-financing structure was not promoted with any religious implications, but solely as a market solution to the existing problems associated with bank-related financing. This indicates the strong market forces that draw SMEs to financing structures that are traditionally considered within the framework of Islamic finance.

Keywords: Africa, entrepreneurs, Islamic finance, market acceptance, Murabaha, SMEs

Procedia PDF Downloads 153
5482 Methodology for Obtaining Food Licenses in India

Authors: Rathna Malhotra Gaur

Abstract:

Owing to multiplicity and competition in the Indian food industry, it was always important for the government of India to bring in reforms that would protect the interest of the consumer and also the food operator. To further this objective, Food Safety, and Standards Act, 2006 (hereinafter referred to as FSSAI) was enacted for laying down science-based standards for articles and food and to regulate their storage, distribution, manufacture, same and import and to ensure safe food availability to the citizens of India. One of the safeguards towards consumer interest is the enactment of Food Safety and Standards (Licensing and Registration of Food Businesses, Regulation, 2011 within the mandate of FSSAI. It is mandatory for every food operator in India to get the registration certificate and procurement of food Licenses before starting operations in the country. All the nuances pertaining to the procurement of licenses are dealt with under these regulations. These regulations also lay down detailed provisions with regard to the conditions that the operator has to adhere to once the License is procured, going to the integrities of the safety and hygiene standards to be maintained by the food operators. This paper is an exhaustive effort to examine the provisions of obtaining the registration and License in India and the conditions that need to be fulfilled subsequently and further on the validity and renewal of these Food Licenses.

Keywords: food laws, food licenses, food registration, penalty

Procedia PDF Downloads 152
5481 Sustainability as a Criterion in the Reconstruction of Libya’s Public Transport Infrastructure

Authors: Haitam Emhemad, Brian Agnew, David Greenwood

Abstract:

Amongst the many priorities facing Libya following the 2011 uprising is the provision of a transport infrastructure that will meet the nation’s needs and not undermine its prospects for economic prosperity as with many developing economies non-technical issues such as management, planning and financing are the major barriers to the efficient and effective provision of transport infrastructure. This is particularly true in the case of the effective incorporation of sustainability criteria, and the research upon which this paper is based involves the examination of alternative ways of approaching this problem. It is probably fair to say that criteria that relate to sustainability have not, historically, featured strongly in Libya’s approach to the development of its transport infrastructure. However, the current reappraisal of how best to redevelop the country’s transport infrastructure that has been afforded by recent events may offer the opportunity to alter this. The research examines recent case studies from a number of countries to explore ways in which sustainability has been included as a criterion for planning and procurement decisions. There will also be an in-depth investigation into the Libyan planning and legislative context to examine the feasibility of the introduction of such sustainability criteria into the process of planning and procurement of Libya’s transport infrastructure.

Keywords: Libya reconstruction, sustainability criteria, transport infrastructure, public transport

Procedia PDF Downloads 309
5480 Impact of Exogenous Risk Factors into Actual Construction Price in PPP Projects

Authors: Saleh Alzahrani, Halim Boussabaine

Abstract:

Many of Public Private Partnership (PPP) are developed based on a public project is to be awarded to a private party within a one contractual framework. PPP project risks typically include the development and construction of a new asset as well as its operation. Certainly the most severe consequences of risks through the construction period are price and time overruns. These events are among the most generally used situation in value for money analysis risks. The sources of risk change during the time in PPP project. In traditional procurement, the public sector usually has to cover all prices suffering from these risks. At least there is plenty to suggest that price suffering is a norm in some of the projects that are delivered under traditional procurement. This paper will find the impact of exogenous risk factors into actual construction price into PPP projects. The paper will present a brief literature review on PPP risk pricing strategies and then using system dynamics (SD) to analyses of the risks associated with the estimated project price. Based on the finding from these analyses a risk pricing association model is presented and discussed. The paper concludes with thoughts for future research.

Keywords: public private partnership (PPP), risk, risk pricing, system dynamics (SD)

Procedia PDF Downloads 520
5479 Analyze and Improve Project Delivery Time Enhancing Business Management System of Review and Approval Process for Project Design Submittals

Authors: Abdulaziz Alnajem, Amit Sharma

Abstract:

Business Case: Project delivery and enhancing activities' completion in the shortest possible time is critical during execution to proceed with the subsequent phases of Procurement, C & C phases of Contracts to have the required Production facilities/Infrastructure in place to achieve the Company strategic objective of 4.0 MBOPD oil production. SOR (Statement of requirement): Design and Engineering phase of Projects execution takes a long time. It is observed that, in most of the cases, company has crossed the Project Design Submittals review time as per the Contract/Company Standards, resulting into delays in projects completion, and cost impact to the company. Study Scope: Scope of the study covers the process from date of first submission of D & E documents by the contractor to final approval by the controlling team to proceed with the procurement of materials. This scope covers projects handled by the company’s project management teams and includes only the internal review process by the company.

Keywords: business management system, project management, oil and gas, analysis, improvement, design, delays

Procedia PDF Downloads 190
5478 The Significance of a Well-Defined Systematic Approach in Risk Management for Construction Projects within Oil Industry

Authors: Batool Ismaeel, Umair Farooq, Saad Mushtaq

Abstract:

Construction projects in the oil industry can be very complex, having unknown outcomes and uncertainties that cannot be easily predicted. Each project has its unique risks generated by a number of factors which, if not controlled, will impact the successful completion of the project mainly in terms of schedule, cost, quality, and safety. This paper highlights the historic risks associated with projects in the south and east region of Kuwait Oil Company (KOC) collated from the company’s lessons learned database. Starting from Contract Award through to handover of the project to the Asset owner, the gaps in project execution in terms of managing risk will be brought to discussion and where a well-defined systematic approach in project risk management reflecting many claims, change of scope, exceeding budget, delays in engineering phase as well as in the procurement and fabrication of long lead items should be adopted. This study focuses on a proposed feasible approach in risk management for engineering, procurement and construction (EPC) level projects including the various stakeholders involved in executing the works from International to local contractors and vendors in KOC. The proposed approach covers the areas categorized into organizational, design, procurement, construction, pre-commissioning, commissioning and project management in which the risks are identified and require management and mitigation. With the effective deployment and implementation of the proposed risk management system and the consideration of it as a vital key in achieving the project’s target, the outcomes will be more predictable in the future, and the risk triggers will be managed and controlled. The correct resources can be allocated on a timely basis for the company for avoiding any unpredictable outcomes during the execution of the project. It is recommended in this paper to apply this risk management approach as an integral part of project management and investigate further in the future, the effectiveness of this proposed system for newly awarded projects and compare the same with those projects of similar budget/complexity that have not applied this approach to risk management.

Keywords: construction, project completion, risk management, uncertainties

Procedia PDF Downloads 129
5477 Impact of Construction Risk Factors into Actual Construction Price in PPP Projects

Authors: Saleh Alzahrani, Halim Boussabaine

Abstract:

The majority of Public Private Partnership (PPP) are developed based on the rationale that the design, construction, operation, and financing of a public project is to be awarded to a private party within a single contractual framework. PPP project risks normally include the development and construction of a new asset as well as its operation for decades. Undoubtedly the most serious consequences of risks during the construction period are price and time overruns. These events are amongst the most broadly used scenarios in value for money analysis risks. The sources of risk change over the life cycle of a PPP project. In traditional procurement, the public sector normally has to cover all price distress from these risks. At least there is plenty evidence to suggest that price distress is a norm in some of the projects that are delivered under traditional procurement. This paper will find the impact of construction risk factors into actual construction price into PPP projects. The paper will present a brief literature review on PPP risk pricing strategies, and then using system dynamics (SD) to analyses of the risks associated with the estimated project price. Based on the finding from these analyses a risk pricing association model is presented and discussed. The paper concludes with thoughts for future research.

Keywords: Public Private Partnership (PPP), Risk, Risk Pricing, System Dynamics (SD), construction price

Procedia PDF Downloads 536