3904 Lean Manufacturing: Systematic Layout Planning Application to an Assembly Line Layout of a Welding Industry

Authors: Fernando Augusto Ullmann Tobe, Moacyr Amaral Domingues, Figueiredo, Stephany Rie Yamamoto Gushiken

Abstract:

The purpose of this paper is to present the process of elaborating the layout of an assembly line of a welding industry using the principles of lean manufacturing as the main driver. The objective of this paper is relevant since the current layout of the assembly line causes non-productive times for operators, being related to the lean waste of unnecessary movements. The methodology used for the project development was Project-based Learning (PBL), which is an active way of learning focused on real problems. The process of selecting the methodology for layout planning was developed considering three criteria to evaluate the most relevant one for this paper's goal. As a result of this evaluation, Systematic Layout Planning was selected, and three steps were added to it – Value Stream Mapping for the current situation and after layout changed and the definition of lean tools and layout type. This inclusion was to consider lean manufacturing in the layout redesign of the industry. The layout change resulted in an increase in the value-adding time of operations carried out in the sector, reduction in movement times between previous and final assemblies, and in cost savings regarding the man-hour value of the employees, which can be invested in productive hours instead of movement times.

Keywords: assembly line, layout, lean manufacturing, systematic layout planning

Procedia PDF Downloads 194
3903 Lean Manufacturing Implementation in Fused Plastic Bags Industry

Authors: Tareq Issa

Abstract:

Lean manufacturing is concerned with the implementation of several tools and methodologies that aim for the continuous elimination of wastes throughout manufacturing process flow in the production system. This research addresses the implementation of lean principles and tools in a small-medium industry focusing on 'fused' plastic bags production company in Amman, Jordan. In this production operation, the major type of waste to eliminate include material, waiting-transportation, and setup wastes. The primary goal is to identify and implement selected lean strategies to eliminate waste in the manufacturing process flow. A systematic approach was used for the implementation of lean principles and techniques, through the application of Value Stream Mapping analysis. The current state value stream map was constructed to improve the plastic bags manufacturing process through identifying opportunities to eliminate waste and its sources. Also, the future-state value stream map was developed describing improvements in the overall manufacturing process resulting from eliminating wastes. The implementation of VSM, 5S, Kanban, Kaizen, and Reduced lot size methods have provided significant benefits and results. Productivity has increased to 95.4%, delivery schedule attained at 99-100%, reduction in total inventory to 1.4 days and the setup time for the melting process was reduced to about 30 minutes.

Keywords: lean implementation, plastic bags industry, value stream map, process flow

Procedia PDF Downloads 144
3902 Implementation of 5S Lean Methodology in Reviewing Competencies in a Higher Education Institution

Authors: Jasim Saleh Said AlDairi

Abstract:

The potential of applying Lean Management in Higher Education Institutions has increased significantly in last few years, leading to tremendous savings. Reviewing and updating competencies’ curriculum matrix is one of the critical and complicated processes that consume time and effort, and this has triggered searching for a scientific and sustainable approach to manage the such review. This paper presents a novel approach of implementing Lean (5S) methodology in reviewing technical competencies required for the graduates of the Military Technological College (MTC) in the Sultanate of Oman. The 5S framework has been imbedded into an action plan using the PDCA cycle. As a result, the method applied has helped in sorting out the actual required competencies, the team has identified the required (new, amended, and deleted) competencies in all of the targeted Engineering Departments, in addition, the major wastes within the overall process were identified, and the future review process was standardized and documented.

Keywords: PDCA, 5S, lean, MTC, competencies, curriculum matrix, higher education

Procedia PDF Downloads 55
3901 Implementing Building Information Modelling to Attain Lean and Green Benefits

Authors: Ritu Ahuja

Abstract:

Globally the built environment sector is striving to be highly efficient, quality-centred and socially-responsible. Built environment sector is an integral part of the economy and plays an important role in urbanization, industrialization and improved quality of living. The inherent challenges such as excessive material and process waste, over reliance on resources, energy usage, and carbon footprint need to be addressed in order to meet the needs of the economy. It is envisioned that these challenges can be resolved by integration of Lean-Green-Building Information Modelling (BIM) paradigms. Ipso facto, with BIM as a catalyst, this research identifies the operational and tactical connections of lean and green philosophies by providing a conceptual integration framework and underpinning theories. The research has developed a framework for BIM-based organizational capabilities for enhanced adoption and effective use of BIM within architectural organizations. The study was conducted through a sequential mixed method approach focusing on collecting and analyzing both qualitative and quantitative data. The framework developed as part of this study will enable architectural organizations to successfully embrace BIM on projects and gain lean and green benefits.

Keywords: BIM, lean, green, AEC organizations

Procedia PDF Downloads 159
3900 The Lean Manufacturing Practices in an Automotive Company Using Value Stream Mapping Technique

Authors: Seher Arslankaya, Merve Si̇mge Usuk

Abstract:

Lean manufacturing, which is based on the Toyota Production System, has focused on increasing the performance in various fields by eliminating the waste. By waste elimination, the lead time is reduced significantly and lean manufacturing provides companies with an important privilege under today's competitive conditions. The initial point of lean thinking is the value. This notion create of a specific product with specific properties for which the customer is ready to pay and which satisfies his needs within a specific time frame and at a specific price. Considering this, the final customer determines the value but the manufacturer creates this value of the product. The value stream is the whole set of activities required for each product. These activities may or may not be essential for the value. Through value stream mapping, all employees can see the sources of waste and develop future cases to eliminate it. This study focused on manufacturing to eliminate the waste which created a cost but did not create any value. The study was carried out at the Department of Assembly/Logistics at Toyota Motor Manufacturing Turkey from the automotive industry with a high product mix and variable demands. As a result of the value stream analysis, improvements are planned for the future cases. The process was improved by applying these suggestions.

Keywords: lead time, lean manufacturing, performance improvement, value stream papping

Procedia PDF Downloads 280
3899 Proposal Evaluation of Critical Success Factors (CSF) in Lean Manufacturing Projects

Authors: Guilherme Gorgulho, Carlos Roberto Camello Lima

Abstract:

Critical success factors (CSF) are used to design the practice of project management that can lead directly or indirectly to the success of the project. This management includes many elements that have to be synchronized in order to ensure the project on-time delivery, quality and the lowest possible cost. The objective of this work is to develop a proposal for evaluation of the FCS in lean manufacturing projects, and apply the evaluation in a pilot project. The results show that the use of continuous improvement programs in organizations brings benefits as the process cost reduction and improve productivity.

Keywords: continuous improvement, critical success factors (csf), lean thinking, project management

Procedia PDF Downloads 326
3898 The Implementation of the Lean Six Sigma Production Process in a Telecommunications Company in Brazil

Authors: Carlos Fontanillas

Abstract:

The implementation of the lean six sigma methodology aims to implement practices to systematically improve processes by eliminating defects, making them cheaper. The implementation of projects with the methodology uses a division into five phases: definition, measurement, analysis, implementation, and control. In this process, it is understood that the implementation of said methodology generates benefits to organizations that adhere through the improvement of their processes. In the case of a telecommunications company, it was realized that the implementation of a lean six sigma project contributed to the improvement of the presented process, generating a financial return with the avoided cost. However, such study has limitations such as a specific segment of performance and procedure, i.e., it can not be defined that return under other circumstances will be the same. It is also concluded that lean six sigma projects tend to contribute to improved processes evaluated due to their methodology that is based on statistical analysis and quality management tools and can generate a financial return. It is hoped that the present study can be used to provide a clearer view of the methodology for entrepreneurs who wish to implement process improvement actions in their companies, as well as to provide a foundation for professionals working with lean six sigma projects. After the review of the processes, the completion of the project stages and the monitoring for three months in partnership with the owner of the process to ensure the effectiveness of the actions, the project was completed with the objective reached. There was an average of 60% reduction with the issuance of undue invoices generated after the deactivation and it was possible to extend the project to other companies, which allowed a reduction well above the initially stipulated target.

Keywords: quality, process, lean six sigma, organization

Procedia PDF Downloads 101
3897 Structural Equation Modelling Based Approach to Integrate Customers and Suppliers with Internal Practices for Lean Manufacturing Implementation in the Indian Context

Authors: Protik Basu, Indranil Ghosh, Pranab K. Dan

Abstract:

Lean management is an integrated socio-technical system to bring about a competitive state in an organization. The purpose of this paper is to explore and integrate the role of customers and suppliers with the internal practices of the Indian manufacturing industries towards successful implementation of lean manufacturing (LM). An extensive literature survey is carried out. An attempt is made to build an exhaustive list of all the input manifests related to customers, suppliers and internal practices necessary for LM implementation, coupled with a similar exhaustive list of the benefits accrued from its successful implementation. A structural model is thus conceptualized, which is empirically validated based on the data from the Indian manufacturing sector. With the current impetus on developing the industrial sector, the Government of India recently introduced the Lean Manufacturing Competitiveness Scheme that aims to increase competitiveness with the help of lean concepts. There is a huge scope to enrich the Indian industries with the lean benefits, the implementation status being quite low. Hardly any survey-based empirical study in India has been found to integrate customers and suppliers with the internal processes towards successful LM implementation. This empirical research is thus carried out in the Indian manufacturing industries. The basic steps of the research methodology followed in this research are the identification of input and output manifest variables and latent constructs, model proposition and hypotheses development, development of survey instrument, sampling and data collection and model validation (exploratory factor analysis, confirmatory factor analysis, and structural equation modeling). The analysis reveals six key input constructs and three output constructs, indicating that these constructs should act in unison to maximize the benefits of implementing lean. The structural model presented in this paper may be treated as a guide to integrating customers and suppliers with internal practices to successfully implement lean. Integrating customers and suppliers with internal practices into a unified, coherent manufacturing system will lead to an optimum utilization of resources. This work is one of the very first researches to have a survey-based empirical analysis of the role of customers, suppliers and internal practices of the Indian manufacturing sector towards an effective lean implementation.

Keywords: customer management, internal manufacturing practices, lean benefits, lean implementation, lean manufacturing, structural model, supplier management

Procedia PDF Downloads 150
3896 Lean Product Development and Sustainability: A Systematic Literature Review

Authors: João P. E. De Souza, Rob Dekkers

Abstract:

Whereas lean product development aims at maximising customer value whilst optimising product and process design, the question arises whether this approach includes sustainability. A systematic literature review reveals that methods associated with this conceptualisation of product development are suitable for including sustainability, but that the criteria for the triple-bottom line need to be included when using these methods; this is particularly the case for social aspects. Thus, the main finding is that not new methods should be developed, but that existing methods should be more inclusive towards all aspects of sustainability and product life-cycle thinking.

Keywords: lean product development, product life-cycle, sustainability, systematic literature review, triple bottom-line

Procedia PDF Downloads 125
3895 Improving the Efficiency of Repacking Process with Lean Technique: The Study of Read With Me Group Company Limited

Authors: Jirayut Phetchuen, Jongkol Srithorn

Abstract:

The study examines the unloading and repacking process of Read With Me Group Company Limited. The research aims to improve the old work process and build a new efficient process with the Lean Technique and new machines for faster delivery without increasing the number of employees. Currently, two employees work based on five days on and off. However, workplace injuries have delayed the delivery time, especially the delivery to the neighboring countries. After the process improvement, the working space increased by 25%, the Process Lead Time decreased by 40%, the work efficiency increased by 175.82%, and the work injuries rate was reduced to zero.

Keywords: lean technique, plant layout design, U-shaped disassembly line, value stream mapping

Procedia PDF Downloads 58
3894 Lean Commercialization: A New Dawn for Commercializing High Technologies

Authors: Saheed A. Gbadegeshin

Abstract:

Lean Commercialization (LC) is a transformation of new technologies and knowledge to products and services through application of lean/agile principle. This principle focuses on how resources can be minimized on development, manufacturing, and marketing new products/services, which can be accepted by customers. To understand how the LC has been employed by the technology-based companies, a case study approach was employed by interviewing the founders, observing their high technologies, and interviewing the commercialization experts. Two serial entrepreneurs were interviewed in 2012, and their commercialized technologies were monitored from 2012 till 2016. Some results were collected, but to validate the commercialization strategies of these entrepreneurs, four commercialization experts were interviewed in 2017. Initial results, observation notes, and experts’ opinions were analyzed qualitatively. The final findings showed that the entrepreneurs applied the LC unknowingly, and the experts were aware of the LC. Similarly, the entrepreneurs used the LC due to the financial constraints, and their need for success. Additionally, their commercialization practices revealed that LC appeared to be one of their commercialization strategies. Thus, their practices were analyzed, and a framework was developed. Furthermore, the experts noted that LC is a new dawn, which technologists and scientists need to consider for their high technology commercialization. This article contributes to the theory and practice of commercialization. Theoretically, the framework adds value to the commercialization discussion. And, practically the framework can be used by the technology entrepreneurs (technologists and scientists), technology-based enterprises, and technology entrepreneurship educators as a guide in their commercialization adventures.

Keywords: lean commercialization, high technologies, lean start-up, technology-based companies

Procedia PDF Downloads 125
3893 Effect of Pre-Construction on Construction Schedule and Client Loyalty

Authors: Jong Hoon Kim, Hyun-Soo Lee, Moonseo Park, Min Jeong, Inbeom Lee

Abstract:

Pre-construction is essential in achieving the success of a construction project. Due to the early involvement of project participants in the construction phase, project managers are able to plan ahead and solve issues well in advance leading to the success of the project and the satisfaction of the client. This research utilizes quantitative data derived from construction management projects in order to identify the relationship between pre-construction, construction schedule, and client satisfaction. A total of 65 construction projects and 93 clients were investigated for this research in an attempt to identify (a) the relationship between pre-construction and schedule reduction, and (b) pre-construction and client loyalty. Based on the quantitative analysis, this research was able to establish a negative correlation based on 65 construction projects between pre-construction and project schedule existed. This finding represents that the more pre-construction is performed for a certain project, the overall construction schedule decreased. Then, to determine the relationship between pre-construction and client satisfaction, Net Promoter Score (NPS) of 93 clients from the 65 projects was utilized. Pre-construction and NPS was further analyzed and a positive correlation was found between the two. This infers that clients tend to be more satisfied with projects with higher ratio of pre-construction than those projects with less pre-construction.

Keywords: client loyalty, NPS, pre-construction, schedule reduction

Procedia PDF Downloads 321
3892 Lean and Six Sigma in the Freight Railway Supplier Base in South Africa: Factors Leading to Their Application

Authors: Hilda Kundai Chikwanda, Lawrence Thabo Mokhadi

Abstract:

The study aimed to review the factors that lead the freight railway suppliers base in South Africa (SA) to apply the Lean and Six Sigma (L&SS) methodologies. A thorough review of the factors that lead organisations, in the different industries, to implement these methodologies was done. L&SS applications were found to be prominent in the automotive industry. In particular, the railway industry in SA and the region were reviewed in terms of challenges in capturing the freight logistics market and growing market share. Qualitative methods have been used to collect primary data and descriptive statistics was used to calculate, describe, and summarize collected research data. The results show that external factors have a greater influence on the implementation of L&SS. The study drew inferences between freight railway supplier base and the application of Lean and Six Sigma (L&SS) methodologies in the SA context. It identified challenges that leads the SA freight railway to lose market share to road freight users. It further observes and recommends that L&SS methodologies are the ideal strategy required to implement a turnaround in the trajectory of freight railways as a competitive freight transport solution.

Keywords: production, methodology, manufacturing, lean, six sigma

Procedia PDF Downloads 11
3891 Reducing Lean by Implementing Distance Learning in the Training Programs of Oil and Gas Industries

Authors: Sayed-Mahdi Hashemi-Dehkordi, Ian Baker

Abstract:

This paper investigates the benefits of implementing distance learning in training courses for the oil and gas industries to reduce lean. Due to the remote locations of many oil and gas operations, scheduling and organizing in-person training classes for employees in these sectors is challenging. Furthermore, considering that employees often work in periodic shifts such as day, night, and resting periods, arranging in-class training courses requires significant time and transportation. To explore the effectiveness of distance learning compared to in-class learning, a set of questionnaires was administered to employees of a far on-shore refinery unit in Iran, where both in-class and distance classes were conducted. The survey results revealed that over 72% of the participants agreed that distance learning saved them a significant amount of time by rating it 4 to 5 points out of 5 on a Likert scale. Additionally, nearly 67% of the participants acknowledged that distance learning considerably reduced transportation requirements, while approximately 64% agreed that it helped in resolving scheduling issues. Introducing and encouraging the use of distance learning in the training environments of oil and gas industries can lead to notable time and transportation savings for employees, ultimately reducing lean in a positive manner.

Keywords: distance learning, in-class learning, lean, oil and gas, scheduling, time, training programs, transportation

Procedia PDF Downloads 41
3890 Autoignition Delay Characterstic of Hydrocarbon (n-Pentane) from Lean to Rich Mixtures

Authors: Sunil Verma

Abstract:

This report is concerned with study of autoignition delay characterstics of n-pentane. Experiments are done for different equivalents ratio on Rapid compression machine. Dependence of autoignition delay period is clearly explained from lean to rich mixtures. Equivalence ratio is varied from 0.33 to 0.6.

Keywords: combustion, autoignition, ignition delay, rapid compression machine

Procedia PDF Downloads 321
3889 The Journey from Lean Manufacturing to Industry 4.0: The Rail Manufacturing Process in Mexico

Authors: Diana Flores Galindo, Richard Gil Herrera

Abstract:

Nowadays, Lean Manufacturing and Industry 4.0 are very important in every country. One of the main benefits is continued market presence. It has been identified that there is a need to change existing educational programs, as well as update the knowledge and skills of existing employees. It should be borne in mind that behind each technological improvement, there is a human being. Human talent cannot be neglected. The main objectives of this article are to review the link between Lean Manufacturing, the incorporation of Industry 4.0 and the steps to follow to implement it; analyze the current situation and study the implications and benefits of this new trend, with a particular focus on Mexico. Lean Manufacturing and Industry 4.0 implementation waves must always take care of the most important capital – intellectual capital. The methodology used in this article comprised the following steps: reviewing the reality of the fourth industrial revolution, reviewing employees’ skills on the journey to become world-class, and analyzing the situation in Mexico. Lean Manufacturing and Industry 4.0 were studied not as exclusive concepts, but as complementary ones. The methodological framework used is focused on motivating companies’ collaborators to guarantee common results, innovate, and remain in the market in the face of new requirements from company stakeholders. The key findings were that both trends emphasize the need to improve communication across the entire company and incorporate new technologies into everyday work, from the shop floor to administrative staff, to help improve processes. Taking care of people, activities and processes will bring a company success. In the specific case of Mexico, companies in all sectors need to be aware of and implement technological improvements according to their specific needs. Low-cost labor represents one of the most typical barriers. In conclusion, companies must build a roadmap according to their strategy and needs to achieve their short, medium- and long-term goals.

Keywords: lean management, lean manufacturing, industry 4.0, motivation, SWOT analysis, Hoshin Kanri

Procedia PDF Downloads 116
3888 Risk Management Approach for Lean, Agile, Resilient and Green Supply Chain

Authors: Benmoussa Rachid, Deguio Roland, Dubois Sebastien, Rasovska Ivana

Abstract:

Implementation of LARG (Lean, Agile, Resilient, Green) practices in the supply chain management is a complex task mainly because ecological, economical and operational goals are usually in conflict. To implement these LARG practices successfully, companies’ need relevant decision making tools allowing processes performance control and improvement strategies visibility. To contribute to this issue, this work tries to answer the following research question: How to master performance and anticipate problems in supply chain LARG practices implementation? To answer this question, a risk management approach (RMA) is adopted. Indeed, the proposed RMA aims basically to assess the ability of a supply chain, guided by “Lean, Green and Achievement” performance goals, to face “agility and resilience risk” factors. To proof its relevance, a logistics academic case study based on simulation is used to illustrate all its stages. It shows particularly how to build the “LARG risk map” which is the main output of this approach.

Keywords: agile supply chain, lean supply chain, green supply chain, resilient supply chain, risk approach

Procedia PDF Downloads 280
3887 A Mixed Method Design to Studying the Effects of Lean Production on Job Satisfaction and Health Work in a French Context

Authors: Gregor Bouville, Celine Schmidt

Abstract:

This article presents a French case study on lean production drawing on a mixed method design which has received little attention in French management research-especially in French human resources research. The purpose is to show that using a mixed method approach in this particular case overstep the limitations of previous studies in lean production studies. The authors use the embedded design as a special articulation of mixed method to analyse and understand the effects of three organizational practices on job satisfaction and workers’ health. Results show that low scheduled autonomy, quality management, time constraint have deleterious effects on job satisfaction. Furthermore, these three practices have ambivalent effects on health work. Interest in the subjects of mixed method has been growing up among French health researchers and practioners, also recently among French management researchers. This study reinforces and refines how mixed methods may offer interesting perspectives in an integrated framework included human resources, management, and health fields. Finally, potentials benefits and limits for those interdisciplinary researches programs are discussed.

Keywords: lean production, mixed method, work organization practices, job satisfaction

Procedia PDF Downloads 330
3886 Exploratory Analysis and Development of Sustainable Lean Six Sigma Methodologies Integration for Effective Operation and Risk Mitigation in Manufacturing Sectors

Authors: Chukwumeka Daniel Ezeliora

Abstract:

The Nigerian manufacturing sector plays a pivotal role in the country's economic growth and development. However, it faces numerous challenges, including operational inefficiencies and inherent risks that hinder its sustainable growth. This research aims to address these challenges by exploring the integration of Lean and Six Sigma methodologies into the manufacturing processes, ultimately enhancing operational effectiveness and risk mitigation. The core of this research involves the development of a sustainable Lean Six Sigma framework tailored to the specific needs and challenges of Nigeria's manufacturing environment. This framework aims to streamline processes, reduce waste, improve product quality, and enhance overall operational efficiency. It incorporates principles of sustainability to ensure that the proposed methodologies align with environmental and social responsibility goals. To validate the effectiveness of the integrated Lean Six Sigma approach, case studies and real-world applications within select manufacturing companies in Nigeria will be conducted. Data were collected to measure the impact of the integration on key performance indicators, such as production efficiency, defect reduction, and risk mitigation. The findings from this research provide valuable insights and practical recommendations for selected manufacturing companies in South East Nigeria. By adopting sustainable Lean Six Sigma methodologies, these organizations can optimize their operations, reduce operational risks, improve product quality, and enhance their competitiveness in the global market. In conclusion, this research aims to bridge the gap between theory and practice by developing a comprehensive framework for the integration of Lean and Six Sigma methodologies in Nigeria's manufacturing sector. This integration is envisioned to contribute significantly to the sector's sustainable growth, improved operational efficiency, and effective risk mitigation strategies, ultimately benefiting the Nigerian economy as a whole.

Keywords: lean six sigma, manufacturing, risk mitigation, sustainability, operational efficiency

Procedia PDF Downloads 159
3885 Scientific Production on Lean Supply Chains Published in Journals Indexed by SCOPUS and Web of Science Databases: A Bibliometric Study

Authors: T. Botelho de Sousa, F. Raphael Cabral Furtado, O. Eduardo da Silva Ferri, A. Batista, W. Augusto Varella, C. Eduardo Pinto, J. Mimar Santa Cruz Yabarrena, S. Gibran Ruwer, F. Müller Guerrini, L. Adalberto Philippsen Júnior

Abstract:

Lean Supply Chain Management (LSCM) is an emerging research field in Operations Management (OM). As a strategic model that focuses on reduced cost and waste with fulfilling the needs of customers, LSCM attracts great interest among researchers and practitioners. The purpose of this paper is to present an overview of Lean Supply Chains literature, based on bibliometric analysis through 57 papers published in indexed journals by SCOPUS and/or Web of Science databases. The results indicate that the last three years (2015, 2016, and 2017) were the most productive on LSCM discussion, especially in Supply Chain Management and International Journal of Lean Six Sigma journals. India, USA, and UK are the most productive countries; nevertheless, cross-country studies by collaboration among researchers were detected, by social network analysis, as a research practice, appearing to play a more important role on LSCM studies. Despite existing limitation, such as limited indexed journal database, bibliometric analysis helps to enlighten ongoing efforts on LSCM researches, including most used technical procedures and collaboration network, showing important research gaps, especially, for development countries researchers.

Keywords: Lean Supply Chains, Bibliometric Study, SCOPUS, Web of Science

Procedia PDF Downloads 309
3884 Field Management Solutions Supporting Foreman Executive Tasks

Authors: Maroua Sbiti, Karim Beddiar, Djaoued Beladjine, Romuald Perrault

Abstract:

Productivity is decreasing in construction compared to the manufacturing industry. It seems that the sector is suffering from organizational problems and have low maturity regarding technological advances. High international competition due to the growing context of globalization, complex projects, and shorter deadlines increases these challenges. Field employees are more exposed to coordination problems than design officers. Execution collaboration is then a major issue that can threaten the cost, time, and quality completion of a project. Initially, this paper will try to identify field professional requirements as to address building management process weaknesses such as the unreliability of scheduling, the fickleness of monitoring and inspection processes, the inaccuracy of project’s indicators, inconsistency of building documents and the random logistic management. Subsequently, we will focus our attention on providing solutions to improve scheduling, inspection, and hours tracking processes using emerging lean tools and field mobility applications that bring new perspectives in terms of cooperation. They have shown a great ability to connect various field teams and make informations visual and accessible to planify accurately and eliminate at the source the potential defects. In addition to software as a service use, the adoption of the human resource module of the Enterprise Resource Planning system can allow a meticulous time accounting and thus make the faster decision making. The next step is to integrate external data sources received from or destined to design engineers, logisticians, and suppliers in a holistic system. Creating a monolithic system that consolidates planning, quality, procurement, and resources management modules should be our ultimate target to build the construction industry supply chain.

Keywords: lean, last planner system, field mobility applications, construction productivity

Procedia PDF Downloads 87
3883 Lean Implementation in a Nurse Practitioner Led Pediatric Primary Care Clinic: A Case Study

Authors: Lily Farris, Chantel E. Canessa, Rena Heathcote, Susan Shumay, Suzanna V. McRae, Alissa Collingridge, Minna K. Miller

Abstract:

Objective: To describe how the Lean approach can be applied to improve access, quality and safety of care in an ambulatory pediatric primary care setting. Background: Lean was originally developed by Toyota manufacturing in Japan, and subsequently adapted for use in the healthcare sector. Lean is a systematic approach, focused on identifying and reducing waste within organizational processes, improving patient-centered care and efficiency. Limited literature is available on the implementation of the Lean methodologies in a pediatric ambulatory care setting. Methods: A strategic continuous improvement event or Rapid Process Improvement Workshop (RPIW) was launched with the aim evaluating and structurally supporting clinic workflow, capacity building, sustainability, and ultimately improving access to care and enhancing the patient experience. The Lean process consists of five specific activities: Current state/process assessment (value stream map); development of a future state map (value stream map after waste reduction); identification, quantification and prioritization of the process improvement opportunities; implementation and evaluation of process changes; and audits to sustain the gains. Staff engagement is a critical component of the Lean process. Results: Through the implementation of the RPIW and shifting workload among the administrative team, four hours of wasted time moving between desks and doing work was eliminated from the Administrative Clerks role. To streamline clinic flow, the Nursing Assistants completed patient measurements and vitals for Nurse Practitioners, reducing patient wait times and adding value to the patients visit with the Nurse Practitioners. Additionally, through the Nurse Practitioners engagement in the Lean processes a need was recognized to articulate clinic vision, mission and the alignment of NP role and scope of practice with the agency and Ministry of Health strategic plan. Conclusions: Continuous improvement work in the Pediatric Primary Care NP Clinic has provided a unique opportunity to improve the quality of care delivered and has facilitated further alignment of the daily continuous improvement work with the strategic priorities of the Ministry of Health.

Keywords: ambulatory care, lean, pediatric primary care, system efficiency

Procedia PDF Downloads 273
3882 Implementation of Lean Tools (Value Stream Mapping and ECRS) in an Oil Refinery

Authors: Ronita Singh, Yaman Pattanaik, Soham Lalwala

Abstract:

In today’s highly competitive business environment, every organization is striving towards lean manufacturing systems to achieve lower Production Lead Times, lower costs, less inventory and overall improvement in supply chains efficiency. Based on the similar idea, this paper presents the practical application of Value Stream Mapping (VSM) tool and ECRS (Eliminate, Combine, Reduce, and Simplify) technique in the receipt section of the material management center of an oil refinery. A value stream is an assortment of all actions (value added as well as non-value added) that are required to bring a product through the essential flows, starting with raw material and ending with the customer. For drawing current state value stream mapping, all relevant data of the receipt cycle has been collected and analyzed. Then analysis of current state map has been done for determining the type and quantum of waste at every stage which helped in ascertaining as to how far the warehouse is from the concept of lean manufacturing. From the results achieved by current VSM, it was observed that the two processes- Preparation of GRN (Goods Receipt Number) and Preparation of UD (Usage Decision) are both bottle neck operations and have higher cycle time. This root cause analysis of various types of waste helped in designing a strategy for step-wise implementation of lean tools. The future state thus created a lean flow of materials at the warehouse center, reducing the lead time of the receipt cycle from 11 days to 7 days and increasing overall efficiency by 27.27%.

Keywords: current VSM, ECRS, future VSM, receipt cycle, supply chain, VSM

Procedia PDF Downloads 263
3881 Simulation: A Tool for Stabilization of Welding Processes in Lean Production Concepts

Authors: Ola Jon Mork, Lars Andre Giske, Emil Bjørlykhaug

Abstract:

Stabilization of critical processes in order to have the right quality of the products, more efficient production and smoother flow is a key issue in lean production. This paper presents how simulation of key welding processes can stabilize complicated welding processes in small scale production, and how simulation can impact the entire production concept seen from the perspective of lean production. First, a field study was made to learn the production processes in the factory, and subsequently the field study was transformed into a value stream map to get insight into each operation, the quality issues, operation times, lead times and flow of materials. Valuable practical knowledge of how the welding operations were done by operators, appropriate tools and jigs, and type of robots that could be used, was collected. All available information was then implemented into a simulation environment for further elaboration and development. Three researchers, the management of the company and skilled operators at the work floor where working on the project over a period of eight months, and a detailed description of the process was made by the researchers. The simulation showed that simulation could solve a number of technical challenges, the robot program can be tuned in off line mode, and the design and testing of the robot cell could be made in the simulator. Further on the design of the product could be optimized for robot welding and the jigs could be designed and tested in simulation environment. This means that a key issue of lean production can be solved; the welding operation will work with almost 100% performance when it is put into real production. Stabilizing of one key process is critical to gain control of the entire value chain, then a Takt Time can be established and the focus can be directed towards the next process in the production which should be stabilized. Results show that industrial parameters like welding time, welding cost and welding quality can be defined on the simulation stage. Further on, this gives valuable information for calculation of the factories business performance, like manufacturing volume and manufacturing efficiency. Industrial impact from simulation is more efficient implementation of lean manufacturing, since the welding process can be stabilized. More research should be done to gain more knowledge about simulation as a tool for implementation of lean, especially where there complex processes.

Keywords: simulation, lean, stabilization, welding process

Procedia PDF Downloads 292
3880 Construction Quality Perception of Construction Professionals and Their Expectations from a Quality Improvement Technique in Pakistan

Authors: Muhammad Yousaf Sadiq

Abstract:

The complexity arises in defining the construction quality due to its perception, based on inherent market conditions and their requirements, the diversified stakeholders itself and their desired output. An quantitative survey based approach was adopted in this constructive study. A questionnaire-based survey was conducted for the assessment of construction Quality perception and expectations in the context of quality improvement technique. The survey feedback of professionals of the leading construction organizations/companies of Pakistan construction industry were analyzed. The financial capacity, organizational structure, and construction experience of the construction firms formed basis for their selection. The quality perception was found to be project-scope-oriented and considered as an excess cost for a construction project. Any quality improvement technique was expected to maximize the profit for the employer, by improving the productivity in a construction project. The study is beneficial for the construction professionals to assess the prevailing construction quality perception and the expectations from implementation of any quality improvement technique in construction projects.

Keywords: construction quality, expectation, improvement, perception

Procedia PDF Downloads 435
3879 Study of Management of Waste Construction Materials in Civil Engineering Projects

Authors: Jalindar R. Patil, Harish P. Gayakwad

Abstract:

The increased economic growth across the globe as well as urbanization in developing countries have led into extensive construction activities that generate large amounts of wastes. Material wastage in construction projects resulted into huge financial setbacks to builders and contractors. In addition to this, it may also cause significant effects over aesthetics, health, and the general environment. However in many cities across the globe where construction wastes material management is still a problem. In this paper, the discussion is all about the method for the management of waste construction materials. The objectives of this seminar are to identify the significant source of construction waste globally, to improve the performance of by extracting the major barriers construction waste management and to determine the cost impact on the construction project. These wastes needs to be managed as well as their impacts needs to be ascertained to pave way for their proper management. The seminar includes the details of construction waste management with the reference to construction project. The application of construction waste management in the civil engineering projects is to describe the reduction in the construction wastes.

Keywords: civil engineering, construction materials, waste management, construction activities

Procedia PDF Downloads 481
3878 Green Construction in EGYPT

Authors: Hanan A. Anwar

Abstract:

This paper introduces green building construction in Egypt with different concepts and practices. The following study includes green building applied definition, guidelines, regulations and Standards. Evaluation of cost/benefit of green construction methods and green construction rating systems are presented. Relevant case studies will be reviewed. Four sites will be included.

Keywords: green construction, ecofreindly, self-sufficient town, carbon neutral atmosphere

Procedia PDF Downloads 618
3877 Agroecology and Seasonal Disparity Nexus with Nutritional Status of Children in Ethiopia

Authors: Dagem Alemayehu, Samson Gebersilassie, Jan Frank

Abstract:

Climate change is impacting nutrition through reducing food quantity and access, limiting dietary diversity, and decreased nutritional food content as well as strongly affecting seasonal rainfall in Ethiopia. Nevertheless, only a few data is available on the impacts of seasonality in Infant, and Young Child Feeding (IYCF) practices undernutrition among 6-23 months old children in different agro-ecological zones of poor resource settings of Ethiopia. Methods: Socio-demographic, anthropometry, and IYCF indicators were assessed in the harvest and lean seasons among children aged 6–23 months of age randomly selected from rural villages of lowland and midland agro-ecological zones. Results: Child stunting and underweight increased from prevalence of 32.8 % and 23.9 % (lowland &midland respectively) in the lean season to 36.1% and 33.8 % harvest seasons, respectively. The biggest increase in the prevalence of stunting and underweight between harvest and lean seasons was noted in the lowland zone. Wasting decreased from 11.6% lean to 8.5% harvest, with the biggest decline recorded in the midland zone. Minimum meal frequency, minimum acceptable diet, and poor dietary diversity increased considerably in harvest compared to a lean season in the lowland zone. Feeding practices and maternal age were predictors of wasting, while women's dietary diversity and children's age was a predictor of child dietary diversity in both seasons. Conclusion: There is seasonal variation in undernutrition and IYCF practices among children 6-23 months of age with more pronounced effect lowland agro-ecological zone.

Keywords: agroecology, seasonality, stunting, wasting

Procedia PDF Downloads 104
3876 Differentiation of Customer Types by Stereotypical Characteristics for Modular and Conventional Construction Methods

Authors: Peter Schnell, Phillip Haag

Abstract:

In the course of the structural transformation of the construction industry, the integration of industrialization and digitization has led to the development of construction methods with an increased degree of prefabrication, such as system or modular construction. Compared to conventional construction, these innovative construction methods are characterized by modified structural and procedural properties and expand the range of construction services. Faced with the supply side, it is possible to identify construction-specific customer types with different characteristics and certain preferences as far as the choice of construction method is concerned. The basis for this finding was qualitative expert interviews. By evaluating the stereotypical customer needs, a corresponding segmentation of the demand side can be made along with the basic orientation and decision behavior. This demarcation supports the target- and needs-oriented customer approach and contributes to cooperative and successful project management.

Keywords: differentiation of customer types, modular construction methods, conventional construction methods, stereotypical customer types

Procedia PDF Downloads 80
3875 A Study on Occupational Injuries among Building Construction Workers in Bhubaneswar City Odisha

Authors: Rahul Pal

Abstract:

In India, construction industry plays a vital role in the development of infrastructures. It is one of the most hazardous industries. Construction workers are a group that is particularly vulnerable to health risks because they have few legal protection. India has the world’s highest accident rate among construction workers. This study aimed to investigate the prevalence of occupation injury among construction workers and to find out the factors responsible for such injuries. Methodology: A cross-sectional study using a semi-structured questionnaire among 305 construction workers in Bhubaneswar city. In this study, it was found that the overall prevalence of injury was 43.28% in the previous one year period. Majority of the construction workers were less experience in the construction work. Factors responsible for injuries are fall of the object followed by striking, and majority of the workers reported their injuries to have occurred in the summer season. And most of the construction workers are not using personal protective equipment (PPE). Conclusion: Given the occupational injuries, the majority of the construction workers are injured in this study; there is a need to address this issue to ensure necessary step for the safety and well-being of construction workers.

Keywords: construction, construction workers, occupational injuries, personal protective equipment