Search results for: investment project risks
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 7368

Search results for: investment project risks

7338 Creating Legitimate Expectations in International Energy Investments: Role of the Stability Provisions

Authors: Rahmi Kopar

Abstract:

Legitimate expectations principle is considered one of the most dominant elements of the Fair and Equitable Treatment Standard which is today’s most relied upon treaty standard. Since its utilization by arbitral tribunals is relatively new, the contours of the legitimate expectations concept under investment treaty law have not been precisely defined yet. There are various fragmented views arising both from arbitral tribunals and scholarly writings with respect to its limits and use even though the principle is ‘firmly rooted in arbitral practice.’ International energy investments, due to their characteristics, are more prone to certain types of risks, especially the political risks. Thus, there are several mechanisms to protect an energy investment against those risks. Stabilisation is one of these investment protection methods. Stability provisions can be found under domestic legislations, as a contractual clause, or as a separate legal stability agreement. This paper will start by examining the roots of the contentious concept of legitimate expectations with reference to its application in domestic legal systems from where the doctrine under investment treaty law context was transplanted. Then the paper will turn to the investment treaty law and analyse the main contours of the doctrine as understood and applied by arbitral tribunals. 'What gives rise to the investor’s legitimate expectations?' question is answered mainly by three categories of sources: the general legal framework prevalent in a host state, the representations made by the officials or organs of a host state, and the contractual commitments. However, there is no unanimity among the arbitral tribunals and the scholars with respect to the form these sources should take. At this point, the study will discuss the sources of a stability provision and the effect of these stability provisions found in various legal sources in creating a legitimate expectation for the investor. The main questions to be discussed in this paper are as follows: a) Do the stability provisions found under different legal sources create a legitimate expectation on the investor side? b) If yes, what levels of legitimate expectations do they create? These questions will be answered mainly by reference to investment treaty jurisprudence.

Keywords: fair and equitable treatment standard, international energy investments, investment protection, legitimate expectations, stabilization

Procedia PDF Downloads 185
7337 Public Private Partnership for Infrastructure Projects: Mapping the Key Risks

Authors: Julinda Keçi

Abstract:

In many countries, governments have been promoting the involvement of private sector entities to enter into long-term agreements for the development and delivery of large infrastructure projects, with a focus on overcoming the limitations upon public fund of the traditional approach. The involvement of private sector through public-private partnerships (PPP) brings in new capital investments, value for money and additional risks to handle. Worldwide research studies have shown that an objective, systematic, reliable and user-oriented risk assessment process and an optimal allocation mechanism among different stakeholders is crucial to the successful completion. In this framework this paper, which is the first stage of a research study, aims to identify the main risks for the delivery of PPP projects. A review of cross-countries research projects and case studies was performed to map the key risks affecting PPP infrastructure delivery. The matrix of mapping offers a summary of the frequency of factors, clustered in eleven categories: Construction, Design, Economic, Legal, Market, Natural, Operation, Political, Project finance, Project selection and Relationship. Results will highlight the most critical risk factors, and will hopefully assist the project managers in directing the managerial attention in the further stages of risk allocation.

Keywords: construction, infrastructure, public private partnerships, risks

Procedia PDF Downloads 404
7336 Decision Framework for Cross-Border Railway Infrastructure Projects

Authors: Dimitrios J. Dimitriou, Maria F. Sartzetaki

Abstract:

Transport infrastructure assets are key components of the national asset portfolio. The decision to invest in a new infrastructure in transports could take from a few years to some decades. This is mainly because of the need to reserve and spent many capitals, the long payback period, the number of the stakeholders involved in decision process and –many times- the investment and business risks are high. Therefore, the decision assessment framework is an essential challenge linked with the key decision factors meet the stakeholder expectations highlighting project trade-offs, financial risks, business uncertainties and market limitations. This paper examines the decision process for new transport infrastructure projects in cross border regions, where a wide range of stakeholders with different expectation is involved. According to a consequences analysis systemic approach, the relationship of transport infrastructure development, economic system development and stakeholder expectation is analyzed. Adopting the on system of system methodological approach, the decision making framework, variables, inputs and outputs are defined, highlighting the key shareholder’s role and expectations. The application provides the methodology outputs presenting the proposed decision framework for a strategic railway project in north Greece deals with the upgrade of the existing railway corridor connecting Greece, Turkey and Bulgaria.

Keywords: decision making, system of system, cross-border, infrastructure project

Procedia PDF Downloads 284
7335 Saudi Arabian Aviation Construction Projects: Risks and Their Assessments

Authors: Ahmad Baghdadi, Mohammed Kishk

Abstract:

Construction projects are unique and involve different level of complexity. Airports projects, among other construction projects, are considered to be very complex as they face a number of challenges which make them inevitably exposed to risks. However, in Saudi Arabia, the sector of aviation is considered an important sector owing to the fact that it is the first destination for Muslims on an annual basis. As a result the Saudi government has allocated a huge amount of their general budget to this sector through the General Authority of Civil Aviation (GACA). However, it has been found that the projects are still delivered with a significant number of time and cost overruns. These consequences are typically generated from the risks involved in the projects. Thus, there is a need to identify the number of risks thought to cause such overruns in project times and costs, as well as to assess their significances in terms of their likelihoods of occurrence and their impacts. Accordingly, this paper aims to identify risks associated with aviation construction projects in Saudi Arabia, as well as to assess their likelihoods of occurrence and impacts on such projects. In total, forty four risks have been identified through a critical literature review of common risks in similar projects, as well as thirteen semi-structured interviews with expert project managers involved in GACA’s projects. However, the assessment of the identified risks in term of their likelihoods of occurrence and impacts was obtained through the analysis of forty five questionnaires. Respondents of questionnaires include clients, contractors and consultants. The results show the risks of design changes by the client, labour issue, and setting a tight schedule by the client have the highest likelihoods of occurrence in GACA projects, while the risks of earthquakes, design constructability, and corruption have the greatest impacts.

Keywords: aviation construction projects, GACA, risks, risk assessment, Saudi Arabia

Procedia PDF Downloads 516
7334 A Risk-Based Approach to Construction Management

Authors: Chloe E. Edwards, Yasaman Shahtaheri

Abstract:

Risk management plays a fundamental role in project planning and delivery. The purpose of incorporating risk management into project management practices is to identify and address uncertainties related to key project-related activities. The uncertainties, known as risk events, can relate to project deliverables that are quantifiable and are often measured by impact to project schedule, cost, or environmental impact. Risk management should be incorporated as an iterative practice throughout the planning, execution, and commissioning phases of a project. This paper specifically examines how risk management contributes to effective project planning and delivery through a case study of a transportation project. This case study focused solely on impacts to project schedule regarding three milestones: readiness for delivery, readiness for testing and commissioning, and completion of the facility. The case study followed the ISO 31000: Risk Management – Guidelines. The key factors that are outlined by these guidelines include understanding the scope and context of the project, conducting a risk assessment including identification, analysis, and evaluation, and lastly, risk treatment through mitigation measures. This process requires continuous consultation with subject matter experts and monitoring to iteratively update the risks accordingly. The risk identification process led to a total of fourteen risks related to design, permitting, construction, and commissioning. The analysis involved running 1,000 Monte Carlo simulations through @RISK 8.0 Industrial software to determine potential milestone completion dates based on the project baseline schedule. These dates include the best case, most likely case, and worst case to provide an estimated delay for each milestone. Evaluation of these results provided insight into which risks were the highest contributors to the projected milestone completion dates. Based on the analysis results, the risk management team was able to provide recommendations for mitigation measures to reduce the likelihood of risks occurring. The risk management team also provided recommendations for managing the identified risks and project activities moving forward to meet the most likely or best-case milestone completion dates.

Keywords: construction management, monte carlo simulation, project delivery, risk assessment, transportation engineering

Procedia PDF Downloads 81
7333 Sustainable Management Practices of International Construction Joint Ventures: A Conceptual Model for Managing Barriers and Risks

Authors: Mershack O. Tetteh, Albert P. C. Chan, Amos Darko, Gabriel Nani

Abstract:

International construction joint ventures (ICJVs) have evolved as an effective approach to sustainable development, given their myriad socio-economic and environmental benefits. Yet, they are not free of barriers and risks. In many studies, it is termed as risks for convenience’s sake. While the barriers and risks continue to affect the success of ICJVs, a systematic and reliable approach for managing them has yet to be developed. This study aims to identify and classify the barriers and risks factors affecting ICJVs through a systematic literature review. Based on a critical review of 54 papers published in peer-reviewed journals from 1990 to 2019, a conceptual framework was proposed for managing the barriers and risks in ICJV operations. The review showed that the barriers can be grouped into six including inter-organizational differences, lack of expertise and confidence, lack of effective planning and strategies, lack of knowledge of ICJV’s fundamentals, conflicts among ICJV entities, and management difficulties. The risks were also categorized into six: policy and political risks, legal risks, financial risks, management risks, project and technical risks, and market risks. The developed model would help practitioners achieve more efficient resource allocation and bring new perspectives for managerial practices in ICJVs. Moreover, it is positioned to alleviate the negligence of previous studies that combined the barriers and risks factors as one checklist.

Keywords: barriers, construction, international construction joint venture, risks, sustainable development

Procedia PDF Downloads 214
7332 Study of Treatment Plant of The City Chlef Study of Environmental Impact

Authors: Houmame Benbouali, Aboubakr Gribi

Abstract:

The risks, in general, exist in any project, one can hardly carry out a project without taking risks. The hydraulic works are rather complex projects in their design, realization and exploitation and are often subjected at the multiple risks being able to influence with their good performance and can have a negative impact on their environment. The present study was carried out to quote the impacts caused by purification plant STEP Chlef on the environment, it aims has studied the environmental impacts during construction and when designing this STEP, it is divided into two parts: The first part results from a research task bibliographer which contain three chapters (- cleansing of water-worn- general information on water worn-proceed of purification of waste water). The second part is an experimental part which is divided into four chapters (detailed state initial description of the station of purification-evaluation of the impacts of the project analyzes measurements and recommendations).

Keywords: treatment plant, waste water, waste water treatment, Chlef

Procedia PDF Downloads 307
7331 Enhancing Project Success: A Case Study of Investment Strategies and Planning Practices in Rwanda’s Housing Projects Managed by Rwanda Social Security Board

Authors: Amina Umulisa

Abstract:

Background: Despite efforts to enhance profitability and project planning, Rwanda has experienced a decline in project success rates, notably in housing projects managed by the Rwanda Social Security Board (RSSB). This study aims to assess the impact of investment strategies and project planning practices on the performance of pension funds projects in Rwanda, focusing on housing projects by RSSB. Methods: Using descriptive and correlational research designs, this study surveyed 109 randomly selected respondents from a pool of 148 workers. Data analysis was conducted using descriptive and inferential statistics in STATA version 18. Results: Findings revealed that 54% of respondents acknowledged the importance of personnel generation. Additionally, 61% agreed with the effectiveness of training programs, and 79% supported the cost of human resource utilization. In terms of project management practices, 65.7% could determine when a project needed adjustments, 65.7% agreed with the approved budget, and 73% supported forecasted expenses. Furthermore, 68% agreed with order placement, 76.0% with using the right materials, and 64.4% with defining project scope. The study found significant associations between order placement and project quality outcomes (r=0.711, P-value <0.001), as well as with time management (Pearson was 0.701 and sing was 0.00) and cost management (r=0.885, P-value <0.001). Moreover, project time targets were found to significantly affect quality management (Pearson was 0.798, sing was 0.000), time management, and cost management (r=0.740, P-value <0.001). Conclusion: The findings highlight the positive association between the project implementation stage and quality management, indicating effective project planning practices among senior staff. However, there is a need to enhance project team collaboration and coordination to improve the performance of constructed houses.

Keywords: project success rates, investment strategies, training programs, cost management

Procedia PDF Downloads 17
7330 Risk Prioritization in Tunneling Construction Projects

Authors: David Nantes, George Gilbert

Abstract:

There are a lot of risks that might crop up as a tunneling project develops, and it's crucial to be aware of them. Due to the unexpected nature of tunneling projects and the interconnectedness of risk occurrences, the risk assessment approach presents a significant challenge. The purpose of this study is to provide a hybrid FDEMATEL-ANP model to help prioritize risks during tunnel construction projects. The ambiguity in expert judgments and the relative severity of interdependencies across risk occurrences are both taken into consideration by this model, thanks to the Fuzzy Decision-Making Trial and Evaluation Laboratory (FDEMATEL). The Analytic Network Process (ANP) method is used to rank priorities and assess project risks. The authors provide a case study of a subway tunneling construction project to back up the validity of their methodology. The results showed that the proposed method successfully isolated key risk factors and elucidated their interplay in the case study. The proposed method has the potential to become a helpful resource for evaluating dangers associated with tunnel construction projects.

Keywords: risk, prioritization, FDEMATEL, ANP, tunneling construction projects

Procedia PDF Downloads 60
7329 Relationship between Financial Reporting Transparency and Investment Efficiency: Evidence from Iran

Authors: Bita Mashayekhi, Hamid Kalhornia

Abstract:

One of the most important roles of financial reporting is improving the firms’ investment decisions; however, there is not much supporting evidence for this claim in emerging markets like Iran. In this study, the effect of financial reporting transparency in investment efficiency of Iranian firms has been investigated. In order to do this, 336 listed companies on Tehran Stock Exchange (TSE) has been selected for time period 2012 to 2015 as research sample. For testing our main hypothesis, we classified sample firms into two groups based on their deviation from expected investment: under-investment and over-investment cases. The results indicate that there is positive significant relationship between financial transparency and investment efficiency. In the other words, transparency can mitigate both underinvestment and overinvestment situations.

Keywords: corporate governance, disclosure, investment decisions, investment efficiency, transparency

Procedia PDF Downloads 340
7328 The Finance of Happiness: Thinking Finance from the Science of Happiness Perspective

Authors: Renaud Gaucher

Abstract:

Research on happiness has developed significantly in the past fifty years and economics and the political science are starting to be influenced by advances in the field. Until recently, finance has stayed outside this movement. The goal of our research is to integrate finance into this movement conceptually. We explain the why, the what and the how of the finance of happiness. We then study the relationship between corporate finance and happiness. We discuss the optimization of the relationship between the financial performance of a firm and the happiness at work of its employees, and the reduction of financial risk by developing goods that foster the happiness of their users. Finally we look at the development of happiness investment funds, that is investment funds founded on happiness research, and the best ways to share risks and earnings to build a happier society.

Keywords: finance, happiness, investment fund, risk

Procedia PDF Downloads 161
7327 COVID-19: A Thread to the Security System of Foreign Investment

Authors: Mehdi Ghaemi

Abstract:

In principle, foreign investment security is enshrined in International Investment Agreements (IIAs) and Bilateral Investment Treaties (BITs) in the form of protection standards such as the Full Protection and Security Standard (FPS). Accordingly, the host countries undertake to provide the necessary security for the economic activities of foreign investment. With the outbreak of coronavirus, the international community called COVID-19 a threat to international peace security, as well as to the public interest and national security of nations; and to deal with, they proposed several solutions, generally including quarantine, creating social distances, and restricting businesses. This article first studies the security of foreign investment in international investment law. In the following, it analyzes the consequences of the COVID-19 pandemic for foreign investment security so that if there is a threat to that security, solutions could be offered to reduce it.

Keywords: foreign investment, FPS standard, host country, public health, COVID-19

Procedia PDF Downloads 69
7326 Optimization Model for Support Decision for Maximizing Production of Mixed Fruit Tree Farms

Authors: Andrés I. Ávila, Patricia Aros, César San Martín, Elizabeth Kehr, Yovana Leal

Abstract:

We consider a linear programming model to help farmers to decide if it is convinient to choose among three kinds of export fruits for their future investment. We consider area, investment, water, productivitiy minimal unit, and harvest restrictions and a monthly based model to compute the average income in five years. Also, conditions on the field as area, water availability and initia investment are required. Using the Chilean costs and dollar-peso exchange rate, we can simulate several scenarios to understand the possible risks associated to this market.

Keywords: mixed integer problem, fruit production, support decision model, fruit tree farms

Procedia PDF Downloads 428
7325 Selection of Social and Sustainability Criteria for Public Investment Project Evaluation in Developing Countries

Authors: Pintip Vajarothai, Saad Al-Jibouri, Johannes I. M. Halman

Abstract:

Public investment projects are primarily aimed at achieving development strategies to increase national economies of scale and overall improvement in a country. However, experience shows that public projects, particularly in developing countries, struggle or fail to fulfill the immediate needs of local communities. In many cases, the reason for that is that projects are selected in a subjective manner and that a major part of the problem is related to the evaluation criteria and techniques used. The evaluation process is often based on a broad strategic economic effects rather than real benefits of projects to society or on the various needs from different levels (e.g. national, regional, local) and conditions (e.g. long-term and short-term requirements). In this paper, an extensive literature review of the types of criteria used in the past by various researchers in project evaluation and selection process is carried out and the effectiveness of such criteria and techniques is discussed. The paper proposes substitute social and project sustainability criteria to improve the conditions of local people and in particular the disadvantaged groups of the communities. Furthermore, it puts forward a way for modelling the interaction between the selected criteria and the achievement of the social goals of the affected community groups. The described work is part of developing a broader decision model for public investment project selection by integrating various aspects and techniques into a practical methodology. The paper uses Thailand as a case to review what and how the various evaluation techniques are currently used and how to improve the project evaluation and selection process related to social and sustainability issues in the country. The paper also uses an example to demonstrates how to test the feasibility of various criteria and how to model the interaction between projects and communities. The proposed model could be applied to other developing and developed countries in the project evaluation and selection process to improve its effectiveness in the long run.

Keywords: evaluation criteria, developing countries, public investment, project selection methodology

Procedia PDF Downloads 251
7324 Risk Factors Affecting Construction Project Cost in Oman

Authors: Omar Amoudi, Latifa Al Brashdi

Abstract:

Construction projects are always subject to risks and uncertainties due to its unique and dynamic nature, outdoor work environment, the wide range of skills employed, various parties involved in addition to situation of construction business environment at large. Altogether, these risks and uncertainties affect projects objectives and lead to cost overruns, delay, and poor quality. Construction projects in Oman often experience cost overruns and delay. Managing these risks and reducing their impacts on construction cost requires firstly identifying these risks, and then analyzing their severity on project cost to obtain deep understanding about these risks. This in turn will assist construction managers in managing and tacking these risks. This paper aims to investigate the main risk factors that affect construction projects cost in the Sultanate of Oman. In order to achieve the main aim, literature review was carried out to identify the main risk factors affecting construction cost. Thirty-three risk factors were identified from the literature. Then, a questionnaire survey was designed and distributed among construction professionals (i.e., client, contractor and consultant) to obtain their opinion toward the probability of occurrence for each risk factor and its possible impact on construction project cost. The collected data was analyzed based on qualitative aspects and in several ways. The severity of each risk factor was obtained by multiplying the probability occurrence of a risk factor with its impact. The findings of this study reveal that the most significant risk factors that have high severity impact on construction project cost are: Change of Oil Price, Delay of Materials and Equipment Delivery, Changes in Laws and Regulations, Improper Budgeting, and Contingencies, Lack of Skilled Workforce and Personnel, Delays Caused by Contractor, Delays of Owner Payments, Delays Caused by Client, and Funding Risk. The results can be used as a basis for construction managers to make informed decisions and produce risk response procedures and strategies to tackle these risks and reduce their negative impacts on construction project cost.

Keywords: construction cost, construction projects, Oman, risk factors, risk management

Procedia PDF Downloads 305
7323 Risk Assessment in Construction of K-Span Buildings in United Arab Emirates (UAE)

Authors: Imtiaz Ali, Imam Mansoor

Abstract:

Investigations as a part of the academic study were undertaken to identify and evaluate the significant risks associated with the construction of K-span buildings in the region of UAE. Primary field data was collected through questionnaires obtaining specific open and close-ended questions from carefully selected construction firms, civil engineers and, construction manager regarding risks associated to K-span building construction. Historical data available for other regions of the same construction technique was available which was compared for identifying various non-critical and critical risk parameters by comparative evaluation techniques to come up with important risks and potential sources for their control and minimization in K-Span buildings that is increasing in the region. The associated risks have been determined with their Relative Importance Index (RII) values of which Risk involved in Change of Design required by Owners carries the highest value (RII=0.79) whereas, Delayed Payment by Owner to Contractor is one of the least (RII=0.42) value. The overall findings suggest that most relative risks as quantified originate or associated with the contractors. It may be concluded that project proponents undertaking K-span projects in planning and budgeting the cost and delays should take into account of risks on high account if changes in design are also required any delays in the material by the supplier would then be a major risk in K-span project delay. Since projects are, less costly, so owners have limited budgets, then they hire small contractors, which are not highly competent contractors. So study suggests that owner should be aware of these types of risks associated with the construction of K-span buildings in order to make it cost effective.

Keywords: k-span buildings, k-span construction, risk management, relative improvement index (RII)

Procedia PDF Downloads 351
7322 A Model Approach of Good Practice Based on the Project Management Body of Knowledge® Guide in the Project Owner

Authors: Claudia Marcela Munoz Gonzalez, Diego Fernando Hernandez Losada, Hugo Alberto Herrera Fonseca

Abstract:

The project owner's role in the public-private investment consists of controlling and verifying the correct execution of the project's objectives and resources. Likewise, it is a discipline little explored in the academic field, whereby this work wishes to contribute with a model of good practices based on the project management methodology proposed by the Project Management Body of Knowledge® Guide. In the same way, highlight what are the controls that an integral project owner should take into account in its exercise and application, through the stages in which its contract runs. This proposal aims to structure its practice and integrate its functions according to a project management methodology. In addition, these practices will be applied in a case study of projects in the agricultural sector, particularly in the construction of irrigation district in Cundinamarca, Colombia.

Keywords: controls, construction of irrigation district, PMBOK®, project owner

Procedia PDF Downloads 427
7321 Dynamics of Investor's Behaviour: An Analytical Survey Study in Indian Securities Market

Authors: Saurabh Agarwal

Abstract:

This paper attempts to formalise the effect of demographic variables like marital status, gender, occupation and age on the source of investment advice which, in turn, affect the herd behaviour of investors and probability of investment in near future. Further, postulations have been made for most preferred investment option and purpose of saving and source of investment. Impact of theoretical analysis on choice among investment alternatives has also been investigated. The analysis contributes to understanding the different investment choices made by households in India. The insights offered in the paper indirectly contribute in uncovering the various unexplained asset pricing puzzles.

Keywords: portfolio choice, investment decisions, investor’s behaviour, Indian securities market

Procedia PDF Downloads 337
7320 System of System Decisions Framework for Cross-Border Railway Projects

Authors: Dimitrios J. Dimitriou, Maria F. Sartzetaki, Anastasia Kalamakidou

Abstract:

Transport infrastructure assets are key components of the national asset portfolio. The decision to invest in a new infrastructure in transports could take from a few years to some decades. This is mainly because of the need to reserve and spent many capitals, the long payback period, the number of the stakeholders involved in the decision process and –many times- the investment and business risks are high. Decision makers and stakeholders need to define the framework and the outputs of the decision process taking into account the project characteristics, the business uncertainties, and the different expectations. Therefore, the decision assessment framework is an essential challenge linked with the key decision factors meet the stakeholder expectations highlighting project trade-offs, financial risks, business uncertainties and market limitations. This paper examines the decision process for new transport infrastructure projects in cross-border regions, where a wide range of stakeholders with different expectation is involved. According to a consequences analysis systemic approach, the relationship of transport infrastructure development, economic system development and stakeholder expectation is analysed. Adopting the on system of system methodological approach, the decision making the framework, variables, inputs and outputs are defined, highlighting the key shareholder’s role and expectations. The application provides the methodology outputs presenting the proposed decision framework for a strategic railway project in north Greece deals with the upgrade of the existing railway corridor connecting Greece, Turkey, and Bulgaria.

Keywords: system of system decision making, managing decisions for transport projects, decision support framework, defining decision process

Procedia PDF Downloads 276
7319 Identifying and Ranking Environmental Risks of Oil and Gas Projects Using the VIKOR Method for Multi-Criteria Decision Making

Authors: Sasan Aryaee, Mahdi Ravanshadnia

Abstract:

Naturally, any activity is associated with risk, and humans have understood this concept from very long times ago and seek to identify its factors and sources. On the one hand, proper risk management can cause problems such as delays and unforeseen costs in the development projects, temporary or permanent loss of services, getting lost or information theft, complexity and limitations in processes, unreliable information caused by rework, holes in the systems and many such problems. In the present study, a model has been presented to rank the environmental risks of oil and gas projects. The statistical population of the study consists of all executives active in the oil and gas fields, that the statistical sample is selected randomly. In the framework of the proposed method, environmental risks of oil and gas projects were first extracted, then a questionnaire based on these indicators was designed based on Likert scale and distributed among the statistical sample. After assessing the validity and reliability of the questionnaire, environmental risks of oil and gas projects were ranked using the VIKOR method of multiple-criteria decision-making. The results showed that the best options for HSE planning of oil and gas projects that caused the reduction of risks and personal injury and casualties and less than other options is costly for the project and it will add less time to the duration of implementing the project is the entering of dye to the environment when painting the generator pond and the presence of the rigger near the crane.

Keywords: ranking, multi-criteria decision making, oil and gas projects, HSEmanagement, environmental risks

Procedia PDF Downloads 127
7318 Risk Management in Industrial Supervision Projects

Authors: Érick Aragão Ribeiro, George André Pereira Thé, José Marques Soares

Abstract:

Several problems in industrial supervision software development projects may lead to the delay or cancellation of projects. These problems can be avoided or contained by using identification methods, analysis and control of risks. These procedures can give an overview of the possible problems that can happen in the projects and what are the immediate solutions. Therefore, we propose a risk management method applied to the teaching and development of industrial supervision software. The method is developed through a literature review and previous projects can be divided into phases of management and have basic features that are validated with experimental research carried out by mechatronics engineering students and professionals. The management is conducted through the stages of identification, analysis, planning, monitoring, control and communication of risks. Programmers use a method of prioritizing risks considering the gravity and the possibility of occurrence of the risk. The outputs of the method indicate which risks occurred or are about to happen. The first results indicate which risks occur at different stages of the project and what risks have a high probability of occurring. The results show the efficiency of the proposed method compared to other methods, showing the improvement of software quality and leading developers in their decisions. This new way of developing supervision software helps students identify design problems, evaluate software developed and propose effective solutions. We conclude that the risk management optimizes the development of the industrial process control software and provides higher quality to the product.

Keywords: supervision software, risk management, industrial supervision, project management

Procedia PDF Downloads 326
7317 Economic Assessment of the Fish Solar Tent Dryers

Authors: Collen Kawiya

Abstract:

In an effort of reducing post-harvest losses and improving the supply of quality fish products in Malawi, the fish solar tent dryers have been designed in the southern part of Lake Malawi for processing small fish species under the project of Cultivate Africa’s Future (CultiAF). This study was done to promote the adoption of the fish solar tent dryers by the many small scale fish processors in Malawi through the assessment of the economic viability of these dryers. With the use of the project’s baseline survey data, a business model for a constructed ‘ready for use’ solar tent dryer was developed where investment appraisal techniques were calculated in addition with the sensitivity analysis. The study also conducted a risk analysis through the use of the Monte Carlo simulation technique and a probabilistic net present value was found. The investment appraisal results showed that the net present value was US$8,756.85, the internal rate of return was 62% higher than the 16.32% cost of capital and the payback period was 1.64 years. The sensitivity analysis results showed that only two input variables influenced the fish solar dryer investment’s net present value. These are the dried fish selling prices that were correlating positively with the net present value and the fresh fish buying prices that were negatively correlating with the net present value. Risk analysis results showed that the chances that fish processors will make a loss from this type of investment are 17.56%. It was also observed that there exist only a 0.20 probability of experiencing a negative net present value from this type of investment. Lastly, the study found that the net present value of the fish solar tent dryer’s investment is still robust in spite of any changes in the levels of investors risk preferences. With these results, it is concluded that the fish solar tent dryers in Malawi are an economically viable investment because they are able to improve the returns in the fish processing activity. As such, fish processors need to adopt them by investing their money to construct and use them.

Keywords: investment appraisal, risk analysis, sensitivity analysis, solar tent drying

Procedia PDF Downloads 248
7316 The Significance of a Well-Defined Systematic Approach in Risk Management for Construction Projects within Oil Industry

Authors: Batool Ismaeel, Umair Farooq, Saad Mushtaq

Abstract:

Construction projects in the oil industry can be very complex, having unknown outcomes and uncertainties that cannot be easily predicted. Each project has its unique risks generated by a number of factors which, if not controlled, will impact the successful completion of the project mainly in terms of schedule, cost, quality, and safety. This paper highlights the historic risks associated with projects in the south and east region of Kuwait Oil Company (KOC) collated from the company’s lessons learned database. Starting from Contract Award through to handover of the project to the Asset owner, the gaps in project execution in terms of managing risk will be brought to discussion and where a well-defined systematic approach in project risk management reflecting many claims, change of scope, exceeding budget, delays in engineering phase as well as in the procurement and fabrication of long lead items should be adopted. This study focuses on a proposed feasible approach in risk management for engineering, procurement and construction (EPC) level projects including the various stakeholders involved in executing the works from International to local contractors and vendors in KOC. The proposed approach covers the areas categorized into organizational, design, procurement, construction, pre-commissioning, commissioning and project management in which the risks are identified and require management and mitigation. With the effective deployment and implementation of the proposed risk management system and the consideration of it as a vital key in achieving the project’s target, the outcomes will be more predictable in the future, and the risk triggers will be managed and controlled. The correct resources can be allocated on a timely basis for the company for avoiding any unpredictable outcomes during the execution of the project. It is recommended in this paper to apply this risk management approach as an integral part of project management and investigate further in the future, the effectiveness of this proposed system for newly awarded projects and compare the same with those projects of similar budget/complexity that have not applied this approach to risk management.

Keywords: construction, project completion, risk management, uncertainties

Procedia PDF Downloads 126
7315 Implementation of Risk Management System to Improve the Quality of Higher Education Institutes

Authors: Muhammad Wasif, Asif Ahmed Shaikh, Sarosh Hashmat Lodi, Muhammad Aslam Bhutto, Riazuddin

Abstract:

Risk Management System is quite popular in profit- based organizations, health and safety and project management fields since the last few decades. But due to rapidly changing environment and requirement of ISO 9001:2015 standards, public-sector institution, especially higher education institutes are also performing risk assessment to monitor the performance of the institution and aligning it with the latest benchmark. In this context, NED University of Engineering and Technology performed research and developed a Standard Operating Procedure (SOP) for the risk assessment, its monitoring and control. In this research, risks are broken into the four sources, namely; Internal Academics Risks, External Academics Risks, Internal Non-academic Risks, External Non-academic Risks. Risks are identified by the management at all levels. Severity and likelihood of the risks are assigned based on the previous audit results and the customer complains. Risk Ratings are calculated to orderly arrange the risk according to the Risk Rating, and controls for the risks are designed, which are assigned to the responsible person. At the end of the article, result and analysis on the different sources of risk are discussed in details and the conclusion is drawn. Discussion on few sample risks are presented in this article. Hence it is presented in the research that the Risk Management System can be applied in a Higher Education Institute to effectively control the risks which might affect the scope and Quality Management System of an organization.

Keywords: higher education, quality management system, risk assessment, risk management

Procedia PDF Downloads 270
7314 The Effect of the Construction Contract System by Simulating the Comparative Costs of Capital to the Financial Feasibility of the Construction of Toll Bali Mandara

Authors: Mas Pertiwi I. G. AG Istri, Sri Kristinayanti Wayan, Oka Aryawan I. Gede Made

Abstract:

Ability of government to meet the needs of infrastructure investment constrained by the size of the budget commitments for other sectors. Another barrier is the complexity of the process of land acquisition. Public Private Partnership can help bridge the investment gap by including the amount of funding from the private sector, shifted the responsibility of financing, construction of the asset, and the operation and post-project design and care to them. In principle, a construction project implementation always requires the investor as a party to provide resources in the form of funding which it must be contained in a successor agreement in the form of a contract. In general, construction contracts consist of contracts which passed in Indonesia and contract International. One source of funding used in the implementation of construction projects comes from funding that comes from the collaboration between the government and the private sector, for example with the system: BLT (Build Lease Transfer), BOT (Build Operate Transfer), BTO (Build Transfer Operate) and BOO (Build Operate Own). And form of payment under a construction contract can be distinguished several ways: monthly payment, payments based on progress and payment after completed projects (Turn Key). One of the tools used to analyze the feasibility of the investment is to use financial models. The financial model describes the relationship between different variables and assumptions used. From a financial model will be known how the cash flow structure of the project, which includes revenues, expenses, liabilities to creditors and the payment of taxes to the government. Net cash flow generated from the project will be used as a basis for analyzing the feasibility of investment source of project financing Public Private Partnership could come from equity or debt. The proportion of funding according to its source is a comparison of a number of investment funds originating from each source of financing for a total investment cost during the construction period by selected the contract system and several alternative financing percentage ratio determined according to sources will generate cash flow structure that is different. Of the various possibilities for the structure of the cash flow generated will be analyzed by software is to test T Paired to compared the contract system used by various alternatives comparison of financing to determine the effect of the contract system and the comparison of such financing for the feasibility of investment toll road construction project for the economic life of 20 (twenty) years. In this use case studies of toll road contruction project Bali Mandara. And in this analysis only covered two systems contracts, namely Build Operate Transfer and Turn Key. Based on the results obtained by analysis of the variable investment feasibility of the NPV, BCR and IRR between the contract system Build Operate Transfer and contract system Turn Key on the interest rate of 9%, 12% and 15%.

Keywords: contract system, financing, internal rate of return, net present value

Procedia PDF Downloads 203
7313 Knowledge Co-Production on Future Climate-Change-Induced Mass-Movement Risks in Alpine Regions

Authors: Elisabeth Maidl

Abstract:

The interdependence of climate change and natural hazard goes along with large uncertainties regarding future risks. Regional stakeholders, experts in natural hazards management and scientists have specific knowledge, resp. mental models on such risks. This diversity of views makes it difficult to find common and broadly accepted prevention measures. If the specific knowledge of these types of actors is shared in an interactive knowledge production process, this enables a broader and common understanding of complex risks and allows to agree on long-term solution strategies. Previous studies on mental models confirm that actors with specific vulnerabilities perceive different aspects of a topic and accordingly prefer different measures. In bringing these perspectives together, there is the potential to reduce uncertainty and to close blind spots in solution finding. However, studies that examine the mental models of regional actors on future concrete mass movement risks are lacking so far. The project tests and evaluates the feasibility of knowledge co-creation for the anticipatory prevention of climate change-induced mass movement risks in the Alps. As a key element, mental models of the three included groups of actors are compared. Being integrated into the research program Climate Change Impacts on Alpine Mass Movements (CCAMM2), this project is carried out in two Swiss mountain regions. The project is structured in four phases: 1) the preparatory phase, in which the participants are identified, 2) the baseline phase, in which qualitative interviews and a quantitative pre-survey are conducted with actors 3) the knowledge-co-creation phase, in which actors have a moderated exchange meeting, and a participatory modelling workshop on specific risks in the region, and 4) finally a public information event. Results show that participants' mental models are based on the place of origin, profession, believes, values, which results in narratives on climate change and hazard risks. Further, the more intensively participants interact with each other, the more likely is that they change their views. This provides empirical evidence on how changes in opinions and mindsets can be induced and fostered.

Keywords: climate change, knowledge-co-creation, participatory process, natural hazard risks

Procedia PDF Downloads 37
7312 Economic Stability and Legitimate Expectations in Foreign Investment Rights

Authors: Mehdi Ghaemi

Abstract:

Within the current paper, there is an attempt to examine the legal system that overrules economic stability and legitimate expectations of foreign investment rights. Studies show that Meeting the legitimate expectations of foreign investment is one of the rights and privileges which obviously are to be benefited from by all types of foreign investments. The legitimate expectations of foreign investors are protected and structured strongly with the help of international investment laws. The body of international investment laws is faced with multiple challenges with respect to the legitimate expectations of foreign investments, including the Economic stability and the public interest of the host country, the attitude of the host country towards the legitimate rights and privileges of the foreign investment, the ways to meet and to control those expectations, and also the assessment of the regulations of the host country which would affect the investing bodies within different circumstances.

Keywords: foreign investment, legitimate expectations, regulating investments, international investment

Procedia PDF Downloads 64
7311 A Critical Analysis of Environmental Investment in India

Authors: K. Y. Chen, H. Chua, C. W. Kan

Abstract:

Environmental investment is an important issue in many countries. In this study, we will first review the environmental issues related to India and their effect on the economical development. Secondly, economic data would be collected from government yearly statistics. The statistics would also include the environmental investment information of India. Finally, we would co-relate the data in order to find out the relationship between environmental investment and sustainable development in India. Therefore, in the paper, we aim to analyse the effect of an environmental investment on the sustainable development in India. Based on the economic data collected, India is in development status with fast population and GDP growth speed. India is facing the environment problems due to its high-speed development. However, the environment investment could give a positive impact on the sustainable development in India. The environmental investment is keeping in the same growth rate with GDP. Acknowledgment: Authors would like to thank the financial support from the Hong Kong Polytechnic University for this work.

Keywords: India, environmental investment, sustainable development, analysis

Procedia PDF Downloads 284
7310 Market Access for Foreign Investment in Host States: Municipal Law and International Law

Authors: Qiang Ren

Abstract:

A growing number of states are improving domestic law to better protect and promote foreign investment by changing/upgrading the existing law. However, inconsistency occurs because the new law is different from the ‘old’ law. For example, China has issued an unprecedented Foreign Investment Law and several regulations allowing comprehensive market access for foreign investment in most energy sectors since 2020. However, some laws, rules, regulations, etc. enacted previously remain valid, and the provisions regulating foreign investment do not grant full market access to foreign investment as such. The inconsistency above makes it necessary to investigatehow the international investment treaty law and dispute settlement practice respond to the ‘inconsistency and conflict’ in municipal law andwhat remedy foreign investors can seek under international law if the investment is denied due to inconsistency. Ultimately, it aims to examine how international tribunals should balance the gradually developing legal system of host states and the protection of foreign investors and investments if the host states cannot provide consistency during such a transition period of law development. The research seeks to answer these questions by making a comparative analysis of domestic law on market access to foreign investment, international investment treaties, and dispute arbitral practice. The objective is to examine how international investment treaty law and international investment dispute settlement practice evaluate the conflicts in the municipal law of host states in the admission of foreign investment. It also explores the possibility of harmonisation among them.

Keywords: municipal law, protect and promote foreign investment, international law, host states

Procedia PDF Downloads 64
7309 Foreign Artificial Intelligence Investments and National Security Exceptions in International Investment Law

Authors: Ying Zhu

Abstract:

Recent years have witnessed a boom of foreign investments in the field of artificial intelligence (AI). Foreign investments provide critical capital for AI development but also trigger national security concerns of host states. A notable example is an increasing number of cases in which the Committee on Foreign Investment in the United States (CFIUS) has denied Chinese acquisitions of US technology companies on national security grounds. On July 19, 2018, the Congress has reached a deal on the final draft of a new provision to strengthen CFIUS’s authority to review overseas transactions involving sensitive US technology. The question is: how to reconcile the emerging tension between, on the one hand, foreign AI investors’ expectations of a predictable investment environment, and on the other hand, host states’ regulatory power on national security? This paper provides a methodology to reconcile this tension under international investment law. Based on an examination, the national security exception clauses in international investment treaties and the application of national security justification in investor-state arbitration jurisprudence, the paper argues that a traditional interpretation of the national security exception, based on the necessity concept in customary international law, fails to take into account new risks faced by countries, including security concerns over strategic industries such as AI. To overcome this shortage, the paper proposes to incorporate an integrated national security clause in international investment treaties, which includes a two-tier test: a ‘self-judging’ test in the pre-establishment period and a ‘proportionality’ test in the post-establishment period. At the end, the paper drafts a model national security clause for future treaty-drafting practice.

Keywords: foreign investment, artificial intelligence, international investment law, national security exception

Procedia PDF Downloads 122