4874 A Case Study on Problems Originated from Critical Path Method Application in a Governmental Construction Project

Authors: Mohammad Lemar Zalmai, Osman Hurol Turkakin, Cemil Akcay, Ekrem Manisali

Abstract:

In public construction projects, determining the contract period in the award phase is one of the most important factors. The contract period establishes the baseline for creating the cash flow curve and progress payment planning in the post-award phase. If overestimated, project duration causes losses for both the owner and the contractor. Therefore, it is essential to base construction project duration on reliable forecasting. In Turkey, schedules are usually built using the bar chart (Gantt) schedule, especially for governmental construction agencies. The usage of these schedules is limited for bidding purposes. Although the bar-chart schedule is useful in some cases, it lacks logical connections between activities; it would be harder to obtain the activities that have more effects than others on the project's total duration, especially in large complex projects. In this study, a construction schedule is prepared with Critical Path Method (CPM) that addresses the above-mentioned discrepancies. CPM is a simple and effective method that displays project time and critical paths, showing results of forward and backward calculations with considering the logic relationships between activities; it is a powerful tool for planning and managing all kinds of construction projects and is a very convenient method for the construction industry. CPM provides a much more useful and precise approach than traditional bar-chart diagrams that form the basis of construction planning and control. CPM has two main application utilities in the construction field; the first one is obtaining project duration, which is called an as-planned schedule that includes as-planned activity durations with relationships between subsequent activities. Another utility is during the project execution; each activity is tracked, and their durations are recorded in order to obtain as-built schedule, which is named as a black box of the project. The latter is more useful for delay analysis, and conflict resolutions. These features of CPM have been popular around the world. However, it has not been yet extensively used in Turkey. In this study, a real construction project is investigated as a case study; CPM-based scheduling is used for establishing both of as-built and as-planned schedules. Problems that emerged during the construction phase are identified and categorized. Subsequently, solutions are suggested. Two scenarios were considered. In the first scenario, project progress was monitored based as CPM was used to track and manage progress; this was carried out based on real-time data. In the second scenario, project progress was supposedly tracked based on the assumption that the Gantt chart was used. The S-curves of the two scenarios are plotted and interpreted. Comparing the results, possible faults of the latter scenario are highlighted, and solutions are suggested. The importance of CPM implementation has been emphasized and it has been proposed to make it mandatory for preparation of construction schedule based on CPM for public construction projects contracts.

Keywords: as-built, case-study, critical path method, Turkish government sector projects

Procedia PDF Downloads 90
4873 A Unique Exact Approach to Handle a Time-Delayed State-Space System: The Extraction of Juice Process

Authors: Mohamed T. Faheem Saidahmed, Ahmed M. Attiya Ibrahim, Basma GH. Elkilany

Abstract:

This paper discusses the application of Time Delay Control (TDC) compensation technique in the juice extraction process in a sugar mill. The objective is to improve the control performance of the process and increase extraction efficiency. The paper presents the mathematical model of the juice extraction process and the design of the TDC compensation controller. Simulation results show that the TDC compensation technique can effectively suppress the time delay effect in the process and improve control performance. The extraction efficiency is also significantly increased with the application of the TDC compensation technique. The proposed approach provides a practical solution for improving the juice extraction process in sugar mills using MATLAB Processes.

Keywords: time delay control (TDC), exact and unique state space model, delay compensation, Smith predictor.

Procedia PDF Downloads 52
4872 Risk Factors for Severe Typhoid Fever in Children: A French Retrospective Study about 78 Cases from 2000-2017 in Six Parisian Hospitals

Authors: Jonathan Soliman, Thomas Cavasino, Virginie Pommelet, Lahouari Amor, Pierre Mornand, Simon Escoda, Nina Droz, Soraya Matczak, Julie Toubiana, François Angoulvant, Etienne Carbonnelle, Albert Faye, Loic de Pontual, Luu-Ly Pham

Abstract:

Background: Typhoid and paratyphoid fever are systemic infections caused by Salmonella enterica serovar Typhi or paratyphi (A, B, C). Children traveling to tropical areas are at risk to contract these diseases which can be complicated. Methods: Clinical, biological and bacteriological data were collected from 78 pediatric cases reported between 2000 and 2017 in six Parisian hospitals. Children aged 0 to 18 years old, with a diagnosis of typhoid or paratyphoid fever confirmed by bacteriological exams, were included. Epidemiologic, clinical, biological features and presence of multidrug-resistant (MDR) bacteria or intermediate susceptibility to ciprofloxacin (nalidixic acid resistant) were examined by univariate analysis and by logistic regression analysis to identify risk factors of severe typhoid in children. Results: 84,6% of the children were imported cases of typhoid fever (n=66/78) and 15,4% were autochthonous cases (n=12/78). 89,7% were caused by S.typhi (n=70/78) and 12,8% by S.paratyphi (n=10/78) including 2 co-infections. 19,2% were intrafamilial cases (n=15/78). Median age at diagnosis was 6,4 years-old [6 months-17,9 years]. 28,2% of the cases were complicated forms (n=22/78): digestive (n=8; 10,3%), neurological (n=7; 9%), pulmonary complications (n=4; 5,1%) and hemophagocytic syndrome (n=4; 5,1%). Only 5% of the children had prior immunization with typhoid non-conjugated vaccine (n=4/78). 28% of the cases (n=22/78) were caused by resistant bacteria. Thrombocytopenia and diagnosis delay was significantly associated with severe infection (p= 0.029 and p=0,01). Complicated forms were more common with MDR (p=0,1) and not statistically associated with a young age or sex in this study. Conclusions: Typhoid and paratyphoid fever are not rare in children back from tropical areas. This multicentric pediatric study seems to show that thrombocytopenia, diagnosis delay, and multidrug resistant bacteria are associated with severe typhoid fever and complicated forms in children.

Keywords: antimicrobial resistance, children, Salmonella enterica typhi and paratyphi, severe typhoid

Procedia PDF Downloads 146
4871 Measuring Delay Using Software Defined Networks: Limitations, Challenges, and Suggestions for Openflow

Authors: Ahmed Alutaibi, Ganti Sudhakar

Abstract:

Providing better Quality-of-Service (QoS) to end users has been a challenging problem for researchers and service providers. Building applications relying on best effort network protocols hindered the adoption of guaranteed service parameters and, ultimately, Quality of Service. The introduction of Software Defined Networking (SDN) opened the door for a new paradigm shift towards a more controlled programmable configurable behavior. Openflow has been and still is the main implementation of the SDN vision. To facilitate better QoS for applications, the network must calculate and measure certain parameters. One of those parameters is the delay between the two ends of the connection. Using the power of SDN and the knowledge of application and network behavior, SDN networks can adjust to different conditions and specifications. In this paper, we use the capabilities of SDN to implement multiple algorithms to measure delay end-to-end not only inside the SDN network. The results of applying the algorithms on an emulated environment show that we can get measurements close to the emulated delay. The results also show that depending on the algorithm, load on the network and controller can differ. In addition, the transport layer handshake algorithm performs best among the tested algorithms. Out of the results and implementation, we show the limitations of Openflow and develop suggestions to solve them.

Keywords: software defined networking, quality of service, delay measurement, openflow, mininet

Procedia PDF Downloads 131
4870 Step Method for Solving Nonlinear Two Delays Differential Equation in Parkinson’s Disease

Authors: H. N. Agiza, M. A. Sohaly, M. A. Elfouly

Abstract:

Parkinson's disease (PD) is a heterogeneous disorder with common age of onset, symptoms, and progression levels. In this paper we will solve analytically the PD model as a non-linear delay differential equation using the steps method. The step method transforms a system of delay differential equations (DDEs) into systems of ordinary differential equations (ODEs). On some numerical examples, the analytical solution will be difficult. So we will approximate the analytical solution using Picard method and Taylor method to ODEs.

Keywords: Parkinson's disease, step method, delay differential equation, two delays

Procedia PDF Downloads 176
4869 Modification of Electrical and Switching Characteristics of a Non Punch-Through Insulated Gate Bipolar Transistor by Gamma Irradiation

Authors: Hani Baek, Gwang Min Sun, Chansun Shin, Sung Ho Ahn

Abstract:

Fast neutron irradiation using nuclear reactors is an effective method to improve switching loss and short circuit durability of power semiconductor (insulated gate bipolar transistors (IGBT) and insulated gate transistors (IGT), etc.). However, not only fast neutrons but also thermal neutrons, epithermal neutrons and gamma exist in the nuclear reactor. And the electrical properties of the IGBT may be deteriorated by the irradiation of gamma. Gamma irradiation damages are known to be caused by Total Ionizing Dose (TID) effect and Single Event Effect (SEE), Displacement Damage. Especially, the TID effect deteriorated the electrical properties such as leakage current and threshold voltage of a power semiconductor. This work can confirm the effect of the gamma irradiation on the electrical properties of 600 V NPT-IGBT. Irradiation of gamma forms lattice defects in the gate oxide and Si-SiO2 interface of the IGBT. It was confirmed that this lattice defect acts on the center of the trap and affects the threshold voltage, thereby negatively shifted the threshold voltage according to TID. In addition to the change in the carrier mobility, the conductivity modulation decreases in the n-drift region, indicating a negative influence that the forward voltage drop decreases. The turn-off delay time of the device before irradiation was 212 ns. Those of 2.5, 10, 30, 70 and 100 kRad(Si) were 225, 258, 311, 328, and 350 ns, respectively. The gamma irradiation increased the turn-off delay time of the IGBT by approximately 65%, and the switching characteristics deteriorated.

Keywords: NPT-IGBT, gamma irradiation, switching, turn-off delay time, recombination, trap center

Procedia PDF Downloads 129
4868 An Indoor Positioning System in Wireless Sensor Networks with Measurement Delay

Authors: Pyung Soo Kim, Eung Hyuk Lee, Mun Suck Jang

Abstract:

In the current paper, an indoor positioning system is proposed with consideration of measurement delay. Firstly, an estimation filter with a measurement delay is designed for the indoor positioning mechanism under a weighted least square criterion, which utilizes only finite measurements on the most recent window. The proposed estimation filtering based scheme gives the filtered estimates for position, velocity and acceleration of moving target in real-time, while removing undesired noisy effects and preserving desired moving positions. Secondly, the proposed scheme is shown to have good inherent properties such as unbiasedness, efficiency, time-invariance, deadbeat, and robustness due to the finite memory structure. Finally, computer simulations shows that the performance of the proposed estimation filtering based scheme can outperform to the existing infinite memory filtering based mechanism.

Keywords: indoor positioning system, wireless sensor networks, measurement delay

Procedia PDF Downloads 442
4867 An Intercontinental Comparison of Delay Discounting for Real and Hypothetical Money and Cigarettes among Cigarette Smokers

Authors: Steven R. Lawyer, Tereza Prihodova, Katerina Prihodova

Abstract:

Delay discounting (DD) is one of the most frequently used behavioral-economic measures of impulsive choice, but there are few cross-cultural comparisons of discounting, and to the best of our knowledge, none compare patterns of DD across different commodities or compare real and hypothetical rewards across cultures. The purpose of this study was to compare patterns of DD for both real and hypothetical money and cigarettes among participants in the USA and the Czech Republic. Adult smokers from the United States and the Czech Republic completed standard measures of DD for hypothetical and real money (~$10USD) and cigarettes (1 pack, or 20 cigarettes). Contrary to data from the USA sample, Czech Republic participants discounted the value of real money steeper than hypothetical money, though this could be related to the relatively poor fit of the hyperbolic decay function to DD for hypothetical money in the Czech sample. These findings suggest that there might be cultural differences in delay discounting that warrant further attention.

Keywords: delay discounting, temporal discounting, cigarette smoking, real rewards, hypothetical rewards

Procedia PDF Downloads 157
4866 Existence of positive periodic solutions for certain delay differential equations

Authors: Farid Nouioua, Abdelouaheb Ardjouni

Abstract:

In this article, we study the existence of positive periodic solutions of certain delay differential equations. In the process we convert the differential equation into an equivalent integral equation after which appropriate mappings are constructed. We then employ Krasnoselskii's fixed point theorem to obtain sufficient conditions for the existence of a positive periodic solution of the differential equation. The obtained results improve and extend the results in the literature. Finally, an example is given to illustrate our results.

Keywords: delay differential equations, positive periodic solutions, integral equations, Krasnoselskii fixed point theorem

Procedia PDF Downloads 403
4865 A Method to Identify the Critical Delay Factors for Building Maintenance Projects of Institutional Buildings: Case Study of Eastern India

Authors: Shankha Pratim Bhattacharya

Abstract:

In general building repair and renovation projects are minor in nature. It requires less attention as the primary cost involvement is relatively small. Although the building repair and maintenance projects look simple, it involves much complexity during execution. Many of the present research indicate that few uncertain situations are usually linked with maintenance projects. Those may not be read properly in the planning stage of the projects, and finally, lead to time overrun. Building repair and maintenance become essential and periodical after commissioning of the building. In Institutional buildings, the regular maintenance projects also include addition –alteration, modification activities. Increase in the student admission, new departments, and sections, new laboratories and workshops, up gradation of existing laboratories are very common in the institutional buildings in the developing nations like India. The project becomes very critical because it undergoes space problem, architectural design issues, structural modification, etc. One of the prime factors in the institutional building maintenance and modification project is the time constraint. Mostly it required being executed a specific non-work time period. The present research considered only the institutional buildings of the Eastern part of India to analyse the repair and maintenance project delay. A general survey was conducted among the technical institutes to find the causes and corresponding nature of construction delay factors. Five technical institutes are considered in the present study with repair, renovation, modification and extension type of projects. Construction delay factors are categorically subdivided into four groups namely, material, manpower (works), Contract and Site. The survey data are collected for the nature of delay responsible for a specific project and the absolute amount of delay through proposed and actual duration of work. In the first stage of the paper, a relative importance index (RII) is proposed for the delay factors. The occurrence of the delay factors is also judged by its frequency-severity nature. Finally, the delay factors are then rated and linked with the type of work. In the second stage, a regression analysis is executed to establish an empirical relationship between the actual time of a project and the percentage of delay. It also indicates the impact of the factors for delay responsibility. Ultimately, the present paper makes an effort to identify the critical delay factors for the repair and renovation type project in the Eastern Indian Institutional building.

Keywords: delay factor, institutional building, maintenance, relative importance index, regression analysis, repair

Procedia PDF Downloads 230
4864 Delay in the Diagnosis of Tuberculosis and Initiation of TB Treatment in the Private and Public Health Sectors, Udaipur District, Rajasthan, India, Nov 2013

Authors: Yogita Tulsian, R. S. Gupta, K. F. Laserson

Abstract:

Background: Delays in the diagnosis and treatment of TB facilitates disease transmission in the community, so we conducted a study to evaluate the burden of and risk factors for delay in TB diagnosis and initiation of TB treatment among patients in the private and public sectors in Udaipur district, Rajasthan, India. Methods: A retrospective cohort study was conducted among 100 new sputum-positive TB. Patients were interviewed in the intensive phase of treatment September 2013-November 2013 Long total diagnosis delay (TDD) was defined as a time interval between first symptom to confirmed diagnosis > 30 days. Long health treatment delay (HTD) was defined as a time interval between confirmed diagnosis to treatment initiation > 7 days. Results: We observed a median TDD of 55 days (range: 7-136 days) in the public sector and of 92 days (11-380 days) in the private sector. Long TDD in the private sector was significantly associated with middle-higher socio-economic status (Risk Ratio (RR): 2;95% CI: 1.3-3). The reasons reported from the private sector for long TDD were suspect TB patients not advised for sputum examination (RR: 42; 95% CI:2.6-660), practise of self-medication (RR: 17.4; 95% CI: 1.1-267), or lack of awareness (RR: 9.7;95% CI: 0.6-145). The median HTD in the public sector was 3 days (range: 0-14 days), and in the private sector, 2 days (range: 0-11 days) (non-significant difference). Conclusions: Long TDD in private sector may be improved through sputum referral for all suspect TB cases and better education to all regarding TB.

Keywords: diagnosis delay, treatment delay, privatesector, public sector

Procedia PDF Downloads 394
4863 Stability Analysis for an Extended Model of the Hypothalamus-Pituitary-Thyroid Axis

Authors: Beata Jackowska-Zduniak

Abstract:

We formulate and analyze a mathematical model describing dynamics of the hypothalamus-pituitary-thyroid homoeostatic mechanism in endocrine system. We introduce to this system two types of couplings and delay. In our model, feedback controls the secretion of thyroid hormones and delay reflects time lags required for transportation of the hormones. The influence of delayed feedback on the stability behaviour of the system is discussed. Analytical results are illustrated by numerical examples of the model dynamics. This system of equations describes normal activity of the thyroid and also a couple of types of malfunctions (e.g. hyperthyroidism).

Keywords: mathematical modeling, ordinary differential equations, endocrine system, delay differential equation

Procedia PDF Downloads 309
4862 Low Power Glitch Free Dual Output Coarse Digitally Controlled Delay Lines

Authors: K. Shaji Mon, P. R. John Sreenidhi

Abstract:

In deep-submicrometer CMOS processes, time-domain resolution of a digital signal is becoming higher than voltage resolution of analog signals. This claim is nowadays pushing toward a new circuit design paradigm in which the traditional analog signal processing is expected to be progressively substituted by the processing of times in the digital domain. Within this novel paradigm, digitally controlled delay lines (DCDL) should play the role of digital-to-analog converters in traditional, analog-intensive, circuits. Digital delay locked loops are highly prevalent in integrated systems.The proposed paper addresses the glitches present in delay circuits along with area,power dissipation and signal integrity.The digitally controlled delay lines(DCDL) under study have been designed in a 90 nm CMOS technology 6 layer metal Copper Strained SiGe Low K Dielectric. Simulation and synthesis results show that the novel circuits exhibit no glitches for dual output coarse DCDL with less power dissipation and consumes less area compared to the glitch free NAND based DCDL.

Keywords: glitch free, NAND-based DCDL, CMOS, deep-submicrometer

Procedia PDF Downloads 223
4861 A Weighted Group EI Incorporating Role Information for More Representative Group EI Measurement

Authors: Siyu Wang, Anthony Ward

Abstract:

Emotional intelligence (EI) is a well-established personal characteristic. It has been viewed as a critical factor which can influence an individual's academic achievement, ability to work and potential to succeed. When working in a group, EI is fundamentally connected to the group members' interaction and ability to work as a team. The ability of a group member to intelligently perceive and understand own emotions (Intrapersonal EI), to intelligently perceive and understand other members' emotions (Interpersonal EI), and to intelligently perceive and understand emotions between different groups (Cross-boundary EI) can be considered as Group emotional intelligence (Group EI). In this research, a more representative Group EI measurement approach, which incorporates the information of the composition of a group and an individual’s role in that group, is proposed. To demonstrate the claim of being more representative Group EI measurement approach, this study adopts a multi-method research design, involving a combination of both qualitative and quantitative techniques to establish a metric of Group EI. From the results, it can be concluded that by introducing the weight coefficient of each group member on group work into the measurement of Group EI, Group EI will be more representative and more capable of understanding what happens during teamwork than previous approaches.

Keywords: case study, emotional intelligence, group EI, multi-method research

Procedia PDF Downloads 102
4860 Stability Analysis of Two-delay Differential Equation for Parkinson's Disease Models with Positive Feedback

Authors: M. A. Sohaly, M. A. Elfouly

Abstract:

Parkinson's disease (PD) is a heterogeneous movement disorder that often appears in the elderly. PD is induced by a loss of dopamine secretion. Some drugs increase the secretion of dopamine. In this paper, we will simply study the stability of PD models as a nonlinear delay differential equation. After a period of taking drugs, these act as positive feedback and increase the tremors of patients, and then, the differential equation has positive coefficients and the system is unstable under these conditions. We will present a set of suggested modifications to make the system more compatible with the biodynamic system. When giving a set of numerical examples, this research paper is concerned with the mathematical analysis, and no clinical data have been used.

Keywords: Parkinson's disease, stability, simulation, two delay differential equation

Procedia PDF Downloads 99
4859 Analysis and Performance of Handover in Universal Mobile Telecommunications System (UMTS) Network Using OPNET Modeller

Authors: Latif Adnane, Benaatou Wafa, Pla Vicent

Abstract:

Handover is of great significance to achieve seamless connectivity in wireless networks. This paper gives an impression of the main factors which are being affected by the soft and the hard handovers techniques. To know and understand the handover process in The Universal Mobile Telecommunications System (UMTS) network, different statistics are calculated. This paper focuses on the quality of service (QoS) of soft and hard handover in UMTS network, which includes the analysis of received power, signal to noise radio, throughput, delay traffic, traffic received, delay, total transmit load, end to end delay and upload response time using OPNET simulator.

Keywords: handover, UMTS, mobility, simulation, OPNET modeler

Procedia PDF Downloads 293
4858 Using Optimal Control Method to Investigate the Stability and Transparency of a Nonlinear Teleoperation System with Time Varying Delay

Authors: Abasali Amini, Alireza Mirbagheri, Amir Homayoun Jafari

Abstract:

In this paper, a new structure for teleoperation systems with time varying delay has been modeled and proposed. A random time varying the delay of up to 150 msec is simulated in teleoperation channel of both masters to slave and vice versa. The system stability and transparency have been investigated, comparing the result of a PID controller and an optimal controller on each master and slave sub-systems separately. The controllers have been designed in slave subsystem for reducing position errors between master and slave, and another controller has been designed in the master subsystem to establish stability, transparency and force tracking. Results have been compared together. The results showed PID controller is appropriate in position tracking, but force response oscillates in contact with the environment. We showed the optimal control established position tracking properly. Also, force tracking is achieved in this controller appropriately.

Keywords: optimal control, time varying delay, teleoperation systems, stability and transparency

Procedia PDF Downloads 224
4857 The On-Board Critical Message Transmission Design for Navigation Satellite Delay/Disruption Tolerant Network

Authors: Ji-yang Yu, Dan Huang, Guo-ping Feng, Xin Li, Lu-yuan Wang

Abstract:

The navigation satellite network, especially the Beidou MEO Constellation, can relay data effectively with wide coverage and is applied in navigation, detection, and position widely. But the constellation has not been completed, and the amount of satellites on-board is not enough to cover the earth, which makes the data-relay disrupted or delayed in the transition process. The data-relay function needs to tolerant the delay or disruption in some extension, which make the Beidou MEO Constellation a delay/disruption-tolerant network (DTN). The traditional DTN designs mainly employ the relay table as the basic of data path schedule computing. But in practical application, especially in critical condition, such as the war-time or the infliction heavy losses on the constellation, parts of the nodes may become invalid, then the traditional DTN design could be useless. Furthermore, when transmitting the critical message in the navigation system, the maximum priority strategy is used, but the nodes still inquiry the relay table to design the path, which makes the delay more than minutes. Under this circumstances, it needs a function which could compute the optimum data path on-board in real-time according to the constellation states. The on-board critical message transmission design for navigation satellite delay/disruption-tolerant network (DTN) is proposed, according to the characteristics of navigation satellite network. With the real-time computation of parameters in the network link, the least-delay transition path is deduced to retransmit the critical message in urgent conditions. First, the DTN model for constellation is established based on the time-varying matrix (TVM) instead of the time-varying graph (TVG); then, the least transition delay data path is deduced with the parameters of the current node; at last, the critical message transits to the next best node. For the on-board real-time computing, the time delay and misjudges of constellation states in ground stations are eliminated, and the residual information channel for each node can be used flexibly. Compare with the minute’s delay of traditional DTN; the proposed transmits the critical message in seconds, which improves the re-transition efficiency. The hardware is implemented in FPGA based on the proposed model, and the tests prove the validity.

Keywords: critical message, DTN, navigation satellite, on-board, real-time

Procedia PDF Downloads 304
4856 Stability of Hybrid Systems

Authors: Kreangkri Ratchagit

Abstract:

This paper is concerned with exponential stability of switched linear systems with interval time-varying delays. The time delay is any continuous function belonging to a given interval, in which the lower bound of delay is not restricted to zero. By constructing a suitable augmented Lyapunov-Krasovskii functional combined with Leibniz-Newton’s formula, a switching rule for the exponential stability of switched linear systems with interval time-varying delays and new delay-dependent sufficient conditions for the exponential stability of the systems are first established in terms of LMIs. Finally, some examples are exploited to illustrate the effectiveness of the proposed schemes.

Keywords: exponential stability, hybrid systems, timevarying delays, Lyapunov-Krasovskii functional, Leibniz-Newton’s formula

Procedia PDF Downloads 425
4855 Risk Management Practices In The Construction Industry In Malawi

Authors: Taonga Temwani Chibaka

Abstract:

This qualitative research study was conducted to identify the common risk factors that affect the construction industry in Malawi in the building and infrastructure (civil works) projects. The study then evaluates the possible risk responses that are done to mitigate the various risk factors that were identified. I addition the research also established the barriers to risk management implementation with lastly mapping out as where the identified risk factors fall on which stage of the project and then also map out the knowledge areas that need to be worked on the cases on Malawian construction industry in order to mitigate most of the identified risk factors. The study involved the interviewing the professionals from the construction industry in Malawi where insights and ideas were collected, analysed and interpreted. The key study findings show that risks related to clients group are perceived as most critical followed by the contractor related, consultant related and then external group related factors respectively where preventive measures are the most applied risk response technique where the aim to avoid most of the risk factors from happening. Most of the risk factors identified were internal risks and in managerial category which suggested that risk planning was to be emphasized at pre-contract stage to minimize these risks since a bigger percentage of the risk factors were mapped out at implementation stage. Furthermore, barriers to risk management were identified and the key barriers were lack of awareness; lack of knowledge; lack of formal policies in place; regarded as costly and limited time which resulted in proposing that regulating authorities to purposefully introduce intense training on risk management to make known of this new knowledge area. The study then recommends that organisation should formally implement risk management where policies should be introduced to enforce all parties to undertake this. Risk planning was regarded as paramount and this to be done from pre-contract phase so as to mitigate 80% of the risk factors. Finally, training should be done on all project management knowledge areas.

Keywords: risk management, risk factors, risks, malawi

Procedia PDF Downloads 253
4854 Simulation for Squat Exercise of an Active Controlled Vibration Isolation and Stabilization System for Astronaut’s Exercise Platform

Authors: Ziraguen O. Williams, Shield B. Lin, Fouad N. Matari, Leslie J. Quiocho

Abstract:

In a task to assist NASA in analyzing the dynamic forces caused by operational countermeasures of an astronaut’s exercise platform impacting the spacecraft, feedback delay, and signal noise were added to a simulation model of an active-controlled vibration isolation system to regulate the movement of the exercise platform. Previous simulation work was conducted primarily via MATLAB/Simulink. Two additional simulation tools used in this study were Trick and MBDyn, NASA co-developed software simulation environments. Simulation results obtained from these three tools were very similar. All simulation results support the hypothesis that an active-controlled vibration isolation system outperforms a passive-controlled system even with the addition of feedback delay and signal noise to the active-controlled system. In this paper, squat exercise was used in creating excited force to the simulation model. The exciter force from a squat exercise was calculated from the motion capture of an exerciser. The simulation results demonstrate much greater transmitted force reduction in the active-controlled system than the passive-controlled system.

Keywords: control, counterweight, isolation, vibration

Procedia PDF Downloads 79
4853 A Critical Study on Unprecedented Employment Discrimination and Growth of Contractual Labour Engaged by Rail Industry in India

Authors: Munmunlisa Mohanty, K. D. Raju

Abstract:

Rail industry is one of the model employers in India has separate national legislation (Railways Act 1989) to regulate its vast employment structure, functioning across the country. Indian Railway is not only the premier transport industry of the country; indeed, it is Asia’s most extensive rail network organisation and the world’s second-largest industry functioning under one management. With the growth of globalization of industrial products, the scope of anti-employment discrimination is no more confined to gender aspect only; instead, it extended to the unregularized classification of labour force applicable in the various industrial establishments in India. And the Indian Rail Industry inadvertently enhanced such discriminatory employment trends by engaging contractual labour in an unprecedented manner. The engagement of contractual labour by rail industry vanished the core “Employer-Employee” relationship between rail management and contractual labour who employed through the contractor. This employment trend reduces the cost of production and supervision, discourages the contractual labour from forming unions, and reduces its collective bargaining capacity. So, the primary intention of this paper is to highlight the increasing discriminatory employment scope for contractual labour engaged by Indian Railways. This paper critically analyses the diminishing perspective of anti-employment opportunity practiced by Indian Railways towards contractual labour and demands an urgent outlook on the probable scope of anti-employment discrimination against contractual labour engaged by Indian Railways. The researcher used doctrinal methodology where primary materials (Railways Act, Contract Labour Act and Occupational, health and Safety Code, 2020) and secondary data (CAG Report 2018, Railways Employment Regulation Rules, ILO Report etc.) are used for the paper.

Keywords: anti-employment, CAG Report, contractual labour, discrimination, Indian Railway, principal employer

Procedia PDF Downloads 128
4852 Disclosure Extension of Oil and Gas Reserve Quantum

Authors: Ali Alsawayeh, Ibrahim Eldanfour

Abstract:

This paper examines the extent of disclosure of oil and gas reserve quantum in annual reports of international oil and gas exploration and production companies, particularly companies in untested international markets, such as Canada, the UK and the US, and seeks to determine the underlying factors that affect the level of disclosure on oil reserve quantum. The study is concerned with the usefulness of disclosure of oil and gas reserves quantum to investors and other users. Given the primacy of the annual report (10-k) as a source of supplemental reserves data about the company and as the channel through which companies disseminate information about their performance, the annual reports for one year (2009) were the central focus of the study. This comparative study seeks to establish whether differences exist between the sample companies, based on new disclosure requirements by the Securities and Exchange Commission (SEC) in respect of reserves classification and definition. The extent of disclosure of reserve is provided and compared among the selected companies. Statistical analysis is performed to determine whether any differences exist in the extent of disclosure of reserve under the determinant variables. This study shows that some factors would affect the extent of disclosure of reserve quantum in the above-mentioned countries, namely: company’s size, leverage and quality of auditor. Companies that provide reserves quantum in detail appear to display higher size. The findings also show that the level of leverage has affected companies’ reserves quantum disclosure. Indeed, companies that provide detailed reserves quantum disclosure tend to employ a ‘high-quality auditor’. In addition, the study found significant independent variable such as Profit Sharing Contracts (PSC). This factor could explain variations in the level of disclosure of oil reserve quantum between the contractor and host governments. The implementation of SEC oil and gas reporting requirements do not enhance companies’ valuation because the new rules are based only on past and present reserves information (proven reserves); hence, future valuation of oil and gas companies is missing for the market.

Keywords: comparison, company characteristics, disclosure, reserve quantum, regulation

Procedia PDF Downloads 379
4851 Conception of Increasing the Efficiency of Excavation Shoring by Prestressing Diaphragm Walls

Authors: Mateusz Frydrych

Abstract:

The construction of diaphragm walls as excavation shoring as well as part of deep foundations is widely used in geotechnical engineering. Today's design challenges lie in the optimal dimensioning of the cross-section, which is demanded by technological considerations. Also in force is the issue of optimization and sustainable use of construction materials, including reduction of carbon footprint, which is currently a relevant challenge for the construction industry. The author presents the concept of an approach to achieving increased efficiency of diaphragm wall excavation shoring by using structural compression technology. The author proposes to implement prestressed tendons in a non-linear manner in the reinforcement cage. As a result bending moment is reduced, which translates into a reduction in the amount of steel needed in the section, a reduction in displacements, and a reduction in the scratching of the casing, including the achievement of better tightness. This task is rarely seen and has not yet been described in a scientific way in the literature. The author has developed a dynamic numerical model that allows the dimensioning of the cross-section of a prestressed shear wall, as well as the study of casing displacements and cross-sectional forces in any defined computational situation. Numerical software from the Sofistik - open source development environment - was used for the study, and models were validated in Plaxis software . This is an interesting idea that allows for optimizing the execution of construction works and reducing the required resources by using fewer materials and saving time. The author presents the possibilities of a prestressed diaphragm wall, among others, using. The example of a diaphragm wall working as a cantilever at the height of two underground floors without additional strutting or stability protection by using ground anchors. This makes the execution of the work more criminal for the contractor and, as a result, cheaper for the investor.

Keywords: prestressed diaphragm wall, Plaxis, Sofistik, innovation, FEM, optimisation

Procedia PDF Downloads 42
4850 New Results on Exponential Stability of Hybrid Systems

Authors: Grienggrai Rajchakit

Abstract:

This paper is concerned with the exponential stability of switched linear systems with interval time-varying delays. The time delay is any continuous function belonging to a given interval, in which the lower bound of delay is not restricted to zero. By constructing a suitable augmented Lyapunov-Krasovskii functional combined with Leibniz-Newton's formula, a switching rule for the exponential stability of switched linear systems with interval time-varying delays and new delay-dependent sufficient conditions for the exponential stability of the systems are first established in terms of LMIs. Finally, some examples are exploited to illustrate the effectiveness of the proposed schemes.

Keywords: exponential stability, hybrid systems, time-varying delays, lyapunov-krasovskii functional, leibniz-newton's formula

Procedia PDF Downloads 522
4849 The Importance of Development Evaluation to Preterm Children in Remote Area

Authors: Chung-Yuan Wang, Min Hsu, Bo-Ya Juan, Hsiv Ching Lin, Hsveh Min Lin, Hsiu-Fang Yeh

Abstract:

The success of Taiwan's National Health Insurance (NHI) system attracts widespread praise from the international society. However, the availability of medical care in a emote area is limited. Without the convenient public transportation system and mature social welfare policy, these people are difficult to regain their health and prevent disability. Preterm children have more risk to get development delay. Preterm children in a remote area have the human right to get rehabilitation resources as those in the city area. Therefore, the aim of this study was to show the importance of development screening to preterm children in a remote area and a tract the government to notice the issue. In Pingtung, children who are suspected development delay would be suggested to take a skillful screening evaluation in our hospital. Those preterm children (within 1-year-old) visited our pediatric clinic would also be referred to take the development evaluation. After the physiatrist’s systemic evaluation, the subjects would be scheduled to take the development evaluation. Gross motor, fine motor, speech comprehension/expression and mental study were included. The evaluation was in-charged by a physical therapist, occupational therapy, speech therapist and pediatric psychologist. The tools were Peabody developmental scale, Bayley Scales of Infant and Toddler Development (Bayley-III) and Wechsler Preschool & Primary Scale of Intelligence-Revised (WPPSI-R). In 2013, 459 children received the service in our hospital. Among these children, fifty-seven were noted with preterm baby history (gestation within 37 weeks). Thirty-six of these preterm children, who had never receive development evaluation, were included in this study. Thirty-six subjects (twenty-six male and ten female) were included. Nineteen subjects were found development delay. Six subjects were found suspected development delay. In gross motor, six subjects were development delay and eight were suspected development delay. In fine motor, five subjects were development delay and three were suspected development delay. In speech, sixteen subjects were development delay and six were suspected development delay. In our study, through the provision of development evaluation service, 72.2% preterm baby were found their development delay or suspected delay. They need further early intervention rehabilitation service. We made their parents realize that when development delay was recognized at the early stage, they are often reversible. No only the patients but also their families were improved their health status. The number of the subjects was limited in our study. Further study might be needed. Compared with 770 physical therapist (PT) and 370 occupational therapy (OT) in Taipei, there are only 108 PT and 54 OT in Pingtung. Further, there are much fewer therapists working on the field of pediatric rehabilitation. Living healthy is a human's right, no matter where does he live. For those development delay children in remote area, particularly preterm children, early detection, and early intervention rehabilitation service could play an important role in decreasing their disability and improving their quality of life. Through this study, we suggest the government to add more national resources on the development evaluation to preterm children in a remote area.

Keywords: development, early intervention, preterm children, rehabilitation

Procedia PDF Downloads 411
4848 Study on the Efficient Routing Algorithms in Delay-Tolerant Networks

Authors: Si-Gwan Kim

Abstract:

In Delay Tolerant Networks (DTN), there may not exist an end-to-end path between source and destination at the time of message transmission. Employing ‘Store Carry and Forward’ delivery mechanism for message transmission in such networks usually incurs long message delays. In this paper, we present the modified Binary Spray and Wait (BSW) routing protocol that enhances the performance of the original one. Our proposed algorithm adjusts the number of forward messages depending on the number of neighbor nodes. By using beacon messages periodically, the number of neighbor nodes can be managed. The simulation using ONE simulator results shows that our modified version gives higher delivery ratio and less latency as compared to BSW.

Keywords: delay tolerant networks, store carry and forward, one simulator, binary spray and wait

Procedia PDF Downloads 98
4847 Democratising Rivers: Local River Conflicts in Rajasthan

Authors: Renu Sisodia

Abstract:

This paper attempted to explore and explain the local level river water conflicts in the larger context of state - society relations. This study also covered causes of local level river water conflicts in the catchment area of Bandi and Arvari river of Rajasthan. The focus of the study was on the emergence of community driven, decentralised management of river water bodies and strategies used by local communities to protect and manage river water conflicts. The research is conducted through the process of designing a framework based on essential theoretical and practical findings supported by primary and secondary data. Two in depth case study is conducted to understand the phenomenon in depth. The first field site is Bandi River of Pali district, which is about the struggle between textile industries, community and the State government in which water pollution is said to be one of the driving force of the conflict. Finding shows that the state is supporting textile industries in Pali district have not been adherent to the environmental ethics. Present legal infrastructure and local institutions fail to resolve the serious problem of water pollution in Bandi River and its adverse impact on the local community as a result local community resistance against the local administration and the state government. The second case illustrates the plight of Arvari River in Alwar district. Tussle for the ownership of fisheries between local community, the private fish contractor and State government has been the main bone of contestation. To resolve this conflict local community formed conflict management mechanism named as Arvari Parliament. Arvari Parliament has its own principle and rules to resolve water conflicts related to ownership of the river and use of the river water. The research findings also highlight the co-existence between conventional and modern practices in resolving conflicts.

Keywords: water, water pollution, water conflicts, water scarcity, conflict resolution, local community

Procedia PDF Downloads 454
4846 Extended Multi-Modulus Divider for Open Loop Fractional Dividers and Fractional Multiplying Delay Locked Loops

Authors: Muhammad Swilam

Abstract:

Solutions for the wrong division problem of the Extended Multi-Modulus Divider (EMMD) that occurs during modulus extension (i.e. switching the modulus value between two different ranges of division ratios), in open loop fractional dividers and fractional multiplying delay locked loop, is proposed. A detailed study for the MMD with Sigma-Delta is also presented. Moreover, extensive simulations for the divider are presented to ensure and verify its functionality and compared with the conventional dividers.

Keywords: extended multi-modulus divider (EMMD), fractional multiplying delay locked loop, open loop fractional divider, sigma delta modulator

Procedia PDF Downloads 456
4845 Hemispheric Locus and Gender Predict the Delay between the Moment of Stroke and Hospitalization

Authors: D. Anderlini, G. Wallis

Abstract:

Background: The number of people experiencing stroke is steadily increasing due to changes in diet and lifestyle, to longer life expectancy resulting in older population, to higher survival rates as a consequence of improvements during the acute phase. This study considers what risk factors might contribute to delayed entry to hospital for treatment. Methods: We analyzed data from 2472 patients admitted to the Stroke Unit of the Royal Brisbane Women's Hospital, Australia, between 2002 to 2011. Results: Previous studies have reported that factors which can contribute to delay include the patient’s age, the time of day, physical location, visit the GP instead of going to the emergency, means of transport, severity of symptoms and type of stroke. Contrary to findings of other studies, we found a strong correlation between side of lesion and delay in admission: patients with right hemisphere lesions had an average delay of 3.78 days, while patients with left hemisphere lesions had an average delay of 1.49 days. Damage to the right hemisphere generally ends in motor impairment in the non-dominant hand and no speech impediment. In contrast, left hemisphere lesions can result in deficit to; dominant hand function and aphasia which will be noticed even if their impact on performance is relatively minor. A finding which goes against many previous studies, is the fact that women get to the hospital much sooner than men, showing an average delay of 0.92 days in women vs. 3.36 days in men. Conclusion: Acute surgical-pharmacological therapies are most effective if applied immediately after stroke. Hence delays to admission can be crucial to the degree of recovery. The tendency of patients to overlook symptoms of right hemisphere lesion should be the target of information campaigns both for the general public and GPs. Why do men go to hospital so late? We don't know yet! Nevertheless an awareness plan specifically direct to male population should be on the agenda of Health Departments.

Keywords: gender, admission delay, stroke location, bioinformatics, biomedicine

Procedia PDF Downloads 200