Search results for: contract risk assessment
Commenced in January 2007
Frequency: Monthly
Edition: International
Paper Count: 10544

Search results for: contract risk assessment

10334 Activity-Based Safety Assessment of Real Estate Projects in Western India

Authors: Patel Parul, Harsh Ganvit

Abstract:

The construction industry is the second highest industry after agriculture provides employment in India. In developing countries like India, many construction projects are coming up to meet the demand. On the one hand, construction projects are increasing; on the other hand still, construction companies are struggling with many problems. One of the major problems is to ensure safe working conditions at the construction site. Due to a lack of safety awareness and ignorance of safety aspects, many fatal accidents are very common at the construction site in India. One of the key success factors for construction projects is “Accident-Free Construction Projects”. The construction projects can be divided into various categories like Infrastructure projects, industrial construction and real estate construction. Real estate projects are mainly comprised of commercial and residential projects. In the construction industry, private sectors play a huge role in urban and rural development and also contribute significantly to the growth of the nation. Infrastructure and Industrial projects are mainly executed by well-qualified construction contractors. For such projects, ensuring safety at construction projects is inevitable and probably one of the major clauses of contract documents as well. These projects are monitored from time to time by national agencies and researchers, too. However, Real estate projects are rarely monitored for safety aspects. No systematic contract system is followed for these projects. Safety is the most neglected aspect of these projects. In the current research projects, an attempt is made to carry out safety auditing for about 75 real estate projects. The objective of this work is to collect the activity-based safety survey of real estate projects in western India. The analysis of activity-based safety implementation for real estate projects is discussed in the present work. The activities are divided into three categories based on the data collected. The findings of this work will help local monitoring authorities to implement a safety management plan for real estate projects.

Keywords: construction safety, safety assessment, activity-based safety, real estate projects

Procedia PDF Downloads 24
10333 UEMSD Risk Identification: Case Study

Authors: K. Sekulová, M. Šimon

Abstract:

The article demonstrates on a case study how it is possible to identify MSD risk. It is based on a dissertation risk identification model of occupational diseases formation in relation to the work activity that determines what risk can endanger workers who are exposed to the specific risk factors. It is evaluated based on statistical calculations. These risk factors are main cause of upper-extremities musculoskeletal disorders.

Keywords: case study, upper-extremity musculoskeletal disorders, ergonomics, risk identification

Procedia PDF Downloads 469
10332 Evaluation of Health Risk Degree Arising from Heavy Metals Present in Drinking Water

Authors: Alma Shehu, Majlinda Vasjari, Sonila Duka, Loreta Vallja, Nevila Broli

Abstract:

Humans consume drinking water from several sources, including tap water, bottled water, natural springs, filtered tap water, etc. The quality of drinking water is crucial for human survival given the fact that the consumption of contaminated drinking water is related to many diseases and deaths all over the world. This study represents the investigation of the quality and health risks of different types of drinking waters being consumed by the population in Albania, arising from heavy metals content. Investigated water included industrialized water, tap water, and spring water. In total, 20 samples were analyzed for the content of Pb, Cd, Cr, Ni, Cu, Fe, Zn, Al, and Mn. Determination of each metal concentration in selected samples was conducted by atomic absorption spectroscopy method with electrothermal atomization, GFAAS. Water quality was evaluated by comparing the obtained metals concentrations with the recommended maximum limits, according to the European Directive (98/83/EC) and Guidelines for Drinking Water Quality (WHO, 2017). Metal Index (MI) was used to assess the overall water quality due to heavy metals content. Health risk assessment was conducted based on the recommendations of the USEPA (1996), human health risk assessment, via ingestion. Results of this investigation showed that Al, Ni, Fe, and Cu were the metals found in higher concentrations while Cd exhibited the lowest concentration. Among the analyzed metals, Al (one sample) and Ni (in five samples) exceeded the maximum allowed limit. Based on the pollution metal index, it was concluded that the overall quality of Glina bottled water can be considered as toxic to humans, while the quality of bottled water (Trebeshina) was classified as moderately toxic. Values of health risk quotient (HQ) varied between 1x10⁻⁶-1.3x10⁻¹, following the order Ni > Cd > Pb > Cu > Al > Fe > Zn > Mn. All the values were lower than 1, which suggests that the analyzed samples exhibit no health risk for humans.

Keywords: drinking water, health risk assessment, heavy metals, pollution index

Procedia PDF Downloads 107
10331 Normal Weight Obesity among Female Students: BMI as a Non-Sufficient Tool for Obesity Assessment

Authors: Krzysztof Plesiewicz, Izabela Plesiewicz, Krzysztof Chiżyński, Marzenna Zielińska

Abstract:

Background: Obesity is an independent risk factor for cardiovascular diseases. There are several anthropometric parameters proposed to estimate the level of obesity, but until now there is no agreement which one is the best predictor of cardiometabolic risk. Scientists defined metabolically obese normal weight, who suffer from metabolic abnormalities, the same as obese individuals, and defined this syndrome as normal weight obesity (NWO). Aim of the study: The aim of our study was to determine the occurrence of overweight and obesity in a cohort of young, adult women, using standard and complementary methods of obesity assessment and to indicate those, who are at risk of obesity. The second aim of our study was to test additional methods of obesity assessment and proof that body mass index using alone is not sufficient parameter of obesity assessment. Materials and methods: 384 young women, aged 18-32, were enrolled into the study. Standard anthropometric parameters (waist to hips ratio (WTH), waist to height ratio (WTHR)) and two other methods of body fat percentage measurement (BFPM) were used in the study: electrical bioimpendance analysis (BIA) and skinfold measurement test by digital fat body mass clipper (SFM). Results: In the study group 5% and 7% of participants had waist to hips ratio and accordingly waist to height ratio values connected with visceral obesity. According to BMI 14% participants were overweight and obese. Using additional methods of body fat assessment, there were 54% and 43% of obese for BIA and SMF method. In the group of participants with normal BMI and underweight (not overweight, n =340) there were individuals with the level of BFPM above the upper limit, for the BIA 49% (n =164) and for the SFM 36 % (n=125). Statistical analysis revealed strong correlation between BIA and SFM methods. Conclusion: BMI using alone is not a sufficient parameter of obesity assessment. High percentage of young women with normal BMI values seem to be normal weight obese.

Keywords: electrical bioimpedance, normal weight obesity, skin-fold measurement test, women

Procedia PDF Downloads 243
10330 Contact Address Levels and Human Health Risk of Metals In Milk and Milk Products Bought from Abeokuta, Southwestern Nigeria

Authors: Olukayode Bamgbose, Feyisola Agboola, Adewale M. Taiwo, Olanrewaju Olujimi Oluwole Terebo, Azeez Soyingbe, Akeem Bamgbade

Abstract:

The present study evaluated the contents and health risk assessment of metals determined in milk and milk product samples collected from the Abeokuta market. Forty-five milk and milk product (yoghurt) samples were digested and analysed for selected metals using Atomic Absorption Spectrophotometric method. Health risk assessment was evaluated for hazard quotient (HQ), hazard index (HI), and cancer risk (CR). Data were subjected to descriptive and inferential statistics. The concentrations of Zn, which ranged from 3.24±0.59 to 4.35±0.59 mg/kg, were the highest in the samples. Cr and Cd were measured below the detection limit of the analytical instrument, while the Pb level was higher than the Codex Alimentarius Commission value of 0.02 mg/kg, indicating unsafe for consumption. However, the HQ of Pb and other metals in milk and milk product samples was less than 1.0, thereby establishing no adverse health effects for Pb and other metals. The distribution pattern of metals in milk and milk product samples followed the decreasing order of Zn > Fe > Ni > Co > Cu > Mn > Pb > Cd/Cr. The CR levels of meals were also less than the permissible limit of 1.0 x 10-4, establishing no possible development of cancer. Keywords: adverse effects, cancer, metals, milk, milk product, the permissible limit.

Keywords: adverse effects, cancer, metals, milk, milk product, permissible limit

Procedia PDF Downloads 50
10329 Identifying Lead Poisoning Risk Factors among Non-Pregnant Adults in New York City through Motivational Interviewing Techniques

Authors: Nevila Bardhi, Joanna Magda, Kolapo Alex-Oni, Slavenka Sedlar, Paromita Hore

Abstract:

The New York City Department of Health and Mental Hygiene (NYC DOHMH) receives blood lead test results for NYC residents and conducts lead poisoning case investigations for individuals with elevated blood lead levels exposed to lead occupationally and non-occupationally. To (1) improve participant engagement, (2) aid the identification of potential lead sources, and (3) better tailor recommendations to reduce lead exposure, Motivational Interviewing (MI) techniques were incorporated during risk assessment interviews of non-pregnant adults by DOHMH’s Adult Lead Poisoning Prevention (ALP) Program. MI is an evidence-based counselling method used in clinical settings that have been effective in promoting behavior change by resolving ambivalence and enhancing motivation in treating both physiological and psychological health conditions. The incorporation of MI techniques in the ALP risk assessment interview was effective in improving the identification of lead sources for non-pregnant adult cases, thus, allowing for the opportunity to better tailor lead poisoning prevention recommendations. The embedding of MI cues in the ALP risk assessment interview also significantly increased engagement in the interview process, resulting in approximately 50 more interviews conducted per year and a decrease in interview refusals during case investigations. Additionally, the pre-MI interview completion rate was 57%, while the post-MI Interview completion rate was 68%. We recommend MI techniques to be used by other lead poisoning prevention programs during lead poisoning investigations in similar diverse populations.

Keywords: lead poisoning prevention, motivational interviewing, behavior change, lead poisoning risk factors, self-efficacy

Procedia PDF Downloads 59
10328 From Intuitive to Constructive Audit Risk Assessment: A Complementary Approach to CAATTs Adoption

Authors: Alon Cohen, Jeffrey Kantor, Shalom Levy

Abstract:

The use of the audit risk model in auditing has faced limitations and difficulties, leading auditors to rely on a conceptual level of its application. The qualitative approach to assessing risks has resulted in different risk assessments, affecting the quality of audits and decision-making on the adoption of CAATTs. This study aims to investigate risk factors impacting the implementation of the audit risk model and propose a complementary risk-based instrument (KRIs) to form substance risk judgments and mitigate against heightened risk of material misstatement (RMM). The study addresses the question of how risk factors impact the implementation of the audit risk model, improve risk judgments, and aid in the adoption of CAATTs. The study uses a three-stage scale development procedure involving a pretest and subsequent study with two independent samples. The pretest involves an exploratory factor analysis, while the subsequent study employs confirmatory factor analysis for construct validation. Additionally, the authors test the ability of the KRIs to predict audit efforts needed to mitigate against heightened RMM. Data was collected through two independent samples involving 767 participants. The collected data was analyzed using exploratory factor analysis and confirmatory factor analysis to assess scale validity and construct validation. The suggested KRIs, comprising two risk components and seventeen risk items, are found to have high predictive power in determining audit efforts needed to reduce RMM. The study validates the suggested KRIs as an effective instrument for risk assessment and decision-making on the adoption of CAATTs. This study contributes to the existing literature by implementing a holistic approach to risk assessment and providing a quantitative expression of assessed risks. It bridges the gap between intuitive risk evaluation and the theoretical domain, clarifying the mechanism of risk assessments. It also helps improve the uniformity and quality of risk assessments, aiding audit standard-setters in issuing updated guidelines on CAATT adoption. A few limitations and recommendations for future research should be mentioned. First, the process of developing the scale was conducted in the Israeli auditing market, which follows the International Standards on Auditing (ISAs). Although ISAs are adopted in European countries, for greater generalization, future studies could focus on other countries that adopt additional or local auditing standards. Second, this study revealed risk factors that have a material impact on the assessed risk. However, there could be additional risk factors that influence the assessment of the RMM. Therefore, future research could investigate other risk segments, such as operational and financial risks, to bring a broader generalizability to our results. Third, although the sample size in this study fits acceptable scale development procedures and enables drawing conclusions from the body of research, future research may develop standardized measures based on larger samples to reduce the generation of equivocal results and suggest an extended risk model.

Keywords: audit risk model, audit efforts, CAATTs adoption, key risk indicators, sustainability

Procedia PDF Downloads 38
10327 Maternal Mental Health and Patient Reported Outcomes: Identifying At-Risk Pregnant and Postpartum Patients

Authors: Jennifer Reese, Josh Biber, Howard Weeks, Rachel Hess

Abstract:

Aim: The Edinburgh Postnatal Depression Screen (EPDS) is a mental health screening for pregnant women that has been widely used over the last 30 years. This screen is typically given in clinic on paper to patients throughout pregnancy and postpartum. The screen helps identify patients who may be at risk for pregnancy related depression or postpartum depression. In early 2016, University of Utah Health implemented an electronic version of the EPDS as well as the PROMIS Depression v1.0 instrument for all pregnant and postpartum patients. We asked patients both instruments to understand coverage of patients identified as at risk for each instrument. Methods: The EPDS is currently administered as part of our PRO template for pregnant and postpartum women. We also administer the PROMIS Depression as part of a standard PRO assessment to all patients. Patients are asked to complete an assessment no more often than every eight weeks. PRO assessments are either completed at home or in clinic with a tablet computer. Patients with a PROMIS score of ≥ 65 or a EPDS score of ≥ 10 were identified as at risk for depression Results: From April 2016 to April 2017, 1,330 unique patients were screened at University of Utah Health in OBGYN clinics with both the EPDS and PROMIS depression instrument on the same day. There were 28 (2.1%) patients were identified as at risk for depression using the PROMIS depression screen, while 262 (19.7%) patients were identified as at risk for postpartum depression using the EPDS screen. Overall, 27 (2%) patients were identified as at risk on both instruments. Conclusion: The EPDS identified a higher percent (19.7%) of patients at risk for depression when compared to the PROMIS depression (2.1%). Ninety-six percent of patients who screened positive on the PROMIS depression screen also screened positive on the EPDS screen. Mental health is an important component to a patient’s overall wellbeing. We want to ensure all patients, particularly pregnant or post-partum women, receive screening and treatment when necessary. A combination of screenings may be necessary to provide the overall best care for patients and to identify the highest percentage of patients at risk.

Keywords: patient reported outcomes, mental health, maternal, depression

Procedia PDF Downloads 344
10326 Instant Fire Risk Assessment Using Artifical Neural Networks

Authors: Tolga Barisik, Ali Fuat Guneri, K. Dastan

Abstract:

Major industrial facilities have a high potential for fire risk. In particular, the indices used for the detection of hidden fire are used very effectively in order to prevent the fire from becoming dangerous in the initial stage. These indices provide the opportunity to prevent or intervene early by determining the stage of the fire, the potential for hazard, and the type of the combustion agent with the percentage values of the ambient air components. In this system, artificial neural network will be modeled with the input data determined using the Levenberg-Marquardt algorithm, which is a multi-layer sensor (CAA) (teacher-learning) type, before modeling the modeling methods in the literature. The actual values produced by the indices will be compared with the outputs produced by the network. Using the neural network and the curves to be created from the resulting values, the feasibility of performance determination will be investigated.

Keywords: artifical neural networks, fire, Graham Index, levenberg-marquardt algoritm, oxygen decrease percentage index, risk assessment, Trickett Index

Procedia PDF Downloads 106
10325 Binary Decision Diagram Based Methods to Evaluate the Reliability of Systems Considering Failure Dependencies

Authors: Siqi Qiu, Yijian Zheng, Xin Guo Ming

Abstract:

In many reliability and risk analysis, failures of components are supposed to be independent. However, in reality, the ignorance of failure dependencies among components may render the results of reliability and risk analysis incorrect. There are two principal ways to incorporate failure dependencies in system reliability and risk analysis: implicit and explicit methods. In the implicit method, failure dependencies can be modeled by joint probabilities, correlation values or conditional probabilities. In the explicit method, certain types of dependencies can be modeled in a fault tree as mutually independent basic events for specific component failures. In this paper, explicit and implicit methods based on BDD will be proposed to evaluate the reliability of systems considering failure dependencies. The obtained results prove the equivalence of the proposed implicit and explicit methods. It is found that the consideration of failure dependencies decreases the reliability of systems. This observation is intuitive, because more components fail due to failure dependencies. The consideration of failure dependencies helps designers to reduce the dependencies between components during the design phase to make the system more reliable.

Keywords: reliability assessment, risk assessment, failure dependencies, binary decision diagram

Procedia PDF Downloads 447
10324 A Probability Analysis of Construction Project Schedule Using Risk Management Tool

Authors: A. L. Agarwal, D. A. Mahajan

Abstract:

Construction industry tumbled along with other industry/sectors during recent economic crash. Construction business could not regain thereafter and still pass through slowdown phase, resulted many real estate as well as infrastructure projects not completed on schedule and within budget. There are many theories, tools, techniques with software packages available in the market to analyze construction schedule. This study focuses on the construction project schedule and uncertainties associated with construction activities. The infrastructure construction project has been considered for the analysis of uncertainty on project activities affecting project duration and analysis is done using @RISK software. Different simulation results arising from three probability distribution functions are compiled to benefit construction project managers to plan more realistic schedule of various construction activities as well as project completion to document in the contract and avoid compensations or claims arising out of missing the planned schedule.

Keywords: construction project, distributions, project schedule, uncertainty

Procedia PDF Downloads 309
10323 The Effect of the Construction Contract System by Simulating the Comparative Costs of Capital to the Financial Feasibility of the Construction of Toll Bali Mandara

Authors: Mas Pertiwi I. G. AG Istri, Sri Kristinayanti Wayan, Oka Aryawan I. Gede Made

Abstract:

Ability of government to meet the needs of infrastructure investment constrained by the size of the budget commitments for other sectors. Another barrier is the complexity of the process of land acquisition. Public Private Partnership can help bridge the investment gap by including the amount of funding from the private sector, shifted the responsibility of financing, construction of the asset, and the operation and post-project design and care to them. In principle, a construction project implementation always requires the investor as a party to provide resources in the form of funding which it must be contained in a successor agreement in the form of a contract. In general, construction contracts consist of contracts which passed in Indonesia and contract International. One source of funding used in the implementation of construction projects comes from funding that comes from the collaboration between the government and the private sector, for example with the system: BLT (Build Lease Transfer), BOT (Build Operate Transfer), BTO (Build Transfer Operate) and BOO (Build Operate Own). And form of payment under a construction contract can be distinguished several ways: monthly payment, payments based on progress and payment after completed projects (Turn Key). One of the tools used to analyze the feasibility of the investment is to use financial models. The financial model describes the relationship between different variables and assumptions used. From a financial model will be known how the cash flow structure of the project, which includes revenues, expenses, liabilities to creditors and the payment of taxes to the government. Net cash flow generated from the project will be used as a basis for analyzing the feasibility of investment source of project financing Public Private Partnership could come from equity or debt. The proportion of funding according to its source is a comparison of a number of investment funds originating from each source of financing for a total investment cost during the construction period by selected the contract system and several alternative financing percentage ratio determined according to sources will generate cash flow structure that is different. Of the various possibilities for the structure of the cash flow generated will be analyzed by software is to test T Paired to compared the contract system used by various alternatives comparison of financing to determine the effect of the contract system and the comparison of such financing for the feasibility of investment toll road construction project for the economic life of 20 (twenty) years. In this use case studies of toll road contruction project Bali Mandara. And in this analysis only covered two systems contracts, namely Build Operate Transfer and Turn Key. Based on the results obtained by analysis of the variable investment feasibility of the NPV, BCR and IRR between the contract system Build Operate Transfer and contract system Turn Key on the interest rate of 9%, 12% and 15%.

Keywords: contract system, financing, internal rate of return, net present value

Procedia PDF Downloads 203
10322 The Significance of a Well-Defined Systematic Approach in Risk Management for Construction Projects within Oil Industry

Authors: Batool Ismaeel, Umair Farooq, Saad Mushtaq

Abstract:

Construction projects in the oil industry can be very complex, having unknown outcomes and uncertainties that cannot be easily predicted. Each project has its unique risks generated by a number of factors which, if not controlled, will impact the successful completion of the project mainly in terms of schedule, cost, quality, and safety. This paper highlights the historic risks associated with projects in the south and east region of Kuwait Oil Company (KOC) collated from the company’s lessons learned database. Starting from Contract Award through to handover of the project to the Asset owner, the gaps in project execution in terms of managing risk will be brought to discussion and where a well-defined systematic approach in project risk management reflecting many claims, change of scope, exceeding budget, delays in engineering phase as well as in the procurement and fabrication of long lead items should be adopted. This study focuses on a proposed feasible approach in risk management for engineering, procurement and construction (EPC) level projects including the various stakeholders involved in executing the works from International to local contractors and vendors in KOC. The proposed approach covers the areas categorized into organizational, design, procurement, construction, pre-commissioning, commissioning and project management in which the risks are identified and require management and mitigation. With the effective deployment and implementation of the proposed risk management system and the consideration of it as a vital key in achieving the project’s target, the outcomes will be more predictable in the future, and the risk triggers will be managed and controlled. The correct resources can be allocated on a timely basis for the company for avoiding any unpredictable outcomes during the execution of the project. It is recommended in this paper to apply this risk management approach as an integral part of project management and investigate further in the future, the effectiveness of this proposed system for newly awarded projects and compare the same with those projects of similar budget/complexity that have not applied this approach to risk management.

Keywords: construction, project completion, risk management, uncertainties

Procedia PDF Downloads 126
10321 The Value of Audit in Managing Supplier’s Process Improvement

Authors: Mohammad E. Nikoofal, Mehmet Gumus

Abstract:

Besides the many benefits of outsourcing, firms are still concerned about the lack of critical information regarding both the risk levels and actions of their suppliers that are just a few links away. In this paper, we study the effectiveness of audit for the manufacturer in managing her supplier’s process improvement effort when the supplier is privately informed about his disruption risk and actions. By comparing the agency costs associated with the optimal menu of contracts with and without audit, we completely characterize the value of audit for all the cases from the perspectives of both manufacturer, and supplier as well as total supply chain. First, the analysis of value of audit from the manufacturer’s perspective shows that she can strictly benefit from auditing her supplier’s actions. To the best of our knowledge, this result has not been documented before in the principal-agent literature under a standard setting where the agent is assumed to be risk-neutral and not protected by limited liability constraints. Second, we find that not only the manufacturer but also the supplier can strictly benefit from audit. Third, the audit enables the manufacturer to customize her contract offerings based on the reliability of the supplier. Finally, by analyzing the impact of problem parameters on the value of audit, we identify the conditions under which an audit would be beneficial for individual supply chain parties as well as total supply chain.

Keywords: supply disruption, adverse selection, moral hazard incentives, audit

Procedia PDF Downloads 435
10320 Health Risk Assessment and Source Apportionment of Elemental Particulate Contents from a South Asian Future Megacity

Authors: Afifa Aslam, Muhammad Ibrahim, Abid Mahmood, Muhammad Usman Alvi, Fariha Jabeen, Umara Tabassum

Abstract:

Many factors cause air pollution in Pakistan, which poses a significant threat to human health. Diesel fuel and gasoline motor vehicles, as well as industrial companies, pollute the air in Pakistan's cities. The study's goal is to determine the level of air pollution in a Pakistani industrial city and to establish risk levels for the health of the population. We measured the intensity of air pollution by chemical characterization and examination of air samples collected at stationary remark sites. The PM10 levels observed at all sampling sites, including residential, commercial, high-traffic, and industrial areas were well above the limits imposed by Pakistan EPA, the United States EPA, and WHO. We assessed the health risk via chemical factors using a methodology approved for risk assessment. All Igeo index values greater than one were considered moderately contaminated or moderately to severely contaminated. Heavy metals have a substantial risk of acute adverse effects. In Faisalabad, Pakistan, there was an enormously high risk of chronic effects produced by a heavy metal acquaintance. Concerning specified toxic metals, intolerable levels of carcinogenic risks have been determined for the entire population. As a result, in most of the investigated areas of Faisalabad, the indices and hazard quotients for chronic and acute exposure exceeded the permissible level of 1.0. In the current study, re-suspended roadside mineral dust, anthropogenic exhaust emissions from traffic and industry, and industrial dust were identified as major emission sources of elemental particulate contents. Because of the unacceptable levels of risk in the research area, it is strongly suggested that a comprehensive study of the population's health status as a result of air pollution should be conducted for policies to be developed against these risks.

Keywords: elemental composition, particulate pollution, Igeo index, health risk assessment, hazard quotient

Procedia PDF Downloads 49
10319 A Review of Benefit-Risk Assessment over the Product Lifecycle

Authors: M. Miljkovic, A. Urakpo, M. Simic-Koumoutsaris

Abstract:

Benefit-risk assessment (BRA) is a valuable tool that takes place in multiple stages during a medicine's lifecycle, and this assessment can be conducted in a variety of ways. The aim was to summarize current BRA methods used during approval decisions and in post-approval settings and to see possible future directions. Relevant reviews, recommendations, and guidelines published in medical literature and through regulatory agencies over the past five years have been examined. BRA implies the review of two dimensions: the dimension of benefits (determined mainly by the therapeutic efficacy) and the dimension of risks (comprises the safety profile of a drug). Regulators, industry, and academia have developed various approaches, ranging from descriptive textual (qualitative) to decision-analytic (quantitative) models, to facilitate the BRA of medicines during the product lifecycle (from Phase I trials, to authorization procedure, post-marketing surveillance and health technology assessment for inclusion in public formularies). These approaches can be classified into the following categories: stepwise structured approaches (frameworks); measures for benefits and risks that are usually endpoint specific (metrics), simulation techniques and meta-analysis (estimation techniques), and utility survey techniques to elicit stakeholders’ preferences (utilities). All these approaches share the following two common goals: to assist this analysis and to improve the communication of decisions, but each is subject to its own specific strengths and limitations. Before using any method, its utility, complexity, the extent to which it is established, and the ease of results interpretation should be considered. Despite widespread and long-time use, BRA is subject to debate, suffers from a number of limitations, and currently is still under development. The use of formal, systematic structured approaches to BRA for regulatory decision-making and quantitative methods to support BRA during the product lifecycle is a standard practice in medicine that is subject to continuous improvement and modernization, not only in methodology but also in cooperation between organizations.

Keywords: benefit-risk assessment, benefit-risk profile, product lifecycle, quantitative methods, structured approaches

Procedia PDF Downloads 118
10318 Power Transformer Risk-Based Maintenance by Optimization of Transformer Condition and Transformer Importance

Authors: Kitti Leangkrua

Abstract:

This paper presents a risk-based maintenance strategy of a power transformer in order to optimize operating and maintenance costs. The methodology involves the study and preparation of a database for the collection the technical data and test data of a power transformer. An evaluation of the overall condition of each transformer is performed by a program developed as a result of the measured results; in addition, the calculation of the main equipment separation to the overall condition of the transformer (% HI) and the criteria for evaluating the importance (% ImI) of each location where the transformer is installed. The condition assessment is performed by analysis test data such as electrical test, insulating oil test and visual inspection. The condition of the power transformer will be classified from very poor to very good condition. The importance is evaluated from load criticality, importance of load and failure consequence. The risk matrix is developed for evaluating the risk of each power transformer. The high risk power transformer will be focused firstly. The computerized program is developed for practical use, and the maintenance strategy of a power transformer can be effectively managed.

Keywords: asset management, risk-based maintenance, power transformer, health index

Procedia PDF Downloads 280
10317 Geriatric Nutrition: An Important Marker for Oral Health Related Quality of Life of Complete Denture Patients

Authors: Rajlakshmi Banerjee, Sujoy Banerjee

Abstract:

The prevalence of malnutrition, as the most common cause of morbidity and mortality increases with old age, especially in developing countries like India, because of many factors out of which dentate status is one. It affects diet, nutritional status and general health due to reduced chewing ability and poor food choices. Aim and Objective: This study aimed to evaluate the effect of nutritional status, dietary intake on the Oral Health-related Quality of life (OHRQoL) of elderly edentulous complete denture wearing patients and to know whether they are at a higher risk of malnutrition. The objective was to assess the need to include dietary and nutritional counselling during Prosthodontic rehabilitation of elderly edentulous patients. Materials and method: A cross-sectional study was conducted among 200 elderly denture wearing patients above 60 yrs of age from Nagpur, Maharashtra. The majority of study subjects (60%) were between the age group 60 and 75 years. Mini-Nutritional Assessment (MNA) Questionnaire was used to assess nutritional status and General Oral Health Assessment Index (GOHAI) questionnaire was used to determine the Oral health related Quality of life of these patients.Descriptive statistics was used to analyze data using SPSS version 21. Results: Among the assessed subjects, nearly 80% of them had total scores of GOHAI between 12 and 57 which require ‘needed dental care.’ As per MNA, 10.5% had adequate nutrition, 70 % were at risk of malnutrition, and remaining 19.5 % of subjects were malnourished. There was a significant correlation between GOHAI and MNA scores. A strong association was found between mean GOHAI and MNA scores and thereby nutritional status and OHRQOL.Conclusion: The use of conventional dentures increases the risk of malnutrition in the elderly due to inability to eat and chew food properly and therefore severely affecting the quality of life. Dietary analysis and counselling should be strictly incorporated into geriatric treatment planning during Prosthetic rehabilitation.

Keywords: general oral health assessment index, General Oral Health Assessment Index (GOHAI), nutritional assessment, mini-nutritional assessment, Mini-Nutritional Assessment (MNA), quality of life

Procedia PDF Downloads 234
10316 Risk Assessment of Particulate Matter (PM10) in Makkah, Saudi Arabia

Authors: Turki M. Habeebullah, Atef M. F. Mohammed, Essam A. Morsy

Abstract:

In recent decades, particulate matter (PM10) have received much attention due to its potential adverse health impact and the subsequent need to better control or regulate these pollutants. The aim of this paper is focused on study risk assessment of PM10 in four different districts (Shebikah, Masfalah, Aziziyah, Awali) in Makkah, Saudi Arabia during the period from 1 Ramadan 1434 AH - 27 Safar 1435 AH. samples was collected by using Low Volume Sampler (LVS Low Volume Sampler) device and filtration method for estimating the total concentration of PM10. The study indicated that the mean PM10 concentrations were 254.6 (186.1 - 343.2) µg/m3 in Shebikah, 184.9 (145.6 - 271.4) µg/m3 in Masfalah, 162.4 (92.4 - 253.8) µg/m3 in Aziziyah, and 56.0 (44.5 - 119.8) µg/m3 in Awali. These values did not exceed the permissible limits in PME (340 µg/m3 as daily average). Furthermore, health assessment is carried out using AirQ2.2.3 model to estimate the number of hospital admissions due to respiratory diseases. The cumulative number of cases per 100,000 were 1534 (18-3050 case), which lower than that recorded in the United States, Malaysia. The concentration response coefficient was 0.49 (95% CI 0.05 - 0.70) per 10 μg/m3 increase of PM10.

Keywords: air pollution, respiratory diseases, airQ2.2.3, Makkah

Procedia PDF Downloads 427
10315 The Existence of Field Corn Networks on the Thailand-Burma Border under the Patron-Client Contract Farming System

Authors: Kettawa Boonprakarn, Jedsarid Sangkaphan, Bejapornd Deekhuntod, Nuntharat Suriyo

Abstract:

This study aimed to investigate the existence of field corn networks on the Thailand-Burma border under the patron-client contract farming system. The data of this qualitative study were collected through in-depth interviews with nine key informants. The results of the study revealed that the existence of the field corn networks was associated with the relationship where farmers had to share their crops with protectors in the areas under the influence of the KNU (Karen National Union) and the DKBA (Democratic Karen Buddhist Army) or Burmese soldiers. A Mae Liang, the person who starts a network has a connection with a Thaokae, Luk Rai Hua Chai or the head of a group of farmers, and farmers. They are under the patron-client system with trust and loyalty that enable the head of the group and the farmers in the Burma border side to remain under the same Mae Liang even though the business has been passed down to later generations.

Keywords: existence, field-corn networks, patron-client system, contract farming

Procedia PDF Downloads 243
10314 A Comparative Study of Self, Peer and Teacher Assessment Based on an English Writing Checklist

Authors: Xiaoting Shi, Xiaomei Ma

Abstract:

In higher education, students' self-assessment and peer assessment of compositions in writing classes can effectively improve their ability of evaluative judgment. However, students' self-assessment and peer assessment are not advocated by most teachers because of the significant difference in scoring compared with teacher assessment. This study used a multi-faceted Rasch model to explore whether an English writing checklist containing 30 descriptors can effectively improve rating consistency among self-assessment, peer assessment and teacher assessment. Meanwhile, a questionnaire was adopted to survey students’ and teachers’ attitudes toward self-assessment and peer assessment using the writing checklist. Results of the multi-faceted Rasch model analysis show that the writing checklist can effectively distinguish the students’ writing ability (separate coefficient = 2.05, separate reliability = 0.81, chi-square value (df = 32) = 123.4). Moreover, the results revealed that the checklist could improve rating consistency among self-assessment, peer assessment and teacher assessment. (separate coefficient = 1.71, separate reliability = 0.75, chi-square value (df=4) = 20.8). The results of the questionnaire showed that more than 85% of students and all teachers believed that the checklist had a good advantage in self-assessment and peer assessment, and they were willing to use the checklist to conduct self-assessment and peer assessment in class in the future.

Keywords: english writing, self-assessment, peer assessment, writing checklist

Procedia PDF Downloads 128
10313 Spatial Distribution, Characteristics, and Pollution Risk Assessment of Microplastics in Sediments from Karnaphuli River Estuary, Bangladesh

Authors: Md. Refat Jahan Rakiba, M. Belal Hossaina, Rakesh Kumarc, Md. Akram Ullaha, Sultan Al Nahiand, Nazmun Naher Rimaa, Tasrina Rabia Choudhury, Samia Islam Libaf, Jimmy Yub, Mayeen Uddin Khandakerg, Abdelmoneim Suliemanh, Mohamed Mahmoud Sayedi

Abstract:

Microplastics (MPs) have become an emerging global pollutant due to their wide spread and dispersion and potential threats to marine ecosystems. However, studies on MPs of estuarine and coastal ecosystems of Bangladesh are very limited or not available. In this study, we conducted the first study on the abundance, distribution, characteristics and potential risk assessment of microplastics in the sediment of Karnaphuli River estuary, Bangladesh. Microplastic particles were extracted from sediments of 30 stations along the estuary by density separation, and then enumerated and characterize by using steromicroscope and Fourier Transform Infrared (FT-IR) spectroscopy. In the collected sediment, the number of MPs varied from 22.29 - 59.5 items kg−1 of dry weight (DW) with an average of 1177 particles kg−1 DW. The mean abundance was higher in the downstream and left bank of estuary where the predominant shape, colour, and size of MPs were films (35%), white (19%), and >5000 μm (19%), respectively. The main polymer types were polyethylene terephthalate, polystyrene, polyethylene, cellulose, and nylon. MPs were found to pose risks (low to high) in the sediment of the estuary, with the highest risk occuring at one station near a sewage outlet, according to the results of risk analyses using the pollution risk index (PRI), polymer risk index (H), contamination factors (CFs), and pollution load index (PLI). The single value index, PLI clearly demonastated that all sampling sites were considerably polluted (as PLI >1) with microplastics. H values showed toxic polymers even in lower proportions possess higher polymeric hazard scores and vice versa. This investigation uncovered new insights on the status of MPs in the sediments of Karnaphuli River estuary, laying the groundwork for future research and control of microplastic pollution and management.

Keywords: microplastics, polymers, pollution risk assessment, Karnaphuli esttuary

Procedia PDF Downloads 46
10312 Factors Constraining the Utilization of Risk Management Strategies in the Execution of Public Construction Projects in North East Nigeria

Authors: S. U. Kunya, S. A. Mohammad

Abstract:

Construction projects in Nigeria are characterized with risks emanating from delays and accompanying cost-overruns. The aim of the study was to identify and assess factors constraining the utilization of risk management strategies in the execution of public construction project in North-East Nigeria. Data was collected with the aid of a well-structured questionnaire administered to three identified projects in the North-east. Data collected were analysed using the severity index. Findings revealed political involvement, selection of inexperienced contractors and lack of coordinated public sector strategy as the most severe factors constraining the utilization of risk management strategies. The study recommended that: formulation of laws to prevent negative political meddling in construction projects; selection of experienced, risk-informed contractors; and comprehensive risk assessment and planning on all public construction projects.

Keywords: factors, Nigeria, north-east, public projects, risk management, strategies, utilization

Procedia PDF Downloads 486
10311 Enterprise Risk Management: A Future Outlook

Authors: Ruchi Agarwal, Jake Ansell

Abstract:

Austerity impacts on all aspects of society. Companies into the future will have to be more capable of dealing with the risks they face. Enterprise Risk Management (ERM) has widely been accepted in recent years as an approach to manage risks within businesses. ERM attempts to tackle risk holistically with gains from opportunities in a managing risk and reduction in the risk of failure. The paper reviews merits and demerits of approaches to risk management in regard to antifragility. A qualitative study has investigated current practices and the problems with ERM implementation by interviewing over 25 chief risk officers and senior management. The findings indicate the gap in ERM description, understanding, and implementation. The paper suggests risk learning and expertise knowledge supports development of effective enterprise risk management by designing systems with inherent resilience.

Keywords: risk management, interviews, antifragility, failure

Procedia PDF Downloads 525
10310 Credit Risk and Financial Stability

Authors: Zidane Abderrezzaq

Abstract:

In contrast to recent successful developments in macro monetary policies, the modelling, measurement and management of systemic financial stability has remained problematical. Indeed, the focus of most effort has been on improving individual, rather than systemic, bank risk management; the Basel II objective has been to bring regulatory bank capital into line with the (sophisticated) banks’ assessment of their own economic capital. Even at the individual bank level there are concerns over appropriate diversification allowances, differing objectives of banks and regulators, the need for a buffer over regulatory minima, and the distinction between expected and unexpected losses (EL and UL). At the systemic level the quite complex and prescriptive content of Basel II raises dangers of ‘endogenous risk’ and procyclicality. Simulations suggest that this latter could be a serious problem. In an extension to the main analysis we study how liquidity effects interact with banking structure to produce a greater chance of systemic breakdown. We finally consider how the risk of contagion might depend on the degree of asymmetry (tiering) inherent in the structure of the banking system. A number of our results have important implications for public policy, which this paper also draws out.

Keywords: systemic stability, financial regulation, credit risk, systemic risk

Procedia PDF Downloads 348
10309 Suicide Wrongful Death: Standard of Care Problems Involving the Inaccurate Discernment of Lethal Risk When Focusing on the Elicitation of Suicide Ideation

Authors: Bill D. Geis

Abstract:

Suicide wrongful death forensic cases are the fastest rising tort in mental health law. It is estimated that suicide-related cases have accounted for 15% of U.S. malpractice claims since 2006. Most suicide-related personal injury claims fall into the legal category of “wrongful death.” Though mental health experts may be called on to address a range of forensic questions in wrongful death cases, the central consultation that most experts provide is about the negligence element—specifically, the issue of whether the clinician met the clinical standard of care in assessing, treating, and managing the deceased person’s mental health care. Standards of care, varying from U.S. state to state, are broad and address what a reasonable clinician might do in a similar circumstance. This fact leaves the issue of the suicide standard of care, in each case, up to forensic experts to put forth a reasoned estimate of what the standard of care should have been in the specific case under litigation. Because the general state guidelines for standard of care are broad, forensic experts are readily retained to provide scientific and clinical opinions about whether or not a clinician met the standard of care in their suicide assessment, treatment, and management of the case. In the past and in much of current practice, the assessment of suicide has centered on the elicitation of verbalized suicide ideation. Research in recent years, however, has indicated that the majority of persons who end their lives do not say they are suicidal at their last medical or psychiatric contact. Near-term risk assessment—that goes beyond verbalized suicide ideation—is needed. Our previous research employed structural equation modeling to predict lethal suicide risk--eight negative thought patterns (feeling like a burden on others, hopelessness, self-hatred, etc.) mediated by nine transdiagnostic clinical factors (mental torment, insomnia, substance abuse, PTSD intrusions, etc.) were combined to predict acute lethal suicide risk. This structural equation model, the Lethal Suicide Risk Pattern (LSRP), Acute model, had excellent goodness-of-fit [χ2(df) = 94.25(47)***, CFI = .98, RMSEA = .05, .90CI = .03-.06, p(RMSEA = .05) = .63. AIC = 340.25, ***p < .001.]. A further SEQ analysis was completed for this paper, adding a measure of Acute Suicide Ideation to the previous SEQ. Acceptable prediction model fit was no longer achieved [χ2(df) = 3.571, CFI > .953, RMSEA = .075, .90% CI = .065-.085, AIC = 529.550].This finding suggests that, in this additional study, immediate verbalized suicide ideation information was unhelpful in the assessment of lethal risk. The LSRP and other dynamic, near-term risk models (such as the Acute Suicide Affective Disorder Model and the Suicide Crisis Syndrome Model)—going beyond elicited suicide ideation—need to be incorporated into current clinical suicide assessment training. Without this training, the standard of care for suicide assessment is out of sync with current research—an emerging dilemma for the forensic evaluation of suicide wrongful death cases.

Keywords: forensic evaluation, standard of care, suicide, suicide assessment, wrongful death

Procedia PDF Downloads 39
10308 Identifying Understanding Expectations of School Administrators Regarding School Assessment

Authors: Eftah Bte. Moh Hj Abdullah, Izazol Binti Idris, Abd Aziz Bin Abd Shukor

Abstract:

This study aims to identify the understanding expectations of school administrators concerning school assessment. The researcher utilized a qualitative descriptive study on 19 administrators from three secondary schools in the North Kinta district. The respondents had been interviewed on their understanding expectations of school assessment using the focus group discussion method. Overall findings showed that the administrators’ understanding expectations of school assessment was weak; especially in terms of content focus, articulation across age and grade, transparency and fairness, as well as the pedagogical implications. Findings from interviews indicated that administrators explained their understanding expectations of school assessment from the aspect of school management, and not from the aspect of instructional leadership or specifically as assessment leaders. The study implications from the administrators’ understanding expectations may hint at the difficulty of the administrators to function as assessment leaders, in order to reduce their focus as manager, and move towards their primary role in the process of teaching and learning. The administrator, as assessment leaders, would be able to reach assessment goals via collaboration in identifying and listing teacher assessment competencies, how to construct assessment capacity, how to interpret assessment correctly, the use of assessment and how to use assessment information to communicate confidently and effectively to the public.

Keywords: assessment leaders, assessment goals, instructional leadership, understanding expectation of assessment

Procedia PDF Downloads 423
10307 Analyzing Risk and Expected Return of Lenders in the Shared Mortgage Program of Korea

Authors: Keunock Lew, Seungryul Ma

Abstract:

The paper analyzes risk and expected return of lenders who provide mortgage loans to households in the shared mortgage program of Korea. In 2013, the Korean government introduced the mortgage program to help low income householders to convert their renting into purchasing houses. The financial source for the mortgage program is the Urban Housing Fund set up by the Korean government. Through the program, low income households can borrow money from lenders to buy a house at a very low interest rate (e.g. 1 % per year) for a long time. The motivation of adopting this mortgage program by the Korean government is that the cost of renting houses has been rapidly increased especially in large urban areas during the past decade, which became financial difficulties to low income households who do not have their own houses. As the analysis methodology, the paper uses a spread sheet model for projecting cash flows of the mortgage product over the period of loan contract. It also employs Monte Carlo simulation method to analyze the risk and expected yield of the lenders with assumption that the future housing price and market rate of interest follow a stochastic process. The study results will give valuable implications to the Korean government and lenders who want to stabilize the mortgage program and innovate the related loan products.

Keywords: expected return, Monte Carlo simulation, risk, shared mortgage program

Procedia PDF Downloads 249
10306 Early Screening of Risk Ergonomics among Workers at Madura's Batik Industrial: Rapid Entire Body Assessment and Quick Exposure Checklist

Authors: Abdul Kadir, L. Meily Kurniawidjaja

Abstract:

Batik Madura workers are exposed to many Musculoskeletal Disorders risk factors, particularly Low Back Pain (LBP). This study was conducted as an early detection of ergonomic risk level on Workers Industrial Sentra Batik Madura in Dusun Banyumas, Klampar Subdistrict, Proppo Pamekasan, Madura, East Java. This study includes 12 workers who 11 workers had pain in the upper and lower part of the neck, back, wrist right hand, also 10 workers had pain in the right shoulder. This is a descriptive observational study with cross-sectional approach. Qualitative research by observing workers activity such as draw and putting the wax motif, fabric dyeing, fabric painting, discoloration, washing, and drying. The results are workers have identified ergonomic hazards such as awkward postures, twisting movements, repetitive, and static work postures. Using the method of REBA and QEC, the results get a very high-risk level of activity in each of Madura batik making process is the draw and putting the wax motif, coloring, painting, discoloration, washing, and drying. The level of risk can be reduced by improvement of work equipment include the provision of seats, strut fabric, high settings furnaces, drums, coloring basin, and washing tub.

Keywords: activities of Madura's batik, ergonomic risk level, equipment, QEC (Quick Exposure Checklist), REBA (Rapid Entire Body Assessment)

Procedia PDF Downloads 163
10305 Identifying Psychosocial, Autonomic, and Pain Sensitivity Risk Factors of Chronic Temporomandibular Disorder by Using Ridge Logistic Regression and Bootstrapping

Authors: Haolin Li, Eric Bair, Jane Monaco, Quefeng Li

Abstract:

The temporomandibular disorder (TMD) is a series of musculoskeletal disorders ranging from jaw pain to chronic debilitating pain, and the risk factors for the onset and maintenance of TMD are still unclear. Prior researches have shown that the potential risk factors for chronic TMD are related to psychosocial factors, autonomic functions, and pain sensitivity. Using data from the Orofacial Pain: Prospective Evaluation and Risk Assessment (OPPERA) study’s baseline case-control study, we examine whether the risk factors identified by prior researches are still statistically significant after taking all of the risk measures into account in one single model, and we also compare the relative influences of the risk factors in three different perspectives (psychosocial factors, autonomic functions, and pain sensitivity) on the chronic TMD. The statistical analysis is conducted by using ridge logistic regression and bootstrapping, in which the performance of the algorithms has been assessed using extensive simulation studies. The results support most of the findings of prior researches that there are many psychosocial and pain sensitivity measures that have significant associations with chronic TMD. However, it is surprising that most of the risk factors of autonomic functions have not presented significant associations with chronic TMD, as described by a prior research.

Keywords: autonomic function, OPPERA study, pain sensitivity, psychosocial measures, temporomandibular disorder

Procedia PDF Downloads 152